August 29, 2012
Transcription
August 29, 2012
August 29, 2012 We are here. Tokyo Dome x 4.5 Operation started from March 1922 Total area 197,878 m2 (Size of Tokyo Dome x 4.5 times) Treatment capacity 700,000 m3/day Facilities: 21 grit chambers, 18 primary sedimentation tanks, 17 reaction tanks, and 33 secondary sedimentation tanks Higashi Ogu Purification Center Mikawashima Water Reclamation Center Kita-ku Arakawa-ku Toshima-ku Bunkyo-ku Taito-ku Shinjuku-ku Covering area 3,936ha Assumed population 810,000 Current treatment capacity per day Chiyoda-ku 700,000m3 ◇. Mikawashima Water Reclamation Center Mikawashima Water Reclamation Center, Hokubu Sewerage Office, Bureau of Sewerage, Tokyo Metropolitan Government Equipment Management: Operation and maintenance of equipment Equipment Development: Designing of mechanical and electric equipment Facilities Development: Designing of civil engineering facilities Water Quality Management: Management of water treatment conditions Location: 8-25-1 Arakawa, Arakawa-ku (Nearest station: Machiya, Keisei Line and Metro Chiyoda Line) Covering area: Arakawa-ku, Taito-ku, Bunkyo-ku, Toshima-ku, etc. Treatment capacity: 700,000 m3/day Total area: 197,878 m2 Operation started from March 1922 as the first modern sewerage treatment facility in Japan. The former main pump building is designated as important cultural property and is opened to the public occasionally in events, such as cherry blossom (spring), azalea blossom (May), cultural assets week (autumn), etc. Cherry blossom and important cultural property Summary of Mikawashima Water Reclamation Center Aizome River Trunk (from Yushima Aizome Pump) (4×2.8m) Pump No.2 Jizobori Pump Aizome East Jizobori Trunk (3×1.9m) Total area 197,878m2 Treat 420,000m3/day No.2 Jizobori Trunk (5.0m) Aizome North Asakusa Trunk (2.88×1.83m) Aizome No.2 Asakusa Trunk (Φ3.25m) No.2 Minami Senju Trunk(Φ2.6m) Ogu Trunk(0.9m) Asakusa Facilities included in the Mikawashima Water Reclamation Center ◇. Sewerage treatment: pumping and water treatment equipment Pump Gate Screen M Primary sedimentation tank Houses, factories, buildings, etc. Sewerage trunk lines Primary sedimentation tank Grit chamber Reaction tank Pump well Water Sterilization Secondary discharge sedimentation tank 【Microbe】 Rivers, etc. From pump well Sludge treatment Suction sludge Sludge treatment Air blower Return sludge Excess sludge Sewerage after grit chamber is tanked here to sink fine particles and sands. Reaction Tank Organic materials are dissolved by microbe (activated sludge), stimulated by aeration from air blower. Inside Reaction Tank Organic materials are dissolved by microbe (activated sludge), stimulated by stirring and aeration from air blower. Air Blower Machine to provide air to the organic reaction tank Sink sludge and skim upper water to chlorination tank. 滅菌設備 Sodium hypochlorite injection facility Discharge water to Sumida River after sterilization. Operation of Higashi Ogu Purification Center Add sodium hypochlorite Mikawashima Advanced treated wastewater Delivery (Approx. 30%) Add sodium hypochlorite Reclaimed wastewater (Approx. 15%) Purification center Highly advanced treated wastewater Sludge treatment Wastewater Water treatment Sludge Sludge tank Water treatment 30,000m3/day Concentration 0.35% P Sunamachi Center Wish to be a Resident-friendly Water Reclamation Center End of the presentation on the Mikawashima Water Reclamation Center 2012/10/29 25