1 - Langdon and Seah
Transcription
1 - Langdon and Seah
LANGDON & SEAH VIETNAM CO LTD 2 1 2 3 Handbook Cover Photos: 1. The One - HCMC 2. German House - HCMC 4 5 3. Viet Capital Center - HCMC 4. Vivo City - HCMC 5. Saigon Center Phase 2&3 - HCMC Copyright Statement and information caveat Eighth Edition 2015 © Langdon & Seah Vietnam Co Ltd All rights reserved. No part of this publication may be produced, copied, stored or transmitted in any form without prior written permission from Langdon & Seah Vietnam Co Ltd. The information contained herein should be regarded as indicative and for general guidance only. Langdon & Seah Vietnam Co Ltd makes no representation, expressed or implied, with regard to the accuracy of the information herein and cannot accept any responsibility or liability for any errors or omissions that may be made. handbook are current as at 4th Quarter 2014. 3 TABLE OF CONTENT Table of Content Calendars Introduction 4 6 7 1. CONSTRUCTION COST DATA 10 18 26 Construction Costs for Selected Asian Cities 28 36 Utility Costs for Selected Asian Cities 44 2. GENERAL CONSTRUCTION DATA 50 Import Duties 52 53 54 LANGDON & SEAH VIETNAM CO LTD 3. PROPERTY INVESTMENT 4 58 62 63 64 67 Contractor Selection Strategies 72 77 82 4. VIETNAM BUSINESS ENVIRONMENT Language Accounting System Taxation Insurance 92 92 93 95 96 100 105 5. OTHER INFORMATION 108 109 110 112 121 IDD Codes and Time Differences Conversion Factors Some Interesting Facts 122 124 Langdon & Seah Culture Langdon & Seah Vietnam 10 Years Anniversaries Professional Services Directory of offices Acknowledgement 131 132 126 127 135 139 150 5 CALENDARS 2015 S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 JAN 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S M T 5 7 6 W 1 8 T F S 2 3 4 9 10 11 APR 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 S M 5 T 6 7 W 1 8 T 2 9 F S 3 4 10 11 JUL 15 16 17 18 19 20 21 22 23 24 25 26 27 28 15 16 17 18 19 20 21 22 23 24 25 26 27 28 FEB S M 31 3 4 5 6 7 8 9 10 11 12 13 14 15 16 T W T F 1 S 2 S M T 1 2 7 8 9 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 21 22 23 24 25 26 27 28 29 30 S M S M MAY A 30 31 2 3 T 4 W 5 T 6 F S 7 1 8 AUG 26 27 28 29 30 31 23 24 25 26 27 28 29 T W T F S OCT 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S M 31 3 10 17 24 T W T S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 NOV 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 F S S M T W T F S 1 8 15 22 29 2 9 16 23 30 7 14 21 28 1 8 15 22 29 2 9 16 23 3 10 17 24 4 11 18 25 5 12 19 26 6 13 20 27 F 1 8 15 22 29 S 2 9 16 23 30 S 1 8 15 22 29 M 2 9 16 23 30 T 3 10 17 24 31 W 4 11 18 25 T 5 12 19 26 F 6 13 20 27 S 7 14 21 28 F 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 S 2 9 16 23 30 S M 1 7 8 14 15 21 22 28 29 T 2 9 16 23 30 W 3 10 17 24 31 T 4 11 18 25 F 5 12 19 26 S S M T W T 2 9 16 23 30 3 10 17 24 JAN 4 11 18 25 5 12 19 26 6 13 20 27 7 14 21 28 S M T W T 3 10 17 24 4 11 18 25 5 12 19 26 6 13 20 27 7 14 21 28 S 31 3 10 17 24 M T W T APR JUL S M T 30 2 9 16 23 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 31 3 10 17 24 W T F OCT MAR 29 30 31 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 LANGDON & SEAH VIETNAM CO LTD S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 13 14 15 16 17 18 19 20 21 22 23 24 25 S M 6 S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 JUN T 1 6 7 8 13 14 15 W 2 9 16 T 3 10 17 SEP F S 4 5 11 12 18 19 20 21 22 23 24 25 26 27 28 29 30 S M T 1 6 7 8 13 14 15 W 2 9 16 T 3 10 17 F S 4 5 11 12 18 19 DEC 20 21 22 23 24 25 26 27 28 29 30 2016 T W T F S 1 8 15 22 29 2 9 16 23 30 3 10 17 24 31 4 11 18 25 5 12 19 26 S M T 5 12 19 26 7 14 21 28 W 1 8 15 22 29 T 2 9 16 23 30 F 3 10 17 24 S 4 11 18 25 S 6 13 20 27 T W T 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 F 2 9 16 23 30 S 3 10 17 24 F S S M F S 4 11 18 25 5 12 19 26 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 2 9 16 23 30 3 10 17 24 31 FEB MAY A AUG 1 6 7 8 13 14 15 20 21 22 27 28 29 W T F S 3 4 5 6 10 11 12 13 17 18 19 20 NOV S M 6 13 20 27 MAR 7 14 21 28 6 13 20 27 S M JUN SEP T W T DEC INTRODUCTION INTRODUCTION future annually published handbooks, focuses on the major cities in Asia. The handbook is structured to serve as a general reference guide on construction cost indicators in Asia. The information contained in this handbook has been compiled by Langdon & Seah Vietnam Co Ltd. Any further information and/or if advice relating to particular Langdon & Seah Vietnam Co Ltd INTRODUCTION 7 CONSTRUCTION COST DATA Construction Market 2015 Outlook Major Rates for Selected Asian Cities Construction Costs for Selected Asian Cities M&E Costs for Selected Asian Cities Utility Costs for Selected Asian Cities 1 1 CONSTRUCTION COST DATA CONSTRUCTION MARKET 2015 OUTLOOK Interestingly much of the global economic press has focused more on politics in its forecast for 2015 rather than economic growth. Although there will be global growth in 2015 it seems few people are expecting anything exceptional. As we had predicted the global economy carried mixed results in 2014. The developed world remained pretty much the driver of global demand and despite the scaling down of Quantitative Easing both in the US and UK. Europe continued to struggle and Japan continued to implement its fiscal and monetary reforms but at a slower rate than hoped. There were a number of issues affecting the Emerging Markets and especially Russia and Brazil struggled. China did not achieve its forecast growth rates yet its LANGDON & SEAH VIETNAM CO LTD GDP growth was higher than the other BRIC nations. 12 10 Global GDP is on the increase however and much of the 2014 growth was carried by China and the other Emerging Markets. Vietnams GDP growth was quite strong at over 6% and largely driven by exports and Foreign Direct Investment. The domestic economy remained fairly flat and with little access to credit. CONSTRUCTION COST DATA THE GLOBAL ECONOMY 2015 Global GDP in 2015 will grow around 2.5% and the fastest growing region will be Asia but few countries in the region will improve upon their 2014 growth. China will likely be the fastest growing major Asia economy at 7% growth. The US and UK are likely to be the best performing developed economies and Japan will continue its own economic and structural reforms, we also expect a greater level of QE in Europe. Ultimately the developed economies will improve growth in Asian exports. THE VIETNAM ECONOMY 2015 Vietnam will have one of the higher GDP growth rates in the region at circa 6.5% and growth will continue to be fuelled by exports and Foreign Direct Investment (FDI). Investment particularly from Japan and South Korea may be hampered by currency volatility. The banking sectors non performing loans issues are being rectified and as consequence we do expect an improvement in money supply into the domestic economy. THE VIETNAM CONSTRUCTION MARKET 2015 The market will continue to remain flat and due to limited access to credit. We do expect a greater FDI focus into property development including; private investment into the residential market and continued Overseas Development Assistance (ODA) into the infrastructure sector. Global commodity prices may improve in 2015 but from a low base and accordingly this may affect and increase construction costs but most likely in the second half of 2015. CONSTRUCTION COST DATA 13 11 16 12 0 10 20 30 40 50 327 285 391 1.31 2.84 555 1.71 3.14 2.57 0.98 5.10 2.47 2001 1998 1999 2000 2002 2003 2004 2005 2006 2007 2008 2009 3.00 808 1.27 3.19 791 1.14 4.55 811 1.22 6.84 970 1.97 2011 2012 2013 987 4.67 969 919 980 2014 17.33 11.20 1,175 1,427 11.50 10.00 11.00 10.05 10.00 10.55 1,544 1,557 1,155 6.04 12.00 21.30 71.73 22.63 18.60 12.70 12.18 20.82 2010 0 200 400 600 800 1,000 1,200 1,400 1,600 70 60 1,800 2014) 80 LANGDON & SEAH VIETNAM CO LTD 1 CONSTRUCTION COST DATA CONSTRUCTION COST DATA CONSTRUCTION COST DATA 13 0 5 10 15 20 25 10.75 3.68 478 28.04 11.81 36.59 2,353 2,454 11.84 36.71 4,063 10.45 32.71 1,342 8.33 17.97 548 5.84 14.16 860 4.51 6.65 371 2.93 10.93 712 2.61 7.94 3.13 1,082 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 35 30 4,500 14 40 1 CONSTRUCTION COST DATA FDI BY SECTORS AS OF NOVEMBER 2014 Sector No. of projects 1 Industry and construction 13,945 Manufacturing LANGDON & SEAH VIETNAM CO LTD 18 14 230,207 76,020 138,578 47,436 12,489 Property 439 46,848 Accommodation 362 11,086 2,624 1,140 11,349 4,154 Mining 82 3,274 2,606 Electricity, gas and water production and distribution 96 9,749 2,072 Information and Communication 1,065 4,095 2,289 Wholesale & Retail; Repair 1,316 3,880 1,981 38 1,348 369 Construction Water supply & Waste treatment 2 9,407 Registered Legal Legal Capital Capital Capital (mn US$) (mn US$) (%) Agriculture & Forestry & Aquaculture 92% 516 3,658 1,822 2% 2,886 13,967 5,231 6% Art & Entertainment 147 3,632 1,076 Logistics 431 3,711 1,140 Finance, Banking & Insurance 81 1,328 1,176 424 3 Service Health care & Social welfare 97 1,755 Science & Technology 1,665 1,773 960 Education and Training 200 807 184 Administration & Supporting services 129 211 109 Others 136 751 162 17,347 247,832 83,073 Total 100% (Source: Vietnam Investment Review) CONSTRUCTION COST DATA CONSTRUCTION COST DATA 0 1 2 3 4 5 6 8 9 1999 2.15 1.35 1998 2.20 1.24 1.65 2000 2.40 (Source: Ministry of Planning and Investment) Billion US$ 1.50 2001 2.40 1.52 2002 2.46 1.42 2003 2.83 1.65 2004 3.44 2005 2006 4.44 2.18 5.43 2.25 2008 5.91 4.10 2009 8.06 3.54 2010 3.65 2011 3.65 2012 4.50 2013 4.11 2014 3.52 VIETNAM ANNUAL ODA 19 15 Construction, % of GDP Construction Value, US$Bn Construction, % of GDP Construction, Real Growth, % of y-o-y Construction Value, US$Bn e e 22 18 68,300 - 75,500 m3 m3 3. Remove excavated materials off site 11. 112.5mm thick brick walls 20,600 - 22,800 178,600 - 197,400 228,400 - 252,400 185,200 - 204,700 kg m2 m2 m2 8. High tensile rod reinforcement 40 - 48 35 - 45 35 - 45 3.50 - 3.90 260 - 320 kg 7. Mild steel rod reinforcement 3.50 - 3.90 m3 1,765,500 - 1,951,300 6. Reinforced concrete grade 30 21,900 - 24,200 60 - 70 230 - 270 346,800 - 383,300 m m3 1,360,800 - 1,504,000 20 - 25 15 - 20 15 - 20 RM KUALA LUMPUR 5. Mass concrete grade 15 3 66,700 - 73,700 74,600 - 82,500 m 2. Excavating for footings not exceeding 1.5m deep VND HO CHI MINH# 1. Excavating basement not exceeding 2m deep Unit 3 DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 800 450 450 28 30 2,800 2,500 600 120 150 150 BAHT BANGKOK# 17.50 15.00 15.00 1.00 1.00 130.00 124.00 43.00 3.00 3.00 3.50 B$ BRUNEI 1 CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 23 19 % 8 - 12 55 - 60 6 - 12 3.50 - 4.50 35 - 45 50 - 70 15 - 22 15 - 22 6.00 - 7.50 6.00 - 7.50 350 - 500 12 - 18 160 800 1,200 225 200 62 62 7,000 1,200 The above costs are at 4th Quarter 2014 levels, exclusive of preliminaries and contingencies unless otherwise stated. # Rates are nett of VAT Average expected preliminaries m2 76,500 - 84,500 299,700 - 631,200 m2 m 232,600 - 257,100 m2 17. 20mm Cement and sand (1:4) plaster to walls 2 55,800 - 61,700 79,700 - 88,100 m 16. 25mm Cement and sand (1:3) paving 29,400 - 32,500 32,400 - 35,800 kg m2 kg 472,700 - 522,500 2,660,000 - 2,940,000 m2 2 14. Structural steelwork - beams, stanchions and the like 12. "Kliplok Colorbond" 0.64mm profiled steel sheeting 58.00 5-8 5.00 28.00 33.00 8.00 9.00 3.20 3.50 160 - 210 22 20 45 38 370 m3 m3 3 3. Remove excavated materials off site 12 180 160 170 kg kg m2 m2 m2 7. Mild steel rod reinforcement 8. High tensile rod reinforcement 11. 112.5mm thick brick walls 1,200 m3 6. Reinforced concrete grade 30 12 1,050 m3 5. Mass concrete grade 15 m 35 m 2. Excavating for footings not exceeding 1.5m deep RP’000 JAKARTA# 1. Excavating basement not exceeding 2m deep Unit 3 DESCRIPTION LANGDON & SEAH VIETNAM CO LTD N/A 850 900 49.00 48.00 5,000 3,500 3,000 300 300 350 PHP MANILA 35.00 - 40.00 40.00 - 45.00 40.00 - 45.00 1.45 - 1.55 1.45 - 1.55 148.00 197.00 50.00 45.00 - 50.00 16.50 16.50 S$ SINGAPORE** 360 380 380 10.30 10.30 1,350 1,150 900 270 190 210 HK$ HONGKONG 72 73 85 5.00 5.00 517 433 170 37 31 26 RMB BEIJING 1 CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 25 21 m2 % m2 m2 m2 m2 m2 kg kg m2 6 - 10 150 27 60 75 160 250 1,200 27 27 8 -15 1,300 400 950 9,500 115 105 350 350 1,200 13 - 17 30.00 3.50 - 4.00 43.00 290.00 4.80 - 5.80 4.80 - 5.80 22.00 24.00 74.00 10 - 15 540 55 850 2,800 36 39 130 138 350 The above costs are at 4th Quarter 2014 levels, exclusive of preliminaries and contingencies unless otherwise stated. # Rates are nett of VAT ** Rates are nett of GST Manila - Item 13 - Aluminium with anodized finished, 6mm thick Singapore - Item 5 - Rate for lean concrete blinding Hong Kong - Item 3 - Rate including dumping charges Beijing - Item 13 - Rate for double glazed window Average expected preliminaries 16. 25mm Cement and sand (1:3) paving 17. 20mm Cement and sand (1:4) plaster to walls 14. Structural steelwork - beams, stanchions and the like 12. "Kliplok Colorbond" 0.64mm profiled steel sheeting 7 - 10 162 32 N/A 815 11 10 27 28 140 22 5.50 5.50 4.70 4.70 75 75 85 kg kg m2 m2 m2 7. Mild steel rod reinforcement 8. High tensile rod reinforcement 11. 112.5mm thick brick walls 484 500 m3 6. Reinforced concrete grade 30 57 80 80 442 400 180 150 m m3 60 105 m3 3. Remove excavated materials off site 5. Mass concrete grade 15 25 22 m3 3 30 22 m 2. Excavating for footings not exceeding 1.5m deep RMB RMB SHENZHEN/ GUANGZHOU 1. Excavating basement not exceeding 2m deep Unit SHANGHAI 3 DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 50 65 65 5.50 5.50 400 360 130 45 40 18 RMB CHONGQING/ CHENGDU 70 90 90 5.00 5.50 500 410 150 35 25 22 RMB SHENYANG 1 CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 23 150 35 m2 2 5 -10 20 180 140 25 30 10 12 550 N/A N/A 5 -10 30 150 130 22 28 10 10 750+ The above costs are at 4th Quarter 2014 levels, exclusive of preliminaries and contingencies unless otherwise stated. Shanghai - Item 11 - Rate for 120mm thick concrete block walls Chongqing/Chengdu, Shenyang - Item 13 - Rate for double glazed window % 5 - 10 145 m2 Average expected preliminaries 26 m2 17. 20mm Cement and sand (1:4) plaster to walls m 9 25 m2 16. 25mm Cement and sand (1:3) paving 11 650 m2 kg N/A m2 kg 14. Structural steelwork - beams, stanchions and the like 12. "Kliplok Colorbond" 0.64mm profiled steel sheeting 5 -10 30 120 165 26 25 11.30 11 700 N/A 22 24 500 5.50 92 92 70 m3 kg kg m2 m2 m2 6. Reinforced concrete grade 30 7. Mild steel rod reinforcement 8. High tensile rod reinforcement 11. 112.5mm thick brick walls 420 5.50 170 m m3 30 m3 3. Remove excavated materials off site 5. Mass concrete grade 15 33 m3 3 28 m 2. Excavating for footings not exceeding 1.5m deep RMB DALIAN 1. Excavating basement not exceeding 2m deep Unit 3 DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 300 250 250 9.00 9.00 1,200 1,200 1,100 90 140 120 MOP MACAU 860 600 550 64 62 6,050 5,150 3,725 NA 180 160 Rs INDIA@ 43,800 27,200 27,200 1,210 1,180 76,500 63,100 28,900 9,800 1,890 1,890 KRW SEOUL^^ 1 CONSTRUCTION COST DATA MAJOR RATES FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 29 25 140 140 32 m2 m2 2 180 8 - 12 6 - 12 1,000 1,350 310 380 130 550 500 130 120 98 98 4,950 1,325 Dalian - Item 13 - Rate for double glazed window The above costs are at 4th Quarter 2014 levels, exclusive of preliminaries and contingencies unless otherwise stated. @ All % 5 -10 40 m2 m 37 m 35 11 17. 20mm Cement and sand (1:4) plaster to walls 35 11 16. 25mm Cement and sand (1:3) paving Average expected preliminaries N/A 3,800 kg m2 kg N/A 700+ m2 2 14. Structural steelwork - beams, stanchions and the like 12. "Kliplok Colorbond" 0.64mm profiled steel sheeting 38,500 6 - 11 7,790 26,000 63,800 8,900 3,100 1,580 1,550 315,000 30 26 HOTELS INDUSTRIAL OFFICE / COMMERCIAL DOMESTIC industry OUTLINE SPECIFICATION painted wall and false ceiling. and heating. 1) Interior decoration excluded excluding excluding excluding Apartment units with fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture Apartment units with good quality fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture Houses with fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings, loose furniture, garden and parking Houses with good quality fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings, loose furniture, garden and parking Industrial units, shell only (Conventional single heating and lighting storey framed unit) Detached houses, high end Terraced houses, average standard Apartments, high rise, high end Apartments, high rise, average standard BUILDING LANGDON & SEAH VIETNAM CO LTD 1 CONSTRUCTION COST DATA CONSTRUCTION COST SPECIFICATION CONSTRUCTION COST DATA CONSTRUCTION COST DATA 31 27 Including fit-out and air-conditioning, but excluding educational equipment Including fit-out, loose furniture and air-conditioning Dry sports (no swimming pool) and are for 'leisure centre' type schemes including main sports hall, ancillary sports facilities, changing and showers, restaurant / cafe, bar, etc. Costs include a/c, Furniture, Fittings and Equipment (FF&E). Excluding medical and operating equipment Schools (primary and secondary) Students' residences Sports clubs, multi purpose sports/leisure centres (dry sports) General hospitals - public sector Notes: 1. The costs for the respective categories given above are averages based on fixed price competitive tenders. It must be understood that the actual cost of a building will depend upon the design and many other factors and may vary from the figures shown. 