Presentation - Tabet Entreprises SAL
Transcription
Presentation - Tabet Entreprises SAL
Tabet entreprises s.a.l Tabet entreprises s.a.l Presentation: TABET GROUP started off in West Africa in 1946. Led by Mr. Antoine TABET, the Group expanded its operation in different continents. Throughout the years the group gained notoriety by achieving major projects that contributed substantially to the economic and social development of many countries and mainly in the Western African countries. Our scope of interest is into the civil engineering works and turnkey projects. In 1966 Antoine Tabet paved the way for the French company Bouygues Construction into Africa, and became the representative of Bouygues in Senegal. Originally he built up his company by concentrating his energies on the finance and execution of a number of industrial, public works and infrastructure projects in Africa. Tabet was not to be contained in Africa. The 1980’s saw the birth of Tabet Group of Companies beginning with the creation of the Belgium based general contracting company ILPA, in which Tabet is a major shareholder. This facilitated the diversification of Tabet Group into the construction of “turnkey “and special design projects. ILPA as part of Tabet Group carved in niche for itself in the hospital sector and won bids to design, build and finance hospitals in the Middle East. The key to the success of the Group has been careful planning and forward thinking. Each new project is carefully studied and is independent of any other ongoing ventures at the time, thus minimizing the risk to the Group as a whole. Our strategy is simple: assess the situation, assess the risk, assess the viability and aggressively go for our target. For more information, please visit our website: www.tabetconstruction.com Tabet entreprises s.a.l Scope of Work: I. Building Works - Residential Buildings: from low cost housing to luxurious residential Villas and Buildings with the aim of budget and time performance - Hospitals: our hospitals are part of our special design/turnkey projects. They are built to satisfy international standards, serve their functional purpose yet maintain an aesthetic appearance to fit into their surroundings. - Office Centers and Shops: the Center in Hazmieh, Lebanon, is the heart of our operations. This Office Center houses different businesses including a bank. - Paper paste factory: the first of its kind in Africa, this paper paste factory, Cellucam, represents a technical achievement never seen before in the area. - Grain Silo: built in Pointe-noire, Congo, this grain silo was part of a mill and fodder project with a production rate of 250 tons per day. II. Civil works branched several categories: to - Roads: our extensive experience in road construction began in Congo (Brazzaville). This has enabled us to take on projects in other developing nations; - Bridges: the technical specifications present in bridge building are a challenge that our team of expert engineers have readily met. Our bridges are built to withstand the test of time. Only the best materials and techniques are used to ensure the safety and longevity of the final product. -Dams: we are have built gravity dams in The Ivory Coast and irrigation water ponds in Lebanon. -Infrastructure: Amwaj, man-made islands, Bahrain, We have undertaken the immense task of providing the infrastructure for this 3 million square meter paradise. The Amwaj project consists of four islands (land fill) joined together to form a world of dreams. PROJECTS in lebanon DISTRIBUTION NETWORKS, PUMPING STATIONS & WATER TANKS ZONE A OF BEIRUT: Location: Beirut – Lebanon. Owner: Beirut & Mount Lebanon