BROKEN ARROW PAC

Transcription

BROKEN ARROW PAC
CONSTRUCTION DOCUMENTS, 08/18/2015
SHEET INDEX
SHEET # SHEET NAME
GENERAL
G-001
COVER SHEET
ARCHITECTURAL
A-101
FIRST FLOOR DIMENSIONED FLOOR PLAN
A-102
FIRST FLOOR PATTERN PLAN, GENERAL NOTES
A-103
ALTERNATE #2 FLOOR PLAN
A-601
ROOM FINISH SCHEDULE, MATERIAL LEGEND, TRANSITION DETAILS
BROKEN ARROW, OKLAHOMA
701 S MAIN STREET
BROKEN ARROW, OK 74012
BROKEN ARROW PAC
PERFORMING ARTS CENTER
FLOOR REMODEL
PWR
ENTRY
VD
VD
PWR
ENTRY
FEC
FEC
42"
42"
42"
42"
REF.
BROKEN ARROW, OK
PERFORMING ARTS CENTER
48
48
Presentation Screen
FEC
D5 Concepts
1705 W. Montpelier St.
Broken Arrow, OK 74012
918.728.9222 t
No.
Description
Date
Key Plan
STOOL
STOOL
STOOL
STOOL
STOOL
STOOL
STOOL
24"
TABLE
36"
TABLE
STOOL
STOOL
STOOL
STOOL
STOOL
STOOL
RACK
STOOL
STOOL
STOOL
STOOL
RACK
FEC
STOOL
FEC
STOOL
FEC
This document, and the ideas and designs incorporated herein,
as an instrument of professional service, is the property of
D5 Concepts, LLC, and is not to be used, in whole
or in part, for any other project, without the written
authorization of D5 Concepts, LLC.
PROJECT NO:
ISSUE DATE:
CONTACT:
CHECKED BY:
NORTH
08/18/15
A. HIBBETS
A. HIBBETS
A-101
PATTERN PLAN KEY:
PERFORMING ARTS CENTER
VD
T3
CA1
VD
PWR
ENTRY
Presentation Screen
PWR
ENTRY
48
48
T2
CA2
SCOPE OF WORK
GENERAL NOTES
1. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO INSTALLATION.
2. PROVIDE APROPRIATE HEIGHT SCHLUTER METAL TRANSITION STRIPS AT ALL TILE TO ADJACENT FLOORING
TRANSITIONS. TRANSITION TRIM FINISH TO BE SATIN ANODIZED ALUMINUM.
3. IF THERE ARE ANY DISCREPANCIES BETWEEN ROOM FINISH SCHEDULE AND THE ARCHITECTURAL DRAWINGS,
PLEASE CONTACT INTERIOR DESIGNER BEFORE PROCEEDING.
4. PROVIDE OWNER WITH TWO SETS OF MATERIAL SUBMTTALS FOR ALL PRODUCTS USED DURING
INSTALLATION.
5. INSTALL NEW WOOD BASE WB1 AT ALL AREAS OF NEW WORK U.N.O. IF BASE IS ABLE TO BE RE-USED,
COORDINATE RE-USE WITH OWNER DURING CONSTRUCTION FOR APPROVAL.
6. INSTALL NEW STAINLESS STEEL FLOOR SUPPLY GRILLS IN EXISTING LOCATIONS. GRILL PROFILE/STYLE TBD.
FEC
FEC
42"
42"
42"
42"
REF.
FEC
CARPET INSTALLATION NOTES
1. REMOVE LOOSE MATERIALS AND ADHESIVE
2. PRIME FLOORS WITH SCHONOX "KH FIX" PRIMER
SLDG DOOR
WALL
MT.
WALL
MT.
3. SELF LEVEL FLOOR WITH SCHONOX "AP" (55 LB / BAG) TO .75"
4. SKIM COAT FLOOR
5. VERIFY CARPET TILE INSTALLATION PATTERN WITH OWNER AND DESIGNER. PROVIDE A TEN SQUARE FOOT AREA FOR
MOCKUP AND APPROVAL. MOCKUP MAY BECOME PART OF FINISHED WORK AFTER APPROVAL.
