Maintenance and Repair of Concrete Underwater
Transcription
Maintenance and Repair of Concrete Underwater
11th INTERNATIONAL OPERATION & MAINTENANCE CONFERENCE Maintenance and Repair of Concrete Underwater May 2013 H.W. Kwon Contents 1. Introduction 2. Damage and Problems 3. Inspection 4. Repair and Retrofit method 5. Maintenance Introduction - All of problems has certain reasons - It is important to find right reasons through detail inspection ? - Repair & rehabilitation method shall be designed according to inspection results with Life Cycle Cost. - Maintenance is important to avoid collapse, shut down and extended service life. - Case study of Bridges and Marine structures Damage and Problems Damage and Problems - Scaling and Cracks - Erosion - Rebar corrosion - Spalling concrete - Scour Damage and Problems - Rebar corrosion & de-bonded - Spalling concrete - Load limitation Damage and Problems - Scaling and Cracks - Rebar corrosion - Spalling concrete Damage and Problems - Twist concrete pier - Construction Joint Break - Rebar corrosion - Scaling - Cracks - Gap between concrete block Damage and Problems - Quay Wall Collapse Inspection method INITIAL PHASE Routine inspection Preliminary inspection Preliminary desk study Initial diagnosis Plan main investigation Inspection method DETAIL PHASE Main investigation Sampling In situ testing Mapping study Laboratory testing Appraisal and evaluation Structural assessment/ Design issues Inspection method Inspection Equipment & tools Personnel diving gear Boat Underwater light underwater camera video side scan sonar Inspection method Visual inspection NDT - Video & Photos - Sampling - Measurement - Side Scan Sonar - Scour - Rebar Corrosion - Type of damage - Size of damage - Settlement - Remote camera Repair and Retrofit method Material Selection Process Owner requirements Service conditions Determine Project objectives Causes of deterioration Application conditions Determine material properties needed to meet project objectives Identify materials or systems which will produce the required properties Select material or system that provides optimum balance of performance, risk Repair and Retrofit method 2. Installation cofferdam 1. Design cofferdam 3. Scaling and cracks 4. Rehabilitation 5. After GFRP application Steel encasement for foundation Sheet pile protection for foundation FRP encasement for foundation Repair and Retrofit method FRP Application procedure underwater Repair and Retrofit method Crack Repair 1. Clean 4. Installation packer 2. Check crack 3. Sealing with UW epoxy 5. Injection UW epoxy 6. Surface grinding Repair and Retrofit method Rehabilitation for Erosion and corrosion 1. rebar corrosion 3. FRP form installation 2. Chipping 4. Grouting with underwater mortar Repair and Retrofit method Rehabilitation for Erosion and corrosion 1. Erosion and corrosion problems 3. GFRP application 2. Dry Shotcrete application 4. After coating Repair and Retrofit method 1. Gap between Concrete blocks 3. Nylon form with underwater mortar 2. Grouting with underwater mortar 4. After Repair and Retrofit method 프레임 00 500~ 600ver. 20 블럭 2000 【1.프레임 제작】 골재채움 후 수중그라우트재주입 프레임 주입호스 나이론 폼 골재채움용 지퍼 나일론폼 【2.나이론폼 설치】 그라우트재 주입 블럭 침하 주입호스 골재채움 【3.그라우트제 주입】 Repair and Retrofit method 1. Jetty 2. Rebar corrosion 3. Strengthening with GFRP 4. After Repair and Retrofit method 1. Railway bridges without maintenance 2. Pier #2 was broken by ship 3. Wire-saw underwater cutting 4. After rehabilitation Repair and Retrofit method Before After 1m raised up Repair and Retrofit method before after Repair and Retrofit method Rebar & FRP Form Installation Grout with Conductive Mortar Electrical connection Before Zinc mesh is used as sacrificial anode Repair and Retrofit method GFRP application 1. Before construction 2. Surface treatment 3. Priming 4. FRP Installation 5. Completion Maintenance - It is expected to retain the required levels of its functions during intended service life. - Maintenance procedure consist of initial inspection, deterioration prediction, inspection, evaluation, assessment, remedial measures and recording. - Not only the engineering aspect but also social and economical ones should be required. - Life Cycle Cost management are expected to be very effective for maintenance strategy. Maintenance Inspection after 4 years GFRP application Corrosion Monitoring Sensor Thermocouple Resistivity probe/ Pseudo-reference electrode Upper cap Counter electrode W C ① R 1 ② R 2 T1 T2 ③ Grout Working electrode A A Bottom cap Resistivity probe [Section A-A] ① GalvaPulse corrosion potential (mV) corrosion velocity (mm/yr) corrosion resistance (K ohm) ② Nilsson resistance measurement concrete resistance (K ohm) ③ Multimeter Temperature (°C) WWW.CONCLINIC.CO.KR Hyuck Woo Kwon +966 2 234 3494 +966 54 382 6777 kwon.hyuckwoo@gmail.com
Similar documents
ROBIT® FOREPOLING PRODUCT CATALOGUE
Copyright © 2015, Robit Rocktools Ltd All rights reserved. No part of this catalogue may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, ...
More information