This is the Powerpoint Presentation on the Algonguin Gas/Spectra

Transcription

This is the Powerpoint Presentation on the Algonguin Gas/Spectra
Proposed
Spectra Gas Pipeline
Hudson River Crossing in
Verplanck, New York
Presentation to the Community
By the WPP/Spectra Task Force
Linda D. Puglisi, Supervisor
April 8, 2014
1
The WPP/Spectra Task Force
Linda D. Puglisi, Supervisor
Bernie Vaughey, Chairman
•
•
•
•
•
Arlene Bell
Jim Bell
Doreen Cole
Holly Haight
Melissa Hayes
Staff Advisors:
•
•
•
•
•
Rosemary B. Lasher
Kathleen Levesque
Joseph Margiotta
Rosemarie Muscolo
Stephanie Vaughey
Thomas F. Wood, Esq, Town Attorney
Ed Vergano, P.E., Director DOTS
Jeff Coleman, P.E., Director DES
2
From the Spectra Energy Website
3
From Spectra Energy Website:
•
•
PROPOSED PROJECT FACILITIES
Construction of approximately:
– 20.1 miles of 42-inch diameter mainline take-up/relay and new pipeline in
Connecticut and New York (includes a new 0.7 mile horizontal directional drill
crossing of the Hudson River in New York);
– 9.1 miles of 16-inch diameter take-up/relay pipeline in Connecticut;
– 1.3 miles of 12-inch diameter loop pipeline in Connecticut;
– 2.0 miles of 36-inch diameter loop extension pipeline in Connecticut; and
– 5.1 miles of new 16-inch and 24-inch diameter lateral pipeline in Massachusetts
•
•
•
•
•
Addition of six new compressor units, for a total of 81,620 additional
horsepower, at five existing compressor stations in New York, Connecticut
and Rhode Island
Modification to an existing compressor station in Connecticut
Construction of one new meter station in Connecticut and two new meter
stations in Massachusetts
Modifications to existing meter stations in New York, Connecticut and
Massachusetts
We anticipate placing the AIM Project fully into service in November 2016.
4
5
6
Other Areas of Town
7
Other Areas of Town
8
Other Areas of Town
9
Photo & Video of HDD Drilling
•
From You Tube:
•
https://www.youtube.
com/v/7Ye4XjUOyto
%26hd=1;autoplay=
1
10
More Photos of Pipe Installation
11
Spectra HDD Pullback Area
12
The HDD Pullback area ends just
near this Pond across from 14th St.
13
HDD Exit Location
14
11th Street, Verplanck
15
Photos of Pipe Installation
16
WHAT YOU CAN DO?
Contact FERC
www.ferc.gov
DOCKET # FERC CP14-96-000
Pick up Petitions, Fill out and submit to the
Federal Energy Regulatory Commission
(FERC)
Speak to your Representatives
17
The End.
To download a copy of this presentation
visit our website at:
www.townofcortlandt.com
THANK YOU!
18