Report and appendices , item 6.1 PDF 1 MB
Transcription
Report and appendices , item 6.1 PDF 1 MB
Item No. Classification: Date: Meeting Name: 6.1 Open 5 November 2013 Planning Committee Report title: Development Management planning application: Application 12/AP/4126 for: Outline Planning Permission Address: CANADA WATER SITES C AND E, SURREY QUAYS ROAD, LONDON SE16 2XU Proposal: Application made under the provisions of the Town and Country Planning Act 1990 (England and Wales), accompanied by an ES under the Environmental Impact Assessment Regulations 2011 seeking Outline planning permission for the demolition of existing buildings on the site (the 'Decathlon' and 'What' Retail Stores) and the erection of 5 buildings (C1-C4 and E1) ranging from 5 to 40 storeys (150.86m AOD) comprising a maximum overall floorspace of up to 138,146.8sq.m GEA. New buildings to comprise: up to 97,851sq.m of residential accommodation (Class C3) (equating to a maximum of 1,030 residential units), up to 12,300.9sq.m Class A1 retail store (including 10,178sq.m (net) sales area, 745sq.m ancillary office accommodation and 308sq.m ancillary cafe); up to 4,352.3sq.m of other retail (Class A1/A2/A3/A4 floorspace); up to 2,800sq.m of office space floorspace (Class B1), up to 658sq.m of health centre floorspace (Class D1) and up to 698.2sq.m of cinema floorspace (Class D2); 19,486.5sq.m ancillary parking (equating to up to a maximum of 466 parking spaces), plant and storage accommodation, including the provision of basements to provide vehicle and cycle parking, circulation, servicing and plant areas; new vehicle and pedestrian accesses and new public amenity space and landscaping including new public square. Within the outline described above: - Full details are submitted for the access, appearance, landscaping, layout and scale of Building C1 and associated works; - Full details are submitted for the layout, appearance and scale of Buildings C2, C3 and C4 and means of vehicular access, with layout of the linked basement, internal layouts of the individual buildings and landscaping reserved; - All matters are reserved in respect of Building E1 (min 17.8m height, max 37.8m height, comprising up to 29,907.9sqm floorspace). Ward(s) or groups affected: Rotherhithe and Surrey Docks From: HEAD OF DEVELOPMENT MANAGEMENT Application Start Date 29/01/2013 Application PPA Decision Date 30/01/2014 RECOMMENDATION 1 a) That planning permission is granted subject to conditions, the applicant entering into a legal agreement on or before 30th January 2014 and subject to referral to the Mayor of London. b) If it is resolved to grant planning permission, that it is confirmed that the environmental information has been taken into account as required by Regulation 3(4) of the Town and Country Planning (Environmental Impact Assessments) Regulations 2011; c) That it is confirmed that, following issue of the decision, the Head of Development Management should place a statement on the Statutory Register pursuant to Regulation 24 of the Town and Country Planning (Environmental Impact Assessments) Regulations 2011 which contains the information required by Regulation 21 and that for the purposes of Regulation 24(1)(c) the main reasons and considerations on which the Planning Committee’s decision was based shall be set out as in this report; 2 d) In the event that the legal agreement is not entered into by 30th January 2014 then the Head of Development Management be authorised to refuse planning permission, if appropriate, for the reasons set out in paragraphs 289-295 of this report. BACKGROUND INFORMATION Site location and description 3 The site is formed of two parts separated by Surrey Quays Road. Site C is located to the west of Surrey Quays Road and adjacent to the Canada Water Basin, while Site E is located to the east of Surrey Quays Road and adjacent to the Harmsworth Quays Printworks site. 4 Site C occupies an area of 2.31 hectares and is currently occupied by the Decathlon retail store, located in two large retail sheds erected in the 1980s, and a car park for 224 surface parking spaces with associated service areas. The two existing retail sheds have a combined floorspace of 6,190sqm and Decathlon benefit from a lease which runs until 2028. The site is bounded the Canada Water Basin to the west, the Albion Channel to the north, Surrey Quays Road to the east and the Surrey Quays Shopping Centre site to the south. To the north of the site and the other side of Albion Channel there are two recent housing blocks (Toronto and Montreal House), with a maximum height of 8 storeys. Beyond these blocks and adjacent to the Canada Water Station there is a recently constructed 26 storey residential tower (Ontario Point). 5 Site E occupies an area of 0.78 hectares and currently located on the site is the What!!! Home and Leisure store situated in a large retail shed, with 104 surface car parking spaces. The site is bounded by the Harmsworth Quays Printworks, the former Mulberry Business Park and Canada Street. Directly opposite the site, to the north and on the opposite side of Canada Street, are existing residential apartment buildings (Giverny House and Pavilion House) which are part of the Water Gardens development. The site is not located within a Conservation Area and there are no listed buildings on or near the site. Part C of the site forms part of the Canada Water Town Centre, part E lies outwith the Town Centre designation and both parts of the site are located in the Core Area in the Canada Water Area Action Plan. In terms of Public Transport Accessibility the PTAL rating is 6a, reflecting the high availability of public transport. Details of proposal 6 The application proposes the construction of 5 buildings on the site in 4 phases:Phase 1 – ‘Building C1’ has full details submitted for layout, scale, access, appearance and landscaping; Phase 2 – ‘Building E1’ has all matters reserved, with only maximum and minimum heights and footprint extent detailed in this current application; and Phase 3 – ‘Buildings C2 and C3’ have full details submitted for the siting, scale, vehicular access and appearance. Landscaping, layout of the basement car park and the internal layouts of individual buildings are reserved for subsequent applications. Phase 4 - ’Building C4’ has full details submitted for the siting, scale, vehicular access and appearance. Landscaping, layout of the basement car park and the internal layout of the building is reserved for subsequent applications. 7 The maximum total floorspace proposed in this development is 138,146.8sqm (GEA) floorspace. The table below defines the maximum floorspace figures for each category of land use proposed. Table 1: Maximum floorspace figures by use Land Use (& Class) Maximum GIA (sqm) Residential (C3) Office (B1) Decathlon Retail Store (A1) including ancillary head office Other Retail (A1-A4) Cinema (D2) Health Centre (D1) Parking, Plant and Storage (ancillary) Total Maximum GEA (sqm) 90,529.4 2,460 12,087.6 97,851 2,800 12,300.9 4,047.6 640.8 573 18,955.8 4,352.3 698.2 658 19,486.5 129,304.2 138,146.8 8 Building C1 is proposed to accommodate the new Decathlon Store over the bottom two floors with the option to construct a large mezzanine to increase trading floorspace (mezzanine forming Phase 1B). Surrounding the store it is proposed to locate ancillary servicing areas for the store, the entrance to the basement car park, the entrances to residential units above and the ground floor levels of the proposed four storey townhouses. A residential central courtyard, (at podium level) is proposed at 4th storey level, with the residential blocks enclosing the courtyard space. A new MUGA ‘Ball Court’ area is also proposed at courtyard level, and intended for use by customers of the Decathlon Store, residents of C1 and the wider public (by arrangement with Decathlon). The residential blocks take the total building heights to 7 -14 storeys (adjacent to Albion Channel), 8 - 11 storeys (adjacent to Surrey Quays Road), and 9 - 17 storeys (adjacent to Surrey Quays Road and the proposed building C2). This building would comprise Phase 1A and 1B of the development. 