village communitydevelopmentdistricts purchasing department 1071
Transcription
village communitydevelopmentdistricts purchasing department 1071
VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 1071 CANAL STREET THE VILLAGES, FLORIDA 32162 PHONE: (352) 751-6700 * FAX: (352) 751-6715 E-mail: amy.strickland@districtgov.org Addendum #1: BID #15B-029 – Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II March 19, 2015 3:00 PM A. Notice to Contractors: Whenever a conflict appears between this addendum and the initial solicitation, or plans, this addendum shall prevail, and as such shall constitute a binding portion of the contract documents. All provisions of the original specifications shall remain in force, except as specifically modified or changed herein. B. Additions, Deletions, and/or Clarifications: This addendum forms a part of the Contract Documents and modified the original Quote Documents as noted below and supersedes all contrary information and requirements. Contractors shall acknowledge receipt of this Addendum. Revision(s): R1. R2. Invitation to Bid 15B-029 – Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II (Revised) (See Attached) Revised Excel BID Form 1 INVITATION TO BID FOR VILLAGE CENTER SERVICE AREA (VCSA) LONG-SIDE WATER SERVICE REPLACEMENT PHASE I & PHASE II BID # 15B-029 Issued By: Village Community Development Districts Purchasing Department Amy Strickland, Buyer 1071 Canal Street The Villages, Florida 32162 Phone (352) 751-6700 * Fax (352) 751-6715 www.districtgov.org amy.strickland@districtgov.org Date of Issue: Wednesday, March 12, 2015 Due Date / Time: Wednesday, April 22, 2015 @ 3:00 PM Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 CALENDAR OF EVENTS / BID TIMELINE Listed below are the important dates and times by which the actions noted must be completed. All dates are subject to change by the Purchasing Department. If the Purchasing Department finds it necessary to change any of these dates or times prior to the Bid due date, the change will be accomplished by addendum. ACTION Issue BID Pre-Bid Conference Last Day for Questions Bids Due VCCDD District Board Approval Village Community Development Districts Purchasing Department COMPLETION DATE March 12, 2015 Wednesday, March 25, 2015 @ 3:00 P.M DPM Conference Room: 1071 Canal Street, The Villages, FL. 32162 Monday, April 6, 2015 @ 4:00 PM Wednesday, April 22, 2015 @ 3:00 PM May 6, 2015 Page 2 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 TABLE OF CONTENTS PART 1.......................................................................................................................................................... 6 INTENT AND GENERAL INFORMATION ............................................................................................... 6 INVITATION TO BID........................................................................................................................................... 6 PRE-BID CONFERENCE ...................................................................................................................................6 FORMS & SPECIFICATIONS ............................................................................................................................6 HOW TO SUBMIT A BID ....................................................................................................................................6 BIDDER RESPONSIBILITY ...............................................................................................................................6 BID DOCUMENTS REQUIRED ..........................................................................................................................7 EXAMINATION OF BID DOCUMENTS ..............................................................................................................8 INSURANCE REQUIREMENTS .........................................................................................................................8 INTERPRETATIONS, CLARIFICATIONS AND ADDENDA ..............................................................................9 ALTERNATES ....................................................................................................................................................9 CHANGES / MODIFICATIONS ..........................................................................................................................9 GOVERNING LAWS AND REGULATIONS ..................................................................................................... 10 BLACK OUT PERIOD ...................................................................................................................................... 10 PROVIDING PERFORMANCE BOND ............................................................................................................. 10 FISCAL YEAR FUNDING APPROPRIATION .................................................................................................. 10 TAX EXEMPT STATUS .................................................................................................................................... 10 PAYMENTS ...................................................................................................................................................... 10 PERMITS / LICENSES / FEES ......................................................................................................................... 11 PROTECTION OF RESIDENT WORKERS ...................................................................................................... 11 VILLAGE COMMUNITY DEVELOPMENT DISTRICTS ................................................................................... 11 REFERENCE TERMS ...................................................................................................................................... 11 RIGHT TO AUDIT RECORDS .......................................................................................................................... 12 ADDITIONAL TERMS AND CONDITIONS ...................................................................................................... 12 PROPRIETARY INFORMATION ...................................................................................................................... 12 ADDITIONAL SERVICES/PURCHASES BY OTHER PUBLIC AGENCIES .................................................... 12 PART 2........................................................................................................................................................ 13 BID SUBMITTAL ................................................................................................................................... 13 PART 3........................................................................................................................................................ 14 SCOPE OF SERVICES .......................................................................................................................... 14 INTRODUCTION .............................................................................................................................................. 14 SCOPE OF WORK ........................................................................................................................................... 15 GENERAL SPECIFICATIONS ......................................................................................................................... 15 PROJECT SPECIFICATIONS .......................................................................................................................... 17 PART 4........................................................................................................................................................ 18 BID DOCUMENTS ................................................................................................................................. 18 BID COVER PAGE ........................................................................................................................................... 18 BID FORM ........................................................................................................................................................ 19 EXCEPTIONS OR DEVIATIONS TO SPECIFICATIONS ................................................................................. 21 DISCLOSURE OF SUBCONTRACTORS, SUBCONSULTANTS AND SUPPLIERS ...................................... 22 BIDDER’S CERTIFICATION ............................................................................................................................ 23 STATEMENT OF TERMS AND CONDITIONS ................................................................................................ 24 DRUG FREE WORKPLACE CERTIFICATE .................................................................................................... 25 PUBLIC RECORDS ACT/CHAPTER 119 REQUIREMENTS .......................................................................... 26 REFERENCES & SIMILAR PROJECTS FORM .............................................................................................. 27 W-9 ................................................................................................................................................................... 29 NO-BID RESPONSE ........................................................................................................................................ 30 PART 5........................................................................................................................................................ 31 EXHIBITS ............................................................................................................................................... 31 SAMPLE AGREEMENT ................................................................................................................................... 31 SAMPLE E-VERIFY CONTRACTOR AFFIDAVIT ........................................................................................... 38 SAMPLE E-VERIFY SUBCONTRACTOR AFFIDAVIT .................................................................................... 39 Village Community Development Districts Purchasing Department Page 3 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 6........................................................................................................................................................ 40 PROJECT REQUIREMENTS ................................................................................................................ 40 Village Community Development Districts Purchasing Department Page 4 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 BID CHECKLIST This standardized check list has been provided to assist the Bidder with the submission of their Bid package. This check list cannot be construed as identifying all required submittal documents for this project. Bidders remain responsible for reading the entire Bid document to insure that they are in compliance. Bids may be considered subject to rejection if, in the sole opinion of the District, there is a serious omission, unauthorized alteration of form, an unauthorized alternate Bid, incomplete or unbalanced unit price, or irregularities of any kind. The District may reject as non-responsive, any or all Bids where Bidders fail to acknowledge receipt of Addenda as prescribed. Bid Cover Page – all information completed and signed Bid Form(s) – submitted in correct format, accurate calculations, and signed Exceptions / Deviations Page – signed and/or information completed Disclosure of Subcontractors, Subconsultants and Suppliers – signed and/or information completed Bidder’s Certification – Addenda acknowledged and form signed Statement of Terms and Conditions – signed Drug Free Workplace Certificate – signed and notarized Public records Act/Chapter 119 Requirements - signed References and Similar Projects Form – list five (5) references of similar size and scope W-9 – completed and signed Copy of Required/Applicable Licenses or Certifications per specifications Required Number of Copies (1 Original and 1 Copy = 2 Total) Proof of Surety (Bond or Equal) Village Community Development Districts Purchasing Department Page 5 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 1 INTENT AND GENERAL INFORMATION INVITATION TO BID The Village Center Community Development District is requesting bids for VCSA Long-side water service replacement. Sealed bids will be received by the Purchasing Department located at 1071 Canal Street, The Villages, Florida 32162, until 3:00 pm, Wednesday, April 22, 2015 for: “BID #: 15B-029 VCSA LongSide Water Service Replacement Phase I & Phase II”. Bidders shall take careful notice of the following conditions of this Invitation to Bid: • Submissions by FAX or other electronic media will not be accepted under any circumstances. Late submissions will not be accepted under any circumstances. • Submitters may withdraw and/or replace bids at any time until the deadline for submission of proposals. • All questions received by 4:00 pm, Monday, April 6, 2015 will be considered. Questions will not be answered over the phone. Questions must be in writing and faxed to (352) 751-6715, attention: Amy Strickland or sent via e-mail to amy.strickland@districtgov.org. PRE-BID CONFERENCE A pre-bid conference will be held on Wednesday, March 25, 2015 at 3:00 pm. Interested Contractors are to meet at the District Property Management Conference room located at 1071 Canal Street, The Villages, FL. 32162. Contractors are also encouraged to attend the pre-bid conference for a clear understanding of the project. For directions please contact Amy Strickland at 352-751-6700. FORMS & SPECIFICATIONS Submitters are required to use the official “BID FORMS”, and all attachments itemized herein are to be submitted as a single document. Any variation from the minimum specifications must be clearly stated on the BID FORMS and explained in detail on the EXCEPTION / DEVIATION FORM. HOW TO SUBMIT A BID One complete bid form set (1 original plus 1 copy) with all required documents as itemized and included herein is to be submitted in a sealed envelope, on the outside of which shall be prominently marked with the following identification “BID #: 15B-029 Village Center Service Area Long-Side Water Service Replacement Phase I & Phase II” together with the name and address of the submitter. The BID should be neat, professional in appearance and bound appropriately for the document’s thickness. The original document shall have original signatures and clearly noted with ORIGINAL on the cover. All bids shall be mailed or hand delivered to the Purchasing Department at the address given, by the date and time set forth herein. BIDDER RESPONSIBILITY Submitters are fully and completely responsible for the labeling, identification and delivery of their bids. The Purchasing Department will not be responsible for any mislabeled or misdirected submissions, nor those handled by delivery persons, couriers, or the U. S. Postal Service. • Submissions shipped by express delivery, or in overnight or courier envelopes, boxes, or packages must be prominently marked on the outside of such envelopes, boxes or packages with the sealed bid identification. • Any envelopes, boxes, or packages which are not properly labeled, identified, and prominently marked with the sealed bid identification, may be inadvertently opened upon receipt, thereby invalidating such bids and excluded from the official bid opening process. Village Community Development Districts Purchasing Department Page 6 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 • Invitation by the Village Center Community Development District to Bidders is based on the recipient’s specific request and application to