BRUMBY ELEMENTARY SCHOOL / EAST COBB MIDDLE SCHOOL
Transcription
BRUMBY ELEMENTARY SCHOOL / EAST COBB MIDDLE SCHOOL
ADDENDUM NO. 3 April 27, 2016 Page 1 TO PLANS AND SPECIFICATIONS FOR CONSTRUCTION OF BRUMBY REPLACEMENT ELEMENTARY SCHOOL & EAST COBB REPLACEMENT MIDDLE SCHOOL FOR COBB COUNTY SCHOOL DISTRICT COBB COUNTY, GEORGIA DATED: AUGUST 31, 2015 CUNNINGHAM FOREHAND MATTHEWS & MOORE, ARCHITECTS, INC. 2011 MANCHESTER STREET, N. E. ATLANTA, GEORGIA 30324 (404) 873-2152 SHL-D05-15 / SHL-D06-15 -----------------------------------------------------------------------------------------------------------------------------------------------The following items shall take precedence over the plans and specifications (Project Manual) for the above named project and shall become a part of the Contract Documents. Where any items called for in the specifications or indicated on the drawings are supplemented hereby, the original shall remain in effect. Where any original item is amended, voided, or superseded hereby, the provisions of such item not specifically amended voided, or superseded shall remain in effect. The following items shall be incorporated in the Plans and Project Manual. ------------------------------------------------------------------------------------------------------------------------------------------------ A. PROJECT MANUAL: BRUMBY ELEMENTARY SCHOOL / EAST COBB MIDDLE SCHOOL ITEM No. 1: SECTION 003100, BID PROPOSAL FORM a. At Unit Prices, Earthwork and Related Materials Unit Price/Allowance Schedule, add the following item: N. Provide well points to dewater areas at lower level for grading work (6 well points) $ _____ per well point= $_______ b. Replace specification section with revised section attached herein, to be used by all Contractors. ADDENDUM NO. 3 April 27, 2016 Page 2 BRUMBY ELEMENTARY SCHOOL ITEM No 2.: SECTION 022000, EARTHWORK At Unit Prices, Earthwork Materials Unit Price Schedule, add the following item: N. Provide well points to dewater areas at lower level for grading work (3 well points) $ ______ per well point= $_________ ITEM No 3: SECTION 025350, PLAY YARD SURFACING and SECTION 028600, PLAYGROUND EQUIPMENT At Part 2 - Products, add the following: Carlton Burr Sales Consultant 678.522.3582 ITEM No. 4: SECTION 033000, CONCRETE At Part 2 - Products, Classes of Concrete: Use: At Piers, Walls, change “3000 psi” to “4000 psi” ITEM No. 5: SECTION 099000, PAINTING At Part 3 - Execution, at Interior Paint Schedule:, add the following: Gypsum Drywall Systems: Walls. Low Luster/Eggshell Finish: Three coats. Primer: White, interior, latex-based primer. Benjamin Moore: PPG: Sherwin-Williams: 253 MooreCraft SuperSpec Latex Enamel Undercoater and Primer Sealer 6-2 Speed Hide Drywall Primer B28W82 ProMar 200 Latex Wall Primer Second and Third Coats: Interior, Semi-Gloss, latex-based paint. Benjamin Moore: PPG: Sherwin-Williams: 274 MooreCraft SuperSpec Latex Eggshell Enamel 6-411 Speed Hide Interior Enamel Latex B20W2200 ProMar 200 Interior Latex Eggshell ADDENDUM NO. 3 April 27, 2016 Page 3 EAST COBB MIDDLE SCHOOL ITEM No. 6: SECTION 022000, EARTHWORK At Unit Prices, Earthwork Materials Unit Price Schedule, add the following item: N. Provide well points to dewater areas at lower level for grading work (3 well points) $ ______ per well point= $______ ITEM No. 7: SECTION 033000, CONCRETE At Part 2 - Products, Classes of Concrete: Use: At Piers, Walls: Change “3000 psi to 4000 psi”. ITEM No. 8: SECTION 061000, CARPENTRY At Part 2 - Products, add the following: Wood Paneling: Wood Paneling shall be ¾" T&G V-Joint, Clear Douglas Fir. Nosings, Stage Trim, Cap Rails or other items shall be: Clear red or white oak, shape as shown. Note: See Section 099000, Painting for Wood Finishes. ITEM No. 9: SECTION 087100, FINISH HARDWARE At Part 3 - Execution, at Door/Hardware Index, a. Add the following doors to the index: DOOR # 112 129 133A 142A 180 290A 315B 410A HARDWARE SET G03 G09 J18 J18 G03 J08 J08 J01 b. At Door 165, change hardware set from J04 to J05. c. At Door 225, change hardware set from G09 to H02. d. Delete Door 428 from Index. ADDENDUM NO. 3 April 27, 2016 e. Page 4 At Door Hardware Schedule: 1. At HW Set: A03, Door 409: delete references to card reader. 