Marina Bay Santo Stefano di Camastra
Transcription
Marina Bay Santo Stefano di Camastra
SANTO STEFANO DI CAMASTRA LOCATION FLIGHT DURATION FROM ROME/PALERMO: SICILY: The Hub Of The Mediterranean Sea Since Phoenicians, Greeks And Romans ROME 1,06 H MILAN 1,38 H VENICE 1,38 H ZURICH 1,50 H PARIS 2,25 H DOHA 6,50 H MADRID 2,25 H ATHENS 2,10 H DUBAI 5,50 H INSTAMBUL 2,30 H TUNIS 1,00 H CAIRO 3,30 H MALTA 0,46 H NAUTICALS MILES FROM MARINA OF SANTO STEFANO DI CAMASTRA TO: The North Coast Of Sicily In Front Of The Aeolian Islands AEOLIAN 30 USTICA 68 SALERNO 159 CAPRI 150 ISCHIA 160 SARDINIA 230 CEFALÙ 16 CAPO D’ORLANDO 20 MILAZZO 50 PALERMO 47 SANTO STEFANO DI CAMASTRA KILOMETRES FROM SANTO STEFANO DI CAMASTRA TO: PALERMO 100 CATANIA 211 MESSINA 132 AGRIGENTO 183 SIRACUSA 260 RAGUSA 248 SANTO STEFANO DI CAMASTRA KNOWN ALL OVER THE WORLD FOR ITS ART, CULTURE AND TYPICAL POTTERY. THE CERAMIC OF SANTO STEFANO DI CAMASTRA BOASTS A RICH REPERTOIRE OF FORMS, SHAPES AND COLORS, WHOSE BRILLIANCE AND BRIGHTNESS, USED WITH THE TYPICAL DECORATIVE MOTIFS, MAKE IT EASILY RECOGNIZABLE WORK BY ESTABLISHING A STRONG LINK BETWEEN THE OBJECTS AND THE AREAS THEY COME FROM. THE CITY WAS SETTLED IN 1683 BY THE WILL OF DUKE CAMASTRA AND PRINCESS MARIA GOMEZ DE SILVERA. L. PIRANDELLO – LA GIARA - « … FORESEEING A RHOMBUS SQUARE IN SANTO STEFANO AN URBAN DESIGN ATTRIBUITED TO THE MILITARY ENGINEERING THAT THE FIVE OLD GLAZED CERAMIC JARS STORED IN HIS CELLAR WOULDN'T BE ENOUGH TO HOLD ALL THE OLIVE OIL FROM THE NEW HARVEST, HAD ALREADY ORDERED A SIXTH BIGGER ONE FROM SANTO STEFANO DI CAMASTRA, WHERE THEY MADE THEM …» IT IS IMPOSSIBLE TO DESCRIBE THE BEAUTY OF THE SANTO STEFANO CERAMICS… YOU HAVE TO SEE THEM ALL! WHAT IS AROUND WHAT IS AROUND WHAT IS AROUND AEOLIAN ISLAND NEBRODI’S PARK FIUMARA D’ARTE WHY BUILD THE MARINA BAY IN SANTO STEFANO DI CAMASTRA? A REAGIONAL PORT PLAN AND SYSTEM FOR THE MARINA BAY OF SANTO STEFANO DI CAMASTRA THE MARINA OF SANTO STEFANO DI CAMASTRA … AN AGREEMENT BETWEEN THE «FIUMARA D’ARTE» FOUNDATION, NEBRODI’S PARK, REGIONAL ASSEMBLY BOARD, DEPARTMENT OF ENVIRONMENTAL AFFAIRS AND DEPARTMENT OF INDUSTRY… NUMBER OF BERTHS: 750 CONCERNED SURFACE: 199.331 SQ.M.; OVERALL COST: 63 MILLIONS OF EUROS ; SOURCE OF FUNDING: PRIVATE CAPITALS; DURATION OF THE GRANT: 50 Quay construction / destination Club House – Restaurant – Marina services Covered surface – sq.m. Number of floors Volume Mc YEARS; Maximum height Ml 850 2 5.950 9,00 Commercial Building Sector 1.160 2 12.180 7,50 Private Housing Estate and Parking 1.535 2 11.512 7,50 Changing rooms – Sport facilities 115 1 345 3,00 Marine authority 400 2 2.800 7,00 Boat storage 650 1 4.875 7,50 Box office 18 1 54 3,00 Restrooms – H1 99 1 297 3,00 Restrooms – H2 176 1 528 3,00 Restrooms – H3 12 1 36 3,00 6.700 4.400 ------------- ------------- ------------- Parking Garden 1 1 2 3 2 1) THE MAIN PIER IS LOCATED IN THE OUTER BASE OF BREAKWATER; 2) THE RESIDENTIAL AND COMMERCIAL BUILDING IS LOCATED JUST BEFORE THE QUAY; 3) THE SLIPWAYS