Page 1 of 5 REQUEST FOR PROPOSALS FOR
Transcription
Page 1 of 5 REQUEST FOR PROPOSALS FOR
REQUEST FOR PROPOSALS FOR PROFESSIONAL SERVICES FOR CIP 650570-100000 WOODWARD AVENUE SANITARY SEWER CIP 650890-100000 MEEKLYNN DRIVE SANITARY SEWER The City of Columbus, Ohio is inviting professional engineering consulting firms, or teams including such firms, to submit Proposals to furnish professional services for the City of Columbus, Department of Public Utilities, Division of Sewerage and Drainage (DOSD), for Capital Improvements Project Number 650570-100000 - WOODWARD AVENUE SANITARY SEWERS and CIP 650890-100000 MEEKLYNN DRIVE SANITARY SEWER. General Project Descriptions CIP 650570 - WOODWARD AVENUE SANITARY SEWER The City desires to provide new sanitary sewer service to a defined residential area that is currently served by on-lot home sewage treatment systems (HSTS). This project will investigate, design, and prepare construction drawings to extend existing sanitary sewers and provide new residential sanitary service taps for 14 existing homes which are served by HSTS systems along Woodward Avenue. The City has performed video inspection of the existing storm sewers in the area and has found evidence of sanitary discharge within the storm system. This project is located on the east side of Columbus along Woodward Avenue between Brentnell Avenue and Sunbury Road. The City wishes to utilize existing easements and/or existing road right of way for the new sanitary sewer(s) to minimize time to construction. However, a task to acquire easements has been included in the Project Scope and shall only be performed if authorized by the City. The selected consultant will need to coordinate the proposed sanitary sewer extensions with the consultant that designed storm sewers for this same area under CC-15722. Final construction plans for this storm improvement project were placed on hold due to the found sanitary problems. The consultant shall prepare a possible BCE case evaluation and a design report for the City which contains estimated costs to provide sanitary sewer service to this area. Upon successful review of the reports, the consultant will then prepare construction documents and plans to provide sanitary sewers for this area. The consultant may propose alternate design ideas that are shown to be cost effective and based on sound and proven engineering principles. CIP 650890 – MEEKLYNN DRIVE SANITARY SEWER The City desires to provide new sanitary sewer service to a defined residential area that is currently served by on-lot home sewage treatment systems (HSTS). This project will investigate, design, and prepare construction drawings to extend existing sanitary sewers and provide new residential sanitary service taps for 20 existing homes which are served by HSTS systems. This project is located on the northwest side of Columbus along Meeklynn Drive between Linworth Road and Olentangy River Road. The City wishes to utilize existing easements and/or existing road right of way for the new sanitary sewer(s) to minimize time to construction. However, a task to acquire easements has been included in the Project Scope and shall only be performed if authorized by the City. The selected consultant will need to coordinate the proposed sanitary sewer extensions with the consultant that designed storm sewers for this same area under CCPage 1 of 5 15573. Final construction plans for this storm improvement project were placed on hold due to the found sanitary problems. The consultant shall prepare a possible BCE case evaluation and a design report for the City which contains estimated costs to provide sanitary sewer service to this area. Upon successful review of the reports, the consultant will then prepare construction documents and plans to provide sanitary sewers for this area. The consultant may propose alternate design ideas that are shown to be cost effective and based on sound and proven engineering principles. General Design Requirements The lead Consultant shall be responsible for all work necessary to establish and/or verify existing tributary area conditions; proposed sanitary design flows in existing and extended sewer systems impacted by this improvement; securing existing plan information; perform additional investigations as required to design this improvement; prepare required hydraulic calculations; summarize all preliminary design findings, investigations, and recommendations into a possible BCE report and a final Letter Report; collect all necessary site survey information; prepare construction drawings, cost estimate(s), specifications, and bid documents; investigate need for and document all required construction permits (such as zoning, electrical, building, regulatory (EPA, City, etc.); prepare, submit, and secure all such construction permits; review construction shop drawing submittals and associated documents during construction of this project. The lead consultant shall submit a letter report, construction plans in CC drawing format, specification documents, and complete all project tasks (excluding construction phase) for this project within 365 days after the notice to proceed is issued. The lead Consultant shall submit information to document prior experience and qualifications of the Design Team members. The team shall have previous experience in the design of sanitary and storm sewer systems. Team members shall be capable of submitting observations and/or recommending design changes for efficient sanitary sewer design. The team members shall research various alternatives and recommend the most economical and best solution to the City. The final project submittal will include the production of all design documents, drawings, specifications and contract documents required to construct the proposed facilities. This work shall also include utility conflict sewer redesign and shop drawing review services during construction. Selection Process Proposals will be reviewed by the City and the City will enter into contract negotiations with the two (2) highest ranked offerors. Each successful offeror shall receive a single project. If negotiations fail with an offeror they shall be terminated and the City will enter into contract negotiations with the next highest ranked offeror. This process will continue until both contracts are successfully negotiated. Selection of professional services for this work shall conform to all applicable requirements of Columbus City Codes, 1959, particularly Title 3 and Section 329.14 thereof. All offerors and all Page 2 of 5 subcontract entities proposed shall have City of Columbus Contract Compliance Certificate Numbers (CCCNs). Offerors shall include a listing of CCCNs for themselves and their proposed subcontractors in their Proposals or shall include completed applications for certification. Applications for certification are available from: EQUAL BUSINESS OPPORTUNITY COMMISSION OFFICE (EBOCO) Tia Roseboro, Contract Compliance Investigator 1393 East Broad Street, Second Floor Columbus, Ohio 43205 Telephone: 614-645-4764 The selection process will be conducted by an Evaluation Committee consisting of representatives from the Department of Public Utilities. The contact person for the selection will be: Mr. Paul B. Roseberry, P.E. Division of Sewerage and Drainage PBRoseberry@Columbus.gov Telephone: 614-645-3728 Selection Schedule 1. All offerors are required to obtain an information package containing instructions on the expected format for the Proposal. These may be obtained at: Division of Sewerage and Drainage, Room 1021B Sewer Systems Engineering Section 1250 Fairwood Avenue Columbus, Ohio 43206 Information packages will be available beginning Wednesday June 25, 2014. There is no charge for the first information package. There will be a charge of $25.00 for subsequent packages. 2. Proposals will be received by the City until 4:30 p.m., Friday July 25, 2014. No Proposals will be accepted thereafter. Direct Proposals to: Mr. John G. Newsome, P.E. Sewer Systems Engineering Manager Division of Sewerage and Drainage 1250 Fairwood Avenue Columbus, Ohio 43206 3. A single proposal shall be submitted as outlined below. The Proposal shall include separate detailed Project Approach sections for each CIP. The Proposals shall be furnished in five (5) identical copies and clearly marked “Proposal for the WOODWARD AVENUE AND MEEKLYNN DRIVE SANITARY SEWERS”. Proposals shall be bound in plastic slant D 3-ring binders, and shall not exceed thirty (30) double-sided (60 total) pages in length, excluding resumes and exhibits. Note that “Competence to Perform” as defined by the Page 3 of 5 Evaluation Criteria shall be demonstrated through resumes and not in the text of the proposal. Resumes should reference only experience that is relevant or beneficial to the project goals. 4. After receiving the Proposals, the Committee will evaluate the submittals based on the criteria specified as detailed below and will select the two (2) highest ranked offerors for contract negotiation. If two (2) or less proposals are received, the City may re-advertise. 5. The Committee may request that some offerors make a presentation to the Committee to elaborate on their proposals and/or any other pertinent information. 6. The Committee will submit a written explanation of the basis for its recommendation, to the Director of the Department of Public Utilities for final approval. 7. Contract negotiations will then commence with the two (2) highest ranked offerors. If negotiations fail with the selected offerors on either project, the City may enter into negotiations with the next highest offeror(s). Minimum Qualifications The included resumes for members of the Consultant Design Team must possess multiple years of previous design experience in the following categories: 1. Design of sanitary and storm sewers, street repair, sidewalk and handicap ramp design, project investigation, construction drawings and bid documents, preparation and securing of permits for construction of sanitary sewers, and construction shop drawing review. 2. Project proposal must clearly demonstrate the above listed minimum qualifications of the project design team. The firm or team must have the ability to perform these services in an expeditious manner given its existing backlog of work. Evaluation Criteria Each proposal will initially be evaluated as to whether the proposed team meets the established minimum qualifications to perform the work competently. Only teams meeting these minimum qualifications will be evaluated further per the detailed evaluation criteria included in the information package. 1. Quality of Proposal – Consultant understands the project intent and demonstrates a thorough knowledge of all work items necessary to accomplish project objectives. (35 Points) 2. Competence to Perform Work – The Consultant demonstrates the education, training and experience to complete the project while assigning the tasks properly. (30 Points) Page 4 of 5 3. Project Schedule – The Consultant has demonstrated a thorough knowledge of the amount of hours necessary to complete the work and has adequately incorporated these durations into the project timeline. (5 Points) 4. Past Performance – The Consultant has previously completed projects of similar size and complexity with attention to quality of work, cost control, and meeting deadlines. (5 Points) 5. Ability to Perform – The Consultant has demonstrated an ability to perform the required services competently and expeditiously through the availability of necessary personnel, equipment and facilities. (5 Points) 6. Local Workforce Breakdown – The Consultant has adequately provided a breakdown of the office locations that would execute the work. (20 Points) Greg J. Davies Director Department of Public Utilities Page 5 of 5 INFORMATION PACKAGE FOR CITY OF COLUMBUS DEPARTMENT OF PUBLIC UTILITIES DIVISION OF SEWERAGE AND DRAINAGE REQUEST FOR TECHNICAL PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES CIP 650570-100000 – WOODWARD AVENUE SANITARY SEWERS CIP 650890-100000 – MEEKLYNN DRIVE SANITARY SEWERS 1. Instructions for Proposal Submittal, (3 pages). 2. Evaluation Criteria, (2 pages). 3. Proposed Professional Engineering Services Agreement, (10 pages). 4. Professional Consultant Reimbursement Policy, (7 pages). 5. Notice of Equal Business Opportunity Requirements, (1 page). 6. Scope of Services Attachment, (13 pages). 7. Exhibits A – C Woodward/Meeklynn (4 pages). 8. Exhibit D – Woodward/Meeklynn (1 page). 9. Exhibit E – Site Map Woodward (1 page). 10. Exhibit E – Site Map Meeklynn (1 page). 