PRESENTATION GABRIC SAZEH TABA
Transcription
PRESENTATION GABRIC SAZEH TABA
PRESENTATION GABRIC SAZEH TABA GST – Composite Permanent framework system The development of the patented GS composite formwork system began back in the early 1980ies in Austria. Up to this day it has been implemented hundreds of housing projects, hotels, restaurants, business and industrial buildings, leisure facilities and social institutions all over the world by using this technology. GST System technology The patented GST-System is based upon the principle of permanent formwork, where the formwork stays in the object after all works on site. The casings of the GST system are made by 24mm thick cement bonded particle boards (CBPB) or Fiber Cement Board, the boards are assembled in the GST-factory in one finished item. Prior to joining the boards the reinforcement steel is placed according to the project in the panel. To join the plates a special patented steel profiles are used which are attached to the boards with special steel bolts. Application of aforementioned profiles ensures even panel thickness and admission of pressure until complete concrete hardening has occurred. The wall and slab elements are acting together as composite shell they will be assembled together on site and will finally be poured with concrete (self compacting concrete) to get their final stability. The cement board remains from both sides in the building as permanent formwork with high quality pre finishing. This system is used for walls, ceilings, stairs and other special element creation. Constructing with GST system retains all advantages of reinforced concrete panel construction High resistance against pressure High resistance to the tensile strength High resistance to dynamic loads At the same time the benefits of wooden buildings are not lost: Necessary favorable micro climate for living Smooth surface temperature of the cement board. GST System advantages compared with traditional building methods 1. Short construction time The GST system requires very short times for erecting raw superstructures. The simple and effective assembly of the panels on site and the omitting of strikingout the frame work and basic-plaster work including dry-out periods, will shorten the process time on site down to 50% compared with traditional systems. Also finishing works can start in relatively short period of time after concrete has dried out. Assembly time of Multi-storey building of one floor of 700-800 m2 for 5 people worker team is one week. 2. High quality The assembly quality and accuracy is measured in mm. Before painting or wallpaper adhesion, internal wall finishes require only minimal internal seam finish. Exterior walls require minimal catch-adhesive consumption for heat isolation strengthening. As the system offers high level of exactness, the final object will be accurate the security risks are reduced to minimum, therefore significant reduction of insurance costs is possible. 3. Size variations and opportunities of large-scale coverage By using GST system there is great potential to create a specific panel sizes designed specifically for each object. The system allows reducing the need for columns. 4. Correction of communications If the customer desire requires changing an existing electrical location, there is possibility of adjustments before concrete – filling, because everything is transparent and adjustable. 5. Little space requirements There are advantages to build in urban, density populated areas panels will be delivered and assembled just in time, no additional space needed, for storing the materials or specific building equipment. GST System advantages compared with traditional building methods 6. Cement board functions depending on the season The boards act like a jacket and protect the concrete against frost in winter or against too quick dry out in summer. The reduction of working time in winter leads to cost reductions. 7. Concrete has high stability and sound insulation Due to the fact that the whole building is monolithic concrete casting, such a system construction is regarded as stable and reliable in earthquake regions. 8. Low load capacity handling equipment necessity Taking into account that in the building site will be moved and assembled empty panels, the freight moving equipment can be with low carrying capacity, as well as costs will be reduced because of relatively short mounting time. 9. Complete absence of construction waste after assembling Cleaning and waste will be minimized significantly as well, therefore the costs for waste management will be close to zero. 10. Low cost of transportation from the factory to the building site, due to the small cargo weight One track is for up to 100m2 (building useful area). 11. Building conditions suits nearly all weather conditions Due to the fact that 60% of the entire processes take place inside the factory therefore into secure surrounding, on building site there is only mounting and concreting. Consequently, the reduced dependence on weather conditions and at the same time costs. 12. The most important is the fact that all the aforementioned advantages are significantly reducing the total construction costs and completion times. GST system advantages compared with reinforced concrete building methods 1. 2. 3. 4. 5. GST-System-panel light weight allows the saving of transport and assembly costs. One track is for up to 100m² (building useful area). The concreting will be done on site; therefore GST System will not have any joints between the panels, compared with the finished panel assembly. The walls and the slabs will be poured together and create a massive concrete structure. If there is a need to reduce the size of a room during the construction, than it is very easy to transform the current panel in to desired size. Communication corrections. If the customer desires to change an existing electrical location, there are possible all types of corrections, before concrete filling. From the top everything is transparent and adjustable. GST wall system technical description The patented GST-system is based upon the principle of permanent formwork, where the formwork stays in the object after all works on site. The shells of the GST- system are formed by 24 mm thick cement bonded particle boards or fiber cement board. They will be assembled in the GST - factory in several processes in an industrial way. As the connecting elements only self- developed steel clips (spacers) will be utilized. The spacers will be fixed with galvanized screws on the inner face of the Board without any appearance on the visible side. All the connections between the single GST- walls will be created as an 8 cm wide and 12mm deep mill or a 12 mm wide and 6 mm deep V- shaped joint. On building site the joints should be treated according to supplier’s instructions. All GST – Wall elements will be fully manufactured and fitted with lifting units and placed in special transportation cases. GST wall system technical description GST – Walls can be used for vertical or pitched use on site All needed openings (doors windows, etc.) and wiring will be built in at factory according to the project. Reinforcement will be built in at factory according to drawings or requirement for each project Standard Wall types: 1. D=17,5cm (d=12,7cm); 2. D=20,0cm (d=15,2cm); 3. D=21,5cm (d=16,7cm); 4. D=23,0cm (d=18,2cm); 5. D=25,0cm (d=20,2cm); 6. D=30,0cm (d=25,2cm). The overall thickness of the GST – Wall D (measurement in architectural drawings) element will be given by the thickness of the concrete core d and the thickness of the cement board on each side. Other wall thicknesses can be manufactured after request and reconfirmation. GST – Slabs technical description The GST-Slab elements type HT consists from cement board (thickness 24mm) and special cap - profiles for horizontal or pitched slab areas. The single slab – elements will be assembled in factory to packages of maximum size 2,4m x 6,00 m The cap-profiles will be screwed on top of the cement board with screws 5/24mm in a distance of 40,0 cm. Height of cap – profile is 50 mm, total height of GST-slab-element is 75mm. The reinforcement bars size is calculated according to following calculation: 3,93cm2/m The bottom surface of the slab must be treated according to supplier’s instruction GST system special element description With the GST formwork solution all elements of load-bearing structure can be provided. In addition to main construction elements we can offer: GST fringe boards GST column elements (rectangular or quadratic) based upon structural analysis, reinforcement will be fitted into the GST element in factory GST beams elements (rectangular or quadratic) based upon structural analysis, reinforcement will be fitted into the GST element in factory GST stairs elements - straight flights and landings including fringes to form risers, reinforcement will be fitted into the GST element in factory GST capitels (shear heads) – to raise resistance against punching of slabs GST window boards – solution to provide the possibility to place a window in the thermal insulation area GST wall heating – a special pipes (hot water) built into the wall panels, creating a wall heating elements (including all necessary taps and connections) fully compliant to thermal requirements GST corners and T-crossing details – providing the possibility to build in reinforcement on site Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Construction in progress Thank you for your attention! Gabric Sazeh Taba Ph.: +98-21-88677917¬20 Fax: +98-21-88677921 Email: Info@gst-co.net Web site: www.gst-co.net