2. The costs per square metre are based on Construction Floor Areas (CFA) measured to the outside face of the external walls / external perimeter including lift shafts, stairwells, balconies, plant rooms, water tanks and the like. 3. All bulidings are assumed to have no basements (except otherwise stated) and are built on flat ground, with normal soil and site condition. The cost excludes site formation works, external works, land cost, professional fees, finance and legal expenses. 4. The standard for each category of building varies from region to region and do not necessary follow that of each other. 5. All costs are in US$/m2 CFA. Fluctuation in exchange rates may lead to changes in construction costs expressed in U.S. dollars. OTHERS RC structure RC structure, natural ventilaion, no facade enclosure Underground/basement car parks (<3 levels) Multi storey car parks, above ground (<4 levels) 32 28 HOTELS Retail malls, high end OFFICE/COMMERCIAL DOMESTIC Apartments, high rise, average standard Apartments, high rise, high end DESCRIPTION 1,050 - 1,290 1,290 - 1,565 1,665 - 1,935 695 - 815 800 - 1,090 500 - 600 645 - 845 595 - 745 755 - 870 395 - 465 455 - 555 HO CHI MINH ## LANGDON & SEAH VIETNAM CO LTD 1,225 - 1,690 2,125 - 2,455 2,360 - 2,725 735 - 845 1,060 - 1,425 655 - 785 805 - 1,045 385 - 580 935 - 1,120 275 - 390 910 - 1,115 KUALA LUMPUR 1,160 - 1,282 1,466 - 1,679 1,710 - 2,443 641 - 794 855 - 1,099 641 - 837 840 - 901 672 - 855 977 - 1,160 489 - 611 824 - 1,008 BANGKOK## US$/m2 1,133 1,475 1,108 1,364 1,133 1,327 842 1,120 1,560 - 1,868 2,200 - 2,508 2,259 - 2,567 825 1,167 801 1,056 - 825 1,019 534 812 - BRUNEI 1,150 - 1,360 1,570 - 1,750 1,680 - 1,900 660 - 735 975 - 1,100 570 - 630 630 - 680 670 - 760 925 - 1,050 360 - 465 970 - 1,170 JAKARTA# 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 33 29 VND 21,333 NA - 600 - 330 - 305 - 380 - 775 RM 3.46 1,060 - 1,300 440 255 270 345 710 525 - 585 350 - 460 595 - 715 375 - 415 500 - 550 500 - 650 750 - 800 390 - 495 350 - 460 BAHT 32.75 N/A 550 - 733 183 - 305 N/A N/A N/A 504 - 611 330 - 365 305 - 330 B$ 1.26 1,871 - 2,179 IDR 12,150 N/A 470 - 575 N/A 423 - 731 305 - 330 619 - 927 N/A 724 - 1,031 N/A 1,665 - 1,973 1,050 - 1,575 518 - 826 381 - 689 The above costs are at 4th Quarter 2014 levels, inclusive of preliminaries and contingencies unless otherwise stated. Exchange Rate Used : US$1 = OTHERS Owner operated factories, low rise, light weight INDUSTRIAL 34 30 HOTELS Retail malls, high end OFFICE/COMMERCIAL DOMESTIC Apartments, high rise, average standard Apartments, high rise, high end DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 1,180 - 1,375 1,270 - 1,375 1,575 - 1,650 820 - 870 1,260 - 1,365 735 - 870 1,080 - 1,120 860 - 920 1,170 - 1,230 605 - 690 1,280 - 1,370 MANILA* 2,460 - 2,660 3,135 - 3,575 3,135 - 3,575 1,985 - 2,185# 2,185 - 2,425 # 2,185 - 2,345 2,345 - 2,580 1,550 - 1,750 2,345 - 3,495 1,985 - 2,225 2,500 - 3,335 SINGAPORE** 3,870 - 4,210 4,080 - 4,790 4,790 - 5,510 3,030 - 3,550 3,770 - 4,600 3,050 - 3,620 4,080 - 4,790 3,030 - 3,550 4,080 - 4,730 4,140 - 4,860 5,510 - 6,180 HONG KONG^ US$/m2 - 1,303 2,117 977 1,792 733 1,873 570 814 1,059 - 1,303 1,792 - 2,280 2,280 - 2,932 977 1,303 733 1,303 668 1,650 489 733 BEIJING$ 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 35 31 Exchange Rate Used : US$1 = OTHERS Owner operated factories, low rise, light weight INDUSTRIAL SG 1.26 3,135 - 3,295 1,350 - 1,475 PHP 44.50 1,825 - 1,985 2,265 - 2,425 1,075 - 1,470 755 - 1075^^ 835 - 1,075 510 - 560 460 - 510 690 - 765 690 - 765 1,180 - 1,425 480 - 510 450 - 460 HK$7.80 5,060 - 5,720 2,230 - 2,820 1,380 - 1,640 2,540 - 2,690 2,440 - 2,820 3,740 - 4,330 2,350 - 2,960 - 896 570 733 570 1,303 RMB 6.14 1,303 - 1,629 814 489 570 407 977 570 - 651 36 32 HOTELS Retail malls, high end OFFICE/COMMERCIAL DOMESTIC Apartments, high rise, average standard Apartments, high rise, high end DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 1,028 - 1,264 1,738 - 2,370 2,370 - 2,844 1,344 - 1,738 948 - 1,264 1,264 - 1,580 712 - 790 1,738 - 1,897 474 - 507 712 - 790 SHANGHAI$ 1,036 - 1,145 1,673 - 1,849 2,282 - 2,521 801 - 886 1,101 - 1,217 762 - 842 1,127 - 1,244 550 - 607 915 - 1,010 415 - 458 567 - 625 SHENZHEN GUANGZHOU$ 1,035 - 1,280 1,920 - 2,395 880 - 1,040 1,120 - 1,520 690 - 895 1,200 - 1,600 530 - 670 850 - 1,120 415 - 511 575 - 670 CHONGQING CHENGDU$ US$/m2 1,053 - 1,165 1,596 - 2,075 878 - 958 1,197 - 1,357 718 - 798 1,197 - 1,357 559 - 638 925 - 1,037 415 - 479 559 - 607 SHENYANG$ 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 33 RMB 6.14 1,580 - 2,052 790 - 1,107 394 - 554 554 - 712 394 - 554 1,028 - 1,264 554 - 632 RMB 6.14 526 - 845 376 - 415 417 - 461 265 - 293 780 - 863 521 - 575 RMB 6.14 370 - 430 480 - 640 The above costs are at 4th Quarter 2014 levels, inclusive of preliminaries and contingencies unless otherwise stated. Rates are exclusive of contingencies. Houses are built to shell and core standard ONLY, where all tenant or occupant areas are unfurnished. Schools (primary and secondary) are of public authority standard, no a/c and complete with basic external works. Exchange Rate Used : US$1 = OTHERS Owner operated factories, low rise, light weight INDUSTRIAL RMB 6.14 607 - 670 375 - 407 38 34 HOTELS Retail malls, high end OFFICE/COMMERCIAL DOMESTIC Apartments, high rise, average standard Apartments, high rise, high end DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 1,085 - 1,181 1,836 - 2,075 910 - 974 1,244 - 1,309 798 - 894 1,230 - 1,389 606 - 702 1,150 - 1,261 446 - 511 606 - 671 DALIAN$ 3,166 - 3,579 4,293 - 5,131 5,131 - 6,308 2,378 - 3,079 3,079 - 3,367 2,240 - 3,367 3,529 - 4,255 2,065 - 2,528 2,879 - 4,406 3,529 - 4,205 4,293 - 5,594 MACAU*** US$/m2 715 - 795 1,115 - 1,325 1,415 - 1,565 380 - 415 475 - 505 370 - 405 520 - 565 505 - 580 765 - 920 345 - 370 455 - 480 INDIA@ 1,680 - 2,010 2,360 - 4,080 2,720 - 4,430 1,200 - 1,550 1,420 - 1,870 1,135 - 1,780 1,360 - 2,210 2,260 - 3,450 1,250 - 1,550 1,500 - 1,900 SEOUL## 1 CONSTRUCTION COST DATA CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 39 35 RMB 6.14 391 - 407 MOP 7.99 1,877 - 2,753 1,039 - 1,364 2,065 - 2,403 1,652 - 1,915 INR 62 580 - 635 245 - 265 190 - 210 240 - 265 265 - 295 530 - 555 315 - 370 295 - 350 The above costs are at 4th Quarter 2014 levels, inclusive of preliminaries and contingencies unless otherwise stated. Rates are exclusive of contingencies. Houses are built to shell and core standard ONLY, where all tenant or occupant areas are unfurnished. Schools (primary and secondary) are of public authority standard, no a/c and complete with basic external works. Exchange Rate Used : US$1 = OTHERS Owner operated factories, low rise, light weight INDUSTRIAL KRW 1,107 975 - 1,035 570 - 690 1,830 - 1,970 1,080 - 1,200 1,475 - 1,580 670 - 825 40 36 HYDRAULIC SERVICES Hotels Shopping Centres Apartment ELECTRICAL SERVICES Hotels Shopping Centres Apartment MECHANICAL SERVICES DESCRIPTION VND/m2 HO CHI MINH 273,000 - 519,000 1,755,000 - 2,217,000 1,990,000 - 2,373,000 1,331,000 - 1,796,000 1,641,000 - 2,339,000 LANGDON & SEAH VIETNAM CO LTD 26 - 55 225 - 465 144 - 160 255 - 600 205 - 275 88 - 220 360 - 470 62 - 90 290 - 460 290 - 410 210 - 295 RM/m2 KUALA LUMPUR 790 - 950 3,400 - 3,600 1,950 - 2,200 3,900 - 4,350 2,800 - ,3050 3,100 - 3,520 4,500 - 4,900 1,550 - 1,600 4,800 - 5,200 4,600 - 4,900 4,500 - 4,600 BAHT/m2 BANGKOK## 17 - 41 243 - 305 203 - 243 305 - 398 231 - 331 263 - 331 189 - 236 24 - 41 305 - 351 216 - 257 223 - 257 B$/m2 BRUNEI 170 - 260 700 - 940 400 - 620 710 - 1000 620 - 780 700 - 940 870 - 1030 270 - 630 870 - 1170 770 - 930 770 - 1000 RP’000/m2 JAKARTA$ 1 CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 41 37 1,202,000 - 1,702,000 671,000 - 971,000 591,000 - 1,127,000 431,000 - 543,000 632,000 - 1,049,000 531,000 - 629,000 88 - 400 55 - 190 85 - 370 85 - 110 63 - 105 60 - 80 45 - 65 65 - 95 65 - 85 20 - 25 37 - 46 180 - 245 26 - 32 18 - 45 1,100 - 1,190 230 - 490 500 - 580 1,100 - 1,150 790 - 860 730 - 750 790 - 890 790 - 850 790 - 890 750 - 790 1,500 - 1,750 810 - 950 1,205 - 1,420 ** Excludes special power supply. Based upon The above costs are at 4th Quarter 2014 levels, exclusive of contingencies unless otherwise stated. Hotels Shopping Centres Apartment LIFTS/ESCALATORS Hotels Shopping Centres Apartment FIRE SERVICES Hotels Shopping Centres Apartment 9 - 33 4 - 20 13 - 47 13 - 38 11 - 27 33 - 41 13 - 20 27 - 51 33 - 69 27 - 54 11 - 20 64 - 88 13 - 43 40 - 63 370 - 940 280 - 750 360 - 750 370 - 1010 230 - 350 100 - 180 240 - 350 240 - 280 240 - 280 100 - 180 710 - 1000 170 - 260 700 - 1010 42 38 HYDRAULIC SERVICES Hotels Shopping Centres Apartment ELECTRICAL SERVICES Hotels Shopping Centres Apartment MECHANICAL SERVICES DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 900 - 2,000 3,300 - 6,000 2,000 - 3,500 4,700 - 9,000 3,060 - 6,000 3,600 - 6,300 3,000 - 5,000 650 - 1,500 3,000 - 6,500 2,125 - 4,500 600 - 3,000 PESOS/m 2 MANILA^ 30 - 60 175 - 280 55 - 145 200 - 385 170 - 330 110 - 250 180 - 290 35 - 130 150 - 325 170 - 285 100 - 190 S$/m 2 SINGAPORE^^ 400 - 500 1,650 - 2,400 600 - 850 1,900 - 2,600 1,800 - 2,400 1,050 - 1,650 1,900 - 2,650 150 - 250 2,100 - 2,600 2,200 - 2,700 800 - 1,650 HK$/m 2 HONG KONG 95 - 140 460 - 703 320 - 450 705 - 943 481 - 676 253 - 398 760 - 1050 170 - 280 910 - 1150 790 - 950 140 - 380 RMB/m2 BEIJING 1 CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 43 39 1,800 - 3,000 595 - 2,000 800 - 2,100 1,600 - 2,900 650 - 1,200 600 - 900 650 - 1,100 550 - 900 600 - 1,300 700 - 1,300 1,950 - 4,000 595 - 1,400 1,400 - 2,700 70 - 180 45 - 115 55 - 120 60 - 100 45 - 125 35 - 60 25 - 55 30 - 60 40 - 60 25 - 55 20 - 40 100 - 195 50 - 90 80 - 160 700 - 1,200 550 - 750 550 - 850 850 - 1,000 450 - 850 550 - 700 400 - 500 600 - 850 550 - 700 150 - 250 300 - 400 1,200 - 1,600 400 - 500 850 - 1,300 ** Excludes special power supply. ^ Transformer included in Electrical Services. The above costs are at 4th Quarter 2014 levels, exclusive of contingencies unless otherwise stated. Hotels Shopping Centres Apartment LIFTS/ESCALATORS Hotels Shopping Centres Apartment FIRE SERVICES Hotels Shopping Centres Apartment 294 - 577 145 - 400 232 - 520 327 - 520 175 - 289 180 - 265 150 - 225 220 - 375 220 - 375 70 - 135 95 - 140 370 - 480 140 - 200 170 - 230 44 40 HYDRAULIC SERVICES Hotels Shopping Centres Apartment ELECTRICAL SERVICES Hotels Shopping Centres Apartment MECHANICAL SERVICES DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 110 - 163 593 - 651 305 - 431 651 - 830 520 - 651 252 - 368 761 - 966 173 - 289 971 - 1,265 1,050 - 1,103 310 - 410 RMB/m2 SHANGHAI 120 - 163 520 - 750 300 - 436 667 - 898 473 - 640 273 - 436 750 - 1,019 147 - 263 1,050 - 1,313 693 - 935 120 - 373 RMB/m2 SHENZHEN GUANGZHOU 2,400 - 2,800 2,400 - 2,600 900 - 1200 2,400 - 2,800 2,000 - 2,600 800 - 1000 MOP/m2 MACAU 70 - 130 450 - 700 300 - 400 550 - 800 450 - 700 250 - 350 700 - 1,000 150 - 250 750 - 1,200 600 - 1,000 100 - 300 RMB/m2 CHONGQING CHENGDU 1 CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 45 41 280 - 550 135 - 390 220 - 495 325 - 495 165 - 325 220 - 300 150 - 250 280 - 380 250 - 380 50 - 100 89 - 131 368 - 488 137 - 184 168 - 226 288 - 427 147 - 425 236 - 456 320 - 451 120 - 263 220 - 341 136 - 262 273 - 405 242 - 363 63 - 120 84 - 110 383 - 483 110 - 147 142 - 252 600 - 800 450 - 700 450 - 600 800 - 1,000 550 - 700 200 - 250 1,200 - 1,500 400 - 550 750 - 1000 ** Excludes special power supply. The above costs are at 4th Quarter 2014 levels, exclusive of contingencies unless otherwise stated. Hotels Shopping Centres Apartment LIFTS/ESCALATORS Hotels Shopping Centres Apartment FIRE SERVICES Hotels Shopping Centres Apartment 350 - 600 150 - 350 300 - 500 300 - 450 140 - 250 180 - 250 150 - 250 200 - 330 220 - 330 50 - 100 70 - 120 300 - 400 70 - 130 120 - 200 46 42 HYDRAULIC SERVICES Hotels Shopping Centres Apartment ELECTRICAL SERVICES Hotels Shopping Centres Apartment MECHANICAL SERVICES DESCRIPTION LANGDON & SEAH VIETNAM CO LTD 30 - 120 700 - 900 500 - 600 300 - 400 450 - 650 700 - 800 600 - 900 100 - 300 600 - 700 RMB/m2 SHENYANG 70 - 120 720 - 920 520 - 620 220 - 320 470 - 690 700 - 800 600 - 700 100 - 300 600 - 700 RMB/m2 DALIAN 34,000 - 57,000 200,000 - 395,000 125,000 - 165,000 300,000 - 490,000 180,000 - 250,000 140,000 - 180,000 220,000 - 290,000 92,000 - 159,000 215,000 - 340,000 149,000 - 245,000 95,000 - 173,000 KRW/m2 SEOUL# 625 - 950 3,550 - 4,900 2,100 - 3,500 3,950 - 5,400 3,400 - 4,550 1,725 - 2,350 4,000 - 5,700 1,855 - 3,300 4,950 - 5,400 3,850 - 5,050 2,200 - 2,700 INR/m2 INDIA@ 1 CONSTRUCTION COST DATA M&E COSTS FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 43 300 - 500 140 - 230 120 - 250 250 - 350 150 - 250 120 - 200 300 - 550 150 - 230 150 - 200 60 - 150 130 - 230 50 - 150 50 - 130 300 - 550 150 - 230 200 - 300 120 - 170 100 - 150 150 - 230 200 - 300 120 - 170 100 - 200 40,000 - 64,000 16,000 - 25,000 110,000 - 175,000 50,000 - 84,000 29,000 - 41,000 35,000 - 68,000 28,000 - 35,000 40,000 - 91,000 25,000 - 72,000 33,000 - 68,000 22,000 - 32,000 71,000 - 110,000 29,000 - 57,000 49,000 - 75,000 825 - 1050 530 - 690 1,200 - 1,750 1,400 - 1,800 750 - 950 990 - 1,300 475 - 625 1,150 - 1,475 950 - 1,100 525 - 630 425 - 750 3,250 - 4900 925 - 1,675 1,450 - 2,000 ** Excludes special power supply. The above costs are at 4th Quarter 2014 levels, inclusive of preliminaries and contingencies unless otherwise stated. Hotels Shopping Centres Apartment LIFTS/ESCALATORS Hotels Shopping Centres Apartment FIRE SERVICES Hotels Shopping Centres Apartment 48 44 GUANGZHOU BEIJING BRUNEI BANGALORE BANGKOK KUALA LUMPUR HO CHI MINH + COUNTRY 0.039 - 0.093 0.13 0.1 RMB 6.13 RMB 6.14 2014 0.08 RMB 6.14 2014 2013 0.08 0.008 - 0.12 B$1.26 RMB 6.13 2014 2013 0.008 - 0.12 0.043 - 0.093 B$1.24 INR 62 2013 2014 INR 63 Baht : 32.75 2013 0.058 - 0.124** 0.057 - 0.120** Baht : 31.69 2014 0.063 - 0.165 RM 3.46 2013 0.068 - 0.142 RM 3.19 ++ 2014 0.11 ++ 2013 VND 21,282 2014 0.111 0.16/0.11 0.11/0.15 0.16 0.13 0.058 - 0.162 0.058 - 0.162 0.115 - 0.123 0.102 - 0.118 0.081 - 0.083 0.084 - 0.086 0.110 - 0.147 0.123 - 0.135 0.09-0.16 / 0.06-0.11 0.10-0.17 / 0.06-0.11 US$1= VND 21,120 US$/kwh US$/kwh 2013 Commercial/ Industrial ELECTRICITY Domestic Exchange Rate Used LANGDON & SEAH VIETNAM CO LTD 0.32 0.32 0.81~1.47 0.65 0.088 - 0.355 0.088 - 0.355 0.242 - 0.580 0.238 - 0.572 0.260 - 0.441 0.268 - 0.456 0.165 - 0.578 0.179 - 0.627 0.25 - 0.54 0.25 - 0.54 US$/m 3 0.57 0.56 1.16 1.01 0.492 - 0.532 0.492 - 0.532 0.967 0.952 0.290 - 0.483 0.300 - 0.499 0.598 - 0.659 0.649 - 0.715 0.8 / 0.49 FUEL 0.63 1.18 1.40 1.12 1.23 0.306 0.306 0.920 0.921 0.867 0.946 0.645 N/A N/A n/a n/a 0.411 0.411 N/A N/A N/A N/A N/A N/A 1.31 1.54ʑ 1.13 1.31 0.427 0.427 1.120 1.238 1.014* 1.244* 0.653 0.66 0.95-0.98 ++++ 1.89 +++ US$/litre Unleaded 1.13-1.15++++ US$/litre Leaded 1.06+++ US$/litre US$/m3 0.8 / 0.49 Diesel Commercial/ Industrial WATER Domestic 1 CONSTRUCTION COST DATA UTILITY COST FOR SELECTED ASIAN CITIES CONSTRUCTION COST DATA CONSTRUCTION COST DATA 49 45 SINGAPORE^ SEOUL NEW DELHI MANILA JAKARTA CHONGQING SHANGHAI MACAU HONG KONG 0.12 S$ 1.25 S $ 1.26 2014 0.20^ 0.21^ 0.129* 2014 KRW 1,114.60 2013 0.06* 0.064-0.130 INR 62 2014 2013 KRW 1,058.40 0.062-0.113 **0.22-0.27' INR 63 PHP 44.50 2014 **0.21-0.26' 2013 PHP 43.20 2013 0.125 IDR 12,150 2014 0.08 0.100 RMB 6.14 IDR 11,400 2014 0.08 2013 RMB 6.13 2013 RMB 6.14 2014 0.20^ 0.21^ 0.154* 0.074* 0.139-0.160 0.124-0.142 **0.21' **0.21' 0.125 0.119 0.13/0.138 0.13/0.139 0.186(peak) 0.055(normal) 0.173(peak) 0.082(normal) 0.101(peak) 0.050(normal) 0.111(peak) 0.055(normal) RMB 6.13 2013 0.17 oo 0.16 oo 0.17 oo MO P7.99 MO P7.99 0.16oo 0.13 2014 2014 2013 0.1 0.1 HK$ 7.80 HK$ 7.80 2013 0.83 1.43^^ 1.44^^ 0.59* 0.387** 0.175-1.288 0.240-1.087 **0.48-0.69' **0.58-0.67' 0.807 0.412 0.46 0.57 0.48 0.59 0.55 to 0.78 o 0.55 to 0.66 o 0.83 0.59 1.65^^^ 1.67^^^ 1.52** 0.71** 1.202-5.366 1.717-3.743 **1.47' **1.47' 1.033 1.101 0.67 0.74 0.6 0.82 0.70 ooo 0.66 ooo 0.59 1.61 1.21^^^^ 1.31^^^^ 1.35 1.28 0.847 0.843 0.808 0.976 0.617 0.482 1.08 1.2 1.10 1.25 1.44 1.68 1.57 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2.12 1.76^^^^^ 1.85^^^^^ 1.55 1.78 1.021 1.127 1.041 1.188 0.700 0.570 1.09/1.15 * 1.16/ 1.30 * 1.12-1.19 1.27-1.35 1.94 1.52 2.10 50 46 MACAU Water: Consumption charge : US$0.55/m3 for 28m3 or below, US$0.62/m3 for 29m3 to 60m3, US$0.70/m3 for 61m3 to 79m3 o and US$0.78/m3 for 80m3 or above; Other charges (Depending on meter size 15mm - 200mm) : Meter rental = US$0.34 - 58.00/month; oo Electricity tariff are composition of demand charges, consumption charges, fuel clause adjustment and government tax ooo Charges for ordinary users (e.g. Business, government buildings, schools, associations, hospitals and others) only. Special users (e.g. gaming industries, hotels, saunas, golf courses, construction, public infrastructures and other temporary consumption) are excluded. HONGKONG 95 Electricity (Domestic) : Tariff effective from 1st Jan 2012. 