sow-manifesto
Transcription
sow-manifesto
Scope of Work Manifesto www.FortuneBuilders.com Ceatus Road, Mira Mesa.......................................................1 Spectacular renovation is West of Black Mountain Rd. This 3 BR/ 2 BA 1,040 square foot house is located just minutes away from the Mira Mesa Market Center. Hazy Glen Court, San Diego..............................................11 Spectacular renovation is in the Rancho Del Ray neighborhood of Chula Vista. This 3 BR/ 2 BA 1,426 square foot house has easy access to 3 major freeways and Southwestern College. Marble Canyon, Chula Vista..............................................16 Stylish renovation by the company from the hit TV show “Flip This House”. Surround yourself in the safety & comfort of one of Eastlake’s most up & coming, very exclusive neighborhoods. The beautifully appointed kitchen offers warmth & light to create your ideal cooking space. Relaxation awaits you in your spa style master retreat. Pine Tree, Vista...................................................................24 Serenity awaits you in this remodel designed by the company from the hit TV show “Flip This House”. Welcome to your retreat as the cozy fireplace beckons quality time around the dinner table. Preparing meals is a breeze in your stylish kitchen w/breakfast bar. The oversized living room is perfect for large gatherings. Sierra Madre, San Diego.....................................................32 This house is located in the Casa del Oro section of Spring Valley. The house was outdated and in need of upgrading. The original house was 1,102 sqft 2 bedroom and 1 bath room. The house was in need of a master suite addition. 32nd Street, San Diego.......................................................40 1925 Spanish revival restoration in the quaint neighborhood of North Park, San Diego. This 3 BR/ 2 BA 1,210 square foot house is located near Balboa Park, downtown and close access to major freeways. 1 Ceatus Road, Mira Mesa, CA Single Family Scope of Work - Single Family, Mira Mesa, CA Project Introduction and Overview Spectacular renovation is West of Black Mountain Rd. This 3 BR/ 2 BA 1,040 square foot house is located just minutes away from the Mira Mesa Market Center. Rehab Overview The home is outdated & needs updating throughout in kitchen and baths as well as custom tile work in kitchen and baths. Electrical and plumbing upgrades were completed as needed to comply with code regulations. A bathroom was added to create a true master suite. Contractor Overview Licensed contractors were hired to complete all renovations. EXTERIOR: Demo: 1. Remove all debris in front and back yard General: 1. Paint entire house per color scheme Color Location Color Code Finish Stone Manor Exterior 6006-2A Flat Extra White Exterior Trim Black Front Door/Pergola Extra White All ceilings Navajo White Bathrooms SW 6126 Semi Gloss Navajo White Living/ Dining/ Halls, Laundry, Kitchen, Bedrooms SW 6126 Flat Extra White All Trim & Doors SW 7006 Semi Gloss Scope of Work Manifesto 7006 Flat 7006 Flat www.FortuneBuilders.com 2 Ceatus Road, Mira Mesa Roof: 1. Clean all debris off of roof. 2. Inspect and make sure all vents stacks and roof vents are sealed correctly 3. Inspect entire roof and patch were needed 4. Remove any debris off of roof Landscape: 1. Removal all debris in front and back yard 2. Remove all weeds in front and back yard 3. Install sod in the front and back yard 4. Cut in planter boxes next to house and fence in front and back yard and plant drought tolerant plants. 5. Test irrigation system and repair where needed or install one in front yard INTERIOR: Demo: 1. Remove all trash in house 2. Demo kitchen and remove all cabinets 3. Demo existing bathroom toilet, vanity, tile floor and shower surround 4. Remove all tile flooring 5. Remove all carpet in entire house 6. Scrape popcorn ceiling 7. Remove all wood paneling 8. Remove all window coverings 9. Demo portion of wall dividing kitchen from family room (the up and lower cabinet section all the way up to where existing fridge location is) GENERAL: 1. Construct new bathroom next to existing bathroom and convert existing bathroom into master bath 2. Change all door hinges and hardware with brush nickel 3. Retexture ceiling 4. Change front door hardware – Home Depot #640-064 $169 5. Install wood flooring in front room and kitchen (engineered hardwood $2-$2.5 per sqft with real wood finish, contractor to provide samples and CT Homes to approve) 6. Install carpet in rest of house – Home Depot Full Throttle Suede Scope of Work Manifesto www.FortuneBuilders.com 3 Ceatus Road, Mira Mesa KITCHEN (See attached layout): 1. Install backsplash– Arizona tile WC Arbor $10.50 per sheet 2. Install new stainless steel appliances A. Refrigerator– Maytag 18 Cu. Ft. Refrigerator Model: MBR1953YES - $858.00 B. Hood– Whirlpool 36in Island Mount Glass Canopy Hood Model: GXI6536DXS - $539.00 C. Dishwasher– Frigidaire 24" Built-In Dishwasher Model: FFBD2407LS - $337.60 D. Range– Maytag 30" Freestanding Gas Range Model: MGS5752BDS - $1,427.00 E. Microwave- Whirlpool 1.7 cu ft Over-the-Range Microwave - $222.00 3. Install new faucet– Home Depot (Brushed Nickel Single Handle Pull Out) 4. Install new countertops– Rainbow Stone “ New Venetian Gold” Granite 5. Install new cabinets– Home Depot American Classics Harvest Finish 6. Paint as per color scheme. Scope of Work Manifesto www.FortuneBuilders.com 4 Ceatus Road, Mira Mesa HALL BATH: 1. Install new vanity (espresso finish) 2. New Faucet (Chrome finish) 3. New toilet (Elongated Bowl) 4. New tub 5. New shower valve (single handle chrome finish) 6. Install Tile surround– Home Depot - #668-521, 6”x6” Almond - $1.89 sq/ft installed subway style 7. Accent Tile – Home Depot - #686-181, Onyn Studio Glass Moasic 12” - $12.99/ea 8. Tile floor– Home Depot - #478-629 “ Hacienda” 12x12 (Installed Subway Style) MASTER BATH: 1. New toilet (Elongated Bowl) 2. New tub – Home Depot #693-952 $209 3. Install new vanity (espresso finish) 4. New Faucet (chrome finish) 5. Install Rain shower head and regular shower head (chrome finish; rain shower