www.demandstar.com, www.districtgov.org, or as the result of response by the public to the legal advertisements required by State and District law. Firms or individuals submit their responses on a voluntary basis, and therefore are not entitled to compensation of any kind. • A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract/agreement to provide any goods or services to a public entity, may not submit a bid on a contract/agreement with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract/agreement with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted vendor list. • Bids that are incomplete, unbalanced, conditional, obscure, or which contain additions not called for, alterations, or irregularities of any kind, or which do not comply with these documents may be rejected at the option of the District. • Any Bidder who submits a no-bid response shall submit the no-bid response in an envelope marked on the outside of the mailing envelope, together with the required bid identification number. BID DOCUMENTS REQUIRED The following documents and forms in the following arrangement must accompany each bid or alternate bid submitted: • Bid Cover Page. This is to be used as the first page of the bid. This form must be fully completed and signed by an authorized officer of the Bidder. • Bid Form • Exceptions or Deviations to Specifications Form • Disclosure of Subcontractors, Subconsultants and Suppliers • Bidder Certification / Addenda Acknowledgement Form • General Terms and Conditions Statement • A sworn, notarized Drug Free Work Place Certificate • Signed Public Records Act/Chapter 119 Requirements • A References and Similar Projects Form • W-9 Please note: This is not to be taken as a complete listing of required bid documents. It is the proposer’s responsibility to ensure all requirements are met. Village Community Development Districts Purchasing Department Page 7 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 EXAMINATION OF BID DOCUMENTS • Each Bidder shall carefully examine the Drawings and/or Specifications and other applicable documents, and inform himself/herself thoroughly regarding any and all conditions and requirements that may in any manner affect cost, progress or performance of the work to be performed under the Agreement. Ignorance on the part of the Bidder will in no way relieve him/her of the obligations and responsibilities assumed under the Agreement. • Should a Bidder find discrepancies or ambiguities in, or omissions from the Drawings and/or Specifications, or should he/she be in doubt as to their meaning, he/she shall at once notify the Purchasing Department, in writing. INSURANCE REQUIREMENTS A Certificate of Insurance will be furnished by the successful bidder (Contractor) upon Notice of Award. The certificate(s) shall be completed by the Contractor’s authorized agent and submitted to the District’s Purchasing Department. The successful bidder shall not commence any work in connection with the Bid until it has obtained all of the following types of insurance and shall maintain such insurance as will protect him/her from claims which may arise out of or result from the Contractor’s operations under the terms and conditions of the BID. The District shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the Contractor and/or subconsultant providing such insurance. • General Liability. Contractor shall obtain, and maintain throughout the life of the Agreement, General Liability Insurance in an amount no less than $1,000,000 per occurrence and $1,000,000 general aggregate for Bodily Injury and Property Damage. Insurance shall protect the Contractor, subconsultants and subcontractor from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under the Agreement. District(s) shall be named as Additional Insured. • Automobile Liability Insurance covering all automobiles and trucks the Contractor may use in connection with this BID. The limit of liability for this coverage shall be a minimum combined single limit of $500,000 per occurrence for bodily injury and property damage. This is to include owned, hired, and non-owned vehicles. District(s) shall be named as Additional Insured. • Excess Liability Insurance (Umbrella Policy) may compensate for a deficiency in general liability or automobile insurance coverage limits. • Waiver of Subrogation: By entering into any agreement as a result of this BID, Contractor agrees to a Waiver of Subrogation for each policy required above. • General Aggregate Limit. The general aggregate limit shall apply per project. • Workers’ Compensation Insurance, as required by the State of Florida. Contractor and any subconsultants or subcontractors shall comply fully with the Florida Worker’s Compensation Law. Contractor must provide certificate of insurance showing Worker’s Compensation coverage. • Certificate(s) shall be dated and show: o The name of the insured Contractor, the specified job by name and/or BID number, the name of the insurer, the number of the policy, its effective date and its termination date. o Statement that the insurer will mail notice to the District at least thirty (30) days prior to any material changes in provisions or cancellation of the policy. o Subrogation of Waiver clause. Village Community Development Districts Purchasing Department Page 8 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 o The Village Center Community Development District and any other governmental agencies using this Agreement in cooperation with the District shall be a named additional insured on Public Liability Insurance and Automobile Liability Insurance. o The Contractor shall require of each its subconsultants and/or subcontractors to procure and maintain during the life of its subcontract, insurance of the type specified above or insure the activities of its subconsultants and/or subcontractors in its policy as described above. o All insurance policies shall be written on companies authorized to do business in the State of Florida. INTERPRETATIONS, CLARIFICATIONS AND ADDENDA • No oral interpretations will be made to any Bidder as to the meaning of the Bid/Agreement Documents. Any inquiry or request for interpretation received by the Purchasing Department before 4:00 pm, Monday, April 6, 2015, will be given consideration. All such changes or interpretations will be made in writing in the form of an addendum and, if issued, will be distributed at or after the Pre-Bid Conference (if applicable) and uploaded to www.demandstar.com and www.districtgov.org. Each Bidder shall acknowledge receipt of such addenda in the space provided on the Bidder’s Certification Form. • In case any Bidder fails to acknowledge receipt of such addenda or addendum, his/her bid will nevertheless be construed as though it had been received and acknowledged and the submission of his/her bid will constitute acknowledgment of the receipt of same. All addenda are a part of the Bid Documents and each Bidder will be bound by such addenda, whether or not received by him/her. It is the responsibility of each Bidder to verify that he/she has received all addenda issued before bids are opened. • In the case of unit price items, the quantities of work to be done and materials to be furnished under this Bid/Agreement are to be considered as approximate only and are to be used solely for the comparison of bids received. The District and its Consultants do not expressly or by implication represent that the actual quantities involved will correspond exactly therewith; nor shall the Bidder plead misunderstanding or deception because of such estimate or quantities of work performed or material furnished in accordance with the Specifications and/or Drawings and other bid documents, and it is understood that the quantities may be increased or diminished as provided herein without in any way invalidating any of the unit or lump sum prices proposal. ALTERNATES When certain items of equipment and/or materials are specified and/or described as the product of a particular manufacturer together with any required additional information such as model number, size or catalog number, only such specific items may be used in preparing the bid, except as hereinafter provided. CHANGES / MODIFICATIONS The Village Community Development Districts reserve the right to order changes in the scope of work and resulting agreement. The successful Bidder has the right to request an equitable price adjustment in cases where modifications to the Agreement under the authority of this clause result in increased costs to the Bidder. Price adjustments will be based on the unit prices proposed by the Bidder in response to this solicitation. Any agreement resulting from this solicitation may be modified upon written and mutual consent of both parties. Village Community Development Districts Purchasing Department Page 9 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 GOVERNING LAWS AND REGULATIONS The Bidder is required to be familiar with and shall be responsible for complying with the District’s Purchasing Policies and Procedures, District resolutions, District rules, all federal, state and local laws, ordinances, rules and professional standards or regulations that in any manner affect this solicitation, the selection process, protests, award of agreement, agreement management or any other activity associated with this solicitation and the subsequent work required of the successful Proposer. BLACK OUT PERIOD The black out period is defined as between the time the submittals for an Invitation to Bid, Request for Proposals, Request for Qualifications or the Invitation to Negotiate, as applicable, are issued by the District Purchasing Department and the time the Board awards the Agreement. During this black out period, any attempt to influence the thinking of District staff or officials for or against a specific cause related to a solicitation for goods or services, in person, by mail, by facsimile, by telephone, by electronic mail, or by any other means of communication, may result in disqualification of their award and/or Agreement. This does not apply to pre-solicitation conferences, oral presentations before the selection committee, agreement negotiations, or communications with staff not concerning this solicitation. PROVIDING PERFORMANCE BOND The successful Proposer will be required to provide the Village Center Community Development District with a Performance Bond for one hundred percent (100%) of the Project Sub-Total. The Performance Bond must be in the form of a Cashier’s Check, Money Order, Certified Check, or Certified Bond from an established Bonding Agency licensed to do business in the State of Florida. “Performance Bond” means a bond of a Contractor in which a surety guarantees to the District that the work/services will be performed in accordance with the Agreement Documents and may, at the discretion of the District, include a letter of credit issued by a financial institution. “Surety” means an organization which, for a consideration, promises in writing to make good the debt or default of another. The surety must hold a certificate of authority as an acceptable surety on federal bonds as published in the current Circular 570, U.S. Department of the Treasury, and the Federal Register effective July 1, annually, as amended. The Contractor shall submit a Bid bond, bank letter or other acceptable form of proof with the submittal Bid indicating that the Contractor will provide the surety required above. FISCAL YEAR FUNDING APPROPRIATION Unless otherwise provided by law, a contract for supplies or services may be entered into for any period of time deemed to be in the best interests of the District, provided the term of the contract and conditions of renewal or extension, if any, are included in the solicitation and funds are available for the fiscal period at the time of the contract. Payment and performance obligations for succeeding fiscal periods shall be subject to appropriation by the District of funds thereafter. When funds are not appropriated or otherwise made available to support continuation of performance in a subsequent fiscal period, the contract shall be cancelled and the contractor shall be entitled to reimbursement for the reasonable value of any nonrecurring cost incurred but not advertised in the price of the supplied or services delivered under the contract or otherwise recoverable. TAX EXEMPT STATUS The Village Community Development Districts are special purpose governmental agencies under Florida law and exempt from Florida sales tax. The tax exempt number will be provided upon request. This exemption does not apply to goods and services purchased separately by a Contractor in connection with its agreement obligations. The Contractor shall be responsible for paying any taxes, fees, or similar payments that are required to be paid in connection with the agreement work. The District maintains the right to direct purchase goods and services whenever possible to utilize the District’s tax exempt status. PAYMENTS Payments shall be made pursuant to Section 218.70, Florida Statutes, the Prompt Payment Act, and all District policies promulgated thereby. Village Community Development Districts Purchasing Department Page 10 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 The Contractor may apply for payment following completion of work at each lift station. Applications shall be on an AIA Document G702 “Application and Certificate for Payment” (or equivalent) as acceptable by the District. The District will promptly inspect the work and review the application for processing and payment. Payment will be made upon approval and acceptance by the District. The Contractor shall be assessed liquidated damages in the amount of $250.00 per day for every day the project is incomplete after the project completion deadline, barring unforeseen circumstances as approved by the District. PERMITS / LICENSES / FEES Any permits, licenses or fees required will be the responsibility of the Bidder. PROTECTION OF RESIDENT WORKERS The Village Community Development Districts actively support the Immigration and Nationality Act of 1952 (INA) and the Immigration Reform and Control Act of 1986 (IRCA), which includes provisions addressing employment eligibility, employment verification, and nondiscrimination and the State of Florida Executive Order Number 11-116 stating contractors shall utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of: all persons employed during the Agreement term by the Contractor to perform employment duties pursuant to the Agreement, within Florida; and all persons, including subcontractors, assigned by the Contractor to perform work pursuant to the Agreement with the District. (http://www.uscis.gov/e-verify) Additionally, the Contractor shall include a provision in all subcontracts that requires all subcontractors to utilize the U.S. Department of Homeland Security’s E-Verify system to verify employment eligibility of: all persons employed during the Agreement Term by the Contractor to perform work or provide services pursuant to this Agreement with the District. All Service contractors and /or vendors who wish to contract with the District to provide services must first certify they have registered with, will participate in, and continue to utilize, once registered, the E-Verify Program (or any successor program implemented by the federal government of its departments or agencies) to verify the work authorization status of all newly hired employees employed by the contractors and/or vendors. Breach of this term or conditions is considered a material breach of the Agreement. Participation in the E-Verify program will only be required of the awarded contractor. To certify participation in the program, awarded contractor, and any subcontractors to the contractor, will be required to sign an E-Verify Contractor/Subcontractor