9 Building C2 is proposed to accommodate retail and residential floorspace and is eight storeys in height. Building C3 is proposed to accommodate a small cinema, retail floorspace and residential units. It is 20 storeys in height. Building C4 is a 40 storey tower with ground floor retail, residential flats, a roof garden and structural frame / lift overrun above the 40 storey height. The details are submitted in full for the external appearance of buildings C2, C3 & C4, but the internal layouts are reserved, and would be subject to future planning applications and approval. These buildings would form Phases 3 and 4 of the development. 10 Building E1 is proposed to provide Class D1 floorspace, which is intended to form a new health centre, as well as office (Class B1), retail (Class A1-A4), and residential accommodation (Class C3) uses. The application is in outline only in respect of this building and building heights of max. 37.8m (AOD) / min. 23.8m (AOD) are proposed to the north, west and south of the site adjacent to Surrey Quays Road and opposite the Water Gardens development. Heights of a maximum of 31.5m (AOD) and a minimum of17.8m (AOD) are proposed to the east of the site. A central courtyard area is also proposed at podium level at a maximum height of 13.6m (AOD) or minimum height of 5.6m (AOD). It is proposed that this building is used to accommodate all of the affordable housing initially provided in the scheme, and would comprise Phase 2 of the development. 11 Table 2: Proposed accommodation within each building and phase Building Number of residential units Phase 1A/1B C1 234 Phase 2 E1 Up to 231 (max quantum) Phase 3 C2 (max quantum) C3 (max quantum) Phase 4 C4 (max quantum) Total (max quantum) Up to 112* Up to 180* Up to 273* Up to 1,030* Commercial floorspace maximum GEA (sqm) • Decathlon retail store 12,300.9; • Other retail (A1A4) 215.5; • Parking, plant, storage (ancillary) 7,869.7 • Health Centre (D1) 678; • Office (B1) 2,800; • Retail (A1-A4) 677; • Parking, plant and storage (ancillary) 2,295.2. • Retail (A1-A4) 1,959; • Parking, plant, storage (ancillary) 3,107.2 • Cinema (D2) 698.2; • Retail (A1-A4) 758.4; • Parking, plant, storage (ancillary) 3,107.2. • Retail (A1-A4) 742.4; • Parking, plant, storage (ancillary) 3,033.6. Up to 40,269sqm Phasing programme Construction starts Construction complete July 2014 December 2016 September 2016 February 2019 March 2019 August 2021 March 2019 August 2021 September 2021 August 2023 *Maximum number of units, subject to future reserved matters applications. 12 In total a site capacity for up to 1,030 residential units and 20,809sqm (GEA) of commercial (including Class D use and excluding ancillary / parking space) floorspace is proposed. Basement areas will provide car parking for the town centre / Decathlon customers and future residential occupiers. Initially a basement is proposed as part of building C1 (in phase 1 of the development) to provide customer parking for Decathlon and the wider town centre. A larger basement as part of buildings C2, C3 and C4 will then be created (in phase 3/4) to link into the original C1 basement area, providing further customer and residential parking. A further basement car park area is proposed in building E1, in Phase 2 of the development for residents. 13 A total of 250 basement car parking spaces for town centre/retail users are proposed. 152 spaces will be provided initially in the basement of building C1, with 98 temporary surface spaces provided on part of the cleared, southern part of the site where buildings C2 and C3 would later be located. 102 permanent town centre/retail car parking spaces will be provided within the basement under buildings C2, C3 and C4 when completed. The number of town centre/retail spaces initially provided in building C1 basement (152) will then be reduced to 148, to enable an access route between the C1 and C2 / C3 basement areas. The temporary surface parking will be removed. Hence 250 town centre/retail spaces are proposed in total. Temporary residential surface parking for building C1 is proposed on site E. 14 In addition to the above, building C1 also includes storage for 62 bicycles for customers of the Decathlon Store and 12 for staff, eight additional spaces are also proposed for the other retail units. There are 281 cycle storage spaces proposed as part of the residential element of Phase 1 (building C1), provided at mezzanine and first floor level or in the form of cycle lockers attached to individual units in the development. The cycle parking for subsequent phases will be established under the reserved matters applications. 15 The application also includes provision for a new public space, consisting of a lawn and routes through and around the site. The details of the landscaping and public realm are reserved for future consideration, but indicative plans have been provided, as well as specifications which are set out in the Design Specification and Place Making document submitted with the application. The proposed public space is focused around a 2,187sqm central lawn space, which faces the Canada Water Basin, situated between buildings C2, C3 and C4. It is intended that this area is completely pedestrianised, offering a space for visitors of the area to sit and spend time in and for informal play. 16 The indicative proposals for the space include a pedestrian route running through the middle of the space, connecting Canada Water Station and the Library Plaza with the rest of the Town Centre and its hinterland. Each half of the lawn is currently envisaged as consisting of a gentle mound, providing views over the basin and providing some enclosure to the space. Trees and seats would line the edge of the lawn, keeping the central area open for casual seating and play. Along the edge of the Basin, new steps descend to the waters edge. The steps are intended to provide a space for people to sit and overlook the Basin and enjoy the water. The steps are an indicative proposal at this stage, with details reserved, but are envisaged to create a seamless edge between the public space and basin. An improved public space is created at the elbow of the Albion Channel with a public lift from Surrey Quays Road to the Channel level and a new route is created from Surrey Quays Road to the Basin between Building C2 and Building C3. Planning history 17 09-AP-0034 – Application WITHDRAWN for Redevelopment of existing retail warehouses and erection of 4 buildings varying in height from 4 to 10 storeys comprising 441 residential units (Class C3), a 9546sqm retail store (Class A1), 1177sqm of other Class A1/A3/A4/A5 space, 876sqm of office space (Class B1a), 303sqm of community space (Class D1), with a basement car park for 477 cars, plus associated access works, landscaping and communal amenity space. (27-03-2009) 18 09-AP-1783 – Planning permission GRANTED with legal agreement for redevelopment of existing retail warehouses and erection of 6 buildings varying in height from 4 to 10 storeys comprising 430 residential units (Class C3), 9104sqm retail store (Class A1), 1287sqm of other Class A1/A3/A4/A5 space, 644sqm of office space (Class B1a), 528sqm of Class D1 community space, access, basement car park for 340 cars, public realm, landscaping and communal amenity space. (25-03-2011) This permission has not been implemented. 19 12-AP-2357 – Screening Opinion that the development is considered to constitute EIA development for comprehensive, phased mixed use redevelopment comprising new and replacement retail (Class A1), offices (Class B1), other A3/A4/A5 retail space, residential uses (Class C3), community leisure uses (Classes D1 and D2), access, basement car parking, public realm and landscaping and community amenity space. (15-08-2012). 