head min 8in diameter) 6. Install 2 new shower valves (single handle chrome finish) 7. Install Tile Surround—Arizona Tile – Country Blend Travertine 18” x18” cut down to 9” x18” installed subway style $1.99/ sqft 8. Accent Tile – Arizona Tile – WC Arbor $10.50 per sheet 9. Tile back splash behind mirror to ceiling - Arizona Tile – WC Arbor $10.50 per sheet 10. Tile floor- Arizona Tile – Country Blend Travertine 18” x18” Scope of Work Manifesto installed subway style $1.99/ sqft www.FortuneBuilders.com Ceatus Road, Mira Mesa 5 BEDROOMS: 1. Install slab closet doors (make sure they are hallow core interior doors converted to closet doors, install ceiling and floor track as well as hardware 2. Lighting– Home Depot Hampton Bay 2- Light Flush mount With Opal Glass, #534-435, $39.97/ea Plumbing: 1. Check all existing plumbing & repair/replace as needed, per code. 2. Remove water heater & replace with new one and install to code (exhaust vent, pressure release valve, earthquake straps) 3. New angle stops on all water lines. 4. Remove all waterlines run on the exterior of the house and rerun them on the interior (attic probably best location) 5. Check gas lines & repair/replace as needed. 6. Check all drain lines & repair/replace as needed Electrical: 1. Replace all outlets & switches. 2. Check all wiring & replace where needed, per code. 3. Install recessed lighting as per drawing. 4. Check panel & repair/replace as needed. 5. Install Dead Panel if missing 6. Check for open junction point in attic HVAC: 1. Inspect and repair as needed Scope of Work Manifesto www.FortuneBuilders.com 6 Ceatus Road, Mira Mesa Completion of Final Punch List General Contracting Work - $24,700.00 All framing, counters, cabinets, paint and patch. Fixtures, backsplash, windows and doors. Appliances- $1,800.00 Stainless Steal Refrigerator, Free Standing Range, Hood and Over The Range Microwave, Dishwasher. Electrical - $2,000.00 Install new fixtures; add recessed lighting, replace outlets and switches, panel upgrade Plumbing - $4,500.00 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, Add tub and shower Flooring - $7,500.00 Install new carpet, hardwood and tile Landscaping - $2,000.00 HVAC- $500.00 Staging (2 month minimum contract)- $2,000.00 Misc. and Permits - $2,700.00 TOTAL - $47,700.00 Scope of Work Manifesto www.FortuneBuilders.com Ceatus Road, Mira Mesa 7 Before Layout COVERED PATIO BATH 1 KITCHEN / DINING BEDROOM 1 HALL LIVING ROOM BEDROOM 2 ENTRY BEDROOM 3 2 CAR GARAGE Scope of Work Manifesto www.FortuneBuilders.com 8 Ceatus Road, Mira Mesa After Layout COVERED PATIO BATH 1 KITCHEN BEDROOM 1 BATH 2 HALL LIVING ROOM BEDROOM 2 ENTRY BEDROOM 3 2 CAR GARAGE Scope of Work Manifesto www.FortuneBuilders.com 9 Hazy Glen Court, San Diego, CA Single Family Scope of Work - Single Family, San Diego, CA Project Introduction and Overview Spectacular renovation is in the Rancho Del Ray neighborhood of Chula Vista. This 3 BR/ 2 BA 1,426 square foot house has easy access to 3 major freeways and Southwestern College. Rehab Overview The home is outdated & needs updating throughout in kitchen and baths as well as custom tile work in kitchen and baths. Electrical and plumbing upgrades were completed as needed to comply with code regulations. Contractor Overview Licensed contractors were hired to complete all renovations EXTERIOR: Demo: 1. Demo all storage sheds 2. Repair all termite damaged material 3. Remove front security door General: 1. Install seamless rain gutters 2. Paint house per color scheme color scheme Scope of Work Manifesto www.FortuneBuilders.com 10 Hazy Glen Court, San Diego Color Location Color Code Finish Valspar/Lowes Stone Manor Exterior 6006-2A Flat Extra White Exterior Trim 7006 Flat Black Front Door/Pergola Extra White All ceilings 7006 Flat Navajo White Bathrooms SW 6126 Semi-Gloss Navajo White Main living walls SW 6126 Flat Extra White All Trim & Doors SW 7006 Semi-Gloss Turkish Coffee Wood ceiling Semi -Gloss Flat Landscape: 1. Remove weeds 2. Install sod in the front and back yard 3. Plant drought tolerant plants in planters and add wood chips 4. Test and repair irrigation system as needed INTERIOR: DEMO: 1. Remove back splash in kitchen (We are leaving cabinets, counter tops and flooring so do not damage, we are also keeping dishwasher) 2. Remove kitchen appliances 3. Demo master bath 4. Remove carpet flooring 5. Demo hall bath Scope of Work Manifesto www.FortuneBuilders.com Hazy Glen Court, San Diego 11 GENERAL: 1. Install new hardware on the front entryway door, brushed nickel (provide CT Homes with 3 keys) 2. Install engineered H/W floors in living room and hallway (contractor to supply samples for CT Homes to select) 3. Change all interior door hardware to brush nickel 4. Install carpet in all three bedrooms (contractor to supply samples for CT Homes to select) 5. Clean tile in kitchen WINDOWS: 1. Clean all windows and make sure they operate properly 2. Replace all damaged/missing screens on all windows 3. Make sure all sliding screen doors operate properly KITCHEN: 1. Install new stainless steel appliances A. Whirlpool WW5CG3625XS 36” Gas Cooktop - $618.00 B. Maytag MEW7627AS 27" Double Electric Wall Oven With 4.3 CF - $1,575.00 C. Whirlpool WED5FVGXWS Side-by-Side Refrigerator - $1,039.00 2. Install backsplash– Home Depot Jeffery Court Mosaic 12x12 Slate $7.78/sqft 3. Clean kitchen cabinets thoroughly, remove any cabinet liners 4. Paint as per color scheme. Scope of Work Manifesto www.FortuneBuilders.com 12 Hazy Glen Court, San Diego MASTER BATH: 1. New toilet (Elongated Bowl) 2. Install new vanity (espresso finish) 3. New: faucet, 2 valves, trim kit and tub filler, rain showerhead, and regular showerhead. A. Grohe G20225000 “ BauLoop” Widespread Sink Faucet - $123.85 4. 5. 6. 