2. At HW Set: A11, Door 135: Delete (1) one Armor plate, install on inside only. 3. At HW Set: A12, Door 501: Delete (1) one Armor plate, install on inside only. 4. At HW Set: G02, Delete Door 428. 5. At HW Set: G03, Add Doors 112 and 180. 6. At HW Set: G04, Change “Floor Stop FS 441" to “Wall Stop WS406/407 CVX.” 7. At HW Set: G05, Delete Door 286. 8. At HW Set: G09, Add Door 129; Delete Door 225. 9. Add HW Set: G14: HW SET: G14 DOOR NUMBER: 122 182 EACH TO HAVE: 3 EA HINGE 1 EA CLASSROOM LOCK 1 EA PERMANENT CORE 1 EA SURFACE CLOSER 1 EA KICK PLATE 1 EA WALL STOP 1 SET DOOR SEALS 10. 11. 12. 13. 14. 15. 16. 17. 5BB1HW NRP L9070T 06A 23-030 4040XP EDA MC TBWMS 8400 8" X 1-1/2" LDW B4E WS406/407 CVX 188S-3M-BK 652 626 626 689 630 630 BLK IVE SCH SCH LCN IVE IVE ZER At HW Set: H02, Add Door 225 and 286. At HW Set: J01, Add Door 410A. At HW Set: J04, Omit HW Set. At HW Set: J05, Add Door 165. At HW Set: J07, Delete surface overhead stop and add (1) one wall stop WS 406/407 CVX IVE. Add “Template door closer” at Door 151 to swing 180 degrees. At HW Set: J08, Add door 315B; Add door 290A, and add (1) one each wall stop WS 406/407 CVX IVE (Doors 290A and 243). At HW Set: J09, Add (1) One each wall stop (Door 136) WS 406/407 CVX IVE. At HW Set: J18, Add the following: -Doors 133A and 142A -(1) One each wall stop (Door 133A) WS 406/407 CVX IVE -(1) One each floor stop (Door 133A) FS 185 IVE -Template closers at Door 133A and 142A to swing 180 degrees. ITEM No. 10: SECTION 099000, PAINTING At Part 3 - Execution, at Interior Paint Schedule:, add the following: Gypsum Drywall Systems: Walls. Low Luster/Eggshell Finish: Three coats. ADDENDUM NO. 3 April 27, 2016 Primer: Page 5 White, interior, latex-based primer. Benjamin Moore: PPG: Sherwin-Williams: 253 MooreCraft SuperSpec Latex Enamel Undercoater and Primer Sealer 6-2 Speed Hide Drywall Primer B28W82 ProMar 200 Latex Wall Primer Second and Third Coats: Interior, Semi-Gloss, latex-based paint. Benjamin Moore: PPG: Sherwin-Williams: B. 274 MooreCraft SuperSpec Latex Eggshell Enamel 6-411 Speed Hide Interior Enamel Latex B20W2200 ProMar 200 Interior Latex Eggshell DRAWINGS: BRUMBY ELEMENTARY SCHOOL ITEM No. 1: DRAWING C3.31: Replace drawing with revised drawing attached herein. ITEM No. 2: DRAWING C5.1: Add the following clarification: The tree planting schedule for Brumby indicates an additional 95 Virginia Pines that are not indicated on the Middle School planting schedule. This is to confirm the additional 95 trees ARE required. ITEM No. 3: DRAWING S4.1: Add Sketches SK-S4.1-1 & 2, dated 4/27/16 and attached herein. ITEM No. 4: DRAWING S4.3: Add Sketch SK-S4.3-1, dated 4/27/16 and attached herein. ITEM No. 5: DRAWING S4.4: Add Sketch SK-S4.4-1, dated 4/27/16 and attached herein. ITEM No. 6: DRAWING S6.1: Add Sketch SK-S6.1-1, dated 4/27/16 and attached herein. ITEM No. 7: DRAWING S7.2: ADDENDUM NO. 3 April 27, 2016 Add Sketch SK-S7.2-1, dated 4/27/16 and attached herein. ITEM No. 8: DRAWING A1.2: Add Sketch SK-A1.2-1, dated 4/27/16 and attached herein. ITEM No. 9: DRAWING A2.8: Add Sketch SK-A2.8-1, dated 4/27/16 and attached herein. ITEM No. 10: DRAWING A3.4: Add Sketch SK-A3.4-1, dated 4/27/16 and attached herein. ITEM No. 11: DRAWING A7.3: Add Sketch SK-A7.3-1, dated 4/27/16 and attached herein. ITEM No. 12: DRAWING A7.6: Add Sketches SK-A7.6-1 & 2, dated 4/27/16 and attached herein. ITEM No. 13: DRAWING A7.7: Replace drawing