2011 Aviation Maintenance S p i ymposium
Transcription
2011 Aviation Maintenance S p i ymposium
2011 Aviation Maintenance S p i Symposium Naval Aviation in Transition: The Next 100 years Presented by: RDML Tim Matthews 2 Naval Aviation in Transition - The Past - The Future - The FRC's - Looking Forward 3 The Past: A Short History of Naval Aviation 1910 1910: First takeoff from a ship, USS Birmingham 1911: First landing on a ship, USS Pennsylvania 1917: WW I 1920 9 0 1922: USS Langley (CV-1) commissioned 1934: First Navyy ship p to be built as a carrier from the keel up, USS Ranger (CV-4) 1930 1938: USS Enterprise (CV-6) The first “Big E” commissioned 1940 4 The Past: A Short History of Naval Aviation 1940 1941: Attack on Pearl Harbor – “a date which will live in infamy” 1942: The Battle of Midway 1948: First 950 Helicopter squadron HU HU-11 1950 1953: Angled Decks & First Jet Trap 1960 1961: CVN 65 The Big “E” goes nuclear July 5th, 1968: Public Law 90-386 90 386 approved, approved AMDO Community born 1969: OPNAV 4790.2, 2 Volumes AMDO’s First 100 1964: Vietnam 1970 5 The Past: A Short History of Naval Aviation 1970 1976: First Female AMDO 1971: First AV-8 Harrier Delivery 1972: First F-14 Tomcat Delivery 1980 1988: First AMDO Flag 1990: Operation D Desert t Storm St 1990 1994 First 1994: Fi t Female F l Aviator A i t CQ's CQ' 2000 2001: September p 11th and Operation Enduring Freedom 2006: Fleet Readiness Centers established 2009: PAMO Wings Approved 2005: CNAF 4790.2, 1 Volume 2010 6 The Future: Naval Aviation Challenges Transitions - Legacy to New • F/A-18 P-3 3 •P • H-60 • E-2 • JSF • BAMS • EA-18 • V-22 Legacy Platforms • Corrosion • Structural Fatigue • Obsolescence (DMSMS) Budgets • Global Economic Situation • Rising sustainment costs • Domestic Budget Priorities • Industrial Base 7 The Future: Solutions • System Engineering and Logistics Technical Review Process (SELTR) • Prognostic Health Management & Conditional Based Maintenance + • Automated Logistics Environment (ALE) • Performance Based Logistics (PBL) • AIRSpeed • Fleet Readiness Centers 8 Fleet Readiness Centers FRC NORTHWEST NAS Whidbey Island AIRCRAFT E/A-6B, E/A-18G, P-3 ENGINES T56, J52 COMPONENTS ALQ 99 E/A-6, ALQ-99, E/A 6 canopies canopies, components for above TMSs INTEGRATED MAINTENANCE, REPAIR AND OVERHAUL OF NAVAL AVIATION AIRFRAMES, ENGINES, AND COMPONENTS I-LEVEL • 10,000 Civilians • 6,000+ Sailors & Marines • 3 Depots + 1 GOCO Operation • 20 IMAs • • 6,000 6 000 Engine / Module / Accessory Repairs 1,500 Engine / Module Repairs • • 580,000 Component Repairs 70,000 Component Repairs • 700 Aircraft Repairs • $2.0 Billion Operation Mission Funded • $2.0 Billion Operation NWCF Funded FRC WEST NAS Lemoore AIRCRAFT F/A-18 (PMI 2, AEPD), E/A-18G ENGINES F414, T56 COMPONENTS F/A-18 RADAR, composites, components for above TMSs D-LEVEL FRC WEST PAC NAF Atsugi, JA (Formerly NAPRA) AIRCRAFT H-53, C-130, E/A-6B, F/A-18, H-46, H-60, H-1 P-3, E-2, E/A-18G MAINTENANCE LEVEL D – DEPOT I – INTERMEDIATE FRC SEFAC NRC Solomons Repair, modification, and overhaul of common and peculiar Support Equipment and Test Cells FRC MID-ATLANTIC NAS Oceana AIRCRAFT F/A-18 (PMI 2), E-2 (PMI 1), C-2 (PMI 1, 2), H-53 (ISR), H-60 (PMI 1N, 2N) ENGINES F404, T56, T700, T64, T400 COMPONENTS F/A-18 Electro-optics, RADAR, Composites, Instruments, Components for above TMSs VOYAGE REPAIR TEAM Repair and overhaul USN, USCG, FMS air capable assets and ALRE components FRC EAST FRC SOUTHWEST NAS North Island AIRCRAFT F/A-18, E-2, C-2, H-1, H-60, AV-8 (PMI 2,3), H-53 (PMID), (PMI 1N, 2N, PMI 2 Mods, P&E) ENGINES