7. B. Grohe G19595000 “ BauLoop” Shower Trim Kit - $47.25 C. Grohe G26017000 “ BauLoop” Tub & Shower Faucet Trim - $130.95 D. Moen MS6360 2.5 GPM Flat Rain Showerhead – 125.10 Install new tub - Home Depot #693-952 $209 (move drain) Install Tile Surround— DalTile Fabric P687 12” x12” $3.70/ sqft (use their 2” x2” floor tile for shower floor) tile to ceiling Accent Tile on control wall – DalTile GR15 Mint Jubilee 3” x6” Glass Subway tile $9.06/sqft (installed subway style) tile to ceiling Tile floor- DalTile Veranda P527 Dune 13” x13” installed subway style $3.70/sqft HALL BATH: 1. Install new vanity (espresso finish) 2. New Faucet (CT Homes to provide) 3. New toilet (Elongated Bowl) 4. New tub 5. New shower valve, trim kit, tub filler and shower head 1. Grohe G20225000 “ BauLoop” Widespread Sink Faucet - $123.85 2. Grohe G26017000 “ BauLoop” Tub & Shower Faucet Trim - $130.95 6. Install Tile surround– DalTile Rittenhouse Square X735 $2,70/ sqft installed subway style (Tile to ceiling) 7. Accent Tile banner – DalTile Stone Radiance Whisper Green Blend SA51 $13.78/sqft (install 12” banner threw all three walls 5’ up the wall) 8. Tile floor- DalTile Honed Travertine 18” x18” Scope of Work Manifesto installed subway style $1.99/sqft www.FortuneBuilders.com Hazy Glen Court, San Diego 13 PLUMBING: 1. Check all existing plumbing & repair/replace as needed, per code. 2. Inspect water heater and make sure it is installed up to code (pressure release valve, earthquake straps, and blocking if needed) 3. New angle stops on all water lines. 4. Check gas lines & repair/replace as needed. 5. Check all drain lines & repair/replace as needed ELECTRICAL: 1. Check all wiring & replace where needed, per code. 2. Check panel & repair/replace as needed (double tap breakers, inadequate sized breakers) 3. Install smoke and carbon monoxide detectors per code. HVAC 1. Inspect HVAC System and repair if needed GARAGE: 1. Inspect garage door opener and replace if needed Scope of Work Manifesto www.FortuneBuilders.com 14 Hazy Glen Court, San Diego Completion of Final Punch List General Contracting Work - $12,850.00 All framing, counters, cabinets, paint and patch. Fixtures, backsplash, windows and doors. Appliances- $3,400.00 Stainless Steel Refrigerator, Free Standing Range, Hood and Over The Range Microwave, Dishwasher. Electrical - $1,700.00 Install new fixtures; add recessed lighting, replace outlets and switches, panel upgrade Plumbing - $2,300.00 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, add tub and shower Flooring - $6,700.00 Install new carpet, hardwood and tile Landscaping - $800.00 Roof- $450.00 Staging (2 month minimum contract)- $2,000.00 Misc. and Permits - $1,500.00 TOTAL - $31,700.00 Scope of Work Manifesto www.FortuneBuilders.com Hazy Glen Court, San Diego 15 MASTER BEDROOM MASTER BATH KITCHEN BEDROOM 2 WALK-IN CLOSET CLOSET HALL CLOSET BATH 2 BEDROOM 3 CLOSET DINING LIVING ROOM ENTRY 2 CAR GARAGE Scope of Work Manifesto www.FortuneBuilders.com 16 Marble Canyon, Chula Vista, CA Single Family Scope of Work – Single Family, Chula Vista, CA MLS Description: Stylish renovation by the company from the hit TV show "Flip This House". Surround yourself in the safety & comfort of one of Eastlake's most up & coming, very exclusive neighborhoods. The beautifully appointed kitchen offers warmth & light to create your ideal cooking space. Relaxation awaits you in your spa style master retreat. Enjoy exquisite sunsets & bright moonlit views from your master balcony. This special home offers something for everyone. Peaceful, quiet, yet centrally located. EXTERIOR: General: 1. Paint house per color scheme color scheme Color Location Color Code Finish Extra White (Shirwin Williams) All ceilings Navajo White (Shirwin Williams) Bathrooms Navajo White (Shirwin Williams) Living/ Dining/ Halls, Laundry, Kitchen, Bedrooms SW 6126 Semi Gloss Extra White (Shirwin Williams) All Trim & Doors SW 6126 Flat Landscape: 1. Remove weeds 2. Plant drought tolerant plants in planters and add wood chips 3. Test and repair irrigation system as needed Scope of Work Manifesto www.FortuneBuilders.com Marble Canyon, Chula Vista 17 INTERIOR: DEMO: 1. Remove back splash and counter tops in kitchen (We are cabinets so do not damage) 2. Remove kitchen appliances 3. Demo master bath (leave vanity) 4. Remove laminate flooring in bathrooms 5. Remove all carpet flooring GENERAL: 1. Paint all interior doors 2. Install new hardware on the front entryway door, brushed nickel (provide CT Homes with 3 keys) 3. Install new engineered hardwood in living room and hall way down stairs ($2$2.50/sqft contractor to supply samples for CT Homes to select) 4. Install carpet on stairs and upstairs (contractor to supply samples for CT Homes to select) 5. Deep clean both guest bathrooms thoroughly and replace faucets (Ct Homes to provide faucets) 6. Sand and repaint deck railing off of master (match existing paint) WINDOWS: 1. Clean all windows and make sure they operate properly 2. Replace all damaged/missing screens on all windows 3. Make sure all sliding screen doors operate properly Scope of Work Manifesto www.FortuneBuilders.com 18 Marble Canyon, Chula Vista KITCHEN: 1. Install new stainless steel appliances A. Frigidaire FFFTR2126PS 20.6 cu. ft. Top-Freezer Refrigerator $586.00 B. Frigidaire FFFBD2406NS Stainless Steel Built in Electric Dishwasher $275.00 C. Frigidaire FFFGF3047LS Stainless Steel Gas Free Standing Multicolor Range - $495.00 D. Frigidaire FFFMV162LS Stainless Steel 1.6 CF 1000 Watts Over the Range Microwave - $220.00 2. Install backsplash– DalTile Travertine 3”x6” T711361U $6.11/sqft installed subway style tile to cabinets 3. Install backsplash accent tile – DalTile American Olean Legacy LG03 Celedon 2”x2” install 4” Strip 4. Install new granite counter top – New Venetian Gold 5. Install new faucet (CT Homes to provide) 6. Clean kitchen cabinets thoroughly, remove any cabinet liners 7. Clean kitchen floor thoroughly 8. Paint as per color scheme. MASTER BATH: 1. New toilet – PROFLO PFCT101WH Two Piece Toilet - $111.00 2. Install new vanity (espresso finish) 3. New Faucets – Mirabelle MIRED3RTBN “Edenton” Deck Mount Whirlpool Faucet – $444.67 4. Install new drop in tub – Sterling Plumbing 71271100 Lawson 5 feet Drop In Tub $469.00 5. Install new tub filler (CT Homes to provide) 6. Install Rain shower head and regular shower head – Moen MS6360 Shower Head $125.01 7. New Shower glass (not frosted and no frame) 8. Install 2 new shower valves – Grohe