11. Excel Version of Exhibits A-C (4 pages) Page 1 of 1 INSTRUCTIONS FOR PROPOSAL SUBMITTAL Proposals will be received by the City until 4:30 P.M. on Friday July 25, 2014. No Proposal will be accepted thereafter. Direct Proposals to: John G. Newsome, P.E. Sewer Systems Engineering Manager Division of Sewerage and Drainage 1250 Fairwood Avenue Columbus, Ohio 43206-3372 Questions will be received by the City in writing until 4:30 P.M. on Wednesday July 16, 2014. No questions will be accepted thereafter. Answers to RFP questions will be given and addenda will be issued by Friday July 18, 2014. Direct Questions to: Paul B. Roseberry, P.E. Project Manager - Sewer Systems Engineering Section Division of Sewerage and Drainage 1250 Fairwood Avenue Columbus, Ohio 43206-3372 Telephone: 614-645-3728 PBRoseberry@Columbus.gov A single proposal shall be submitted as outlined below. The Proposal shall include separate detailed Project Approach sections for each CIP. The Proposals shall be furnished in five (5) identical copies and clearly marked “Proposal for the WOODWARD AVENUE AND MEEKLYNN DRIVE SANITARY SEWERS”. Proposals shall be bound in plastic slant D 3-ring binders, and shall not exceed thirty (30) double-sided (60 total) pages in length, excluding resumes and exhibits. Note that “Competence to Perform” as defined by the Evaluation Criteria shall be demonstrated through resumes and not in the text of the proposal. Resumes should reference only experience that is relevant or beneficial to the project goals. The ENGINEER shall provide completed copies of the following Exhibits for each project, which are found in the "APPENDIX": Exhibit A -"Project Time Schedule", Exhibit B - "Estimate of Cost Allocation by Task Activity", Exhibit B.1 – “Maximum Hourly Rate Schedule”, Exhibit C - "Cost Summary", and Exhibit D – “Local Work Force Breakdown”. Final versions of these documents shall be incorporated into the Contract. A copy of the transmittal letter should be inserted into each binder. The Proposals shall contain the following: Page 1 of 3 Section 1 - Proposed Project Approach Provide the proposed technical approach to complete each project along with any proposed deviation from, and changes to, the attached preliminary Scopes of Services. Provide separate hours and costs for any proposed changes to the Scope in Exhibits B and C, for each project. General project approach shall be stated once in this section. Project approach details pertinent to each specific project shall be stated in separate subsections, clearly denoted by the project title. Provide an organizational chart indicating roles of project team members including subconsultants, if any. Clearly identify tasks to be performed by any sub-consultant proposed as part of the project team. Provide Minority or Female Business Enterprise (MBE/FBE) status of any firm proposed for utilization on this contract. For more information regarding MBE/FBE participation, please refer to the enclosed “Notice of Equal Business Opportunity Requirements” sheet. Section 2 - Experience Include current, updated resumes of key team members. Resumes should depict relevant projects only for those personnel in roles for which work will be assigned. Indicate the home office of that team member. This section shall be provided only once in the proposal. For project leadership, note specific competencies, experience, and skills related to performance of proposed contract. For project team leaders, indicate current City commitments. Section 3 - Estimated Hours/Cost Complete Exhibits A through D for each project. When completing Exhibit C, please make note of the Consultant Reimbursement Policy in the enclosed Professional Services Agreement. The Consultant Reimbursement Policy covers allowable reimbursable expenses and items that must be accounted for in overhead. The Engineer shall further provide an Exhibit C – Cost Summary for each proposed subcontractor for which the basis of payment is direct labor hours. When completing Exhibit D, the ENGINEER shall provide a detailed self-evaluation of staff and sub-consultant utilization estimated for this project in accordance with the Evaluation Criteria. The local workforce information requested shall be detailed enough to enable the City to complete its own evaluation. Separate Exhibit A -"Project Time Schedule", Exhibit B - "Estimate of Cost Allocation by Task Activity", Exhibit B.1 – “Maximum Hourly Rate Schedule”, Exhibit C - "Cost Summary", and Exhibit D – “Local Work Force Breakdown” shall be provided for each project. Page 2 of 3 Proposals will be evaluated based on the enclosed selection criteria and in accordance with Columbus City Code, Title 3, Section 329.14. The City will enter into contract negotiations with the two (2) highest ranked offerors. Each offeror shall receive one project. If negotiations fail with an offeror, they shall be terminated and the City will enter into contract negotiations with the next highest ranked offeror. This process will continue until both contracts are successfully negotiated. Please be advised that proposals submitted to the City are subject to applicable federal, state, and local public information disclosure regulations. Requests to view a proposal will be arranged only upon receipt by the City of a written request for such; therefore, any proposal may be subject to viewing by the public. If any information contained in the documents submitted is deemed proprietary in nature, the offeror is required to defend the City concerning any litigation arising from the offeror’s request for confidentiality. Page 3 of 3 REQUEST FOR PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES FOR CIP 650570 – WOODWARD AVENUE SANITARY SEWERS CIP 650890 – MEEKLYNN DRIVE SANITARY SEWERS Proposal Evaluation Criteria • Proposal Quality: 35 Points Total How easily does the proposal lend itself to review and evaluation? (5 points) How effectively does the Offeror’s approach address project requirements? (10 points) Does Offeror demonstrate knowledge of sanitary sewer design? (15 points) Does Offeror possess experience for the evaluation of the utilization of environmentally beneficial methods and technologies? (5 points) • Competence to Perform: 30 Points Total Does project manager demonstrate education/training/experience with sanitary sewer design? (15 points) Are other personnel assigned to tasks that fit their prior education, training, experience? (5 points) Do subconsultants demonstrate experience with assigned project tasks? (10 points) • Project Schedule: 5 Points Total Did Offeror present a realistic and achievable project timeline and hours? (5 points) • Past Performance: 5 Points Total Does the Team demonstrate a successful history of completed engineering design for DOSD, and other City Divisions or municipalities, while controlling project costs, meeting deadlines and completing projects on time and within budget? (5 points) • Ability to Perform: 5 Points Total Does the Team have the ability to perform the required service competently and expeditiously as indicated by their provided DPU backlog, the availability of necessary personnel, equipment, and facilities? (5 points) • Local Workforce: 20 Points Total At least 90% of the Team’s project labor costs are assignable to employees paying City of Columbus income tax on the date the proposal is submitted, or at least 90% of the Team’s project labor costs are assignable to the office location within Franklin County if office established prior to 1995. (20 points) At least 75% of the Team’s project labor costs are assignable to employees paying City of Columbus income tax on the date the proposal is submitted. (15 points) At least 90% of the Team’s labor will be performed in an office location within Franklin County but outside of the Columbus Corporate Limits on the date the proposal is submitted. (15 points) Page 1 of 2 At least 50% of the Team’s project labor costs are assignable to employees paying City of Columbus income tax on the date the proposal is submitted. (10 points) Less than 50% of the team is paying Columbus income tax on the date the proposal is submitted. (0 points) Note: The offeror shall indicate their percentage of local workforce and show how this number was determined and indicate the year local office was established in Columbus. The Team includes the prime consultant and all subconsultants. TOTAL: Page 2 of 2 100 Points AGREEMENT BETWEEN THE CITY OF COLUMBUS, OHIO AND CONSULTANT FOR WOODWARD AVENUE SANITARY SEWERS CAPITAL IMPROVEMENTS PROJECT NO. 650570-100000 MEEKLYNN DRIVE SANITARY SEWERS CAPITAL IMPROVEMENTS PROJECT NO. 650890-100000 SECTION I - GENERAL: This Agreement entered into this day of , 20 by and between the City of Columbus, Ohio, acting through the Director of Public Utilities, pursuant to and under the authority of Ordinance No. , passed , by the Council of the City of Columbus and approved by the Mayor of said City, hereinafter designated as the City, and CONSULTANT, hereinafter designated as the Engineer. WITNESSETH: That the Engineer for the consideration hereinafter named, agrees to perform professional engineering services as requested by the City, and described elsewhere in this Agreement, for professional engineering services on the following Project: WOODWARD AVENUE SANITARY SEWERS CAPITAL IMPROVEMENTS PROJECT NO. 650570-100000 MEEKLYNN DRIVE SANITARY SEWERS CAPITAL IMPROVEMENTS PROJECT NO. 650890-100000 SECTION II - SERVICES BY THE ENGINEER: 1. The Engineer shall provide such professional engineering services as may be necessary to accomplish the work and shall at its cost furnish all necessary personnel, equipment, and materials to competently perform the work. 2. The Engineer shall be responsible for the professional quality, technical accuracy, timely completion, and the coordination of all reports, preliminary plans, designs, drawings, specifications, bid documents and other services furnished for the City by the Engineer. 3. In the performance of all services incident to this Agreement, the Engineer shall comply fully with all applicable laws, court decisions, and administrative regulations, and with all regulations and rules of the City. The Engineer shall also consider the substantial impacts of its recommended design on the personnel and operational procedures of the Division of Sewerage and Drainage and which the Engineer is aware, and shall identify such impacts to Page 1 of 10 the City. The Engineer shall not proceed with detailed designs in areas so impacted without the approval of the City. 4. The Engineer shall, to the best of its ability, obtain access to private and public property as necessary to perform surveys, observations, and other studies needed to perform the services under this Agreement. The Engineer shall comply with the notification Ohio Rev. Code 163.03 in obtaining such access. The City shall cooperate with the Engineer in attempting to such access. 5. SCOPE OF SERVICES: See Attachment No. 1 for the description of the scope of services. SECTION III –CITY RESPONSIBILITIES 1. The City shall provide to the Engineers all known criteria and information as to the City’s requirements for the project, including design objectives and constraints, performance requirements, flexibility and expendability, and any budgetary limitations, and furnish copies of all design and construction standards which the City will require to be included in the bid Documents. 2. The City shall make available for the use of the Engineer, copies of all existing information in the possession of the City which may be pertinent to the performance of the professional engineering services under this Agreement, including but not limited to core borings, probings, and/or subsurface explorations, hydrographic surveys, laboratory tests and records of existing facilities. 3. So as not to delay the engineering work, the City shall respond within a reasonable time to the Engineer's requests for written decisions and determinations pertaining to the Project. The City shall not, however, be responsible for professional engineering judgments. 4. The City shall give written notice to the Engineer whenever the City becomes aware of any event, occurrence, condition or circumstance which may substantially affect the Engineer's performance of services under this Agreement. 5. The City shall examine all studies, reports, drawings, specifications, proposals and other documents presented by the Engineer. 6. The City shall assist and cooperate with the Engineer to allow the professional engineering services to be executed in a timely and effective manner. SECTION IV – STANDARDS OF PERFORMANCE, ERRORS AND OMMISSIONS 1. Services provided by the Engineer under this agreement shall be performed in a manner consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. 2. The City shall not be responsible for discovering deficiencies in the technical accuracy of Engineer’s service. The Engineer shall be solely responsible for the accuracy of the services and shall promptly make necessary revisions or corrections resulting from its negligent acts, errors or omissions without any additional compensation from the City. 3. Acceptance of services, including payment for same, shall not relieve the Engineer of responsibility for subsequent correction of its negligent acts, errors, omissions, or for clarification of ambiguities. During construction or any other phase of work performed by others based on service provided by Engineer, the Engineer shall confer with the City when necessary for the purpose of interpreting the information, and/or to correct any negligent act, error, or omission without additional compensation, even though final payment may have Page 2 of 10 been received by the Engineer. The Engineer shall give immediate attention to these corrections and/or changes so there will be no delay to the construction contractor. 4. In the event of any negligent act, error or omission that is the responsibility of the Engineer in any phase of the service, the correction, repair or reconstruction of which may require additional field or office work, the Engineer shall be promptly notified by the City and shall be required to perform such corrective services as may be necessary without delay and without additional cost to the City. SECTION V - COMPENSATION: The City agrees to pay the Engineer for professional services rendered under Section 2 in an amount equal to the Direct Labor Cost, plus the Indirect Costs, plus other Direct Costs, including Reimbursable Expenses and Sub-agreement costs all as hereinafter defined and documented within Appendix B, “Estimate of Labor Hours” and Appendix C, “Cost Summary” for each project. A. Direct Labor Costs shall be defined as the product of the actual number of man-hours worked by each of the Engineer’s employees, in performing services under this Agreement times the hourly salary rate paid by the Engineer to each such employee. The direct labor rates billed by the Engineer shall be the actual hourly rates paid to employees of the Engineer. These rates shall not exceed those established within “Cost Summary”. For the purpose of this Agreement, the hourly salary rate for principals of the Engineer, to the extent they perform technical or advisory services directly applicable to the Project, shall not exceed the rates shown in “Cost Summary”, unless agreed to in writing prior to such services being performed. B. Indirect Costs shall be defined as the Engineer’s overhead expense, general administrative, benefits, taxes, utilities, rent, debt service and other non-project-specific expenses which are incurred for the performance of the Engineer’s specific projects, and which are allocable to the services performed under this Agreement. Indirect costs shall be calculated as a percentage of the Direct Labor Costs and shall be as shown in “Cost Summary”. C. Payroll Costs are stipulated and agreed to be as shown in “Cost Summary” of the actual salaries (direct labor) of all personnel employed on the Project. Overhead shall be defined as the Indirect Costs/Direct Labor Costs and shall be calculated as a multiplier. D. Profit shall be defined as the Engineer’s Expected Rate of Return and shall be calculated as a multiplier. E. The Hourly Cost Multiplier (HCM) shall be calculated as [1 + Overhead + Profit] and shall be shown in the “Cost Summary.” F. The Engineer shall be reimbursed for the cost of all subcontract services in accordance with the sub-agreements upon submitting and validating the sub-consultant services and approving work as being performed satisfactorily. The Engineer shall not be allowed to markup any sub-consultant charges. The sub-agreement contract amount cannot be exceeded without authorization from the City’s Contract Administrator and City Council approval, if required. G. During the project it may become necessary to obtain additional professional engineering, survey and technical services that were not foreseen prior to the development of the original scope of services. The City may provide contingency funding in an amount as shown in each Appendix C, “Cost Summary”. If it is determined that additional services are required, the City may request a proposal from the Engineer for said services. This contingency shall be utilized only upon issuance of Page 3 of 10 explicit, written authorization of the City’s Contract Administrator, prior to the work being performed. 