with revised drawing attached herein. ITEM No. 14: DRAWING P1.5: At Teachers Dining, 1.137, label drop-in sink as Fixture P.6. EAST COBB MIDDLE SCHOOL ITEM No. 15: DRAWING C2.0: Add Sketch SK-C2.0-1, dated 4/27/16 and attached herein. ITEM No. 16: DRAWING C3.1: Add Sketch SK-C3.1-1, dated 4/27/16 and attached herein. ITEM No. 17: DRAWING C3.31: Replace drawing with revised drawing attached herein. ITEM No. 18: DRAWING S2.1: Add Sketch SK-S2.1-3, dated 4/27/16 and attached herein. Page 6 ADDENDUM NO. 3 April 27, 2016 ITEM No. 19: DRAWING S3.1: Add Sketches SK-S3.1-2 & 3, dated 4/27/16 and attached herein. ITEM No. 20: DRAWING S3.5: Add Sketches SK-S3.5-1 & 2, dated 4/27/16 and attached herein. ITEM No. 21: DRAWING S3.6: Add Sketch SK-S3.6-1, dated 4/27/16 and attached herein. ITEM No. 22: DRAWING S4.1: Add Sketches SK-S4.1-1, 2 & 3, dated 4/27/16 and attached herein. ITEM No. 23: DRAWING S4.2: Add Sketch SK-S4.2-1, dated 4/27/16 and attached herein. ITEM No. 24: DRAWING S4.3: Add Sketch SK-S4.3-1 & 2, dated 4/27/16 and attached herein. ITEM No. 25: DRAWING S5.1: Add Sketch SK-S5.1-1, dated 4/27/16 and attached herein. ITEM No. 26: DRAWING S5.2: Add Sketches SK-S5.2-1 & 2, dated 4/27/16 and attached herein. ITEM No. 27: DRAWING S5.3: Add Sketches SK-S5.3-1 & 2, dated 4/27/16 and attached herein. ITEM No. 28: DRAWING S5.4: Add Sketches SK-S5.4-1 & 2, dated 4/27/16 and attached herein. ITEM No. 29: DRAWING S5.5: Add Sketch SK-S5.5-1, dated 4/27/16 and attached herein. ITEM No. 30: DRAWING S5.6: Add Sketches SK-S5.6-1 & 2, dated 4/27/16 and attached herein. ITEM No. 31: DRAWING S6.1: Add Sketches SK-S6.1-2 & 3, dated 4/27/16 and attached herein. Page 7 ADDENDUM NO. 3 April 27, 2016 Page 8 ITEM No. 32: DRAWING S8.3: Add Sketches SK-S8.3-1, 2 & 3, dated 4/27/16 and attached herein. ITEM No.33: DRAWING S8.4: Add Sketches SK-S8.4-2 & 3, dated 4/27/16 and attached herein. ITEM No. 34: DRAWING A2.2: a. b. Add Sketch SK-A2.2-1, dated 4/27/16 and attached herein. At main gym floor provide (4) four sleeves for (2) two independent volleyball courts. ITEM No. 35: DRAWING A2.11: Add Sketch SK-A2.11-1, dated 4/27/16 and attached herein. ITEM No. 36: DRAWING A2.12: Add Sketches SK-A2.12-1 & 2, dated 4/27/16 and attached herein. ITEM No. 37: DRAWING A3.1: At Legend, at T.T.H-Toilet tissue holder and S.N.P.-Sanitary Napkin Dispenser, delete (N.I.C.). Refer to specification section 108000. ITEM No. 38: DRAWING A3.4: Add Sketches SK-A3.4-1 & 2, dated 4/27/16 and attached herein. ITEM No. 39: DRAWING A4.1: At DOOR SCHEDULE: a. At “DOOR/SIZE” column, at Door 165, change 3'-0" x 6'-8" x 1 3/4" to 4'0" x 6'-8" x 1 3/4". b. At “GLASS” column, add 8" x 27" glass to the following doors: 126, 129, 131, 132. c. At “GLASS” column, delete GLASS at the following doors: 148 and 162. d. At “GLASS” column, change glass width from 16" to 8" at the following doors: 104, 184, 197, 198, 228, 229. e. At “REMARKS” column: 1. At Door 122, delete “M”. ADDENDUM NO. 3 April 27, 2016 2. f. Page 9 At Door 142A, delete “RX, M”. Add Sketch SK-A4.1-1, dated 4/27/16 and attached herein. ITEM No. 40: DRAWING A4.2: a. b. At DOOR SCHEDULE, at “GLASS” column 1. Change glass width from 16" to 8" at the following doors: 416, 419, 420, 452, 453, 454, 455, 460, 461. 