Water Establishment. Engineer: Dar el Handasah Nazih Taleb & Partners Project Cost: 17,980,514 USD Contractor: Tabet Entreprises - Cooperativa Edile Appennino SCARL (Italy). Time Frame: 2015 - 2018 Description: The works consists of water supply systems including pipes, fittings and accessories, water tanks, pumping stations, electrical works, geotechnical works… PROJECTS in lebanon OLIVAR BRASILIA Location: Baabda, Brasilia – Lebanon Owner: CAPITALE FONCIERE S.A.L (part of Tabet group) Project Cost: 14,000,000 USD Time Frame: 2014 – 2016 Brief Description: Project consists of 30 apartments spread over 3 modern buildings comprising of 3 basements and 4 floors. PROJECTS in lebanon AYA TOWER – MAR MIKHEAL Location: Acharfieh – Lebanon Client: Mar Mikhael Rmeil Consultant: DG Jones Project Cost: 18,500,000 USD Time Frame: 2011 – 2016 Brief Description: Construction of a tower, including excavation works. Construction of 5 basements, 1 ground floor, 3 floors offices retails and 18 floors residential on a land area of 1,500m². PROJECTS in lebanon EVANGELICAL SCHOOL – RAS MASKA Location: Ras Maska – Lebanon Client: The National Evangelical Synod in Syria & Lebanon Consultant: Massoud Rahmeh & Yaaccoub El Soraf Project Cost: 12,957,954 USD Time Frame: 2013 – 2016 Brief Description: Part 1: consists in the concrete, waterproofing works pertaining to buildings A, B, C and the “House”. Part 2: consists in the Architectural, Mechanical & Electrical works pertaining to buildings A, C and the “House” and all External works. PROJECTS in lebanon OLIVAR 3 – JAMHOUR Location: Haret El Sitt – Lebanon Owner: Groupe Antoine TABET (part of Tabet group) Project Cost: 6,000,000 USD Time Frame: 2012 – 2015 Brief Description: The works comprise the construction of 3 buildings composed of underground parking, seller, 3 floors and 1 duplex each with one swimming pool. The apartment’s area varies between 150 m² and 285 m². PROJECTS in lebanon QATAR EMBASSY & AMBASSADOR’S RESIDENCE BUILDING IN BEIRUT Location: Jnah – Lebanon Client: Ministry of Foreign Affairs - Qatar Consultant: AEB /MA Consulting Group Project Cost: 17,771,875 USD Time Frame: 2011 – 2015 Brief Description: The works comprise the construction of Qatar Embassy and the Ambassador’s residence. The works will include all site works, landscaping, electrical and mechanical works. PROJECTS in lebanon REHABILITATION OF THE CHAMBER OF COMMERCE, INDUSTRY & AGRICULTURE OF BEIRUT & MOUNT LEBANON Location: Sanayeh – Lebanon Client: Chamber of Commerce Industry & Agriculture of Beirut & Mount Lebanon Consultant: My Projects Project Cost: 3, 685,048 USD Time Frame: 2012 – 2013 Brief Description: Rehabilitation of existing building: supply, installation, testing, commissioning, warranty & mobilization. PROJECTS in lebanon ORDER OF ENGINEERS & ARCHITECTS – TRIPOLI Location: Tripoli – Lebanon Client: Order of Engineers & Architects. Consultant: Bureau Ghalayini Project Cost: 9,043,217 USD Time Frame: 2009 - 2012 Brief Description: Execution & Completion of structural, infrastructural (mechanical & electrical) and isolation works. The building is composed from offices & conference hall. PROJECTS in lebanon MILITARY CLUB – DEIR AMMAR Location: Deir Ammar – Lebanon Client: Ministry of Defense - Lebanese Army Project Cost: 5,896,039 USD Time Frame: 2005 - 2010 Brief Description: Construction of a military club composed of sporting club (pools, cabinets, snack bar,….) social club (restaurant, salons, offices, library….) and general services ( parking, repair shop & maintenance, kitchen….) PROJECTS in lebanon SAIFI RESIDENCES – LOT 146 SAIFI Location: Saifi – Lebanon Client: Dubai Islamic Bank – UAE Engineer: Nabil Gholam Architecture & Planning Project Cost: 29,920,000 USD Time Frame: 2005 - 2009 Brief Description: Construction of 4 residential buildings: typical floors, duplex, basements for parking’s, underground for technical & shop storage ground floor for shops and cafes. PROJECTS in lebanon NACIM BAABDAT PLOT No. 220 MARMOUSA Location: Nacim Baabdat - Lebanon Client: Dubai Islamic Bank Consultant: ATME Engineers & Architects. Project Cost: 12,000,000 USD Time Frame: 2005 – 2006 Brief Description: Construction of 16 luxurious villas (Electrical works, plumbing, sanitary, heating, air conditioning). PROJECTS in lebanon VILLA FOULADFARD: Client: Location: Value: Time: Mr. Fouladfard Mechref 2,000,000 USD 2006 – 2008 SIRAN TOWERS: Client: Location: Value: Time: Mr. Ghandour Ramlet el Bayda 845, 000 USD 2006 – 2007 BOURJ EL MOULOUK, Client: Location: Value: Time: Ministry of Public Works South Lebanon 671,935 USD 2006 - 2007 AL AFIFA BUILDING: Client: Location: Value: Time: Bourgi Family Mussaytbeh 3,850,000 USD 2005 – 2007 OLIVAR II: Client: Location: Value: Time: Groupe Antoine TABET sal Jamhour 3,000,000 USD 2003 – 2005 SOUTH LEBANON IRRIGATION PONDS: Client: Value: Time: World Vision 729,000 USD 2004 Client: Location: Value: Time: Tripoli 5,700,000 USD 2001 - 2003 TABET HEAD OFFICE: Client: Location: Value: Time: Tabet Entreprises s.a.l Baabda 3,500,000 USD 2001 – 2002 RESIDENCE OLIVAR: Client: Location: Value: Time: Groupe Antoine TABET sal Jamhour 8, 000,000 USD 1998 – 2000 SAINTE THERESE HOSPITAL: Client: Congrégation Maronite des Sœurs de Sainte Thérèse de l ‘Enfant Jésus Hadath 10, 160,000 USD 1998 – 1999 KLAYLE, JEZZINE, DEBEL AIN EBEL ROADS; HABBOUCHE & HAJJEH, REMECH BRIDGES TRIPOLI PUBLIC HOSPITAL: Location: Value: Time: Council for Development & Reconstruction PROJECTS in bahrain DIYAR AL MUHARRAQ PROJECT HABITAT, PRIORITY PLOT 23A.2 Location: Kingdom of Bahrain Client: Diyar Al Muharraq Housing Development CO. S.P.C Contractor: Cyprus Cybarco Tabet JV W.L.L Project Cost: BHD 20,749,958 Time Frame: May 2016 – Nov 2017 Scope of work: The work comprises the construction of: - Villa Type D11 (345 Nr) - Villa Type A1 (43 Nr) - Secondary Infrastructure - Adjustment for Facades & Villas PROJECTS in bahrain MONDELEZ BISCUIT FACTORY AT BIIP – HIDD Location: Kingdom of Bahrain Client: Mondelez Bahrain Biscuits WLL Sub-Contractor: Cyprus Cybarco Tabet JV W.L.L Project Cost: BHD 4,200,000 Time Frame: Dec 2015 – Nov 2016 Scope of work: Construction of Production Plant Building, Administration & Canteen Building, Utilities Services Buildings (RO Plants, Chiller room, Water Tank, Transformer room, substation). Construction of Internal Roads, Parking Lots and Paving Works, Construction of External Service Utilities Structures (Effluent Tank, Fire water collection tank, Underground water Tank, Underground Utilities, Septic Tank, Soak Pits, Manholes…) PROJECTS in bahrain LOT 111- INFRASTRUCTURE WORKS REEF ISLAND DEVELOPMENT Location: Kingdom of Bahrain Client: Lulu Tourism Company B.S.C Contractor: Cyprus Cybarco Tabet JV W.L.L Project Cost: 8,857,000 USD Time Frame: 2014 –2017 Brief Description: Infrastructure works for Reef Island PROJECTS in bahrain MARINA & YACHT CLUB Location: Kingdom of Bahrain Client: Lulu Tourism Company B.S.C Contractor: Cyprus Cybarco Tabet JV W.L.L Project Cost: 877, 800 USD Time Frame: 03/2014 – 08/2014 PROJECTS in bahrain RIFFA VIEWS DEVELOPMENT Location: Kingdom of Bahrain Client: Riffa Views Development B.S.C Consultant: MACE International Ltd Project Cost: 66,000,000 USD Project Frame: 2006 - 2009 Brief Description: The works briefly comprises of construction and completion