20 12-AP-2457 – Scoping Opinion agreeing required information of the Environmental Statement relating to the comprehensive, phased mixed use redevelopment comprising new and replacement retail (Class A1), offices (Class B1), other A3/A4/A5 retail space, residential uses (Class C3), community leisure uses (Classes D1 and D2), access, basement car parking, public realm and landscaping and community amenity space. (12-10-2012). Planning history of adjoining sites 21 Outline permission was GRANTED in 2007 at Site A & B (05-AP-2539) for the following: Development of the site for mixed use purposes comprising residential flats, community use/public library (Class D1), offices, studio workshops and retail, in buildings up to a maximum of 10 storeys in height; creation of new areas of open space, construction of new roads, pedestrian and cycle routes and new access to the public highway together with associated works including the provision of parking, servicing and plant areas and a replacement entrance to London Underground Station. 22 In 2007 the Council GRANTED permission within Site B (07-AP-1174) for: Erection of a Library building on northern edge of the Dock (within Site B), comprising a public library, cafe, community and performance space, and incorporating a new entrance to Canada Water Underground Station; laying out of an adjacent Civic Plaza; together with associated enabling works and highway alterations. Construction of the library is now complete. 23 Reserved Matters were APPROVED by the Council in 2008 at Site B1 (07-AP-2588) for: External appearance, internal layout, and access to buildings, following Outline Planning Permission dated 4 May 2007 (05-AP-2539) for the erection of an eight storey building comprising 63 dwellings and Class A1 (retail) and B1(office/commercial) accommodation within the ground floor. Site B1, now known as Toronto House, is now occupied. 24 An application was made for detailed permission at Site B2 which was GRANTED in 2009 (08-AP-2388) for: Erection of a part 7, part 8 storey building to provide 169 residential units (Class C3), 938sqm of retail and/or food/drink (Class A1/A3) and 300sqm of ancillary residential floorspace (residents gym), 46 basement car parking spaces, together with access, hard and soft landscaping, and other associated works incidental to the development. This development is now complete and occupied, and is now known as Montreal House. 25 Full permission was GRANTED at the Mulberry Business Park, Quebec Way in 2008 (07-AP-2806) for: Demolition of existing buildings and the erection of a series of buildings up to 8 storeys comprising 256 residential units, 5105m² of Class B1 (Office) floorspace, basement car park with access to Canada Street, and landscaping works. A certificate of lawfulness in 2011 established implementation of the planning permission. 26 Full permission GRANTED at Quebec Way Industrial Estate, Quebec Way on 28th February 2012 (11-AP-2565) for: Demolition of three existing warehouse buildings and construction of 7 blocks between 3 and 6 storeys high (max 21m AOD); containing 366 residential units (142x 1 bed, 113x 2 bed, 98x 3 bed and 13x 4 bed) and commercial floorspace for Class A1 (shops) / A3 (restaurant/cafes) / D1 (non-residential institutions / D2 (assembly and leisure)uses; with basement car parking, motorcycle and cycle storage, ancillary storage spaces and a new route through the site into Russia Dock Woodlands. New vehicle and pedestrian accesses to be created from Quebec Way. This permission has not yet been implemented. 27 Full Permission GRANTED (13/AP/1429) subject to Legal Agreement at former Mulberry Business Park on 17th September 2013 for: (13/AP/1429) - Redevelopment of the former Mulberry Business park to provide buildings of between 4 and 9 storeys (maximum height 42.85m AOD), comprising 770 student bedrooms with related living/kitchen and communal spaces (sui generis); 33 affordable residential units (Class C3); 610sqm retail uses (Classes A1, A2,A3); 322sqm health centre (Class D1); 75sqm area of retail (Classes A1, A2, A3) or alternate non-residential institutional use (Class D1); 4,490sqm offices (Class B1); associated car parking, cycle parking and landscaped public realm; new vehicular and pedestrian access/egress and associated works. Not yet implemented. 28 A SPLIT Planning Decision issued in March 2012 for development at Surrey Quays Shopping Centre, Redriff Road (11-AP-4206) granting permission for an extension to the existing shopping centre, and refusing outline planning consent for a single storey car parking deck. Application description:Hybrid outline/full application for the erection of an extension to the existing shopping centre comprising retail floorspace (approximately 10,564sqm of Use Classes A1 retail, A2 services, A3 cafe/restaurant, A4 drinking establishments and A5 hot food takeaways), alterations to the appearance of the existing shopping centre, landscaping, and reconfiguration of part of the existing car parking and associated highway works (full) together with the erection of a single level car parking deck above part of the existing car park, incorporating additional retail floorspace (approximately 450sqm of Use Classes A1, A2, A3, A4 and A5) (outline). This permission has not yet been implemented. 29 Outline planning permission was GRANTED in 2010 at Surrey Quays (Mast) Leisure Site (09-AP-1999) for: Application made under the provisions of the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999 seeking Outline permission for demolition of all existing buildings and erection of buildings ranging from 2 to 10 storeys comprising 11,105sqm leisure floorspace (including cinema) (Class D2), 2,695sqm retail floorspace (Class A1-A3), 49,276sqm of private and affordable residential accommodation (approximately 509 flats) (Class C3), 495 car parking spaces (142 for residential and 350 for leisure uses) and associated works including public and private open space, as well as detailed design for 123 rooms (4,250sqm) of student housing (Class Sui Generis), 2,500sqm commercial floorspace (Class B1), 86 residential units (included in the 509 flats referenced above) (Class C3) and the external appearance of any elevation facing Harmsworth Quays Printworks. No reserved matters applications have been made, and the permission has not been implemented. 30 Full permission was GRANTED for Site A at Canada Water in 2010 (09-AP-1870) for: Erection of a series of buildings comprising a 26 storey tower, with ground floor mezzanine (maximum height 92.95m AOD), and 9 individual buildings ranging from 4 to 8 storeys in height to provide 668 residential units, 958sqm of retail (Class A1, A2 and A3), and 268sqm of community use (Class D1), creation of a new open space and construction of new roads, pedestrian and cycle routes and new access to the highway, together with associated works including the provision of public cycle facility, basement car parking for 166 cars and cycle parking, servicing, landscaping and plant areas. The construction of the development is now complete and occupied. KEY ISSUES FOR CONSIDERATION Summary of main issues 31 The main issues to be considered in respect of this application are: • • • • • • • • • • • • • • • • Principle of the proposed development in terms of land use and conformity with the development plan and the Canada Water Area Action Plan; Impacts from the development as described in the submitted Environmental Statement; Impact on the amenities of occupiers of adjoining properties; Impact of adjoining occupiers on development; Transport issues; Design issues including layout, heights, massing and elevations; Tall buildings and impact on views; Quality of accommodation; Housing mix, type