Bolting i berg (Lillehammer, 07.
Transcription
Bolting i berg (Lillehammer, 07.
Product Presentation Rock Reinforcement Systems Local Presence - Global Competence Wolfgang Dolsak, M.Sc. Business Line Manager Rock Reinforcement wolfgang.dolsak@alwag.com Contents Introduction General Information State-of-the-art Ground Control Practices in Underground Construction Rock Support Pre-Support Rock Reinforcement Anchors and Rock Bolts Discussion Bolting i berg (Lillehammer, 07.-09.10.2008) Introduction ALWAG Tunnelausbau Gesellschaft m.b.H. Member of DYWIDAG-Systems International Bolting i berg (Lillehammer, 07.-09.10.2008) Introduction DSI‘s Fields of Activity Construction Post-Tensioning Geotechnics Concrete Accessories Underground Mining Tunneling Bolting i berg (Lillehammer, 07.-09.10.2008) Introduction ALWAG Headquarters Tunneling Africa / Asia-Pacific / Europe Mining Africa / Europe North America www.americancommercial.com Headquarters www.alwag.com South America www.soprofint.cl Asia-Pacific www.dsiminingproducts.com/au Bolting i berg (Lillehammer, 07.-09.10.2008) General Information DSI Worldwide Solutions Ground Support for Mining and Tunneling Advanced Self-drilling Rock Reinforcement and Ground Control Systems Wide Choice Product Line - “One-Stop-Shop“ Bolting i berg (Lillehammer, 07.-09.10.2008) Principles of Tunneling Conventional Tunneling Drill and Blast - “D&B“ Bolting i berg (Lillehammer, 07.-09.10.2008) Mechanized Tunneling Tunnel Boring Machines - “TBM“ Ground Control Procedures Rock Reinforcement Systematic Anchoring and Rock Bolting Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Rock Reinforcement Systematic Anchoring and Rock Bolting Face Anchoring and Bolting Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Rock Reinforcement Systematic Anchoring and Rock Bolting Face Anchoring and Bolting Micropiles Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Pre-support Definition Ground Stabilization and improvement before excavation Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Pre-support Definition Ground Stabilization and improvement before excavation Large-scale Pipe Umbrella Support System Jet-grouting Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Small-scale Conventional Forepoling (e.g. Lagging Sheets) Spiles Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Pre-support Requirements Stiff support elements to avoid progressive ground destabilization Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Rock Support Steel arches and lattice girders Yielding Support Elements Chain-linked wire mesh and welded wire mesh Bolting i berg (Lillehammer, 07.-09.10.2008) Ground Control Procedures Rock Support Steel arches and lattice girders Yielding Support Elements Chain-linked wire mesh and welded wire mesh Shotcrete US: Rib and Board Tunneling Steel ribs Steel or wood lagging Bolting i berg (Lillehammer, 07.-09.10.2008) Product Range Anchors & Rock Bolts Spiles Rock Support AT - Casing System Injection Equipment Rock Driling Tools Drilling Machines Service & Engineering Bolting i berg (Lillehammer, 07.-09.10.2008) Anchors and Rock Bolts Rebar Rock Bolts Fully cement grouted dowels Steel grades Reinforcement Steel (BSt 550 or Bst 500 S) Rock Bolt Steel (Fa 650/850 or St. 650/820) Special rib geometry Underground Mining and Tunneling Bolting i berg (Lillehammer, 07.-09.10.2008) Anchors and Rock Bolts Special rib geometry - pull tests after 12 hrs Rebar rock bolts Ø 25 mm, bond length 500 mm Load [kN] Orange: standard rebar Blue: special rib geometry (ALWAGRIP) Displacement [mm] Bolting i berg (Lillehammer, 07.-09.10.2008) Anchors and Rock Bolts THREADBAR Anchors and Rock Bolts GRP Bolts plus Accessories Solid or hollow bar version Expansion Anchors Mechanical Anchors Expansion Shells B38 / B43 Anchor Yield Bar Thread Strength Diameter Rp0,2 Tensile strength Rm Max. tensile load Fm [mm] [--] [N/mm²] [N/mm²] [kN] 16 M 18 260 670-830 140 Bolting i berg (Lillehammer, 07.-09.10.2008) Anchors and Rock Bolts Combination Bolts Mechanical / Fully Grouted Self-drilling Hollow Bar Bolts Expandable Friction Bolts Friction Stabilizers „Split-Sets“ Bolting i berg (Lillehammer, 07.-09.10.2008) Anchors and Rock Bolts Self-drilling Friction Bolts AT - POWER SET Simultaneous drilling and bolt installation Accessories Anchor Plates Resin Cartridges Rock Drilling Equipment Injection Equipment Mortar Mixing Pumps Bolting i berg (Lillehammer, 07.-09.10.2008) Thank you for your Attention! Local Presence - Global Competence Wolfgang Dolsak, M.Sc. Business Line Manager Rock Reinforcement wolfgang.dolsak@alwag.com
Similar documents
DSI Waterproofing System - DYWIDAG
dry / wet after swelling / re-dried Associated elongation according to EN 10319: dry / wet after swelling / re-dried Static puncture test according to EN 12236: dry / wet after swelling / re-dried ...
More informationSpiles and Forepoling Boards - DYWIDAG
■■ Assembly of the IBO - Self-Drilling Spile and connection onto the drill boom
More information