G35015000 Tub & Shower Rough In Valve $70.50 each Scope of Work Manifesto www.FortuneBuilders.com Marble Canyon, Chula Vista 19 9. Install Tile Surround— DalTile Fabric P687 12”x24” $3,70/ sqft (use their 2”x2” floor tile for shower floor, tile around tub and tub skirt too) tile to ceiling 10. Construct Niche cut out and tile - DalTile GR15 Mint Jubilee 3”x6” Glass Subway tile $9.06/sqft (installed subway style) tile to ceiling, also tile shower damn 11. Accent Tile – DalTile GR15 Mint Jubilee 3”x6” Glass Subway tile $9.06/sqft (installed subway style) tile to ceiling, also tile shower damn 12. Tile floor- DalTile Mendocino Travertine Honed 18”x18” BE14 installed subway style PLUMBING: 1. Check all existing plumbing & repair/replace as needed, per code. 2. Inspect water heater and make sure it is installed up to code (pressure release valve, earthquake straps, and blocking if needed) 3. New angle stops on all water lines. 4. Check gas lines & repair/replace as needed. 5. Check all drain lines & repair/replace as needed MASTER BEDROOM: Scope of Work Manifesto www.FortuneBuilders.com 20 Marble Canyon, Chula Vista ELECTRICAL: 1. Check all wiring & replace where needed, per code. 2. Check panel & repair/replace as needed (double tap breakers, inadequate sized breakers) 3. Install smoke and carbon monoxide detectors per code. HVAC 1. Inspect HVAC System and repair if needed GARAGE: 1. Inspect garage door opener and replace if needed Scope of Work Manifesto www.FortuneBuilders.com Marble Canyon, Chula Vista 21 Completion of Final Punch List General Contracting Work - $3,700 All framing, counters, cabinets, paint and patch, fixtures, backsplash, windows and doors. Painting - $2,800 Flooring - $5,500 Install new carpet and hardwood HVAC - $250 Roof - $750 Granite - $2,400 Tile - $5,600 Plumbing - $1,850 Electrical - $750 Install new fixtures; replace outlets and switches, panel upgrade Plumbing Fixtures - $1,500 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, add tub and shower Appliances - $2,000 Stainless Steel Refrigerator, Free Standing Range, Hood and Over The Range Microwave, Dishwasher Staging - $2,150 Permit - $750 Total - $30,000 Scope of Work Manifesto www.FortuneBuilders.com 22 Marble Canyon, Chula Vista BEDROOM 4 LIVING ROOM CLOSET HALL BATH 3 ENTRY KITCHEN DW 2 CAR GARAGE Scope of Work Manifesto www.FortuneBuilders.com Marble Canyon, Chula Vista 23 MASTER BEDROOM MASTER BATH BEDROOM 2 CLOSET WALK-IN CLOSET HALL BATH 2 CLOSET LANDING BEDROOM 3 Scope of Work Manifesto www.FortuneBuilders.com 24 Pine Tree, Vista, CA Single Family Scope of Work – Single Family, Vista, CA MLS Description - Serenity awaits you in this remodel designed by the company from the hit TV show “Flip This House”. Welcome to your retreat as the cozy fireplace beckons quality time around the dinner table. Preparing meals is a breeze in your stylish kitchen w/breakfast bar. The oversized living room is perfect for large gatherings. Spa inspired bathrooms will encourage you to unwind. Enjoy BBQ’s under the covered patio or just relax in the peace & quiet of your private oasis. Relish the nostalgia of rural summer vacations all year long in your haven nestled amongst the trees. EXTERIOR: Demo: • Demo the existing pergola’s “roof” General: • Repair the existing pergola and paint it black • Build up the existing fence in the backyard so it is the same height as the side/front yard fence • Add a new section of fence running from the south-east corner of the house to the fence that separates the neighbors house to the south, approx. 15-20 feet, add gate • Paint exterior of house per color scheme • Do wood repairs / replacement at termite damaged areas called out by inspector Color Location Color Code Finish Valspar/Lowes Stone Manor Exterior of house & interior chimney 6006-2A Flat Extra White Sherwin Williams Exterior Trim 7006 Flat Black Front Door/Pergola Extra White (Sherwin Williams) All ceilings 7006 Flat Navajo White (Sherwin Williams) Bathrooms SW 6126 Semi Gloss Navajo White (Sherwin Williams) Living/ Dining/ Halls, Laundry, Kitchen, Bedrooms SW 6126 Flat Extra White (Sherwin Williams) All Trim & Doors SW 7006 Semi Gloss Scope of Work Manifesto Semi Gloss on door www.FortuneBuilders.com Pine Tree, Vista, CA 25 Landscape (Carlos Sandoval): • Remove weeds • Get the grass green throughout entire yard • Plant drought tolerant plants in planters and add wood chips • Test and repair irrigation system as needed INTERIOR: DEMO: • Demo kitchen: countertops, backsplash, ceiling light fixture, and upper cabinets going to the living room area (DO NOT DEMO ANY OTHER CABINETS AS WE ARE GOING TO REUSE THEM, DO NOT DEMO FLOOR) • Remove kitchen appliances • Demo all bathrooms completely (keep vanity cabinet in hall bathroom to reuse) • Remove all window coverings • Demo all light fixtures and ceiling fans (except in the dining room) GENERAL: • Install new hardware on the front entryway door, brushed nickel (provide CT Homes with 3 keys) • Fix / repair existing interior doors • Install new brushed nickel hardware on all interior doors • Install new closet doors throughout (replace existing mirror doors only) • Install new brush nickel hardware on all closet doors • Seal tile grout in all bathrooms • Install accessories in all bathrooms • Replace door going from garage to house • Paint interior of house per color scheme • Refinish the book shelf in the dining area same as kitchen cabinets • Install brushed nickel hardware on the hallway cabinets WINDOWS: • Clean all windows and make sure they operate properly • Replace all damaged/missing screens on all windows Scope of Work Manifesto www.FortuneBuilders.com 26 Pine Tree, Vista, CA • Make sure all sliding screen doors operate properly KITCHEN: • Refinish existing kitchen cabinets and install new brushed nickel hardware • Install new stainless steel appliances: A. Frigidaire FFEW2725L 27" Single Electric Wall Oven - $836.00 B. Frigidaire FFGEC3045KS "Gallery" Electric Cooktop - $627.00 C. Frigidaire FFFBD2406NS 24 Stainless Steel Built in Electric Dishwasher - $275.00 D. Frigidaire FFFMV162LS Stainless Steel 1.6 CF 1000 