1. Any provision in this Agreement to the contrary notwithstanding, the maximum obligation of the City for services described in this agreement is limited to the amount of $_____________________, unless this Agreement is modified in writing after City Council has enacted an ordinance, which has been approved by the Mayor and certified by the Auditor, authorizing additional funds. The City is not obligated to spend the maximum obligation authorized under this Agreement. 2. During the performance of services under this Agreement, the Engineer shall submit detailed invoices for payment monthly. Invoices shall be in the format requested by the City, shall be accompanied by adequate supporting documentation, and shall include a brief progress report delineating the progress on each task of the services described herein, including any deviations from the Project Time Schedule. 3. The Engineer shall furnish Affidavits of Payment for all subcontractors, and for major suppliers, to the City for all monthly invoices, and when requesting final payment for services under this Agreement. 4. Reimbursable expenses shall be limited to those proposed within Appendix C, “Cost Summary”, unless written approval for additional expenses is authorized by the City during the prosecution of the contracted scope of service. These expenses shall be limited to the actual cost borne by the Engineer, and shall be evidenced by proof of expenditure at the time of invoice to the City. The Engineer stipulates herein that they have incorporated all expenses associated with the day-to-day operations of providing the professional services outlined within Section 2 herein, within the indirect overhead rate shown in the “Cost Summary”. These overhead expenses include but shall not be limited to the following: local and long distance phone service; fax transmissions, photocopies, routine courier services, cellular phone services, computer aided design drafting expenses; survey supplies, office supplies, field supplies unless itemized on Appendix C, “Cost Summary”, and routine transportation costs associated with the project. The Engineer shall be reimbursed the costs of transportation, meals and lodging in connection with any employee who performs specialized services under this contract from any office not located in Columbus, Ohio. The reimbursement rate paid for automobile mileage shall be at the Standard Mileage Rate allowable by the U.S. Internal Revenue Service as of the date the mileage is incurred. Reimbursable expenses shall conform to the most current version of the "Guidelines For Reimbursable Expenses Under Professional Services Contracts" of the Division of Sewerage and Drainage, which is attached hereto. In case of disagreement between the Guidelines and this Agreement on particular reimbursable items, the Agreement shall govern. Particular provisions of the Guidelines may be modified by the City, in writing, to suit particular circumstances. 5. The Engineer is responsible to maintain a Master List of non-expendable personal property purchased and approved by the City for the work as Reimbursable Expenses. Nonexpended personal property shall be delivered to the City’s representative upon completion of the Engineer’s service and shall conform to the Master List. SECTION VI - CHANGES: No changes to this Agreement will be effective unless they are contained in a written modification, signed by both parties. The City may, at any time during the performance of the services under this Agreement, request a modification of the Agreement. Upon execution of Page 4 of 10 such modification by both parties hereto, it shall be fully incorporated into this Agreement and shall govern all subsequent performance under the Agreement. SECTION VII - TIME SCHEDULE: The time schedule for the performance of services under this Agreement shall be as set forth in the attached Attachment No. 2, Exhibit A, “Project Time Schedule”. The Engineer shall adhere to and comply with the Project Time Schedule as set forth in these Exhibits. SECTION VIII - SUSPENSION OF SERVICES: The City may order the Engineer, in writing, to suspend, delay or interrupt all or any part of the services for such period of time as may be determined to be appropriate for the convenience of the City. In the event of such a suspension, the Engineer may be entitled to extra compensation for damages if there are documented wage or material cost increases; however, the Engineer shall make no claim for lost profit, office overhead or other damages. SECTION IX - RECORDS TO BE MAINTAINED, ACCESS TO RECORDS: 1. The Engineer shall maintain account books, records, documents and other evidence directly pertinent to performance and billing of the services defined in this Agreement in accordance with generally accepted professional engineering and accounting practices. The Engineer shall also maintain the financial information and data used by the Engineer in the preparation or support of the Statements of Probable Construction Costs to the City. The City, or its duly authorized representative, shall have access to such account books, records, documents, and other evidence for the purpose of inspection, audit and copying. The Engineer shall provide proper facilities for such access and inspection. 2. The Engineer shall maintain copies of the complete engineering records documents of the design and execution of the Project, including, but not limited to, survey notes, computations, design development documents, logs, physical investigations, correspondence, material submittals, and photographs, (this requirement only applies to documents, not physical samples of soil borings, etc.) as necessary to assist in the defense of any legal action claiming professional liability or neglect of duty which may involve the City. The City shall also have access to these engineering records. These records shall be maintained for a period of not less than 15 years after substantial completion or termination of the Project. 3. The Engineer shall maintain and make available accounting records during performance of the services under this Agreement and until three years from date of final payment for the Project. In addition, those records which relate to any appeal, agreement, litigation, or the settlement of claims arising out of such performance or cost, or items to which an audit exception has been taken, shall be maintained and made available until three years after the date of resolution of such appeals, litigation, claims, or exception. 4. Upon completion of the project, the Engineer shall provide to the City electronic copies of all drawings with field corrections noted (record documents). SECTION X - INSURANCE AND INDEMNITY: 1. The Engineer shall comply with all Worker's Compensation laws of the State of Ohio and shall carry at least the following minimum private insurance coverages: A. Public Liability and Automobile Insurance in an amount not less than Five Hundred Thousand Dollars ($500,000.00) for injuries, including those resulting in death, to any one person, and in an amount not less than One Million Dollars ($1,000,000.00) on account of any one accident or occurrence. Property damage insurance in an Page 5 of 10 amount not less than Five Hundred Thousand Dollars ($500,000.00) from damages on account of any one accident or occurrence. Said insurance shall be maintained in full force and effect during the life of this Agreement and shall protect the Engineer, its employees, agents, and representatives from claims for damages for personal injury and wrongful death and for damages to property arising in any manner from the negligent or wrongful acts, errors or omissions of the Engineer, its employees, agents or representatives in the performance of the services under this Agreement. B. Valuable Papers Insurance in an amount sufficient to assure the restoration of any drawings, project manual pages, field notes, or other similar data relating to the work under this Agreement, in the event of their loss or destruction, during the life of this Agreement. C. Professional Liability Insurance in an amount as necessary to provide coverage for any negligent acts, errors, omissions or negligence by the Engineer and its technical subcontractors. Subcontractors of the Engineer who are manifestly not providing professional services need not carry Professional Liability Insurance. 2. The Engineer shall indemnify and save harmless the City from any claims or liabilities, of any type or nature to any person, firm or corporation, to the proportional extent arising in any manner from the Engineer's negligent performance of the work covered by this Agreement, and shall pay it’s proportional share of any judgment obtained or growing out of said claim or liabilities. 3. Certificates showing the Engineer is carrying the above described insurance in at least the above specified minimum amounts shall be furnished to the City before the City is obligated to make any payment to the Engineer for the services under this Agreement. Such certificates shall name the City as an additional insured party under all coverages except professional liability and workers compensation, and shall provide for notice to the City not less than 30 days prior to the effective date of any modification or cancellation of any coverage. SECTION XI - TERMINATION: 1. The City may, at any time prior to the completion of full performance by the Engineer, terminate the Agreement by written notice by registered mail not less than fifteen days prior to the effective date of its intention to do so. Such termination may be for cause or for the convenience of the City. 2. If the termination is for the City's convenience, payment to the Engineer will be made promptly for the amount of any fees earned to the effective date of the notice of termination, less any payments previously made. Such requests for reimbursement shall be supported with factual data and shall be subject to the City's approval. 3. The City may terminate this Agreement for cause if the Engineer has substantially failed to perform in accordance with the terms of the agreement, including but not limited to the requirement that the Project be completed in a timely manner. If the termination is for cause, the City shall compensate the Engineer the amount of any fees earned prior to the effective date of the notice of termination, less any payments previously made and less any amount retained by the City to defer additional cost the City may sustain in connection with the unsatisfactory performance of the Engineer, including but not limited to costs associated with finishing the project. Page 6 of 10 4. In the event that the City terminates the Agreement for cause pursuant to this section, and it later determined that the City did not have sufficient cause for the termination, the City shall compensate the Engineer as if it had terminated the Agreement for its convenience. 5. In the event the Agreement is terminated prior to its completion, the Engineer, upon payment as specified in this section, shall deliver to the City all project reports, field books, drawing and other documents, including electronic files and CAD files, which have been prepared in the course of the work done under this Agreement. All such material shall become and remain the property of the City, to be used in such manner and for such purpose as the City may choose. The Engineer shall not be responsible for any reuse of the project documents for any purpose other than that for which such documents were originally prepared, or for any alteration of such documents and the City releases the Engineer from any liability arising from any such alteration. The Engineer shall be entitled to keep copies of all documents provided to the City. It is further agreed that in the event the City shall terminate this Agreement due to failure to properly perform in a manner satisfactory to the Director of Public Utilities, the City may make such arrangements as it desires for the completion of the Project. 6. The Engineer shall make no claim for additional compensation against the City by reason of such termination, beyond the amounts described in this section. SECTION XII - NON-DISCRIMINATION: 1. The Engineer will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Engineer will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment upgrading, demotion, or termination; rates of pay or other forms of compensation; and selection for training. The Engineer agrees to post in conspicuous places, available to employees and applicants for employment, notices summarizing the provisions of this Non-discrimination Clause. 2. The Engineer will, in all solicitations or advertisements for employees placed by or on behalf of the Engineer, state that the Engineer is an equal opportunity employer. 