and density; Affordable housing; Landscaping and mpact on trees; Ecology and biodiversity; Planning obligations; Socio-economics; Land contamination; Environment and sustainability; • • Archaeology Equality Planning policy 32 Designations The site is subject to the following designations of the Southwark Plan:Air Quality Management Area; Urban Density Zone; Canada Water Major Town Centre; Canada Water Action Area Core; Canada Water Strategic District Heat Network and the Rotherhithe Ward. 33 Core Strategy 2011 1 – Sustainable development 2 – Sustainable transport 5 – Providing new homes 6 – Homes for people on different incomes 7 – Family homes 10 – Jobs and businesses 11 - Open spaces and wildlife 12 – Design and conservation 13 – High environmental standard 14 - Implementation and delivery 34 Southwark Plan 2007 (July) - saved policies The Council's cabinet on 19th March 2013, as required by paragraph 215 of the NPPF, considered the issue of compliance of Southwark Planning Policy with the National Planning Policy Framework. All policies and proposals were reviewed and the Council satisfied itself that the polices and proposals in use were in conformity with the NPPF. The resolution was that with the exception of Policy 1.8 (location of retail outside town centres) in the Southwark Plan, all Southwark Plan policies are saved. Due weight is to be given to relevant policies in existing plans in accordance to their degree of consistency with the NPPF. The following policies are relevant to the current proposals. 1.7 Development within Town and Local Centres 2.5 Planning Obligations 3.1 Environmental Effects 3.2 Protection of Amenity 3.3 Sustainability Appraisal 3.4 Energy Efficiency 3.6 Air Quality 3.7 Waste Reduction 3.11 Efficient Use of Land 3.12 Quality in Design 3.13 Urban Design 3.14 Designing Out Crime 3.15 Conservation of the historic environment 3.18 Setting of listed buildings, conservation areas, and world heritage 3.19 Archaeology 3.20 Tall buildings 3.28 Biodiversity 4.1 Density of Residential Development 4.2 Quality of Residential Development 4.3 Mix of Dwellings 4.4 Affordable Housing 5.1 Locating Developments 5.2 Transport Impacts 5.3 Walking and Cycling 5.6 Car Parking 5.7 Parking Standards for disabled people and the mobility impaired 35 Supplementary Planning Documents The following SPDs are material to the determination of the application: Sustainable Design and Construction 2009 Affordable Housing 2008 (September) and 2011 Draft Section 106 Planning Obligations 2007 Residential Design Standards 2011 36 Canada Water Area Action Plan The site forms part of the CWAAP Core Area (and is a Strategic Heating Area). The boundary for the Canada Water town centre lies to the south-west of the site, along Surrey Quays Road, so includes Site C but not Site E. The application site comprises proposal sites CWAAP7 & CWAAP8 of the adopted Canada Water Area Action Plan. Buildings C1-4 lie within proposal site CWAAP7. Building E1 lies within CWAAP8. The AAP was adopted in March 2012 following an examination-in-public (EIP) which was held during summer 2011. Also in 2011, the Daily Mail group announced that it would be vacating Harmsworth Quays printworks. This has implications for the AAP which assumed at the time of its preparation that predicated the printworks would remain in-situ. The Council is in the process of reviewing the AAP and has prepared a draft revised area action plan, and this is considered further below. Policy 1: Shopping in the town centre Policy 2: Cafes and restaurants in the town centre Policy 6: Walking and cycling Policy 7: Public transport Policy 8: Vehicular traffic Policy 9: Parking for town centre uses Policy 10: Parking for residential development in the Core Area Policy 11: Leisure and entertainment Policy 12: Sports facilities Policy 13: Arts, culture and tourism Policy 14: Streets and public spaces Policy 15: Building blocks Policy 16: Town centre development Policy 17: Building heights on sites in and adjacent to the core area Policy 18: Open spaces and biodiversity Policy 19: Children’s play space Policy 20: Energy Policy 21: New homes Policy 22: Affordable homes Policy 23: Family homes Policy 24: Density of developments Policy 25: Jobs and business space Policy 27: Community facilities Policy 28: Early years Policy 29: Health facilities Policy 32: Proposals sites Policy 33: S106 Planning Obligations 37 London Plan 2011 Canada Water is identified as an Intensification Area in the London Plan. The following policies are relevant: 2.13 Opportunity Areas and Intensification Areas 2.15 Town Centres 3.1 Ensuring Equal Life Chances For All 3.2 Improving Health And Addressing Health Inequalities 3.3 Increasing Housing Supply 3.4 Optimising Housing Potential 3.5 Quality And Design Of Housing Developments 3.6 Children And Young People's Play And Informal Recreation Facilities 3.7 Large Residential Developments 3.8 Housing Choice 3.9 Mixed And Balanced Communities 3.11 Affordable Housing Targets 3.12 Negotiating Affordable Housing On Individual Private Residential And Mixed Use Schemes 4.1 Developing London's Economy 4.7 Retail And Town Centre Development 5.1 Climate Change Mitigation 5.2 Minimising Carbon Emissions 5.3 Sustainable Design And Construction. 5.6 Decentralised Energy In Development Proposals 5.7 Renewable Energy 5.11 Green roofs And Development Site Environs 5.12 Flood Risk Management 5.13 Sustainable Drainage 6.3 Assessing Effects Of Development On Transport Capacity 6.9 Cycling 6.10 Walking 6.13 Parking 7.2 An Inclusive Environment 7.3 Designing Out Crime 7.6 Architecture 7.7 Location And Design Of Tall And Large Buildings 7.8 Heritage Assets And Archaeology 7.10 World Heritage Sites 7.14 Improving Air Quality 7.15 Reducing Noise And Enhancing Soundscapes 7.18 Protecting Local Open Space And Addressing Local Deficiency 7.19 Biodiversity And Access To Nature 7.21 Trees And Woodlands 8.2 Planning Obligations 38 National Planning Policy Framework (NPPF) The NPPF came into effect on 27 March 2012 and is a material planning consideration. The document is applicable in its entirety, but the most relevant sections are: Section 1: Building a strong competitive economy Section 2: Ensuring the vitality of town centres Section 4: Promoting sustainable development Section 6: Delivering a wide choice of good quality homes Section 7: Requiring good design Section 8: Promoting healthy communities Section 10: Meeting the challenge of climate change, flooding and coastal change Section 11: Conserving and enhancing the natural environment Section 12: Conserving and enhancing the historic environment 39 40 Principle of development Introduction Section 38(6) of the Planning and Compulsory Purchase Act 2004 (together with section 70(2) of the Town and Country Planning Act 1990), provided that applications for planning permission must be determined in accordance with the development plan unless material considerations indicate otherwise. National Planning Policy Framework 2012 The National Planning Policy Framework (NPPF) 2012 sets out the purpose of the planning system to contribute to the achievement of sustainable development, and that there are three dimensions to sustainable development: economic, social and environmental. The NPPF promotes the delivery of a wide choice of high quality homes, seeks to widen opportunities for home ownership and create sustainable, inclusive and mixed communities. It encourages the effective use of land by reusing land that has been previously developed and also promotes mixed use developments. At the heart of the NPPF is the presumption in favour of sustainable development, and for decision-taking this means: approving development proposals that accord with the development plan without delay; and where the development plan is absent, silent or relevant policies are out-of-date, granting permission unless: (i) any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole; or (ii) specific policies in this Framework indicate development should be restricted. 