Watts Over The Range Microwave - $220.00 E. Frigidaire FFHT2126PS Top-Freezer Refrigerator 20.6 cu. ft. $586.00 • Install backsplash field tile – Arizona Tile – SL Kiwi glossy 3”x6” installed subway style, tile from counter tops to cabinets - $5.60/SF • Install new granite counter top – New Venetian Gold • Install new under mount stainless steel sink • Install new faucet - KOHLER K-596-VS Simplice Single-Hole Pull-down Kitchen Faucet, Vibrant Stainless - $212.00 • Install four 6” recessed lights, and one 4” over the sink • Paint as per color scheme Scope of Work Manifesto www.FortuneBuilders.com Pine Tree, Vista, CA 27 MASTER BATH: • New toilet (Elongated Bowl) • Install new vanity - Home Depot American Classics White Finish • Install new granite counter top – New Venetian Gold • Install new square drop in / flush mount sinks • Install new faucet - Grohe G34270001 "Concetto" Single Hole Bathroom Sink Faucet - $72.13 • Install new wood frame vanity mirror (match vanity cabinet) • Hot mop shower pan • Install new shower door (try to reuse the existing one if possible) • Install rain and regular shower head A. Grohe G19457001 "Concetto" Custom Shower Trim Kit - $50.91 B. Moen S6360 Flat-Faced Rainshower Showerhead • Install 2 new shower valves - Grohe G35015000 Tub & Shower Rough In Valve - $70.50 each • Install Tile Surround - Arizona Tile Fibra Series, Fibra Merino 12”x24” (use their 2”x2” floor tile for shower floor) tile to ceiling • Accent Tile on control wall – DalTile Glass Reflections Whisper Green GR02 • 3”x6” Glass Subway tile $9.06/sqft (installed subway style) tile to ceiling, also tile shower damn all three sides Construct 12” W x 24” H niche cut in in shower surround with - DalTile GR02 Whisper Green, installed subway style Tile floor - DalTile Briton Bone 12”x12” Ceramic Tile installed subway style • $1.45/sqft Scope of Work Manifesto www.FortuneBuilders.com 28 Pine Tree, Vista, CA HALL • • • • • • • • • • • • BATHROOM: Keep existing vanity cabinet, install new brushed nickel hardware Install new granite counter top – New Venetian Gold Install new square drop in / flush mount sink Install new wood frame vanity mirror (match vanity cabinet) New faucet - Grohe G34270001 "Concetto" Single Hole Bathroom Sink Faucet - $72.13 New toilet (Elongated Bowl) New tub – Proflo PFB14RWH 60 X 30 X 14 1/4 Bath RH White - $146.80 New shower valve, trim kit, tub filler and shower head A. Grohe G19457001 "Concetto" Custom Shower Trim Kit - $50.91 B. Grohe G35015000 Tub & Shower Rough In Valve - $70.50 C. Grohe G27613000 "BauCosmopolitan" Shower Head – $25.20 D. Grohe G13611000 "Eurodisc" Tub Spout – $16.42 Install Tile surround (all 3 walls) – Arizona Tile H-Line Series Cotton 3”x6” installed subway style (Tile to Ceiling) Accent Tile banner – DalTile Stone Radiance Glacier Gray Marble Random Mosaic Blend SA59 $13.78/SF (install 12” banner on all three walls 5’ up the wall) Use a light gray grout color throughout Tile floor – Arizona Tile Metro Platinum 12”x12” installed subway style $2.65/SF Scope of Work Manifesto www.FortuneBuilders.com Pine Tree, Vista, CA 29 MASTER BEDROOM: GUEST BEDROOMS: Scope of Work Manifesto www.FortuneBuilders.com 30 Pine Tree, Vista, CA PLUMBING: • Check all existing plumbing & repair/replace as needed, per code. • Inspect water heater and make sure it is installed up to code (pressure release valve, earthquake straps, and blocking if needed) • New angle stops on all water lines. • Check gas lines & repair/replace as needed. • Check all drain lines & repair/replace as needed ELECTRICAL: • Check all wiring & replace where needed, per code. • Check panel & repair/replace as needed (double tap breakers, inadequate sized breakers) • Install smoke (on ceilings) and carbon monoxide (install on walls, 2’ off floor) detectors per code • Install Hampton Bay 3-Light Vanity Wall Fixture, Model #V294CH03-G5097-1WHFR (Home Depot $59.97) in all bathrooms • Install new ceiling fans in bedrooms and living room • Install new exterior light fixtures HVAC • Inspect HVAC System and repair if needed (A/C Mechanical) GARAGE: • Install new garage door opener (if current does not operate) • Install new fire rated / self-closing door going from garage to house (if not existing) • Paint the interior of the garage white Scope of Work Manifesto www.FortuneBuilders.com Pine Tree, Vista, CA 31 Completion of Final Punch List General Contracting Work - $14,900 All counters, paint and patch, backsplash, windows and doors. Electrical - $1,800 Install new fixtures; add recessed lighting replace outlets and switches Plumbing - $2,000 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, add tub and shower Sewer Lateral - $1,200 HVAC - $500 Appliances/Fixtures - $3,200 Install new refrigerator, oven/stove, hood, & dishwasher Flooring - $2,200 Install new hardwood floors, tile and carpet Landscaping - $2,600 Staging - $2,000 Permits - $1,600 Total - $32,000 Scope of Work Manifesto www.FortuneBuilders.com 32 Sierra Madre, San Diego, CA Single Family Scope of Work - Single Family, San Diego, CA Project Introduction and Overview Rehab Overview This house is located in the Casa del Oro section of Spring Valley. The house was outdated and in need of upgrading. The original house was 1,102 sqft 2 bedroom and 1 bath room. The house was in need of a master suite addition. Contractor Overview Licensed contractors were hired to complete all renovations EXTERIOR: Demo: 1. Remove all debris in front and back yard 2. Remove Deck in front yard 3. Remove pavers in back yard General: 1. Pour concrete pad off of Kitchen (15’ x 15’) 2. Pour concrete pad off of new master suite (8’ x 8’) 3. Build pergola off of kitchen (15’ x 15’) 4. Repair fence in back yard 5. Remove deck off of dinning room 6. Paint entire house per color scheme Scope of Work Manifesto www.FortuneBuilders.com Sierra Madre, San Diego 33 Color Location Color Code Finish Valspar/Lowes Stone Manor Exterior 6006-2A Flat Extra White Shirwin Williams Exterior Trim 7006 Flat Black Front Door/Pergola Extra White (Shirwin Williams) All ceilings 7006 Flat Navajo White (Sherwin Williams) Bathrooms SW 6126 Semi Gloss Navajo White (Sherwin Williams) Living/ Dining/ Halls, Laundry, Kitchen, Bedrooms SW 6126 Flat Extra White (Sherwin Williams) All Trim & Doors SW 7006 Semi Gloss Urbane Bronze (Sherwin Williams) Ceiling beams SW 7048 Flat Roof: 1. Remove torch down roof 2. Install new decking were needed 3. Install new felt paper 4. Install new torch down roof (Charcoal color) 5. Seal all roof penetrations to code 6. Paint all vent stacks black Scope of Work Manifesto www.FortuneBuilders.com 34 Sierra Madre, San Diego Landscape: 1. Removal all debris in front and back yard 2. Remove all weeds in front and back yard 3. Install sod in the front and back yard 4. Cut in planter boxes next to house and fence in front and back yard and plant drought tolerant plants. 