Affidavit (see Part 5: Exhibits for sample affidavits). For more information and to register visit https://e-verify.uscis.gov/enroll/. VILLAGE COMMUNITY DEVELOPMENT DISTRICTS The Village Center Community Development District, Sumter Landing Community Development District, North Sumter County Utility Dependent District, Brownwood Community Development District and Village Community Development Districts 1-11 are local units of special-purpose government and reserve the right to reject any and/or all bids, reserve the right to waive any informalities or irregularities in the bid or examination process, reserve the right to select low bid per item, and reserve the right to award bids and/or agreements in the best interest of the Districts. REFERENCE TERMS Any headings in this document are for the purposes of reference only and shall not limit or otherwise affect the meaning thereof. Any reference to gender shall be construed to include all genders, firms, partnerships and corporations. References in the singular shall be construed to include the plural and references in the plural shall be construed to include the singular. Any reference to the “District” or the “Village Community Development Districts” shall be construed to refer to the specific District or Districts for which the solicitation was issued and those District(s) shall be the legislative authority for all matters concerning this solicitation or the resulting agreement(s). Village Community Development Districts Purchasing Department Page 11 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 RIGHT TO AUDIT RECORDS The Districts shall be entitled to audit the books and records of the Bidder or any sub-contractor to the extent that such books and records relate to the performance of the Agreement or any sub-contract to the Agreement. Such books and records shall be maintained by the Bidder for a period of three (3) years from the date of final payment under the Agreement and by the sub-contractor for a period of three (3) years from the date of final payment under the sub-contract unless a shorter period is otherwise authorized in writing. ADDITIONAL TERMS AND CONDITIONS No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and effect and are inapplicable to this bid. If submitted either purposefully through intent or design or inadvertently appearing separately in transmitting letters, specifications, literature, price lists or warranties, it is understood and agreed the general and special conditions in this solicitation are the only conditions applicable to this bid and the Bidder’s authorized signature affixed to the bid attests to this. PROPRIETARY INFORMATION Responses to this Invitation to Bid, upon receipt by the District, become public records subject to the provisions of Chapter 119 F.S., Florida’s Public Record Law. If any Bidder believes that any portion of all of the response is confidential and proprietary, Bidder shall clearly assert such exception and the specific legal authority of the asserted exemption. All materials that qualify for exemption from Chapter 119 must be submitted in a separate envelope, clearly identified as “TRADE SECRETS EXCEPTION”, with the firm’s name and the bid number marked on the outside. Such designation of an item as a trade secret may be challenged in court by any person. By the Bidder’s designation of material submitted to the District as a “trade secret”, the Bidder agrees to hold harmless the District for any award to a plaintiff for damages, costs or attorney’s fees and for costs and attorney’s fees incurred by the District by reason of any legal action challenging the Bidder’s “trade secret” claim. ADDITIONAL SERVICES/PURCHASES BY OTHER PUBLIC AGENCIES The Bidder by submitting a bid acknowledges that other public agencies may seek to “Piggy-Back” under the same terms and conditions during the effective period of any resulting agreement services and/or purchases being offered in this bid for the same prices and/or terms being bid. The successful Bidder has the option to agree or disagree to allow agreement Piggy-Backs on a case-by-case basis. Before a public agency is allowed to Piggy-Back any agreement, the agency must first obtain the Bidder’s approval. Without the Bidder’s approval, the seeking agency cannot Piggy-Back. Village Community Development Districts Purchasing Department Page 12 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 2 BID SUBMITTAL An original and one (1) copy (for a total of 2), of each bid shall be submitted in a sealed envelope, prominently marked on the outside with the words, "BID # 15B-029 Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II". Bids submitted in express, overnight or courier envelopes, boxes or packages must be prominently marked on the outside with the words, "BID # 15B-029 Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II" and the contents sealed as required. • Deadline for Submissions in response to this Invitation to Bid: Bids must be received no later than 3:00 pm, Wednesday, April 22, 2015. Bids submitted by FAX or other electronic media will not be accepted under any circumstances. Late bids will not be accepted, and will be returned, unopened, to the Bidder, at the Bidder’s expense. • A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract/agreement to provide any goods or services to a public entity, may not submit a bid on a contract/agreement with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract/agreement with any public entity, and may not transact business with any public entity in excess of ten thousand dollars, ($10,000.00) for a period of thirty-six (36) months from the date of being placed on the convicted vendor list, pursuant to paragraph 2a of Section 287.133, Florida Statutes. • The Village Center Community Development District reserves the right to reject any and/or all bids, reserves the right to waive any informalities or irregularities in the bid, and reserves the right to award agreement(s) in the best interest of the District. Village Community Development Districts Purchasing Department Page 13 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 3 SCOPE OF SERVICES INTRODUCTION CDD INFORMATION The Village Community Development Districts (CDD’s) within The Villages are units of special purpose local government created under Chapter 190 of the Florida Statutes. North Sumter County Utility Dependent District is a special District under Chapter 189. There are currently thirteen (14) CDD’s in The Villages, which include: Village Center Community Development District, Sumter Landing Community Development District, Brownwood Community Development District and Village Community Development Districts 1-11. CDD‘s are widely used throughout the United States to provide for certain service delivery infrastructure such as water management and control (drainage), fire control, road and bridge construction and maintenance, park and recreational facilities, water and sewer systems, sidewalks, multi-modal paths, streetlights, and similar infrastructure that is required to provide urban services to areas that may not have access to such services through a general purpose government such as a municipality. A Community Development District is a unit of local government with the special purpose of providing the services described above. As a unit of local government, the District is subject to many of the same State Statutes that regulate cities and counties; of particular interest are those statutes related to ethics in government for the elected Board of Supervisors, Government in the Sunshine, a cornerstone of local government in the State of Florida which requires that decisions made by any governmental agency be done at a public meeting; the public records law, which means the records of the District are open for review by any citizen; the auditing requirements in which annually the accounting records of the District are audited by an independent certified accountant and the results of such audit are provided to the State Controller and Auditor General; competitive bidding requirements for construction and maintenance contracts; and various other statutory provisions that protect the interest of the public. The Villages is the largest single-site residential real estate development in the United States spanning over 26,000 acres in three adjoining counties in Central Florida (Lake, Marion and Sumter). The Villages earned the No. 1 ranking as the fastest growing micropolitan area in the United States according to a 2008 Census Bureau report. The current population is approximately 90,000 residents and growing with an anticipated population of approximately 105,000 residents at build-out. Village Community Development Districts Purchasing Department Page 14 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 SCOPE OF WORK The Village Center Community Development District is requesting bids for the replacement of long-side water services at VCSA. Qualified firms wishing to respond to BID #: 15B-029 Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II must provide all labor, services, equipment and materials described in this document, whether directly or through sub-contractors/subconsultants. This does not, however, limit the use of sub-contractors or sub-consultants. Work on this project will begin upon awarded Contractor’s receipt of Notice to Proceed and is to be completed within 120 calendar days. The completion date may be extended due to unforeseen circumstances with the approval of the District. GENERAL SPECIFICATIONS It is the intent of these specifications to describe a complete project fully acceptable to the District. Even though certain details may have been unintentionally omitted, the Contractor shall nonetheless perform all work necessary to complete the project to the highest industry standards and acceptable to the District. All materials and workmanship shall be first class and shall conform to the highest industry standards or the specifications, whichever requirements are more stringent. o Work hours are 7:00 am to 7:00 pm, seven (7) days per week. o Worksite is to be kept clear of debris at all times. o Contractor is responsible for removal of all debris from project site. o All areas are to be kept safe for workers and residents. o Any District property damaged at the project site by Contactor shall be repaired to District Standards. Contractor is responsible for all repairs of damage. o All permits and inspections are the responsibility of the Contractor. o Contractor shall coordinate with the operation and maintenance contractor, CH2M Hill, on any activities that will impact the existing operational facilities of the WWTP. o All existing WWTP treatment processes shall remain operational at all times. o All materials removed from the site shall be disposed at the properly permitted facility. Contractor will be responsible for all work according to the attached plans to include all materials, labor, and permitting required completing the project in a timely and professional manner. Contractor and any subcontractors will be required to attend a pre-construction meeting after the bid award is approved by the Village Center Community Development District and the Agreement has been executed by all parties. Contractor shall supply the District with a schedule of values and project progress schedule immediately following the receipt of Notice to Proceed. SITE CLEANLINESS AND CONDITION As much as possible, all areas shall be kept free of litter and/or construction debris. It is expected that the Contractor and workers are to be aware of site conditions and keep a neat and clean appearance at all times. All work areas shall meet all safety requirements for pedestrian and vehicular traffic and must be left in a clean and orderly manner. Village Community Development Districts Purchasing Department Page 15 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 The Contractor will keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the work, and, at the completion of each day of work, will remove all waste materials, rubbish and debris from and about the premises, as well as all tools, construction equipment, machinery, and surplus materials, leaving the site clean and ready for acceptance by the District. Contractor is responsible for removal of all debris from project site. WORKFORCE It is desired that the Contractor employees be dressed in a uniform fashion with the company identification. Vehicles as well should be easily identified. A neat and clean appearance should be maintained as much as possible. Contractor employees should be instructed to be helpful and courteous to residents, other employees, and visitors at all times. Contractor will provide The District with a current list of all employees. ALTERNATE BIDS / APPROVED EQUALS / DEVIATIONS The Bidder shall be responsible for reading very carefully, and understanding completely, the requirements and the specifications of the items requested. Any deviation from the specifications listed herein must be clearly indicated, otherwise it will be considered that the items offered are in strict compliance with these specifications and the successful Bidder will be held responsible. Therefore, deviations must be explained in detail on the form provided. Any item(s) that does not meet District specifications upon delivery will not be accepted and if the item cannot be brought up to the specifications in a reasonable time, the Bidder will be required to compensate the District for the difference in price entailed in utilizing the next qualified Bidder. WARRANTY / REPAIRS The Contractor warrants that any failure of materials or labor within one (1) year of acceptance by the District which can be traced to said materials or labor supplied during the project shall be repaired without any additional charge to the District. Warranty shall cover all said materials and labor associated with warranty repairs performed on site. The manufacturer’s warranty shall prevail. Contractor shall provide the manufacturer’s warranty certificate with the BID submission. All other materials and labor shall be warranted as per the preceding paragraph. Contractor shall perform an inspection of the materials prior to the warranty period to expire and an inspection of the labor within one year after acceptance by the District at no charge to ensure that all materials were installed properly and District staff is satisfied with the work and/or materials. Village Community Development Districts Purchasing Department Page 16 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PROJECT SPECIFICATIONS FOR PROJECT DETAILS AND PLANS REFERENCE “PART 6 PROJECT REQUIREMENTS”, AS INCLUDED IN THIS BID DOCUMENT. Village Community Development Districts Purchasing Department Page 17 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 4 BID DOCUMENTS BID COVER PAGE Name of Firm, Entity or Organization: Federal Employer Identification Number (EIN): State of Florida License Number (If Applicable): Name of Contact Person: Title: E-Mail Address: Mailing Address: Street Address (if different): City, State, Zip: Telephone: Fax: Organizational Structure – Please Check One: Corporation Partnership Proprietorship If Corporation: Date of Incorporation: Joint Venture Other State of Incorporation: States Registered in as Foreign Corporation: Does your firm accept Visa® for payment? Yes No Authorized Signature: Print Name: ______________________________________________________ Signature: _______________________________________________________ Title: ____________________________________________________________ Phone: __________________________________________________________ This document must be completed and returned with your Submittal. Village Community Development Districts Purchasing Department Page 18 