3. It is the policy of the City that business concerns owned and operated by minority and female persons shall have the maximum practicable opportunity to participate in the performance of contracts awarded by the City. 4. The Engineer shall permit access to any relevant and pertinent reports and documents by the Executive Director of the Equal Business Opportunity Commission Office (EBOCO) for the sole purpose of verifying compliance with Article I of Title 39, Columbus City Codes, and with the regulations of the Contract Compliance Office. All such materials provided to the Executive Director by the Engineer shall be considered confidential. 5. The Engineer will not obstruct or hinder the Executive Director or the Executive Director’s deputies, staff, and assistants in the fulfillment of the duties and responsibilities imposed by Article I, Title 39. 6. The Engineer and each subcontractor will include a summary of this Equal Opportunity Clause in every subcontract. The Engineer will take such action with respect to any subcontractor as is necessary as a means of enforcing the provisions of the Equal Opportunity Clause. Page 7 of 10 7. The Engineer shall not subcontract any part of this contract to a contractor not holding a valid certification number as provided for in Article I, Title 39. 8. Failure or refusal of the Engineer or any of its subcontractors to comply with the provisions of Article I, Title 39 may result in cancellation of this contract. (Ord. 1178-95). SECTION XIII - CITY INCOME TAX TO BE WITHHELD: The Engineer will withhold all City Income Taxes due or payable under the provisions of Chapter 361, Columbus City Codes, for wages, salaries, and commissions paid to its employees and further agrees, that its subcontractors shall be required to agree to withhold any such City Income Taxes due under this chapter for services under this Agreement. SECTION XIV - REMEDIES: All claims, counterclaims, disputes and other matters in question between the City and the Engineer, including their agents, employees, subcontractors, consultants or other subordinate parties arising out of or relating to this Agreement or its breach shall be decided in a court of competent jurisdiction within the County of Franklin, State of Ohio. This Agreement is to be governed by and interpreted in accordance with the law of the State of Ohio. SECTION XV – CITY APPROVAL AND ACCEPTANCE: Approvals by the City of drawings, designs, specifications, reports and incidental engineering work or materials furnished hereunder shall not in any way relieve the Engineer of responsibility for the technical adequacy of the work. Neither the City's review, approval or acceptance of, nor payment for, any of the services shall be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement, and the Engineer shall be and remain liable in accordance with applicable law for all damages to the City caused by the Engineer’s negligent performance of any of the services furnished under this Agreement. SECTION XVI - CONFLICTS OF INTEREST; OBJECTIVITY: In the performance of services under this Agreement, the Engineer shall endeavor at all times to render objective and impartial technical and other judgments in all matters. To avoid compromise of the objective spirit required for such service, the Engineer shall not: 1. Employ any sub-consultant who is actually or potentially a supplier of items specified in the design, to be furnished in the construction work; this does not preclude obtaining assistance, advice or information from such suppliers. 2. Maintain a business interest in any of the equipment or patented processes specified in the design. The Engineer will inform the City of any business connections, interest of circumstances which may be deemed as influencing its judgment or quality of its services. SECTION XVII - INCORPORATION BY REFERENCE: The following documents are hereby incorporated into and made part of the Contract as though specifically rewritten herein: 1. 2. 3. Attachment No. 1, Detailed Scope of Services Attachment No. 2, Exhibit A, Project Time Schedule Attachment No. 3, Exhibit B, Estimate of Cost Allocation by Task Activity Page 8 of 10 4. 5. 6. Attachment No. 4, Exhibit B.1, Maximum Hourly Rate Schedule Attachment No. 5, Exhibit C, Cost Summary Attachment No. 6, Exhibit D, Local Workforce Breakdown SECTION XVIII – ENVIRONMENTALLY PREFERRED PURCHASING In evaluation of this bid pursuant to the City of Columbus Code (329.31 Environmentally Preferable Purchasing) preference shall be given to an environmentally preferable bidder. The bidder that will be considered environmentally preferred will have (but not limited to) products with one or more of the following certifications: Green Seal, ISO14001, Energy Star, SCS or other Eco-Friendly certification determined by the City as relevant. Vendor is encouraged to provide products, information, training and/or programs that will help the City comply with its’ environmental initiative SECTION XIX – ENVIRONMENTAL MANAGEMENT SYSTEM 1. Environmental Policy The Contractor shall review the City of Columbus Department of Public Utilities (DPU) Environmental Policy and shall make its employees and subcontractors performing work on behalf of DPU aware of the policy. The policy is posted on the DPU’s EMS webpage and ems.columbus.gov. 2. Environmental Management System Awareness The Contractor shall review the document entitled “DPU Consultant/Contractor/Vendor Environmental Management System Awareness Procedure”. This procedure is posted on the DPU’s EMS webpage at ems.columbus.gov. 3. Record-Keeping The Contractor shall maintain any and all records necessary to demonstrate compliance with the requirements of this Special Provision and shall provide such records to the DPU upon request. SECTION XX – CAMPAIGN CONTRIBUTIONS Contractor hereby certifies that all applicable parties listed in Division (I)(3) or (J)(3) of O.R.C. Section 3517.13 are in full compliance with Divisions (I)(1) and (J)(1) of O.R.C. Section 3517.13. Page 9 of 10 SECTION XXI - EXECUTION, APPROVAL AND CERTIFICATION: IN WITNESS WHEREOF, the parties hereto have affixed their hands and have executed this Agreement, as of the day and year first above written. CITY OF COLUMBUS Date: Greg J. Davies Director of Public Utilities CONSULTANT Date: Title: Approved as to form: Date: Richard C. Pfeiffer, Jr. City Attorney Page 10 of 10 PROFESSIONAL CONSULTANT REIMBURSEMENT POLICY Dated August 8, 2013 General. The purpose of this policy is to clarify for professional consultants, hereinafter referred to as Consultant, to the City of Columbus what the City considers to be a reasonable level of reimbursement for project costs other than direct labor. This reimbursement policy should be provided to the Consultant prior to final determination of project scope and fee and before dollars are encumbered for the project. In general, all reimbursement requests will require complete and proper documentation and must be necessary and reasonable for the completion of the project. All reimburseable expenses will require an itemized receipt attached to the invoice. These receipts will be required from the Consultant and subconsultants. Receipts must be dated within 90 days prior to the billing date period stated on the applicable invoice. The City reserves the right to question any item submitted for payment and may reduce, modify or refuse to pay any item which is unreasonable or incompatible with reimbursement policies. It is in the Consultant’s best interest to obtain written City approval before incurring any cost which may be questionable. Without exception, expenses which include reimbursement for the costs of meals or any other gratuity or gift provided to employees of the City will be disallowed. GSA Guidelines for Expenses. If the Consultant or subconsultant travels to Columbus to work on the project, the city shall reimburse for lodging and travel up to the amounts listed on the U.S. General Services Administration website. http://www.gsa.gov/portal/category/100120. Sales and other Taxes. When a Consulting firm is carrying out requirements of a City of Columbus contract, the firm can incur costs such as travel, lodging, meals, rentals, leases, etc. All of these expenditures include various taxes charged to the firm as part of doing business. These above-mentioned reimbursable expenditures include taxes that are not subject to any exemption. Therefore the City will pay for sales and other taxes submitted by the firm if they are determined to be a cost of doing business and no exemption applies. The City does not reimburse for sales tax paid on building and construction materials and services for incorporation into a public improvement (Ohio Revised Code 5739.02(B)(13). A sales tax exemption certificate is available from the City. Generally, if equipment purchased under the contract is determined to be incorporated into the public improvement the City will provide an exemption certificate. If the equipment is to be provided/delivered to the City, and may be later stored by the City or used by the City for another purpose, the equipment would not be exempt. Leased equipment items are generally not considered to be incorporated into the public improvement and are therefore not exempt. Other costs associated with design of a public improvement, specifically plan copies and plan sets, may be considered to be incorporated into the public improvement and may be exempt. The foregoing examples are illustrative only and are not all-inclusive. The City should be contacted before the Consultant or sub-consultant 1 makes a purchase of any items that may be exempt to determine if the City will provide an exemption certificate. 1. Temporary Living Expenses A. General. The City will provide for a comfortable, but not extravagant, standard of living for those out-of-state Consultants who are temporarily assigned to Columbus in the course of project work. For reimbursement purposes, “temporarily” shall be defined as, a duration of less than six (6) months. The Consultant will be required to stipulate at the project’s outset those employees who will be assigned to a City project and the length of each employee’s assignment to the project. The City will retain the option to determine at what point the City’s needs are better served by relocating the employee to central Ohio. The City does not reimburse general expenses on a per diem basis. B. Meals. The City will reimburse itemized receipted expenses for the cost of meals up to the current GSA per diem rates (Columbus), for Consultants who have a home office in excess of 50 miles from Columbus and are on temporary assignment here. The current rate is $56 per day. The cost of meals includes the actual cost of food and beverages, including tax and tips. In General, the City will not reimburse for meals for Consultants who have a home office within 50 miles from Columbus. Under certain circumstances, such as project meetings with the City that overlap meal hours, reimbursement for these meal and beverage expenses will be reviewed and considered by the City. If the Consultant is not entitled to meal and incidental reimbursement for a whole day then the following reimbursement amounts apply: $9 for continental breakfast/breakfast, $13 for lunch, $29 for dinner, and $5 for incidentals. C. Lodging. The City will reimburse for lodging, including tax, at the current GSA per diem rates (Columbus). The current rate is $94 per day. The City will determine at what point it becomes more cost-effective to provide temporary housing in the form of an apartment rather than a hotel. D. Entertainment. Entertainment, alcoholic beverages and personal expenses are not allowable for reimbursement. E. Laundry. Laundry costs, including dry cleaning, will be allowed with itemized receipts if the employee is required to be away from home on City business over five (5) consecutive business days. F. Trip Home. The City will reimburse for no more than one (1) trip home per employee for the convenience of the employee. If the employee chooses to travel 2 home each week, all reimbursement rates and provisions detailed in this policy will apply. All receipts should be itemized G. Call Home. The City will reimburse the employee for one (1) safe arrival call home per stay in Columbus. Other personal calls are not reimbursable. H. Temporary Housing. The City will reimburse the Consultant up to $1,000 per month for apartment rental for temporary employees. Consultants shall provide the City a copy of the lease agreement. All receipts should be itemized. 2. 3. Relocation of Employees A. If it is decided and placed in writing by the City that it is in the best interest of the City of Columbus and the employee of a Consultant to relocate that employee to Columbus, the City will reimburse that employee for transportation of the employee and family, furnishings and personal items to the new residence. The City will reimburse the lowest of three (3) common carrier estimates up to a maximum of $3,000. If it is determined that the estimates exceed $3,000 then a reasonable amount may be negotiated between the City and the Consultant. Other associated costs of transporting the household to Columbus will be evaluated on a per-casebasis and must be pre-approved in writing by the City to be allowable for reimbursement B. The City will not reimburse the Consultant for other costs related to relocation of employees, including items such as Realtor commissions, loan origination fees, closing costs, mortgage interest, subsidies, house-hunting trips, compensation for loss on the sale of property, telephone/cable/internet installation, vehicle tags, driver’s licenses, etc. C. After an employee has relocated, the City will not reimburse the Consultant for any living expenses for that employee such as rents, meals, etc. The only exception will occur when the employee is required to travel on the City’s behalf outside of Columbus, at which time temporary living guidelines will apply. D. The City will not reimburse the Consultant for the relocation of an employee to another city, or any other associated costs, after project completion or contract or employee termination. Air Transportation A. Reimbursable air transportation for out-of-state travel is to be provided by commercial airlines. Only coach seating will be reimbursed. All airfare expenses must be receipted and itemized. If possible, advantage should be taken of special rates or discounts and flights should be scheduled as far in advance as possible. 