Inspection Report - MRE Commercial Real Estate
Transcription
Inspection Report - MRE Commercial Real Estate
Inspection Report Inspection Date: February 23, 2015 Inspection Address: 2908 Ellsworth Street, Berkeley, CA Prepared For: Hab Siam Prepared By: JMC Building Inspections 1410 Alcatraz Ave Berkeley, CA 94702 (510) 525-7173 Report Number: E0222 Inspector: Paul Barraza ACI Certified Member: American Society of Home Inspectors¨ Certified Inspector: Inspection Training Associates (ITA) Agent Information: Matt Gondak MRE Commercial Real Estate 6001 Shellmound Street Suite 825 Emeryville, CA 94608 F ILE NAME F ILE NAME © 2015 JMC Building Inspections 2908 Ellsworth Street, Berkeley, CA Page 2 of 29 This confidential report was prepared for Hab Siam Table of Contents CLIENT ADVISORY 3 INSPECTION OVERVIEW 5 STRUCTURE 7 BUILDING EXTERIOR & SITE 9 ROOF SURFACE 13 PLUMBING SYSTEM 16 WATER HEATING 18 ELECTRICAL SYSTEM 20 HVAC 23 INTERIOR COMPONENTS 26 This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 3 of 29 This confidential report was prepared for Hab Siam Client Advisory Please note: This Advisory is not a “summary” of the inspection report. That is why we urge you to read the entire inspection report before you review this section. As an additional service to our Clients and their Real Estate Professionals, we have provided this listing of the items which, in the professional opinion of your Inspector, merit further attention, investigation, or improvement at this time. Some of these conditions may be of such a nature as to require repair or modification by a skilled craftsman, technician or other specialist. In listing these items, your Inspector is not offering any opinion as to who, among the parties to your transaction, should take responsibility for addressing any of these concerns. As with most other facets of your transaction, we recommend consultation with your Real Estate Professional, Attorney or Builder for further advice with regards to the items listed below. STRUCTURE 1. Where visible, the foundation slab was generally in acceptable condition. Small and/or moderate cracks were observed, indicating past settlement, but we observed no related conditions suggesting the need for immediate repair. These cracks should be monitored, and if ongoing movement is observed, further review would then be recommended. (See Photos 1 & 2) BUILDING EXTERIOR & SITE 2. Trip hazards were observed in the public sidewalk adjacent to this building. In most jurisdictions, sidewalk maintenance is the responsibility of the property owner. We recommend removal of all trip hazards for improved safety and to reduce the potential for personal injury. (See Photo 3) 3. Biohazard waste was observed at the left exterior. We recommend proper disposal of this waste in accordance with all applicable regulations. (See Photo 4) ROOF SURFACE 4. Several shingles were torn or damaged, allowing water entry and subsequent damage. We recommend repairs by a licensed roofing contractor to increase the dependability of the roofing surface. (See Photo 6) 5. A “soft spot” was found when the roof at the front-left was walked upon, which could indicate water damaged roof sheathing. We recommend further evaluation by a licensed roofing contractor. 6. The roofing was near the end of its expected service life. Even with routine maintenance, the need for replacement should be expected within the next few years. The roofing was currently in need of repairs or maintenance – therefore we recommend the advice and services of one or more competent, licensed roofing contractors. PLUMBING SYSTEM 7. It should be noted that it was impossible to determine the condition of the sewer lateral (the drain line between the building and main sewer line in the street) during this inspection, because it was buried. Many Bay Area jurisdictions now require sewer lateral testing to ensure water tightness. Replacement of the sewer lateral can be expensive and therefore we recommend hiring a licensed plumber to determine the condition of the sewer lateral. 8. An automatic seismic gas shut-off valve was not installed. Fires can cause significant damage after a large earthquake and this type of valve is intended to automatically shut off the gas in an earthquake. We recommend the installation of an automatic seismic shutoff valve by a licensed plumbing contractor. 9. The water heater gas connector was flexible brass. Flexible brass connectors are no longer acceptable for use in a natural gas supply as they can develop pinhole leaks over time. We recommend the This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 4 of 29 This confidential report was prepared for Hab Siam installation of an approved flexible connector by a licensed plumbing contractor in accordance with current standards. 10. Several aspects of the water heater venting were improper and repairs were needed. We recommend review and repair as necessary by a licensed plumbing or HVAC contractor to ensure proper operation. 11. The water heater tank lacked seismic restraint. The lack of proper restraint could result in unnecessary damage in the event of a major earthquake. We recommend immediate installation of proper restraint in accordance with current standards and applicable local requirements. ELECTRICAL SYSTEM 12. The service mast was leaning as it was not adequately braced or supported. Failure of the mast to adequately support the service drop could result in a very hazardous situation. We recommend a competent, licensed electrician adequately brace it in conformance with current industry standards. (See Photo 7) 13. The exposed electrical conductors below a sink in the lab posed a potential shock hazard. We recommend a licensed electrician immediately repair or remove this inherent risk to personal safety. (See Photo 8) 14. Several of the subpanels had been manufactured by the Federal Pacific Company. In laboratory testing and actual performance, an unacceptably high proportion of Federal Pacific circuit breakers failed to trip at their rated amperage. Such malfunctions could result in serious personal injury or property loss and therefore we recommend replacement of these panels by a licensed electrical contractor. 15. Ground Fault Circuit Interrupter (GFCI) protection was not provided for all of the receptacles where this type of protection is presently required. GFCI protection is a modern, inexpensive safety feature designed to help prevent shock, particularly in wet locations. We recommend the installation of GFCI protection by a licensed electrical contractor in all areas where it is presently required. INTERIOR COMPONENTS 16. The ceiling at the right front was stained, but it could not be determined if the leak was active. The source of the leak should be identified and necessary repairs performed before any attempt is made to restore surface appearance. Restoration of surface appearance may require extensive patching and/or replacement of some of the surface materials. (See Photo 10) 17. An angle stop below the left sink was leaking water at the time of the inspection. We recommend review and repair as necessary by a licensed plumbing contractor. (See Photo 11) 18. Unsecured medical files were observed in one of the interior rooms. We recommend proper transfer or disposal of these files by an appropriate specialist. (See Photo 12) This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 5 of 29 This confidential report was prepared for Hab Siam Inspection Overview DESCRIPTIVE INFORMATION Weather Conditions: Temperature at Start: Orientation of the Building: Age of the Building: Age of Remodel: Main Water Shutoff Location: Sewer Cleanout Location: Electrical Panel Location: Main Disconnect Location: Main Gas Shut-Off Location: Persons in Attendance: • Clear sky • 50 - 60° F • The front of the building faced the street • Built in 1959, from public information • The age of the remodel(s) could not be established • At the right-front corner of the exterior • In or near the sidewalk • In an exterior cabinet at the at the right front corner • Fuse block in the main distribution panel • At the right-front corner of the exterior • Client ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE INSPECTION IMPORTANT NOTICE We performed this inspection for the exclusive use of the client(s) named in this report. If anyone other than our client(s) for this inspection reads this report, we wish to emphasize that by contract, our sole responsibility is to our client(s) and no third party may rely on this report for any purpose. If anyone else wishes to obtain current information on the condition of this building, we can perform, for a fee, a follow-up inspection on their behalf. Pre-Listing Inspection This is a pre-listing inspection report. We strongly recommend that interested parties retain JMC Building Inspections, or another qualified inspection company, to provide either a ‘walk through’ review, or another complete inspection, to more fully understand the findings of the inspector and to avoid any possible misinterpretation of the comments included in this report or the findings of the inspector. This report represents conditions observed at the time of the inspection, only, and conditions may have changed since that time. Location/Direction Conventions Used In This Report When we talk about the “right side” or “left side” of the building, we are assigning direction as we would if we were standing at the street and were looking towards the front of the building. Locations will be described as “left” or “right”, “front” or “rear”, and right-front. (For example, “the left-front” would be the left side, toward the front). Furnishings and Storage Limited Our Access The presence of furnishings, stored items, decorations or other ‘stuff’ limited our view, and thus, the scope of the inspection. For instance, the placement of furniture prevented access to every electrical receptacle. If possible, we recommend a walkthrough inspection when these items have been removed. Evidence of a Past Remodel It appeared that parts of the building had been remodeled one or more times in the past. Confirmation should be obtained from the owner, or in their absence the local building department, that all necessary permits for appropriate construction and/or remodeling were secured, appropriate inspections were performed and all requisite final signatures have been obtained. Detached Buildings Were Not Inspected Examination of the sheds at the left side was not within the scope of this inspection and therefore they were not inspected. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 6 of 29 This confidential report was prepared for Hab Siam Have Specialized Equipment Inspected by a Qualified Specialist The building was in use as medical offices. Medical equipment is beyond the scope of inspection and was not evaluated or tested. If further information is desired, we recommend consulting a firm specializing in this type of equipment for further information. Central Vacuum Not Tested A central vacuum system had been installed in this building. The system was not tested, as testing is outside the scope of this inspection. For further information, we recommend consultation with the current owner and/or an appliance technician experienced in the maintenance and operation of central vacuums. A Definition of the Terms “Acceptable” and “Satisfactory” as Used in this Report When any item in this report is noted as being in “acceptable” or “satisfactory” condition, the meaning is that it was providing generally adequate service within the limits of its age - and any defects, deficiencies or potential problems noted during the inspection. Not Inspecting for Building Code Violations The presence or extent of building code violations was not the subject of this inspection, nor was it included in the report. No warranty is offered on the legal use, or uses of the building or property. Information with regard to these issues may be available from the appropriate building and/or zoning agency. Environmental Issues Are Excluded Environmental hazards or conditions, including, but not limited to, toxic, reactive, combustible or corrosive contaminants, wildfire, geologic or flood hazards are specifically excluded from this inspection and report. We Evaluate for Function, Operability and Condition The purpose of this inspection is to evaluate the building for function, operability and condition of systems and components. Its purpose is not to list or attempt to address cosmetic flaws. It is assumed that the client will be the final judge of aesthetic issues as the inspector’s tastes and values will always be different from those of the client. Important Information May be Found in the Public Records Important information about this property may be a matter of public record. However, search of public records is not within the scope of this inspection. We recommend interested parties thoroughly review all appropriate public records and disclosures. A Building Inspection, Not a Pest Inspection Any observations made in this report regarding evidence of pests or wood destroying organisms, are not a substitute for inspection by a licensed pest control operator or exterminator. Your inspector may only report on a portion of the currently visible conditions and cannot render an opinion regarding their cause or remediation. Guidelines for the Proper Disposal of “Universal Wastes” Beginning February 9, 2006, it is ILLEGAL to dispose of waste batteries, electronic devices, fluorescent light bulbs, and mercury-containing thermostats in the trash. These waste items are known as “universal wastes” and must be recycled or taken to a household hazardous waste disposal facility. Hazardous wastes contain harmful chemicals, which, if put in the trash, are harmful to the environment and public health. These items include: Electronic Devices: Televisions, monitors, computers, printers, mobile phones, radios, and microwave ovens. These devices often contain heavy metals like lead, cadmium, copper, and chromium. Batteries: All batteries of sizes AAA, AA, C, D, button cell, 9 Volt, and all other batteries, both rechargeable and single use. These contain a corrosive chemical that can cause burns as well as toxic heavy metals like cadmium. Fluorescent Tubes and Bulbs and Other Mercury-Containing Lamps: These lights contain mercury vapor that may be released into the environment when they are broken. Mercury is a toxic metal that can cause harm to people and animals including nerve damage and birth defects. If mercury is released into the environment it can contaminate the air we breathe and enter streams, rivers, and the ocean. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 7 of 29 This confidential report was prepared for Hab Siam Structure DESCRIPTIVE INFORMATION • Slab on grade • Poured in place concrete • Conventionally framed wood stud • Concrete masonry units (CMU) at the left rear corner • Conventionally framed wood partitions • Concrete slab on grade • Conventionally framed joist and rafter • Plywood nailed across the rafters Foundation Type: Foundation Material: Exterior Walls: Interior Walls: Floor System: Roof Structure: Roof Sheathing: OBSERVATIONS & RECOMMENDATIONS Building Foundation Overview The foundation appeared to be relatively modern in design. Foundations of this type typically have internal steel reinforcing. A determination as to the presence or extent of steel reinforcing is beyond the scope of this inspection. Foundation Slab Where visible, the foundation slab was generally in acceptable condition. Small and/or moderate cracks were observed, indicating past settlement, but we observed no related conditions suggesting the need for immediate repair. These cracks should be monitored, and if ongoing movement is observed, further review would then be recommended. (See Photos 1 & 2) Photo 1 Photo 2 Seismic Considerations Several exterior walls were constructed with large expanses of glass. The connections between the posts that frame the windows, and the framing or beams above, could not be observed. From a seismic standpoint, these are potentially weak areas in the building. We recommend a licensed structural engineer further evaluate the adequacy of the wall framing to resist earthquake movement. Due to the construction of this building on a slab foundation and the installation of finished interior, the structural connections between the foundation and the structure were not accessible. To determine seismic adequacy, we recommend hiring a licensed structural engineer to evaluate the building and any available construction plans to determine if seismic upgrades would be prudent for this building. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 8 of 29 This confidential report was prepared for Hab Siam Moisture Considerations Although access to the slab was limited because of the presence of finished flooring, we found no visible evidence of seepage or other moisture related conditions. *For information about site drainage, please see the Exterior section* Wall Framing The wall framing adjacent to the finished areas of the building was not visible; however no symptoms of nonperformance were evident. A small section of the exterior walls was constructed of concrete masonry units (CMU) at the left rear corner. Verifying the existence and/or placement of reinforcing materials in solid masonry walls is beyond the scope of this inspection. Because of seismic concerns regarding unreinforced and inadequately reinforced masonry, we recommend further evaluation of these walls and/or checking any available plans, or construction documents by a licensed structural engineer. Roof Framing The roof framing was mostly not visible due to restricted access; thus it could not be thoroughly inspected. Where visible, the roof framing was constructed in a manner typical of buildings of this type and age and was generally in acceptable condition for its age. Most of the ceiling joists were not visible due to installed insulation that covered them; thus they could not be thoroughly inspected. Where visible, the ceiling joists were in acceptable condition. General Comments On The Structure Generally speaking, the visible structural elements were in acceptable condition for a building of this age and type of construction. Instances of needed repair or correction were observed. See notes above. A licensed contractor, possibly in conjunction with a licensed structural engineer should examine those portions of the structure specified as deficient in this report to ensure that the entire structure is safe and durable. ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE STRUCTURE INSPECTION Foundation Slab Was Not Visible Surface finishes covered the floor slab, rendering a meaningful visual evaluation impossible. Further evaluation might be possible when the flooring is removed, but such an activity is beyond the scope of this inspection. Not All of The Rafters Were Visible The attic was partially inaccessible and not all the rafters were visible, thus not all could be inspected. Usually, Our Evaluation Must Be Based On Symptoms Most of the time, many, if not all, structural components are inaccessible. Thus, our evaluation is based only on our observations of symptoms of movement, damage, and deterioration. If there are no visible symptoms, conditions requiring repair may go undetected. We make no comment on the internal conditions of soils, foundations and framing, except as reflected in their performance. A Word About Foundation Cracks Cracking is common in concrete or masonry foundations. Minor cracks caused by shrinkage and/or settling can be found in even relatively new foundations. Moderate or larger cracks may indicate ongoing settling or movement and the eventual need for underpinning or foundation repair. There is no way to determine if a crack will grow in size or if new cracks will form. Most large cracks were once small. The best way to estimate the likelihood of future movement may be to monitor the number and size of cracks over a period of time. Information on Seismic Strengthening For more information about the steps to seismically strengthen a building, the Association of Bay Area Governments (ABAG) has extensive information on their website: http://quake.abag.ca.gov/business This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 9 of 29 This confidential report was prepared for Hab Siam Building Exterior & Site DESCRIPTIVE INFORMATION Lot Topography: Site Gradient: Driveway / Parking Surface: Walkway Surface: Primary Exterior Cladding: Secondary Exterior Cladding: Exterior Window Material: • Gently sloping • Slopes toward the rear of the building • Concrete • Concrete • Stucco • Masonry veneer at the front • Plywood siding at the front • Painted or stained wood frame • Exposed aluminum frame • Painted steel frame OBSERVATIONS & RECOMMENDATIONS Grading and Drainage Grading at the front sloped toward the foundation. This condition promotes water accumulation at the building, which could result in deterioration of the foundation and water penetration under the building. If it is found that negative conditions from moisture penetration are present, a qualified contractor, specializing in drainage systems should be consulted. Several areas near the building did not have an appreciable slope away from the building. This can encourage water accumulation near the building and could cause water damage to foundations and interior as well as exterior building elements. We recommend monitoring both interior and exterior areas during heavy or extended rains, and if water penetration is observed, appropriate corrective measures should be undertaken. No formal drainage system had been installed on this site. We recommend monitoring surface drainage performance for a full cycle of seasons or until deficiencies emerge. If negative conditions arise, then appropriate modifications should be made. Downspouts Several of the downspouts were not properly extended away from the building foundation. This condition will allow roof water to pool, often leading to excess water around and under the foundation. The discharge from all downspouts should be routed sufficiently away from the structure (usually at least 5 to 10 feet). The gutters and downspouts are a very important part of any drainage system, as a substantial amount of water can flow from the roof surface when it is raining heavily. For example, a roof that is 15 feet by 40 feet in size can collect more than 280 gallons of water for each one inch of rainfall (enough water to fill a two-person hot tub)! The downspout system should direct this water away from the building foundation, helping to reduce the possibility of structural movement. Controlling roof drainage can also reduce the need for exterior maintenance. The gutters and downspout system should be checked regularly to ensure that it functions properly during wet weather. Driveway/Parking Lot The small cracks in the driveway and parking lot pavement were not significant in terms of the performance. We recommend periodic monitoring of this condition, followed by corrective action taken if problems are observed. Walkways Trip hazards were observed in the public sidewalk adjacent to this building. In most jurisdictions, sidewalk maintenance is the responsibility of the property owner. We recommend removal of all trip hazards for improved safety and to reduce the potential for personal injury. (See Photo 3) Trip hazards were observed in the left side walkway. We recommend repair, if possible, or removal and replacement, of deteriorated sections to eliminate trip hazards and reduce the potential for personal injury. Sometimes simply “ramping-up” patching material at the changes in elevation can serve as a short term solution. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 10 of 29 This confidential report was prepared for Hab Siam The walkways around the building were sloped. Over time, the sloping may get worse, necessitating repairs. We recommend periodic monitoring of this condition, followed by corrective action taken if problems are observed. Photo 3 Photo 4 Grounds The fences and gates were not inspected and are not included in this report. Fences at the perimeter of the lot usually approximate the property lines, but only a licensed surveyor can verify their exact location. Wood fences have a finite service life. Keeping the bases of the fence posts free and clear of rotting leaves, and occasional treatment of the entire fence with a wood preservative or exterior stain will help slow deterioration. Biohazard waste was observed at the left exterior. We recommend proper disposal of this waste in accordance with all applicable regulations. (See Photo 4) Stucco Cracked stucco was evident at the rear, possibly indicating structural movement. The cracked surfaces can be patched, but if the movement in the structure is not addressed, the cracks are likely to return and/or become more noticeable. If the cracks return, then we recommend examination and review by a structural specialist such as a structural engineer competent in the field of light construction. Plywood Siding The plywood siding was generally in acceptable condition. For this type of siding, frequent maintenance is required to keep it sealed and prevent moisture damage. Masonry Siding The masonry siding at the front left was a veneer applied to the outside building. The veneer was in acceptable condition. Vegetation Considerations One or more large trees were evident on or immediately adjacent to the property that could damage the building if they fall over, or if large branches should separate from the trunk. Evaluation of the stability and condition of these trees is beyond the scope of this inspection. We recommend periodic advice and services of a competent and experienced arborist for evaluation. Eaves and Soffits Portions of the fascia (boards nailed across the ends of the rafters at the eaves) at the rear were weathered and blistered, or peeling paint was observed. This condition will require surface preparation and refinishing in the course of property maintenance to restore surface appearance and extend the service life of the fascia materials. A fire-sprinkler system was installed in the eaves at the right side. A five-year fire sprinkler certification was not present. We recommend consulting a licensed fire protection contractor to perform the five-year certification and perform necessary maintenance for improved safety. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 11 of 29 This confidential report was prepared for Hab Siam Flashings A flashing at the front-right was upturned and would not properly shed water away from the building. We recommend review and repair as necessary by a licensed contractor. (See Photo 5) Photo 5 Exterior Doors The frame/jamb for the door at the right-front was deteriorated from wood destroying organisms. All damaged components should be repaired, if possible, or replaced in a manner that complies with current industry standards. The glass in several of the exterior doors was not tempered or safety glass. The etched emblem in one corner of each pane can usually identify such glass, but was not present or could not be observed. We recommend replacing the current door glass with safety glazing or approved safety film. Safety glass or films should be installed by a competent glass technician in all locations where currently required. Exterior Windows The exterior aspects of the windows were in acceptable condition for their age, with exceptions noted below. The Jalousie type window (which consist of adjustable parallel glass louvers) at the rear-right was missing some panes of glass. This type of window is a security liability and should re replaced with a modern window for improved security. We recommend consultation with one or more licensed contractors for advice and cost estimates. *For information about the interior aspects of the windows, please see the Interior Components section* ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE EXTERIOR INSPECTION Soils Evaluation not Performed An opinion on soil stability and potential movement may be available from a competent soil or geotechnical engineer who is familiar with conditions in this area. Hillside structures are prone to landslide and movement, while flatland buildings can be prone to liquefaction. A competent specialist should be consulted, if specific information on the characteristics and performance of this particular site is desired. Inquire About Repairs to Exterior Obvious repairs to the cladding were observed. The owner may have information about the condition that required the repairs, what repairs had been done and any permits required, issued and completed because of the repair work. We recommend consultation with the owner about these issues. Inspect Stucco Below Grade Periodically Stucco extended over the foundations below the finished grade in some areas. This configuration was accepted practice when installed, but has proved to promote infestation by wood destroying organisms. We recommend periodic inspections for wood destroying organisms. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 12 of 29 This confidential report was prepared for Hab Siam Jalousie Type Windows Jalousie type windows (which consist of adjustable parallel glass louvers) were observed on this building. They are known for their poor security and even poorer energy conservation characteristics. For these reasons, this type of window is no longer a preferred style. Upgrading is optional and should eventually be considered. Screens Not Inspected The door and windows screens were not inspected; as such a task was beyond the scope of this inspection. We recommend reviewing the screens to ensure they will function as desired. Rekeying Exterior Doors Exterior door locks should be rekeyed after transfer of ownership to ensure personal safety and security. Safety Glass Labeling All safety glass should be labeled using either an etching or ceramic-blasting method to produce a permanent emblem in the surface of the glass that must remain visible after it has been installed. During our inspection, we will look for the emblem as evidence that the glass is, indeed, safety glass. However, industry standards do allow for installation of safety glass that does not display the specified emblem, under certain circumstances. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 13 of 29 This confidential report was prepared for Hab Siam Roof Surface DESCRIPTIVE INFORMATION Roof Coverage Area: Slope, or Pitch, of the Roof: Roof Covering Material: Number of Layers: Estimated Age of Covering: Method of Inspection: Edges/Sides Flashed With: Penetrations Sealed With: Roof Drainage: • The entire building • Medium • Asphalt-composition shingles • At least one • 20 years • Inspector walked the roof • Sheet metal • Roofing mastic • Sheet metal with roofing mastic • Sheet metal with neoprene collars • Gutters OBSERVATIONS & RECOMMENDATIONS Composition Shingles Several shingles were torn or damaged, allowing water entry and subsequent damage. We recommend repairs by a licensed roofing contractor to increase the dependability of the roofing surface. (See Photo 6) Photo 6 The slope of the roof appeared to be less than 4:12, which typically requires a double layer of roofing felt but this could not be confirmed. We recommend further evaluation by a licensed roofing contractor to determine the installation method. If only one layer of felt is installed, the roofing may be prone to premature failure. It was the inspector’s opinion that reroofing was not warranted but diligent maintenance is recommend. A “soft spot” was found when the roof at the front-left was walked upon, which could indicate water damaged roof sheathing. We recommend further evaluation by a licensed roofing contractor. The condensate from the heating system was routed to discharge onto the roofing surface. Condensate is highly corrosive and can lead to premature deterioration of the roofing surface. We recommend rerouting of the condensate drain by a licensed HVAC contractor to an approved location. Penetration Flashings The mastic or caulking used to seal some of the roof penetrations, by its nature, will crack with age. All sealants should be monitored and repaired, renewed, or replaced as necessary to continue to prevent leakage. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 14 of 29 This confidential report was prepared for Hab Siam Edge Flashings Several rake edge flashings (flashings that cover the sloping edges of the roof surface) were not adequately sealed and were subject to leakage. We recommend all rake edge flashings be repaired or re-sealed by a licensed roofing contractor. Roof Drainage Roof runoff water was collected and channeled to the downspouts by a metal gutter system that was attached to the edge of the roof. The gutters were obstructed by accumulated debris. All of the debris should be removed immediately to ensure proper drainage, and then the gutters should be kept clear to reduce the potential for backups and subsequent water penetration into the building, which could result in damage to exterior and interior building elements and finishes. The condition of the gutters can be better evaluated after the debris has been removed. The gutters were rusted in several areas. The gutters should be cleaned, primed and painted to help prevent further deterioration. Eventual replacement will be required if there is continued deterioration. Appliance Vents A flue cap at the right side was rusty and corroded to the point where it was not functioning as designed. The flue cap should be replaced with a new flue cap by a competent, licensed heating or plumbing contractor. Vegetation Considerations Tree branches were overhanging the roof at the right-rear. As a part of routine maintenance, we recommend trimming the overhanging branches to avoid abrasion to the roof surface and obstruction of roof runoff. Moss and or lichen were growing on the roofing. The growth should be removed periodically as part of routine maintenance as it will trap moisture that can cause premature roof deterioration. Substantial growth can be removed by a company that specializes in cleaning roofs. Attaching bare copper wire on top of the roof, at the upper portion of the roof areas, also may help to retard or prevent moss and lichen growth. General Commentary on the Roof The roofing was near the end of its expected service life. Even with routine maintenance, the need for replacement should be expected within the next few years. The roofing was currently in need of repairs or maintenance – therefore we recommend the advice and services of one or more competent, licensed roofing contractors. Attic Access Entry Information The attics were accessible through hatches in the ceilings of the front bathroom and Room 2. To prevent damage to ceilings below, our inspection of the attic was limited to a visual examination from the various access openings. Thus, portions of the attic were not visually accessible for inspection. A void in the fire wall (used to separate the attics) was observed, which will allow fire to spread from one attic to the next. We recommend that a licensed contractor properly repair the void for improved fire safety. Evidence of Moisture in the Attic Evidence of possible leakage was observed inside the attic. In our opinion, leaks could still exist in one or more areas. We recommend water testing of all questionable areas and/or further investigation by a licensed roofing contractor. Attic Ventilation The attic did not appear to be adequately vented. The temperature in an attic space can rise to a very high level on a hot day, sometimes causing discomfort in the living area and always potentially damaging elements of the roof structure and the roof surface through overheating. We recommend improvements to attic ventilation by increasing airflow and controlling moisture entry into the attic space at the time of reroofing. Screen(s) on the attic vents were torn, which could allow the entry of insects, birds, and small animals. Damaged or missing screens should be replaced with new, 1/8” x 1/8” hardware cloth. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 15 of 29 This confidential report was prepared for Hab Siam ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE ROOF SURFACE INSPECTION Extending the Life of Sheet Metal Flashings By Painting The effective service life of sheet metal flashings can be extended by regular, conscientious painting of the exposed surfaces. The paint should be applied over dry surfaces prepared by wire brushing or scraping to remove as much rust as possible. All rusted flashings should be replaced when a new roof is installed. Enlarge The Access Opening as an Upgrade The small size of the attic access opening can make entering the attic difficult. As an upgrade, the opening should be enlarged to make physical access and regular inspection more practical. We Cannot Guaranty a Leak-free Roof Our comments do not constitute a warranty that the roof is free of leaks, or will remain free of leaks. The Benefits of Cleaning the Roof Drainage System The roof drainage system should be monitored on a regular basis and be cleaned out whenever debris has accumulated. Regular cleaning will prevent clogging of the downspouts and potentially damaging leaks. All Roofs Should Have a Periodic “Checkup” All roof systems require annual (or even more frequent) maintenance. Failure to perform routine roof maintenance will usually result in leaks and accelerated deterioration of the roof covering and flashings. Any estimate of remaining life expectancy must be based upon the assumption that the roof will receive periodic maintenance. Attic Ventilation Attic ventilation is important to the general “health” of a building and can be provided by eave/soffit, gable or ridge vents. Thermostatically controlled fans and wind driven turbines are sometimes used to augment passive ventilation. While no absolute formula exists for determining attic ventilation requirements under all circumstances, experts generally agree that attic ventilation should remove excess heat and moisture from an attic space. Total ventilation should be divided almost equally between gable or ridge vents and soffit or eave vents. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 16 of 29 This confidential report was prepared for Hab Siam Plumbing System DESCRIPTIVE INFORMATION Domestic Water Source: Main Supply Line Material: Main Supply Line Size: Distribution Piping Material: Water Pressure: Waste Disposal: Drain & Vent Piping Material: • Municipal/community supply • Copper, where visible • 1½ inch • Copper, where visible • Approximately 50 psi • Municipal/community collection system • Cast iron • Galvanized steel OBSERVATIONS & RECOMMENDATIONS Main Water Supply Piping No surface corrosion or leakage was visible at the exposed and accessible portions of the main water supply piping. The main water supply shut-off valve was located, but testing the operation of this valve is not within the scope of this inspection. Operation of the valve from time to time will keep it functional and maximize its useful life. Water Distribution Piping The visible portions of the exposed and accessible distribution piping generally were in acceptable condition, with exceptions noted below. Water hammer in the supply piping resulted when the plumbing fixtures at the hall bathroom were operated. Over time, this condition can compromise the integrity of pipe connections. Closing valves and faucets slowly is one approach to avoiding water hammer. However; better securing of pipes, where feasible, and installing air chambers or shock absorbers at the risers near the fixtures would be the long term solution. Water Pressure System pressure, as judged by a water pressure tester, was within the normal range. Several