2. Change glass width from 30" to 8" at the following doors: 456, 457, and 458. Add Sketches SK-A4.2-1, 2 & 3, dated 4/27/16 and attached herin. ITEM No 41: DRAWING A4.3: Add Sketch SK-A4.3-1, dated 4/27/16 and attached herein. ITEM No. 42: DRAWING A5.1: Add Sketch SK-A5.1-1, dated 4/27/16 and attached herein. ITEM No. 43: DRAWING A6.4: Add Sketches SK-A6.4-1 & 2, dated 4/27/16 and attached herein. ITEM No. 44: DRAWING A7.5: Add Sketch SK-A7.5-1, dated 4/27/16 and attached herein. ITEM No. 45: DRAWING A7.7: a. Add Sketch SK-A7.7-1, dated 4/27/16 and attached herein. b. At detail 3 / A7.7, add the following: “NOTE: SEE UL DESIGN No. P527, DET.3/F1.2 AT METAL TRUSSES OVER LOBBY 1.120" ITEM No. 46: DRAWING A7.9: Add Sketch SK-A7.9-1, dated 4/27/16 and attached herein. ITEM No. 47: DRAWING A7.10: Add Sketches SK-A7.10-1, 2 & 3, dated 4/27/16 and attached herein. ITEM No. 48: DRAWING A9.3: ADDENDUM NO. 3 April 27, 2016 Add Sketch SK-A9.3-1, dated 4/27/16 and attached herein. ITEM No. 49: DRAWING E0.1: Add Sketch SK-E0.1-1, dated 4/27/16 and attached herein. ITEM No. 50: DRAWING E1.1: Add Sketch SK-E1.1-1, dated 4/27/16 and attached herein. ITEM No. 51: DRAWING E1.2: Add Sketch SK-E1.2-1, dated 4/27/16 and attached herein. ITEM No. 52: DRAWING E1.5: Add Sketch SK-E1.5-1, dated 4/27/16 and attached herein. ITEM No. 53: DRAWING E1.6: Add Sketch SK-E1.6-1, dated 4/27/16 and attached herein. ITEM No. 54: DRAWING E1.8: Add Sketch SK-E1.8-1, dated 4/27/16 and attached herein. ITEM No. 55: DRAWING E1.9: Add Sketch SK-E1.9-1, dated 4/27/16 and attached herein. ITEM No. 56: DRAWING E2.3: Add Sketch SK-E2.3-1, dated 4/27/16 and attached herein. ITEM No. 57: DRAWING E2.4: Add Sketches SK-E2.4-1, 2, 3, 4 & 5, dated 4/27/16 and attached herein. ITEM No. 58: DRAWING E2.6: Add Sketch SK-E2.6-1, dated 4/27/16 and attached herein. ITEM No. 59: DRAWING E2.7: Add Sketch SK-E2.7-1, dated 4/27/16 and attached herein. ITEM No. 60: DRAWING E2.9: Add Sketch SK-E2.9-1, dated 4/27/16 and attached herein. ITEM No. 61: DRAWING E3.2: Page 10 ADDENDUM NO. 3 April 27, 2016 Add Sketch SK-E3.2-1, dated 4/27/16 and attached herein. ITEM No. 62: DRAWING E6.1: Add Sketch SK-E6.1-1, dated 4/27/16 and attached herein. ITEM No. 63: DRAWING E6.2: Replace drawing with revised drawing attached herein.. ITEM No. 64: DRAWING E6.3: Add Sketch SK-E6.3-1, dated 4/27/16 and attached herein. C. PRODUCT AND/OR MANUFACTURER APPROVAL: NONE THIS ADDENDUM End of Addendum No. 3 Page 11 CFMM, Atlanta, GA (Revised 4/27/16) Section 003100-1 Bid Proposal Form SECTION 003100 BID PROPOSAL FORM BID 23 -16 DATE: TO: OWNER FROM: BIDDER'S NAME AND ADDRESS SUPERINTENDENT COBB COUNTY SCHOOL DISTRICT 514 GLOVER STREET MARIETTA, GA 30060 Gentlemen: 1. BASE BID: Pursuant to and in compliance with the Invitation for Bids and the proposed Contract Documents relating to the construction of: PROJECT NAME: PROJECT NO. Brumby Replacement Elementary/ East Cobb Replacement Middle School 9003/9001 including Addendum No./Clarification No. _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ _______________, dated_____________ the undersigned, having become thoroughly familiar with terms and conditions of the proposed Contract Documents and with local conditions affecting the performance, progress and cost of the work that is to be completed and having fully inspected the site in all particulars, hereby proposes and agrees to fully perform the work within the time stated and in accordance with the Contract Documents including furnishing any and all services, labor, materials, and equipment and to do all the work required to construct and complete said work in accordance with the Contract Documents for the following sum: BRUMBY REPLACEMENT ELEMENTARY SCHOOL Dollars ($ ) which Sum is hereinafter called the "Base Bid". EAST COBB REPLACEMENT MIDDLE SCHOOL Dollars ($ ) which Sum is hereinafter called the "Base Bid". Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA (Revised 4/27/16) Section 003100-2 Bid Proposal Form COMBINED TOTAL BASE BID Dollars ($ ) which Sum is hereinafter called the "Base Bid". 