1-10kwh 10c, 11-60kwh 8c, 61-100kwh 12c, above 100kwh 15c GUANGZHOU BRUNEI BANGKOK * For normal tariff with consumption not exceeding 150 kWh per month ** HO CHI MINH + All rates are VAT inclusive ++ Domestic electricity rates are applied to the 301 KW above wards. +++ D.O- 0.05% ++++ 92&95 Unleaded petrol as at Oct 2012 Notes LANGDON & SEAH VIETNAM CO LTD 1 CONSTRUCTION COST DATA CONSTRUCTION COST DATA CONSTRUCTION COST DATA 51 47 below in use) SINGAPORE * Electricity tariff is based on low tension power supply ^ water ^^ ^^^ water ^^^^ As at 6 November 2014 98 Unleaded petrol as at 6 November 2014 ^^^^^ SEOUL CHONGQUING Unleaded 93# = US$1.09/litre; Unleaded 97# = US$1.15/litre MANILA SHANGHAI Notes (continued) GENERAL CONSTRUCTION DATA Material Price Indices Import Duties Progress Payments Estimating Rules of Thumb 2 50 GENERAL CONSTRUCTION DATA I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV Quarter 0.00% -4.61% 0.00% 0.00% 0.00% 0.00% 129.20 129.20 129.20 129.20 14,470,000 14,470,000 14,470,000 14,470,000 8.11% 0.00% 0.00% 0.00% 2.48% 0.00% 0.00% 11.83% 3.38% 1.90% 0.46% 0.00% 29.63% 19.20% 135.45 135.45 129.20 98.13 105.54 109.11 111.18 103.48 114.55 120.00 134.20 131.52 142.19 142.19 142.19 142.19 100.00 129.63 154.51 15,170,000 14,470,000 15,925,000 15,925,000 15,925,000 15,925,000 16,320,000 16,320,000 16,320,000 12,000,000 10,940,000 10,990,000 11,820,000 12,220,000 12,452,500 11,590,000 12,830,000 13,440,000 15,030,000 11,200,000 14,518,000 VND/T Index (Base QI/2008) Steelbar (D12-D15) 1,109,090 1,109,090 1,109,090 1,109,090 1,109,000 1,109,090 1,109,090 1,109,090 1,109,090 945,000 945,000 904,000 850,000 163.87 163.87 163.87 163.87 125.59 130.00 130.00 130.00 130.00 130.00 130.00 130.00 130.00 130.00 130.00 143.32 143.32 139.63 139.63 166.56 163.86 163.87 163.87 163.87 163.87 100.00 116.80 0.00% 0.00% 0.00% 0.00% 0.01% 0.00% 0.00% 0.00% 0.00% 19.29% 3.51% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 10.25% 0.00% 0.00% 16.80% 14.36% 1,600 1,600 1,600 1,600 1,255 1,255 1,255 1,255 1,255 1,218 1,209 1,209 1,241 1,263 1,459 1,459 1,459 1,546 1,600 1,600 1,600 1,600 1,600 1,600 VND/kg 163.93 163.93 163.93 163.93 129.41 149.49 149.49 149.49 158.40 163.93 163.93 163.93 163.93 163.93 163.93 Index (Base QI/2008) 100.00 99.69 130.64 130.43 128.59 128.59 128.59 128.59 128.59 124.80 VND/m Cement (PCB40) Index (Base QI/2008) 3 Concrete (Grade 250) (Source: Ho Chi Minh City Departments of Construction and Departments of Finance Year 2008-2014) 2014 2013 2012 2011 2010 2009 2008 Year LANGDON & SEAH VIETNAM CO LTD 0.00% 0.00% 0.00% 0.00% 0.00% 15.52% 0.00% 0.00% 5.96% 3.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.65% 0.00% 0.00% 0.00% 0.00% 31.04% 2 GENERAL CONSTRUCTION DATA MATERIAL PRICE INDICES GENERAL CONSTRUCTION DATA 51 80.00 90.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 170.00 180.00 I III 2008 II IV I III IV Steelbar (D1 D25) 2009 II I III 2010 II IV III 2011 II IV Concrete ( ade 250) I I III 2012 II IV I Cement 40) III 2013 II IV I III 2014 II IV 2 GENERAL CONSTRUCTION DATA IMPORT DUTIES ACFTA NON-ACFTA AKFTA NON-AKFTA VCFTA AJCEP VJEPA VAT TARIFF kg 12 0 5 (1) 10 (2) 15 12.5 19 14 16 10 Granite kg - 0 5 (3) 10 (2) 15 12.5 19 14 16 10 Carpentry of Wood kg 3 0 5 - 5 - 5 5 2 10 Porland cement Ceramic building bricks, flooring blocks Ceramic roofing tiles LANGDON & SEAH VIETNAM CO LTD Ceramic floor, hearth, wall tiles 52 AIFTA MFN/WTO Marble AANZFTA UNIT ATIGA SPECIAL TARIFF DESCRIPTION (ALL FIGURES) 3 5 kg 37 5 - - - - 15 - 33 - - 10 1000 unit 35 5 - - 15 - 15 25 32 23 25 10 kg 45 5 - - 15 - 15 35 46 28 31 10 15 (4) 15 35 48 28 31 10 15 (4) 15 35 41 29 32 10 m2 45 5 - - 15 (5) Ceramic sanitary fixtures of porcelain kg Multiple-walled insulating units of glass m2 20 5 - - - - 15 - 28 30 18 10 Glass mirror (unframed) kg 25 5 - - - - 15 - 23 30 30 10 Concrete steel kg 15 5 12.5 (6) 7 (7) 10 - - 4 0 10 U,I or H section of steel (height under 80mm) kg 12 5 15 - - - - - 37 15 10 10 Alluminium doors, windows, frames and thresholds m2 15 5 5 - 7 - 7 12 15 7 8 10 Air conditioner (window or wall mounted) not exceeding 26,38 kW unit 30 5 15 (8) - - 15 18 33 11 9 10 Passenger lifts unit 10 5 5 (9) 5 (9) 5 5 9 4 4.5 10 Water pump unit 20 5 5 - - - 15 27.5 24 17 19 10 Electric genset unit 20 5 12 (1) - - 15 30 30 10 35 5 24 MFN/WTO : Most-Favored-Nation/World Trade Organisation Normal Tax Rate = Favoured Tax Rate x 150% ATIGA : ASEAN Trade In Goods Agreement/ ASEAN free trade area ACFTA : ASEAN-China Free Trade Area AKFTA : ASEAN-Korea Free Trade Area AANZFTA : Australia-ASEAN-New Zealand Free Trade Agreement AIFTA : ASEAN-India Free Trade Agreement VCFTA : Vietnam-Chile Free Trade Agreement AJCEP : ASEAN-Japan Comprehensive Economic Partnership VJEPA : Vietnam-Japan Economic Partnership Agreement (1) : Cambodia, Thailand : Thailand : Cambodia, Indonesia, Thailand (4) : Myanmar (5) : Cambodia, Indonesia, Malaysia (6) : Cambodia, Lao, Malaysia, Thailand (7) : Indonesia, Myanmar (8) : Brunei, Cambodia, Philippines, Thailand (9) : Malaysia, Thailand (2) (3) Where the MFN/WTO tax tariff of a goods item specified in the Import Tariff is lower than Special tariff according to different trade agreement, the import tax tariff applicable to such goods item shall be the MFN/WTO tax tariff. GENERAL CONSTRUCTION DATA PROGRESS PAYMENTS The following graph and table are an indication of the rate of expenditure for construction projects. The rate of expenditure is an average rate and will circumstances are taken into account. No account has been made for retention. Progress Claims 100% 80% 60% 40% 20% 0% 0% 20% 40% 60% 80% 100% Project Period CONTRACT CUMMULATIVE PROGRESS CLAIMS GENERAL CONSTRUCTION DATA CONTRACT PERIOD CUMMULATIVE PROGRESS CLAIMS 53 2 GENERAL CONSTRUCTION DATA ESTIMATING RULES OF THUMB Structural Design – Concrete Ratios The following is a range of concrete ratios for building superstructure design in Viet Nam. 3/m2 2/m2 3 0.5 m3/m2 3.0 m2/m2 250 kg/m3 to to to Average External Wall/Floor Ratio 2/m2 2/m2 2/m2 Average Internal Wall/Floor Ratio 2/m2 2/m2 2/m2 Air - Conditioning 2 The above ratios are indicative and for reference purposes only. They do not account for buildings with special shapes, LANGDON & SEAH VIETNAM CO LTD Indicative Dimensions for Sports Grounds 54 Length Width Tennis Court 40 m 20 m Volleyball Court 30 m 20 m The above dimensions are for a single court with appropriate clearance. No Spectator seating or support area has been allowed. Densities of Common Materials Concrete Cement Sand 2,400 kg/m3 1,441 kg/m3 1,600 kg/m3 Water 3 3 3 3 1,000 kg/m3 3 Soil (compact) 2,100 kg/m3 GENERAL CONSTRUCTION DATA Concrete Strength (in accordance with TCVN 3118 - 1993) 6,000 5,000 4,000 3,000 41 34 28 21 49 41 34 25 40 35 30 25 5,800 5,000 4,400 3,600 33 29 25 21 15 2,200 13 Reinforcement Bar Dia. (mm) Weight/m (kg/m) Perimeter (mm) Area (mm2) 8 0.395 25.13 50.26 20 2.466 62.83 314.16 32 40 6.313 9.864 100.53 125.66 804.25 1256.64 0.45 m3 0.43 m3 0.38 m3 0.90 m3 0.86 m3 Composition of Concrete (per m3) 1:3:6 1:2:4 1:1:2 216 kg 308 kg 540 kg 3 Average Loads Volume Lorry (24 ton) Concrete truck (24 ton) 10.0 m3 5.5 m3 3 Dimensions for Standard Parking Space, Loading / Unloading Bays and Lay - bys Light Vans 5m 2.5 m 2.4 m Lorries Container Vehicles 11 m 16 m 3.5 m 3.5 m 4.1 m 3.5 m and the lower most projection from the ceiling including any lighting units, ventilation ducts, conduits or similar. GENERAL CONSTRUCTION DATA 55 PROPERTY INVESTMENT Building Control and Procedures Project Closed Out Procedures Typical Submission Flowchart Key Planning Parameter Procurement Strategies Contractor Selection Strategies Property Overview 3 3 PROPERTY INVESTMENT BUILDING CONTROL AND PROCEDURES Project Classification Projects are categorized based on the scale, nature and source of fund in accordance with Appendix 01 of the Decree 12/2009/ NDCP dated 10 February 2009. Special projects under the jurisdiction of the Prime Minister’s Office encompass the most national important project and or top security project. Projects classified as Group A under the jurisdiction of the Ministers of Ministries encompass infrastructure and ports (sea-ports and airports), oil and gas, cultural and sensitive projects to national defense and all projects over VND 500 billion, or equivalent to USD 25 million. Group B projects encompass all other projects and fall under the jurisdiction of Provincial People’s Committees and require registration only for investment licenses and applies to projects with a manufacturing and export earnings component. A full assessment for investment licenses is required for all other projects. LANGDON & SEAH VIETNAM CO LTD Project Investment Appraisal Developers must carry out the project investment report (feasibility study report) and the basic design for project investment appraisal including the Planning Certificate applied to the People’s Committee of the relevant province. The information of basic design to be included encompasses address and description of land plot, function of land plot, red-line boundary and exit and connection with the existing transportation and infrastructure including power, water, storm water drainage, waste water treatment, overall dimension and existing level, construction boundary, construction density, plot ratio, schedule of land use area and schedule of floor area, maximum floor height and building height, parking lot ratios, principle of architectural, structure and infrastructure design, environmental impact plan, fire protection plan, design standards and building codes. The project investment appraisal is in accordance with the Circulation 03/2009/ TT-BXD dated 26 March 2009. 58 PROPERTY INVESTMENT Technical Design and Detailed Design Developers using foreign design consultancies must ensure their projects undergo a Design Evaluation Assessment to the Ministry of Construction or the Chairman of the Peoples Committee of relevant province who will delegate to the Ministry of Construction or provincial Construction Department. The Technical Design and Detailed Design must be in line with the previous approved basic design including the compliance of design standards and building codes, the integrity of project, the well protection of environment and the safety in the event of fire circumstances. The appraisal and approval of technical and detailed design are in accordance with the Decree 15/2013/ NDCP dated 6 February 2013 and Circulation 13/2013/ TT-BXD dated 15 August 2013. Construction Permit Under the Law on Construction investors must first obtain a construction permit issued by the Provincial People’s Committee Construction Department prior to construction can commence. The investor of residential development projects shall submit an application dossier of all the mentioned inclusion plus the certificate of EIA (Environment Impact Assessment) and Fire Protection, which are issued by the Provincial Department of National Resources and Environment and Provincial Fire Police Department respectively. An application dossier shall contain design implementation drawings and land-use right certificates and land rental contracts. The basic inclusions are mandatory and they are location and description of works, storey height and height above sea-level, site boundary PROPERTY INVESTMENT 59 3 PROPERTY INVESTMENT BUILDING CONTROL AND PROCEDURES (cont’d) demarcation, overall site plan, major cross sections, main elevations, structural framing plans and foundation designs, environmental and safety technical details, principle of materials, schematic line diagrams of infrastructure connection of power, telecommunication, water supply, storm and waste water drainage system, and quantities for key components.. Construction Permit applications will be checked against various compliances in respect of boundaries and interference with neighboring properties and approved planning (site coverage, plot ratio and car-parking). The issuing body should provide timely notice to the investor of any non-compliance for their remedy and resubmission to allow the implementation stage to commence. The content of application, procedures of construction permit are in accordance with the Decree 64/2012/ NDCP dated 4 September 2012 and Circulation 10/2012/ TT-BXD dated 20 December 2012. LANGDON & SEAH VIETNAM CO LTD Site Clearance 60 A plan for site clearance and/or resettlement shall be submitted at the same time as the application for the investment license and resettlement carried out prior to site clearance taking place for construction. The time limit for site clearance should comply with the project implementation schedule. Resettlement is based on the principle of providing similar or better conditions and governmental regulations on principles, methods and a price framework shall be adopted by the People’s Committee for determination of compensation levels. This is a matter for great uncertainty and foreign investors are advised to seek vacant possession prior to transfer of land use right to the joint venture. PROPERTY INVESTMENT Supervision of Construction Independent Supervision of construction works by a competent and registered firm is a mandatory requirement. The supervisory role encompasses quality control and compliance checking, schedule control, quantification control, safety and environmental hygiene control during construction. The safety and environment control are conducted regularly and continuously during the implementation phase. The Supervisor is also responsible for arranging independent inspections witnessing of testing and commissioning data and assistance in compilation of the dossier for putting the building into operation and receipt of the Occupation Permit. Commencement of Construction Construction of works may only commence after satisfying the following conditions : the site area being ready to be handed over, either in whole or in section and free of encumbrances; a construction permit; approved design drawings for execution of building; a construction contract; sufficient capital funds to ensure the building schedule in accordance with the approved building schedule in the investment license; measures to ensure safety and minimum environmental impact during the construction process. Construction All Risks and Third Party Liability Insurances as well as all required insurances in accordance with conditions of contract are recommended to be effected prior to commencement of any physical construction works on Site. PROPERTY INVESTMENT 61 3 PROPERTY INVESTMENT PROJECT CLOSED OUT PROCEDURES Before an investor can receive rental income and occupy the premises for its intended use, the receipt of approval must be received by the provincial Construction Department or the Ministry of Construction depending on the category and size of the project. LANGDON & SEAH VIETNAM CO LTD The Construction Department will receive a dossier complete with independent testing and commissioning data (prepared by an independent party not the original designer) for piling, structure, electricity and earthing, environmental impact with regard to water and waste disposal, final checking and approval of fire protection requirement. The dossier needs to have Minutes to put the Building into Operation signed by the Investor, Testing Body, Contractor and Designer including the Project or Construction Manager if appointed. The project close out procedure is in accordance with Decree 15/2013 – NDCP dated 6 December 2013. 