5. Install irrigation system in front and back yard 6. Trim trees in front and back yard 7. Trim neighbors bushed that are growing into our yard INTERIOR: Demo: 1. Remove all trash in house 2. Demo kitchen completely 3. Demo existing bathroom toilet, vanity, tile floor and shower surround 4. Remove all tile flooring 5. Remove all window coverings 6. Demo bedroom closet to prepare for room addition 7. Demo out laundry closet (going to flip it around into the garage) GENERAL: Construct new hallway, master bedroom and master bath per plans Change all door hinges and hardware with brush nickel Change front door hardware – Home Depot #640-064 $169 1. 2. 3. 4. 5. 6. 7. Install new wood flooring in living room hall way and kitchen (Contractor to provide samples) Install carpet in all three bedrooms – Home Depot Full Throttle Suede Close in existing laundry closet and frame in new closet in laundry room Frame in new FAU closet in garage KITCHEN: Scope of Work Manifesto www.FortuneBuilders.com Sierra Madre, San Diego 35 KITCHEN: 1. Install backsplash– DalTile Travertine 3”x6” T711361U $6.11/sqft installed subway style tile to cabinets 2. Install backsplash accent tile – DalTile American Olean Legacy LG03 Celedon 2”x2” install 4” Strip 3. Install new stainless steel appliances A. Frigidaire FFTR2126LK 20.5 CF Top Freezer Refrigerator - $625.00 B. Frigidaire FFFMV162LS 1.6 CF 1,000 Watt Range Microwave - $222.00 C. Frigidaire 24” Built in Dishwasher - $295.00 D. Frigidaire 30” Free Standing Gas Range - $556.00 4. Install new faucet - Proflo PFXC8011BN Single Handle Kitchen Faucet w/ Pullout Spray (Low Lead Compliant) - $180.65 5. Install new countertops– Rainbow Stone “ New Venetian Gold” Granite 6. Install new shaker style espresso cabinets (contractor to provide samples for CT Homes to approve) 7. Paint as per color scheme. HALL BATH: 1. Install new vanity (espresso finish) 2. New toilet (Elongated Bowl) Scope of Work Manifesto www.FortuneBuilders.com 36 Sierra Madre, San Diego 3. New tub 4. New shower valve, faucet, shower head, trim kit, and tub spout A. Grohe G35015000 Tub & Shower Valve - $67.50 B. Grohe G20209002 "Eurostyle Cosmopolitan" 8'' Widespread Bathroom Sink Faucet $160.10 C. Grohe G27613000 “BauCosmopolitan” Shower Head - $22.62 D. Grohe G19572002 "Eurostyle Cosmopolitan" Custom Shower Trim Kit - $31.92 E. Grohe G13611000 “Eurodisc” Tub Spout - $14.65 5. Install Tile surround– DalTile Rittenhouse Square X735 $2,70/ sqft installed subway style (Tile to ceiling) 6. Accent Tile – DalTile Stone Radiance Whisper Green Blend SA51 $13.78/sqft (install 12” banner threw all three walls 5’ up the wall) 7. Tile floor– DalTile Honed Travertine 18” x18” installed subway style $1.99/sqft MASTER BATH 1. Install new vanity (espresso finish) 2. New toilet (Elongated Bowl) 3. Install 2 new shower valves, 8” rain shower head and regular shower head, faucet, and trim kit A. Grohe G20209002 "Eurostyle Cosmopolitan" 8'' Widespread Bathroom Sink Faucet $160.10 B. Grohe G35015000 Tub & Shower Valve - $67.50 C. Grohe G19572002 "Eurostyle Cosmopolitan" Custom Shower Trim Kit - $31.92 D. Grohe G27613000 “BauCosmopolitan” Shower Head - $22.62 E. Moen MS6360 2.5 GPM Flat Rain Showerhead – 125.15 4. Install Tile Surround— DalTile Fabric P687 12” x12” $3,70/ sqft (use their 2” x2” floor tile for shower floor) tile to ceiling 5. Accent Tile – DalTile GR15 Mint Jubilee 3” x6” Glass Subway tile $9.06/sqft (installed subway style) tile to ceiling, also tile shower damn 6. Tile floor- DalTile Veranda P527 Dune 13” x13” installed subway style $3.70/sqft Scope of Work Manifesto www.FortuneBuilders.com Sierra Madre, San Diego 37 BEDROOMS: 1. Install 6 panel closet doors (make sure they are hollow core interior doors converted to closet doors, install ceiling and floor track as well as hardware) 2. Lighting– Home Depot Hampton Bay 2- Light Flush mount With Opal Glass, #534-435, $39.97/ea Plumbing: 1. Check all existing plumbing & repair/replace as needed, per code. 2. Remove water heater & replace with new one and install to code (exhaust vent, pressure release valve, earthquake straps) 3. New angle stops on all water lines. 4. Adjust laundry hook ups in new location 5. Check gas lines & repair/replace as needed. 6. Check all drain lines & repair/replace as needed Electrical: 1. Replace all outlets & switches. 2. Check all wiring & replace where needed, per code. 3. Check panel & repair/replace as needed. 4. Install Dead Panel if missing 5. Install new carbon monoxide and smoke detectors per code 6. Check for open junction points in attic HVAC: 1. Remove existing FAU located on roof 2. Install new FAU in garage 3. Run all new duct lines under floor and install new floor registers Scope of Work Manifesto www.FortuneBuilders.com 38 Sierra Madre, San Diego Completion of Final Punch List General Contracting Work - $45,550.00 All framing, counters, cabinets, paint and patch. Fixtures, backsplash, windows and doors. Appliances- $1,800 Stainless Steel Refrigerator, Free Standing Range, Hood and Over The Range Microwave, Dishwasher. Electrical - $9,000.00 Install new fixtures; add recessed lighting, replace outlets and switches, panel upgrade Plumbing - $5,200.00 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, add tub and shower Flooring - $6,800.00 Install new carpet, hardwood and tile Landscaping - $2,500 Foundation- $7,300.00 