2. ALTERNATES: The Undersigned proposes that should any of the following Alternates be accepted and incorporated into the Contract, the Base Bid will be altered in each case as follows. (See "Alternates" section of the specifications for a complete description of Alternates.) Alternate No. 1: (Add Aerator Pumps). (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 2a (Add Solotubes - Brumby) (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 2b (Add Solotubes -East Cobb) (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 3a (Schedule 40 Sprinkler Piping - Brumby) (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 3b (Schedule 40 Sprinkler Piping - East Cobb) (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 4a (Schedule 40 Water Piping - Brumby) (Add/Deduct) Dollars ($ ) to/from Base Bid. Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA Section 003100-3 Bid Proposal Form (Revised 4/27/16) Alternate No. 4b (Schedule 40 Water Piping - East Cobb) (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 5a (Cmu at Admin/Counseling - Brumby) (Add/Deduct) Dollars ($ ) to/from Base Bid. Alternate No. 5b (Cmu at Admin/Counseling - East Cobb) (Add/Deduct) Dollars ($ 3. ) to/from Base Bid. UNIT PRICES: The following unit prices are amounts to be used for work that will be added to or deleted from the Contract by Change Order in the event such additional work may be requested or required. The quantities shown (in parenthesis) on the following schedule shall be included in the Base Bid as an allowance at the rates that the Contractor proposes. Unit prices are complete for labor, equipment, material, the hauling in of needed material and the hauling off and disposal of excess and unsuitable material, installation, applicable taxes, overhead and profit and all other incidental costs. Units will be measured in place. OWNER reserves the right to accept or reject these unit prices or require the Work to be performed on a time and material basis with complete daily breakdowns and logs submitted. DESCRIPTION Earthwork and Related Materials Unit Price/Allowance Schedule: (Quantities shown shall be included in the Combined Total Base Bid as an Allowance. Quantities shown here are the sum of quantities shown in Sections 022000 of Brumby ES and of East Cobb MS) Unit Prices A. B. C. Mass Rock excavation, rock hauled off site. (Allow 500 cu. yd) Trench Rock excavation, rock hauled off site. (Allow 500 cu. yd) Excavate unsuitable soil and waste onsite. (Allow 1,000 cu. yd) Amount of Allowance $_________ Per cubic yard = $____________ $_________ Per cubic yard = $____________ $_________ Per cubic yard = $____________ Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA Section 003100-4 Bid Proposal Form (Revised 4/27/16) D. E. F. G. H. I. J. K. L. M. N. Excavate unsuitable soil and haul offsite. (Allow 1,000 cu. yd) $_________ Per cubic yard= $_________ Per cubic yard = $____________ $_________ Per cubic yard= $____________ $_________ Per ton = $____________ Per ton = $____________ $_________ Per ton = $____________ $_________ Per square yard = $____________ Material and placement of specified sod: (Allow 1,000 Sq. Ft.) $_________ Per square foot = $____________ Haul in and placement of G.A.B. stone. (Allow 1,000 Tons) $_________ Per ton = $____________ $_________ Per linear foot= $____________ $_________ Per well point = $____________ Obtain suitable soil from on-site and compact in-place to replace excavated rock or unsuitable soil: (Allow 1,500 cu. yd) Obtain suitable soil from off-site and compact in-place for dam key: (Allow 500 cu. yd.) Haul in and placement of #3 stone or #34 stone. (Allow 500 Tons) Haul in and placement of #57 stone: (Allow 500 Tons) Haul in and placement of RIP RAP TYPE III (Allow 500 Tons) Material and placement of geotechnical fabric (Tensar BX1100 or equal): (Allow 2,500 Sq. Yds.) Provide dewatering trench consisting of 24" x 24" cross section lined with “mirafi”filter fabric filled with #57 stone, in addition to trench, also provide min. 100 lin.ft. of 4" dia. PVC pipe, for outlet purposes: (Allow 500 Lin. Ft. of dewatering trench) Provide well points to