mas errázuriz ltda. – aveng grinaker lta. consortium
Transcription
mas errázuriz ltda. – aveng grinaker lta. consortium
MAS ERRÁZURIZ LTDA. – AVENG GRINAKER LTA. CONSORTIUM SINKING VENTILATION SHAFTS CONSTRUCTION CHUQUICAMATA SUBTERRÁNEA PROJECT Expositors Sr. Iván Pérez P. Business Manager Mas Errázuriz Ltda. Sr. Louis Germishuys International Business Manager Aveng Grinaker LTA Isometric View of the Project Consortium Organization MAS ERRAZURIZ LTDA. – AVENG GRINAKER LTA. TECHNICAL ADMINISTRATIVE COMMITTE MAS ERRAZURIZ LTDA. – AVENG GRINAKER LTA. SITE MANAGER ADMINISTRATIVE LEADERSHIP MAS ERRÁZURIZ TECHNICAL LEADERSHIP AVENG GRINAKER LTA Risk Control, Environmental and Occupational Health Program DOCUMENTATION Analysis and legal adjustment and Grinaker experience Communication, participation and consultation Dissemination Incident Indicator Report Behavior Improvement Program Risk Assessment o Documentation and control (Quality Manual) o Preparation and response in emergency cases Preparation of procedures Formation of Committees o o VERIFICATION AND CONTROL Measurement and monitoring of the SSOMA program performance. Monthly review through the Administrative Technical Committees on site Monthly reports to the senior management (Directory) o Evaluation of legal compliance o Accident Investigation o Non compliances and corrective actions Findings Management System o Internal Audit Program o Leadership Review: evaluate program SSOMA effectiveness o Human Resource Management Plan The Human Resource Management Model is based on a mixed organization of Chilean and southafrican personnel. Aveng Grinaker’s Technical Leadership involves training and transferring knowledge to Mas Errázuriz staff, by training carried out in current Aveng Grinaker works in South Africa or Zambia and on-site instruction for six months periods in previously defined positions. The organization follows similar criteria. CHILEAN/SOUTHAFRICAN MIXED ORGANIZATION • RECRUITING AND SELECTION • TRAINING IN CHILE AND SOUTHAFRICA • TRAINING AND DEVELOPMENT PLAN WITH COMPETENCE CERTIFICATION • PERFORMANCE MANAGEMENT • QUALITY OF LIFE AND SOCIAL RESPONSIBILITY • INTERNAL AND EXTERNAL COMMUNICATIONS Direct Personnel DIRECT PERSONNEL AND STRUCTURAL MECHANICAL ASSEMBLIES Capataz de Montajes Maestro Primera de Montajes Maestro Segunda de Montajes Soldadores Plancha Ayudantes de Montajes Maestro Primera Mecánico Maestro Primera Eléctrico Ayudante Mecánico Ayudante Eléctrico DIRECT PERSONNEL AT THE FACE Jefe de Turno Pique Operadores de Perforadoras Ayudantes Mineros DIRECT PERSONNEL AT THE PLATFORM Jefe de Turno Plataforma Campanero de Plataforma Ayudantes de Minería (Plataforma) DIRECT PERSONNEL ON BENCH OR SURFACE Minería: Ayudante Minería (Banco) Operador de Grúa Torre SUPPORT SERVICES Jefe de Turno Minería Mecánicos Ayudantes Eléctrico Servicios Mecánico Servicios Soldadores PERSONAL TRAINING FOR 6 MONTHS Jefe de Turno Minería General Jefe de Turno Plataforma Jefe de Turno Pique Operador Compuerta de Superficie Operador de Clam Shell Operador de guinche Mecánico de Jumbo Critical Shaft Sinking Safety Rules 1. Avoid Falling Objects at all Cost 2. Follow procedures for Working at Heights 3. Safety Slings on All Tools 4. Follow Proper Barring Technique & Procedure 5. Support Installed to Standard 6. Follow Correct Explosive Handling & Blasting Procedures 7. Ensure Right Equipment for the Job 8. Follow procedures – No Short Cuts 9. Personal Protective Clothing 10. Behavioural Based Safety (BBS) – Your and your colleague’s safety Shaft Sinking Phases 1. Mobilisation 2. Design & Planning 3. Site Establishment 4. Collar Construction 5. Pre-Sink 6. Change over to Main Sink 7. Main Sink 8. Remove Sinking Services & Clear Site 1. Mobilisation 1. Mobilisation of Equipment 2. Forwarding & Clearing of Equipment 3. Recruitment of Workforce 4. Sinking Training 5. Approvals and Permits (legal requirements) 2. Design & Planning Type of Drawing Number of Drawings Hours Required General Arrangement 5 110 Infrastructure & Reticulations 30 1150 Collar & Pre-Sink 20 720 Main Sink 35 1100 Sinking Headgear 25 1100 Sinking Equipment 15 600 Winders 15 550 Management & Administration 400 3. Site Establishment 1. Winder Foundations 2. Batch Plant 3. Workshops 4. Stores 5. Offices 6. Services Reticulations 7. Manufacture in Chile 4. Collar Construction 1. Survey – setting out 2. Back Actor 3. Support 4. Shutter 5. Concrete 5. Pre-Sink 1. Drilling 2. Support 3. Mucking 4. Hoisting 5. Pre-Sink Stage 6. Change Over to Main Sink 1. Remove pre-sink stage 2. Lower main sink stage 3. Collar Steel 4. Headgear 5. Winders 6. Fans 7. Main Sink 1. Drilling 2. Mucking 3. Support 4. Concrete Lining 5. Services 8. Remove Sinking Services & Clear Site 1. Remove all sinking infrastructure 2. Hand over of site to client 3. Permanent Fan Construction to commence Resumen Duración m3 Excavados Consumo Explosivos m3 Totales de Hormigón** Consumo Eléctrico Estimado Dotación Total Promedio Mes m3 Kg m3 KWh Trabajadores/Mes Alt 1 Concurrent 24.0 117,078 316,112 27,478 71,215,200 219 Alt 1 in line 30.0 idem idem idem 89,019,000 213 Alt 2 Concurrent 41.0 234,022 631,859 55,041 121,659,300 230 Alt 2 in line 52.0 idem idem idem 154,299,600 225 Alt 3 Concurrent 24.0 123,891 334,505 31,064 71,215,200 230 Alt 3 in line 30.0 idem idem idem 89,019,000 223 Alternativa Pique 1 Pique 1 + Pique 2 Pique 1 + Collar 2 Site Preparation and Civil Works Site Preparation and Civil Works Site Preparation and Civil Works Pre-Sinking Pre-Sinking Main Excavation Main Excavation Blast Diagram Phase : Jumbo Perforation Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo Phase : Blast Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo Phase : Ventilation Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo Phase : Dump Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo Phase : Fortification Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo Phase : removal of perforation equipment Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo Phase : Box Lining Caso : Ciclo trabajo en Línea: Prohibido Trabajo Paralelo