41 The London Plan 2011 The London Plan 2011 Policy 2.13 'Opportunity Areas and Intensification Areas' identifies the site as being an intensification area. This policy seeks to optimise residential and non residential outputs and densities and contribute towards meeting (or where appropriate) exceeding the minimum guidelines for housing and employment capacity including realising the scope for intensification associated with existing/proposed improvements in public transport accessibility and supporting wider regeneration and integration of developments to the surrounding area. 42 The Core Startegy 2011 The Core Startegy 2011 identifies Canada Water as an Action Area to provide new homes, office and retail development to improve Canada Water as a shopping destination and transforming it into a Town Centre. 43 The Southwark Plan 2007 (Saved policies) Canada Water is recognised as a Town Centre in the Southwark Plan 2007 and saved policy 1.7 'Development within town and local centres' identifies town centres as being appropriate locations for a range of uses including retail, leisure, services, community use, entertainment, civic, cultural, tourism, employment and residential. 44 Canada Water Area Action Plan The adopted Canada Water Area Action Plan (CWAAP) sets out a vision for Canada Water to transform it from an out of centre style development into a vibrant town centre which combines shopping, civic, leisure, business and residential uses. 45 Policy designations and the development plan The application site is part of an Intensification Area in the London Plan, a Town Centre in the Southwark Plan 2007 and the Core Strategy 2011, and forms the part of the Core Area of the Canada Water Area Action Plan. The application site (formed of both sites C&E) comprise proposals sites CWAAP7 and CWAAP8, and is located within the Air Quality Management Area, Urban Density Zone, Canada Water Major Town Centre, Canada Water Action Area Core and Canada Water Strategic District Heat Network. Adjacent to the site is the Canada Water Basin, a designated Site of Importance to Nature Conservation, surrounded by designated Borough Open Land. The edge of the site as it meets the Basin is part of the Borough Open Land designation. 46 47 Adopted CWAAP The Core Strategy and AAP vision for Canada Water is to transform it from an out of centre style development into a vibrant town centre which combines shopping, civic, leisure, business and residential uses. The vision notes that existing facilities in the centre are separated and poorly linked and that development in the town centre should create a street based environment with high quality public realm and open spaces. The strategy for the area involves expanding the amount of retail space by around 35,000 sqm, at least 2,500 high quality new homes in the core area and at least 875 affordable housing units. Alongside the target for new homes, the vision also notes that around 2,000 jobs will be generated. The adopted Canada Water AAP designates a number of proposals sites within the action plan area. This application site is covered by CWAAP7 (Buildings C1, C2, C3 and C4) and CWAAP8 (Building E1). It should be noted that CWAAP7 also encompasses Deal Porters Way, Surrey Quays Leisure Park and Surrey Quays Shopping Centre and overflow car park. Policy 32 states that permission will be granted for proposals in accordance with the Proposals Map and Schedule of Proposals sites in Appendix 8 to the AAP. Proposal Site ‘CWAAP 7: Decathlon site, Surrey Quays Leisure Park, Surrey Quays Shopping Centre and overflow car park’ sets out the following: Required land uses Up to 35,000sqm of retail uses (Classes A1, A2, A3, A4); a minimum of 5,000sqm of business use (Class B1); leisure uses (Class D2); residential use (Class C3); community use (Class D); hotel use (Class C1); public open space; town centre parking. Other acceptable uses Student accommodation (sui generis use). Estimated capacity 1,530 residential homes (600 units on the shopping (approximate) centre and overflow car park, 500 units on the Leisure Park and 430 units on the Decathlon site); 35,000sqm of retail uses; 5,000sqm of business use, health facilities (which complement rather than replace existing facilities) and other community uses. These amounts of development are stated to have been informed by feasibility testing to ensure that development can be implemented consistently with design principles and building heights set out elsewhere in the AAP. Estimates are stated elsewhere in the AAP (in respect of all proposals sites) to be approximate and depend on factors including compliance with other policies such as design policies. The designation includes reference to the proximity of the Harmsworth Quays Printworks, and the consideration of noise impacts and vehicular trips associated with that site on development proposals surrounding it. Building heights are expected to range across the site to provide visual interest, and help ensure a transition to surrounding sites, creating an area which is easy to find your way around, with buildings being between five and eight storeys in height on the shopping centre site and around Surrey Quays Road. A taller building is identified as appropriate on the south-western corner of the shopping centre. The AAP notes that pedestrian and cycle links around the town centre are very poor and that development should help create safe, direct and attractive routes through the centre for pedestrians and cyclists. The creation of stronger links to Greenland Dock and the sharing of car parks provided for retail areas are also referred to. These key principles are acknowledged to provide some flexibility and could be implemented in several ways. Improvements to the site are to be considered comprehensively. ‘Policy 17: Building heights in the core area’ of the adopted CWAAP sets out the considerations that should be taken into account in assessing the acceptability of tall buildings in the area. 48 Proposal Site ‘CWAAP8: Site E (Land at the corner of Surrey Quays Road and Quebec Way’ sets out the following: Required land uses Residential use (Class C3) a minimum of 3,000sqm of business use (Class B1). Other acceptable uses Community use (Class D); hotel use (Class C1); retail use (A classes). Estimated capacity 140 residential homes; 3,000sqm of business use. (approximate) The designation refers to this edge of centre site as suitable for residential-led mixed use development. Again, this designation mentions the need for the layout and distribution of development on the site to take into account the proximity of the Harmsworth Quays Printworks and the implication this has for development proposals for Site E, including the need for a non-residential buffer to the HQP site. New pedestrian and cycle links through the site are also required, with a new softened landscape boundary to the north western edge, to help retain a sense of greenness as a key part of the character of this area 49 Draft Revised CWAAP As stated earlier, the AAP was adopted in March 2012 following an examination-inpublic (EIP) which was held in summer 2011 and assumed that the Harmsworth Quays Printworks would remain in situ. However, in 2011 the Daily Mail group announced it would be vacating Harmsworth Quays Printworks. In light of this, the Council is in the process of reviewing the AAP and a draft revised CWAAP was approved by Cabinet in May 2013 and was subject to consultation over the summer. 