62 PROPERTY INVESTMENT TYPICAL SUBMISSION FLOWCHART PROGRESS OF IMPLEMENTATION FOR CONSTRUCTION INVESTMENT PROCEDURES FOR REAL ESTATE PROJECTS LEVEL 1, SPECIAL LEVEL – GROUP A The Employer [upon completion of the Basic Design] The Employer can simultaneousty perform Step 1,1’, 1’’, 1’’’ (1) Request for written comments on the fire protection measures (Fire Department – 10 days) (1’) Report on assessment of environmental impact (provincial People’s Committee – 75 days) (1”) Request for written approval on height of the building (Department of Combat Department of Defense – 15 days) (1’”) Agreement on technical infrastructure connections includes: (no required time by law so the Employer shall make their own arrangements) (2) Collect the approval on the Basic Design (Ministry of Construction – 20 days) Agreement on location of water supply connection (Water Supply Company) (3) Approval on Fire Protection (Fire Department – 15 days) (4) Review on Technical Design (Ministry of Construction – 40 days) (5) Construction Permit (Department of Construction – 20 days) Agreement on Power Supply (Electricity Company) Agreement on Drainage System connection (Department of Transportation / Management Company) Agreement on communicaltions infrastructure connection (Department of Information Center / Managerment Company) Note: 1. “Date” as above mentioned is considered as working days from the date of sufficient and valld documents 2. The Employer can implement procedures for collecting of the agreements on technical infrastructure connections after receipt of approval on the basic design, However, if after the basic design approved by the Ministry of Construction that the technical infrastructure managerment agency does not agree with the Employer’s plan, then the Employer must change the plan for technical infrastructure connections, leading to change in the basic design and to request the Ministry of Construction to approve again on the basic design dossier. Therefore, the Ministry of Construction recommends that the Employer should have in advance the written agreement on the provision of electricity, water and drainage connections, transportation system connection for the project, infrastructure communication connection before submitting documents to the Ministry of Construction for approval on the basic design PROPERTY INVESTMENT 63 3 PROPERTY INVESTMENT KEY PLANNING PARAMETER MAXIMUM SITE COVERAGE Maximum site coverage of linked houses and villa houses Land plot area (m2/house) coverage (%) 75 100 90 100 200 300 500 80 60 50 40 Maximum site coverage of condominium buildings Building height Maximum site coverage (%) according to land plot area measured from 10,000 18,000 35,000 ground level (m) 2 m m2 m2 m2 19 65 63 60 60 58 55 55 52 22 25 53 51 48 28 50 48 45 31 48 46 43 34 46 44 41 42 39 43 41 38 43 42 40 46 41 39 36 >46 40 38 35 LANGDON & SEAH VIETNAM CO LTD 44 40 The maximum site coverage of urban public building such as educational, healthcare, cultural buildings, sport centres and market in the new urban development area is 40%. 64 PROPERTY INVESTMENT lot must be complied with the current regulation. Building height measured from ground level (m) Maximum site coverage (%) according to land plot area 3,000 10,000 18,000 2 m2 m m2 m2 80 68 65 60 19 80 65 63 22 80 62 60 25 80 58 56 53 28 80 55 53 50 31 80 53 51 48 34 80 51 49 46 80 49 40 80 48 43 80 46 80 >46 80 44 46 43 45 42 46 44 41 45 43 40 For those built on a land plot of area <3.000m2, the site coverage with the current regulation. MINIMUM LANDSCAPING RATIO FOR CONSTRUCTION LAND LOTS Type of building Minimum of ratio for landscape (%) 20 house, villa) 20 30 30 30 3. Factory 20 20 PROPERTY INVESTMENT 65 3 PROPERTY INVESTMENT KEY PLANNING PARAMETER (cont’d) MINIMUM OF CAR PARKING LOT Type of building Minimum car parking lot 4 bedrooms / 1 lot standard upward 100m2 Super market, shopping mall, conference centre, exhibition, show room and display center 100m2 1 apartment / 1.5 lot condominium MINIMUM OF PARKING SPACE Type of vehicle Minimum area of parking space Car parking space 25 m2 3 m2 LANGDON & SEAH VIETNAM CO LTD 0.9 m2 66 40 m2 30 m2 Truck parking space For the hotel grade of below three-star, public administration office and public service buildings, the numbers of parking lot must be at least 50% of the parking lots specified in the table above ROAD FOR FIRE PROTECTION Width of road > 3.5 (m) Clearance height > 4.25 (m) Area for making U-turn > 15x5 (m) PROPERTY INVESTMENT BUILDING AREAS DEFINITIONS Gross External Area (GEA) Includes: Areas occupied by internal walls and partitions Columns, piers, chimney breasts, stairwells, liftwells, and the like Atria with clear height above, measured at base level only Internal balconies access Lift rooms, plant rooms, fuel stores, tank rooms which are housed in a covered structure of a permanent nature, whether or not above main roof level main building Loading bays Areas with a headroom of less than 1.5m Conservatories PROPERTY INVESTMENT 67 3 PROPERTY INVESTMENT BUILDING AREAS DEFINITIONS (cont’d) Excludes: Canopies property Gross Internal Area (GIA) Includes: Areas occupied by internal walls and partitions LANGDON & SEAH VIETNAM CO LTD other internal projections, vertical ducts, and the like Atria with clear height above, measured at base level only 68 corridors, smoke lobbies, etc.) access Lift rooms, plant rooms, fuel stores, tank rooms which are housed in a covered structure of a permanent nature, whether or not above main roof level PROPERTY INVESTMENT Service accommodation such as toilets, toilet lobbies, bathrooms, showers, changing rooms, cleaners’ rooms, and the like Loading bays Areas with a headroom of less than 1.5m Conservatories Excludes: Canopies like in residential property Gross Floor Area (GFA) the internal structural face of the enclosing walls. Includes: Areas occupied by partitions, columns, chimney and the like Lift, plant, tank rooms and the like above main roof slab PROPERTY INVESTMENT 69 3 PROPERTY INVESTMENT BUILDING AREAS DEFINITIONS (cont’d) Note: Sloping surfaces such as staircases, galleries, tiered terraces and the like should be measured Excludes: of the building which are not enclosed spaces the like). These should each be shown separately should be shown separately. Net Internal Area (NIA) Net Internal Area is the usable area within a building measured to the internal face of the perimeter walls LANGDON & SEAH VIETNAM CO LTD Includes: 70 Atria with clear height above, measured at base level only Entrance halls Notional lift lobbies usable areas Area occupied by ventilation/heating grills Area occupied by skirting and perimeter trunking demountable partitions, whether or not perma nent, and the like, where the purpose of the divi sion is partition of use, not support, provided the area beyond is not used in common PROPERTY INVESTMENT Excludes: Those parts of entrance halls, atria, landings and balconies used in common Toilets, toilet lobbies, bathrooms, cleaners’ rooms, and the like Lift rooms, plant rooms, tank rooms (other than those of a trade processcnature), fuel stores, and the like Corridors and other circulation areas where used in common with other occupiers or of a permanent essential nature (e.g. fire corridors, smoke lobbies, etc.) Areas under the control of service or other external authorities including meter cupboards and statutory service supply points Internal structural walls, walls enclosing excluded areas, columns, piers, chimney breasts, other projections, vertical ducts, and the like The space occupied by permanent and continuous and ducting in so far as the space it occupies is rendered substantially unusable Areas with headroom of less than 1.5m Areas rendered substantially unusable by virtue fhaving a dimension between opposite faces of less than 0.25m Vehicle parking areas (the number and type of spaces noted) Building Footprint but is generally understood to mean the area of the land upon which the building sits (excluding all basements), measured to the outside face of external walls. PROPERTY INVESTMENT 71 3 PROPERTY INVESTMENT PROCUREMENT STRATEGIES Overview The primary consideration in the choice of procurement strategy is the need to obtain overall value for money during the entire life of the facility and each method has a different risk profile for the employer and contractor. In Vietnam the following is currently prevalent. - high extent - low extent - medium to high extent Design and Construct - low extent Prime Contracting - low extent Framework Agreements - rising extent Public Private Partnership (PPP) - new and promoted extent LANGDON & SEAH VIETNAM CO LTD Traditional Lump Sum Management Contracting Construction Management 72 Most if not all projects in Vietnam are tendered in competition and the process is covered by the Law of Tendering promulgated in 2006 intended primarily for state projects defined as over 30% total investment capital by a state entity and for Vietnamese Private firms. Foreign Investors do not need to follow the Law of Tendering although it is advisable. The law recognizes open tendering, limited tendering and competitive tendering. For state projects tenders are normally sought using a “two-envelope system” i.e. technical and financial the former being opened first to check for compliances. Most foreign entities short-list tendering contractors by having a robust pre - qualification procedure for checking financial and technical competencies. Tenders are usually open for 90 days. The FIDIC suite of contracts is widely used for Vietnam construction contracts with the 1999 Red Book being now widely accepted. There are official translations of some of the FIDIC forms and the Vietnam Consultant Association (VECAS) is an official member of FIDIC. Most Official Development Aid (ODA) projects in Vietnam adopt FIDIC also. PROPERTY INVESTMENT a) Traditional Lump Sum Most contracts are let in Vietnam on a lump sum basis using a modified FIDIC Contract which in its unamended form is a measure and value contract. This method requires appointment of independent design consultants by the employer and a sufficiently developed design preferably “frozen” prior to tender. Bills of Quantities are usually provided for “information only” to the contractor who normally provide their own quantities with their tender for comparison purposes only and only the rates are contract rates with any “errors and omissions” not being subject to remeasurement after the lump sum is finalized. Prime costs sums for nominated subcontracts for mechanical and electrical and lift sub-contracts are widely used. b) Construction Management This form of procurement is often portrayed as “fast-track” as tender packages are often let successively throughout the design process with no need to wait until detail design is complete. A construction management consultant is engaged normally for a fixed percentage fee to procure and manage the individual trade contracts which are placed by the employer. This necessitates effective cost management as the total construction budget is not finalized until the final packages are let. The employer bears not an insignificant risk in terms of price certainty, delays, disruption, design and coordination problems. Clients adopting this approach need to be conversant with the local environment and have the requisite in-house skills to deal with issues as they arise. c) Framework Agreements Framework agreements referred sometimes as “call-off” contracts between investors with a “pipe-line” of projects and contractors can result in significant savings to both parties using any of the procurement options above. The advantages are time reduced for tendering and negotiations, improved processes and knowledge transfer, bulk order costs savings, reduced confrontation and economies of scale due to continuity of workflow. All these advantages are extremely important in the Vietnam context because it is of paramount importance to maintain healthy relationships between employers and contractors as unforeseen events are prevalent during the design and procurement stages in Vietnam. PROPERTY INVESTMENT 73 3 PROPERTY INVESTMENT LANGDON & SEAH VIETNAM CO LTD PROCUREMENT STRATEGIES (cont’d) 74 d) Public Private Partnership (PPP) PPP is the generic term for the relationships formed between the private sector and public bodies often with the aim of introducing private sector resources and / or expertise in order to help provide and deliver public sector assets and services. The term PPP is used to describe a wide variety of working arrangement from loose, informal and strategic partnerships to design, build, finance and operate type services contract and formal points of joint venture companies. The PPP mechanisms would help attract commercial capital and other sources of capital that private investors will seek for PPP projects. In that way, investment efficiency will be improved while public debts controlled at safe levels. Investors of projects will be chosen via competitive bidding in order to maximize benefits and create equal opportunities for domestic and foreign investors. On 9 November 2010 the Prime Minister of Vietnam authorized the issue of detailed regulations covering the piloting of investment in the form of Public Private Partnerships (PPPs) in Vietnam. The PPP Regulations became effective on 15 January 2011 and will continue to be implemented over the next three to five years. The Vietnamese Government intends to carry out PPP programme according to a list of defined projects to ensure that investors are provided with carefully prepared projects with a view to creating a real PPP commercial market in Vietnam. In the coming years the government will carry out some pilot projects. The PPP projects in the country will concentrate on core technical infrastructure that requires much capital, and furthermore, mechanisms to mobilize private investment: (i) Roads, Road bridges, road tunnels, ferry road stations; (ii) Railway, railway bridges, railway tunnels; (iii) Airports, sea ports and river ports; (iv) Clean water supply systems; water drainage systems; liquid and solid waste collection and treatment systems; (v) Power plants, electricity transmission cables; (vi) Hospitals; (vii) Other infrastructure projects. The draft decrees of PPP has been official submitted to Prime Minister since October 2014 and hopefully been approved soon to create solid legal frame work to increase the trends of contribution of private fund into the infrastructure works especially the major infrastructure works. PROPERTY INVESTMENT PROPERTY INVESTMENT ✓ x ✓ Desire to transfer complete risk Damage Contractor input to economic construction ✓ x x ✓ x ✓ Single contractual link Need for design team to report to sponsor ✓ x ✓ Technically advanced or highly complex building Complexity Facility to recover cost direct from construction ✓ ✓ x Avoid prohibitive cost of change Variations Avoidance ✓ ✓ x Design prestige Quality ✓ ✓ x ✓ x ✓ x ✓ ✓ ✓ ✓ x x ✓ x ✓ ✓ ✓ x ✓ x ✓ ✓ ✓ ✓ ✓ x ✓ ✓ x ✓ x x x x x ✓ x x Prime Contracting ✓ Appropriateness of Contract Strategy Design Construction and Management Construct Management Contracting Cost Tracditional x Early Completion Timing PPP x Objectives Project Criteria Parameter ✓ ✓ ✓ ✓ ✓ x x x ✓ ✓ Framework Agreements Table A - Procurement Strategy 75 3 PROPERTY INVESTMENT LANGDON & SEAH VIETNAM CO LTD Table B - Risk Allocation 76 PROPERTY INVESTMENT CONTRACTOR SELECTION STRATEGIES There are four tiers of contractor available for tendering Tier 1 Australia Tier 2 Tier 3 Tier 4 State contractors There is a considerable diversity between these tiers and have much lower human resource costs. This is inevitably leading to higher tender returns. A rigorous weighted scoring in line with project objectives eg. lowest cost objective will have an inevitable impact (indicative weighting for Vietnam 1 10 highest) Vietnam experience (if foreign) 8 through 10, Financial capacity (particularly local) 8 Direct labour strength (local and foreign) 6 PROPERTY INVESTMENT 77 3 PROPERTY INVESTMENT CONTRACTOR SELECTION STRATEGIES (cont’d) Cognizance of international procedures, codes and Financial capacity (local) Local contractors now have access to bank funding interim payments. Deductions for defective works so careful diplomacy is often more productive. Claims for additional costs due to prevailing market conditions are more common in today’s climate but also for misinterpretation of contract obligations making the Plant and Equipment Inventory (local) LANGDON & SEAH VIETNAM CO LTD State firms tend to share or pool plant and equipment for example tower-cranes and piling rigs. It is often impossible to determine the true owner of plant and equipment on-site in the event of premature demobilization. size, capacity and suitable state