3 B. Transferable premiums or discounts with cash value, if any, are to become the property of the City. C. The traveler is personally liable for any charges assessed for unused travel reservations which are not released within the time limits specified, unless failure to cancel can be shown as unavoidable to the City’s satisfaction. D. Travel plans should be filed with the City of Columbus at least 24 hours in advance of travel, if possible. Plans should specify purpose of travel, personnel involved, and deviations from the above policy, if any. The City reserves the right to disallow any travel which it deems unnecessary for completion of the project. Exceptions to this policy will be considered on a case-by-case basis. E. The City will not reimburse costs for Sky Phone, movies, or seat upgrade charges. F. Any airline ticket change fees must include documentation that the change was due to work associated with the project such as meeting overruns, special circumstances, etc. 4. Lease/Purchase/Rental of Vehicles, Capital Equipment and Other Non-Consumable Items A. For purposes of this policy, a “capital” item shall be defined as an item costing more than $5,000 and/or having a useful life of five (5) years or more. Prior to the reimbursement for any capital item the Department is required to notify the Auditor’s office. B. All contracts involving capital purchases will stipulate that ownership of all items purchased will be retained by the City. C. The Consultant will provide specifications for the rental, lease, or purchase of capital item(s) to the City, which will review them for reasonableness and appropriateness. The City will forward the specifications to the City’s Purchasing Office, which will solicit bids and provide to the Consultant all bids which meet the approved specifications. The Consultant, will then rent/lease/purchase the item(s) from the lowest bidder, unless the Consultant can provide to the Purchasing Office an acceptable justification for obtaining the item(s) from one of the other bidders. Any deviation from this procedure must receive prior written approval from the Purchasing Office and the contracting City Department; otherwise, the City reserves the right to disallow reimbursement for capital items. D. Vehicle lease rate shall be no more than $500 per month. Receipts for fuel reimbursement will be required. Consultants shall provide the City a copy of the lease agreement. 4 5. E. The City will not reimburse for Global Positioning Systems/or charges (GPS), roadside assistance charges, and frequent renter miles. F. The City will reimburse up to $70 per day for a rental car (including tax). G. All data processing equipment must receive approval from the City’s Department of Technology prior to purchase or lease. H. Before any vehicle or other major equipment items can be rented, leased or purchased, the Consultant will provide for the City adequate justification of need, including which employee(s) will have use of the vehicle or equipment, and how long the vehicle or equipment will be needed. The City reserves the right to determine whether rental, lease or purchase best suits the needs of the project and the City. I. Vehicles will only be provided for the project if other means of on-the-job transportation cannot be provided by the Consultant or the City. Whenever practical, the Consultant will be required to provide his own vehicles and will be reimbursed at the established City rate per mile for job-required mileage. Under no circumstances will the City provide vehicles or mileage reimbursement for Consultant employees’ personal travel. J. The Consultant shall be required to maintain for the City a current detailed inventory of all items purchased with City funds. At the termination of a contract, the Consultant will be required to repair or replace any equipment prior to transfer to the City, normal wear and tear excepted. Vehicle Mileage Reimbursement The reimbursement rate paid for automobile mileage shall be at the Standard Mileage Rate allowable by the U.S. Internal Revenue Service as of the date the mileage is incurred. If the consultant’s contract specifies a lower rate than the current IRS rate, the consultant will be reimbursed at the lower rate. Gas, oil and other operating expenses related to personal vehicle usage are not reimbursable as these expenses are factored into the per mile rate. The City will not reimburse for mileage or transportation expenses between the Consultant’s home (which is defined by the IRS as where you reside) and their main/regular place of work or a temporary work location (within the metropolitan area). These mileage and transportation expenses are personal commuting expenses. However, mileage can be reimbursed from an employee’s home to a temporary work location outside the metropolitan area where the Consultant lives. Temporary work location being defined as a place where a Consultant’s work assignment is realistically expected to last (and does in fact last) one year or less. If the Consultant’s 5 contract specifies a lower rate than the current IRS rate, the consultant will be reimbursed at the lower rate. 6. Maintenance of Office Space A. The City will not consider any costs associated with the establishment of a place of business in Columbus, Ohio as reasonable expenses. The Consultant will be responsible for his own local office facilities, including rent, office furnishings and other costs not directly related to the City’s project. B. The City will reimburse for the reasonable costs of maintaining a project management office at the project site. Furnishings will be purchased as previously outlined. 7. Miscellaneous Items A. Shipping Charges. The City will reimburse for shipping charges from common carriers. B. Web Hosting. The City will reimburse for web hosting expenses as applicable in fulfillment of the contract. C. Meeting Room Rental. The City will reimburse the cost of meeting room rental if needed to facilitate discussion on a project. All room rentals should be reasonably price and not extravagant. D. Review & Permit Fees. The City will reimburse for project review and permit fees required from entities such as the OEPA, State of Ohio, and other governmental agencies. E. Materials, Supplies, and Miscellaneous Equipment. The City will reimburse for materials and supplies associated with the work performed under the contract such as paper, printing copying costs, gauges, field office cleaning, and other small miscellaneous equipment, etc. Note: Certain items may be eligible for sales tax exemption. See the section on “Sales and other Taxes” in this policy. The City should be consulted before making the purchase of these items to determine if the City will provide an exemption certificate. F. Parking Costs. The City will reimburse the cost of parking in garages, at meters, etc. if such expenses are necessary in fulfillment of the contract. Consultants should seek the lowest, most reasonable parking rates available. The City will not reimburse for parking tickets. G. Non-Reimburseable Items. The City will not reimburse for the following: Coffee service/bottled water 6 Fines and penalties First class airfare Disposable mobile phones ATM or bank fees Miscellaneous personal items: newspapers, toiletries, valet services, tobacco products, pay TV, shoeshine, health club charges, and in-room mini bars. Entertainment expenses including movies Alcoholic beverages Barber/hairstylist, manicures, massages, etc. Clothing and footwear (unless specifically needed for the project) Gifts, gratuities and favors for City employees Donations Damaged personal possessions Losses due to the theft during travel This list is not all-inclusive, but represents a sample of the type of items that will not be reimbursed by the City of Columbus. 7 NOTICE OF EQUAL BUSINESS OPPORTUNITY REQUIREMENTS: A. Minority and Female Business Enterprise (MBE and FBE) Participation: Title 39 of the Columbus City Code (C.C.C.) provides for certification of minority business enterprises and female business enterprises. Under the current legislation, a minority business enterprise is defined as a for-profit business performing a commercially useful function which is owned and controlled by a person or persons having an African American ancestry. C.C.C. §3901.01 (G). A female business enterprise is defined as a for-profit business performing a commercially useful function which is owned and controlled by one or more females of non-African American descent. C.C.C. §3901.01 (F). B. Specific Contract M/FBE goals: Specific Contract M/FBE goals shall not apply to this selection. C. In collaboration with the Equal Business Opportunity Commission Office, the Department of Public Utilities encourages the utilization of city-certified minority, female and small business enterprises and minority business registrants. D. In addition to the current requirements of Title 39, Columbus City Codes, 1959, it is expected that all or part of this contract may be undertaken with State and/or Federal funding assistance. The City may, therefore, be required to conform to certain utilization goals in order to conform fully to those programs. Documentation suggested: Include the name, description of the work, and the dollar value of all certified M/FBE’s and MBR’s included in the proposal. For information related to minority, female and small business enterprises, please contact the Equal Business Opportunity Commission Office at (614) 645-4764. Page 1 of 1 SCOPE OF SERVICES WOODWARD AVENUE SANITARY SEWERS CAPITAL IMPROVEMENTS PROJECT 650570-100000 MEEKLYNN DRIVE SANITARY SEWERS CAPITAL IMPROVEMENTS PROJECT 650890-100000 The ENGINEER shall be responsible for the professional quality, technical accuracy, timely completion, and the coordination of all reports, preliminary plans, designs, drawings, specifications, bid documents and other services furnished for the CITY by the ENGINEER as defined herein. The ENGINEER shall perform professional design services herein stated, which include typical civil engineering services for sanitary sewer system improvements, surveying, geotechnical, structural, environmental, and other approved supplemental services incidental thereto. The ENGINEER shall provide such professional design services as may be necessary to accomplish the work required to be performed and shall at his/her cost, furnish all necessary competent personnel, equipment, and materials to perform the work. Exhibit A -"Project Time Schedule", Exhibit B - "Estimate of Cost Allocation by Task Activity", Exhibit B.1 – “Maximum Hourly Rate Schedule”, Exhibit C - "Cost Summary", Exhibit D – “Local Workforce Breakdown” are hereinafter designated as the "APPENDIX". The ENGINEER shall furnish services in accordance with the provisions of Tasks A1 through A20 below and as noted in the Exhibits. The inclusion of the Exhibits attached hereto in no way supersedes the work delineated below. GENERAL The project goal is to eliminate illicit sanitary discharge to the City storm sewer system in a defined residential area which contains a number of existing on-lot (HSTS) sewage disposal systems, during dry conditions and rain events, while minimizing construction costs and neighborhood disruption. The consultant shall, according to Tasks A1-A9, conduct interviews of City of Columbus DOSD employees to solicit information about the project area; investigate all relevant data sources; perform field/site condition assessments; research historic records; develop multiple feasible alternatives to accomplish the project objectives; perform a business case evaluation (as directed) to select the most cost effective solution; perform hydraulic calculations as required for the proposed improvements; prepare a letter report for this project which outlines the City’s design requests. The report should provide a preliminary construction cost estimate and include recommendations for other improvements not previously listed. Revise this report as required to address City review comments. The consultant shall use information provided by the City in addition to information obtained during performance of Tasks A1-A9 to prepare construction drawings for the proposed work according to Tasks A10-A17. Page 1 of 13 The consultant will provide services during and after construction as described in Tasks A18 and A19. The consultant will attend coordination meetings, progress meetings, submit regular progress reports and provide meeting minutes of all meetings during the development of the Project. The consultant shall coordinate and attend public information meetings as required (assume 2 meetings). All invoices are to be accompanied by a progress report of sufficient detail to clearly define what work was done in the invoice period. WOODWARD AVENUE SANITARY SEWERS The City desires to provide new sanitary sewer service to a defined residential area that is currently served by on-lot home septic tank systems (HSTS). This project will investigate, design, and prepare construction drawings to extend existing sanitary sewers and provide a new residential sanitary service tap for 14 existing homes which are served by HSTS systems along Woodward Avenue. The City has performed video inspection of the existing storm sewers in the area and has found evidence of sanitary discharge within the storm system. This project is located on the east side of Columbus along Woodward Avenue between Brentnell Avenue and Sunbury Road. The City wishes to utilize existing easements and/or existing road right of way for the new sanitary sewer(s) to minimize time to construction. The selected consultant will need to coordinate the proposed sanitary sewer extensions with the consultant that designed storm sewers for this same area under CC-15722. Final construction plans for this storm improvement project were placed on hold due to the found sanitary problems. The consultant shall prepare a possible BCE case evaluation and a design report for the City which contains estimated costs to provide sanitary sewer service to this area. Upon successful review of the reports, the consultant will then prepare construction documents and plans to provide sanitary sewers for this area. The consultant may propose alternate