6. PROVIDE 15% ATTIC STOCK TO OWNER OF EACH CARPET TILE SPECIFIED.
PORCELAIN TILE/GRANITE INSTALLATION NOTES
1. REMOVE LOOSE MATERIALS & EXISTING ADHESIVE
2. APPLY SLURRY COAT OF LATICRETE 254
3. MUDSET 12" OF LATICRETE 3701
4. APPLY 2 COATS OF LATICRETE HYDRO BAN CRACK ISOLATION MEMBRANE
5. THINSET WITH LATICRETE 254
6. GROUT WITH LATTICRETE PERMACOLOR SELECT. FIELD TILE GROUT COLOR DUSTY GREY #60. GROUT AT ACCENT TILE
BANDS OF T2 AND T3, COLOR ANTIQUE WHITE #23.
7. FIELD TILES AND ACCENT TILES MAY HAVE VARYING THICKNESSES. MUDSET AND INSTALL ACCORDINGLY FOR FLUSH
INSTALLATION
8. INSTALL ACCENT TILE T2 AND T3 RADIATING OUT FROM THE THEATER WALL TO THE CURTAIN WALL. ALIGN ALL GROUT
JOINTS OF T2, AND T3 ALONG EACH LINEAR ROW.
9. TILE T1 INSTALLED RANDOMLY MAINTAINING A MINIMUM OF 33% OVERLAP. ADJUST LENGTHS IN TILE AS NEEDED SO
THAT ALL T1 TILES ARE 12" MINIMUM.
10. INSTALL T1 SO THAT NORTH/SOUTH GROUT JOINTS ARE A MINIMUM OF 3" AWAY FROM NORTH/SOUTH GROUT JOINTS
OF T2 AND T3.
11. TILES T2 AND T3 TO BE WATERJET CUT.
12. PROVIDE 5% ATTIC STOCK OF EACH TILE SPECIFIED.
13. SEAL GRANITE TILE AS REQUIRED AT END OF INSTALLATION.
14. PROVIDE A 20 SQUARE FOOT AREA FOR MOCKUP AND APPROVAL INCLUDING PART OF THE ACCENT BANDS.
MOCKUP MAY BECOME PART OF FINISHED WORK AFTER APPROVAL.
15. PROVIDE EXPANSION JOINTS EVERY 12-15'. ALIGN NORTH/SOUTH EXPANSION JOINTS WITH EXISTING COLUMNS
RADIATING TOWARDS WOOD THEATRE WALL. EAST/WEST JOINTS TO FOLLOW CURVES OF ACCENT TILES AND TRANSITION
TO STRAIGHT EAST/WEST LINES OF TILE T1 AS NECESSARY.
BROKEN ARROW, OK
48
T1
D5 Concepts
1705 W. Montpelier St.
Broken Arrow, OK 74012
918.728.9222 t
No.
Description
Date
Key Plan
STOOL
STOOL
STOOL
STOOL
STOOL
STOOL
STOOL
24"
TABLE
36"
TABLE
STOOL
STOOL
STOOL
STOOL
STOOL
STOOL
RACK
STOOL
STOOL
STOOL
STOOL
RACK
FEC
STOOL
FEC
STOOL
FEC
NORTH
This document, and the ideas and designs incorporated herein,
as an instrument of professional service, is the property of
D5 Concepts, LLC, and is not to be used, in whole
or in part, for any other project, without the written
authorization of D5 Concepts, LLC.
PROJECT NO:
ISSUE DATE:
CONTACT:
CHECKED BY:
08/18/15
A. HIBBETS
A. HIBBETS
A-102
BROKEN ARROW, OK
PERFORMING ARTS CENTER
18
D5 Concepts
1705 W. Montpelier St.
Broken Arrow, OK 74012
918.728.9222 t
No.
