Tabet entreprises s.a.l
Tabet entreprises s.a.l
Presentation:
TABET GROUP started off in
West Africa in 1946. Led by Mr. Antoine
TABET, the Group expanded its
operation in different continents.
Throughout the years the group
gained notoriety by achieving major
projects that contributed substantially
to the economic and social development
of many countries and mainly in the
Western African countries.
Our scope of interest is into the
civil engineering works and turnkey
projects.
In 1966 Antoine Tabet paved the
way for the French company Bouygues
Construction into Africa, and became
the representative of Bouygues in
Senegal. Originally he built up his
company by concentrating his energies
on the finance and execution of a
number of industrial, public works and
infrastructure projects in Africa.
Tabet was not to be contained in
Africa. The 1980’s saw the birth of
Tabet Group of Companies beginning
with the creation of the Belgium based
general contracting company ILPA, in
which Tabet is a major shareholder.
This facilitated the diversification of
Tabet Group into the construction of
“turnkey “and special design projects.
ILPA as part of Tabet Group carved in
niche for itself in the hospital sector
and won bids to design, build and
finance hospitals in the Middle East.
The key to the success of the Group
has been careful planning and forward
thinking. Each new project is carefully
studied and is independent of any other
ongoing ventures at the time, thus
minimizing the risk to the Group as a
whole.
Our strategy is simple: assess
the situation, assess the risk, assess
the viability and aggressively go for our
target.
For more information, please visit our
website:
www.tabetconstruction.com
Tabet entreprises s.a.l
Scope of Work:
I.
Building Works
- Residential Buildings: from low cost
housing to luxurious residential Villas
and Buildings with the aim of budget
and time performance
- Hospitals: our hospitals are part of
our special design/turnkey projects.
They are built to satisfy international
standards,
serve
their
functional
purpose yet maintain an aesthetic
appearance
to
fit
into
their
surroundings.
- Office Centers and Shops: the
Center in Hazmieh, Lebanon, is the
heart of our operations. This Office
Center houses
different businesses
including a bank.
- Paper paste factory: the first of its
kind in Africa, this paper paste factory,
Cellucam,
represents
a
technical
achievement never seen before in the
area.
- Grain Silo: built in Pointe-noire,
Congo, this grain silo was part of a mill
and fodder project with a production
rate of 250 tons per day.
II.
Civil works branched
several categories:
to
- Roads: our extensive experience in
road construction began in Congo
(Brazzaville). This has enabled us to
take on projects in other developing
nations;
- Bridges: the technical specifications
present in bridge building are a
challenge that our team of expert
engineers have readily met. Our bridges
are built to withstand the test of time.
Only the best materials and techniques
are used to ensure the safety and
longevity of the final product.
-Dams: we are have built gravity dams
in The Ivory Coast and irrigation water
ponds in Lebanon.
-Infrastructure: Amwaj, man-made
islands, Bahrain, We have undertaken
the immense task of providing the
infrastructure for this 3 million square
meter paradise. The Amwaj project
consists of four islands (land fill) joined
together to form a world of dreams.
PROJECTS in lebanon
DISTRIBUTION NETWORKS, PUMPING STATIONS & WATER TANKS
ZONE A OF BEIRUT:
Location:
Beirut – Lebanon.
Owner:
Beirut & Mount Lebanon Water Establishment.
Engineer:
Dar el Handasah Nazih Taleb & Partners
Project Cost:
17,980,514 USD
Contractor:
Tabet Entreprises - Cooperativa Edile Appennino SCARL (Italy).
Time Frame:
2015 - 2018
Description:
The works consists of water supply systems including pipes,
fittings and accessories, water tanks, pumping stations, electrical
works, geotechnical works…
PROJECTS in lebanon
OLIVAR BRASILIA
Location:
Baabda, Brasilia – Lebanon
Owner:
CAPITALE FONCIERE S.A.L (part of Tabet group)
Project Cost:
14,000,000 USD
Time Frame:
2014 – 2016
Brief Description:
Project consists of 30 apartments spread over 3 modern buildings
comprising of 3 basements and 4 floors.
