pre-qualified contractors distribution list
Transcription
pre-qualified contractors distribution list
Construction Management Services for Receiving and Stores Area Renovation Request for Proposal Bid # TSH15-0037 Addendum #01 Date: November 25, 2015 1. This Addendum is issued in accordance to questions and clarifications from the Mandatory Site Walkthrough dated November 19, 2015 2. This Addendum is issued prior to the anticipated proposal deadline of November 25, 2015. 3. Such revisions shall become part of the RFP Documents and shall change the original Tender Package TSH15-0037 (November 12, 2015 documents only in the manner and extent stated. Section 2.1 ADD: PRE-QUALIFIED CONTRACTORS DISTRIBUTION LIST: Prime General Contractors Chart Construction Management Limited Dineen Construction Corp. NewGen Construction Corporation Olar Limited Harbridge & Cross Mechanical Contractors Battaglia Mechanical Services Kelson Company Limited Modern Niagara Toronto Incorporated NuTemp Mechanical Electrical Contractors Accel Electric Black and McDonald Guild Electric Limited OZZ Electric Incorporated Plan Group Electrical Email info@chartcm.ca joanne@chartcm.ca dfiorini@dineen.com fbattiston@dineen.com info@newgen.cc maryann@newgen.cc david@olar.on.ca info@ogca.ca lizarra@harbridgeandcross.com mike@battagliamechanical.com gakelson@kelson.on.ca awarde@modernniagara.com jpmartella@nutemp.ca estimating@nutemp.ca estimating@accelelectric.com dburrowes@blackandmcdonald.com Paul.donner@guildelectric.com lford@ozzelectric.com info@ozzelectric.com elecestimating@plan-group.com Page 1 of 3 General Clarifications: 1) Extension of bid closing to Wednesday December 2, 2015 at 2pm. 2) Proposal is for Lump sum construction cost, not fee for Construction Management only. 3) Phasing of work will not be necessary. User group operations will be maintained throughout the duration of the construction. The New Clean area will be cleared of contents and the space available for construction. Path of access from the loading dock to the elevator at the end of the Bulk Storage area must be maintained at all times. 4) All work is to be completed during regular working hours from 7am to 5pm. In the event afterhours is required, please review and obtain clearance with the Project Manager. 5) Bids can be received via emails, but must be received with enough time to ensure the email is received and a return message provided as receipt of the actual transfer. 6) Infection Control is to be (level 3 -hard hoarding) up to underside of main duct (approx. 7’) and poly above to the underside of slab. A second hoarding (level 2 – poly/tarp) is to be erected with steel studs to separate the Clean from the Bulk areas. (refer to attached drawing A1)Extent of Hoarding will be to keep the Construction area separate from the Main Receiving Area corridor as well as keeping the supplies free from debris and dust. Ensure that general operations (moving of palettes, equipment, and supplies) are not impeded by the installation and location of the hoarding. Infection Control and Prevention team (IPAC) shall review the hoarding for their approval prior to work commencing on site. 7) Mandatory walkthrough was for General Contractors only 8) Bid bonds will be required for this tender 9) Work to commence the second week of January 2016. Contractor to provide a schedule. Please note evaluation criteria stipulated in section 2.4.1 under Evaluation and Award 10) NO cash allowances for this project. 11) Please note the list of exclusions in Section 3.0 (Scope of Services), from original RFP. Section 3.0 Architectural 1) Add to General Notes: Existing double doors to receive crash bar hardware (lever handle with lockset on pull side) with surface mounted vertical rods up to header with electric strikes cut into the existing frame, wired to the new card readers, via normal power 2) Add to General Notes: For Doors D-1 and D-2, typically provide crash bars, 12” kick plate, unless otherwise noted (see exceptions below). a) Door to Office - Provide classroom style hardware with lever handle and lockset. b) Doors at Vestibule (clean storage side) - Provide storage style lever handle on pull side of door and half height kick plates on push side of BOTH vestibule doors. Sensor on ones side to be wave type activation. c) Doors at Vestibule (corridor side) - Provide panic crash bar ONLY, blank-off plate on pull side. Sensor on ones side to be wave type activation. Page 2 of 3 3) Provide structural lintels/posts as required to support the opening for the automatic sliding door installations 4) Added Wall guard specification to Appendix C, refer to attached spec or equivalent. 5) Single slider aluminum framed window to be 3’-0” wide by 3’-0” high, mount 42” above finish floor. 