HVAC- $2,000.00 Roof- $5,100.00 Staging (2 month minimum contract)- $2,000 Misc. and Permits - $8,250.00 TOTAL - $95,500.00 Scope of Work Manifesto www.FortuneBuilders.com Sierra Madre, San Diego 39 Before Layout PORCH KITCHEN DINING BEDROOM 1 BATH LIVING ROOM GARAGE BEDROOM 2 DECK After Layout PORCH DINING KITCHEN BATH BEDROOM 1 MSTR. BATH MASTER BEDROOM HALL "HIS" & "HER" CLOSETS LIVING ROOM GARAGE BEDROOM 2 DECK OPTION 2 Scope of Work Manifesto www.FortuneBuilders.com 40 32nd Street, San Diego, CA Single Family Scope of Work - Single Family, San Diego , CA Project Introduction and Overview 1925 Spanish revival restoration in the quaint neighborhood of North Park, San Diego. This 3 BR/ 2 BA 1,210 square foot house is located near Balboa Park, downtown and close access to major freeways. Rehab Overview The home is outdated & needs updating throughout in kitchen and baths as well as custom tile work in kitchen and baths. Extensive landscaping work needed. Electrical and plumbing upgrades were completed as needed to comply with code regulations. Contractor Overview A licensed contractor were hired to complete all renovations. EXTERIOR: General: 1. Remove all debris in the front and back yard. 2. Re-stucco entire house and garage (no colored stucco will want to paint house) 3. Repair and stucco under covered porch 4. Demo Shed on side of garage 5. Install proper patio drains in front of garage and on driveway 6. Construct new pergola off Kitchen door, roughly 15’x10’ and paint per color scheme (Check set back codes, make sure car can fit underneath) 7. Demo porch wall between pillars and to north side 8. Build new stairs on porch 9. Repair all termite damage wood as noted on provided termite report 10. Paint entire house per color scheme Scope of Work Manifesto www.FortuneBuilders.com 32nd Street, San Diego 41 All paint through Sherwin Williams: Color Location Color Code Finish Pavilion Beige Exterior 7515 Flat Fiery Brown Front Door & Windows 6055 Flat Curio Gray Cement Front Porch 0024 Flat Repose Gray Kitchen Walls 7015 Satin Alabaster All ceilings 7008 Flat Navajo White Bathrooms SW 6126 Semi Gloss Natural Tan Living/ Dining/ Halls, Laundry, Kitchen, Bedrooms SW 7567 Flat Alabaster All Trim & Doors and Kitchen Cabinets SW 7008 Semi Gloss Alabaster Bathroom and Kitchen Ceilings SW 7008 Satin Samovar Silver Master Bath Walls 6233 Satin Conservative Gray Guest Bath Walls 6183 Satin Roof: 1. Rip of existing roof on house and garage 2. Install new sheeting were needed 3. Install new roof underlayment 4. Install new vents as needed per code 5. Install new torch down roofing material 6. Replace gutters (on main house and garage) 7. All permits and inspections as needed per code Scope of Work Manifesto www.FortuneBuilders.com 42 32nd Street, San Diego Windows: 1. Remove all bars on windows and doors 2. Restore all windows (paint per color scheme) 3. Replace all cracked windows 4. Restore all window hardware to original condition (remove all paint) 5. Replace window in hall bath with smaller one (make sure window matches rest of windows in house) 6. Remove window in proposed new master bath where toilet is located (see attached layout) 7. Make sure all windows are operational (even after being painted, some windows string and weights are broken so those need to be fixed) 8. Make sure screens are on all window (repair or replace as needed) Landscape: 1. Install irrigation system in front yard 2. Remove existing grass in the front yard 3. Removal all debris in front and back yard 4. Install Sod in front yard and planter boxes around fence perimeter 5. Plant drought tolerant plants in planters and add wood chips in planter boxes 6. Install cement walkway to front of house in middle of grass 7. Construct new wooden fence on north side of house (CT Homes to approve fence design, follow all set back codes) 8. Fence in entire front yard with entry gate in middle (do not fence in driveway, CT Homes to approve fence design and layout, follow all set back codes) INTERIOR: DEMO: 1. Remove all trash in house 2. Demo kitchen and remove all cabinets, countertops and backsplash 3. Demo bathroom toilets and shower surround 4. Remove drop ceiling and ceiling tiles throughout entire house 5. Demo closet in third bedroom and old water heater closet (save close doors and drawer because we are relocating to other side of room and want it to look exactly the same) 6. Demo wall in master dividing master bedroom from bathroom and extra room (see attached layout) 7. Demo 3/4 bath and relocate per layout 8. Remove all wood paneling throughout the house 9. Remove ceiling drywall in garage Scope of Work Manifesto www.FortuneBuilders.com 32nd Street, San Diego 43 GENERAL: 1. Paint all interior doors (per color scheme) 2. Sand, refinish all interior trim work, doors and closet doors (replace to match existing where needed) 3. Inspect foundation (stem wall, post and piers, and floor joists) Repair and replace as needed per code 4. Keep all door hardware through out entire house. Replace broken hardware as needed but replace with period specific. 5. Sand and refinish existing hardwood floor threw out entire house 6. Install new hardwood floors to match existing in third bedroom 7. Clean Fire place, remove cover, and paint interior black with high heat paint, patch broken tiles and paint per color scheme 8. Sand and refinish front door (insert 3 windows in top) clean and save all hardware 9. Replace and patch drywall as needed Scope of Work Manifesto www.FortuneBuilders.com 44 32nd Street, San Diego KITCHEN (Discuss final layout at property): 1. Install backsplash– Dal Tile, Panaro Blend (Brick-joint Polished) DA90, Midnight Ice 2. Install new stainless steel appliances A. Refrigerator– KitchenAid French Door KKBRS19KTMS Stainless Steal (Fergusons) B. Hood– KitchenAid Canopy Hood KKXW2330YSS Stainless Steal (Fergusons) C. Dishwasher– KitchenAid KKUDC10FXSS Stainless Steal (Fergusons) D. Range– KitchenAid 30” Slide in Range KKGSK901SSS Stainless Steal (Fergusons) 3. Install new faucet– Brushed nickel, single handle pull out 4. Install new countertops– Rainbow Stone “Lapitus” Granite 5. Install double bowl, stainless steal under mount sink 6. Install a 10 window door on side closest to sink and close in other door (see attached layout) 7. Install wood floor in kitchen to match existing wood floor threw out house. Sand and finish to match existing 8. Paint existing cabinets per color scheme 9. Paint as per color scheme. Scope of Work Manifesto www.FortuneBuilders.com 32nd Street, San Diego 45 HALL BATH: 1. Save existing sink, clean thoroughly and reinstall 2. Save existing toilet paper holder, clean and reinstall 3. New toilet– Fergusons Plumbing Pure Flow elongated bowl 4. Leave tub and re-glaze (check framing underneath tub and reframe if necessary) 5. Install new single handle chrome tub valve 6. Install Tile surround– Dal Tile:3” x 6” Rittenhouse Square, Color: Arctic White 0190 7. 