design ideas that are shown to be cost effective and based on sound and proven engineering principles. MEEKLYNN DRIVE SANITARY SEWERS CIP 650890 – MEEKLYNN DRIVE SANITARY SEWER The City desires to provide new sanitary sewer service to a defined residential area that is currently served by on-lot home sewage treatment systems (HSTS). This project will investigate, design, and prepare construction drawings to extend existing sanitary sewers and provide new residential sanitary service taps for 20 existing homes which are served by HSTS systems. This project is located on the northwest side of Columbus along Meeklynn Drive between Linworth Road and Olentangy River Road. The City wishes to utilize existing easements and/or existing road right of way for the new sanitary sewer(s) to minimize time to construction. However, a task to acquire easements has been included in the Project Scope and shall only be performed if authorized by the City. The selected consultant will need to coordinate the proposed sanitary sewer extensions with the consultant that designed storm sewers for this same area under CC-15573. Final construction plans for this storm improvement project were placed on hold due to the found sanitary problems. The consultant shall prepare a possible BCE case evaluation and a design report for the City which contains estimated costs to provide sanitary sewer service to this area. Upon successful Page 2 of 13 review of the reports, the consultant will then prepare construction documents and plans to provide sanitary sewers for this area. The consultant may propose alternate design ideas that are shown to be cost effective and based on sound and proven engineering principles. General Design Requirements The lead Consultant shall be responsible for all work necessary to establish and/or verify existing tributary area conditions; proposed sanitary design flows in existing and extended sewer systems impacted by this improvement; securing existing plan information; perform additional investigations as required to design this improvement; prepare required hydraulic calculations; summarize all preliminary design findings, investigations, and recommendations into a possible BCE report and a final Letter Report; collect all necessary site survey information; prepare construction drawings, cost estimate(s), specifications, and bid documents; investigate need for and document all required construction permits (such as zoning, electrical, building, regulatory (EPA, City, etc.); prepare, submit, and secure all such construction permits; review construction shop drawing submittals and associated documents during construction of this project. The lead consultant shall submit a letter report, construction plans in CC drawing format, specification documents, and complete all project tasks (excluding construction phase) for this project within 365 days after the notice to proceed is issued. The lead Consultant shall submit information to document prior experience and qualifications of the Design Team members. The team shall have previous experience in the design of sanitary and storm sewer systems. Team members shall be capable of submitting observations and/or recommending design changes for efficient sanitary sewer design. The team members shall research various alternatives and recommend the most economical and best solution to the City. The final project submittal will include the production of all design documents, drawings, specifications and contract documents required to construct the proposed facilities. This work shall also include utility conflict sewer redesign and shop drawing review services during construction. PROJECT SCHEDULE Within fourteen (14) days of contract award, the consultant shall prepare a schedule of activities showing task duration, deliverables, and project milestones. The schedule shall specifically show all information to and/or from others necessary to complete the work. The schedule will be updated monthly and submitted with the progress report. Updates should reflect the project schedule as of the last day of the month in which it is prepared. DETAILED SCOPE OF SERVICES Work to be completed by the ENGINEER shall include but not be limited to the following: TASK A1: REVIEW EXISTING INFORMATION Review pertinent reports, construction plans, and other Division of Sewerage and Drainage (DOSD) records that have a bearing on this project. Conduct interviews of City of Columbus DOSD employees who are familiar with this residential area. Review available data, such as “as built” or “as designed” parameters for existing sanitary sewers in this area, WIB information, Page 3 of 13 yard, and street flooding information as recorded by the sewer maintenance section (SMOC), or other investigations as required for this project TASK A2: FIELD INVESTIGATIONS Perform all necessary field investigations as required to document the extent of the problem(s) (such as site visits with residents), perform additional site visits, and research necessary to prepare the BCE report and draft letter report for the project. TASK A3: SEWER CLEANING AND TELEVISING Television inspection shall be conducted on select storm sewers as identified by the City within the project area to document blind connections to the existing sewer. For proposal purposes, assume the following amount for the project: 2,000 LF of 8” thru 12” diameter sewer inspection to be included in the contract. This work is to be performed under the written direction of the City and is an “if authorized” item. Note that sewer cleaning and televising work may be performed in high traffic areas; therefore, work may need to be performed at off-peak hours. The Engineer shall perform all tasks necessary to acquire the proper permits from the Transportation Division. A Maintenance of Traffic plan may be required to obtain the necessary permits. All sewer cleaning and televising shall meet the requirements of City of Columbus Supplemental Specification’s SS-4 Sewer Cleaning and SS-5 Sewer Video Recording and Inspection as well as the items detailed herein. A3.1 The ENGINEER (or their sub-consultant) shall be responsible for providing all required water for sewer cleaning, televising and inspection, including all necessary valves, backflow preventors, and flow meters for each hydrant connection. All equipment, fittings, and valves shall be in accordance with the standards of the City of Columbus. Use of water from fire hydrants and associated fees are outlined in the City of Columbus Rule and Regulation No. 01-01. A copy of this regulation is available from the Division of Water, Permit Office, (614) 645-7695. Due to the age and size of the existing waterlines in the project area, the Division of Water may limit the use of fire hydrants. Water needed for sewer cleaning may need to be obtained from a remote source and trucked to the project location. The CITY will not pay for water obtained from City of Columbus Division of Water or trucked from a remote site for sewer cleaning. For verification of available fire hydrants, contact the Division of Water Engineering Offices at 910 Dublin Road, (614) 645-7677. A3.2 Any manhole or sewer entries performed shall meet the minimum requirements as presented in the OSHA Standard, Title 29 CFR 1910.146, Permit Required Confined Spaces. Upon conclusion of the Project, copies of all confined space entry permits must be submitted to DOSD. A3.3 The ENGINEER shall provide private property owners impacted by their work a 48-hour minimum written notification before entering their property and/or the start of cleaning and televising work. A door hanger is acceptable written notification. The notice shall inform the property owner of the date of the inspection and the description of work to be performed. A3.4 Heavy cleaning may be required to remove roots, brick, gravel, and other heavy debris from the sewer, however it is not the City’s intent to have 100% of the sewer invert Page 4 of 13 A3.5 cleaned during the evaluation phase of the project. An allowance is included in the contract cost assuming 100% of lines to be video inspected will require heavy cleaning. Payment will be made for heavy cleaning based on evaluation of pre-cleaning videotape and consensus of the City. A copy of the sewer inspection sub-agreement must be submitted to the City for review. The ENGINEER shall provide adequate personnel to assure conformance with the requirements set forth herein regarding sewer cleaning and televising. These personnel will be qualified and trained to approve heavy cleaning when necessary, assure quality of the cleaning and televising and assist with communication with the residents and businesses. TASK A4: HYDROLOGIC AND HYDRAULIC ANALYSES (H&H Analysis) Perform all hydrologic and hydraulic calculations necessary to evaluate and design the sanitary sewer system improvements in accordance with the Division of Sewerage and Drainage Sanitary Sewer Design manual, the Stormwater Drainage Manual and/or the City’s Siting Green Infrastructure, Siting and Design manual unless directed otherwise by the City. Prepare all such maps, figures and exhibits necessary for a full communication of each calculation. Maps may be generated from Franklin County Auditor’s mapping that delineates tributary drainage areas. TASK A5: BUSINESS CASE EVALUATION (BCE) REPORT (If Authorized) The Department of Public Utilities has instituted an Asset Management policy that requires specific information be provided and analyzed before a project can move forward to Detailed Design. To meet these policy requirements a distinct problem statement, multiple alternative solutions, and a benefit to cost ratio must be developed for this project during the Preliminary Design Report (PDR) phase of the project. The consultant shall incorporate all of the required elements of a Business Case Evaluation (BCE), listed below, into the final PDR document. In addition, the consultant shall be required to attend the Department’s BCE training class, and as a reference, the Department's "Business Case Evaluation Guidelines Document" is available upon request. After the BCE has been completed and a recommendation approved, consultants shall proceed with a Detailed Design that is consistent with the selected alternative. A5.1: The Problem Statement: - A thorough characterization of the problem(s) which the project is intended to mitigate. Problems should be expressed in terms of financial, social, and environmental impacts to Department stakeholders, as well as perceived risks, regulatory issues, and effects on Levels of Service. Stakeholders include, but are not limited to, customers/rate payers, regulatory agencies, the general public, and the environment. A5.2: Status Quo/Alternatives: - A description of all alternatives, both “green”, “gray”, and a mixture thereof, that are feasible solutions to the issue at hand, including a baseline alternative, or "status quo", that represents the expected outcome of the Department choosing to maintain the current course of action. Each alternative description should indicate how they will impact costs, levels of service (listing available upon request), and risks to assets and overall business stability. A5.3: Triple-Bottom Line (TBL): - Costs must be accounted for on three separate levels: financial, social, and environmental. Financial costs should include capital, operations, maintenance, and other direct financial costs. Social values should include impacts to the Page 5 of 13 community that do not have market driven values (e.g. inconvenience factors such as traffic delays, noise, odor, dust, pollution, and other costs to stakeholders outside of direct DPU costs). Environmental values may include impacts on water quality (pollutant loading, turbidity), air quality (e.g. greenhouse gas emissions, particulate emissions), and land use. Where it is practical, social and environmental costs should be expressed in terms of dollar value. The Department's Asset Management Office will assist with the derivation of social and environmental values as necessary. A5.4: Risk: - All significant foreseeable risks to the Department, their stakeholders, and the greater community must be monetized and compared between each alternative and the status quo. For the assets associated with the problem to be addressed by the alternative options, risks of failure should be assigned as appropriate. For alternative solutions that impact the condition and/or criticality of assets, the change in risk should be documented. The Department’s Asset Management Office will provide guidance on derivation of riskcosts for assets as necessary. A5.5: Life-Cycle Cost Analysis: - In general, the present value of each alternative should be assessed over a 20-year life-cycle that includes all of the factors previously mentioned, monetized to current year dollars. The Department’s Asset Management Office will provide assistance where necessary for completing the life-cycle cost analysis. Some basic assumptions include: An overall 2% discount rate to address the time value of money; Assets with useful lives extending beyond the analysis period should be assigned a residual value in the final year of the analysis using straight-line depreciation. A5.6: Benefit/Cost Ratio: - A benefit to cost ratio must be completed for each of the alternatives. This ratio is a direct comparison of the costs and benefits between each individual alternative and the originally established status quo. This simple comparison will yield a result that will indicate which alternative, or the status quo, has the best overall outcome and impact on the City and its stakeholders. TASK A6: PRELIMINARY DESIGN REPORT After the recommendations of the BCE report have been accepted, prepare and submit a letter report for the project that meets the design objectives as stated in the proposal. The report should also include the proposed preliminary alignment(s) of the sanitary sewers, existing overhead and buried utility constraints, private structure and landscape constraints. Provide updated sewer capacity calculations for all existing sanitary sewers modified by this project, provide an updated sanitary sewer tributary map, construction cost estimate, and meeting minutes from any public meetings held to date. Provide a summary of the field