fixtures were operated simultaneously in the course of the inspection. Minor changes in flow, when other fixtures are turned on or turned off, are considered normal. Pressure Regulator The pressure regulating valve may also act as a check valve, which would make the water system effectively a closed circuit. Since thermal expansion occurs when water is heated, it increases pressure in the supply system. Expansion tanks are required on regulating valves without an integral bypass, but it could not be determined which type of valve was present. We recommend further evaluation by a licensed plumbing contractor. Exterior Plumbing The hose bibb at the front right corner leaked noticeably from the stem packing at the time of this inspection. The leaking bibb should be repaired or replaced as necessary by a licensed plumbing contractor. The handle was missing from, or damaged on, several of the hose bibbs. To restore the operation of the hose bibbs, either the handles or the entire valves should be replaced, as appropriate. Sewer Cleanouts A full-size exterior sewer cleanout was located at the right side and near the sidewalk. It should be noted that it was impossible to determine the condition of the sewer lateral (the drain line between the building and main sewer line in the street) during this inspection, because it was buried. Many Bay Area jurisdictions now require sewer lateral testing to ensure water tightness. Replacement of the sewer lateral can be expensive and therefore we recommend hiring a licensed plumber to determine the This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 17 of 29 This confidential report was prepared for Hab Siam condition of the sewer lateral. Drain & Waste Lines The visible drain & waste piping was in acceptable condition. Gas Meter Installation An automatic seismic gas shut-off valve was not installed. Fires can cause significant damage after a large earthquake and this type of valve is intended to automatically shut off the gas in an earthquake. We recommend the installation of an automatic seismic shutoff valve by a licensed plumbing contractor. A meter wrench could not be located in the vicinity of the gas meter. A proper wrench should be located near the meter to provide a convenient means for shutoff in an emergency. The valve can be turned 90 degrees in either direction to shut the gas supply off. The gas meter was located in an exterior cabinet, a configuration that will make the gas meter prone to damage in an earthquake. As an upgrade, relocation of the gas meter to the outside the building should be considered for seismic safety. For more information, the local utility should be consulted. Gas Piping The visible sections of the gas piping were in acceptable condition. No evidence of leakage was detected at any of the exposed gas piping. Pressure testing may reveal leaks, but this procedure is beyond the scope of this inspection. General Comments About The Plumbing System The plumbing system was generally in acceptable condition; however, instances of needed repair or correction were observed. We recommend a licensed plumbing contractor to examine the plumbing system and repair, augment, or modify as necessary to ensure that the entire system is safe and dependable. ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE PLUMBING SYSTEM INSPECTION Piping Below Floor Slab At least some of the piping was installed below the concrete slab, rendering it inaccessible for inspection. Repairs to piping below the slab will often require removal of portions of the concrete slab. No adverse conditions were observed, however, we recommend periodic inspection and leak testing. Copper Water Lines Copper is generally considered a very desirable type of piping because it is less susceptible to corrosion (than galvanized piping) and could be expected to last the lifetime of the building. More Plumbing Items In The Interior Section For information about the “interior components” of the plumbing system, please see the Interior Components section of this report. Information about gas connections can also be found in the Heating and Water Heating sections. For Water Quality Questions, Ask The Supplier For information concerning water quality, we suggest contacting the municipality or utility company that provides water to this property. What To Do If You Smell Gas A persistent sulfuric “rotten egg” odor signals a natural gas leak and the local gas utility should be contacted immediately if the odor is detected. It is typical to smell the odor when lighting natural gas appliances like kitchen ranges, but the odor should not persist. Once you have contacted the local utility, keep the area clear until the service call is over. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 18 of 29 This confidential report was prepared for Hab Siam Water Heating DESCRIPTIVE INFORMATION Water Heater Location: Energy Source: Storage Capacity: Water Heater Age: Water Heater Configuration: Vessel Insulation: • In a closet accessed from the exterior • Natural gas • 30 gallons • Year of manufacture: 1994, from data plate • Free standing tank • Manufactured with insulation OBSERVATIONS & RECOMMENDATIONS Water Connections Rigid piping had been used for at least some of the water heater connections. As an upgrade, installation of flexible braided stainless steel “no-burst” supply lines should be considered to help prevent damage to the adjacent piping in a large earthquake. Temperature and Pressure Relief Valve (TPRV) The water heater installation included a temperature and pressure relief valve. This device is an important safety feature and should not be altered or tampered with. The temperature and pressure relief valve installation did not include a discharge pipe and this is a hazard as scalding water can be discharged from the valve, possibly injuring occupants. We recommend the installation of a discharge pipe, conforming to current standards and local requirements, terminating at an approved location. Water Heater Gas Supply The gas supply piping included a shutoff valve in the vicinity of the water heater for service and emergency use. The valve was not operated, but this age and style of valve is normally found to be operable by hand. The water heater gas connector was flexible brass. Flexible brass connectors are no longer acceptable for use in a natural gas supply as they can develop pinhole leaks over time. We recommend the installation of an approved flexible connector by a licensed plumbing contractor in accordance with current standards. Water Heater Combustion Air Supply The grills in the doors to the enclosure provided most of the fresh air needed for combustion. They should be kept free of obstructions at all times. Combustion air provides the oxygen needed for the safe and efficient operation of fuel burning appliances. An adequate supply of fresh air around all fuel burning appliances with open combustion compartments is vital for their safe operation. Recent standards prefer combustion air to come from the outside, only. Water Heater Ignition System The pilot light was controlled by a thermocouple, which ensures that the pilot gas valve will close, if the pilot light is extinguished. This system appeared to be in acceptable condition, but was not tested. Water Heater Burner The water heater burner was generally clean and was in acceptable condition. Water Heater Venting System Several aspects of the water heater venting were improper and repairs were needed. We recommend review and repair as necessary by a licensed plumbing or HVAC contractor to ensure proper operation. For illustration purposes, some examples from the above comment are listed below: The water heater vent connector was outdated. Outdated components can shorten the lifespan of the water heater. We recommend outdated components be replaced at the time the water heater is replaced. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 19 of 29 This confidential report was prepared for Hab Siam The vent connector terminated within a Transite (asbestos cement) flue pipe, which is outdated. Outdated flues will shorten the lifespan of water heaters and they don’t draft well. We recommend upgrading the flue when the water heater is replaced to meet current standards and the manufacturer’s requirements. The water heater vent was installed too close to a combustible material, which is a potential fire hazard. We recommend a licensed plumber or heating contractor modify or repair the vent system in a manner consistent with current standards to eliminate this hazard. The cap for one exhaust vent was damaged. We recommend it be repaired or replaced. Water Heater Seismic Restraint The water heater tank lacked seismic restraint. The lack of proper restraint could result in unnecessary damage in the event of a major earthquake. We recommend immediate installation of proper restraint in accordance with current standards and applicable local requirements. California law requires that all water heater tanks be properly anchored or strapped when real estate is sold or transferred. Standards require at least two restraints on every tank provided by either approved metal strap or electrical conduit, one in the upper third and one in the lower third. The lower strap should be at least 4 inches above the gas control valve. If the tank is larger than 52 gallons, additional straps are required. General Comments About The Water Heater The water heater was beyond its expected service life. Although it was still operating, the need for replacement should be expected in the near future. The age of this water heater may make it more cost effective to replace this unit rather than attempting to make significant repairs or corrections. To determine the best course of action, we recommend the advice and services of a licensed plumbing contractor. ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE WATER HEATER INSPECTION Sacrificial Anode Rod Replacement Most modern tank-type water heaters include a device known as an anode rod, which is a passive yet effective corrosion preventative. Corrosion will attack the anode rod first, thereby extending the life expectancy of the steel tank. Eventually, the anode rod will completely corrode and dissolve, and will therefore no longer be able to perform its function. Timely anode replacement can significantly increase the lifespan of the water heater. After the water heater is two or three years old, the anode rod should be removed and inspected every year if maximizing the life of the water heater is desired. Some pitting and surface corrosion are normal and to be expected. Large chunks of metal coating missing from the surface indicate that it should be replaced. The Benefits of Periodic Purging of The Tank Draining a few gallons of water from the tank periodically to flush the sediment from the bottom is recommended by all manufacturers. However, drain valves often become encrusted with deposits and sediment in old tanks may be “sealing” the rust holes in the bottom of the tank. Therefore, unless the tank is flushed regularly from the time it is new, operation of the drain valve is not recommended except in an emergency or when the unit is replaced. Why is a Discharge Pipe Required on Every T & P Relief Valve? The function of the T & P Relief valve, which is required on every water heater, is to allow excessive pressure to safely escape the tank without causing damage to the vessel or the surroundings. Excessive pressure can be caused by a variety of conditions, including too high an internal temperature, which could even cause the water to flash to steam. In any case, when the valve discharges (as is its intended function), it will spray very hot water or even steam from its exit opening. If water is ever observed coming out of the TPRV drain, a licensed plumbing contractor should be consulted immediately. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 20 of 29 This confidential report was prepared for Hab Siam Electrical System DESCRIPTIVE INFORMATION Service Entry Type: Electric Meter Location: Service Voltage Supplied: System Amperage Capacity: Based Upon: Visible Grounding Source: Circuit Protection: Wiring Type(s): • Overhead drop • In a cabinet at the right front corner of the building • 120-240 • 200 • The rated capacity of the main distribution panel • Water supply piping • A combination of circuit breakers and fuses • Non-metallic sheathed cable (“Romex”) • Flexible metallic sheathed cable (AC/MC) • Rigid conduit / EMT OBSERVATIONS & RECOMMENDATIONS Electrical Service The service mast was leaning as it was not adequately braced or supported. Failure of the mast to adequately support the service drop could result in a very hazardous situation. We recommend a competent, licensed electrician adequately brace it in conformance with current industry standards. (See Photo 7) Photo 7 The electric meter was in acceptable condition. The service capacity appeared to be adequate for the existing demand, but may require upgrading if remodeling and/or changes in patterns of use increase demand. Main Disconnect / Main Panel The function of the main disconnect was provided by one or more fuse blocks mounted in the main distribution panel. The main disconnect and main panel were in acceptable condition. System Grounding and Bonding The grounding system appears outdated and may not function effectively in some situations as the grounding system was not supplemented with driven rods. While this may have been consistent with older building practices, we recommend driven grounding rods be installed to upgrade the main panel grounding for increased safety. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 21 of 29 This confidential report was prepared for Hab Siam A pressure regulator valve (PRV) was present on the main water supply piping; however there was no grounding “jumper” wire installed across the PRV for electrical safety. We recommend that such a wire be installed. An equipment grounding conductor was attached to the water piping at the employee bathroom, which is an outdated configuration. Modern standards require grounding conductors to terminate in the panel of circuit origin. We recommend review and repair as necessary by a licensed electrical contractor. Branch Circuitry The exposed electrical conductors below a sink in the lab posed a potential shock hazard. We recommend a licensed electrician immediately repair or remove this inherent risk to personal safety. (See Photo 8) A section of electrical wiring in the attic was not properly terminated in a junction box and posed a shock hazard. We recommend review and repair as necessary by a licensed electrical contractor to remove this safety hazard. (See Photo 9) An open junction box was observed in the attic. All open junction boxes should be covered with an acceptable cover to protect the wiring connections and reduce the risk of shock. Unsecured wiring was observed in several areas in the attic. For maximum safety, all loose wiring should be secured to protect it from abrasion and stretching. Photo 8 Photo 9 Subpanels Additional distribution panels (subpanels) were located in the waiting room, in the front bathroom, and in a hallway utility closet. Not all of the circuits in the subpanel were labeled. When the opportunity arises, we recommend labeling of the balance of the breakers and verifying the accuracy of the existing labeling by actually operating the breakers. Several of the subpanels had been manufactured by the Federal Pacific Company. In laboratory testing and actual performance, an unacceptably high proportion of Federal Pacific circuit breakers failed to trip at their rated amperage. Such malfunctions could result in serious personal injury or property loss and therefore we recommend replacement of these panels by a licensed electrical contractor. The interior aspects of the subpanels were not inspected as the dead front covers were not removed. Removing dead front covers is beyond the scope of this inspection. If more information is desired, a licensed electrician, who is qualified to work on commercial systems, should be consulted. Electrical Receptacles (Outlets) The building contained some two-prong and some three-prong type receptacles, ungrounded and grounded, indicating installation at different times and probably by different people. Several of the receptacles were missing their cover plates. All missing cover plates should be replaced immediately with new cover plates to restore proper protection for those who will be using the devices in the future by reducing the risk of electrical shorts and hazardous shocks. A receptacle in one of the exam rooms was a 3-prong configuration but was not grounded. All ungrounded 3-prong This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 22 of 29 This confidential report was prepared for Hab Siam receptacles should have a grounding wire added or be replaced with a 2-prong receptacle. It is important to note that surge protection required by sensitive electronic equipment such as TVs and computers require a grounded 3-prong receptacle in order to work properly. Electrical Switches During this inspection, we noted several switches for which no purpose was immediately obvious. Sometimes wall switches will control wall receptacles, a light which has yet to be installed, or one that only operates at night. The operation and monitoring of these “mystery” switches at night could shed light on the situation (no pun intended). Electrical Lighting Light bulbs were missing from several fixtures. The missing bulbs should be replaced to provide adequate lighting. Several fluorescent light fixtures were flickering when in use. Replacement of the transformer (ballast) in the fixture may be necessary. We recommend review and repair as necessary by a licensed electrical contractor. Ground Fault Circuit Protection Ground Fault Circuit Interrupter (GFCI) protection was not provided for all of the receptacles where this type of protection is presently required. GFCI protection is a modern, inexpensive safety feature designed to help prevent shock, particularly in wet locations. We recommend the installation of GFCI protection by a licensed electrical contractor in all areas where it is presently required. GFCI protection is currently required: in bathrooms, at kitchen countertops, within 6 feet of all non-kitchen sinks, in garages, in unfinished basements, in crawl spaces, and on the exterior. General Comments On The Electrical System There were numerous “clean-up” type items in the electrical system that needed repair or correction. We recommend a licensed electrical contractor examine the electrical system and repair, augment, or modify as necessary to ensure that the entire system is safe and dependable. Portions of the electrical system use older technology. Modern systems feature improvements in safety and upgrading the outdated portions of the electrical system should be considered, especially when undertaking remodeling projects. ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE ELECTRICAL SYSTEM INSPECTION Low Voltage Systems Were Not Included Review of any low voltage electrical devices and their associated wiring, including, telephone, TV antenna, stereo systems, fire and burglar alarm, intercom, yard lighting, landscape water (sprinkler) timers or other water features, is not within the scope of this inspection. We recommend consultation with the appropriate service technician for full evaluation of the operating condition of these devices. GFCI Protection Explained GFCI (ground fault circuit interrupter) protection is a modern safety feature designed to help prevent shock hazards and electrocution. GFCI breakers and receptacles de-energize a circuit or a portion of a circuit when a hazardous condition exists. GFCI protection is inexpensive and can provide a substantially increased margin of safety. GFCI protection was first required by national standards for receptacles in the vicinity of swimming pools and in exterior locations in 1971. Over the years, the requirements have expanded to include more locations. Currently, GFCI protection is required at all receptacles located: in bathrooms, kitchens, within 6 feet of all non-kitchen sinks, in garages and accessory buildings, outdoors (including rooftops), locker rooms with associated showers, vending machines, pools & spas, drinking fountains, and landscaping fountains. Representative Sampling of Outlets A representative sample of the outlets was tested in each room. Nationally recognized inspection standards require testing a minimum of one outlet in every room, where accessible. Before plugging in sensitive electronic equipment like computers and TVs, we recommend testing outlets with a receptacle tester (available at local hardware stores for under $20) to verify that the receptacle is properly grounded. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 23 of 29 This confidential report was prepared for Hab Siam HVAC DESCRIPTIVE INFORMATION Heat Plant Location: Heating Fuel: BTU Input Rating: Plant Age: Plant Efficiency: Air Filter Type: Number of Zones: • In a closet off Room 2 • Natural gas • 125,000 • Year of manufacture: 2009, from data plate • Estimated at 90+% • None present • Single zone system OBSERVATIONS & RECOMMENDATIONS Forced Hot Air Heating Forced air heating systems operate by heating a stream of air moved by a blower through a system of ducts. Important elements of the system include: the heat exchanger, exhaust venting, blower, controls, and ducting. The heat exchanger in this furnace was inaccessible and could not be visually examined. As they age, heat exchangers can crack and thereby allow products of combustion into the living areas. If information about the condition of the heat exchanger is desired, a licensed HVAC contractor should be retained. HVAC Electrical The equipment local disconnect provides a shut off switch for use in an emergency or while servicing. The local disconnect was in acceptable condition. Fuel Supply The gas supply piping included a shutoff valve in the vicinity of the heating plant for service and emergency use. The valve was not operated, but this age and style of valve is normally found to be operable by hand. The gas connector was an appropriate flexible type and was in acceptable condition. Combustion Air Some of the combustion air was supplied by a patient room. Combustion air provides the oxygen needed for the safe and efficient operation of fuel burning appliances. An adequate supply of fresh air around all fuel burning appliances with open combustion compartments is vital for their safe operation. We recommend consultation with a licensed HVAC contractor for advice and cost estimates. Combustion air provides the oxygen needed for the safe and efficient operation of fuel burning appliances. An adequate supply of fresh air around all fuel burning appliances with open combustion compartments is vital for their safe operation. Recent standards prefer combustion air to come from the outside, only. Ignition and Controls The burner was equipped with an electronic ignition system, which is an energy saving feature that allows operation without the need for a continuously burning pilot light. The ignition system was activated during the inspection and was in acceptable condition. Exhaust Venting System A plastic pipe extending to the exterior of the building provided the flue for the venting of exhaust gases from the heating plant. This type of venting is common on high-efficiency heating systems. A contrasting primer was not visible at the joints in the PVC exhaust vent piping, which may indicate that the joints are not securely attached. Unsecure joints can allow products of combustion in the living areas. We recommend This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 24 of 29 This confidential report was prepared for Hab Siam further evaluation of the venting system by a licensed HVAC contractor to ensure the system is safe. There was a condensate pump, which removes excessive moisture from the furnace vent pipe, due to condensation of combustion products in the vent pipe system. As a part of routine maintenance, a qualified HVAC contractor should periodically examine any installed pump and all drain lines to ensure proper operation. The interlock switch on the condensate pump, which is intended to prevent the furnace from operating if the condensate drain backs up, was disabled or not connected. This condition could cause damage to the furnace, and we recommend wiring the interlock switch to the furnace so the furnace will not run if problems arise. The flexible tubing serving the condensate pump was longer than recommended and could be prone to clogging. Most installation instructions specify the shortest possible run of flexible tubing terminating in a rigid drain line that can drain by gravity. We recommend review and repair as necessary by a licensed HVAC contractor. Air Filters Air filter(s) were not installed. We recommend the installation of properly sized air filter(s) to filter out dust, preventing its re-entry into the occupied interior, and helping keep the blower and ductwork clean. Distribution System The required interlock safety switch (which prevents the operation if the blower compartment door is opened) was disabled, missing, or defective. We recommend review and repair as necessary by a licensed HVAC contractor. Several of the ducts, which were visible, covered with a material that appeared to be asbestos. The removal of asbestos requires a qualified abatement firm and will increase the cost of duct removal. As a precaution, care should be taken to not disturb this material. For more information, a licensed abatement firm should be consulted. The insulation on several of the ducts was missing and/or loose. Repair to minimize heat loss should be considered. System Controls Activation of the user controls on the thermostat caused the unit to respond. Keep in mind that this was a programmable device with many options for setback settings, timed events, etc. No attempt was made to test all of the functions of this thermostat. General Comments About The Heating System The heating system was newer, responded to normal operating controls and with routine maintenance should be reliable for a number of years. For attention to the items noted in this section, a competent, licensed HVAC contractor should be contacted for further evaluation and/or cost estimates for the adjustments, modifications, or repairs recommended in this report. The system was activated, and conditioned air flowed out of the registers, but system balance was not evaluated. The adequacy of the amount of conditioned air delivered to any given room is quite subjective, and depends upon the occupant’s comfort level and how much they want to spend on fuel bills. Therefore, only the occupants can make this kind of determination. This type of determination is obviously beyond the scope of this inspection. It should be noted that an evaporator coil was installed on the furnace, but a condenser was not installed on the exterior. This was will facilitate the installation of air conditioning. If air conditioning is desired, we recommend consultation with one or more licensed contractors for advice and cost estimates. ROOM VENTILATION Ventilation fans were installed in the ceilings of several rooms. Several of the exhaust fans were very noisy. The fans should be serviced to restore quiet operation, or be replaced. Several of the exhaust fans were not functional. We recommend replacement as a more practical response than any attempt to repair. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 25 of 29 This confidential report was prepared for Hab Siam ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE HEATING SYSTEM INSPECTION Furnace Construction Limits Our Inspection The configuration of most furnaces, and particularly their heat exchangers, prevents visual access to many critical interior surfaces. In addition, inspection standards do not allow an inspector to disassemble a furnace beyond those panels that can be easily removed. Thus, any observations available to an inspector will be limited. Carbon Monoxide Warning Carbon monoxide is a colorless, odorless gas. You can’t see it. You can’t smell it. But it can poison or kill. Early symptoms of carbon monoxide poisoning resemble those of the flu – headache, dizziness and nausea. The after effects can be headache, tiredness, memory impairment, difficulty in concentrating, difficulty in sleeping, and impairment of vision. Continued exposure to high levels of the gas can cause unconsciousness or death. The U.S. Consumer Product Safety Commission (CPSC) estimates that hundreds of people die each year from carbon monoxide poisoning. It is also estimated that thousands of others unknowingly suffer the ill effects of this health hazard in their buildings. One source of carbon monoxide is the incomplete combustion of fuel gasses. Incomplete combustion can be caused by the lack of an adequate supply of combustion air, improper installation of venting systems, clogged vents, improperly sized burner orifices in some cases, unvented gas appliances. Rusted, cracked or damaged furnace heat exchangers can also lead to carbon monoxide production. To prevent unnecessary exposure to carbon monoxide, all fuel burning appliances must be properly adjusted and vented, must have an adequate supply of combustion air, and must be maintained in good working order. Energy Saving Features Insulation, weather-stripping, double-glazed windows and doors, and set-back thermostats are features that help reduce heat loss and/or gain and increase comfort while reducing energy costs. Today’s standards would suggest that attic insulation levels reach at least R-30, while wall insulation be at least R-11 for 2 x 4 framing or R-19 for 2 x 6 framing, and floor insulation, where appropriate, should be R-19. Air sealing of the ceiling structure and installation of insulation are usually the most cost effective methods to increase the thermal efficiency of a building. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 26 of 29 This confidential report was prepared for Hab Siam Interior Components DESCRIPTIVE INFORMATION Number of Bathrooms: Wall Finish: Ceiling Finish: • Three • Gypsum wallboard (Drywall) • Plaster • Wood paneling • Gypsum wallboard (Drywall) • Acoustic tile OBSERVATIONS & RECOMMENDATIONS Interior Surfaces Wear and tear of the surfaces was evident throughout the building, of the type generally resulting from deferred maintenance. We made no attempt to list all cosmetic flaws, but do suggest attention to items relating to function and safety. The 9”x9” floor tiles are most likely vinyl asbestos (VA). It is important to keep this type of flooring properly sealed or covered because asbestos fibers can be released when the tiles are damaged, scraped or sanded. Confirmation of actual asbestos content can only be determined by laboratory testing. As a precaution, removal of this type of flooring should only be performed by a qualified environmental contractor. Minor wall cracks were observed throughout the building. These can be patched, then the walls prepared and refinished in the course of routine maintenance. However, we caution that this type of cosmetic cracking might recur because of minor movement in the structure. The ceiling at the right front was stained, but it could not be determined if the leak was active. The source of the leak should be identified and necessary repairs performed before any attempt is made to restore surface appearance. Restoration of surface appearance may require extensive patching and/or replacement of some of the surface materials. (See Photo 10) Photo 10 Some of the ceiling material was a type that may contain asbestos. Acoustic tiles / texture is typically regarded as safe when secure and undamaged, because asbestos is hazardous only when fibers are released into the air. Further information on asbestos can be obtained from a licensed asbestos consultant or abatement contractor. Acoustic tile and sprayed-on acoustic texture, the kind normally found on ceilings, is common in buildings from the late 50s through the 80s. For most of these years, asbestos fibers were added to the material as a binding agent and to enable easier application. On ceilings, the material is not exposed to routine contact and therefore tends to remain intact. Actual asbestos content can only be determined by laboratory testing. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 27 of 29 This confidential report was prepared for Hab Siam Front Office Bathroom Washbasin The washbasin was in acceptable condition. Toilet The toilet was running continuously most likely because a malfunctioning fill valve. This condition can waste a significant amount of water. We recommend review and repair as necessary by a licensed plumbing contractor. Faucets, Water Supplies, and Drains The faucet was operated and allowed to run for a short period of time. It produced functional flow and was in acceptable condition. The visible portions of the shutoff valves and supply lines were in acceptable condition. The visible portions of the drain piping were in acceptable condition. Bathroom Ventilation The bathroom vent fan was not functional. We recommend replacement as a more practical response than any attempt to repair. “Employee” Bathroom Washbasin The washbasin was in acceptable condition. Toilet The toilet was not securely attached to the floor and drain piping, which can allow water leakage. We recommend a licensed plumber remove and reset the toilet securely to the floor, using new bowl wax. The base of the toilet should also be set in caulk to help prevent movement and prevent water entry or exit. Faucets, Water Supplies, and Drains The faucet was operated and allowed to run for a short period of time. It produced functional flow and was in acceptable condition. The visible portions of the shutoff valves and supply lines were in acceptable condition. The visible portions of the drain piping were in acceptable condition. Bathroom Ventilation A vent fan provided ventilation for this bathroom. The fan responded to its user controls and was in acceptable condition. “Public” Bathroom Washbasin The washbasin was in acceptable condition, with exceptions noted. Joint caulking at the wall was deteriorated. The joints should be scraped clean then re-caulked in accordance with standard trade practices, or the caulk manufacturer’s specifications, for a better appearance and to help to reduce the potential for moisture penetration into concealed areas, which could possibly cause more serious damage. In the process of this repair, damage may be discovered in previously concealed areas. Toilet The toilet was not securely attached to the floor and drain piping, which can allow water leakage. We recommend a licensed plumber remove and reset the toilet securely to the floor, using new bowl wax. The base of the toilet should also be set in caulk to help prevent movement and prevent water entry or exit. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 28 of 29 This confidential report was prepared for Hab Siam Faucets, Water Supplies, and Drains The faucet was operated and allowed to run for a short period of time. It produced functional flow and was in acceptable condition. The visible portions of the shutoff valves and supply lines were in acceptable condition. The visible portions of the drain piping were in acceptable condition. Bathroom Ventilation A vent fan provided ventilation for this bathroom. The fan responded to its user controls and was in acceptable condition. Lab Room Sinks Washbasins The washbasins were in acceptable condition. Faucets, Water Supplies, and Drains The aerator at the right sink faucet was clogged. For a smoother flow of water with less splashing, we recommend the aerator be cleaned or replaced to restore proper operation. A faucet near the door was disconnected. The faucet should be reconnected by a licensed plumbing contractor to restore service. An angle stop below the left sink was leaking water at the time of the inspection. We recommend review and repair as necessary by a licensed plumbing contractor. (See Photo 11) Photo 11 Misc Utility Sinks Utility Sinks Shutoff valves were not installed for the several of the faucets, leaving no way to turn off the water to these fixtures without turning off the water to the entire building. We recommend the installation of shutoff valves by a licensed plumbing contractor to facilitate faucet repairs and replacement. balky foot petal General Comments About the Interior Unsecured medical files were observed in one of the interior rooms. We recommend proper transfer or disposal of these files by an appropriate specialist. (See Photo 12) For more information see http://www.hhs.gov/ocr/privacy/hipaa/faq/disposal_of_protected_health_information This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net 2908 Ellsworth Street, Berkeley, CA Page 29 of 29 This confidential report was prepared for Hab Siam Photo 12 ADVICE, PRECAUTIONS & CONDITIONS AFFECTING THE SCOPE OF THE INTERIOR INSPECTION Excessive Personal Storage Prevented Access and Inspection Many areas could not be fully inspected because access was denied by an excessive quantity of stored personal items. We recommend that these areas be cleared of all stored items and any mechanical or electrical system components and all finish components in the space be thoroughly inspected. Note that once access becomes available, further inspection could reveal reportable conditions. Window Blind Information Window treatments were installed but they were not within the scope of this inspection. These treatments partially obscured the interior aspects of the windows, and thereby prevent a thorough window inspection. Some strings or cords used to operate retractable window shades can be a child safety hazard. For more information, please visit the Window Covering Safety Council website: http://www.windowcoverings.org/basic_cord_safety.html Lead Paint Information This building was constructed before 1978 and most likely contains lead paint. A new rule regarding lead paint (and other contaminants) is now in effect. Called the "Renovation, Repair, and Painting" (RRP) rule, it imposes a strict protocol on work done to buildings built before 1978. We recommend verifying that painting contractors are RRP certified before hiring them. More information about this program, we recommend consulting this website: http://www.epa.gov/getleadsafe Burglar Alarm Not Tested A burglar alarm had been installed in this building. The alarm system was not tested. We recommend consultation with the owner and/or an alarm company regarding the operation and maintenance of this system. Secure Building Contents Unsecured building contents such as televisions, computers, bookshelves, and other items can become missile hazards in an earthquake. For more information about how to secure these items please see the Association of Bay Area Governments (ABAG) website http://www.abag.ca.gov/bayarea/eqmaps/business/nonstruc-business.html. Not A Punch List We did not attempt to list all cosmetic flaws and suggest that most of these items will be addressed by routine maintenance upgrading. The intended purpose of this inspection was not to create an architectural “punch list” of minor cosmetic flaws. This inspection was done on February 23, 2015, by Inspector Paul Barraza ACI of JMC Building Inspections, (510) 525-7173. Acceptance and/or use of this Inspection Report shall constitute acceptance of, and agreement to, all of the provisions of the Property Inspection Contract and its Standard Terms and Conditions which are incorporated by reference and form a part of this Inspection Report. Summit System Master Comment Library Copyright © 1998 - 2015, Summit Property Inspection Systems. All Rights Reserved. www.summitinspection.net