PROJECTS in lebanon
AYA TOWER – MAR MIKHEAL
Location:
Acharfieh – Lebanon
Client:
Mar Mikhael Rmeil
Consultant:
DG Jones
Project Cost:
18,500,000 USD
Time Frame:
2011 – 2016
Brief Description:
Construction of a tower, including excavation works.
Construction of 5 basements, 1 ground floor, 3 floors offices retails
and 18 floors residential on a land area of 1,500m².
PROJECTS in lebanon
EVANGELICAL SCHOOL – RAS MASKA
Location:
Ras Maska – Lebanon
Client:
The National Evangelical Synod in Syria & Lebanon
Consultant:
Massoud Rahmeh & Yaaccoub El Soraf
Project Cost:
12,957,954 USD
Time Frame:
2013 – 2016
Brief Description:
Part 1: consists in the concrete, waterproofing works pertaining to
buildings A, B, C and the “House”.
Part 2: consists in the Architectural, Mechanical & Electrical
works pertaining to buildings A, C and the “House” and all
External works.
PROJECTS in lebanon
OLIVAR 3 – JAMHOUR
Location:
Haret El Sitt – Lebanon
Owner:
Groupe Antoine TABET (part of Tabet group)
Project Cost:
6,000,000 USD
Time Frame:
2012 – 2015
Brief Description:
The works comprise the construction of 3 buildings composed of
underground parking, seller, 3 floors and 1 duplex each with one
swimming pool. The apartment’s area varies between 150 m² and
285 m².
PROJECTS in lebanon
QATAR EMBASSY & AMBASSADOR’S RESIDENCE BUILDING IN
BEIRUT
Location:
Jnah – Lebanon
Client:
Ministry of Foreign Affairs - Qatar
Consultant:
AEB /MA Consulting Group
Project Cost:
17,771,875 USD
Time Frame:
2011 – 2015
Brief Description:
The works comprise the construction of Qatar Embassy and the
Ambassador’s residence. The works will include all site works,
landscaping, electrical and mechanical works.
PROJECTS in lebanon
REHABILITATION OF THE CHAMBER OF COMMERCE, INDUSTRY &
AGRICULTURE OF BEIRUT & MOUNT LEBANON
Location:
Sanayeh – Lebanon
Client:
Chamber of Commerce Industry & Agriculture of Beirut & Mount
Lebanon
Consultant:
My Projects
Project Cost:
3, 685,048 USD
Time Frame:
2012 – 2013
Brief Description:
Rehabilitation of existing building: supply, installation, testing,
commissioning, warranty & mobilization.
PROJECTS in lebanon
ORDER OF ENGINEERS & ARCHITECTS – TRIPOLI
Location:
Tripoli – Lebanon
Client:
Order of Engineers & Architects.
Consultant:
Bureau Ghalayini
Project Cost:
9,043,217 USD
Time Frame:
2009 - 2012
Brief Description:
Execution & Completion of structural, infrastructural (mechanical
& electrical) and isolation works. The building is composed from
offices & conference hall.
PROJECTS in lebanon
MILITARY CLUB – DEIR AMMAR
Location:
Deir Ammar – Lebanon
Client:
Ministry of Defense - Lebanese Army
Project Cost:
5,896,039 USD
Time Frame:
2005 - 2010
Brief Description:
Construction of a military club composed of sporting club (pools,
cabinets, snack bar,….) social club (restaurant, salons, offices,
library….) and general services ( parking, repair shop &
maintenance, kitchen….)