of repair as contractors 78 PROPERTY INVESTMENT Direct labour strength (local) unskilled and untrained workers from remote provinces, who often are not legally resident at their working destination. Contractors should be asked to prove their direct labour arrangements. The tier 1 contractors will not have 2 contractors often import workers from their home country for the project duration and shall be responsible for all associated costs and taxes. Labour is not usually permitted to reside on site. Contractors shall provide details of training curriculums for each trade discipline when tendering as well as health and safety programmes. Proposed sub-contracting arrangements (local) to check the percentage of work subcontracted out contractors largely act as management function providing only project engineers, site supervisors, and local contractors rarely directly employ foremen, These arrangements are perfectly normal and accepted but it is preferable to know in advance the exact ar interests with other projects and to understand fully the amount of “control” the appointed contractor has on the works he is engaged to undertake. Planning and programming capability (local) PROPERTY INVESTMENT 79 3 PROPERTY INVESTMENT CONTRACTOR SELECTION STRATEGIES (cont’d) resourced planning is rarely used. The approach adopted is often “rule of thumb” whereby planners determine critical activity durations using their knowledge of other projects. Floor/structure cycle times are often inconsistent and the lack of recording and reutilization of historical data means the planning process can be crude at best. Time or delay is a perennial problem in Vietnam sometimes due to employer delays such as site clearance or permit issues or neutral delays such as weather but contractor culpable delays should not be of any surprise. The use of critical path analysis, planned impacted analysis, window analysis and collapsed asbuilt are not widely known in Vietnam. This means time recovery analysis and the implementation of acceleration measures are not readily adopted and time for completion can become unpredictable. The input of experienced delays and formulating time recovery plans. LANGDON & SEAH VIETNAM CO LTD International experience (local) from the source country. It is essential to determine the degree of exposure local contractors have had to international standards, procedures and indeed expectations. The Vietnamese Codes and Standards whilst detailed need to be used concurrently with international standards such as American, Australian, 80 PROPERTY INVESTMENT international standard project. There is no uniform and bespoke set of standards depending on the investor and his consultant source country. The appointed design team will naturally look to use their familiar “off the be asked to list the standards they have successfully built for the key trades and building elements. There is a move to produce a set of consolidated Vietnamese standards but this is some way off and the hybrid approach will continue for some time to come. mandatory Vietnam building code or standard. Design to obtain local approvals. The contractors should also be asked to list investments such as system formwork and their use of recent technology and list previous employers and consultants whom they have worked with. PROPERTY INVESTMENT 81 3 PROPERTY INVESTMENT PROPERTY OVERVIEW Vietnam’s gross domestic product grew 5.62% in the first nine months of 2014. Coupled with accelerating foreign investment, this helped to boost manufacturing and exports and helped the country to counter low credit growth. According to the State Bank of Vietnam, by September 2014, credit to the real estate market had expanded by 10.8% compared to the beginning of this year, higher than the credit growth for the whole economy (nearly 7%) and other sectors’. However, credit growth projected for the first eight months is only at 4.50% y-o-y, half of the target for 2014 despite government efforts in gradually lowering lending rates from 20% in 2011 to 13% currently. LANGDON & SEAH VIETNAM CO LTD Apart from the recovery in consumer confidence, the performance of the economy is supported by investment in the manufacturing sector, which remains the most significant sector for foreign investment, accounting for almost 70% of total FDI. South Korea has overtaken Japan as the biggest foreign investor. Samsung has invested nearly US$8 billion in Vietnam to date and Lotte Mart plans to double its current number of stores to a total of 2020. 82 Following manufacturing, the real estate sector is ranked second in terms of a destination for FDI to Vietnam, accounting for 7.3%, equivalent to US$1.27 billion. Large amounts of money are expected to flow into southern realty. Large current projects include: Smart Complex by Lotte in Thu Thiem, HCMC (US$2 billion) and Amata City Long Thanh by Amata in Dong Nai Province (US$530 million). There is additional investment to ports in HCMC, which will be replaced by mixed-use projects including Saigon New Port, Khanh Hoi Nha Rong Port and Ba Son Shipyard. PROPERTY INVESTMENT OFFICE In Q3 2014, the market welcomed only one Grade A office building – Lotte Center Hanoi in Ba Dinh District, Hanoi while demand keeps being observed in the market, vacancy reported improvements across all sub-markets both on the yearly and quarterly basis. In HCMC, the Grade A and B vacancy rate decreased by 0.6 percentage points (pps) quarter-on-quarter (q-o-q) and 3.6 pps year-on-year (y-o-y). Hanoi also saw a positive improvement in Grade B’s occupancy rate due to some large occupiers taking over space in several buildings. Rents being more affordable and attractive incentives from landlords motivated commercial tenants to move from villa-type offices to professionally managed office buildings. Besides, tenants are paying more attention to buildings in Midtown and the West for lower rents. Preferred office area reported from 200sm to 300sm. Hanoi’s Grade A occupancy, on a contrary, recorded a decrease due to the entrance of Lotte Center Hanoi with large leasable office space of over 36,000 sm. In HCMC, average rent showed a remarkable improvement with Grade A increasing by 3.7% y-o-y, 1.8% q-o-q and Grade B increasing by 2.2% y-o-y and being quite stable as compared to the previous quarter. In Hanoi, Grade A rents in Midtown experienced a sharp growth of 12.8% q-o-q in the review quarter due to the entrance of Lotte Center Hanoi with asking rent of US$39 psm pm. Whereas, asking rents in both grades in other areas of the country’s capital underwent declines ranging from 0.4% to 6.7%. On a y-o-y basis, both Grade A and Grade B rents witnessed significant drops of 4.9% and 5.9% respectively. Moving forward, it is anticipated that no new Grade A and Grade B buildings will come online till early next year. Delays in construction as well as launch of several office projects relieved pressure for the Hanoi market while in HCMC, a large proportion of new supply showing good construction progress will be owner-occupied. For this reason, the market will be unlikely to suffer an increasing burden from new competitors and landlords may maintain a position of strength. Notable new supply will predominantly be located in decentralized submarkets such as District 3 PROPERTY INVESTMENT 83 3 PROPERTY INVESTMENT PROPERTY OVERVIEW (cont’d) (Lim Tower 2), District 10 (Viettel Office and Trade Center). Vietcombank Tower is the only notable office project located in the CBD of HCMC. Last but not least, it is now essential that aged office buildings renovate their facilities and keep up with newer offerings so as to be competitive to new buildings, especially in the West of Hanoi. Office Vacancy Rate (%), HCMC vs. Hanoi VACANCY RATE (%) GRADE B GRADE A Q3 2014 Q2 Q1 Q4 Q3 2013 Q2 Q1 Q4 Q3 2012 Q2 Q1 Q4 Q3 2011 Q2 Q1 50% 40% 30% 20% 10% 0% 0% 10% 20% 30% 40% 50% Source: CBRE Research, Q3 2014 84 PROPERTY INVESTMENT RETAIL The third quarter is a high contrast picture of retail market in Hanoi and HCMC. In Hanoi, there were two projects that were closed for restructuring, but two remarkable new projects came online in Q3 2014. While the renowned Trang Tien Plaza was temporarily and partially closed to be re-positioned to improve tenant mix after 16 months of operation since its re-opening in April 2013, the opening of Lotte Department Store created certain hype among Hanoi’s residents as this is the first department store under Lotte brand name opened in Hanoi, integrated in a 65-level building with multiple premium F&B outlets and entertainment services, including an observation deck, sky walk and fine dining. Other newly-opened retail project in Hanoi is the podium of Hoang Thanh Tower, which is located in CBD area, is fully leased out to four tenants, three of which are high fashion brands, introducing to Hanoi two new retail entries (Topshop, Topman and Oasis opened their first stores in Hanoi), and one retail expansion. In HCMC, new retail entries included Marks & Spencer opening a 1,200 sm flagship store in Vincom Center B and Café Bene’s first store in Dong Khoi Street, District 1. On the other hand, Saigon Tax Trade Center is taken out of the retail sample for Q3 2014. This shopping centre officially closed on September 25th, 2014 to provide space for a 40-storey skyscraper. The building is planned to have five floors and 1.5 basements for a shopping centre component with over 40,000 sm GFA. In terms of market performance, the two cities experienced different scenarios. In Hanoi, rents declined by 13.9% in the CBD and 2.0% in non-CBD areas. The CBD saw such a significant drop only due to the temporary closure of Trang Tien Plaza which offered highest rent in shopping centre segment. Retail occupancy also dropped by 1.8 pps q-o-q. Meanwhile, in HCMC, both occupancy rates and CBD retail rents showed improvements as the average rent of shopping centres in the CBD increased 6.7% y-o-y. Notably, five retail companies operating in Vietnam have been chosen among 500 best-performing retailers in Asia Pacific in 2014, according to an PROPERTY INVESTMENT 85 3 PROPERTY INVESTMENT PROPERTY OVERVIEW (cont’d) announcement by Singapore-based Retail Asia Publishing Pte Ltd and Euromonitor (Asia) Pte Ltd. The ranking, based on the retailers’ revenues in 2013, included Saigon Union of Trading Cooperatives (Saigon Co.op) (US$1.1 billion), BigC under French-based Casino Guichard Perrachon SA ($534 million), Nguyen Kim Trading Joint Stock Co ($490 million), Saigon Jewellery Co ($487 million), and Mobile World Joint Stock Co. ($395 million). Looking forward, retail space in the CBD is in high demand in spite of high rents due to big retailers’ preferences, particularly new entries. Luxury shopping centres, besides location, should create better tenant mix and offer more professional services to serve sophisticated and discerning customers. According to a CBRE survey, planned future retail developments in HCMC in the next two years are only 50% of the levels expected in Manila and Singapore and 12% - 15% the levels expected in Tokyo and Bangkok. This will help to support rental levels in HCMC, especially in CBD areas. 86 2,000 1,800 1,600 1,400 1,200 1,000 800 600 400 200 0 2015 2014 Tokyo Bangkok Beijing Kuala Lumpur New Delhi Shenzhen Hanoi Guangzhou Shanghai Singapore Manila Melbourne Jakarta Brisbane Ho Chi Minh City Murnbai Adelaide Hong Kong Penrth Taipei Auckland Wellington Development Pipeline (’000 sm) LANGDON & SEAH VIETNAM CO LTD Development Pipeline, Q3 2014 Source: CBRE Vietnam, Q3 2014 PROPERTY INVESTMENT RESIDENTIAL FOR SALE Activities from developers and buyers were seen in both Hanoi and HCMC residential markets. Active launches and re-launches were held and well-attended by buyers even during the “ghost” month which, in the traditional Eastern mind-set, is not a good time for business activities. In Hanoi, 2,202 units were added to total supply, while in HCMC, developers launched a total 3,104 new units to the stock, making the 9-month new launches since beginning of the year well surpass the total new launches of the whole 2013 in both cities. Meanwhile, re-launches of mid-end projects were active in Hanoi with massive promotion programs and deferred payment schemes were very common as most of these projects are completed and buyers can move in immediately. Sales momentum remained strong despite the “ghost” month’s tradition. In Hanoi, an estimated 2,550 units were sold in the quarter, a slight increase of 2% as compared to last quarter. In HCMC, an estimated 3,300 units changed hand, an 8.6% q-o-q increase. Affordable segment led the rising wave in HCMC, while mid-end projects were the main drivers for the increase in number of transaction in Hanoi. Growth in transaction of high-end condominiums was relatively modest, comprising mostly of investors (either buy-to-let or capital gain investors), who often try to avoid selling or buying houses in “ghost” month. Thanks to improving market conditions, prices on both the primary and secondary markets started to show tentative improvements on a q-o-q basis. In terms of primary pricing, slight increase from 2.0% to 5.0% y-o-y in tag prices was seen in many new launches in both Hanoi and HCMC, especially those projects that are completed and ready to move in. Although promotions of bigger value are on offer, the increase in tag prices shows that developers were more confident in the market and in positioning of their projects. Prices of resale apartments were also on an upward trend with a slight 1.0% increase q-o-q in Hanoi and approximately 2.5% increase q-o-q in HCMC. In Hanoi, resale prices improved in most segments, and strongest in mid-end apartments with 1.8% q-o-q PROPERTY INVESTMENT 87 3 PROPERTY INVESTMENT PROPERTY OVERVIEW (cont’d) LANGDON & SEAH VIETNAM CO LTD growth. (In Q1 and Q2 of the year, resale price increase was stronger in luxury and high-end segments.) The coming back of the mid-end segment in resale price increase shows that resale buyers are finding mid-end apartments more reasonable while products are realized. Meanwhile, in HCMC, the high-end segment showed a more positive picture than the other segments as resellers found it easy to find tenants and were confident about capital value increases. In addition, housing is a favoured investment route for Vietnamese. 88 If 2013 showed early signs of recovery, especially in the affordable housing sector, 2014 has seen a complete turnaround due to some Government policies in an effort to unfreeze the residential market. Notable measurements include: lower home interest rate; more transparent condominium measurement; the extension to 15 years for loans from the VND30,000-billion credit package; and mortgage of future-built houses; etc. Basically the residential market has gone on steroids with large local developments coming on line across districts 2, 4, 9 and Binh Thanh and developers being able to sell more mid-market units in the last four months than in the last two years. The largest examples of this are at Masteri Thao Dien in District 2 and at Vinhomes Central Park in Binh Thanh in HCMC. Recently, the National Assembly allowed all foreigners who are granted a visa to Vietnam to buy residential properties in the country. This together with other ‘rescue’ measurement from the Government will boost the market confidence and bring a brighter outlook for 2015. PROPERTY INVESTMENT Hanoi, Q-o-Q changes in secondary prices HCMC, Price changes of condominiums for sale Source: CBRE Vietnam, Q3 2014. PROPERTY INVESTMENT 89 VIENAM BUSINESS ENVIRONMENT Language Accounting System Banks Government Administration Taxation Insurance Workforce 4 4 FINANCIAL LANGUAGE borrowed from Chinese and the intonation is similar to Cantonese. It is spoken by approximately 90% of the Vietnamese population and ranked as the world’s 15th most spoken language. English, however, is widely used in the business community. ACCOUNTING SYSTEM LANGDON & SEAH VIETNAM CO LTD Accounting records are required to be maintained in VND. Foreign-invested business entities can select a foreign currency to be used for their accounting UHFRUGV DQG ¿QDQFLDO VWDWHPHQWV SURYLGHG WKDW WKH\ PHHW DOO UHTXLUHPHQWV VSHFL¿HG LQ &LUFXODU 244/2009/TT-BTC issued by the Ministry of Finance (“MoF”). Accounting records are required in Vietnamese language, but this can be combined with a commonly-used foreign language. At the end of a ¿QDQFLDO \HDU WKH HQWLW\ PXVW SHUIRUP D SK\VLFDO FRXQWRILWV¿[HGDVVHWVFDVKDQGLQYHQWRU\ 92 Companies operating in Vietnam are required to comply with the Vietnam Accounting System (“VAS”). It is possible to diverge from the standard VAS, but WKLVLVVXEMHFWWRVSHFL¿FDSSURYDOIURPWKH0R)7KH tax authorities treat VAS non compliance as a basis for tax reassessment and imposition of penalties, including withdrawal of CIT incentives, disallowance of expense deductions for CIT purposes and disallowance of input VAT credits/refunds. 