dewater areas at lower level for grading work. ( 6 well points ) $_________ TOTAL ALLOWANCES TO BE INCLUDED IN BASE BID $____________ $____________ MISCELLANEOUS ALLOWANCES: A. ASPHALT ALLOWANCE: Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA (Revised 4/27/16) Section 003100-5 Bid Proposal Form Contractor shall include in the Base Bid an Allowance of Fifty Thousand Dollars ($50,000.00) to cover possible asphalt cost escalation that may occur between the project Bid date and the originally scheduled date of installation for binder and for topping. This allowance shall be included in the Base Bid and applied to each schedule of values as one-half the above amount. Contractor shall include in the Base Bid the total quantity and cost of asphalt paving on Bid day. The Asphalt Cement Index as listed by Georgia D.O.T. will be recorded on the Project Bid Date as the basis for the estimated cost of the asphalt on Bid day. Cost escalation applies only to topping and binder raw cost for asphalt types specified, not for base. For purpose of record keeping, Contractor shall separate Bid Date Quantities and costs for base, binder and topping in the initial Schedule of Values. Compensation for asphalt material cost escalation shall be determined at the time of asphalt installation based on the then current Asphalt Cement Index and the Contract adjusted accordingly up or down. Contractor shall submit documentation acceptable to the Architect prior to including this cost on a pay application. B. PERMIT ALLOWANCE: Contractor shall include in the Base Bid an Allowance of Fifteen Thousand Dollars ($15,000.00) to cover possible requests by the Fire Marshal or Building Inspector for modifications they may require during the course of the work. The Architect and Owner must approve the use of these funds. This allowance shall be included in the Base Bid and applied to each schedule of values as one-half the above amount. Note: Crusher run stone, #57 stone and #3 (#34) stone shall be used as directed by the Architect, without restriction, at the Unit Prices shown, i.e., remedial footing subgrade, general fill areas, remedial slab subgrade or drainage course, etc. The above allowances are to be used at the discretion of the Owner representatives and the Architect and are not intended for use by the Contractor without joint agreement by the Owner representative and the Architect. The above Unit Prices will also be used to determine any credit due the Owner on any changes in the work. Allowances shall be shown in the Schedule of Values for each item listed above. MISCELLANEOUS UNIT COSTS NOT INCLUDED AS ALLOWANCES The following unit prices are amounts to be used for work that will be added to or deleted from the Contract by Change Order in the event such additional work may be required. Unit prices are complete for labor, equipment, material, the hauling in of needed material and the hauling off and disposal of excess and unsuitable material, installation, acceptable taxes, overhead and profit and all other incidental costs. The Owner reserves the right to accept or reject these unit prices or require the work to be performed on a time and material basis with complete daily breakdown and logs submitted. a. Furnish and install storm/sanitary sewer cleanout: 1. 2. Furnish and install storm/sanitary sewer cleanout outside of pavement. Furnish and install storm/sanitary sewer cleanout within paved $ /C.O. Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA (Revised 4/27/16) area. b. Section 003100-6 Bid Proposal Form $ /C.O. $ $ $ $ $ $ $ $ $ $ $ $ $ /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. /L.F. Furnish and install pipe material including: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 3" diameter class 50 ductile iron pipe 4" diameter class 50 ductile iron pipe 7" diameter class 50 ductile iron pipe 8" diameter class 50 ductile iron pipe 8" diameter schedule 40 PVC 10" diameter schedule 40 PVC 12" diameter schedule 40 PVC 15" CMP 18" CMP 24" CMP 30" CMP 36" CMP 3" Type K copper pipe. All CMP shall be fully asphalt coated or aluminized as per Section 027200. Cost shall include all appurtenances, including fittings, bands, wyes, etc. and all appurtenant details. c. Furnish and install: 1. 2. 3. 4. 5. 6. 7. d. Pre-cast concrete storm drainage structures. Brick storm drainage structures Heavy duty cast iron grate and frame Pre-cast sanitary sewer manholes per Cobb County Department of Public Utilities Standards Cast iron ring and cover as per Cobb County Department of Public Utilities Standards Concrete curb and gutter as shown on Drawings for Construction in Right-of-Way Asphalt paving as shown on Drawings for Construction in Right-of-Way Furnish and install Georgia D.O.T. Type C Erosion Control Fencing $ $ $ /V.F. /V.F. /SET $ /V.F. $ SET $ /L.F. $ /L.F. $ /L.F. The above unit prices will also be used to determine any credit due the Owner on any changes in the work. 4. TIME OF COMPLETION: Bidder hereby agrees to commence actual physical work on the site with an adequate force and equipment within ten (10) days of a date to be specified in a written order of the Owner's (Notice to Proceed) and to substantially complete and finally complete the work by dates stated in Project Manual, Section 002100. 5. For and in consideration of the sum of $1.00, the receipt of which is hereby acknowledged, the Undersigned agrees that this proposal may not be revoked or withdrawn after the time set for the opening of bids but will remain open for acceptance for a period of sixty (60) days following such time, and that the acceptance of Alternates by the Owner, for the amounts proposed, may occur with-in (60) sixty days of the contract award, and incorporated into the Contract by Change Order. Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA (Revised 4/27/16) 6. Section 003100-7 Bid Proposal Form BID SECURITY: (CERTIFIED CHECK NOT ACCEPTED) Bid security in the amount of five percent (5%) of the Base Bid is attached in the amount of Dollars ($) _____________, which is to become the property of the Owner in the event the Contract and Performance Bonds are not executed within the time set forth, as liquidated damages for the delay and additional cost caused the Owner. The Undersigned agrees that upon receipt of the Notice of Acceptance of his Bid (NOTICE OF AWARD), he will, within ten (10) days from the Notice of Award, execute the formal Contract (AIA Document A101), and will deliver a Surety Bond for the faithful performance of this Contract and such other bonds and insurance as required by the specifications. The Undersigned further agrees that if he fails or neglects to appear within the specified time to execute the Contract of which this Proposal, the Bidding Documents and the Contract Documents are a part, the Undersigned will be considered as having abandoned the Contract, and the Bidder's Bond accompanying this Proposal will be forfeited to the Owner by reason of such failure on the part of the Undersigned. 7. If awarded a contract, the Undersigned's surety will be . Respectfully submitted, Signature of an Individual: Doing Business as: Business Address: If a Partnership: By: Member of Firm Member of Firm Business Address: If Corporation: By: Title: Business Address: Telephone Number: (Seal - If bid is by Corporation) DATE OF BID State of Georgia General Contractor's License Number __________________________. Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15 CFMM, Atlanta, GA (Revised 4/27/16) Section 003100-8 Bid Proposal Form End of Section 003100 Brumby Replacement Elementary/East Cobb Replacement Middle School, Cobb County, GA SHL-D05/6-15