PROJECTS in lebanon
SAIFI RESIDENCES – LOT 146 SAIFI
Location:
Saifi – Lebanon
Client:
Dubai Islamic Bank – UAE
Engineer:
Nabil Gholam Architecture & Planning
Project Cost:
29,920,000 USD
Time Frame:
2005 - 2009
Brief Description:
Construction of 4 residential buildings: typical floors, duplex,
basements for parking’s, underground for technical & shop
storage ground floor for shops and cafes.
PROJECTS in lebanon
NACIM BAABDAT PLOT No. 220 MARMOUSA
Location:
Nacim Baabdat - Lebanon
Client:
Dubai Islamic Bank
Consultant:
ATME Engineers & Architects.
Project Cost:
12,000,000 USD
Time Frame:
2005 – 2006
Brief Description:
Construction of 16 luxurious villas (Electrical works, plumbing,
sanitary, heating, air conditioning).
PROJECTS in lebanon
 VILLA FOULADFARD:
Client:
Location:
Value:
Time:
Mr. Fouladfard
Mechref
2,000,000 USD
2006 – 2008
 SIRAN TOWERS:
Client:
Location:
Value:
Time:
Mr. Ghandour
Ramlet el Bayda
845, 000 USD
2006 – 2007
 BOURJ EL MOULOUK,
Client:
Location:
Value:
Time:
Ministry of Public Works
South Lebanon
671,935 USD
2006 - 2007
 AL AFIFA BUILDING:
Client:
Location:
Value:
Time:
Bourgi Family
Mussaytbeh
3,850,000 USD
2005 – 2007
 OLIVAR II:
Client:
Location:
Value:
Time:
Groupe Antoine TABET sal
Jamhour
3,000,000 USD
2003 – 2005
 SOUTH LEBANON
IRRIGATION PONDS:
Client:
Value:
Time:
World Vision
729,000 USD
2004
Client:
Location:
Value:
Time:
Tripoli
5,700,000 USD
2001 - 2003
 TABET HEAD OFFICE:
Client:
Location:
Value:
Time:
Tabet Entreprises s.a.l
Baabda
3,500,000 USD
2001 – 2002
 RESIDENCE OLIVAR:
Client:
Location:
Value:
Time:
Groupe Antoine TABET sal
Jamhour
8, 000,000 USD
1998 – 2000
 SAINTE THERESE
HOSPITAL:
Client:
Congrégation Maronite des Sœurs de
Sainte Thérèse de l ‘Enfant Jésus
Hadath
10, 160,000 USD
1998 – 1999
KLAYLE, JEZZINE,
DEBEL AIN EBEL ROADS;
HABBOUCHE & HAJJEH,
REMECH BRIDGES

TRIPOLI PUBLIC
HOSPITAL:
Location:
Value:
Time:
Council for Development & Reconstruction
PROJECTS in bahrain
DIYAR AL MUHARRAQ PROJECT HABITAT, PRIORITY PLOT 23A.2
Location:
Kingdom of Bahrain
Client:
Diyar Al Muharraq Housing Development CO. S.P.C
Contractor:
Cyprus Cybarco Tabet JV W.L.L
Project Cost:
BHD 20,749,958
Time Frame:
May 2016 – Nov 2017
Scope of work:
The work comprises the construction of:
- Villa Type D11 (345 Nr)
- Villa Type A1 (43 Nr)
- Secondary Infrastructure
- Adjustment for Facades & Villas
PROJECTS in bahrain
MONDELEZ BISCUIT FACTORY AT BIIP – HIDD
Location:
Kingdom of Bahrain
Client:
Mondelez Bahrain Biscuits WLL
Sub-Contractor:
Cyprus Cybarco Tabet JV W.L.L
Project Cost:
BHD 4,200,000
Time Frame:
Dec 2015 – Nov 2016
Scope of work:
Construction of Production Plant Building, Administration &
Canteen Building, Utilities Services Buildings (RO Plants, Chiller
room, Water Tank, Transformer room, substation).