7KHDQQXDO¿QDQFLDOVWDWHPHQWVRIDOOIRUHLJQLQYHVWed business entities must be audited by an independent auditing company operating in Vietnam. Audited DQQXDO ¿QDQFLDO VWDWHPHQWV PXVW EH FRPSOHWHG ZLWKLQ GD\V IURP WKH HQG RI WKH ¿QDQFLDO \HDU 7KHVH ¿QDQFLDO VWDWHPHQWV VKRXOG EH ¿OHG ZLWK WKH applicable licensing body, MoF, local tax authority, Department of Statistics, and other local authorities if required by law. FINANCIAL BANKS Banking industry of Vietnam is considered as young in terms of integration to worldwide, until in 1990, it was only restructured to separate the State Bank of Vietnam from commercial banks. The State Bank of Vietnam acts as a central bank and a supervisory institution and is also a main share holder in state-owned commercial banks (SOCB). Later, more forms of commercial banks are established especially after 2006 when Vietnam joined WTO. With less than 5% of the population regularly using banking service, and 10%-20% holding bank accounts, it has provided good opportunities for growth, however, competition in banking sector is considered as very harsh. Besides Vietcombank, Vietinbank, Agriculture Bank, BIDV as top of SOCB, top joint stock banks can be named as ACB, Sacombank, Techcombank, Indovina Bank as top of joint venture bank. Nowadays, in the banking sector, we can see a variety range of plenty commercial banks including 4 biggest SOCB, around 40 joint –stock banks, and 40 foreign invested banks or branches of foreign banks, representative offices, 4 joint-venture banks in playground. Although all the big names of foreign banks such as Citibank, HSBC, Standard Chartered Bank, ANZ are all presence in Vietnam, the banking system is still characterized by the strong dominance of market share by SOCB. Official currency in Vietnam is VND, however, laws allow local and foreign entities and individuals to hold foreign currency at bank accounts as deposit/savings and funds received/transferred from foreign countries in freely. Nevertheless, domestic payment, usage or cross border outward transfer of foreign currency is prohibited or limited to certain kinds of transactions and it requires supporting documents. FINANCIAL 93 4 FINANCIAL LANGDON & SEAH VIETNAM CO LTD BANKS (cont’d) 94 Banks can provide customers with all kinds of services, however, it is more characterized by commercial banking market rather than having a clear division on investment banking and commercial banking. Commercial banking services are such as deposits, loans, trade finance, bank guarantees Deposit can be made in both VND or foreign currencies and deposit is including current account, saving accounts and fixed deposit from 1 months to 24 months. Interest rate for VND is always higher than foreign currencies (currently average VND interest rate is 5%-7%p.a. compared to USD interest rate at 0.75%p.a). Loan services comprises of short term loan (under 1 year), medium term loan (from 1 to 5 years) and long term loan (over 5 years). Loans in foreign currencies (popular USD) are restricted to companies who have the proceeds in foreign currency. Getting loans in USD is also always cheaper than loans in VND especially for those who having source of fund from their export. Banks always offer a credit line to their customers to finance all their need in short term working capital or long time investment in machineries or factories. Credit line may be used for loan disbursement, trade finance or bank guarantee service. Trade finance can be listed as L/C service (sight or usance L/C), bills for collection D/P or D/A, L/C negotiation, shipping guarantee, factoring. The most popular trade finance service in Vietnam is L/C, D/P and D/A, while factoring service is rarely used. Bank guarantee services are comprised of many types, some commonly used in the economy are such as bid bond, performance bond, warranty guarantee, payment guarantee or advance payment guarantee… Fee for issuance of bank guarantee is 2% p.a. of the guarantee value plus a small amount charge on documentation. Customers can request banks to issue for them a bank guarantee by deposit fund to bank or from a credit line offered by bank. FINANCIAL GOVERNMENT ADMINISTRATION The National Assembly is the highest representative organ of the people and the highest organ of the state elections. Sittings of the National Assembly are held twice a year and have full constitutional and legislative powers. The standing committee of the National Assembly is responsible for enforcement of laws. Its functions by the National Assembly from among its members to from the representatives. The National Defense and Security Council has the duty to mobilize all forces and Assembly and shall report to the National Assembly, the National Assembly standing committees and the Assembly and has the term of 5 years. The Deputy take on the State management of allotted branches criminal court, civilian court, the court of appeal and the assistant apparatus. FINANCIAL 95 4 FINANCIAL TAXATION TAXATION IN THE REAL ESTATE INDUSTRY I. Corporate Income Tax (“CIT”) Organizations established in Vietnam deriving income from transferring or leasing property are subject to Corporate Income Tax (“CIT”) at the standard tax rate of 22% from 1 January 2014. This rate will reduce to 20% from 1 January 2016. A CIT rate of 10% shall be applicable to income from selling, leasing and financial leasing of social housing. Aside from this, real estate developers generally are not given preferential tax rates, tax holidays or other tax reductions except for special cases such as projects located in poor social-economic regions or projects for construction of residential houses for the poor or workers. LANGDON & SEAH VIETNAM CO LTD For advanced payment for properties under development, real estate developers are required to pay provisional CIT, either at 25% on provisional income if the corresponding expenses can be determined and matched with the revenue or 1% on advanced payments if not. However, no revenue recognition is allowed for the advance payment. 96 Where the enterprise sub-leases out a property, if the lessee pays a lump sum for a number of years and certain conditions are met then the lessor is able to recognise revenue by one of two methods: (i) on allocated on a year-by-year basis or (ii) a lump-sum basis. Losses incurred in a given year can be consecutively carried forward for 5 years. With effect from 1 January 2014, losses from real estate transfer activities can be offset against the taxable income of other business activities of the relevant tax year. However, the gain from transfer of real estate is still required to be recorded and taxed separately without offsetting with loss from other activities. Land use rights (“LURs”) with indefinite terms may not be depreciated for tax purposes. However, LURs with a definite term used for production or business activities, can be amortized over the prescribed land use duration. Any gains from the revaluation of a LUR for capital contribution purposes shall be determined as follows: FINANCIAL (i) For capital contribution for residential housing for sale: the whole gain is recognized as other income at once in the current tax period. (ii) For capital contribution for production or business activities, if the company receiving LUR is allowed to depreciate such LUR, the whole gain is recognized as other income at once in the current tax period. Otherwise, the gains may be allocated to other income over the period up to ten years. II. Value Added Tax (“VAT”) The transfer of a LUR without any related infrastructure is not subject to VAT. Conversely, the transfer of LUR with an infrastructure and building component is generally subject to VAT at 10%. However, the land value can be excluded from the revenue subject to VAT. The determination of deductible land price for VAT purpose varies depending on how the land was acquired for the project. Input VAT incurred for construction costs can generally be claimed as an input VAT credit. Output VAT will also be applied to the payment collection on schedule and the deductible land value for VAT purpose is also allocated accordingly. The VAT rate of 5% applicable to contracts of selling/leasing/financial leasing for social housing, which satisfy the stipulated conditions. III. Stamp Duty Stamp duty is payable at the transfer of title of real estate property by the buyer. Some specific transfers may be exempted from the stamp duty. Stamp duty is imposed at 0.5% on the value of the property up to VND 500 million (approx. USD 25,000) per asset per transaction. IV. Foreign Contractor Tax (“FCT”) Foreign companies with or without its permanent establishment (“PE”) in Vietnam carrying out its business activities in Vietnam, and/or deriving income in Vietnam under a contract or agreement signed with a Vietnamese organisation or individual, would be referred to as a FINANCIAL 97 4 FINANCIAL TAXATION (cont’d) foreign contractor (“FC”), and subject to Vietnamese FCT. VAT and CIT are the two components of the FCT. There are three tax filing and payment options: (i) Full registration method with maintenance of books and accounts in Vietnam under Vietnam Accounting System; (ii) Deemed Withholding method and (iii) the Hybrid method, which consists of paying VAT on the conventional deduction method like a Vietnamese company but paying CIT on a Deemed Withholding method basis. The Deemed Withholding method is the most common one in practice by which the contracting Vietnamese party is responsible for registering, withholding, filing and paying the FCT due from each payment made to the FC. The applicable rates vary depending on the nature of goods and services provided. For projects having a substantial portion of local purchases, the Hybrid method is often applied so that the FCs can claim credit on the input VAT incurred on local purchases but can still pay the CIT on a deemed basis. LANGDON & SEAH VIETNAM CO LTD V. Personal Income Tax (“PIT”) 98 Generally, real estate (other than a property used as a sole residential property and some other specific exempt transactions) transferred by an individual is subject to PIT. Property transactions subject to PIT include the transfer of “the right to buy”, and the transfer of “the right to lease”. PIT exemption for transfer of sole residential property is not applicable for (i) transfer within 182 days from the date of having the right of ownership/LUR; and (ii) transfer of house/apartment/construction work completed in the future. Typically, a Vietnam tax resident has to pay PIT for the property transactions under one of the following two methods: (i) At 25% on the net gain assessed by the difference between the transaction price less the cost and relevant expenses; or (ii) 2% on the transfer price, if the cost cannot be determined. FINANCIAL However, recent practice has indicated that (ii) above would apply in most cases. No PIT declaration and payment are required in case individuals/households having property for lease earning annual rental of VND100 million or less (approx. USD4,800 per year). VI. Non-agricultural land-use tax Non-agricultural land-use tax (“NALUT”) is generally applicable to the following types of land: Non-agricultural land used for residential, production or business purposes. The calculation of the tax liability is generally based on the land area, price of land (normally set by the provincial-level People Committee and remains unchanged within 5 years from 1 January 2012) and tax rate. For residential land holding a multi-floor building or non-agricultural land holding a production or business establishment, the applicable tax rate is 0.03%. Organisations granted with LUR and existing land users are required to submit NALUT declaration on a yearly basis at the tax office of the relevant district no later than 30 January of the following year. However, no further declaration in subsequent years is required if there is no change in tax payer or tax liability. If there is any change, the tax payer is required to submit an amended declaration within 30 days following the date on which the change takes effect. The tax payer may opt to pay the NALUT on one-off basis a year no later than 31 May each year or twice a year no later than 31 May and 31 October each year. If the tax payer requests to pay the NALUT on one-off basis for many years within a 5-year period, the payment of tax may not be later than 31 December of the year in which the request is made. NALUT exemption and reduction can be granted to certain types of land including land related to investment projects in the sectors eligible for special investment incentives, investment projects in geographical areas with qualifying socio-economic difficulties and other specific cases. (Reproduced by kind permission of KPMG) FINANCIAL 99 4 FINANCIAL INSURANCE Overview LANGDON & SEAH VIETNAM CO LTD Most risks that a company would insure anywhere else in the world can be adequately insured for in Vietnam. Rates and terms are generally a function of the world market with due consideration given to local factors however it should be noted that VAT of 10% applies to insurance premiums on policies written within Vietnam. While the overall ability to insure large or complicated risks entirely within Vietnam is limited, the Vietnamese insurance industry can nonetheless insure any size risk through reinsurance arrangements with international reinsurance organizations. The leading reinsurers and those who carry more than 10% have to be rated at least BBB by Standards & Poors or B++ by AM Best or Baa by Moody's or equivalent. 100 Vietnam passed a comprehensive Insurance Law in December 2000 which took effect on April 1, 2001. The Amendment of Insurance Law has been passed and was effective as at July 1, 2011. The key changes are focused at keeping up with any WTO commitments such as: the insurance market is professional & open, foreign insurers are allowed to establish a branch in Vietnam or issue an insurance policy into Vietnam. However, the law gives the power to the government to release detailed guidance and to license such transactions. The Decree No. 123/2011/ND-CP was issued on 28 Dec 2011 to provide guidance on the implementation of the Amended Insurance Law. In addition, the government issued Circular No. 124/2012/TT-BTC and Circular No. 125/2012/TT-BTC on 30 Jul 2012 with effective from 01 Oct 2012 to guide on the operation and finance of the insurance market. The Decree No. 98/2013/ND-CP effective from 15 Oct 2013 providing guidance on penalties for administration offences in Insurance Business. Construction All Risks (CAR) insurance, including the covers for the Contract Work & Third Party Liability, is popular in Vietnam. Recently, owners of larger projects have shown interest in considering more technical coverages such as Advance Loss of Profit (ALoP) / Delay in Start-Up (DSU), to protect their anticipated profit/fixed costs and Completed Operation/Product Liability insurance liability of a particular project. FINANCIAL Since the real estate market was in hibernation stage over the past years, construction insurance program did not develop significantly. At the moment, due to positive enactment of new law and regulation from the government including Property Law (Amendment) and Real Estate Commercial Law (Amendment) which shall have effect from July 1st, 2015. In addition, mortgage loan for construction and real estates will be also easy access as instructions of National Banks, the real estate market has recovered positively and we are expecting promising developments in construction insurance also In another side, construction insurance premiums tend to decline in recent years. This comes from fierce competition between insurance companies and tightening insurance costs of investors and contractors. The international insurance companies are hardly capable to compete on cost with the local insurance companies. However, the international insurance companies still have certain advantages in projects requiring in-depth underwriting skills and the ability to arrange with international re-insurers. Construction insurance still tends to be left to the contractor to arrange rather than the owner which can give rise to gaps in cover when projects are delayed or split into smaller packages. There may also be gaps when the project passes from construction to operation. Compulsory Insurances in Vietnam Compulsory insurances are regulated in insurance laws & some