LM2500, T700, T56 COMPONENTS Instruments, E-2 radar, composites, components for above TMSs FRC SOUTHEAST NAS Jacksonville J k ill AIRCRAFT E/A-6B (PMI 1, 2, 3, 4), P-3 (PH 1, 2, 3, SSI), F/A-18 (PMI 1, 2, 1M, 2M), H-60 (PMI 1N, 2N) ENGINES T56, J52, TF34, F404, F414, T700 COMPONENTS Electro-Optics, air refueling stores, racks/launchers, components for above TMSs 9 MCAS Cherry Point AIRCRAFT AV-8B (PMI 1, 2, 3, 4, SWRK), H-53 (AWI, SDML, PMID), H-1(BSL, 1N, 2N, SDLM), EA-6B, (PMI 2, 3, 4), CH-46 (PMID, SDLM, AWI) ENGINES T58, F402, T64, T400, T56 COMPONENTS Dynamic components, rotor blades, props, blades/vanes, APU/GTC, components for above TMSs as well as E-2 and P-3 props File: NAVAIR _Overview 9 COMFRC: Organizational and Resource Alignment CNRFC CPF CNAF CNAFR COMFRC (AIR-6.0D) CNAP CNAL Former titles in parentheses FRC Southwest 65888 FRC MidAtlantic 44327 FRC West 44321 FRC Northwest 44329 (AIMD Oceana) (AIMD Lemoore) (AIMD Whidbey Is) (NADEP North Island) Sea OP DET 46963 (NAS Oceana SEAOPDET) Det Norfolk 44325 (AIMD Norfolk) Det Norfolk SEAOPDET 46966 (Sea OPDET) Det Beaufort SEAOPDET 46961 Det CV/CVN SEAOP Det ELU 31635 FRC SW 44326 FRC SE Det MA Oceana 4274A (NADEP Jacksonville Det) FRC Det MA Oceana 65883 (NWCF) FRC Det MA PAX 63087 (MPN) FRC MA Det PAX 4143A (AIMD Patuxent River) Det NORL 44490 (AIMD New Orleans) Det Wash DC 44492 (AIMD Wash DC) 46964 (CV/CVN SEA OPDET) (Elec Attack Wing ELU) Det Fallon P3 OPDET 3826A 44317 (AIMD Fallon) SW Det W Lemoore 68833 (DEPOT NI Det) FRC Det West China Lake 65884(NWCF) FRC Det West China Lake 63088 (MPN) FRC West Det China Lake 30764 (NAWCWD AIMD China Lake) Det FT Worth 44487 (AIMD Ft Worth) (P3 OP Det) Det Everett 3844A (AIMD Everett Unit) EA-6B VAN OPDET 31179 (EA-6B VAN OPDET) CV/CVN SEA OPDET 46967 (CV/CVN SEA OPDET) (AIMD North Island) CV/CVN OP DET 46968 (CV/CVN OP Det) Det Pt Mugu 44328 (AIMD Pt Mugu) Det Pt Mugu CV/CVN OPDET 46962 (CV/CVN OP DET PT Mugu) Det NAVCAL LAB Futenma 68314 (NAVCALLAB) FRC SW DET NW Whidbey IS 39801 (DEPOT NI Det) NAVAIR FFC Det NAVCAL LAB Iwakuni 68315 FRC East 65923 31304 (NWCF) 69549 (MPN) 69548 (MPN) 3073A (RPN) FRC Southeast 65886 FRC East 3074A FRC SE 44319 Det Guam 66979 (AIMD Jacksonville) (NAPRA Det Guam) Sea OP Det Jax 46965 Det Okinawa 39539 (AIMD Willow Will G Grove)) Det P-3 3824A (P-3 Op Det/JAX) Det Mayport 45459 (NS Mayport FL AIMD) Det Key West 44320 (NAS Key West AIMD) (new detachment) (SEFAC) (NAPRA) (NAS JAX Sea OP Det) COMFRC DET MPN North Island FRC SUPEQUIP (NADEP Jacksonville) Det Willow Grove 44493 COMFRC DET NWCF North Island 47672 FRC Westpac 66021 (NADEP Cherry Point) (NADEP Cherry Point (MPN)) COMFRC DET MPN North Island 39931 FLAG / 68520 (MPN) Legend 68778 (NAPRA Det Okinawa) Det Singapore 55245 (NAPRA Det Singapore) Det Korea 48759 NAPRA Det Korea Det Iwakuni 68698 NAVAIR NWCF Industrial NAVAIR UIC MPN/GF NAVAIR UIC USMC CO NAVAIR NAWC UICS MPN/MRTFB BILLETS REALIGNED CPF/CNAP (NAPRA Det D t IIwakuni) k i) Det Australia 52846 FFC/CNAL CNRFC/ CNAFR (NAVCALLAB) Updated: 10 Mar 2011 10 COMFRC Output FY10 AIRCRAFT ENGINES COMPONENTS 532 LVL III: 1208 LVL III: 78,383 ISR: 3850 LVL II: 4115 LVL II: 562,396 REVENUE LVL III FY10 A/C: $566,625 ENG: $388,949 COMP: $638,072 PRE: $199,252 PRL: $84,951 OTHER: $343,228 TOTAL: $2,171,077 11 COMFRC Strategy NAVAL AVIATION MAINTENANCE STRATEGIES • Distribute • Consolidate – Moving Depot Capability Forward – Establishing High Velocity Repair Loops with Brokered R/R • Optimize – BRAC BRAC-Related Related Closures – Consolidating Repair Sites and Creating Centers of Excellence – AIRSpeed Saturation – Supply / Maintenance Consolidation of Connectivity y Driven by Business Case Analysis COMFRC 2011 COMMANDERS GUIDANCE THEMES Current Readiness – Reduce Cost of Delivered Products and Services – Improve On-Time Delivery – IImprove Ability Abilit to t Produce Products and Future Capability – Optimize p Infrastructure – Optimize Capabilities and Capacity – Improve Interface with I d t and Industry d Customers C t People – Improve p Workforce Safety and Wellness – Develop Workforce for Future Capability – Execute Strategic Planning Services 12 Distributed Depot Maintenance (Subsystem Examples) Disassemble I- Repair Assemble N t Not Repairable Re-Assemble Check & Test Transport Disassemble Non-Distributed Maintenance Example I- Repair Assemble Not Repairable Re-Assemble Disassemble D-Repair Assemble Distributed Maintenance Example Check & Test Transport Inspect Disassemble Inspect D-Repair Assemble • F/A – 18 A-D Hydraulic Drive Unit (HDU) Repairs – 44 HDUs Interdicted, Interdicted $1 $1.15M 15M Cost-avoidance Cost avoidance • F/A – 18 A-D Horizontal Stabilizer Actuator Repair – $3.31M Cost-avoidance • H-53 Main Rotor Blade Repairs – 27 Rotor Blades Interdicted, $2.05M Cost-avoidance Intermediate Maint Supply Depot Maint 13 Overall FRC BRAC Cost Avoidance FRC Total Cost Avoidance BRAC Implementation Period to date Oct 2006 to March 2011 Oct 2006 to March 2011 FRC Total Cost Avoidance FRC Total Cost Avoidance All 6 BRAC Savings Categories* FY11 $ THOUSANDS $ THOUSANDS ALL 6 BRAC SAVINGS CATEGORIES* Ahead of BRAC FYDP plan to date $184M BRAC C FYDP cost a avoidance o da ce ta target get for o Oct 06 – 15 5 Sep 11 = $ $1,151M , 5 Actual Cost Avoidance to date = $1,218M Exceeded FYDP target to date = $67M Ahead of FY‐11 BRAC plan $48M * BCMI, AIRSpeed, MPN, Civ. Salary, BOS, & APN‐6 14 COMFRC Workforce Trends TOTAL CIVILIAN END STRENGTH (INCLUDING TEMPORARY EMPLOYEES) 24,000 22,000 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6 000 6,000 4,000 2,000 0 FY92 FY93 FRC EAST FY94 FY95 FY96 FRC SOUTHEAST FY97 FY98 FY99 FY00 FRC SOUTHWEST FY01 FY02 FY03 FY04 NADEP ALAMEDA FY05 FY06 FY07 FY08 NADEP NORFOLK FY09 PB10 PB11 NADEP PENSACOLA Workforce Trends • Work Years – Trending consistent with ith workload kl d • Workforce Age – 50 years -Need to monitor critical skill and apprentice programs closely l l • Attrition – 5% -Trending lower over last 2 years FY07–FY10: DONIBIS Actuals FY11: FY12 PresBud Civilian Workyears less OT 15 AIRSpeed Focusing on Efficiency FLEET READINESS CENTER EAST CHERRY POINT – H-1 AIRCRAFT PRODUCTION LINE AFTER: BEFORE: – AH-1W Cobra TAT 35 Days – AH-1W Cobra TAT 75 Days – Overtime 8% – Overtime 13 13.8% 8% FLEET READINESS CENTER SOUTH EAST JACKSONVILLE – F/A-18 F/A 18 Li Line BEFORE: - TAT: 422 days - Delivered: 9 F/A-18 AFTER: – TAT: 326 days (22% reduction) – Delivered: 16 F/A-18 (77% increase) FLEET READINESS CENTER SOUTHWEST – F/A-18 CBR+ KITTING BEFORE: – AFC 316 fastener kitted In 88 bags – Artisans used PEB V kitted Vs. kitt d hardware h d AFTER: – Central location – Better inventory control – Reduced duplicate PEB fasteners – Savings g $590k annually y 16 FRC Efficiency and Effectiveness • EFFICIENCY – Rates – WLS – TRR – Overhead Costs • EFFECTIVENESS – On Time Deliveryy – RFI Rate – Quality – Unit Cost IImprovement IInitiatives ii i -ARAT/ QBM -Best B off B Breed dR Rates -Reduced Cup Price/OARS -Capacity C i O Optimization i i i -Direct Unit Cost Standardization 17 Looking Forward • Enterprise Behavior • Leveraging Le eraging Technology Technolog • Adapting to Budget Realities 18 19