Construction of Internal Roads, Parking Lots and Paving Works,
Construction of External Service Utilities Structures (Effluent
Tank, Fire water collection tank, Underground water Tank,
Underground Utilities, Septic Tank, Soak Pits, Manholes…)
PROJECTS in bahrain
LOT 111- INFRASTRUCTURE WORKS REEF ISLAND DEVELOPMENT
Location:
Kingdom of Bahrain
Client:
Lulu Tourism Company B.S.C
Contractor:
Cyprus Cybarco Tabet JV W.L.L
Project Cost:
8,857,000 USD
Time Frame:
2014 –2017
Brief Description:
Infrastructure works for Reef Island
PROJECTS in bahrain
MARINA & YACHT CLUB
Location:
Kingdom of Bahrain
Client:
Lulu Tourism Company B.S.C
Contractor:
Cyprus Cybarco Tabet JV W.L.L
Project Cost:
877, 800 USD
Time Frame:
03/2014 – 08/2014
PROJECTS in bahrain
RIFFA VIEWS DEVELOPMENT
Location:
Kingdom of Bahrain
Client:
Riffa Views Development B.S.C
Consultant:
MACE International Ltd
Project Cost:
66,000,000 USD
Project Frame:
2006 - 2009
Brief Description:
The works briefly comprises of construction and completion of
infrastructure works including but not limited to site clearance
and preparation, bulk excavation, road works, sewerage network,
potable water, drainage works, 11Kv distribution, LV cable
distribution, street lighting, irrigation networks.
PROJECTS in bahrain
GCC INTERCONNECTION – ELECTRICAL SUBSTATIONS
IN BAHRAIN & QATAR
Location:
Kingdom of Bahrain
Client:
GCC Interconnection Authority
Consultant:
ABB Switzerland Ltd
Project Cost:
9,500,000 USD
Project Frame:
2007 - 2009
Brief Description:
Design & build of 2 electrical sub-station of 400 KV in Bahrain (Al
Jasra) and Qatar (Doha South)
PROJECTS in bahrain
AIN ADHARI NATIONAL PARK
Location:
Kingdom of Bahrain
Client:
Adhari Park Development Company B.S.V
Engineer:
Gulf House Engineering Architects & Engineers
Project Cost:
21,280,000 USD
Time Frame:
2006 –2008
Brief Description:
Works includes all civil, electro-Mechanical & finishing works for
the main building complex, individual buildings, site development
& infrastructure works (roads, demolition works, excavation &
earthwork, Aqua Park…)
PROJECTS in bahrain
GULF AIR SIMULATOR TRAINING CENTER IN MUHARRAQ
Location:
Kingdom of Bahrain
Client:
Gulf Air Company G.S.C.
Consultant:
Mazen Al Umran Consulting Engs
Project Cost:
7,021,070 USD
Project Frame:
2005 - 2006
Brief Description:
Simulator training center building for Pilot, MEP & Civil works
and all related facilities for Gulf Air.
PROJECTS in bahrain
AMWAJ ISLAND
Location:
Kingdom of Bahrain
Client:
Ossis Property Development B.S.C
Consultant:
Ossis Property Development B.S.C
Project Cost:
16,000,000 USD
Project Frame:
2003 - 2005
Brief Description:
Road works: asphalt, interlock, Kstone.
Sewerage: gravity, new vacuum system, storm water, ducts
crossing & all related works.
PROJECTS IN AFRICA
SAUDI ARABIA EMBASSY OFFICES & AMBASSADOR’S BUILDING
Location:
Bamako - Mali
Client:
Ministry of Foreign Affairs – Kingdom of Saudi Arabia
Consultant:
Arabian Consulting Engineering Services
Project Cost:
19, 091,771.47 USD
Time Frame:
2015 – 2017
Tabet Scope of Work: Project Management.
Brief Description:
The works comprise the construction of Saudi Arabia Embassy
and the Ambassador’s residence. The works will include all site
works, landscaping, electrical and mechanical works.