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 BID FORM SCHEDULE OF UNIT PRICES All work required for a complete project is inclusive in unit prices, whether or not specifically referenced in the unit price description. ITEM DESCRIPTION QUANTITY UNIT 1 MOBILIZATION 1 LS 2 LAKE COUNTY PERMITS 1 LS 3 MAINTENANCE OF TRAFFIC 1 LS 4 3/4-INCH SINGLE SERVICE LATERAL (MOLE) 140 EA 5 1-INCH DOUBLE SERVICE LATERAL (MOLE) 905 EA 8 EA 70 EA 3/4-INCH SINGLE SERVICE LATERAL (DIRECTIONAL DRILLED) 1-INCH DOUBLE SERVICE LATERAL (DIRECTIONAL DRILLED) 6 7 UNIT PRICE AMOUNT PROJECT SUB-TOTAL Payment & Performance Bond (100% of PROJECT SUB-TOTAL) TOTAL PROJECT BID PRICE SCHEDULE OF UNIT PRICES BID ALTERNATES ITEM 1 2 3 4 5 6 7 8 9 10 11 12 DESCRIPTION 3/4-INCH REPLACEMENT SERVICE TAP (3" MAIN AND SMALLER) 3/4-INCH REPLACEMENT SERVICE TAP (4" MAIN) 3/4 - INCH REPLACEMENT SERVICE TAP (6" MAIN) 3/4-INCH REPLACEMENT SERVICE TAP (8" MAIN) 3/4-INCH REPLACEMENT SERVICE TAP (10" MAIN) 3/4- INCH REPLACEMENT SERVICE TAP (12” MAIN) 1-INCH REPLACEMENTSERVICE TAP (3” MAIN AND SMALLER) 1-INCH REPLACEMENT SERVICE TAP (4”MAIN) 1-INCH REPLACEMENT SERVICE TAP (6” MAIN) 1-INCH REPLACEMENT SERVICE TAP (8”MAIN) 1-INCH REPLACEMENT SERVICE TAP (10”MAIN) 1-INCH REPLACEMENT SERVICE TAP (12” MAIN) Village Community Development Districts Purchasing Department QUANTITY UNIT 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA UNIT PRICE Page 19 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 NOTES: * The number of water service laterals listed is based on the subdivision construction plans. Contractors shall be compensated based on the actual number of long-side water service laterals of each size and type that are replaced. * Should certain additional work be required, or should the quantities submitted by the Contractor of certain classes of work be increased or decreased from those required by the Contract Documents, by authorization of the Owner, the unit prices contained in the Schedule of Unit Prices shall, be the basis of payment, to the Contractor and of credit to the Owner, for such increase or decrease in the work * The Unit Prices shall represent the exact net amount per unit to be paid by the Contractor (in case of additions or increases) or to be refunded by the Owner (in the case of decrease). No additional adjustments will be allowed for overhead, profit. insurance, or to other direct expenses of the Contractor or Subcontractors, and no additional adjustments will be allowed. * Bid prices shall include all labor, equipment, and materials needed to complete the project per specifications. Bid will be awarded to one Contractor based on the lowest responsible and responsive Bidder. Bid evaluation to determine the lowest and responsive Bidder will include the Total Project Bid Price and Contractor’s References. The total project Bid Price will be used to determine lowest bid only. * When completing your bid, do not attach any forms which may contain terms and conditions that conflict with those listed in the District’s bid documents. Inclusion of additional terms and conditions such as those which may be on your company’s standard forms may result in your bid being declared non-responsive. * All price information to be used in the Bid review must be on this Bid form. * District reserves the right to adjust any quantity upward or downward as may be warranted or necessary. * The District maintains the right to utilize other vendors/contractors to address any unforeseen conditions as they may arise. "The undersigned, as Bidder, hereby declares that he/she has informed himself/herself fully in regard to all conditions to the work to be done, and that he/she has examined the BID and Specifications for the work and comments hereto attached. The Bidder agrees, if this Bid is accepted, to contract with the Village Center Community Development District in the form of an Agreement, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation, labor and service necessary to complete the work covered by the Bid and Agreement Documents for this Project. The Bidder agrees to accept in full compensation for each item the prices named in the schedules incorporated herein. Bidder agrees to supply the products or services at the prices proposed above in accordance with the terms, conditions and specifications contained in this Bid.” ____________________________________________ Authorized Agent Name, Title (Print) ____________________________________________ Authorized Signature Date Name of Bidder’s Firm: This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 20 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 EXCEPTIONS OR DEVIATIONS TO SPECIFICATIONS Note: Bidder must sign the appropriate statement below as applicable. ( ) Bidder understands and agrees to all terms, conditions, requirements and specifications stated herein. Firm: Signature: ( ) Bidder takes exceptions to terms, conditions, requirements or specifications stated herein. (Bidder must itemize each exception below and return with the Bid Form.) Firm: Signature: Bidder should note that any exceptions taken from the stated terms and/or specifications may, but not necessarily will be cause for their submittal to be deemed “non-responsive”, risking rejecting of the submittal. Attached are _________ additional pages. Name of Bidder’s Firm: This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 21 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 DISCLOSURE OF SUBCONTRACTORS, SUBCONSULTANTS AND SUPPLIERS Note: Bidder must sign the appropriate statement below as applicable. ( ) No Subcontractors, Subconsultants or Suppliers will be used in connection with performance of this Agreement. Firm: Signature: ( ) All Subcontractors, Subconsultants or Suppliers to be used in connection with performance of this Agreement are listed below. (Attach additional sheets as necessary.) Firm: Signature: SUBCONTRACTORS, SUBCONSULTANTS AND SUPPLIERS Name of Firm or Agency: Address: Telephone: Contact Name / Title: Name of Firm or Agency: Address: Telephone: Contact Name / Title: Name of Firm or Agency: Address: Telephone: Contact Name / Title: Name of Firm or Agency: Address: Telephone: Contact Name / Title: Name of Bidder’s Firm: This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 22 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 BIDDER’S CERTIFICATION Submit To: Village Community Development Districts Purchasing Department 1071 Canal Street The Villages, FL 32162 Phone 352-751-6700 Fax 352-751-6715 DUE DATE: April 22, 2015 VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT INVITATION TO BID (BID) CERTIFICATION AND ADDENDA ACKNOWLEDGMENT DUE TIME: 3:00pm BID # 15B-029 TITLE: Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II VENDOR NAME: PHONE NUMBER: VENDOR MAILING ADDRESS: FAX NUMBER: CITY/STATE/ZIP: E-MAIL ADDRESS: “I, the undersigned, certify that I have reviewed the addenda listed below (list all addenda received to date).” ___________ Addendum # ____________ Addendum # ____________ Addendum # ____________ Addendum # ____________ Addendum # “I, the undersigned, declare that I have carefully examined the BID, specifications, terms and conditions as applicable for this Request, and that I am thoroughly familiar with all provisions and the quality and type of coverage and services specified. I agree to abide by all conditions of this BID and certify that I am authorized to sign this response and that the offer is in compliance with all requirements of the BID, including but not limited to certification requirements, insurance requirements and E-Verify participation. I certify that there are no pending or overtly threatened actions, claims, orders, decrees, investigations, suits or proceedings by or before any governmental authority, arbitrator, court or administrative agency which would have a material adverse effect, or which question the validity of this Agreement or any action taken or to be taken by the Offeror in connection herewith, or which might result in any impairment of the right or ability of the Offeror to enter into or perform its obligations under this Agreement. I understand that timely commencement will be considered in award of this BID and that cancellation of award will be considered if commencement time is not met, and that untimely commencement may be cause for assessment of liquidated damages claims. I further certify that the services will meet or exceed the BID requirements. I certify that this quote is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a BID for the same material, supplies, equipment or services and is in all respects fair and without collusion or fraud. I further declare that I have not divulged, discussed, or compared this BID with any other Offeror and have not colluded with any Offerors or parties to a BID whatsoever for any fraudulent purpose. In conducting offers with an agency for Village Center Community Development District, Sumter Landing Community Development District or any Village Community Development District, respondent agrees that if this BIDis accepted, the respondent will convey, sell, assign, or transfer to the Districts all rights, title and interest in and to all causes of action it may now or hereafter acquire under the anti-trust laws of the United States for price fixing relating to the particular commodities or services purchased or acquired by the Districts. At the Districts’ discretion, such assignment shall be made and become effective at the time the purchasing agency renders final payment to the respondent.” ___________________________________________________ Authorized Agent Name, Title (Print) _______________________________________________ Authorized Signature Date Name of Proponent’s Firm: This form must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 23 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 STATEMENT OF TERMS AND CONDITIONS PUBLIC ENTITY CRIME: A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Proposal/Bid on a contract to provide any goods or services to a public entity, for the construction or repair of a public building or public work, may not submit Proposals/Bids on leases of real property to a public entity, may not be awarded or perform work as a vendor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. INDEMNIFICATION : The Vendor agrees to indemnify and hold harmless Village Center Community Development District, Sumter Landing Community Development District, North Sumter County Utility Dependent District, Brownwood Community Development District, Village Community Development Districts 111 and their elected officials, employees and volunteers and defend and indemnify the Districts and the agents, servants, employees, officers, and officials thereof from and against any and all liability or responsibility for damage to property or person that may arise in connection with the services to be provided hereunder, including reasonable attorney fees and expenses. PROHIBITION OF LOBBYING: During the black out period which is, the period between the time the submittals for Invitation to Bid or the Request for Proposal, or Qualifications, or information, as applicable, are received at Contracts / Purchasing and the time the Board awards the contract, no proposer, no lobbyist, principal, or other person may lobby, on behalf of a competing party in a particular procurement matter, any member of the Board, or any District employee other than the Purchasing Manager. Violation of this provision may result in disqualification of violating party. All questions regarding this Request for Proposal (RFP) or Invitation to Bid (BID) must be submitted in writing to the District’s Purchasing Manager. ANTI TRUST LAWS: By submission of a signed RFP or BID, the successful Vendor acknowledges compliance with all antitrust laws of the United States and the State of Florida, in order to protect the public from restraint of trade, which illegally increases prices. CONFLICT OF INTEREST: The award of the contract hereunder is subject to the provisions of Chapter 112 of the Florida Statutes. Vendors shall disclose the name of any Officer, Director, Partner, Associate, or Agent who is also an Officer, Appointee, or Employee of any of the Districts at the time of the RFP or BID, or at the time of occurrence of the Conflict of Interest thereafter. INTERPRETATION, CLARIFICATIONS AND ADDENDA: No oral interpretations will be made to any vendor as to the meaning of the RFP/BID Contract Documents. Any inquiry or request for interpretation received by the Purchasing Manager before the date listed herein will be given consideration. All such changes or interpretations will be made in writing in the form of an addendum and, if issued, will be distributed at or after the Pre-Proposal/Pre-Bid Conference, mailed or sent by available or electronic means to all attending prospective Submitters prior to the established RFP/BID opening date. Each Vendor shall acknowledge receipt of such addenda in the space provided. In case any Proposer/Bidder fails to acknowledge receipt of such addenda or addendum, his offer will nevertheless be construed as though it had been received and acknowledged and the submission of his bid will constitute acknowledgment of the receipt of same. All addenda are a part of the RFP/BID FORMS and each Proposer/Bidder will be bound by such addenda, whether or not received by him. It is the responsibility of each proposer/bidder to verify that he has received all addenda issued before RFP’s/BID’s are opened. In the case of unit price items, the quantities of work to be done and materials to be furnished under this RFP/BID Contract are to be considered as approximate only and are to be used solely for the comparison of RFP’s/BID’s received. The District and/or his CONSULTANT do not expressly or by implication represent that the actual quantities involved will correspond exactly therewith; nor shall the Vendor plead misunderstanding or deception because of such estimate or quantities of work performed or material furnished in accordance with the Specifications and/or Drawings and other Proposal/Bid Documents, and it is understood that the quantities may be increased or diminished as provided herein without in any way invalidating any of the unit or lump sum prices bid. GOVERNING LAWS AND REGULATIONS: The vendor is required to be familiar with and shall be responsible for complying with all federal, state and local laws, ordinances, rules and regulations that in any manner affect the work. PROPRIETARY/CONFIDENTIAL INFORMATION: Vendors are herby notified that all information submitted as part of, or in support of RFP’s/BID’s, will be available for public inspection ten days after opening of the RFP’s/BID’s or until a short list is recommended whichever comes first, in compliance with Chapter 119, and 287 of the Florida Statutes. Any person wishing to view the RFP’s/BID’s must make an appointment by calling the Purchasing Manager at (352) 751-6700. All RFP’s/BID’s submitted in response to this solicitation become the property of the District. Unless information submitted is proprietary, copy written, trademarked, or patented, the District reserves the right to utilize any or all information, ideas, conceptions, or portions of any RFP/BID, in its best interest. TAXES: Village Center Community Development District, Sumter Landing Community Development District, North Sumter County Utility Dependant District, Brownwood Community Development District and Village Community Development Districts 1-11 are exempt from any taxes imposed by the State and/or Federal Government. Exemption certificates will be provided upon request. NON-COLLUSION DECLARATION: By signing this RFP/BID, all Vendors shall affirm that they shall not collude, conspire, connive or agree, directly or indirectly, with any other Proposer, firm, or person to submit a collusive or sham