AND THE WAREHOUSES OF THE WORKSHOPS ARE LOCATED IN THE BASE OF THE UNDER-BILLOW PIER EXAMPLE OF MARINAS'S DOCKS DOCKS SPECIAL STONES CLADDING (MISTRETTA STONE) OFFERED SERVICES DOCKING RENTAL PRINCIPAL SERVICES BERTHS RENTAL ACCOMMODATION/BOARD FOOD COURTS BOAT LAUNCHING AND HAULING BOAT STORAGE FUEL DISTRIBUTOR STORAGE FACILITIES ADDITIONAL SERVICES REFRESHMENT STANDS AND OTHERS SAILING SCHOOL WATER SPORT CENTER EVENTS AND SPORT FEATURES, FUN AND GAMES TOURIST ATTRACTIONS YACHT SAILBOATS RENTAL AND CATAMARAN CHARTER TOURIST RESORT SERVICES SUNSET IN SANTO STEFANO DI CAMASTRA EXPECTED ANNUAL OVERHEAD PERSONNEL COSTS € 1.250.000,00 STATE-OWNED FEE € 300.000,00 SERVICES: CONSUMPTION, MAINTENANCE ETC. € 1.582.800,00 AMORTIZATION € 1.650.000,00 TOTAL PRODUCTION COSTS FINANCIAL BURDENS € 4.782.800,00 € 400.000,00 INCOME TAXES € 1.586,575,16 TOTAL € 6.769.375,16 SEA IN SANTO STEFANO DI CAMASTRA ANNUAL USE OF MOORINGS EXPECTED ANNUAL INCOME Berth size Boats 10,0x3,5 11,5x4,0 12,0x4,1 15,5x5,0 18,0x5,5 21,0x6,0 24,0x6,5 28,0x7,0 32,0x7,5 36,0x8,0 126 103 91 79 69 41 26 29 25 13 DAILY USE OF MOORINGS Berth size 12,0x4,1 15,5x5,0 18,0x5,5 21,0x6,0 24,0x6,5 28,0x7,0 32,0x7,5 36,0x8,0 Number of seats 41 36 31 18 10 12 10 5 Annual Rate € 2.006,55 2.746,09 3.538,83 4.732,16 8.107,91 8.715,00 10.915,00 12.400,00 14.100,00 18.300,00 Total annual income Rate Annual € production 100,00 60 120,00 60 150,00 60 200,00 60 250,00 60 400,00 60 600,00 60 1000,00 60 Total annual income Annual income € 252.825,30 282.847,27 322.033,53 373.840,64 559.445,79 357.315,00 283.790,00 359.600,00 352.500,00 237.900,00 3.382.097,53 Annual income € 246.000,00 259.200,00 279.000,00 216.000,00 150.000,00 288.000,00 360.000,00 300.000,00 2.098.200,00 OTHER COMMERCIAL SERVICES EXPECTED ANNUAL INCOME services accommodation garage/storage restaurants bar - shops fuel Teorical Max prod. n./week 4.212 n.clients/daily 7.300 n.clients/daily 91.250 n.clients/daily 73.000 liters 7.300.000 Measuring unit/Time use 80% 90% 70% 65% 95% Effective Average Production value annual unit price prod. 3.791 € 70,00 € 265.356,00 6.570 € 100,00 € 657.000,00 45.625 € 30,00 € 1.916.250,00 36.500 € 50,00 € 2.372.500,00 6.935.000 € 0,08 € 554.800,00 Total annual income SUMMARY OF THE EXPECTED ANNUAL INCOME annual income from moorings € 3.382.097,53 daily income from moorings € 2.098.200,00 accommodation € 235.872,00 garage/storage € 657.000,00 restaurants € 1.916.250,00 bar – shops € 2.372.500,00 fuel € 554.800,00 € 11.216.719,53 TOTAL € 5.736.422,00 Aeolian Islands from Santo Stefano di Camastra FINANCIAL SUSTAINABILITY STATEMENT OF COMPREHENSIVE INCOME PRODUCTION VALUE € 11.216.719,53 PRODUCTION COST € 4.782.800,00 € 6.433.919,53 € 550.000,00 € 5.833.919,53 € 1.941.693,44 € 3.942.226,09 EARNINGS BEFORE INTEREST AND TAXES FINANCIAL BURDENS RESULT BEFORE TAXES TAXES NET INCOME Relative financial sustainability: • Return On Investment: ROI = 12,24 % = Gross income/invested capital x 100 • Return On Equity: ROE = 7,50 % = Net