PROJECTS IN AFRICA
IMMEUBLE SIEGE ECOBANK
Location:
Brazzaville - Congo
Client:
Ecobank
Project Cost:
15, 848, 600 USD
Time Frame:
2015 – 2017
Brief Description:
The works comprise the construction of offices: 1 basement, 1
ground floor and 6 levels, 7,200 m² built up area.
PROJECTS IN AFRICA
USINE D’EMBOUTEILLAGE HUILE DE PALME ET PRODUCTION
MARGARINE
Location:
Ouesso - Congo
Client:
Eco Oil Energy SA - Congo
Project Cost:
10, 852,845 USD
Time Frame:
2015 – 2017
Brief Description:
Construction of Modern Hangar Metallic Structure (Size 90 X 75 m
H = 14m).
Hangar & offices of Eco Oil built up area is 7,900m², Parking and
External works built up area is 16,800m².
The work consists of earthworks, Structure and hangar assembly.
PROJECTS IN AFRICA
MINISTERE DES MINES ET DE LA GEOLOGIE (BECC)
Location:
Brazzaville - Congo
Client:
Ministry of Mines
Project Cost:
5, 168, 022 USD
Time Frame:
2014 – 2016
Brief Description:
The works comprise the construction of the Ministry offices: 1
ground floor and 4 levels, 4,900 m² built up area.
PROJECTS IN AFRICA
ASSURANCE GENERALE DU CONGO
Location:
Brazzaville – Congo
Client:
Assurance Générale du Congo
Consultant:
CICOP-CI
Project Cost:
15,600,000 USD
Time Frame:
2013 – 2016
Brief Description:
Construction of the Insurance Headquarter in Brazzaville
consisting of 2 undergrounds, 1 ground floor and 14 levels.
The built up area is 8,100m²
PROJECTS IN AFRICA
VILLA KINTELE
Location:
Brazzaville – Congo
Client:
Confidential
Consultant:
Erga Group
Project Cost:
5, 634,264 USD
Time Frame:
2014 – 2016
Brief Description:
Villa composed of 2 underground levels, 1 ground floor and 1
level, with a swimming pool.
Built up area: 2,450m²
PROJECTS IN AFRICA
USINE DE PRODUCTION PHARMACEUTIQUE
Location:
Ollombo – Congo
Client:
Imex Group
Project Cost:
7, 407, 498 USD
Time Frame:
2014 – 2016
Brief Description:
The factory is composed of 1 ground floor and 2 levels
Built up area: 5,400m²
PROJECTS IN AFRICA
OFFICE BUILDING PLASCO
Location:
Pointe Noire – Congo
Client:
Société Eau Mayo
Project Cost:
1,434, 400 USD
Time Frame:
2014 – 2016
Brief Description:
Civil works, Extension & Rehabilitation of the Factory.
PROJECTS IN AFRICA
HOTEL AZUR
Location:
Pointe Noire – Congo
Client:
Société de Développement Touristique
Project Cost:
8, 476,000 $
Time Frame:
2006 - 2013
Brief Description:
Construction, Extension and refurbishment.
The hotel is composed of 1 ground floor & 4 levels.
PROJECTS IN AFRICA
AGENCE DE REGULATION DES POSTES ET TELECOMMUNICATIONS
ELECTRONIQUES
Location:
Brazzaville – Congo
Client:
Agence de Régulation des Postes et Télécommunications
Electroniques
Consultant:
Socotec - Congo
Project Cost:
10,000,000 USD
Time Frame:
2009 - 2011
Brief Description:
Construction of the Headquarter building of the Agency in
Brazzaville. The building is composed of 2 underground floor, 1
ground floor and 6 levels.
PROJECTS IN AFRICA
CATHEDRALE ICB
Location:
Brazaville – Congo
Client:
Private Client
Project Cost:
1,789,088 USD
Time Frame:
2009 – 2011
Brief Description:
The building is composed of 1 ground floor, 3 levels and 1 duplex.