Proposal in connection with the work for which their RFP/BID has been submitted; or to refrain from Bidding in connection with such work; or have in any manner, directly or indirectly, sought by person to fix the price or prices in the RFP/BID or of any other Bidder, or to fix any overhead, profit, or cost elements of the RFP/BID price or the RFP/BID price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful Contract any advantage against any other Bidder, or any person interested in the proposed work. PROPOSER RESPONSIBILITY: Invitation by the Districts to vendors is based on the recipient’s specific request and application to DemandStar by Onvia at www.DemandStar.com, to the District website at www.Districtgov.org or as the result of response by the public to the legal advertisements required by State law. Firms or individuals submit their responses on a voluntary basis, and therefore are not entitled to compensation of any kind. OWNERSHIP OF SUBMITTALS: All responses, inquiries or correspondence relating to or in reference to this RFP/BID, and all other reports, charts, displays, schedules, exhibits and other documentation submitted by the vendors will become the property of the District. Reference to literature submitted with a previous RFP/BID will not relieve the Bidder from including any required documents with this RFP/BID. EXAMINATION OF BID DOCUMENTS: Each Bidder shall carefully examine the RFP/BID Document to ensure all pages have been received, all drawings and/or Specifications and other applicable documents are included, and shall inform himself thoroughly regarding any and all conditions and requirements that may in any manner affect cost, progress or performance of the work to be performed under the Contract. Ignorance on the part of the VENDOR will in no way relieve him of the obligations and responsibilities assumed under the Contract. VENDOR RESPONSIBILITY: Vendors are fully and completely responsible for the labeling, identification and delivery of their submittals. The Purchasing Manager will not be responsible for any mislabeled or misdirected submissions, nor those handled by delivery persons, couriers, or the US Postal Service. DRUG FREE WORKPLACE: All Proposers/Bidders shall submit the enclosed, duly signed and notarized form entitled “Drug Free Workplace Certificate”. The Drug Free Workplace Vendor shall have the burden of demonstrating that his program complies with Section 287.087 of the Florida Statutes, and any other applicable state law. VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT, SUMTER LANDING COMMUNITY DEVELOPMENT DISTRICT, NORTH SUMTER COUNTY UTILITY DEPENDENT DISTRICT, BROWNWOOD COMMUNITY DEVELOPMENT DISTRICT AND VILLAGE COMMUNITY DEVELOPMENT DISTRICTS 1-11, are political subdivisions of the State of Florida, and reserve the right to reject any and/or all submittals, reserve the right to waive any informalities or irregularities in the examination process, and reserve the right to award contracts and/or in the best interest of the Districts. Submittals not meeting stated minimum terms and qualifications may be rejected by the Districts as non-responsive. The Districts reserve the right to reject any or all submittals without cause. The Districts reserves the right to reject the submission of any Vendor in arrears or in default upon any debt or contract to the Districts, or who has failed to perform faithfully any previous contract with the Districts or with other governmental agencies. PUBLIC RECORDS LAW: Correspondence, materials and documents received pursuant to this RFP/BID become public records subject to the provisions of Chapter 119, Florida Statutes. PREPARATION OF PROPOSALS/BIDS: Signature of the Bidder: The Bidder must sign the RFP/BID FORMS in the space provided for the signature. If the Proposer/Bidder is an individual, the words “doing business as ,” must appear beneath such signature. In the case of a partnership, the signature of at least one of the partners must follow the firm name and the words, “Member of the Firm” should be written beneath such signature. If the Proposer/Bidder is a corporation, the title of the officer signing the RFP/BID on behalf of the corporation must be stated and evidence of his authority to sign the RFP/BID must be submitted. The Proposer/Bidder shall state in the RFP/BID FORMS the name and address of each person interested therein. Basis for Bidding: The price proposed for each item shall be on a lump sum or unit price basis according to specifications on the RFP/BID FORM. The proposed prices shall remain unchanged for the duration of the Contract and no claims for cost escalation during the progress of the work will be considered, unless otherwise provided herein. Total Proposed Price/Total Contract Sum Proposed: If applicable, the total price bid for the work shall be the aggregate of the lump sum prices proposed and/or unit prices multiplied by the appropriate estimated quantities for the individual items and shall be stated in figures in the appropriate place on the RFP/BID FORM. In the event that there is a discrepancy on the RFP/BID FORM due to unit price extensions or additions, the corrected extensions and additions shall be used to determine the project bid amount. TABULATION: Those wishing to receive an official tabulation of the results of the opening of this RFP/BID are to submit a self-addressed, stamped business size (No. 10) envelope, prominently marked on the front lower left side, with the RFP identification. Tabulation requested by telephone, fax or electronic media will not be accepted. OBLIGATION OF WINNING BIDDER: The contents of the RFP/BID of the successful proposer/bidder will become contractual obligations if acquisition action ensues. Failure of the successful Proposer/Bidder to accept these obligations in a contract may result in cancellation of the award and such vendor may be removed from future participation. AWARD OF BID: It is the Districts’ intent to select a vendor within sixty (60) calendar days of the deadline for receipt of Proposals/Bids. However, Proposals/Bids must be firm and valid for award for at least ninety (90) calendar days after the deadline for receipt of the RFP/BID. ADDITIONAL REQUIREMENTS: The firms shall furnish such additional information as the Districts may reasonably require. This includes information which indicates financial resources as well as ability to provide the services. The Districts reserve the right to make investigations of the qualifications of the firm as it deems appropriate. PREPARATION COSTS: The Districts shall not be obligated or be liable for any costs incurred by Proposers/Bidders prior to issuance of a contract. All costs to prepare and submit a response to this RFP/BID shall be borne by the Proposer/Bidder. TIMELINESS: All work will commence upon authorization from the Districts’ representative (Purchasing Manager). All work will proceed in a timely manner without delays. The Vendor shall commence the work UPON RECEIPT OF NOTICE TO PROCEED and/or ORDER PLACED (PURCHASE ORDER PRESENTED), and shall deliver in accordance to the terms and conditions outlined and agreed upon herein. DELIVERY: All prices shall be FOB Destination, The Villages, Florida, inside delivery unless otherwise specified. ADDITIONAL SERVICES/PURCHASES BY OTHER PUBLIC AGENCIES (“PIGGY-BACK”): The Vendor by submitting a Bid acknowledges that other Public Agencies may seek to “Piggy-Back” under the same terms and conditions, during the effective period of any resulting contract – services and/or purchases being offered in this Bid, for the same prices and/or terms proposed. Vendor has the option to agree or disagree to allow contract Piggy-Backs on a case-by-case basis. Before a Public Agency is allowed to Piggy-Back any contract, the Agency must first obtain the vendor’s approval – without the vendor’s approval, the seeking Agency cannot Piggy-Back. PLANS, FORMS & SPECIFICATIONS: Bid Packages are available from the Purchasing Manager. These packages are available for pickup or by mail. If requested to mail, the Proposer/Bidder must supply a courier account number (UPS, FedEx, etc). Proposers/Bidders are required to use the official RFP/BID FORMS, and all attachments itemized herein, are to be submitted as a single document. Any variation from the minimum specifications must be clearly stated on the RFP/BID FORM and/or Exceptions/Deviations Sheet(s). Only one set of plans, forms, and specifications will be furnished each company or corporation interested in submitting a proposal/bid. RFP/BID FORM documents for this project are free of charge and are available on-line and are downloadable (vendor must pay any DemandStar fees or any shipping). MANUFACTURER’S NAME AND APPROVED EQUIVALENTS: Any manufacturer’s names, trade names, brand names, information and/or catalog numbers listed in a specification are for information and not intended to limit competition unless otherwise indicated. The Proposer/Bidder may offer any brand for which he is an authorized representative, which meets or exceeds the RFP/BID specification for any item(s). If RFP’s/BID’s are based on equivalent products, indicate on the RFP/BID FORM the manufacturer’s product name and literature, and/or complete specifications. Reference to literature submitted with a previous RFP/BID will not satisfy this provision. The Proposer/Bidder shall explain in detail the reason(s) why the proposed equivalent will meet the specifications and not be considered an exception thereto. RFP’s/BID’s which do not comply with these requirements are subject to rejection. RFP’s/BID’s lacking any written indication of intent to quote an alternate brand will be received and considered in complete compliance with the specifications as listed on the RFP/BID FORM. The Purchasing Manager is to be notified, in writing, of any proposed changes in materials used, manufacturing process, or construction. However, changes shall not be binding upon the Districts unless evidenced by a Change Notice issued and signed by the Purchasing Manager, or designated representative. QUANTITIES: The quantities as specified in this RFP/BID are estimates only and are not to be construed as guaranteed minimums. SAMPLES: Samples of items, when called for, shall be furnished free of expense, and if not destroyed may, upon request, be returned at the Proposer’s/Bidder’s expense. Each sample shall be labeled with the Proposer’s/Bidder’s name, manufacturer brand name and number, RFP/BID number and item reference. Samples of successful Proposer’s/Bidder’s items may remain on file for the term of the contract. Request for return of samples shall be accompanied by instructions which include shipping authorization and must be received at time of opening. Samples not returned may be disposed of by the Districts within a reasonable time as deemed appropriate. DOCUMENT RE-CREATION: Vendor may choose to re-create any document(s) required for this solicitation, but must do so at his own risk. All required information in the original District format must be included in any re-created document. Submittals may be deemed non-responsive if required information is not included in any re-created document. ACKNOWLEDGED: ____________________________________________________________________________________ (Signature and Date) This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 24 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 DRUG FREE WORKPLACE CERTIFICATE I, the undersigned, in accordance with Florida Statute 287.087, hereby certify that, _______________________________________________ (print or type name of firm) • • • • • • • Publishes a written statement notifying that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the workplace named above, and specifying actions that will be taken against violations of such prohibition. Informs employees about the dangers of drug abuse in the work place, the firm’s policy of maintaining a drug free working environment, and available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug use violations. Gives each employee engaged in providing commodities or contractual services that are under proposal or bid, a copy of the statement specified above. Notifies the employees that as a condition of working on the commodities or contractual services that are under proposal or bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, please or guilty or nolo contendere to, any violation of Chapter 1893, or of any controlled substance law of the State of Florida or the United States, for a violation occurring in the work place, no later than five (5) days after such conviction, and requires employees to sign copies of such written (*) statement to acknowledge their receipt. Imposes a sanction on, or requires the satisfactory participation in, a drug abuse assistance or rehabilitation program, if such is available in the employee’s community, by any employee who is so convicted. Makes a good faith effort to continue to maintain a drug free work place through the implementation of the drug free workplace program. “As a person authorized to sign this statement, I certify that the above named business, firm or corporation complies fully with the requirements set forth herein”. _________________________________ Authorized Signature _________________________________ Date Signed State of: _____________________ County of: ___________________ Sworn to and subscribed before me this ________day of _____________, 2015 Personally known _______ or Produced Identification ___________________________ (Specify Type of Identification) ___________________________________ Signature of Notary My Commission Expires _______________ (seal) This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 25 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PUBLIC RECORDS ACT/CHAPTER 119 REQUIREMENTS Contractor/Vendor agrees to comply with the Florida Public Records Act to the fullest extent applicable, and shall, if this agreement is one for which services are provided by doing the following: 1. Contractor/Vendor shall keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to perform the service; 2. Contractor/Vendor shall provide the public with access to such public records on the same terms and conditions that the public agency would provide the records at a cost that does not exceed that provided in Chapter 119, Florida Statutes or as otherwise provided by law; 3. Contractor/Vendor shall insure that public records that are exempt or that are confidential and exempt from the public record requirements are not disclosed except as authorized by law; and 4. Contractor/Vendor shall meet all requirements for retaining public records and transfer to the public agency, at no cost, all public records in possession of the contractor upon termination of the contract and shall destroy any duplicate public records that are exempt or confidential and exempt. All records stored electronically must be provided to the public agency in a format that is compatible with the current information technology of the District. The parties agree that if the contractor/vendor fails to comply with a public records request, then the District must enforce the contract provisions in accordance with the contract as required by Section 119.0701, Florida Statutes. Notwithstanding any other requirement therein stated, the Contractor/Vendor shall comply fully with the requirements of Florida Statutes 119.0701. Acknowledged by: __________________________________________ Signature __________________________________________ Printed Name and Date This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 26 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 REFERENCES & SIMILAR PROJECTS FORM (References must be of similar size and scope to this project and for work performed within the past three (3) years.) Owner / Business