The Bronx Pepper Sauce Bottom
Transcription
The Bronx Pepper Sauce Bottom
Peppersauce Bottoms STORMWATER DRAINAGE Rainfall Intensity Is used to represent the average intensity of a storm of a given frequency for a selected duration. 100 year Rainfall Intensity for Pueblo 2.67 inches / 60 min. Rainfall Intensity for August 26, 2006 3 inches / 45 min. (4 inches / 60 min.) Flooding Flooding Blockage Peppersauce Bottoms Summary of projects that have been completed •City Stormwater crews have reshaped and improved existing channels upstream of Peppersauce Bottoms •Areas under existing railroad bridges have been cleared to provide for greater flow capacity •Concrete barrier flood wall has been installed adjacent to Peppersauce Bottoms •Concrete barriers have been placed in other upstream locations Summary of projects to be completed in the next 5 years • • • • • • • Infiltration Pond Adjacent to Peppersauce Bottoms………. $60,000 West 23rd Street Regional Detention Pond ………………....$271,257 Alabama Ave. Right-of-Way Channel Improvements…….. $312,004 Bancroft Ave. Regional Detention Pond …………………...$176,802 18th St. Regional Detention Pond…………………………...$109,129 15th St. Regional Detention Pond………………………….. $119,519 West 29th St. Drainage Improvements………………………$1,658,642 Total Estimate $2,707,353 Questions ?