of infrastructure works including but not limited to site clearance and preparation, bulk excavation, road works, sewerage network, potable water, drainage works, 11Kv distribution, LV cable distribution, street lighting, irrigation networks. PROJECTS in bahrain GCC INTERCONNECTION – ELECTRICAL SUBSTATIONS IN BAHRAIN & QATAR Location: Kingdom of Bahrain Client: GCC Interconnection Authority Consultant: ABB Switzerland Ltd Project Cost: 9,500,000 USD Project Frame: 2007 - 2009 Brief Description: Design & build of 2 electrical sub-station of 400 KV in Bahrain (Al Jasra) and Qatar (Doha South) PROJECTS in bahrain AIN ADHARI NATIONAL PARK Location: Kingdom of Bahrain Client: Adhari Park Development Company B.S.V Engineer: Gulf House Engineering Architects & Engineers Project Cost: 21,280,000 USD Time Frame: 2006 –2008 Brief Description: Works includes all civil, electro-Mechanical & finishing works for the main building complex, individual buildings, site development & infrastructure works (roads, demolition works, excavation & earthwork, Aqua Park…) PROJECTS in bahrain GULF AIR SIMULATOR TRAINING CENTER IN MUHARRAQ Location: Kingdom of Bahrain Client: Gulf Air Company G.S.C. Consultant: Mazen Al Umran Consulting Engs Project Cost: 7,021,070 USD Project Frame: 2005 - 2006 Brief Description: Simulator training center building for Pilot, MEP & Civil works and all related facilities for Gulf Air. PROJECTS in bahrain AMWAJ ISLAND Location: Kingdom of Bahrain Client: Ossis Property Development B.S.C Consultant: Ossis Property Development B.S.C Project Cost: 16,000,000 USD Project Frame: 2003 - 2005 Brief Description: Road works: asphalt, interlock, Kstone. Sewerage: gravity, new vacuum system, storm water, ducts crossing & all related works. PROJECTS IN AFRICA SAUDI ARABIA EMBASSY OFFICES & AMBASSADOR’S BUILDING Location: Bamako - Mali Client: Ministry of Foreign Affairs – Kingdom of Saudi Arabia Consultant: Arabian Consulting Engineering Services Project Cost: 19, 091,771.47 USD Time Frame: 2015 – 2017 Tabet Scope of Work: Project Management. Brief Description: The works comprise the construction of Saudi Arabia Embassy and the Ambassador’s residence. The works will include all site works, landscaping, electrical and mechanical works. PROJECTS IN AFRICA IMMEUBLE SIEGE ECOBANK Location: Brazzaville - Congo Client: Ecobank Project Cost: 15, 848, 600 USD Time Frame: 2015 – 2017 Brief Description: The works comprise the construction of offices: 1 basement, 1 ground floor and 6 levels, 7,200 m² built up area. PROJECTS IN AFRICA USINE D’EMBOUTEILLAGE HUILE DE PALME ET PRODUCTION MARGARINE Location: Ouesso - Congo Client: Eco Oil Energy SA - Congo Project Cost: 10, 852,845 USD Time Frame: 2015 – 2017 Brief Description: Construction of Modern Hangar Metallic Structure (Size 90 X 75 m H = 14m). Hangar & offices of Eco Oil built up area is 7,900m², Parking and External works built up area is 16,800m². The work consists of earthworks, Structure and hangar assembly. PROJECTS IN AFRICA MINISTERE DES MINES ET DE LA GEOLOGIE (BECC) Location: Brazzaville - Congo Client: Ministry of Mines Project Cost: 5, 168, 022 USD Time Frame: 2014 – 2016 Brief Description: The works comprise the construction of the Ministry offices: 1 ground floor and 4 levels, 4,900 m² built up area. PROJECTS IN AFRICA ASSURANCE GENERALE DU CONGO Location: Brazzaville – Congo Client: Assurance Générale du Congo Consultant: CICOP-CI Project Cost: 15,600,000 USD Time Frame: 2013 – 2016 Brief Description: Construction of the Insurance Headquarter in Brazzaville consisting of 2 undergrounds, 1 ground floor and 14 levels. The built up area is 8,100m² PROJECTS IN AFRICA