Name: Project Location / Address: City: State: Zip Code: Point of Contact: Dates of Work: Phone Number: Fax Number: E-mail Address: Project Name: Contract Amount: Brief Description of Project and Installation: Owner / Business Name: Project Location / Address: City: State: Zip Code: Point of Contact: Dates of Work: Phone Number: Fax Number: E-mail Address: Project Name: Contract Amount: Brief Description of Project and Installation: Owner / Business Name: Project Location / Address: City: State: Zip Code: Point of Contact: Dates of Work: Phone Number: Fax Number: E-mail Address: Project Name: Contract Amount: Brief Description of Project and Installation: Village Community Development Districts Purchasing Department Page 27 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 Owner / Business Name: Project Location / Address: City: State: Zip Code: Point of Contact: Dates of Work: Phone Number: Fax Number: E-mail Address: Project Name: Contract Amount: Brief Description of Project and Installation: Owner / Business Name: Project Location / Address: City: State: Zip Code: Point of Contact: Dates of Work: Phone Number: Fax Number: E-mail Address: Project Name: Contract Amount: Brief Description of Project and Installation: This document must be completed and returned with your Submittal Village Community Development Districts Purchasing Department Page 28 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 W-9 (Download this form at http://www.irs.gov/pub/irs-pdf/fw9.pdf ) Village Community Development Districts Purchasing Department Page 29 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 NO-BID RESPONSE Village Community Development Districts Statement of “No Bid” If you do not intend to submit a bid for this project, please complete and return this form prior to date shown for receipt of bids to: Village Community Development Districts, 1071 Canal Street, The Villages, FL 32162, Attn: Amy Strickland, Buyer. We, the undersigned, have declined to submit a bid on your BID #: 15B-029 Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II for the following reasons: _________ Specifications are too “tight”, i.e. geared toward one brand or manufacturer only (please explain reason below) _________ Insufficient time to respond to the Invitation to Bid. _________ We do not offer this product/service or equivalent. _________ Our schedule would not permit us to perform to specifications. _________ Unable to meet specifications. _________ Unable to meet insurance requirements. _________ Specifications unclear (please explain below). _________ Competition restricted by pre-approved owner standards. _________ Other (please specify below). Remarks: Company Name: _______________________________________________________ Address: ______________________________________________________________ Signature and Title: Telephone Number ____________________ Date _____________________________ Village Community Development Districts Purchasing Department Page 30 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 5 EXHIBITS SAMPLE AGREEMENT (Sample agreement only. District reserves the right to alter this Agreement based on final BID results and/or any negotiations with proposed Contractor) th THIS AGREEMENT is made this 6 day of May , 2015, by and between VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT (hereafter referred to as "DISTRICT"), whose address is 984 Old Mill Run, The Villages, Florida 32162, and XXXXXXXXXXX (hereafter referred to as "CONTRACTOR"), whose address is XXXXXXXXXXXX. RECITALS WHEREAS, the DISTRICT owns or operates certain real property requiring pump replacement services and wishes to enter into an agreement with a party capable of providing suitable pump replacement services; and WHEREAS, CONTRACTOR provides said services and wishes to enter into an agreement whereby the CONTRACTOR performs services for the DISTRICT in consideration of payments from the DISTRICT to the CONTRACTOR; NOW, THEREFORE, in consideration of the mutual covenants and agreements contained herein, it is agreed as follows: I. Construction Materials, Services and Labor: That for and in consideration of the mutual promises and covenants hereinafter contained, together with the monetary considerations hereinafter recited, the CONTRACTOR shall furnish all labor, services and materials for the Village Center Service Area (VCSA) Long-Side Water Service Replacement Phase I & Phase II, Invitation to Bid (BID) #15B-029. All work and labor shall be done in accordance with the plans and specifications as provided to the CONTRACTOR for the BID and all incidental and necessary work thereto. II. Agreement Price: In consideration of the work, labor, services and materials to be furnished by the CONTRACTOR, in accordance with said plans and specifications, the DISTRICT agrees to pay the CONTRACTOR, upon completion and acceptance thereof by the DISTRICT, the total Agreement price of xxxxxxxxxxxxxxxxxxxxxxx ($xxx.xx) as evidenced by Exhibit “A” to this Agreement. III. Agreement Documents: a. Invitation to Bid b. Instructions, Terms, and Conditions c. Bid Forms d. Bidder's Certification e. Statement of Terms and Conditions f. Drug Free Workplace Certificate g. Public Records Act/Chapter 119 Requirements h. Statement of Contractor’s Experience, Equipment & Personnel i. E-Verify Contractor/Subcontractor Affidavit j. Scope of Work / Specifications k. Plans / Drawings l. Agreement m. Permits / Licenses Village Community Development Districts Purchasing Department Page 31 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 n. All Addenda Issued Prior to Bid Opening Date o. All Modifications and Change Orders Issued p. Notice of Award / Notice to Proceed IV. Insurance: Before performing any contract work, the CONTRACTOR shall procure and maintain during the life of the Agreement the insurance listed below. a. General Liability. CONTRACTOR shall obtain, and maintain throughout the life of the Agreement, General Liability Insurance in an amount no less than $1,000,000 per occurrence and $1,000,000 general aggregate for Bodily Injury and Property Damage. Insurance shall protect the CONTRACTOR, subconsultants and subcontractors from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under the Agreement. DISTRICT(s) shall be named as Additional Insured. b. Automobile Liability Insurance covering all automobiles and trucks the CONTRACTOR may use in connection with this BID. The limit of liability for this coverage shall be a minimum combined single limit of $500,000 per occurrence for bodily injury and property damage. This is to include owned, hired, and non-owned vehicles. DISTRICT(s) shall be named as Additional Insured. c. Excess Liability Insurance (Umbrella Policy) may compensate for a deficiency in general liability or automobile insurance coverage limits. d. Waiver of Subrogation: By entering into any agreement as a result of this BID, CONTRACTOR agrees to a Waiver of Subrogation for each policy required above. e. Workers’ Compensation Insurance, as required by the State of Florida. As required by the State of Florida. CONTRACTOR and any subconsultants or subcontractors shall comply fully with the Florida Worker’s Compensation Law. CONTRACTOR must provide certificate of insurance showing Worker’s Compensation coverage. f. Certificate(s) shall be dated and show: i. The name of the insured CONTRACTOR, the specified job by name and/or BID number, the name of the insurer, the number of the policy, its effective date and its termination date. ii. Statement that the insurer will mail notice to the DISTRICT at least thirty (30) days prior to any material changes in provisions or cancellation of the policy. iii. Subrogation of Waiver clause. iv. The Village Center Community Development District and any other governmental agencies using this Agreement in cooperation with the DISTRICT shall be a named additional insured on Public Liability Insurance and Automobile Liability Insurance. v. The CONTRACTOR shall require of each its subconsultants and/or subcontractors to procure and maintain during the life of its subcontract, insurance of the type specified above or insure the activities of its subconsultants and/or subcontractors in its policy as described above. vi. All insurance policies shall be written on companies authorized to do business in the State of Florida. V. Contractor’s Affidavit: When all work contemplated by the Agreement has been completed, inspected and approved by the DISTRICT, the CONTRACTOR shall furnish to the DISTRICT the CONTRACTOR’s affidavit as required by the Construction Lien Law, Florida Statutes Ch. 713. Signed Release of Lien may also be required by the DISTRICT at its option. Village Community Development Districts Purchasing Department Page 32 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 VI. Warranty: The CONTRACTOR warrants to the DISTRICT that all materials and equipment furnished under the Agreement will be of good quality and new, unless otherwise required or permitted by the Agreement Documents, that the work will be free from defects not inherent in the quality required or permitted, and the work will conform with the requirements of the Agreement Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized may be considered defective. The CONTRACTOR’s warranty excludes remedy for damage or defect cause by abuse or modifications not executed by the CONTRACTOR, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. a. All installed landscape material shall be under CONTRACTOR warranty for a period of ninety (90) days. Such warranty period shall begin on the date the final payment to CONTRACTOR by the DISTRICT is issued. b. All other labor and materials shall be under CONTRACTOR warranty for a period of one (1) year. Such warranty period shall be begin on the date of the final payment to CONTRACTOR by the DISTRICT is issued. VII. Correction of Work: The CONTRACTOR shall promptly correct work rejected by the DISTRICT or work failing to conform to the requirements of the Agreement Documents, whether observed before or after acceptance by the DISTRICT and whether or not fabricated, installed or completed. The CONTRACTOR shall bear costs of corrected such rejected work, including additional testing and inspections and any compensation for the services and expenses made necessary thereby. If within one (1) year after the date of acceptance any of the work is found to be not in accordance with the requirements of the Construction Documents, the CONTRACTOR shall correct it promptly after receipt of written notice from the DISTRICT to do so unless the DISTRICT has previously given the CONTRACTOR a written acceptance of such condition. The obligation under this paragraph shall survive the termination of this Agreement. The DISTRICT shall give such notice promptly after discovery of the condition. VIII. Payment: Upon certification and approval by the DISTRICT, payments may be made to the CONTRACTOR upon CONTRACTOR’s application for all services or work completed or materials furnished in accordance with the Agreement. CONTRACTOR shall submit all application for payments to the DISTRICT for review, processing and payment. All pay requests shall be submitted to the DISTRICT on an AIA Document G702 “Application and Certificate for Payment” (or equivalent). All applications for payment must be submitted to the DISTRICT’s representative for Certification and must be delivered to: Village Center Community Development District Attn: Diane Tucker, Administrative Operations Manager 984 Old Mill Run The Villages, Florida 32162 Payment by the DISTRICT will made no later than twenty-five (25) days after the Application and Certificate for Payment (AIA Document G702) has been certified by the DISTRICT representative, per the “Local Government Prompt Payment Act”, Florida Statutes, Chapter 218.735. IX. Time for Performance: Time is of the essence in the performance of this Agreement. The CONTRACTOR specifically agrees that he will commence operations on the date specified in the Notice to Proceed and that all work to be performed under the provisions of this Agreement shall be completed within 120 days, subject only to delays caused through no fault of the CONTRACTOR. X. Indemnification: To the fullest extent permitted by Florida Statute 725.06, CONTRACTOR shall indemnify and hold harmless the DISTRICT and the officers, directors, members, partners, Village Community Development Districts Purchasing Department Page 33 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 employees, agents, consultants, and subcontractors from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolutions costs) arising out of or relating to the performance of the work, provided that any such claim, cost, loss, or damage is attributable to bodily injury, sickness, disease, or death, or to injury or destruction of tangible property (other than the work itself), including the loss of use resulting therefrom but only to the extent caused by any negligent act or omission of CONTRACTOR, any subcontractor, any supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the work or anyone for whose acts any of them may be liable. The monetary limitation on the extent of the indemnification by CONTRACTOR shall be $1 million dollars per occurrence. XI. Changes: No changes to this Agreement or the performance contemplated hereunder shall be made unless the same are in writing and signed by the parties hereto. In the event of any disagreement as to the provisions of this Agreement with the plans and specifications that are made a part hereof by reference, the Agreement shall prevail. XII. Liquidated Damages: The parties to this Agreement agree that time is of the essence in the work provided for herein and that a precise determination of actual damages which would be incurred by the DISTRICT for delay in the completion of the work provided for herein would be difficult to ascertain. Accordingly, the parties to the Agreement agree that the liquidated damages for each and every day that the time consumed in completing the work provided for in these Agreement Documents exceeds the time(s) allowed therefore, shall be the amount(s) stated below per day, including Saturdays, Sundays and legal holidays. The parties specifically agree that the liquidated damages provided for herein do not constitute a penalty. The amount(s) of liquidated damages caused by the CONTRACTOR’s delay will be deducted and retained out of the monies payable to the CONTRACTOR. If not so deducted, the CONTRACTOR and sureties for the CONTRACTOR shall be liable therefore. The amount of liquidated damages to be assessed for each calendar day that final completion is delayed beyond the required date of completion per Paragraph IX of this Agreement shall be Two Hundred Fifty and 00/100 Dollars ($250.00) per day. XIII. General Conditions: a. The CONTRACTOR shall collect and dispose of all trash, litter, debris, refuse and discarded materials resulting from CONTRACTOR's operations, including site clean up and policing on a daily basis. The CONTRACTOR shall remove or contract for the removal of debris and refuse in such a manner that no unsightly, unsanitary, or hazardous accumulations occur. The CONTRACTOR shall ensure that all handling and disposal of refuse materials performed pursuant to this Agreement is performed in compliance with all local, state and federal regulations. The CONTRACTOR shall provide CONTRACTOR's own dumpster(s) for the storage of such material, which shall be located in approved areas designated by the DISTRICT. The use of DISTRICT's dumpster(s) for any refuse disposal by the CONTRACTOR is strictly prohibited. b. All CONTRACTOR and Sub-Contractor personnel shall wear personal protective equipment in the performance of their duties to include safety vests, protective eye wear or face shields, respiratory protection