50 The revised draft AAP isnow at an advanced stage, consultation has finished and the preferred option was presented to Cabinet on 23 October 2013 with the next steps being an Examination in Public and potential subsequent adoption. The draft AAP does give a clear indication of the direction the Council would like to take, subject to examination, although at this point, significant weight cannot be attached to its detailed policies. In general terms, it will attain more weight as it moves towards examination and adoption, as the likelihood that the revisions will be adopted increases. 51 However, the change in circumstances which has generated the review of the AAP is a material consideration to be weighed alongside any assessment of the adopted policies and designations of the current AAP. 52 The proposed changes to the CWAAP relate mainly to: • Southwarks ambition to promote activities and uses on Harmsworth Quays and the adjacent sites which will boost the daytime economy and create a vibrant town centre. These uses include offices, higher education, shops, leisure and housing; • Transport, including pedestrian and cycle routes; • The height of new buildings and potential for public realm improvements; • Open spaces to be protected from development; • Infrastructure, including schools and leisure facilities. The draft revised policy designation includes a higher estimated capacity for residential accommodation, specifically 800 units over the Decathlon site, with an additional unspecified figure on Site E; the estimated quantum for business and other uses are not provided. 53 The proposed revisions to the CWAAP have been informed by several pieces of evidence including a master-planning feasibility study for Harmsworth Quays and a non-residential uses study. In addition to this, in November 2012 the Council also held a consultation workshop on the future of Harmsworth Quays. 54 The draft revised CWAAP includes ‘CWAAP 7: Decathlon Site, Surrey Quays Shopping Centre and overflow car park’ which sets out the following: Required land uses Up to 33,000sqm of retail uses (Classes A1/A2/A3/A4); leisure uses (Class D2); residential uses (Class C3); community use (Class D); public open space; town centre car parking. Other acceptable uses Student accommodation (sui generis use); business use (Class B1); hotel use (Class C1). Estimated capacity 1,400 residential homes (600 units on the shopping centre and overflow car park, and 800 units on the Decathlon site; 33,000sqm of retail uses; business use; health facilities (which complement rather than replace existing facilities) and other community uses. The proposed changes to the designation for this site recognise the departure of the Daily Mail printworks from the Harmsworth Quays site. There is also now a desire to make the Canada Water basin and the surrounding public spaces a focal point in the town centre. It is also recognised in the revised draft designation that there is potential for tall buildings on the site. Justification for these would need to be based on their potential to intensify the provision of town centre uses, their scope to provide public space and the role in creating a town centre which is easy to understand and move around. 55 The revised draft creates a much larger site designation, CWAAP24, incorporating the Canada Water site E (the 'What!' store), the printworks, Mulberry Business Park and Surrey Quays Leisure Park. In relation to Site E, this would replace the adopted designation CWAAP8. 56 The draft revised CWAAP also includes ‘CWAAP 24: Site E, Mulberry Business Park, Harmsworth Quays and Surrey Quays Leisure Park’, this does not currently include a quantification of estimated capacity for Site E alone, but sets out the following for the combined sites: Required land uses A mix of employment generating uses such as business use (Class B1), retail use (Class A), community use (Class D), including education and health uses and hotel 57 58 use (Class C1); and public open space. Other acceptable uses Residential use (Class C3); student housing (sui generis use). Estimated capacity Around 240,000sqm of floorspace. The number of new homes would be dependent on the amount of nonresidential floorspace provided. Building Heights Tall building in excess of 30m in the core area must demonstrate that they are of an exemplary design with measured benefits for the public realm and surrounding area. As mentioned above, it is not considered that the detailed policies of the draft revised CWAAP can be given significant weight at this stage of their preparation, although they indicate that circumstances have changed since the adoption of the current AAP. Proposed land use: assessment The policy designations for sites C&E (CWAAP 7 & 8) within the adopted CWAAP set out the required land uses as retail uses; business use; leisure uses; residential use; community use; hotel use; public open space; and town centre parking. The application proposal includes 16,643.9sqm of retail with 12,308.9sqm of this formed of the Decathlon store as well as 2,800sqm of office space; 698.2sqm of cinema leisure floorspace and a 658sqm health centre. 59 In respect of site C, residential accommodation is provided, as is retail, community use, leisure use, significant new public open space and town centre car parking. The retail element represents a significant contribution to the large quantum on CWAAP7. The provision of a cinema and an additional health centre are welcome additions to the area that will provide a service and community benefit to local residents. The active frontages being provided will enliven the dock allowing it to fulfil a role as a principle pedestrian thoroughfare to the town centre. It is to be recognised that the B Class floorspace sought by policy is not provided and no hotel is proposed, although the proposals do not preclude or prejudice these uses from coming forward elsewhere within the wider designation or wider area covered by the AAP. The proposal for 829 residential units is in excess of the estimated capacity for the relevant parts of the site, however it would nonetheless make a substantial contribution to the overall housing provision sought within the designation, subject to the application of other policies which are addressed further below. The overall quantum of housing provision must also be viewed in the context of the departure of the Harmsworth Quay Printworks. As previously mentioned the policies in the AAP were drafted on the assumption that the printworks would remain and their departure would reduce constraints on the quantum of residential development which could be accommodated on the site. Their vacation from this site does therefore alter the character of the area under which the original designation was made as there is no longer the same need for the anticipated noise buffer to constrain residential development. It also presents an opportunity to change the character of the town centre, opening up routes and links through the site to the wider Rotherhithe /Canada Water area. 60 In respect of site E, both the required uses of residential and business use would be provided. There would be a shortfall of B Class accommodation, although this is only nominal. The proposal for up to 231 residential units exceeds the estimated capacity of this site for residential floorspace, however similar considerations arise as in respect of site C. 61 Officers consider that the proposals generally meet the objectives of AAP policy. The quantum of retail floorspace proposed would form an important contribution to the establishment of Canada Water as a Major Town Centre location, strengthening and developing its reputation as a retail destination and retaining Decathlon who have themselves become part of the identity of Canada Water and a flagship tenant. The proposed scheme would provide a custom-designed Decathlon store with scope for a considerable increase in floorspace (and a trading unit to allow them to operate continuously during the construction works which is a requirement of any development coming forward on this site prior to the expiry of the Decathlon lease in 2028). This will ensure an anchor retailer prior to the delivery of the scheme which is a benefit to the area. The application proposal also includes the creation of up to 1,030 new homes, which would make a significant contribution to Southwark’s housing stock and form an important contribution to the Canada Water housing targets. The development proposal includes the creation of a new public realm landscaped area that could complement the existing Canada Water Basin forming an important public space. The proposal does not introduce any land uses not identified as acceptable in the CWAAP designation. 