6) Contractor to determine number of openings in the slab and ceiling to require fire seal per note (k) 7) All card readers to be supplied and installed per the RFP documents 8) Deck height unknown at this time, please site verify Section 3.0 RCP/Lighting 1) Add to General notes: New ceiling mounted light fixtures. Product to be supplied by hospital. (Added light specification to Appendix C, refer to attached spec). “Power to be fed from Emergency Power Panel (Clean Storage Area)” 2) Add to General notes: Demolish all existing fixtures in the Clean Storage Area only 3) Add : Provide 2 illuminated exit signs (to match existing) to existing double doors of the Main Receiving Area, one at each set of existing double doors, on the inside of the room, connected to emergency power. 4) Add additional access hatches as required to the new drywall ceiling to service electrical junction boxes and duct clean outs overhead. Section 3.0 Electrical 1) Existing electrical panels are directly across the hall, immediately SW of the existing double doors. Distance to electrical room is approximately 200 feet away. 2) All mechanical equipment is to be fed with standard 120v power from normal power panel Drawing M1 – (only part plan re-issued) 1) Add to General notes: All equipment is to be fed from Normal Power panel 2) Condenser location(s) per attached part plan. Location of condenser drains TBD. 3) Nortown Air contact is Denise McCormack, 20 Densley Ave, Toronto M6M 2R1 - 416-235-2727 4) Sprinkler work to be carried in this contract proposal, End of Addendum # 01 Page 3 of 3 121" [38] 2" [51] 3/4" [19] Dia counterbore* By others Extruded 100% Post-Consumer HDPE Density: (ASTM D6111) .024-.027 lbs/cu-in Modulus of Elasticity: (ASTM D6109) 114,000 psi at 1% strain Ultimate Flexural Stress: (ASTM D6109) 2300 psi at 3% strain Allowable Flexural Stress: (ASTM D6109) 1200 psi Endwise Compressive Stress: (ASTM D6108) 1740 psi at 3% strain Screw Withdrawl: (ASTM D6117 7) 90 lbs (#10 x 1 1/2") Water Absorption, 11 weeks: (ASTM D570) less than 0.1% Coefficient of Thermal Expansion: (ASTM D6341) Stock length: 12'-0" [3658] 1121" [292] Manufacturer's standard colors UV Inhibited pigments Fasteners * Not to exceed 16" [406] on center Supplied separately if required Suggested concrete hardware: 1/4" [6] x 3" [76] Tapcon with Hex-Washer head Not to Exceed 16" [406] Typ Not Less Than 2" [51] or More Than 8" [203] Holes shown for reference only. Product is supplied undrilled. Recycled HDPE wall guard WallGuard.Com reserves the right to discontinue a design or modify an existing design without prior notice Toll Free Tel: 1-877-WGDOTCOM Toll Free Fax: 1-877-WGFAXCOM 1-877-943-6826 1-877-943-2926 web: www.wallguard.com email: sales@wallguard.com WGDC.3020.4 TIBULE CLEAN STORAGE AREA LOADING/ RECEIVING OFFICE LED Wraparounds SLWP Series - LED Linear Wraparounds Introducing the new Metalux AP series, SLWP – Low Profile LED Wraparound series. These products are offered in a non-configurable LED platform with a streamline linear construction and design. SLWP wraparounds meet all of the critical energy savings requirements with either DesignLights Consortium® or ENERGY STAR® and are an ideal replacement for linear fluorescent products. Performance Compliance • Available in three different models • DLC Qualified and ENERGY STAR® Certified 2 ft. 2000 lumens, 120V • LED modules comply with IESNA LM-79 and LM-80 4 ft. 3900 lumens, 120V • cULus listed 1598 for damp locations 4 ft. 4000 lumens, UNV • RoHS complaint • UNV or 120V non-dim electronic drivers • Color Temperature: 4000K • Typical CRI 82 2 Lamp • Lumen maintenance of L70 at 50,000 hrs. EQUIVALENT • Five Year warranty • Suitable for ceiling or wall mount applications LED LUMENS WATTAGE MODEL# PRODUCT DESCRIPTION 2SLWP2040ND-120V 2 ft. Linear LED Wraparound, 120V 2207 4SLWP3940ND-120V 4 ft. Linear LED Wraparound, 120V 4SLWP4040ND-UNV 4 ft. Linear LED Wraparound, UNV MODEL# PRODUCT DESCRIPTION COMPARED TO T12 FLUORESCENT COMPARED TO T8 FLUORESCENT 40W LAMP ENERGY SAVINGS 32W LAMP 22W 35W 59% 28W 27% 4069 38W 60W 58% 56W 47% 4390 45W 70W 56% 56W 24% UPC UNIT CARTON ENERGY SAVINGS ENERGY PROGRAM 2SLWP2040ND-120V 2 ft. Linear LED Wraparound, 120V 080083706570 7.13 in. w x 26.42 in. h x 3.54 in. d ENERGY STAR® 4SLWP3940ND-120V 4 ft. Linear LED Wraparound, 120V 080083706587 7.13 in. w x 50.55 in. h x 3.54 in. d ENERGY STAR® 4SLWP4040ND-UNV 4 ft. Linear LED Wraparound, UNV 080083706594 7.13 in. w x 50.55 in. h x 3.54 in. d DLC Eaton’s Cooper Lighting Business 1121 Highway 74 South. Peachtree City, GA 30269 © 2014 Eaton. All Rights Reserved. Publication No. R14-0168 December 2014 www.cooperlighting.com