as necessary, gloves and protective clothing. c. CONTRACTOR shall be responsible for adhering to all local, state and federal safety guidelines and observe all safety precautions when performing services on DISTRICT property, roadways and right-of-ways to include safe location of parked vehicles, signage, use of safety cones, flag personnel as necessary, use of safety vests on all personnel and vehicles which are clearly identifiable as belonging to the CONTRACTOR. Village Community Development Districts Purchasing Department Page 34 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 d. CONTRACTOR acknowledges that the public may associate the CONTRACTOR as an employee of the DISTRICT while the CONTRACTOR performs services on the DISTRICT's property. CONTRACTOR agrees to conduct its services and supervise its employees in a way not detrimental to the DISTRICT’s business operation. e. CONTRACTOR shall comply with all applicable governmental statutes, rules, regulations and orders and any amendments and modifications thereto. f. The obligations of the CONTRACTOR under this Agreement may not be delegated without the prior written consent of the DISTRICT. The DISTRICT may freely assign this Agreement to any entity acquiring the real estate which is subject to this Agreement. g. In the event of default by any party to this Agreement, the prevailing party shall be entitled to recover from the defaulting party, all costs and expenses, including a reasonable attorney's fee, whether suit be instituted or not, and at the trial court and appellate court level incurred by the prevailing party enforcing its right hereunder. The venue for the enforcement, construction or interpretation of this Agreement, shall be the County or Circuit Court for Sumter County, Florida, and CONTRACTOR does hereby specifically waive any "venue privilege" and/or "diversity of citizenship privilege" which it has now, or may have in the future, in connection with the Agreement, or its duties, obligations, or responsibilities or rights hereunder. h. CONTRACTOR shall not be construed to be the agent, servant or employee of the DISTRICT or of any elected or appointed official thereof, for any purpose whatsoever, and further CONTRACTOR shall have no express or implied authority of any kind or nature whatsoever, to incur any liability, either in contract or on a tort, as the agent, servant or employee of the DISTRICT. i. These Agreement Documents constitute the entire understanding and agreement between the Parties and supersedes any and all written and oral representations, statements, negotiations, or contracts/agreements previously existing between the Parties with respect to the subject matters of this Agreement. The CONTRACTOR recognizes that any representations, statements, or negotiations made by DISTRICT staff do not suffice to legally bind the DISTRICT in a contractual relationship unless they have been reduced to writing and signed by an authorized DISTRICT representative. This Agreement shall inure to the benefit of and be binding upon the Parties, their respective assigns, and successors in interest. j. No amendment to this Agreement shall be effective except those agreed to in writing and signed by both of the parties to this Agreement. XIV. Contractor’s Representations: CONTRACTOR makes the following representations: a. CONTRACTOR has familiarized himself with the nature and extent of the Agreement Documents, work, locality, and all local conditions, and federal, state, and local laws, ordinances, rules, and regulations that in any manner may affect cost, progress, or performance of work. b. CONTRACTOR declares that he has visited and examined the site of the work and informed himself fully in regard to all conditions pertaining to the place where the work is to be done, that he has examined the plans for the work and other Agreement Documents relative thereto and has read all the addenda furnished prior to the proposal opening, and that CONTRACTOR has satisfied himself relative to the work to be performed. Village Community Development Districts Purchasing Department Page 35 of 40 Village Center Service Area Long-Side Water Service Replacement c. BID # 15B-029 CONTRACTOR has investigated and is fully informed of the construction and labor conditions, of obstructions to be encountered, of the character, quality and quantities of work to be performed, materials to be furnished, and requirements of the plans and other Agreement Documents. d. CONTRACTOR has given the DISTRICT written notice of all conflicts, errors, or discrepancies that he has discovered in the Agreement Documents. e. CONTRACTOR declares that submission of a proposal/bid for the work constitutes an incontrovertible representation that the CONTRACTOR has complied with every requirement of this Section, and that the Agreement Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of work. f. Equal Opportunity: CONTRACTOR assures that no person shall be discriminated against on the grounds of race, color, creed, national origin, handicap, age or sex, in any activity under this Agreement. g. E-Verification: As per the Immigration and Nationality Act of 1952 (INA), Immigration Reform and Control Act of 1986 (IRCA) and State of Florida Executive Order Number 11116, the CONTRACTOR identified in this Agreement shall utilize the U.S. Department of Homeland Security’s E-Verify system to verify employment eligibility of: all persons employed during the Agreement term by the CONTRACTOR to perform employment duties pursuant to the Agreement, within Florida; and all persons, including subcontractors, assigned by the CONTRACTOR to perform work pursuant to the Agreement with the DISTRICT. (http://www.uscis.gov/e-verify) Additionally, the CONTRACTOR shall include a provision in all subcontracts that requires all subcontractors to utilize the U.S. Department of Homeland Security’s E-Verify system to verify employment eligibility of: all persons employed during the Agreement term by the CONTRACTOR to perform work or provide services pursuant to this Agreement with the DISTRICT. It is understood that the DISTRICT will not be responsible for any violations of Federal law and the CONTRACTOR, solely, will be responsible and liable for any violations and or penalties associated with such violation. h. Public Entity Crimes: In accordance with Section 287.133, Florida Statutes, a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal/bid on a contract/agreement with a public entity for the construction or repair of a public building or public work, may not submit proposals/bids on leases or real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida Statutes, for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. CONTRACTOR affirmatively represents that neither it or its owners, subcontractor or sub-subcontractor are nor will be on the convicted vendor list during the term of this Agreement. Village Community Development Districts Purchasing Department Page 36 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 IN WITNESS WHEREOF, said DISTRICT has caused this Agreement to be executed in its name by the Chairman / Vice Chairman of the VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT, attested by the clerk of said DISTRICT, and XXXXXXXXXXXXXX has caused this Agreement to be executed in its name by its authorized representative, attested to and has caused the seal of said corporation to be hereto attached (if applicable), all on the day and year written above. VILLAGE CENTER COMMUNITY XXXXXXXXXXXXXXXXXX DEVELOPMENT DISTRICT By:__________________________________ By: __________________________________ __________________________________ Print Name __________________________________ Print Name __________________________________ Print Title __________________________________ Print Title __________________________________ Date __________________________________ Date __________________________________ Attest __________________________________ Attest Village Community Development Districts Purchasing Department Page 37 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 SAMPLE E-VERIFY CONTRACTOR AFFIDAVIT Solicitation No.__________ CONTRACTOR AFFIDAVIT AND AGREEMENT By executing this affidavit, the undersigned contractor verifies its compliance with State of Florida Executive Order No. 11-116, stating affirmatively that the individual, firm, or corporation which is contracting with the Village Community Development Districts Board of Supervisors has registered with and is participating in a federal work authorization program * (any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security) to verify information of all persons assigned by the Contractor to perform work pursuant to the Contract with the District. The undersigned further agrees that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to this contract with the Village Community Development Districts Board of Supervisors, contractor will secure from such subcontractor(s) similar verification of compliance with State of Florida Executive Order No. 11-116 on the Subcontractor Affidavit provided or a substantially similar form. Contractor further agrees to maintain records of such compliance and provide a copy of each such verification to the Village Community Development District Board of Supervisors, Purchasing Department at the time the subcontractor (s) is retained to perform such service. __________________________________ E-Verify * User Identification Number __________________________________ Company Name ______________________________________ By: Authorized Officer or Agent of Contractor _________________ Date _________________________________________ Title of Authorized Officer or Agent of Contractor _________________________________________ Printed Name of Authorized Officer or Agent Subscribed and Sworn before me on this the ______________day of _____________2015 ___________________________________ Notary Public My Commission Expires:______________ *The applicable federal work authorization program is “E-Verify” operated by the U.S. Citizenship and Immigration Services Bureau of the U.S. department of Homeland Security, in conjunction with the Social Security Administration (SSA). Village Community Development Districts Purchasing Department Page 38 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 SAMPLE E-VERIFY SUBCONTRACTOR AFFIDAVIT Solicitation No.__________ SUBCONTRACTOR AFFIDAVIT By executing this affidavit, the undersigned subcontractor verifies its compliance with State of Florida Executive Order No. 11-116 stating affirmatively that the individual, firm, or corporation which is engaged in the performance of services under a contract between _____________________________________________________(name of contractor) and the Village Community Development Districts Board of Supervisors has registered with and is participating in a federal work authorization program * (any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security) to verify information of all persons assigned by the subcontractor to perform work pursuant to the Contract with the District. __________________________________ E-Verify * User Identification Number __________________________________ Company Name _________________________________________ By: Authorized Officer or Agent of Subcontractor _________________ Date ___________________________________________ Title of Authorized Officer or Agent of Subcontractor _________________________________________ Printed Name of Authorized Officer or Agent Subscribed and Sworn before me on this the ______________day of _____________2015 ___________________________________ Notary Public My Commission Expires:______________ *The applicable federal work authorization program is “E-Verify” operated by the U.S. Citizenship and Immigration Services Bureau of the U.S. department of Homeland Security, in conjunction with the Social Security Administration (SSA). Village Community Development Districts Purchasing Department Page 39 of 40 Village Center Service Area Long-Side Water Service Replacement BID # 15B-029 PART 6 PROJECT REQUIREMENTS CONSTRUCTION PLANS FOR VILLAGE CENTER SERVICE AREA LONG-SIDE WATER SERVICE REPLACEMENT PHASE I SHEET1: SHEET 2: SHEET 3: SHEET 4: COVER SHEET SERVICE REPLACEMENT PLAN – PHASE I A SERVICE REPLACEMENT PLAN – PHASE I B DETAILS & GENERAL NOTES CONSTRUCTION PLANS FOR VILLAGE CENTER SERVICE AREA LONG-SIDE WATER SERVICE REPLACEMENT PHASE II SHEET1: COVER SHEET SHEET 2: SERVICE REPLACEMENT PLAN – PHASE II SHEET 3: DETAILS (see following pages) Village Community Development Districts Purchasing Department Page 40 of 40 CONSTRUCTION PLANS FOR VILLAGE CENTER SERVICE AREA LONG-SIDE WATER SERVICE REPLACEMENT PHASE I INDEX OF SHEETS 1. COVER SHEET CONTACT LISTING OWNER: VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT CONTACT: JANET TUTT (352) 751-3939 2. SERVICE REPLACEMENT PLAN - PHASE I A OWNER'S REPRESENTATIVE: ARNETT ENVIRONMENTAL, L.L.C. CONTACT: TREY ARNETT, P.E. (352) 753-4747 3. SERVICE REPLACEMENT PLAN - PHASE 1 B ENGINEER: BOOTH, ERN, STRAUGHAN & HIOTT, INC. CONTACT: TROY MITCHELL, P.E. (352) 343-8481 4. DETAILS & GENERAL NOTES PLANT OPERATIONS: CH2M HILL, INC. CONTACT: RUSS VAUGHN (352) 259-2802 PLANT OPERATOR: CH2M HILL, INC. CONTACT: DEANNA SIMMONS (352) 750-2035 DATE SITE REVISION 02-13-15 1 Revised per comments from Arnett Environmental dated: 02-12-15 03-10-15 2 Revised per comments from Arnett Environmental dated: 03-09-15 3 COVER SHEET 4 5 6 7 8 Environmental, LLC 902 North Sinclair Ave. Tavares, Florida 32778 www.besandh.com Office: 352.343.8481 Fax: 352.343.8495 Certificate of Authorization Number: 27029 SHEET 1 BOULEVARD 8" 1/1 0/1 8" 1/7 STREET 6" UE AVE N EAST 4" PO INT 12" E CT WS DR AN BOULEVARD DR IVE DRIVE NT PO I UR ST. ST ANDREWS CHERRY HILL ROAD TZ AR EH 6" 4" EA S 0/2 0/6 8" 1/6 ST AN DR EW 4" S 0/1 6" BAY 6" 1/7 6" DR BOULEVARD 0/8 0/10 0/4 12" WATER 10" 250 ft. PIN BAY BLE LANE HILL MYR TLE MAGNOLIA R TOW E 12" 12" 10" ( IN FEET ) IR COURT 12" 1/4 500 IVE ST. 6" 250 0/10 UN A E BOULEVARD R RS ON SCHWARTZ E NT 8" CC BE RE R. CI BO 1/13 HU 8" ST COURT 6" 1/4 125 0 C T 0/10 250 6" 6" 0/2 GRAPHIC SCALE 1 inch = 0/8 0/7 12" WE 6" 0/2 AL S A CIRCLE 4" 1/3 ES LCR HIL W RE ND T UR 0/9 0/2 0/1 CO 0/2 2" OWS BAYMEAD CI. DOR 0/5 B 2" R VA BOUL EVAR D T Y 8" D LE OU 0/6 BOULEVARD 1/4 8" WS MEADO KILE 1/0 1/7 1/8 8" ANDR EWS DRIVE ER IV OL 0/1 0/1 2" 6" 1/6 8" ST. 1/5 ST 2" 0/6 PEB 0/1 6" N LA E IV DR 6" COG CH BEA ON HILT AVENUE E UR LA 8" LE EN RC 0/1 DRIVE AIR E D HEA CI 4" 6" 4" L 1/6 6" 1/3 SC HW BE 1/0 8" 0/5 NE 6" LA H AC 0/4 HIL L 8" PALM 6" CR E 0/1 E IV DR SS T 0/4 6" PR E UR 1/1 6" CY CO 1/10 0/1 1/5 HIL L 0/1 1/8 ORANGE BLOSSOM HILLS GOLF COURSE BACK NINE KILEY 2" 0/7 4" 8" ST E 6" D R VA LE U BO DR IV O RA LAUREN ESS 1/3 CIRCLE LANE SCHWARTZ 1/1 DO WEST 436 CYP R H RC E LAN DRIVE 43 B 0/3 4" PARADISE TOTAL D 0/7 0/1 AR 0/12 R ST AD 2" MA x" 1/0 79 111 68 104 28 46 V LE OU L LY LIL T EE HE BOULEVARD IA OL GN ON LT HI CI. 0/4 1/3 0/6 BOULEVARD D OL IG R. ID BOONE 11 12 5 10 1 4 2" E AN 0/4 PARADISE SCHWARTZ AR 6" 8" 6" COURT OLEANDER M AD 6" 1/16 1/1 BOGEY BAY SOUTH 2" AL E 2" SCHWARTZ 7 8 9 10 11 13 DRIVE AZ E WEST STREET 2" 0/5 1/1 1/1 0/3 PL LAN 6" NO. OF DOUBLE SERVICE LATERALS 1/9 2" N 0/4 NO. OF SINGLE SERVICE LATERALS E LAN 6" LINTZ STREET 2" E PI LAURE 8" 1/3 ORCHID 8" 6" 1/3 ORCHID 6" CAMELIA FMA KAU 1/11 O TR UNIT I.D. 6" . LA 2" 2" CAMELIA NIA TU 6" ROSE PE LANE 2" 0/4 BOULEVARD ORANGE BLOSSOM HILLS GOLF COURSE FRONT NINE 0/1 0/4 1/1 0/2 8" 6" LL HO 8" 0/1 1/3 6" COURT Y 1/10 NE LA CL CIR 1/8 N 0/1 SCHWARTZ 0/3 SCHWARTZ 2" 8" 1/3 0/9 E X SO ER W BO BOULEVARD 1/5 6" WEST DRIVE 2"IVE DR 1/4 6" 2" HIBISCUS LANE 1/1 WEST GARDENIA LA. SCHWARTZ DAFFODILL WEST 10" Legend: 10" 10" KIM 10" LANE 10" KIM LONE OAK LAKE 2" RA PA " 10 4" SE DI DRIVE CINDY 8" 2" 8" E 4" NELL WAY 4" 0/1 VERMONT 4" AVENUE 4" 02-13-15 REVISION A BR DE 4" LAKE PARADISE 4" 1 Revised per comments from Arnett Environmental dated: 02-12-15 2 3 4 5 6 7 8 Environmental, LLC OXBOW DRIVE VE TANGER INE 1/1 LANE 2" AY W TURNBERRY 2" 3" A 4" AL OH LESTER 8" DATE LAN RRY 0/14 2" 10" Number Of Services (Single Services/Double Services) E TURNBE 2" IV DR 2" 1/5 2" 1/3 LANE 4" 8" 0/1 1/13 BAY COURT HILL OW THR HEA SCHWARTZ DRIVE 10" 4" Lots To Have Water Services Directional Bored EAST 10" LINDSEY LANE LINDSEY LANE COURT 0/4 Lots To Have Water Services Moled 10" 10" TORREY 4" 4" GOLFVIEW LAKE 4" AVENUE AVENUE PLANTATION DRIVE 6" 6" LANE 0/3 1/4 2" PINES 4" HILLTOP GOLF COURSE 10" Lake County Roads 8" BONAVENTURE 6" 6" Town Of Lady Lake Roads 8" WEST WEST 8" DRI 8" 1/5 LONG-SIDE WATER SERVICE REPLACEMENT PLAN - PHASE I A DATE: Dec. 17, 2013 DESIGNED BY: CBW DRAWN BY: CBW CHECKED BY.: JOB NO.: RAE 121016.0000 12" BOULEVAR WATER 0/8 10" 8" WEST 10" 4" LINDSEY LANE COURT 10" 10" T HEA 10" LANE 10" KIM LANE 2" SERVICE DEPARTMENT BOONE PARK PARADISE POOL DRIVE I DR 2" 8" 2" 8" 4" 0/1 LANE 1/1 SILVER LAKE GOLF COURSE AL 4" O L IL W G PIN E AVENUE FA C IL NE RI D EVAR BOUL LANE LANE TZ AR SCHW NO POMPA N TARPO TO T PALME STREET EAST 2" FIRE STATION GAS ISLAND 0/2 1/2 TRACY 6" 4" 0/1 6" 4" 0/4 1/5 KELSEA 6" 0/4 0/1 4" 0/1 2" DRIVE 0/7 BOULEVARD 4" CIRCLE 2" 8" BOULEVARD 8" 8" 2" KELSEA 4" AN 0/2 TARRSON 8" N 0/1 0/1 1/0 8" 6" PLACE CIRCLE 4" 1/3 1/3 1/3 0/3 8" 6" 2" PARKER DRI JENNIFER 4" 8" 0/1 4" KELSEA PARK FF 1/3 VE 1/6 2" Y 6" 2" 2" RE 4" 1/5 1/5 JE RICHARD 0/3 RESTAURANT & CONVENIENCE STORE 0/7 AR SH 6" 8" TARRSON 2" AL BROOME PARK RECREATION BUILDING MARK 4" SOUTHSIDE POOL 0/5 2" RE ON FI TI A ST ST A AZ E PL ND LA RA G PO 2" WAY 4" 8" 2" 2" 2" SH 1/5 SHOPPING PLAZA 2" 6" 8" UE AY 1/3 8" " 2" 1/0 6" 4" WEBB E UL BO E IV ON POST OF 6 FICE DRIVE 2" 6" 6" 8" KELSEA COURT RD VA DR IV E N SO 8" JASON 1/12 EN EN AV E PL 6" 0/4 0/2 NE LA AN I AR N RI TE VE E DRIVE 6" 2" 8" 2" 0/3 BANK 6" BOULEVARD x" AV UE ON AR SH 6" 0/2 RAINBOW 0/6 6" DRIVE Y HA E AP 6" 4" 10" AG 6" 1/7 4" VETERINARIAN LL 4" DRIVE 8" 6" 4" RD 8" JASON 0/8 4" SE E8" VA 0/7 DRIVE DRIVE N SO RO UL 0/4 0/3 JA 6" VI 8" AV UM AN BO DRIVE 1/6 8" 0/1 0/4 DA BL TH VD E . 