PROJECTS IN AFRICA
ROAD REHABILITATION / RN4 KISANGANI – NIANIA
Location:
Kinshasa – Congo
Client:
Ministère du Plan, Unité de Coordination
Réunification Economique et Sociale.
Consultant:
Tescult - Canada
Project Cost:
18, 6500,000 USD
Time Frame:
2005 – 2008
Brief Description:
Rehabilitation of 341 km, 20 culvert & 7 bridges.
du
Projet
de
PROJECTS IN AFRICA
EXTENSION HOTEL OLYMPIC PALACE
Location:
Brazzaville - Congo
Client:
Rihan Family
Consultant:
GAPO
Project Cost:
1,000,000 USD
Time Frame:
2005 – 2006
Brief Description:
Construction of a new building of 6 floors, 30 rooms and 4
presidential suites.
PROJECTS IN AFRICA
COCO BEACH HOTEL
Location:
Mbour - Senegal
Client:
C.T.P.C
Consultant:
MSCE - Senegal
Project Cost:
5,100,000 USD
Time Frame:
2003 – 2006
Brief Description:
Construction and refurbishment (5000m²) supply of furniture and
equipment, including building management system (BMS).
PROJECTS IN AFRICA
DAMS OF N’ZI VALLEY
Location:
N’ZI - Ivory Coast.
Client:
Ministry of Rural Development Team.
Consultant:
Team International - Morocco
Project Cost:
14,700,000 USD
Time Frame:
2003 – 2006
Brief Description:
Construction of two earth dams and irrigation planning of 400 Ha.
Length: 1,200m and 900m, Height: 9m
PROJECTS IN AFRICA
BOUANZA – MOUYOUNDI ROAD
Location:
Brazzaville – Congo
Client:
Ministry of Public works
Consultant:
Sogeco - Cetec
Project Cost:
42,000,000 USD
Time Frame:
1985 – 1988
Brief Description:
Construction of Bouanza – Mouyoundi road (43Km – 4 reinforced
concrete bridges).
PROJECTS IN AFRICA
 NGO – MPOUYA ROAD:
Client:
Location:
Value:
Time:
P.U.R.I.C.V
Congo
1,400,000 USD
2004 – 2007
Client :
Location:
ASECNA
Brazzaville
 EXTENSION NATIONAL
ROAD N.2
Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville
30, 000,000 USD
2001 – 2002
 OFFICE BUILDING FOR
THE AVIATION
AUTHORITY:
Client:
Location:
Value:
Time:
Ministry of Public Works
Pointe Noire & Brazzaville
6, 500, 000 USD
2001 – 2002
 NATIONAL ROAD N.2:
Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
45,000,000 USD
2000 – 2001
 PREFECTORAL ROAD 8:
Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
18,000,000 USD
1998 – 1999
 POINTE NOIRE TOWNSHIP ROADS:
Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
13,000,000 USD
1997 – 1998
 PRIME MINISTER
RESIDENCE:
Client:
Location:
Value:
Time:
Republic of Congo
Brazzaville - Congo
3,000,000 USD
1997

ASECNA:
Value:
Time:
1,425,000 USD
2002 – 2003
 PREFECTORAL ROAD 26: Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
22,000,000 USD
1996 – 1997
 PRESIDENTIAL GUEST
PALACE:
Presidency of the Republic of Congo
Brazzaville – Congo
6, 500,000 USD
1996
Client:
Location:
Value:
Time:
PROJECTS IN AFRICA
 MFILOU RING ROAD:
Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
12,500,000 USD
1996
 MAYAMA ROAD RP 20:
Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
20,000,000 USD
