This is the Powerpoint Presentation on the Algonguin Gas/Spectra
Transcription
This is the Powerpoint Presentation on the Algonguin Gas/Spectra
Proposed Spectra Gas Pipeline Hudson River Crossing in Verplanck, New York Presentation to the Community By the WPP/Spectra Task Force Linda D. Puglisi, Supervisor April 8, 2014 1 The WPP/Spectra Task Force Linda D. Puglisi, Supervisor Bernie Vaughey, Chairman • • • • • Arlene Bell Jim Bell Doreen Cole Holly Haight Melissa Hayes Staff Advisors: • • • • • Rosemary B. Lasher Kathleen Levesque Joseph Margiotta Rosemarie Muscolo Stephanie Vaughey Thomas F. Wood, Esq, Town Attorney Ed Vergano, P.E., Director DOTS Jeff Coleman, P.E., Director DES 2 From the Spectra Energy Website 3 From Spectra Energy Website: • • PROPOSED PROJECT FACILITIES Construction of approximately: – 20.1 miles of 42-inch diameter mainline take-up/relay and new pipeline in Connecticut and New York (includes a new 0.7 mile horizontal directional drill crossing of the Hudson River in New York); – 9.1 miles of 16-inch diameter take-up/relay pipeline in Connecticut; – 1.3 miles of 12-inch diameter loop pipeline in Connecticut; – 2.0 miles of 36-inch diameter loop extension pipeline in Connecticut; and – 5.1 miles of new 16-inch and 24-inch diameter lateral pipeline in Massachusetts • • • • • Addition of six new compressor units, for a total of 81,620 additional horsepower, at five existing compressor stations in New York, Connecticut and Rhode Island Modification to an existing compressor station in Connecticut Construction of one new meter station in Connecticut and two new meter stations in Massachusetts Modifications to existing meter stations in New York, Connecticut and Massachusetts We anticipate placing the AIM Project fully into service in November 2016. 4 5 6 Other Areas of Town 7 Other Areas of Town 8 Other Areas of Town 9 Photo & Video of HDD Drilling • From You Tube: • https://www.youtube. com/v/7Ye4XjUOyto %26hd=1;autoplay= 1 10 More Photos of Pipe Installation 11 Spectra HDD Pullback Area 12 The HDD Pullback area ends just near this Pond across from 14th St. 13 HDD Exit Location 14 11th Street, Verplanck 15 Photos of Pipe Installation 16 WHAT YOU CAN DO? Contact FERC www.ferc.gov DOCKET # FERC CP14-96-000 Pick up Petitions, Fill out and submit to the Federal Energy Regulatory Commission (FERC) Speak to your Representatives 17 The End. To download a copy of this presentation visit our website at: www.townofcortlandt.com THANK YOU! 18