specialisedspecialized laws. Below is the consolidation: Fire and Explosion - (Article 8 of Law on Insurance Business) Motor Vehicle/Aviation carriers to passengers (Article 8 of Law on Insurance Business, Decree 103/2006/ND-CP/ Article 163 of Civil Aviation Law) Civil Liability Insurance of those who deal in the transport of passengers or cargo in inland water ways - (Article 6 &7 of Decree 125/2005/ND-CP and Article 58 & 126 of Marine Law) FINANCIAL 101 4 FINANCIAL INSURANCE (cont’d) Professional Indemnity insurance for: Insurance brokers - (Article 8 of Law on Insurance Business) Lawyers - (Article 8 of Law on Insurance Business & Article 40 of Law on Lawyer) Contractor to perform survey for construction works - (Article 51 of Law on Construction) Contractor to design for construction works (Article 58 of Law on Construction) Contractor to supervise for execution of building works - (Article 90 of Law on Construction) Securities companies - (Article 71 of Law on Securities) Fund management companies - (Article 72 of Law on Securities) Auditing Companies - (Decree 105/2004/NDCP on independent auditor) Enterprises on price assessment - Article 11 of Decree 111/2005/ND-CP on Price assessment) Medical examination and treatment LANGDON & SEAH VIETNAM CO LTD Insurance for Construction works: 102 Applicable to investors/developers - (Article 75 of Law on Construction) Applicable to contractors - (Article 76 of Law on Construction) Applicable to parties who call construction tender - (Article 104 of Law on Construction) Professional insurance, civil liability insurance and environmental damage compensation liability insurance applicable to organizations and individuals performing radiation jobs Civil Liability Insurance and Environmental Damage Compensation Liability Insurance applicable to Organizations and Individuals performing Radiation Jobs Travel Insurance for Vietnamese traveling overseas Technically there is no requirement for worker compensation insurance. However since there is a liability regarding employees under the Vietnamese labour law the purchase of worker compensation insurance can act as a risk transfer method to protect against these liabilities. FINANCIAL Market Players Insurers There are numerous domestic and foreign companies licensed to provide non-life insurance, including insurance for construction sectors in Vietnam. State-owned: Vietnam Insurance Corp (Bao Viet), Bao Minh Insurance Corp (Bao Minh) Group-controlled: PetroVietnam Insurance Corporation (PVI), PG Insurance (PJICO), Post & Telecommunication Insurance JSC (PTI), Global Insurance Co. (GIC), Vietnam Aviation Insurance JSC (VNI), SHB Vinacomin Insurance JSC (SVIC) Bank-based: Vietinbank Insurance Co. (VietInsco), BIDV Insurance Co. (BIC), Agriculture Bank Insurance JSC (ABIC), Military Bank Insurance Company (MIC) PrivateJoint Stock: BaoLong Insurance Corporation (Bao Long), Vien Dong Assurance Corp (VASS), AAA Assurance JSC (AAA), Phu Hung Assurance (PAC), Hung Vuong Insurance Corp (BHV), Great Mountant Insurance JSC (GMIC) Foreign: Groupama, QBE, AIG, ACE, Liberty, Fubon, MSIG, Cathay Joint Venture: Bao Viet Tokyo Marine (JV between Baoviet and Tokio Marine), United Insurance Co. (UIC – the JV among Bao Minh, Sompo & LG), Samsung Vina Insurance (JV between Samsung and VinaRe) Reinsurer: Vietnam National Insurance Corp (VinaRe). FINANCIAL 103 4 FINANCIAL Brokers As insurance is best arranged through a licensed insurance broker who can help companies to assess the underlying risks and then arrange appropriate insurance on their behalf, there are a number of licensed insurance brokers. International: Jardine Lloyd Thompson (JLT), Aon, Marsh, Grass Savoye Willis 104 PJICO 8.15% BIC 3.25% Sa ms ung Vi na 3.77% MIC 2.42% ABIC 2.18% AAA 2.17% Li berty 1.84% GIC 2.02% PTI 6.07% Ba o Long 1.76% VNI 1.81% (Source: Vietnam Insurance Associate) Non-life Insurance Market Share 2013 Ba o Mi nh 9 44% Other 3.87% UIC 0.93% VASS 1.12% MSIG 1.36% AIG 1.54% BVTM 1.18% PVI Reinsurance Joint Stock Corporation (PVIRe) LANGDON & SEAH VIETNAM CO LTD BSH 0.90% Ba o Vi et 23.30% PVI 20.94% Local: Viet Quoc, A Dong, Thai Binh Duong, Sao Viet, CIMEICO, Nam A FINANCIAL WORKFORCE The estimated population of Vietnam in 2015 will be circa 91.3 million (as the General Office for Population Family Planning). The region-based minimum wage level applied to operating in localities of region is USD 147 per month from 01st January, 2015 (Pursuant to the Decree No. 103/2014/ND-CP of the Government dated 11th November 2014). Pursuant to the Law No 46/2014/QH13 dated June 13, 2014 on amendments to some articles of the Law on Health insurance No. 25/2008/QH12, from January 2015, the monthly Health insurance rates and responsibilities to pay health insurance of the group whose insurance are paid by the employers and employees must not exceed 6% of the monthly salaries, 4% is paid by the employers and 2% is paid by the employees. During the time the employees are entitled to maternity leave due to maternity benefits under the regulations of law on health insurance, the maximum premiums equal to 6% of their monthly salaries before the maternity leave shall be paid by the health insurance organizations. In accordance with the Law on Employment No: 38/2013/QH13 on 16 November 2013 with effective date on 1 January 2015, a person on unemployment allowance will stop receiving it when he/she has found a job. The period of payment of unemployment insurance premiums shall be reserved for calculating the subsequent duration of receipt of unemployment allowance. The reserved period equals the total of the periods of payment of unemployment insurance premiums minus the period during which the worker has received unemployment allowance, with one month of receipt of unemployment allowance equivalent to 12 months of payment of unemployment insurance premiums. FINANCIAL 105 OTHER INFORMATION Vietnam Map Domestic Routes Relevant Websites Public Holidays Prime Rates IDD Codes and Time Differences Conversion Factors Some Interesting Facts Vietnam Key Data Langdon & Seah Culture Langdon & Seah Vietnam 10 Years Anniversaries Professional Services Directory of offices Acknowledgement 5 5 OTHER INFORMATION LANGDON & SEAH VIETNAM CO LTD VIETNAM MAP 108 (Source: Wikimedia) OTHER INFORMATION DOMESTIC ROUTES DISTANCE FLIGHT TIME MILES/KMS OUTBOUND RETURN HA NOI TO Da Lat 662/1065 1:40 1:40 Da Lat 133/214 0:50 0:50 Vinh 549/883 1:45 1:45 HO CHI MINH CITY TO DA NANG TO (Source: Vietnam Airlines) OTHER INFORMATION 109 5 OTHER INFORMATION RELEVANT WEBSITES LANGDON & SEAH VIETNAM CO LTD Ministry of Health Portal 110 The State Bank of Vietnam Vietnam National Administration of Tourism OTHER INFORMATION http://www.chinhphu.vn http://www.mps.gov.vn http://www.moha.gov.vn http://www.moj.gov.vn http://www.mpi.gov.vn http://www.mof.gov.vn http://www.moit.gov.vn http://www.mard.gov.vn http://www.mt.gov.vn http://www.moc.gov.vn http://www.monre.gov.vn http://www.mic.gov.vn http://www.molisa.gov.vn http://www.cinet.gov.vn http://www.most.gov.vn http://www.moh.gov.vn http://www.moet.gov.vn http://www.mofa.gov.vn http://www.sbv.gov.vn http://www.gso.gov.vn http://www.tcvn.gov.vn http://www.vietnamtourism.com http://www.customs.gov.vn http://www.vr.org.vn OTHER INFORMATION 111 5 OTHER INFORMATION PUBLIC HOLIDAYS 2015 VIETNAM Normal Scheduled Holidays Liberation Day of Saigon International Labour Day National Day Christmas Day # substitue for 21 Feb (Sat) LANGDON & SEAH VIETNAM CO LTD CHINA 112 Labour Day National Day * 2 - 3 January 2015 are holidays, 4 January 2015 is working day. $ 21 - 24 February 2015 are holidays, 15 and 28 February 2015 are working days. ^ 6 April 2015 is holiday. % 22 June 2015 is holiday. @ As 27 September 2015 falls on Sunday, the deferred day off is arranged together with National Day. # 6 - 7 October 2015 are holidays, 10 October 2015 is working day. OTHER INFORMATION 2015 HONGKONG 19 Feb 20 Feb 21 Feb The day following Ching Ming Festival Labour Day Tuen Ng Festival 03 Apr 04 Apr 06 Apr* 07 Apr 01 May 25 May 20 Jun 01 Jul The day following Chinese National Day 28 Sep 01 Oct 21 Oct Festival Christmas Day 25 Dec Christmas Day 26 Dec *As Ching Ming Festival in 2015 falls on a Sunday, the following day will be designated as a general holiday in substitution. However, as the day following Ching Ming Festival and Easter Monday fall on the same day, the next following day that is not itself a general holiday will be observed as an additional general holiday. OTHER INFORMATION 113 5 OTHER INFORMATION PUBLIC HOLIDAYS (cont’d) 2015 LANGDON & SEAH VIETNAM CO LTD MACAU 114 New Year's Day Lunar New Year's Eve(Afternoon) Lunar New Year's Day The 2nd day of Lunar New Year The 3rd day of Lunar New Year The 4th day of Lunar New Year The 5th day of Lunar New Year Good Friday The day before Easter Ching Ming Festival The first working day after the Day before Easter The second working day after Ching Ming Festival Labour Day The Buddha's Birthday Tung Ng Festival (Dragon Boat Festival) The first working day after Tung Ng Festival Bank's Holiday The day following Mid-Autumn Festival National Day The day following National Day Chung Yeung Festival All Soul's Day Feast of the Immaculate Conception Macau SAR Establishment Day The first working day after Macau SAR Establishment Day Winter Solstice Christmas Eve Christmas Day New Year's Eve (Afternoon) 01 Jan#* 18 Feb@ 19 Feb#* 20 Feb#* 21 Feb* 23 Feb#@ 03 Apr# 04 Apr 05 Apr* 06 Apr#@ 07 Apr@ 01 May#* 25 May# 20 Jun 22 Jun@ 01 Jul# 28 Sep#* 01 Oct#* 02 Oct 21 Oct#* 02 Nov# 08 Dec# 20 Dec* 21 Dec#@ 22 Dec 24 Dec# 25 Dec# 31 Dec@ # Bank’s Holiday * Obligatory Holiday @ Special Holiday Granted by Chief Executive for staff in Public Administration OTHER INFORMATION 2015 BRUNEI National Day Forces Anniversary** 01 Jan 03 Jan 19 Feb 23 Feb 16 May 31 May 15 Jul 18 Jun Anniversary of the Christmas Day 04 Jul 17 Jul 18 Jul 19 Jul 23 Sep 13 Oct 25 Dec * Subject to Change ** Replacement for Fridays / Sundays Fridays and Sundays are government off days SINGAPORE Labour Day Vesak Day National Day Deepavali* Christmas Day 01 Jan 19 Feb 20 Feb 03 Apr 01 May 01 Jun 17 Jul 09 Aug# 24 Sep 10 Nov 25 Dec * Subject to changes # The following Monday will be a public holiday. OTHER INFORMATION 115 5 OTHER INFORMATION PUBLIC HOLIDAYS (cont’d) 2015 PHILIPPINES A. Regular Holidays Labour Day Independence Day Christmas Day 01 Jan 02 Apr 03 Apr 09 Apr 01 May 12 Jun 18 Jun 31 Aug 24 Sep 30 Nov 25 Dec 30 Dec LANGDON & SEAH VIETNAM CO LTD B. Special Holidays (Non-Working Holidays) 116 All Saint’s Day All Souls Day (Additional) Christmas Eve (Additional) 15 Feb 04 Apr 21 Aug 01 Nov 02 Nov 24 Dec 31 Dec OTHER INFORMATION 2015 MALAYSIA New Year's Day ** Chinese New Year Labour Day Wesak Day King/Agong's Birthday Hari Raya Aidilfitri* National Day M alaysia Day Hari Raya Qurban* Awal M uharam (M aal Hijrah) Deepavali* Prophet M uhammad's Birthday Christmas Day * Subject to change ** Except Johor, Kelantan, Kedah, Perlis &Terengganu # The following Monday will be an additional public holiday INDONESIA International Labour Day Waicak Day National Independence Day Idul Fitri* Idul Adha Day Christmas Day * Subject to changes OTHER INFORMATION 117 5 OTHER INFORMATION PUBLIC HOLIDAYS (cont’d) 2015 THAILAND Special Holiday@ Songkran Festival National Labour Day Coronation Day Chulalongkorn Day LANGDON & SEAH VIETNAM CO LTD Constitution Day 118 # Banks only + Government only @ Special Holiday Granted by Thai Government - Substitute for 5 December 2015(Saturday) OTHER INFORMATION 2015 INDIA Sankranthi Ugadi Independence Day Deepavali Christmas Day KOREA Children’s Day Liberation Day National Foundation day Christmas Day OTHER INFORMATION 119 5 OTHER INFORMATION PUBLIC HOLIDAYS (cont’d) 2015 TAIWAN Founding Day Children’s Day Double Ten Day LANGDON & SEAH VIETNAM CO LTD *When the memorial day or holiday falls on a Saturday or Sunday, a deferred day off will be granted. If a memorial day or a holiday falls on a Saturday, the deferred day off is on the preceding workday; if a memorial day or a holiday falls on a Sunday, the deferred day off is on he following workday. However, the deferred days off for Chinese New Year’s Eve and Chinese New Year are always on the following workdays. 120 OTHER INFORMATION PRIME RATES (as at 4th Quarter 2014) RATE (%) COUNTRY Australia* 4Q 2010 4Q 2011 4Q 2012 4Q 2013 4Q 2014 4.75 4.50 3.25 2.50 2.50 5.50 5.50 5.50 5.50 5.50 China** 5.60 6.90 6.40 6.15 6.15 Egypt *** 9.75 10.25 10.25 9.75 10.25 5.00 5.00 5.00 5.00 5.00 India 8.50 14.75 9.75 8.75 10.25 Indonesia New Zealand^ 6.50 6.00 5.75 7.50 7.75 1.60 1.60 1.20 1.20 1.15 5.25 5.25 5.25 5.25 5.25 6.30 6.60 6.60 6.60 6.85 10.47 10.01 9.57 9.57 10.46 13.52 13.97 11.29 10.38 10.00 4.360 6.540 5.740 5.320 4.662 Singapore 5.38 5.38 5.38 5.38 5.35 South Africa 9.00 9.00 9.00 9.50 9.50 2.38 3.25 2.76 2.50 2.00 Thailand# 6.56 7.71 7.52 7.51 7.28 0.50 0.50 0.50 0.50 0.50 United States of America 3.25 3.25 3.25 3.25 3.25 Vietnam## 9.00 9.00 9.00 9.00 9.00 OTHER INFORMATION 121 5 OTHER INFORMATION LANGDON & SEAH VIETNAM CO LTD IDD CODES & TIME DIFFERENCES 122 OTHER INFORMATION * Allowance should be made for seasonal time variations OTHER INFORMATION 123 5 OTHER INFORMATION LANGDON & SEAH VIETNAM CO LTD CONVERSION FACTORS 124 OTHER INFORMATION OTHER INFORMATION 125 5 OTHER INFORMATION SOME INTERESTING FACTS Vietnam’s history can roughly be divided into the following periods: to 4,000 years (Neolithic) ago, cultures in the area included Son Lang. In the third cen French War: Vietnam battled French colonialism from American War: Vietnam fought America from 1954 to LANGDON & SEAH VIETNAM CO LTD development and success and has been member of 126 Nations (UN) Association of Southeast Asian Nations (ASEAN) with the United States 182 nations throughout the world, including permanent members of United Nations Security Council OTHER INFORMATION VIETNAM KEY DATA Government Country Name : : : : Capital City : Administrative Divisions : Independence : Legal System : National Language 58 provinces and 5 municipalities 2nd September 1945 : Vietnamese : Vietnamese : 16 10 N, 107 50 E : South East Asia : Cambodia 1,228 km, Geography Location China 1,281 km, Laos 2,130 km Total Area : Land Area : Water : Land use : arable land: 19.64%; permanent crops: 11.18%; other: 69.18% Irrigated Land : 45,850 sq km (2005) Coastline : 3,444 km (excludes islands) Land boundaries : 4,616 km : phosphates, coal, manganese, rare earth elements, bauxite, chromate, offshore oil and gas deposits, timber, hydropower Climate type : tropical in south; monsoonal in north with hot, rainy season (May to September) and warm, dry season (October to March) Natural hazards : delta OTHER INFORMATION 127 5 OTHER INFORMATION VIETNAM KEY DATA (cont’d) People : 90.73 million (2014 est.) Age structure : 0-14 years : 24.3% 15-24 years : 17.8% 25-54 years : 44.8% 55-64 years : 7.4% 65 years and over : 5.7% : 1.08% (2014 est.) : total: 29.2 years male: 28.1 years female: 30.2 years (2014 est.) Life Expectancy : 72.91 years male: 70.44 years female: 75.65 years (2014 est.) : 6.94 million (May.2014 est.) : 7.82 million (May.2014 est.) : 54 Ethnic Groups Kinh (Viet) 85.7%, Tay 1.9%, Thai 1.8%, Muong 1.5%, Khome 1.5%, Hmong 1.2% (2009 census) Languages : LANGDON & SEAH VIETNAM CO LTD (increasingly favored as a second 128 language), some French, Chinese, : total population: 94% 15 and over can read and write) male: 96.1% female:92% (2012 est.) : 11.3% (2012 est.) poverty line Labor Force : 54.48 million (2014 est.) Labor Force by : Agriculture: 46.6% (2014 est.) occupation Industry: 21.4% (2014 est.) Services: 32% (2014 est.) : 2.45% (2014 est.) OTHER INFORMATION Economy : Vietnamese Dong Currency Code : VND dong (VND) per Exchange rate to USD : 21,222 (2014 average) Euro : 28,324 (2014 average) : 35,110 (2014 average) Average Consumer : 4.09% (2014 est) : : US$ 185.56 billion (2014 est) : 5.98% (2014 est) : Agriculture: 18.12% Industry: 38.50% sectors Services: 43.38% (2014 est.) Trade Total Exports : US$ 150 billion : Commodities parts thereof instruments parts and accessories thereof : EU 14.7%, US 19.6%, Asean 3.1%, Japan 8%, Korea 18.1%, China 11.8% Total Imports OTHER INFORMATION : US$ 148 billion 129 5 OTHER INFORMATION VIETNAM KEY DATA (cont’d) : instruments Commodities materials and auxiliaries group parts thereof fodders materials International Airports parts and auxiliaries thereof : China 21.8%, Asean 8.2%, Korea 4.9%, EU (5.9%), Japan 9.4% : Tan Son Nhat International Nang International Airport (Da Trang), Can Tho International Airport (Can Tho). LANGDON & SEAH VIETNAM CO LTD : 130 Tho) OTHER INFORMATION OTHER INFORMATION 131 LANGDON & SEAH CULTURE