1995
 PRESIDENTIAL PALACE
& PRIME MINISTER
RESIDENCE:
Client:
Location:
Value:
Time:
Presidency of the Republic of Congo
Brazzaville – Congo
45,000,000 USD
1992 – 1995
 FLOUR MILL FACTORY:
Client:
Location:
Value:
Time:
M.A.B Public Company
Pointe Noire - Congo
10,000,000 USD
1991
 RESIDENTIAL BUILDINGS: Client:
Location:
Value:
Time:
Soprogi
Moukondo, Brazzaville - Congo
2, 750,000 USD
1991
 EROSION CONTROL RP20:Client:
Location:
Value:
Time:
Ministry of Public Works
Brazzaville - Congo
42,000,000 USD
1990 – 1991
 GENERAL HOSPITAL
LOUBOMO:
Ministry of Public Health
Brazzaville - Congo
32,000,000 USD
1989 – 1991
Client:
Location:
Value:
Time:
 OFFICE CONSTRUCTION Client:
LOUBOMO:
Location:
Value:
Time:
Funds for Retired Civil Servants
Brazzaville – Congo
1,400,000 USD
1991
 EDIBLE OIL FACTORY:
Ministry of Industry
Brazzaville - Congo
4,500,000 USD
1989 - 1990
Client:
Location:
Value:
Time:
PROJECTS IN EUROPE
ELLIPSE CENTER
Location:
Sofia – Bulgaria
Owner:
Ilpa Development Ltd (part of Tabet group)
Project Cost:
23,000,000 Euro Excl. VAT
Brief Description:
Project consists of a mixed use office commercial building of about
18,763 sq.m and comprising offices, restaurant, showroom, shops,
conference facilities and underground parking.
PROJECTS IN EUROPE
 IMMEUBLE DE LA
COURONNE:
Client:
Location:
Consultant:
Value:
Time:
HSE Belgium
Brussels - Belgium
ILPA S.A
6,000,000 USD
2005 – 2006
 EXTENSION CHEST
HEART & VASCULAR
SURGERY HOSPITAL
HAYDARPASA
Client:
Location:
Consultant:
Value:
Time:
Ministry of Health- Turkey
Turkey
ILPA Belgium
10,000,000 USD
2000 – 2002
 CHEST, HEART &
VASCULAR SURGERY
500 BEDS HOSPITAL
HAYDARPASA
Client:
Location:
Consultant:
Value:
Time:
Ministry of Health- Turkey
Turkey
ILPA Belgium
26,000,000 USD
1996 – 1998
ADDRESSES
TABET ENTREPRISES S.A.L
Tabet Center, 3rd Floor
Baabda – Lebanon
Tel: +961 5 959959
Fax: +961 5 951182
P.O. Box: 130-Hazmieh
TABET ENTERPRISES W.L.L
Yateem Center, Suite 304
Manama – Bahrein
Tel: +973 17 224545
Fax: +973 17 228858
P.O. Box: 18180 - Manama
GROUPE TABET SAL HOLDING
Tabet Center, 3rd Floor
Damascus Highway,
Baabda – Lebanon
Tel: +961 5 959959
Fax: +961 5 951182
Email: admin@tabetconstruction.com
P.O. Box: 130-Hazmieh
GROUPE ANTOINE TABET
Tabet Center, 3rd Floor
Baabda – Lebanon
Tel: +961 5 959959
Fax: +961 5 951182
P.O. Box: 130-Hazmieh
GENERALE DES TRAVAUX ET AMENAGEMENT
Avenue Galieni, M’Pila
Brazzaville – Congo
Tel: +242 06 6666617
Fax: +242 2 22811971
P.O. Box: 1114 – Brazzaville
CÔTE D’IVOIRE
Trade Center Bldg
Abidjan
Tel: +225 09666166
P.O. Box: 186 Abidjan 01

Similar documents

PDF Catalogue - arda ertek

PDF Catalogue - arda ertek Social activity groups within the external heat power station and water tanks for hosting projects consisting of housing 13 blocks in total, plumbing, heating, ventilation, fire protection systems, ...

More information