Description
Date
Presentation Screen
Key Plan
This document, and the ideas and designs incorporated herein,
as an instrument of professional service, is the property of
D5 Concepts, LLC, and is not to be used, in whole
or in part, for any other project, without the written
authorization of D5 Concepts, LLC.
PROJECT NO:
ISSUE DATE:
CONTACT:
CHECKED BY:
08/18/15
A. HIBBETS
A. HIBBETS
NORTH
A-103
ROOM INFORMATION
FLOOR
WALL
CEILING
NO.
ROOM/SPACE
FINISH
BASE
NORTH
EAST
SOUTH
WEST
100
VESTIBULE
CA2
WB1
-
-
-
-
-
101
GRAND FOYER
T1, T2, T3,
CA1
WB1
-
-
-
-
-
102
VESTIBULE
T1
WB1
-
-
-
-
-
107
CORRIDOR
T1
WB1
-
-
-
-
-
110
VESTIBULE
T1
WB1
-
-
-
-
-
111
ENTRY VESITBULE
CA1
WB1
-
-
-
-
-
112
VESTIBULE
T1
WB1
-
-
-
-
-
128
CORRIDOR
CA1
WB1
-
-
-
-
-
129
CORRDIOR
CA1
WB1
-
-
-
-
-
143
RECEPTION
CA1
WB1
-
-
-
-
-
156
CORRIDOR
CA1
WB1
-
-
-
-
-
S1
STAIR
CA1
WB1
-
-
-
-
-
S2
STAIR
CA1
WB1
-
-
-
-
-
220
EDUCATION SERVICE
CENTER
CA1
EXIST
-
-
-
-
-
COUNTER
TOP
REMARKS
MATERIAL FINISH LEGEND
FINISH
CODE
MATERIAL
FLOOR BASE
WB1
WOOD BASE
FLOORING
CA1
CA2
T1
T2
T3
CARPET - TILE
CARPET - TILE
PORCELAIN FLOOR TILE
PORCELAIN FLOOR TILE
GRANITE
MANUF
DESCRIPTION
SIZE
COMMENTS / INSTALLATION
NOTES
REPLACE WOOD BASE WITH NEW WOOD BASE TO MATCH . STAIN TO MATCH EXISTING WOOD WALL
TBD
MOHAWK LEES
DALTILE
CROSSVILLE
TBD
STEP IN STYLE II GT312, COLOR: IRON ORE 983
INVOKE COLORBODY PROCELAIN, COLOR: EVENING VEIL ID04
BLUESTONE, COLOR: COLORADO BUFF AV201, HONED
GRANITE TO MATCH EXISTING GRANITE AT STAIRS.
2'X2'
2'X2'
18"X36"X 38"
12"X12X 10.5MM
12"X12"X83"
BROKEN ARROW, OK
PERFORMING ARTS CENTER
ROOM FINISH SCHEDULE
VERIFY SANTE CECILIA GRANITE COLOR MATCH WITH SUBMITTALS.
D5 Concepts
1705 W. Montpelier St.
Broken Arrow, OK 74012
918.728.9222 t
No.
Description
Date
Key Plan
Schluter - RENO-T
Schluter - RENO-TK
FOR USE AT TILE TO CARPET/CONCRETE INSTALLATION
FOR USE WHERE CARPET MEETS EXISTING TILE INSTALLATION
Tile or Stone
Tile or Stone
Other Covering
This document, and the ideas and designs incorporated herein,
as an instrument of professional service, is the property of
D5 Concepts, LLC, and is not to be used, in whole
or in part, for any other project, without the written
authorization of D5 Concepts, LLC.
Other Covering
Substrate
Substrate
A1
FLOOR TRANSITION DTL.
PROJECT NO:
08/18/15
A. HIBBETS
CHECKED BY: A. HIBBETS
ISSUE DATE:
CONTACT:
A2
FLOOR TRANSITION DTL.
PRELIMINARY
PLANS
A-601