conditions, design recommendations, and type of construction methods necessitated by the limits of the work. Summarize observations and make thorough recommendations for all project issues addressed including pavement rehabilitation and curb and drive apron replacement within the project limits. Research the various design alternatives as presented in the BCE to accomplish the proposal goals in the most cost efficient and maintenance friendly environment. Document existing field conditions, including alignment conflicts with existing private structures or public and private utilities, review updated sanitary system hydraulics, tributary maps, and construction cost Page 6 of 13 estimates for each alternative, etc. Include meeting minutes from any public meetings held to date. Provide a summary of the field conditions, design recommendations, and type of construction methods necessitated by the scope of the work. Summarize all observations and provide thorough recommendations for all project issues addressed by this project. Provide 3 (three) copies of the draft letter Report. The City will require 2 (two) weeks for letter report review. Review all comments received from the City and update or revise the letter reports as required. Resubmit the letter report for this project to the City for final compliance. Upon satisfactory resolution of all review comments, the City will issue approval of the letter reports and the Engineer can begin preparation of the draft construction plans. TASK A7: CONSTRUCTION PLAN SURVEYING Generate project base mapping from the digital format of the Franklin County Auditor’s facet maps made available by the City of Columbus. Perform all fieldwork necessary for the development of the construction plans. Survey work shall be in State Plane coordinates. This work shall be performed under the direction of a professional surveyor licensed in the State of Ohio. Survey work may include verification of site topography (residential homes and out buildings, trees including size, shrubs, structures, ornamentals, etc, within the existing property boundaries or within a proposed easement corridor 60 feet in width along the proposed alignment(s)), location of existing right-of-way, all utility easements such as sanitary, storm, platted utility or drainage easements, courthouse research required to identify such plats, deeds and easements, property line pins, existing water, gas and sanitary service lines to existing buildings, storm and sanitary sewers, including the location, size and depth of existing site utilities. As defined by the City of Columbus Transportation Division Utility Manual, Subsurface Utility Engineering (SUE) level A shall be used to determine the location of underground utilities potentially in conflict with proposed improvements; assume 15 test holes. All field survey information shall be recorded in field survey books. If the ENGINEER utilizes electronic data collection, information that can be provided in a fixed column ASCII file format will not require entry into field survey books. The ASCII file(s) shall contain the following information: point number, northing, easting, elevation, survey code and description (optional) fields. The ENGINEER shall provide the City with a printout of all electronic data submitted on 8 1/2" by 11" pages bound in a 3-ring binder with insertable cover. The data will also be accompanied by a legend of survey codes, an electronic points plot drawing(s) of all survey points obtained and a disk(s) containing the ASCII file(s) and drawing file(s). All survey information submitted to the City by means of field books and electronic data shall be complete in every detail. All survey data shall be based on State Plane Coordinates and the most current USGS datum. USGS and/or Franklin County Engineers Monuments (at least two) shall be used for horizontal and vertical control. All manhole and structure locations shall be provided with State Plane Coordinates. Control points shall be spaced 1000 feet apart maximum or more frequently if the line of sight conditions in the field dictate closer spacing, and three point referenced. Any additional information required to re-create the survey that cannot be derived Page 7 of 13 through the submitted information shall be re-established by the ENGINEER at no additional cost to the City. Establish adequate horizontal and vertical controls for the development of the construction drawings and easements. If applicable, develop a list of affected residents, institutions and businesses to generate mailings informing them of upcoming survey work in their neighborhood; generate the mailings under direction by the City; and mail. Obtain all necessary street occupancy permits required for surveying. Provide the necessary traffic control/maintenance of traffic plans as required by such permits. TASK A8: EASEMENTS Determine the limits for permanent, temporary construction, and access easements over private property. Under the direction of a professional surveyor licensed in the State of Ohio, prepare legal descriptions and pictorial exhibits (plats) for the required easements. Prepare a property acquisition map (at 1" = 100' scale or otherwise appropriate scale) to indicate the location of the easements, adjacent properties, and property addresses. Provide one (1) original and four (4) copies of the easement descriptions and plats to the City, and one (1) copy of the construction plans to the City for easement acquisition purposes. Upon authorization by the City, stake all proposed temporary and permanent easements for use during easement acquisition phase. It is anticipated that most of the construction will be performed within existing road right-ofways or within City-owned property. For proposal purposes, it is to be assumed that this project will require permanent and a temporary easement to be prepared for 15 properties each. This is an “if authorized” item. TASK A9: GEOTECHNICAL INVESTIGATIONS A9.1 Develop and submit to the CITY a detailed plan outlining the geotechnical investigations for the improvements which shall include, but is not limited to, soil borings, soil infiltration testing and other relevant tests necessary for design suitability A9.2 Upon selection and acceptance of the project layout, locate sites in a manner acceptable to the CITY. Locations and depth of the infiltration test sites and soil borings must be shown on the plans and profiles. A9.3 Prepare a Geotechnical Design Summary Report (Avoiding and Resolving Disputes During Construction ASCE, 1991). The report must contain: 1. Geological Setting. 2. Geological features of engineering and construction significance. 3. Man-made features of engineering and construction significance. 4. Description of subsurface conditions, soil boring logs, test data, analysis. 5. Expected soil infiltration rates. 6. Anticipated ground behavior consistent with the construction methods likely to be used by the contractor. 7. Excavation methods and ground support requirements if significant depth of the sewer line is anticipated. 8. Dewatering requirements during construction. A9.4 Upon review of the findings from the soil borings, submit to the CITY for approval any additional soil investigation requirements needed to adequately define any design Page 8 of 13 constraints. TASK A10: DRAFT CONSTRUCTION PLANS A10.1: Prepare engineering and right-of-way drawings in AutoCAD format (version 2000 minimum) to show the detail and scope of work for the PROJECT herein called "Drawings" in accordance with the current 2012 Construction and Materials Specifications, The Standard Construction Drawings of the City of Columbus, and the Division of Sewerage and Drainage’s Procedures and Standards for Creation and Submittal of Sewer Drawing Plans. Plan format shall be “CC” Plans (22"x34") at 1"=30' horizontal scale and 1"=5' vertical scale (or other scale if approved by the City). Generate project base mapping from the digital format of the Franklin County Auditor's facet maps made available by the City of Columbus. Drawings shall include, but be not limited to, Title Sheet, General Notes Sheet, Estimate of Quantities Sheet, Demolition/Restoration Plan, Plan and profile sheets, cross section sheets, Miscellaneous Detail Sheets, Erosion Control Sheets. A10.2: If necessary, prepare Maintenance of Traffic drawings at the scale and detail as required by the regulatory agency. A10.3: Coordinate all field survey, easement development, and other supplemental services for the development of the Drawings. A10.4: Evaluate information and comments received from the City, public and private utility companies, other agencies, and the soils report in the development of the details for the improvement. A10.5: Establish the horizontal alignment of the improvement with its location relative to critical clearance points in the field with existing structures. For each proposed improvement, develop vertical and horizontal profiles and determine the location of all appurtenances. Review the alignment in the field with the City. Minutes of the field tour are to be recorded by the ENGINEER with the approved alignment noted. A10.6: Develop any required topography for the drafting of the Drawings. Review special construction items and details affecting the construction costs. All topography within the right of way and/or easements shall be shown on the Drawings. Show location of the centerline relative to the property lines, the easement and access easement widths, and the pay items for the work. Provide adequate details for special construction procedures. A10.7: Submit two (2) sets of draft (50% complete) construction plans to the City for review. The 50% plans shall include complete site or building base mapping and the proposed location of all appurtenances. The City will require 1 (one) month for draft (50%) construction plan review. A10.8: Participate in a draft construction plan review meeting with the City. Prepare and submit minutes of the meeting to the City. A10.9: Upon satisfactory resolution of all review comments and completion of design, submit twelve (12) sets of draft final construction plans to the City for review by various City Divisions. Submit two (2) sets to all private utility companies for their review. Provide the City with a letter that summarizes the disposition of all private utility company review comments. The City will require 1.5 (one and a half) months for draft final construction plan review. Page 9 of 13 A10.10: Participate in a draft final construction plan review meeting with the City. Prepare and submit minutes of the final review meeting to the City. TASK A11: REVISED CONSTRUCTION PLANS Upon satisfactory resolution of all review comments, submit two (2) sets of revised final construction plans and the title sheet tracing to the City for compliance review and signatures. The City will provide the ENGINEER with the Front End Documents (Bidders Checklist, Advertisement For Bids, Bid Forms, Contract Proposal) and Prevailing Wage Rates. The ENGINEER shall prepare Supplemental Specifications (as needed), Unit Price Bid Forms (in Excel format supplied by the City) and Standard Drawings. Bidders Checklist, Advertisement For Bids, Bid Forms, Contract Proposal, Prevailing Wage Rates, Supplemental Specifications and Standard Drawings shall be assembled by the ENGINEER into a single bound book, hereinafter called “Specifications”. Prepare an itemized construction cost estimate and an estimated time for the contractor to complete the work. Submit one (1) set of the Specifications, cost estimate and the estimated time for completion to the City for review. The City will require 1.5 (one and a half) months for final construction plan/bid document (compliance) review. TASK A12: STORMWATER POLLUTION PREVENTION PLAN AND NOI If the construction to be performed includes clearing, grubbing, excavating, and/or filling activities that result in the disturbance of more than one (1) acre of total land, the ENGINEER shall prepare a Stormwater Pollution Prevention Plan (SWPPP) in accordance with City of Columbus Erosion and Sediment Control Guidelines as well as include post construction bmp’s in the detailed construction plans, as required, per section 3.3 of the Stormwater Drainage Manual. The ENGINEER shall also prepare a Notice of Intent Application form (NOI) for City signature and submit the signed NOI, SWPPP, and applicable fees to the Ohio Environmental Protection Agency (OEPA). The SWPPP shall be included as a part of the bid documents. The ENGINEER will be reimbursed for the amount of the actual application fee (not subject to administrative and overhead markup, etc.). If the proposed improvements will result in the disturbance of less than one acre, the construction plans will contain all appropriate sediment & erosion controls in accordance with the current City and OEPA requirements TASK A13: PERMITS AND EVALUATIONS A13.1: Where required and in consultation with the CITY, the ENGINEER shall submit the required number of sets of Project Drawings and completed applications to the State of Ohio Environmental Protection Agency, Division of Surface Water, to secure a Permit To Install for the Project. A13.2: ENGINEER shall investigate the need for and prepare for City signature any other permits required for construction of both Projects. Permits shall include but not be limited to; 401 and 404 permits, Notice of Intent (NOI), Permit To Install (PTI), Traffic Control Plans, Traffic Maintenance Plans, Ohio Department of Natural Resources (ODNR) Groundwater Removal Permits, Ohio Department of Transportation (ODOT) Highway Permits, City/County Street Occupancy Permits and City, State, or County Building or Electrical Permits, etc. A13.3: The ENGINEER shall prepare applications and drawings to obtain street occupancy permits for the design phase of the work. Drawings shall depict locations of occupancy and required traffic control measures. Page 10 of 13 A13.4: The ENGINEER shall pay any fees associated with the above permits and shall submit to the CITY receipts for the fee paid, to be reimbursed for the amount of actual charges. TASK A14: BID DOCUMENTS When directed by the City, update the bid documents to reflect any remaining City review comments. Prepare a complete set of bid documents which include