2" DE VI L C NT LA AR A G E L E TR 10" SUN CENTRAL REALTY DEVON LIN DA RI O FL YE ID E 7 2 1/ 44 343 DE 2" DRIVE 8" 8" 8" 10" AL TR Y EN T C LI N EA SU R M . 31 G RA N UE EN AV 4" LA PA PL RK AZA W AY NO 10" LA 0/7 OW 2" NB I RA T C P AP SE 1/4 1/3 4" LE EN U YA L 10" BONITA 8" 0/4 2" M PA L BE 0/5 N PE D 1/0 0/1 0/1 RO JA O RG O AY H S RR RT Y IL E M CIN FA DI E M R N TE O EN ATI C IT KE BIL A H RE O 10" TA ES BU LA & R LE 0/4 1/3 RO FO HW G HI ZA LA P . LA PL NO. OF DOUBLE SERVICE LATERALS 49 47 48 30 79 90 AR T 0/6 10" 0/2 4" EC S. 10" R N MA RU WAY WHITNEY JOE'S 10" HW OO U. TOTAL 4 5 5 4 10 3 10" AV D D SE E RN FIC K BU OF AR P 1/3 PLAZA PROFESSIONAL PARK 2" 0/7 8" 0/1 AL OY UE EN 4" 1/0 8" S NG EE PI 1/5 S 3 3.1B 4 5 6 12 UE EN B WI AV W AL IC & ER ED G T M IN EN KE AG T C LA IM AS E BR 10" IC UNIT I.D. 1/5 LEV OU LL SI LV OW ER L TA E N IC DE FF O & Y TER RG EN LE C AL US N SI 10" 10" NO. OF SINGLE SERVICE LATERALS H EC D 4" 10" 1/3 D AVENUE BE 0/7 O WO DR TA R EN OREN AV 0/10 0/4 UE AVENUE 4" 8" EL LAGOS 8" 0/1 M AK ON O 4" RS PARADISE ISLAND 8" W RAINBOW 4" E NU 2" BOULEVARD AVENUE AV EN LV SCHWARTZ10" BOULEVARD 0/13 8" UE ER 8" 2" 8" WE 250 ft. DRIVE 8" EN UE 1/7 DRIVE AV 0/9 4" E AV 1 inch = 0/6 4" 0/3 4" 500 ( IN FEET ) BOULEVARD MATTHEW D AR EV 6" 250 Number Of Services (Single Services/Double Services) 10" IN SI 125 8" SILVER LAKE DU ST 10" LAKE PARADISE 0 T CI AN R GE 2" 4" 4" 250 8" 1/5 4" WAY GRAPHIC SCALE 2" PA L E IV SILVER LAKE CLUB 8" DRIVE LANE DR RAINBOW 4" 10" 1/5 0/14 DRIVE OH A 0/6 UL BO Lots To Have Water Services Moled 4"STREET ELM ALOHA Lake County Roads Lots To Have Water Services Directional Bored 10" 2" Town Of Lady Lake Roads 0/18 0/2 4" 4" EAST TARRSON VE D I DR OO 4" 6" 10" OAK 4" Y WA 2" 4" 8" Legend: MA 3" 4" W SE I AD 4" 10" NE PL E IVE ER 4"WAY AK TE ALOHA R PA 4" LA 2" DR ST LE 4" VE W 2" I DR ES AL EN BOCCE COURTS 0/3 3" W O 4" SCHWARTZ PARK 1/5 DUSTIN RA A AZ PL 8" TURNBERRY 4" A AVENUE VE DRI TANGER INE 1/1 4" OH LESTER 4" B DE ES O VERMONT OXBOW DRIVE W AL CH H ES RS UR CH HO 2" 4" AY LAKE PARADISE 3" DUSTIN WAY DRIVE NELL 4" KARNEY 2" 4" 2" LAN 0/14 8" 10" E TURNBE RRY 2" 2" VE RECREATION CENTER OFFICES CINDY 1/3 DRIVE 8" 4" SE DI RA PA RECREATION COMPLEX 2" LONE OAK LAKE 4" The Villages Public Safety " Department 10 Station 3 0/1 1/13 10" KIM W HRO AVENUE GOLF COURSE MAINTENANCE BUILDING LINDSEY LANE GOLFVIEW LAKE DRIVE 4" 4" TORREY 6" 6" 10" 0/4 4" EAST PLANTATION DRIVE 2" 10" AVENUE SCHWARTZ 0/3 1/4 BAY COURT HILL 4" 10" PINES 8" HILLTOP GOLF COURSE LANE 6" BONAVENTURE WEST 8" BOULEVARD 6" 6" 1/4 GRIFFIN AVENUE IT Y DATE 02-13-15 REVISION DATE: 1 Revised per comments from Arnett Environmental dated: 02-12-15 2 3 4 5 6 7 8 Environmental, LLC LONG-SIDE WATER SERVICE REPLACEMENT PLAN - PHASE I B Dec. 17, 2013 DESIGNED BY: CBW DRAWN BY: CBW CHECKED BY.: JOB NO.: RAE 121016.0000 EXISTING METER BOX WITH TOUCH READ LID GENERAL NOTES: REPLACE: 1" P.E.T. DR9 SERVICE LINE REPLACE: 3/4" P.E.T. DR9 SERVICE LINE 1. THE CONTRACTOR SHALL ENSURE ALL NECESSARY PERMITS ARE IN HAND BEFORE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL REQUIREMENTS OF REGULATORY AGENCY PERMITS IN REGARD TO CONSTRUCTION ACTIVITIES AND CONDITIONS STATED THEREIN. 2. CONTRACTOR SHALL COORDINATE AND SCHEDULE CONSTRUCTION ACTIVITIES WITH THE DISTRICT AND WATER SYSTEM OPERATING PERSONNEL. THE CONTRACTOR SHALL PROVIDE, AT A MINIMUM, 48 HOURS NOTICE TO SYSTEM PERSONNEL PRIOR TO THE BEGINNING OF CONSTRUCTION. 3. CONTRACTOR SHALL HAVE A PERMANENT OFFICE ADDRESS IN THE STATE OF FLORIDA. 4. SERVICE LATERAL PIPING LOCATED IN ARES DESIGNATED AS LAKE COUNTY ROADS SHALL BE INSTALLED VIA DIRECTIONAL DRILL METHOD. LATERAL PIPING LOCATED IN AREAS DESIGNATED AS TOWN OF LADY LAKE ROADS SHALL BE INSTALLED VIA MOLE METHOD. 5. CONTRACTOR SHALL REPLACE LATERAL SERVICE PIPING FROM THE EXISTING COMPRESSION FITTING (CORPORATION STOP) TO THE ANGLE METER VALVE OR CURB STOP AT THE METER. 6. LATERAL SERVICE PIPING SHALL BE POLYETHYLENE TUBING (P.E.T.) DR 9. SERVICE PIPING SHALL CONFORM TO THE APPLICABLE REQUIREMENTS OF AWWA C901, ASTM D1248 AND ASTM D2737, LATEST REVISION. SERVICE PIPING SHALL BE CHEVRON PHILLIPS DRISCO 5100 OR ENDOT INDUSTRIES ENDOPURE. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONNECTING THE NEW LATERAL SERVICE PIPING TO THE EXISTING METER, TEMPORARILY REMOVING THE METER, FLUSHING THE LINE, AND REINSTALLING THE METER. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING MAINTENANCE OF TRAFFIC IN ACCORDANCE WITH LAKE COUNTY OR TOWN OF LADY LAKE REQUIREMENTS, AS APPLICABLE. 9. ALL EXISTING PROPERTY, FENCING, DRIVEWAYS, PIPING, SIDEWALKS, SIGNS, CURBING AND OTHER ITEMS SHALL BE RESTORED TO ORIGINAL LINE AND GRADE UNLESS APPROVED BY THE DISTRICT REPRESENTATIVE. ACCESS TO ADJOINING PROPERTYSHALL BE MAINTAINED AT ALL TIMES. EXISTING DUAL CHECK VALVE (TYP.) INSTALL "Y" BRANCH FORD Y44-243-NL (FOR DOUBLE SERVICE) CONNECT TO EXISTING CORPORATION STOP EXISTING METER EXISTING DUAL CHECK VALVE (TYP.) REPLACE: 1" P.E.T. DR9 SERVICE LINE CONNECT TO EXISTING ANGLE METER VALVE OR CURB STOP EXISTING METER BOX WITH TOUCH READ LID 3 4" REPLACE: P.E.T. DR9 SERVICE LINE 10. ALL AREAS WHERE LANDSCAPING, SOD, OR IRRIGATION HAS BEEN REMOVED OR DISTURBED BY CONTRACTOR'S OPERATIONS SHALL BE RESODDED, LANDSCAPED, OR REPAIRED BY LIKE KIND. STANDARD DOUBLE SERVICE DETAIL 11. SHOULD THE INSTALLATION OF ANY NEW SERVICE LINE RESULT IN A HUMP OF THE PAVEMENT, THE CONTRACTOR SHALL BE RESPONSIBLE TO SMOOTH THE PAVEMENT - TO THE SATISFACTION OF THE DISTRICT - USING A ROLLER COMPACTOR. N.T.S. 12. THE NUMBER OF WATER SERVICE LATERALS LISTED IS BASED ON THE SUBDIVISION CONSTRUCTION PLANS. CONTRACTOR SHALL BE COMPENSTATED BASED ON THE ACTUAL NUMBER OF LONG-SIDE WATER SERVICE LATERALS OF EACH SIZE AND TYPE THAT ARE REPLACED. EXISTING METER 13. EXISTING CONNECTIONS TO THE WATER MAIN WHERE THE NEW SERVICE LINE CANNOT BE RELIABLY CONNECTED TO THE EXISTING CORPORATION STOP SHALL BE ABANDONED BY CLOSING AND CAPPING THE CORPORATIONS STOP. A NEW SERVICE TAP SHALL BE INSTALLED. CONNECT TO EXISTING CORPORATION STOP 14. SERVICE LINE CONNECTIONS TO A WATER MAIN THAT IS BENEATH THE PAVEMENT OR A DRIVEWAY WILL NOT BE REPLACED. QUANTITIES WILL BE DEDUCTED FROM THE FINAL PRICE. CORPORATION STOP FORD F1001-X-NL OR APPROVED EQUAL NEW P.E.T. DR9 SERVICE LINE 15. EACH WATER SERVICE LINE HAS AN ESTIMATED TOTAL LENGTH OF 85 FEET FOR DOUBLE SERVICE AND 60 FEET FOR SINGLE SERVICE. REPLACE: 43" P.E.T. DR9 SERVICE LINE CONNECT TO EXISTING ANGLE METER VALVE OR CURB STOP 16. RESIDENTS IN EACH AREA SHALL RECEIVE A PRELIMINARY NOTICE BY MAIL OF PENDING ACTIVITY AT LEAST ONE WEEK IN ADVANCE OF COMMENCING CONSTRUCTION ACTIVITIES. THE PRELIMINARY NOTICE WILL BE DELIVERED BY THE DISTRICT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PLACE A DOOR HANGER NOTICE AT EACH HOUSE WHOSE WATER SERVICE WILL BE INTERRUPTED WITHIN THE FOLLOWING 24 HOURS. THE DISTRICT AND CONTRACTOR WILL COORDINATE REGARDING THE INFORMATION TO BE SHOWN ON THE DOOR HANGER. 17. LAKE COUNTY REQUIRES A RIGHT-OF-WAY UTILIZATION PERMIT FOR EACH LAKE COUNTY ROAD TO COVER ALL CROSSINGS ALONG THAT ROAD. THE PERMIT APPLICATION SHALL INCLUDE CONSTRUCTION PLANS, M.O.T. PLANS, AND ANY OTHER DOCUMENTATION REQUIRED BY LAKE COUNTY. TAPPING SADDLE STANDARD SINGLE SERVICE DETAIL N.T.S. NOTES: 1. REPLACEMENT TAP SHALL BE LOCATED A MINIMUM OF 18 INCHES AWAY FROM THE ABANDONED SERVICE TAP. 2. TAPPING SADDLES FOR MAINS 3" OR LESS SHALL BE FORD S70-XXX OR APPROVED EQUAL. TAPPING SADDLES FOR MAINS LARGER THAN 3" SHALL BE FORD S90-XXX OR APPROVED EQUAL. REPLACEMENT SERVICE TAP DETAIL (IF REQUIRED) N.T.S. DATE REVISION 02-13-15 1 Revised per comments from Arnett Environmental dated: 02-12-15 03-10-15 2 Revised per comments from Arnett Environmental dated: 03-09-15 DATE: 3 4 5 6 7 8 Environmental, LLC DETAILS & GENERAL NOTES DESIGNED BY: CBW DRAWN BY: CBW CHECKED BY.: 902 North Sinclair Ave. Tavares, Florida 32778 www.besandh.com JOB NO.: Office: 352.343.8481 Fax: 352.343.8495 Certificate of Authorization Number: 27029 Dec. 17, 2013 RAE 121016.0000 CONSTRUCTION PLANS FOR VILLAGE CENTER SERVICE AREA LONG-SIDE WATER SERVICE REPLACEMENT PHASE II INDEX OF SHEETS 1. COVER SHEET CONTACT LISTING OWNER: VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT CONTACT: JANET TUTT (352) 751-3939 2. SERVICE REPLACEMENT PLAN - PHASE II OWNER'S REPRESENTATIVE: ARNETT ENVIRONMENTAL, L.L.C. CONTACT: TREY ARNETT, P.E. (352) 753-4747 3. DETAILS ENGINEER: BOOTH, ERN, STRAUGHAN & HIOTT, INC. CONTACT: TROY MITCHELL, P.E. (352) 343-8481 PLANT OPERATIONS: CH2M HILL, INC. CONTACT: RUSS VAUGHN (352) 259-2802 PLANT OPERATOR: CH2M HILL, INC. CONTACT: DEANNA SIMMONS (352) 750-2035 SITE DATE REVISION 02-13-15 1 Revised per comments from Arnett Environmental dated: 02-12-15 03-10-15 2 Revised per comments from Arnett Environmental dated: 03-09-15 3 COVER SHEET 4 5 6 7 8 Environmental, LLC 902 North Sinclair Ave. Tavares, Florida 32778 www.besandh.com Office: 352.343.8481 Fax: 352.343.8495 Certificate of Authorization Number: 27029 SHEET 1 Legend: Town Of Lady Lake Roads Lake County Roads Lots To Have Water Services Moled Lots To Have Water Services Directional Bored 1/5 Number Of Services (Single Services/Double Services) 10/0 UNIT I.D. NO. OF SINGLE SERVICE LATERALS NO. OF DOUBLE SERVICE LATERALS 14 15 16 80 81 82 6 5 8 2 18 35 46 40 86 24 0 0 TOTAL 74 196 7/0 9/0 3/0 10/0 8/0 6/0 GENERAL NOTES: 1. THE CONTRACTOR SHALL ENSURE ALL NECESSARY PERMITS ARE IN HAND BEFORE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL REQUIREMENTS OF REGULATORY AGENCY PERMITS IN REGARD TO CONSTRUCTION ACTIVITIES AND CONDITIONS STATED THEREIN. 2. CONTRACTOR SHALL COORDINATE AND SCHEDULE CONSTRUCTION ACTIVITIES WITH THE DISTRICT AND WATER SYSTEM OPERATING PERSONNEL. THE CONTRACTOR SHALL PROVIDE, AT A MINIMUM, 48 HOURS NOTICE TO SYSTEM PERSONNEL PRIOR TO THE BEGINNING OF CONSTRUCTION. 3. CONTRACTOR SHALL HAVE A PERMANENT OFFICE ADDRESS IN THE STATE OF FLORIDA. 4. SERVICE LATERAL PIPING LOCATED IN ARES DESIGNATED AS LAKE COUNTY ROADS SHALL BE INSTALLED VIA DIRECTIONAL DRILL METHOD. LATERAL PIPING LOCATED IN AREAS DESIGNATED AS TOWN OF LADY LAKE ROADS SHALL BE INSTALLED VIA MOLE METHOD. 5. CONTRACTOR SHALL REPLACE LATERAL SERVICE PIPING FROM THE EXISTING COMPRESSION FITTING (CORPORATION STOP) TO THE ANGLE METER VALVE OR CURB STOP AT THE METER. 6. LATERAL SERVICE PIPING SHALL BE POLYETHYLENE TUBING (P.E.T.) DR 9. SERVICE PIPING SHALL CONFORM TO THE APPLICABLE REQUIREMENTS OF AWWA C901, ASTM D1248 AND ASTM D2737, LATEST REVISION. SERVICE PIPING SHALL BE CHEVRON PHILLIPS DRISCO 5100 OR ENDOT INDUSTRIES ENDOPURE. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONNECTING THE NEW LATERAL SERVICE PIPING TO THE EXISTING METER, TEMPORARILY REMOVING THE METER, FLUSHING THE LINE, AND REINSTALLING THE METER. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING MAINTENANCE OF TRAFFIC IN ACCORDANCE WITH LAKE COUNTY OR TOWN OF LADY LAKE REQUIREMENTS, AS APPLICABLE. 9. ALL EXISTING PROPERTY, FENCING, DRIVEWAYS, PIPING, SIDEWALKS, SIGNS, CURBING AND OTHER ITEMS SHALL BE RESTORED TO ORIGINAL LINE AND GRADE UNLESS APPROVED BY THE DISTRICT REPRESENTATIVE. ACCESS TO ADJOINING PROPERTYSHALL BE MAINTAINED AT ALL TIMES. 0/11 0/4 1/2 1/12 1/1 1/2 1/7 0/3 1/17 0/3 2/13 0/3 1/16 0/3 0/4 1/5 1/8 0/4 1/4 0/6 1/3 1/5 10. ALL AREAS WHERE LANDSCAPING, SOD, OR IRRIGATION HAS BEEN REMOVED OR DISTURBED BY CONTRACTOR'S OPERATIONS SHALL BE RESODDED, LANDSCAPED, OR REPAIRED BY LIKE KIND. 11. SHOULD THE INSTALLATION OF ANY NEW SERVICE LINE RESULT IN A HUMP OF THE PAVEMENT, THE CONTRACTOR SHALL BE RESPONSIBLE TO SMOOTH THE PAVEMENT - TO THE SATISFACTION OF THE DISTRICT - USING A ROLLER COMPACTOR. 2/2 1/6 12. THE NUMBER OF WATER SERVICE LATERALS LISTED IS BASED ON THE SUBDIVISION CONSTRUCTION PLANS. CONTRACTOR SHALL BE COMPENSTATED BASED ON THE ACTUAL NUMBER OF LONG-SIDE WATER SERVICE LATERALS OF EACH SIZE AND TYPE THAT ARE REPLACED. 2/6 0/7 0/1 0/3 1/5 0/7 0/8 1/7 14. SERVICE LINE CONNECTIONS TO A WATER MAIN THAT IS BENEATH THE PAVEMENT OR A DRIVEWAY WILL NOT BE REPLACED. QUANTITIES WILL BE DEDUCTED FROM THE FINAL PRICE. 0/1 15. EACH WATER SERVICE LINE HAS AN ESTIMATED TOTAL LENGTH OF 85 FEET FOR DOUBLE SERVICE AND 60 FEET FOR SINGLE SERVICE. 16. RESIDENTS IN EACH AREA SHALL RECEIVE A PRELIMINARY NOTICE BY MAIL OF PENDING ACTIVITY AT LEAST ONE WEEK IN ADVANCE OF COMMENCING CONSTRUCTION ACTIVITIES. THE PRELIMINARY NOTICE WILL BE DELIVERED BY THE DISTRICT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PLACE A DOOR HANGER NOTICE AT EACH HOUSE WHOSE WATER SERVICE WILL BE INTERRUPTED WITHIN THE FOLLOWING 24 HOURS. THE DISTRICT AND CONTRACTOR WILL COORDINATE REGARDING THE INFORMATION TO BE SHOWN ON THE DOOR HANGER. 0/7 DATE 13. EXISTING CONNECTIONS TO THE WATER MAIN WHERE THE NEW SERVICE LINE CANNOT BE RELIABLY CONNECTED TO THE EXISTING CORPORATION STOP SHALL BE ABANDONED BY CLOSING AND CAPPING THE CORPORATIONS STOP. A NEW SERVICE TAP SHALL BE INSTALLED. REVISION 02-13-15 1 Revised per comments from Arnett Environmental dated: 02-12-15 03-10-15 2 Revised per comments from Arnett Environmental dated: 03-09-15 3 4 5 6 7 8 Environmental, LLC LONG-SIDE WATER SERVICE REPLACEMENT PLAN - PHASE II 902 North Sinclair Ave. Tavares, Florida 32778 www.besandh.com Office: 352.343.8481 Fax: 352.343.8495 Certificate of Authorization Number: 27029 SHEET 2 DATE 02-13-15 REVISION 1 Revised per comments from Arnett Environmental dated: 02-12-15 2 3 DETAILS 4 5 6 7 8 Environmental, LLC 902 North Sinclair Ave. Tavares, Florida 32778 www.besandh.com Office: 352.343.8481 Fax: 352.343.8495 Certificate of Authorization Number: 27029 SHEET 3