VILLA KINTELE Location: Brazzaville – Congo Client: Confidential Consultant: Erga Group Project Cost: 5, 634,264 USD Time Frame: 2014 – 2016 Brief Description: Villa composed of 2 underground levels, 1 ground floor and 1 level, with a swimming pool. Built up area: 2,450m² PROJECTS IN AFRICA USINE DE PRODUCTION PHARMACEUTIQUE Location: Ollombo – Congo Client: Imex Group Project Cost: 7, 407, 498 USD Time Frame: 2014 – 2016 Brief Description: The factory is composed of 1 ground floor and 2 levels Built up area: 5,400m² PROJECTS IN AFRICA OFFICE BUILDING PLASCO Location: Pointe Noire – Congo Client: Société Eau Mayo Project Cost: 1,434, 400 USD Time Frame: 2014 – 2016 Brief Description: Civil works, Extension & Rehabilitation of the Factory. PROJECTS IN AFRICA HOTEL AZUR Location: Pointe Noire – Congo Client: Société de Développement Touristique Project Cost: 8, 476,000 $ Time Frame: 2006 - 2013 Brief Description: Construction, Extension and refurbishment. The hotel is composed of 1 ground floor & 4 levels. PROJECTS IN AFRICA AGENCE DE REGULATION DES POSTES ET TELECOMMUNICATIONS ELECTRONIQUES Location: Brazzaville – Congo Client: Agence de Régulation des Postes et Télécommunications Electroniques Consultant: Socotec - Congo Project Cost: 10,000,000 USD Time Frame: 2009 - 2011 Brief Description: Construction of the Headquarter building of the Agency in Brazzaville. The building is composed of 2 underground floor, 1 ground floor and 6 levels. PROJECTS IN AFRICA CATHEDRALE ICB Location: Brazaville – Congo Client: Private Client Project Cost: 1,789,088 USD Time Frame: 2009 – 2011 Brief Description: The building is composed of 1 ground floor, 3 levels and 1 duplex. PROJECTS IN AFRICA ROAD REHABILITATION / RN4 KISANGANI – NIANIA Location: Kinshasa – Congo Client: Ministère du Plan, Unité de Coordination Réunification Economique et Sociale. Consultant: Tescult - Canada Project Cost: 18, 6500,000 USD Time Frame: 2005 – 2008 Brief Description: Rehabilitation of 341 km, 20 culvert & 7 bridges. du Projet de PROJECTS IN AFRICA EXTENSION HOTEL OLYMPIC PALACE Location: Brazzaville - Congo Client: Rihan Family Consultant: GAPO Project Cost: 1,000,000 USD Time Frame: 2005 – 2006 Brief Description: Construction of a new building of 6 floors, 30 rooms and 4 presidential suites. PROJECTS IN AFRICA COCO BEACH HOTEL Location: Mbour - Senegal Client: C.T.P.C Consultant: MSCE - Senegal Project Cost: 5,100,000 USD Time Frame: 2003 – 2006 Brief Description: Construction and refurbishment (5000m²) supply of furniture and equipment, including building management system (BMS). PROJECTS IN AFRICA DAMS OF N’ZI VALLEY Location: N’ZI - Ivory Coast. Client: Ministry of Rural Development Team. Consultant: Team International - Morocco Project Cost: 14,700,000 USD Time Frame: 2003 – 2006 Brief Description: Construction of two earth dams and irrigation planning of 400 Ha. Length: 1,200m and 900m, Height: 9m PROJECTS IN AFRICA BOUANZA – MOUYOUNDI ROAD Location: Brazzaville – Congo Client: Ministry of Public works Consultant: Sogeco - Cetec Project Cost: 42,000,000 USD Time Frame: 1985 – 1988 Brief Description: Construction of Bouanza – Mouyoundi road (43Km – 4 reinforced concrete bridges). PROJECTS IN AFRICA NGO – MPOUYA ROAD: Client: Location: Value: Time: P.U.R.I.C.V Congo 1,400,000 USD 2004 – 2007 Client : Location: ASECNA Brazzaville EXTENSION NATIONAL ROAD N.2 Client: Location: Value: Time: Ministry of Public Works Brazzaville 30, 000,000 USD 2001 – 2002 OFFICE BUILDING FOR THE AVIATION AUTHORITY: Client: Location: Value: Time: Ministry of Public Works Pointe Noire & Brazzaville 6, 500, 000 USD 2001 – 2002 NATIONAL ROAD