Prezentacja programu PowerPoint - Inss-Pol
Transcription
Prezentacja programu PowerPoint - Inss-Pol
where we are POLAND OFFICE: ul. Międzyleska 6A 50-514 Wrocław tel. +48 71 362 90 00 +48 607 638 679 fax. +48 71 362 90 10 @: insspol@inss-pol.pl WORKSHOP: ul. Międzyleska 6A 50-514 Wrocław tel. +48 71 342 50 05 fax. +48 71 343 05 28 @: zp@inss-pol.pl business activities support you in engineering prefabrication in our workshop on-site assembly of the technological systems industrial activities brewery dairy energy pharmacy food nuclear cosmetics chemistry biotechnology environmental protection construction our business philosophy quality safety important figures employment (people) turnovers (mln PLN) contribution of industrial activities the standards and certificates the standards and certificates the standards and certificates our workshop land area 6.925 m2 height of the production hall 10,06 m gantry frames 2 x 12,5 T 1 x 2,0 T production hall area 2.775 m2 what we manufacture in our workshop tanks and reactors pipe fences and flow plates elements of process pipelines with diameters from DN 10 to DN 1200 pilot plants service skids – a pump system what we manufacture in our workshop complete process systems – SKIDs special process piping (for a nuclear power station) heat exchangers, evaporators piping systems, tunnels, ducts storage and process tanks what we manufacture in our workshop platforms, steelworks manifolds ducts mobile process arrangements SKIDs and manifolds what we do at construction sites pressure tanks complete process installations orbital welding process and media piping supporting structures, platforms, stairs, railings heat and cold insulation pipe bridges our main clients awards and honours our primary goal is to support the client in achieving success selected projects in the years 2007-2015 selected projects in the years 2007-2015 selected projects in the years 2007-2015 GEA TBS / HEINEKEN Sevilla 2005-2007 Buyer: GEA Tuchenhagen Brewery Systems and GEA HUPMANN AG Scope of work: Assembly of complete process system and brewery plant. Assembly, welding and thermal insulation of process plants in fermentation cellars, CIP, fermentation and storage stations. Turnkey project. Moving of tanks, equipment into the hall, prefabrication of carrying structures under pipelines, laying and welding of pipelines. Trials, participation in commissioning. 105 000 hours. selected projects in the years 2007-2015 TOOTHPASTE FACTORY COLGATE Świdnica 2006-2013 Buyer: Colgate – Palmolive Mfg (Poland) Sp. z o.o. Scope of work: Building and installation work at the toothpaste site. Process plants and utility media. Construction and as-built documentation. Validation of toothpaste manufacturing plant. Extension of the piping system. Supply of a complete CIP unit including automation and control systems. selected projects in the years 2007-2015 UNILEVER POLSKA S.A. Poznań 2007 Buyer: Unilever Polska S.A. Scope of work: Process plant for soup manufacture in Unilever Polska S.A. Manufacturing Site in Poznań. Delivery together with installation and commissioning of the process plant and preparation of thermal insulation on process lines. selected projects in the years 2007-2015 PROCESSING OF FRUIT AND VEGETABLES PLANT Mogielnica 2007 Buyer: Holvrieka Ido BV Scope of work: Manufacturing and installation of 6 tanks 1000m3 selected projects in the years 2007-2015 PROCTER&GAMBLE POLSKA SP. Z O.O. Aleksandrów Łódzki 2007-2014 Buyer: Procter & Gamble Polska Sp. z o.o. Scope of work: Assembly, welding and installation of pipelines and hook up facilities, process plants and utility media. CIPs and SKIDs selected projects in the years 2007-2015 LECH BROWAR WIELKOPOLSKI S.A. Poznań 2008 Buyer: Holvrieka Ido BV Scope of work: Assembly, welding, installation and insulation of 32 fermentation tanks V = 5500 hl selected projects in the years 2007-2015 MBEYA BREWERY (SAB MILLER) Tanzania 2009 Buyer: Krones AG Scope of work: Assembly, welding, CIP, filtration, fermentation, filling plants; Utility pipelines (steam, condensate, cooling water) thermal insulation. Turnkey project. selected projects in the years 2007-2015 MONDELEZ INTERNATIONAL Skarbimierz 2009 - 2014 Buyer: Cadbury Wedel Line of: Crunchy, FCCW, Turkish, Double Decker, Picnic Scope of work: Process hot water; design, manufacture, delivery, installation and commissioning of hot process water system 80°C on Crunchy line including fittings, placed on Skid frame, unloading and assembly of process equipment. Design, manufacture, delivery, installation and commissioning of low temperature hot water exchangers (LTHW) including pipelines and fittings, supports for LTHW pipelines, access platforms and process media systems; unloading and assembly of process equipment. selected projects in the years 2007-2015 WATER TREATMENT STATION Bochnia 2009/2010 Buyer: Veolia Water Systems Sp. z o.o. Scope of work: Modernization, extension and installation works. selected projects in the years 2007-2015 WASTE WATER TREATMENT PLANT CZAJKA Warszawa 2009-2013 Buyer: Veolia Water Systems Sp. z o.o. Scope of work: Assembly of process plant. Prefabrication of the pipelines. Assembly of equipment, participation in commissioning. STUOŚ-CZAJKA: Thermal Effluent Sediment Disposal Station: Documentation, prefabrication, delivery and assembly of ducts. Thermal protection insulation. selected projects in the years 2007-2015 FRUIT JUICES PRODUCTION PLANT WESERGOLD DODOW Germany 2010/2011 Buyer: Ziemann International GmbH Scope of work: Manufacturing and installation of 8 tanks 1500m3 selected projects in the years 2007-2015 KASZTELAN Brewery Sierpc 2013 - 2014 Buyer: Krones Sp. z o.o. Scope of work: 9 CCT Ø6800mm including walkway, ladder, connecting walkway Premanufacture of elements of the tanks Assembly and welding of the tanks Pressure tests Documentation UDT / TUV selected projects in the years 2007-2015 KASZTELAN Brewery - Brewhouse Sierpc 2013 - 2014 Buyer: Ziemann International GmbH Scope of work: Placing and installation of brewing vessels Assembly of pumping systems, pipe bridges, piping, Assembly of ”dry part” Tests and start-up selected projects in the years 2007-2015 UNILEVER BYDGOSZCZ Bydgoszcz 2013, 2014 Buyer: GEA Polska S.A./ GEA PE United Kingdom Scope of work: Process system for manufacturing and distribution of creams and gels: Skids and valve block prefabrication; Piping system; Prefabrication and assembly of CIP station with piping; Product transfer installation with recovery system (PIG stations). selected projects in the years 2007-2015 Catalysts factory BASF Środa Śląska 2013-2015 Buyer: MOSTOSTAL ZABRZE S.A. Scope of work: Process installation for production of catalysts for a mobile NOx reduction system Technological and utilities installations Premanufacture of the valve blocks; Premanufacture and assembly of the pipelines Building and system works Construction and as-built documentation Start-up of the system Project value: 6.800.733,08 Euro selected projects in the years 2007-2015 Vreugdenhil Dairy Foods Nederland Görinchem 2014 - 2015 Buyer: GEA Process Engineering Nederland BV & GEA Nu-Con Ltd Scope of work: Process, technological and utilities installations Premanufacture and TIG welding of the valve blocks Premanufacture of SKIDs Premanufacture and assembly of the pipelines Building and system works Construction and as-built documentation Start-up of the system Project value: 2.488.771,02 Euro selected projects in the years 2007-2015 Royal Friesland Campina Borculo 2014 - 2015 Buyer: GEA Process Engineering Nederland BV, GEA Nu-Con Ltd GEA France, GEA Denmark Scope of work: Process, technological and utilities installations Premanufacture and welding of the valve blocks Premanufacture of SKIDs Premanufacture and assembly of the pipelines and service platforms Construction and as-built documentation Start-up of the system Project value: 3.228.600,00 Euro selected projects in the years 2007-2015 Paulaner Germany Münich 2014 - 2015 Buyer: KRONES AG Scope of work: Process, technological and utilities installations Premanufacture and welding of the valve blocks Premanufacture of SKIDs Premanufacture and assembly of the pipelines and service platforms Construction and as-built documentation Start-up of the system Thank you for your attention …waiting for your new projects