income/income equity x 100 FINANCIAL SUSTAINABILITY THE MARINA BAY PROJECT OF SANTO STEFANO DI CAMASTRA HAS BEEN ADMITTED TO USE OF THE «JESSICA» FUNDS (JESSICA: JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS) THE FINANCIAL HELP OF JESSICA FUNDS CAN BE GRANTED IN THE FORM OF SHARES, LOW-INTEREST LOANS AND/OR GUARANTEES THE INITIATIVE IS CARRIED OUT BY THE EUROPEAN COMMISSION IN COLLABORATION WITH THE EUROPEAN INVESTMENT BANK AND THE COUNCIL OF EUROPE DEVELOPMENT BANK (CEB BANK) THE MARINA PROJECT HAS BEEN CONSIDERED BANKABLE BECAUSE: PROVIDED OF AN INTRINSIC ABILITY TO GENERATE REVENUE THROUGH USER CHARGES; ALLOWS FULL RECOVERY OF INVESTMENT COSTS OVER THE LIFE OF THE CONCESSION THE PROJECT REALIZATION FUNDS FOR ORIENTED TO HAS BEEN ESTIMATED FOR USE OF OF STRUCTURAL INTERVENTIONS FULFILLMENT OF THE REGIONAL STRATEGIC PLAN OF A PORT SYSTEM THROUGH SETTING UP OF THE EU AID SCHEME, UNDER ARTICLE 75 REGIONAL LAW 23.12.2000 N° 32, REPLACED BY ARTICLE 18 OF REGIONAL LAW 06.08.09 N°9, IN FAVOUR OF PRIVATE SECTORS OPERATING IN SICILIAN TOURIST INDUSTRYUNDER OF THE REGIONAL STRATEGIC PLAN OF THE PORT SYSTEM, THERE ARE 42 MARINAS THAT COULD BENEFIT FROM GRANTS AND AMONG THOSE, THERE IS THE MARINA BAY CAMASTRA, THE ONLY NEW STRUCTURE ON THE TYRRHENIAN COAST OF SICILY. THE PROJECT, THAT MUST RESPECT THE RULES, CONSISTS IN 50% SANTO STEFANO DI READY TO BE CARRIED OUT EU INVESTMENT AID SYSTEM GRANT BASED ON PLANT FINANCING FOR SMALL-SIZED ENTERPRISES AND ENTERPRISES. OF 40% GRANT FOR MEDIUM-SIZED THE PROJECT OF MARINA IS FEASIBLE BOTH UNDER THE TECHNICAL PROFILE LEGAL AND THE PROJECT IS PROVIDED OF ALL THE PREPARATORY PERMISSIONS ALL THE GEOLOGICAL, SEISMIC, ARCHEOLOGICAL INVESTIGATIONS WERE EFFECTED FOR THE REALIZATION OF THIS WORK AND IS IN COMPLIANCE WITH THE LOCAL AND REGIONAL PLANS THE PROJECT WAS POSITIVELY SUBJECTED TO THE STRATEGIC ENVIRONMENTAL ASSESSMENT RELATED INVESTMENTS CABLEWAY THE PROJECT IS ALSO PROVIDED FOR THE REQUALIFICATION OF THE AREA NEXT TO THE OLD TOWN CENTER, FOR REALIZATION OF: THE PARKING, MOBILITY ACCESS, CONNECTION MARINA BAY AND THE CITY BETWEEN TROUGH CABLEWAY. WITH SUCH INTERVENTION IT IS EXPECTED TO MAKE USE OF THE TOTAL AMOUNT OF OFFICES WORKS IS EXPECTED FOR THE REALIZATION OF TO COST € 3.500.000,00 MUNICIPAL (OVER 6.000 CUBIC METERS) BUILDING SECTOR COMMERCIAL AND PRIVATE HOUSING ESTATE NEAR MARINA BAY. RELATED INVESTMENTS HOUSING ESTATES THE PROJECT IS ALSO PROVIDED FOR THE REFUNCTIONALISATIO OF THE HOUSING ESTATES WITH VAST OUTDOOR SPACES. WITH SUCH INTERVENTION IT IS EXPECTED TO MAKE USE OF THE MUNICIPAL OFFICES FOR THE REALIZATION OF A TOURIST RESORT LOCATED IN A PANORAMIC – HOTEL POSITION OVERLOOKING THE MARINA. COVERED SURFACE: UNCOVERED SURFACE: MQ MQ 1.000 2.000 TOTAL AMOUNT OF WORKS IS EXPECTED TO COST € 5.500.000,00 START TO MAKE PROFIT FROM THE PUBLIC INVESTMENT APPROVAL WORKS STARTUP OF MANAGEMENT 10-12 MONTHS 28-30 MONTHS 2 MONTHS HOTEL 3 MONTHS 10-12 MONTHS 2 MONTHS CABLEWAY/PARK/RESIDENCE 6 MONTHS 10-12 MONTHS 2 MONTHS MARINA