Construction Consultancy providing integrated solutions rather than individual service lines and standing out from our competitors OUR VISION Duty to the communities, country and the environment in which we live and work Sustainable Responsibility Equal Opportunity, Diversity, Recognition of Human Capital as our vital asset and investment, Professional Development & Continual Learning Employment Excellence Service of excellence - through our expertise and experience, innovations and collaboration, teamwork & lateral service realising our Clients’ needs Service Excellence Deliver success for L&S with the commitment & respect to our stakeholders, management & fellow members of staff Duty to act with the Highest levels of Integrity, Respect and Honesty, Impartiality & Independency, Utmost Professionalism To further develop & bring about opportunities for professional development in core skills of our staff To systematically view Clients’ feedback and internal process, through continual improvement strategies to ensure success in our service excellence To manage & control each & every process with the highest integrity, impartiality & independency To play a positive & creative role in realising our Clients’ needs and in meeting requirements to their satisfactions QUALITY POLICY STATEMENT To provide our Clients with a service of excellence – through our expertise & experience OUR VALUES We are Ambassadors of L&S OUR MISSION To deliver world class construction cost management, project management and consultancy services which through teamwork and collaboration, make a measurable difference to our Clients, maximising value for money and security of objective Long Established History, Emphasis on Teamwork and collaboration, Professional, Integrity and Quality Service orientaled, Investment on Research and Development, Encourage continuous learning and professional development, Client Focus 5 OTHER INFORMATION LANGDON & SEAH VIETNAM CO LTD LANGDON & SEAH VIETNAM 10 YEARS ANNIVERSARY 132 OTHER INFORMATION 1 2 3 4 5 6 7 8 9 10 OTHER INFORMATION 133 5 OTHER INFORMATION LANGDON & SEAH VIETNAM CO LTD Professional Consultancy & Practices 134 OTHER INFORMATION PROFESSIONAL SERVICES Langdon & Seah Vietnam offers an unparalleled range of compatible and integrated cost and project management services which alongside their particular fields of specialism are designed to provide a seamless service to the construction industry and property market. At the very essence in the success of any project is the selection of an appropriate procurement strategy in terms of the Client's requirements, project characteristics, time and cost certainty, quality targets and distribution of risk. Langdon & Seah is well placed and has the relevant experience to advice on various procurement options from the traditional and straightforward to bespoke hybrid methods - in response to the Client's priorities. These include: Measurement contracts Lump sum contracts Design and build contracts Develop and construct contracts Turnkey contracts Construction management contracts Management contracts Term contracts Cost reimbursement contracts Guaranteed maximum price contracts Langdon & Seah Vietnam provides a total integrated cost and project management service in the following areas to meet and add value to each individual Client's specific needs: Quantity Surveying Mechanical and Electrical Engineering Quantity Surveying Civil Engineering Quantity Surveying Project Management Services of Employer's Agent or Representative (for Design and Build projects) Contract Advisory & Dispute Management Services Investment Appraisals Value Management OTHER INFORMATION 135 5 OTHER INFORMATION LANGDON & SEAH VIETNAM CO LTD Build-ability Appraisals Due Diligence Reports Project Cost and Contract Audits Capital Allowances Taxation Assistance Fire Insurance Valuations (or Reinstatement Cost Assessments) Advice on Development Brief Sustainable Economics and Strategies 136 The types of construction projects undertaken cover both new building and refurbishment work on residential, commercial, institutional, industrial and infrastructure type developments, such as: Airports and Airport Buildings Arts and Cultural Buildings Business Park Developments Civic Buildings Civil Engineering and Infrastructure Works Educational Buildings Health and Hospital Buildings Historic Buildings Hotels and Resorts Internet Data Center Industrial/Warehouse Developments Leisure Projects Office Buildings and Interior Fit-out Works Parks and Recreational Projects Petro-chemical Projects Power Generation Projects Public Buildings Residential Developments Retail Developments Sports Centers Transportation Water and Waste Projects OTHER INFORMATION L&S CONTRACT ADVISORY MANAGEMENT SERVICES & DISPUTE L&S VN offers a professional Contract Advisory and Dispute Management (CADM) Services at all stages of the construction process. Our primary objectives are to ensure that our Client’s contractual interests are suitably protected and to effectively communicate to our Client a clear understanding of his commitments made to other parties. Our CLIENTS - Our services are provided to and for developers, building owners, construction professionals, insurance companies, financial institutions, contractors, sub-contractors. Front End Contract Advisory Work We Provide contract advisory work prior to, during and after completion for every type of construction project. The work includes project procurement, incorporation of conditions of contract, interpretation and selection of appropriate forms of contract, warranties, indemnities, wording on performance bonds, and contracts and sub-contract agreements. We Ensure the front end documents are kept updated with the latest developments in the law and legislations. Expert Technical Advisory Work We Provide expert advisory services on most construction related issues including extension of time, loss and expenses, contractual validity and quantum of claims, value of defective work, and time related issues. We Advice on preparation and presentation of payment claims and responses including notices, applications and responses in connection with adjudication proceedings under the Security of Payment regime. OTHER INFORMATION 137 5 OTHER INFORMATION Claims Assessment, Legal & Litigation Support We Work for and with Construction Lawyers and advise their clients on contractual validity and evaluation of claims, negotiation, project monitoring, audit & recovery, extension of time, defects and liability, loss and expenses, acceleration, valuation measurement methods, determination, and termination. We Provide support in the preparation of documents for claims, discovery process, trial, mediation, adjudication and arbitration. Dispute Management, Avoidance and Resolution LANGDON & SEAH VIETNAM CO LTD We Assist and facilitate parties in negotiations on disputed claims to avoid and/or resolve disputes. We Advise and support the legal process for cost-effective resolution of disputes by carrying out neutral evaluation, expert determination, managing adjudication, arbitration and the various other forms of alternative dispute resolution. We Offer the highest level of expertise and support to the legal processes associated with every stage of the construction cycle. 138 Expert Witness in Connection with Adjudicators & Arbitrators We Provide the preparation of defense and support documents in response to potential dispute issues as raised to Adjudication or Arbitration by the Contractor against Engineer's assessments of Variations; Engineer's assessments of Contractor's Financial Claims; Engineer's assessments of Contractor's Extension of Time Claims and Engineer's interpretation of contractual matters. We Attend and Assist the Employer for the purposes of preparing a necessary defense during Adjudication and Arbitration hearings in the capacity of an Expert Witness. OTHER INFORMATION DIRECTORY OF OFFICES ASIA PACIFIC MALAYSIA SELANGOR LANGDON & SEAH SDN BHD JURU UKUR BAHAN MALAYSIA JUBM SDN BHD ARCADIS PROJEKS SDN BHD Level 5, Menara TSR 12 Jalan PJU 7/3, Mutiara Damansara 47810 Petaling Jaya Selangor Darul Ehsan, Malaysia GPS : 3.1616, 101.6129 Tel : (60 3) 2106 8000 Fax : (60 3) 2106 9090 Email : info@my.LangdonSeah.com Contact : Loo Ming Chee / Mohd Ali Abd Karim / Justin Teoh / Syed Mahadzir Syed Ahmad / Mohamad Faiz Awang / Nur Aziz Abu Bakar JOHOR Taman Setia Tropika Email : jubmjb@my.LangdonSeah.com PENANG No.25, Lebuh Light Fax : (60 4) 264 2068 Nur Aziz Abu Bakar (Cont’d) OTHER INFORMATION 139 5 OTHER INFORMATION DIRECTORY OF OFFICES (cont’d) SABAH Tel : (60 88) 223 369 Email : jubmkk@my.LangdonSeah.com SARAWAK Tel Fax Email : (60 82) 232 212 : (60 82) 232 198 : kuching@my.LangdonSeah.com BRUNEI LANGDON & SEAH VIETNAM CO LTD BANDAR SERI BEGAWAN 140 Email : info@bn.LangdonSeah.com KUALA BELAIT Email : info.jbpusb@jbpu.com.bn OTHER INFORMATION KUALA BELAIT Email : pusbkb@pusbbrunei.com.bn CHINA BEIJING Tel Fax Email : (86 10) 6310 1136 : (86 10) 6310 1143 : info@cn.LangdonSeah.com CHANGSHA 410005, China Email : info@cn.LangdonSeah.com CHENGDU Email Contact : info@cn.LangdonSeah.com : Lum Ka Wai, Andy (Cont’d) OTHER INFORMATION 141 5 OTHER INFORMATION DIRECTORY OF OFFICES (cont’d) CHONGQING Tel Fax Email : (86 23) 8655 1333 : (86 23) 8655 1616 : info@cn.LangdonSeah.com DALIAN 116001, China Tel Fax Email : (86 411) 8800 8018 : (86 411) 8800 8823 : info@cn.LangdonSeah.com FOSHAN LANGDON & SEAH VIETNAM CO LTD 3/F, Foshan Ling Nan Tian Di 142 528000, China Email : info@cn.LangdonSeah.com GUANGZHOU Tel Fax Email : (86 20) 8130 3813 : (86 20) 8130 3812 : info@cn.LangdonSeah.com OTHER INFORMATION HAIKOU Email : info@cn.LangdonSeah.com HANGZHOU 310016, China Email Contact : info@cn.LangdonSeah.com : Lu Mei Hua / Lu Wei HENGQIN LANGDON & SEAH CONSULTANCY (ZHUHAI HENGQIN) CO. LTD. HENGQIN BRANCH 7/F, 156 Nan Shan Ju Road, Hengqin, Zhuhai, Guangdong Province 519031, China GPS : 22.142774, 113.544438 Tel : (86 756) 868 8986 Fax : (86 756) 868 8969 Email : info@cn.LangdonSeah.com Contact : Wan Chi Shing, Stanley HONG KONG Tel : (852) 2830 3500 Email Contact : info@hk.LangdonSeah.com : Au Kai Ming, Francis (Cont’d) OTHER INFORMATION 143 5 OTHER INFORMATION DIRECTORY OF OFFICES MACAU LANGDON & SEAH MACAU LIMITED Avenida da Praia Grande, No. 594 Edificio BCM, 12th Floor,Macau GPS : 22.192210,113.541252 Tel : (853) 2833 1710 Fax : (853) 2833 1532 Email : info@mo.LangdonSeah.com Contact : Chan Yuk Sim, Katherine QINGDAO Tel Fax Email Contact : (86 532) 8280 1818 : (86 532) 8280 1881 : info@cn.LangdonSeah.com : Feng Shi En, Andy SHANGHAI LANGDON & SEAH VIETNAM CO LTD Shanghai 200052, China 144 Tel Fax Email Contact : (86 21) 6091 2800 : (86 21) 6091 2999 : info@cn.LangdonSeah.com : Chan Hoi Or, Joe SHENYANG Tel Fax Email : (86 24) 3195 8880 : (86 24) 3128 6983 : info@cn.LangdonSeah.com OTHER INFORMATION SHENZHEN Room 1001, AVIC Centre, 1018 Huafu Road, Shenzhen Guangdong Province 518031, China GPS : 22.543241, 114.082051 Tel : (86 755) 2598 1841 Fax : (86 755) 2598 1854 Email : info@cn.LangdonSeah.com Contact : Lo Kwok Chu, Kenneth SUZHOU 1 Suzhou Avenue West, 215021 China Email : info@cn.LangdonSeah.com TIANJIN LANGDON & SEAH CONSULTANCY CO LTD TIANJIN BRANCH 4002, 40/F Tel Fax Email : (86 22) 2329 8611 : (86 22) 2319 3186 : info@cn.LangdonSeah.com WUHAN Email : info@cn.LangdonSeah.com (Cont’d) OTHER INFORMATION 145 5 OTHER INFORMATION DIRECTORY OF OFFICES XI’AN Tel : (86 29) 8866 9711 Email Contact : info@cn.LangdonSeah.com : Wang Zhu Zhu INDIA BANGALORE 2nd Floor, Esquire Center No.9, M G Road Bangalore 560 008, India GPS : 12.974, 77.617 Tel : (00 91 80) 4123 9141 Fax : (00 91 80) 4123 8922 Email : info@in.LangdonSeah.com Contact : Gary Miles / Velan Murali / Biju AK LANGDON & SEAH VIETNAM CO LTD CHENNAI 146 New No.20, West Cott Road Royapettah Chennai 600 004, India GPS : 13.055, 80.265 Tel : (00 91 44) 2855 3137 Fax : (00 91 44) 2855 0141 Email : info@in.LangdonSeah.com Contact : Gary Miles / Sankar Ramakrishnan DELHI The Elements Email : info@in.LangdonSeah.com OTHER INFORMATION HYDERABAD LANGDON & SEAH CONSULTING INDIA PVT LTD 2nd Floor, Trade Fair Office Hitex Exhibition Center Izzat Nagar, Hyderabad 500 084, India GPS : 17.475, 78.375 Tel : (00 91 40) 2311 4942 Fax : (00 91 40) 2311 2942 Email : info@in.LangdonSeah.com Contact : Gary Miles / Bhoomeshwar Rao PUNE LANGDON & SEAH CONSULTING INDIA PVT LTD City Survey No 804 / B, Bhandarkar Institute Road, Lane No-14.Pune 411004 (Near Skoda Show room), Maharashtra - INDIA GPS : 18.5204, 73.8567 Tel : (00 91 20) 25650417 / 25650419 Fax : (00 91 22) 3933 5556 Email : info@in.LangdonSeah.com Contact : Gary Miles / Darshan Joshi / Rahul Patil MUMBAI LANGDON & SEAH CONSULTING INDIA PVT LTD Unit No.103, First Floor Akruti SMC, Khopat Junction Near Khopat Bus Depot Thane (West) 400601 Maharashtra, India GPS : 19.1988, 72.9756 Tel : (00 91 22) 4125 6060 Fax : (00 91 22) 4125 6050 Email : info@in.LangdonSeah.com Contact : Gary Miles / Darshan Joshi KOLKATA LANGDON & SEAH CONSULTING INDIA PVT LTD Stesalit Towers, 6th Floor E2-3, EP & Gp Block, Sector V, Salt Lake, Kolkata - 700091 GPS : 22.569814, 88.433725 Tel : (00 91 124) 430 8790 Fax : (00 91 124) 430 8793 Email : info@in.LangdonSeah.com Contact : Gary Miles / Arun Basu INDONESIA BALI P.T. LANGDON & SEAH INDONESIA Jalan Sunset Road No 8C Lingkungan Abian Base Bali 80361, Indonesia GPS : 8.7046, 115.1520 Tel : (00 62 361) 894 7517 Fax : (00 62 361) 894 7392 Email : lsbali@id.LangdonSeah.com Contact : Ir. Putu Arya Canti (Cont’d) OTHER INFORMATION 147 5 OTHER INFORMATION DIRECTORY OF OFFICES JAKARTA P.T. LANGDON & SEAH INDONESIA Level 18, Ratu Plaza Office Tower Jalan Jenderal Sudirman 9 Jakarta 10270, Indonesia GPS : 6.2271, 106.8008 Tel : (00 62 21) 739 7550 Fax : (00 62 21) 739 7846 Email : lsjkt@id.LangdonSeah.com Contact : Peter Robinson / Stephen Osborne KOREA SEOUL LANGDON & SEAH KOREA CO LTD #429, 27, Seochojungang-ro 24-gil Seocho-gu, Seoul Korea 137-882 GPS : 37.4953, 127.0164 Tel : (00 82 2) 543 3888 Fax : (00 82 2) 543 3898 Email : info @kr.LangdonSeah.com Contact : Victor Stanger LANGDON & SEAH VIETNAM CO LTD PHILIPPINES 148 MANILA LANGDON & SEAH PHILIPPINES INC 4th & 7th Floor, Kings Court 1 2129 Pasong Tamo, Makati City 1231 Philippines GPS : 14.5576, 121.0135 Tel : (00 63 2) 811 2971 Fax : (00 63 2) 811 2071 Email : info@ph.LangdonSeah.com Contact : Bernie C. Basilan CEBU LANGDON & SEAH PHILIPPINES INC 12F, 2Quad Bldg., Cardinal Rosales Avenue Cebu Business Park, Cebu City 6000 Philippines GPS : 10.3142574, 123.9053502 Tel : (00 63 32) 2322 200 Fax : (00 63 32) 2603 699 Email : info@ph.LangdonSeah.com Contact : Bernie C. Basilan SINGAPORE LANGDON & SEAH SINGAPORE PTE LTD L&S CONTRACT ADVISORY & DISPUTE MANAGEMENT SERVICES PTE LTD 1 Magazine Road, #05-01 Central Mall Singapore 059567 GPS : 1.288526,103.842085 Tel : (65) 6222 3888 Fax : (65) 6224 7089 Email : lssp3@sg.LangdonSeah.com Contact : Eugene Seah / Ho Kong Mo OTHER INFORMATION ARCADIS PROJECT MANAGEMENT PTE LTD (Formerly known as Langdon & Seah Project Management Pte Ltd) 1 Magazine Road, #03-12 Central Mall Singapore 059567 GPS : 1.288526,103.842085 Tel : (65) 6239 8600 Fax : (65) 6538 4508 Email : pmps@arcadis.sg Contact : Seah Choo Meng / Bernard Ho / Teoh Wooi Sin THAILAND BANGKOK LANGDON & SEAH (THAILAND) LTD LECE (THAILAND) CO LTD 10th Floor, Kian Gwan II Building 140/1 Wireless Road, Lumpini, Pratumwan Bangkok 10330, Thailand GPS : 13.734969, 100.545448 Tel : (00 66 2) 253 1438 - 9 Fax : (00 66 2) 253 4977 Email : info@th.LangdonSeah.com Contact : Ang Yen Kooi / Wong Soon Bin VIETNAM HANOI LANGDON & SEAH VIETNAM CO LTD 4th Level Thanh Dong Building 132-138 Kim Ma Street, Ba Dinh District Hanoi, Vietnam GPS : 21.0320, 105.8263 Tel : (00 844) 3942 7525 Fax : (00 844) 3942 7526 Email : info@vn.LangdonSeah.com Contact : Mark Olive HO CHI MINH CITY LANGDON & SEAH VIETNAM CO LTD 9th Level, Unit E-VTP Building 08 Nguyen Hue, District 1 Ho Chi Minh City, Vietnam GPS : 10.7727, 106.7051 Tel : (00 848) 3823 8297 Fax : (00 848) 3823 8197 Email : info@vn.LangdonSeah.com Contact : Mark Olive ARCADIS ASIA HEADQUARTERS HONG KONG 38/F AIA Kowloon Tower, Landmark East, 100 How Ming Street Kwun Tong, Kowloon, Hong Kong GPS : 22.3125, 114.2223 Tel : (852) 2830 3500 Fax : (852) 2576 0416 Email : asiainfo@arcadis.com Contact : Poon Kan Young, Kenneth, CEO (end) OTHER INFORMATION 149 5 OTHER INFORMATION ACKNOWLEDGEMENT Credits to KPMG, Jardine Lloyd Thompson. CB Richard Ellis. Langdon & Seah Vietnam Co Ltd would like to acknowledge the invaluable support and advice from the following organisations: http://www.kpmg.com http://www.jltasia.com LANGDON & SEAH VIETNAM CO LTD http://www.cbrevietnam.com 150 OTHER INFORMATION