N.2: Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 45,000,000 USD 2000 – 2001 PREFECTORAL ROAD 8: Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 18,000,000 USD 1998 – 1999 POINTE NOIRE TOWNSHIP ROADS: Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 13,000,000 USD 1997 – 1998 PRIME MINISTER RESIDENCE: Client: Location: Value: Time: Republic of Congo Brazzaville - Congo 3,000,000 USD 1997 ASECNA: Value: Time: 1,425,000 USD 2002 – 2003 PREFECTORAL ROAD 26: Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 22,000,000 USD 1996 – 1997 PRESIDENTIAL GUEST PALACE: Presidency of the Republic of Congo Brazzaville – Congo 6, 500,000 USD 1996 Client: Location: Value: Time: PROJECTS IN AFRICA MFILOU RING ROAD: Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 12,500,000 USD 1996 MAYAMA ROAD RP 20: Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 20,000,000 USD 1995 PRESIDENTIAL PALACE & PRIME MINISTER RESIDENCE: Client: Location: Value: Time: Presidency of the Republic of Congo Brazzaville – Congo 45,000,000 USD 1992 – 1995 FLOUR MILL FACTORY: Client: Location: Value: Time: M.A.B Public Company Pointe Noire - Congo 10,000,000 USD 1991 RESIDENTIAL BUILDINGS: Client: Location: Value: Time: Soprogi Moukondo, Brazzaville - Congo 2, 750,000 USD 1991 EROSION CONTROL RP20:Client: Location: Value: Time: Ministry of Public Works Brazzaville - Congo 42,000,000 USD 1990 – 1991 GENERAL HOSPITAL LOUBOMO: Ministry of Public Health Brazzaville - Congo 32,000,000 USD 1989 – 1991 Client: Location: Value: Time: OFFICE CONSTRUCTION Client: LOUBOMO: Location: Value: Time: Funds for Retired Civil Servants Brazzaville – Congo 1,400,000 USD 1991 EDIBLE OIL FACTORY: Ministry of Industry Brazzaville - Congo 4,500,000 USD 1989 - 1990 Client: Location: Value: Time: PROJECTS IN EUROPE ELLIPSE CENTER Location: Sofia – Bulgaria Owner: Ilpa Development Ltd (part of Tabet group) Project Cost: 23,000,000 Euro Excl. VAT Brief Description: Project consists of a mixed use office commercial building of about 18,763 sq.m and comprising offices, restaurant, showroom, shops, conference facilities and underground parking. PROJECTS IN EUROPE IMMEUBLE DE LA COURONNE: Client: Location: Consultant: Value: Time: HSE Belgium Brussels - Belgium ILPA S.A 6,000,000 USD 2005 – 2006 EXTENSION CHEST HEART & VASCULAR SURGERY HOSPITAL HAYDARPASA Client: Location: Consultant: Value: Time: Ministry of Health- Turkey Turkey ILPA Belgium 10,000,000 USD 2000 – 2002 CHEST, HEART & VASCULAR SURGERY 500 BEDS HOSPITAL HAYDARPASA Client: Location: Consultant: Value: Time: Ministry of Health- Turkey Turkey ILPA Belgium 26,000,000 USD 1996 – 1998 ADDRESSES TABET ENTREPRISES S.A.L Tabet Center, 3rd Floor Baabda – Lebanon Tel: +961 5 959959 Fax: +961 5 951182 P.O. Box: 130-Hazmieh TABET ENTERPRISES W.L.L Yateem Center, Suite 304 Manama – Bahrein Tel: +973 17 224545 Fax: +973 17 228858 P.O. Box: 18180 - Manama GROUPE TABET SAL HOLDING Tabet Center, 3rd Floor Damascus Highway, Baabda – Lebanon Tel: +961 5 959959 Fax: +961 5 951182 Email: admin@tabetconstruction.com P.O. Box: 130-Hazmieh GROUPE ANTOINE TABET Tabet Center, 3rd Floor Baabda – Lebanon Tel: +961 5 959959 Fax: +961 5 951182 P.O. Box: 130-Hazmieh GENERALE DES TRAVAUX ET AMENAGEMENT Avenue Galieni, M’Pila Brazzaville – Congo Tel: +242 06 6666617 Fax: +242 2 22811971 P.O. Box: 1114 – Brazzaville CÔTE D’IVOIRE Trade Center Bldg Abidjan Tel: +225 09666166 P.O. Box: 186 Abidjan 01
Similar documents
PDF Catalogue - arda ertek
Social activity groups within the external heat power station and water tanks for hosting projects consisting of housing 13 blocks in total, plumbing, heating, ventilation, fire protection systems, ...
More information