v0011 Installing a tekmar Boiler Control 275 with Modulating Boilers
Transcription
v0011 Installing a tekmar Boiler Control 275 with Modulating Boilers
SB 050 Service Bulletin v0011 Aug 14, 2008 form Installing a tekmar Boiler Control 275 with Modulating Boilers Essential Control Settings Buderus GB142 Heat Transfer Products Munchkin IBC 15-150 Lochinvar Knight Peerless Pinnacle Triangle Tube Prestige Weil-McLain Ultra Series I & II Weil-McLain Ultra Series III This table describes certain essential settings required on the Boiler Control 275 when installed with the most common modulating boilers. For a complete list of compatible boilers, please refer to tekmar Service Bulletin SB 032. Relay 1 Type Pump 1 Pump 1 Pump 1 Burner 1 Pump 1 Pump 1 Pump 1 Pump 1 Fire Delay (minute:second) 0:20 0:15 0:30 0:25 0:15 0:35 0:30 0:30 Min Mod Delay (minute:second) 0:00 0:20 0:30 0:05 0:20 2:00 2:00 1:00 Motor Speed (seconds) 10 60 10 10 60 90 60 60 Start Modulation (%) 30 45 40 50 45 18 50 50 Minimum Modulation (%) 30 33 10 20 33 18 18 20 Maximum Modulation (%) 100 100 100 100 100 100 100 100 Additional Equipment Purchased from Boiler Manufacturer EM10 Module Munchkin Interface Board none none Analog Interface Adapter AM4* AM4 none * Triangle Tube Prestige boilers manufactured after February 2008 do not require AM4 module. File And Version v0011-May0803-L 1 of 2 SB 050 Service Bulletin Aug 14, 2008 form Figure 1: AM4 Module Wiring Figure 2: Lochinvar Knight Boiler Wiring Guide Figure 3: Peerless and Heat Transfer Products Adapter Wiring Guide Figure 4: Buderus EM10 Module Wiring Guide File And Version v0011-May0803-L v0011 2 of 2