62 There are areas of divergence from AAP policy and capacity estimates, as identified above. The proposed development surpasses the expected quantum of development designated for the site, albeit as part of a designation over a wider area. However it is not considered that these should prevent the grant of planning permission, subject to the application of other specific policies as addressed below. The shortfall in business floorspace and a hotel use would not preclude the achievement of this development elsewhere as part of the policy aspirations for the area, and the exceedance of residential capacity estimates should be seen in the context of the anticipated departure of the printworks. The expense of accommodating the requirements of Decathlon has also generated viability considerations which has prompted increased residential provision (and is addressed further below when addressing affordable housing). 63 Overall, subject to the consideration of detailed policies as set out below, officers consider that the application proposal would deliver land uses broadly in accordance with those included in the CWAAP 2012, and that this is in accordance with the vision for this area set out in the Core Strategy 2011 as a Major Town Centre destination. Although significant weight cannot be given to the emerging revised AAP, the proposals would also accord generally with the land use principles set out in the current draft. Environmental impact assessment 64 Applications where an Environmental Impact Assessment (EIA) is required will either be mandatory or discretionary, depending on whether they constitute Schedule 1 (mandatory) or Schedule 2 (discretionary) development of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011. In this case the proposed development falls under Schedule 2, Category 10b ‘urban development project’ of the EIA Regulations where the threshold for these projects is a site area exceeding 0.5ha. The application site area is 3.76 ha and therefore is well above this trigger threshold. An EIA would only be required for this current application site, if it is likely to generate significant environmental effects having regard to the criteria set out in Schedule 3 of the Regulations which include: i). The characteristics of the development; ii). The environmental sensitivity of the location; and iii). The characteristics of the potential impact. In the present case, a Screening Opinion was issued by the authority on the application proposals (application reference 12-AP-2357). This determined that the development proposal is EIA development (regulation 4(2) of the 2011 Regulations), and the application is therefore accompanied by an Environmental Statement. 65 Prior to the submission of the application, the applicant requested a formal ‘Scoping Opinion’ under Regulation 13 of the EIA Regulations to ascertain what information the local planning authority considered should be included within the Environmental Statement (ES) (application reference 12-AP-2457). 66 Regulation 3 of the EIA Regulations precludes the granting of planning permission unless the Council has first taken the ‘environmental information’ into consideration. The ‘environmental information’ means the ES, including any further information, any representations made by consultation bodies, and any other person about the environmental effects of the development. 67 The submitted Environmental Statement (ES) comprises Main Text and Figures; Technical Appendices; Townscape, Visual and Built Heritage Assessment; and NonTechnical Summary. Updated documents were submitted in August 2013 (ES Addendum Technical Appendix A-1: Townscape and Visual Assessment by Ettwein Bridges Architects, August 2013; ES Daylight and Sunlight Addendum Chapter (and Appendices 12.1-12.5 by Waldrams, dated 12th August 2013). The ES details the results of the EIA and provides a detailed verification of the potential beneficial and adverse environmental impacts in relation to the proposed development, including the following areas of impact (in the order they appear in the ES); • Ground conditions and contamination; • Hydrology, flood risk and drainage; • Cultural heritage; • Noise and vibration; • Air quality; • Townscape and visual; • Socio-Economics; • Waste; • Daylight and sunlight; • Wind; • Ecology; • Transport; and • Residual effects. 68 In assessing the likely environmental effects of a scheme, the ES must identify the existing (baseline) environmental conditions prevailing at the site, and the likely environmental impacts (including magnitude, duration, and significance) taking account of potential sensitivity receptors. It further identifies measures to mitigate any adverse impacts, and a summary of potential positive and negative residual effects remaining after mitigation measures is included in the ES in order to assess their significance and acceptability. The Environmental Statement also discusses alternatives, including the ‘no development scenario’ and this is discussed further below. 69 Within the submitted ES the following generic matrix is used to define the level of significance, described in the table below:Table 4: Significance Matrix Magnitude of Impact Sensitivity / Value of receptor Major Moderate Minor Negligible Very High Substantial Substantial Moderate Slight High Substantial Moderate Slight Negligible Medium Moderate Slight Negligible Negligible Low Slight Negligible Negligible Negligible The four levels of significance defined by the generic matrix are described as follows: • Substantial – very large or large change in environmental conditions (e.g. unacceptable pollution levels, catastrophic destruction of habitat). This could result in expedience of statutory objectives and / or breaches of legislation. An effect which in isolation could have a material influence on the decision making process; • Moderate – Intermediate change in environmental conditions. An effect which on its own could have some influence on decision making, particularly when combined with other similar effects; • Slight – Small change in environmental conditions. An effect which on its own is likely to have a minor influence on decision making but when combined with other effects could have a more material influence; • Negligible – No discernible change in environmental conditions. An effect that is likely to have a negligible influence, irrespective of other effects. Effects are also described as:• Adverse – detrimental effects to an environmental resource or receptor; or, • Beneficial – advantageous effects to an environmental resource or receptor. In terms of Daylight and Sunlight impacts, the ES uses a different scale rating, referring to being Major, Moderate and Minor. 70 Reference to cumulative effects includes reference to two types of cumulative impacts:• Impact interaction – the interaction of individual effects, for example noise, airborne dust or visual effects from the proposed development on a single receptor; and • Cumulative effects of several development schemes – which may on an individual basis be insignificant, but when considered cumulatively may have a significant effect. 