all construction drawings, specifications, proposal and contract documents, prevailing wage rates, soils reports and appropriate standard drawings. The City will provide the ENGINEER with the prevailing wage rates and compliance regulations. Submit project tracings, AutoCAD files, field books and field survey information to the City; these materials become the property of the City. TASK A15: BIDDING / CONSTRUCTION PROCUREMENT A15.1: Review with the CITY their requirements, format, and legal documents required for the Contract Documents. The CITY will acquire wage rates and compliance regulations and shall incorporate them in the Contract Documents. A15.2: Utilizing the CITY standardized contract proposal documents (hereafter called “Bid Documents”, the ENGINEER shall prepare the Advertisement, Special Provisions, Supplemental Specifications and Standard Drawings that are specifically applicable to the Project, and forward them to the CITY for review. Upon approval and direction by the CITY, the ENGINEER shall submit thirty (30) copies of the construction plans on compact disk (CD), fifteen (15) paper copies (half size and full size) of the plans for construction purposes, and thirty (30) copies of the bid book to the CITY for the advertising of the Project for bids. A15.3: Prepare and distribute all contract addenda. Addenda shall be distributed via registered mail, fax, or e-mail. The Engineer shall provide to the City one of the following verifications of receipt: 1. Copy of notifications of mail delivery; 2. Copy of fax reports, showing successful transmissions, along with copies of telephone memos showing that phone calls were placed to the recipients to confirm fax receipt. The names of interlocutors and the time of conversations shall be recorded; 3. Copy of e-mails along with copies of notifications of delivery. A15.4: Assist the CITY at all bid openings, and provide an analysis and recommendation concerning the lowest, best, responsive and responsible bid. Analysis shall provide for the application of the requirements of Chapter 329 of the Columbus City Codes. A15.5: The ENGINEER is required to attend and provide consultation at the Project's pre-bid and preconstruction meeting. Provide advice and direction on design-related issues during the bidding process. TASK A16: PROGRESS MEETINGS, REPORTS AND SCHEDULES The ENGINEER shall attend the kick-off meeting and one progress meeting each month. The ENGINEER shall prepare and submit monthly progress reports and minutes of the progress meetings to the City. Within fourteen (14) days of contract award, the consultant shall prepare a schedule of activities showing task duration, deliverables, and project milestones. The schedule shall specifically show all information to and/or from others necessary to complete the work. The schedule will be updated monthly and submitted with the progress report. Updates should Page 11 of 13 reflect the project schedule as of the last day of the month in which it is prepared. This Task concludes once the ENGINEER successfully accomplishes Tasks A1-A10. TASK A17: PUBLIC MEETINGS Prepare presentation materials, attend and assist the City in conducting two (2) public meetings. The first meeting will be held shortly after Notice to Proceed to solicit information from residents. The second meeting will be held after 50% plan submittal and review. The ENGINEER shall advertise and secure the meeting location. If there are costs associated with the advertising and providing a meeting location, receipts shall be submitted to the City for the fees that were paid. The ENGINEER will only be reimbursed for the amount of the actual charges (not subject to administrative and overhead markup, etc.). Prepare and submit minutes of these meetings to the City. TASK A18: ENGINEERING SERVICES DURING CONSTRUCTION The ENGINEER shall provide the following minimum Engineering Services during Construction: A18.1: When directed by the CITY, the ENGINEER shall send construction notification letters to all residents affected by the proposed construction. The notification shall include the project name and CIP number, anticipated time frames for construction, and shall contain general information about the project and restoration process. A18.2: The ENGINEER shall make the appropriate personnel available to respond to inquiries regarding the interpretation of the contract documents during the course of construction. If such interpretation involves any monetary, quality or materials/equipment substitution, the CITY shall make the final interpretation. A18.3: The ENGINEER shall provide professional engineering review of all shop drawing submittals and provide advice and direction on design-related issues during construction. All reviews shall be performed within 14 calendar days of receipt of the submittal. TASK A19: RECORD PLANS The ENGINEER shall provide the technical personnel necessary to fully prepare record plan drawings using construction drawing images in .TIF Group 4 format, headsheet images in .TIF Group 4 format, fieldbook notes, and progress plan data furnished by the CITY. All survey information to be used for record plan purposes shall be provided by the field personnel performing construction inspection services. All record plan drawings shall be created in accordance with “Procedures and Standards for Creation and Submittal of Sewer Drawing Plans” manual. All revisions to the plans shall also be made in accordance with the Submittal manual. The work shall include but not be limited to the following: A19.1: As-built Profile information shall incorporate the following: Cross out the proposed top of casting and invert elevations, structure stations, and pipe slopes; Cross out the information on the datum line (station, surface, invert and cut). This information shall not be recalculated; Add the as-built top of casting and invert elevations at the appropriate structure next to the crossed out elevations; Add the as-built structure stations at the appropriate structure next to the crossed out stations; Page 12 of 13 A19.2: A19.3: Update the pipe size, material (PVC, RCP, VCP, etc.) and slope used for each run between structures and note this on the appropriate profile- Example: 8" PVC @ 0.45%. If a backflow is indicated by a negative grade, note this on the profile along with the actual direction. Notify the City of all instances of negative grade situations; Redraw structure and pipe to show actual elevation if actual elevation differ by more than 1 foot from construction drawing elevations, and cross out proposed pipe and structures. Notify the City of the discrepancies. As-built Plan View information shall incorporate the following: Mark the structure station and structure type (MH, CB, etc.) at each structure, labeling perpendicular to the pipe whenever possible; Add the as-built state plane coordinate information in the state plane coordinate table under the “As-built” heading. As-built Title Block information shall incorporate the following: Add the Record Plan Number in the “Record Plan #” box; Cross out the CC number in the “Contract Drawing #” box; Erase “DIVISION USE ONLY” in the “Owner” box and add City of Columbus; Add the Contractor’s name in the “Contractor” box; Add the Inspector’s names in the “Inspector” box; Add N/A in the “Agreement” box; Add the completed date in the “Completed” box; Add the drafter’s initials in the “RPD” box; Add N/A in the “CID” box; Add the CC# in the “CON. DR.” box; Add the Planning Map Number in the “Index Detail” box; Add the Record File Number in the “Record File” box; Add a separate title block for each section of sewer that was completed in phases, parts or sections all on the same CC plan; Add Easement Reference Information in the “Easement Reference” box; Review all updates in-house for accuracy and completeness; Tracings of all drawings and .TIF images of the same on industry standard portable media (i.e. CD, DVD, etc.) shall be delivered to the CITY. TASK A20: IF AUTHORIZED Due to the uncertain nature of various work elements in this contract, it may be necessary to authorize additional work beyond the scope as written. Such work would be performed only upon the approval of a cost estimate for such services prepared by the ENGINEER (under the rates and costs established by this agreement) and subsequent written authorization by the City. Page 13 of 13 EXHIBIT A - TIME SCHEDULE Project Title: CIP NO.: TASK NO. ACTIVITY A1 Review Existing Information A2 Field Investigations A3 Sewer Cleaning and Televising A4 Hydrologic & Hydraulic Analyses A5 Business Case Evaluation (BCE) Report A6 Preliminary Design Report A7 Construction Plan Surveying A8 Easements - If Authorized A9 Geotechnical Investigations A10 Draft Construction Plans A11 Revised Construction Plans A12 Stormwater Pollution Prevention Plan A13 Permits and Evaluations A14 Bid Documents A15 Bidding / Construction Procurement A16 Progress Meetings, Reports and Schedules A17 Public Meetings A18 Engineering Services During Construction A19 Record Plans A20 If Authorized 1 2 3 4 City Review NOTES: 1. Shade the blocks indicating which month the task is expected to be performed. 2. Refer to Schedule 1 - Scope of Services for number and duration of City reviews. 5 MONTH 6 7 8 9 10 11 12 EXHIBIT B - ESTIMATE OF COST ALLOCATION BY TASK ACTIVITY Project Title: CIP NO.: TASK LABOR HOURS NO. ACTIVITY A1 Review Existing Information A2 Field Investigations A3 Sewer Cleaning and Televising A4 Hydrologic & Hydraulic Analyses A5 Business Case Evaluation (BCE) Report A6 Preliminary Design Report A7 Construction Plan Surveying A8 Easements - If Authorized A9 Geotechnical Investigations A10 Draft Construction Plans A11 Revised Construction Plans A12 Stormwater Pollution Prevention Plan A13 Permits and Evaluations A14 Bid Documents A15 Bidding / Construction Procurement A16 Progress Meetings, Reports and Schedules A17 Public Meetings A18 Engineering Services During Construction A19 Record Plans A20 If Authorized PR PM SPE PE DE ET DR CL RS FP TOTAL Total Hours PR - Principal PM - Project Manager SPE - Senior Project Engineer PE - Project Engineer DE - Design Engineer ET - Eng. Technician DR - Drafter CL - Clerical RS - Registered Surveyor FP - Field Person EXHIBIT B.1 - MAXIMUM HOURLY RATE SCHEDULE PROJECT TITLE: CIP NO.: Project Duration: Firm: From: xxx To: xxx XXX YEAR Labor Categories Principal (PR) Project Manager (PM) Project Engineer (PE) Design Engineer (DE) Engineering Technician (ET) CAD Operator (D1) Clerical (CL) Registered Surveyor (RS) 3-Man Field Crews (FP) 2011 2012 2013 2014 EXHIBIT C - COST SUMMARY 1. CITY: COLUMBUS, OHIO DEPT. OF PUBLIC UTILITIES 4. NAME OF CONSULTANT: 5. ADDRESS: 2. CIP NO. 3. VERSION: PROJECT TITLE: 6. TYPE OF CONTRACT: DIRECT HOURLY w/MULTIPLIER 7. DIRECT LABOR (DL) LABOR CATEGORY EST. HRS. MAX HOURLY RATE DL TOTAL: 8. HOURLY COST MULTIPLIER HCM = (1+OR+NF) OR= ( ______ %) Overhead Rate NF= ( ______ %) Net Fee or profit HCM TOTAL: 9. TOTAL LABOR COSTS (Line 7 x Line 8) 10. OTHER DIRECT COSTS (ODC) a. Travel Transportation _______ mi @ $ _______ /mile TOTALS $0.00 0.00 $0.00 EST. COST Travel Subtotal: $ b. Equipment, materials, supplies (provide itemized breakdown of these costs on separate sheet) E, M & S Subtotal: $ c. Subcontracts Subcontracts Subtotal: $ d. Other (Specify categories) Other Subtotal: $ OTHER DIRECT COSTS (ODC) TOTAL: $0.00 11. TOTAL COST (without Tasks A3, A8, A10.11 and A20)(sum of line 9 + line 10) $0.00 12 Task A3 - Sewer Cleaning and Televising (If Authorized) $0.00 13 Task A8 - Easements (If Authorized) $0.00 14 Task A10.11 - Waterline Relocation (If Authorized) $0.00 15 Task A20 - If Authorized (20% of line 11) $0.00 16 CONTRACT GRAND TOTAL (sum of lines 11 thru 15) $0.00 Exhibit D – Local Work Force Breakdown Provide a detailed self-evaluation of staff and sub-consultant utilization estimated for this project in accordance with the Evaluation Criteria. The local workforce information requested shall be detailed enough to enable the City to complete its own evaluation to validate the stated breakdown. Identify the percentage of the Team paying Columbus income tax on the date the proposal is submitted and the percentage of the Team that is located within Franklin County, but outside Columbus corporate limits. Use this information to determine scoring as stated in the evaluation criteria. Offeror: ______________________________________ Team % - (Cols. Income Tax/Within Franklin Co.) __________/___________ Provide office location of team members and indicate whether or not they pay Columbus income tax.: Proposed Subcontractor: ______________________________ Contract $ Amount: ________________________ Team % - (Cols. Income Tax/Within Franklin Co.) ___________/___________ Provide office location of team members and indicate whether or not they pay Columbus income tax: Proposed Subcontractor: ______________________________ Contract $ Amount: ________________________ Team % - (Cols. Income Tax/Within Franklin Co.) ___________/___________ Provide office location of team members and indicate whether or not they pay Columbus income tax: Proposed Subcontractor: ______________________________ Contract $ Amount: ________________________ Team % - (Cols. Income Tax/Within Franklin Co.) ___________/___________ Provide office location of team members and indicate whether or not they pay Columbus income tax: Proposed Subcontractor: ______________________________ Contract $ Amount: ________________________ Team % - (Cols. Income Tax/Within Franklin Co.) ___________/___________ Provide office location of team members and indicate whether or not they pay Columbus income tax: Page 1 of 1 8 21 8 12 12 8 12 15 8 12 12 12 15 12 WOODWARD AVE 12 24 12 8 8 Sanitary 12 12 8 12 Storm HSTS - City of Columbus 21 Feet 150 8 8 12 8 RUSKIN AVE 15 15 18 8 75 0 150 BUR YR L L IN Combined 12 WE Sewer Type: SU N NB GTO µ Legend D LVD L L IN WE 12 BARRYMORE AVE 12 12 ROSEWOOD AVE 15 12 30 GTO 8 NB 12 18 MEADOWDALE AVE 8 BRENTNELL AVE 10 LVD 24 12 12 12 8 12 12 12 15 24 12 12 8 10 24 12 12 RD 30 RT H 24 12 8 Sewer Type: OLENTAN µ Legend Combined Sanitary 8 HSTS - Franklin Co 12 12 12 Storm HSTS - City of Columbus Feet 150 75 80 150 4 LARKSTONE DR Columbus Corporation Boundary 12 8 8 GY RIVER RD 12 18 8 15 O 12 W 12 LI N HAVENHILL DR 21 12 12 24 8 18 12