8. Accent Tile – Dal Tile:4.25” x 4.25” Semi Gloss, Color: Mint Ice (accent) Mission tile West:½” x 6” Revival liner - order at Euro Tile Art (858) 452-5090 9. Tile floor– Dal Tile, Keystones Hex Ceramic Mosaic, Color: D317-White 10. Install chrome bathroom accessories 11. Remove wall heater 12. Install recessed lights 13. Scrape, clean and refinish closet doors in niche closet next to tub 14. Install wood frame mirror (Contractor to provide samples and CT Homes to decide) Scope of Work Manifesto www.FortuneBuilders.com 46 32nd Street, San Diego MASTER BATH (See new layout): 1. New toilet– Fergusons Plumbing Pure Flow elongated bowl 2. Install new tub – Home Depot #693-952 3. Install Rain showerhead and standard shower head (Contractor to provide samples and CT Homes to decide) 4. Install new three way shower diverter, chrome finish (CT Homes to decide wall and location) 5. Install new dual sink Vanity (Contractor to provide samples and CT Homes to decide) 6. Install granite counter top with porcelain under mount sinks (Contractor to provide samples and CT Homes to decide) 7. Faucet is Delta "Pasadena" style 4" 8. Install Tile Surround— Dal Tile: 3” x 6” Rittenhouse Square, Color: Arctic White 0190 Arizona Tile: 3” x 6” Fog, Glossy 9. Install chrome bathroom accessories 10. Install recessed lights 11. Install wood frame mirror (Contractor to provide samples and CT Homes to decide) 12. Tile wall where sinks are from sink to ceiling not exceeding width of mirrors (communicate with CT Homes before installing) – Arizona Tile: 3” x 6” Fog, Glossy 13. Tile floor- Dal Tile: Cashmere Gray MY25, Fabric Floor Unpolished, Size: 12” x 12” BEDROOMS: 1. Lighting– Home Depot Hampton Bay 2- Light Flush mount With Opal Glass, #534-435, $39.97/ea Scope of Work Manifesto www.FortuneBuilders.com 32nd Street, San Diego 47 2. PLUMBING: 1. Check all existing plumbing in entire house and replace as needed, per code. 2. Remove water heater & replace with new tankless water heater to code 3. Install new 30 gal water heater in garage to supply laundry hook ups (Install to code with earthquake straps, pressure release valves, blocking if needed) 4. New angle stops on all water lines. 5. Remove all old gas lines in all rooms that were supplying heaters 6. Install new laundry hook ups per code in garage 7. Check gas lines & repair/replace as needed. 8. Check all drain lines & repair/replace as needed ELECTRICAL: 1. Replace all outlets & switches. 2. Check all wiring threw out entire house and replace where needed, per code. 3. Install recessed lighting in kitchen, hall bath and master bath. 4. Check panel & repair/replace as needed (double tap breakers, inadequate sized breakers). 5. Install new Dead Panel 6. Make sure all junction boxes are to code and covered HVAC 1. 2. 3. 4. Replace HVAC unit Relocate to back side of house (CT Homes to confirm final location) Run new duct as needed Add duct to bathrooms and kitchen GARAGE: 1. Install Garage door opener 2. Install new wooden roll up garage door (Contractor to supply samples for CT Homes to select) 3. Replace all moldy drywall in garage 4. Patch and paint garage interior Scope of Work Manifesto www.FortuneBuilders.com 48 32nd Street, San Diego Completion of Final Punch List General Contracting Work - $89,250.00 All framing, counters, cabinets, paint and patch. Fixtures, backsplash, decking, windows and doors. Appliances- $5,000.00 French Door Refrigerator, Slide In Range, Island Hood, Dishwasher. Roof- $3,750.00 Remove all roofing tiles and felt paper, replace felt paper with two layers and reinstall existing roof tiles. Electrical - $7,300.00 Install new fixtures; add recessed lighting, replace outlets and switches Home Staging ( 3 Months Minimum Contract) - $3,000.00 Plumbing - $9,800.00 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, and new water heater Flooring - $3,500.00 Install new carpet, tile, sand and refinish existing hardwood Landscaping - $1,900.00 HVAC- $3,500.00 Misc. and Permits - $3,000.00 TOTAL - $130,000.00 Scope of Work Manifesto www.FortuneBuilders.com 32nd Street, San Diego 49 Before: Scope of Work Manifesto www.FortuneBuilders.com 50 32nd Street, San Diego After: 1 2 3 4 5 6 A A BEDROOM 3 B B MASTER BEDROOM KITCHEN C BATH 2 HALL D D DINING BEDROOM 2 LIVING ROOM Scope of Work Manifesto www.FortuneBuilders.com FortuneBuilders | 960 Grand Avenue, San Diego, CA 92109 ©2013 FortuneBuilders, Inc. All rights reserved. This information is for educational purposes. We don’t believe in push-button profits—we believe in proven business systems, education, drive and hard work. We are committed to teaching you how to reach your goals. In promoting our educational programs, we illustrate success stories. We want you to know, students are not compensated for their testimonials. However, many of our most successful students join our team as Coaches and Trainers. As stipulated by law, we cannot and do not guarantee results or offer legal advice. As with any business, your results will vary and will be based on your drive, effort, follow-through and other variables beyond our control. We believe in full transparency, and a high standard of integrity, that is why we encourage you to read our full earnings and income disclaimer by visiting www.fortunebuilders.com/earnings-income-disclaimers/