71 Additional environmental information or ‘Further Information’ (ES Addendum May 2013) was received during the course of the application (May 2013 and August 2013) and in accordance with Regulation 22 of the EIA Regulations all consultees and neighbours were re-consulted and a press notice re-advertised. The further information included revisions to the planning application and is set out in appendix 4. The ES and Further Information (ES Addendum – Regulation 22 response) has been the subject of consultation, the details of which are set out at the end of this report. The assessment of the ES and Further Information and the conclusions reached regarding the environmental effects of the proposed development as well as mitigation measures are set out in the report. 72 73 Alternatives Under the Environmental Impact Assessment Regulations, an Environmental Statement is required to provide ‘an outline of the main alternatives studied by the applicant or appellant and an indication of the main reasons for this choice, taking into account the environmental effects’. The Environmental Statement has considered the ‘no development’ alternative, the use of alternative sites, and the evolution of the design in response to issues raised by key stakeholders and preliminary assessment of environmental impacts of the scheme. 74 The ‘no development’ scenario was discounted by the applicant because the following adverse impacts were considered to result following from that scenario:• Continued limited range of shops in the town centre with Southwark residents • • • • • • • continuing to shop outside the borough; Continued lack of restaurants and cafes, no improvement to poor transport links for pedestrians and cyclists, and no new links to the wider area, particularly Greenland Dock; No public realm / connectivity improvements as a result of the development; No net increase in housing provision as a result of the development; Current architecture would remain; Re-development of an existing under-utilised previously developed site would not be realised; Contributions to the wider regeneration phases and objectives of the Canada Water Area Action Plan would not be realised; and The positive socio-economic benefits from the proposed additional retail and leisure space would not be realised. 75 The ‘alternative site’ scenario was also considered by the applicant. The submitted ES describes that the proposed development responds to the needs of two specific sites highlighted in the Canada Water Area Action Plan and that no additional alternative sites or locations for the proposed development were considered to be appropriate. 76 The submitted ES also describes the Design Evolution of the scheme with four key steps of the design evolution identified:• Relocating ‘Decathlon’ in a viable position that would create a suitable store and allow ‘Decathlon’ to operate continuously during the construction process; • Identification of key connections across the site; • Development and testing of three masterplan scenarios that examined very different layouts for the site but that all responded to the initial ‘Decathlon’ and connectivity studies; and • Detailed evolution of the individual buildings and their overall composition in terms of heights and massing. 77 The final version of the proposed development is for the construction of five buildings around a publicly accessible landscaped area. Alternative quantums and building heights have been considered as part of the daylight and sunlight assessment however this was not considered by the applicant to be a deliverable option. 78 Cumulative Impacts The submitted ES has taken into account a number of committed (existing or approved) development schemes in the vicinity of the site. This is in accordance with the Circular (DETR, 1999), which refers only to cumulative impacts of other existing and approved developments. There are eleven committed schemes, seven in Southwark and four in Lewisham, and an overview of the possible cumulative impacts of this proposed development with those committed schemes has been provided. A table of the committed schemes considered is provided in appendix 3 of this report. 79 During construction of the proposed development, similar works on the other committed developments in the area would be likely to result in temporarily increased traffic, noise, emissions and visual impacts on the local townscape. The implementation of mitigation measures described in the Construction Environmental Management Plan for the development (as well as plans relative to other permitted developments) will minimise the cumulative impacts from these construction effects. 80 The key cumulative impacts of the development once completed are described in the applicants Environmental Statement and set out below:- Cumulatively the consented and proposed mixed use / residential developments within 500m of the site are expected to result in approximately 1,290 residential units, in addition to the units proposed by this application, contributing to the CWAAP housing targets; - The increasing population will result in additional demand on existing social infrastructure, measures to mitigate these impacts are included as part of application proposals; - Likely net beneficial effect on the site and surround areas as a result of treating / removing areas of contaminated land, as well as the inclusion of mitigation measures to prevent land contamination during the operation of the development; - No significant cumulative effect with respect to flood risk / drainage or water supply is envisaged, subject to agreed mitigation with Thames Water and the Environment Agency; - Cumulative effects have been predicted and assessed in relation to noise and air quality, and the results detailed in the submitted ES. The impacts of traffic flows associated with proposed and committed developments have been assessed, along with noise from fixed plant and aircraft noise. Mitigation measures are recommended to prevent significant cumulative effects in association with noise and air quality. Cumulative Impact with Mulberry Business Park 81 There are a number of consented and proposed schemes in the vicinity of the development that are likely to have cumulative impacts with regards to social infrastructure in the area, most notably the Kings College London development at the former Mulberry Business Park. 82 A cumulative townscape and daylight/sunlight assessment was undertaken by the applicants to take into account the intentions of Kings College to redevelop Mulberry Business Park to create a new student and educational village. In terms of the townscape assessment, the assessment states that aspirations for Mulberry Business Park will have no significant adverse impact on views to or from the site in addition to those already considered for the current Canada Water proposals. The daylight and sunlight study also seeks to demonstrate that there will be no significant change to surrounding properties daylight/sunlight in addition to those already assessed for the Canada Water C and E schemes. Conclusions of EIA 83 The ES concludes that in relation to the majority of environmental impacts, the residual impacts of the proposed development (demolition, construction, and operational phases) following mitigation would be negligible. However, it is explained that there are likely to be some adverse impacts of minor to moderate significance, particularly during the demolition and construction phases and traffic, as well as some long term impacts from the completed development. There are also a number of beneficial impacts as a result of the proposed development. The impacts described in the submitted ES are summarised below:- 84 Ground conditions and contamination; It is intended that a site specific ground investigation and risk assessment is undertaken, the results of which will then determine the remediation works to be carried out to reduce the risks from any potential contamination. The assessment demonstrates that through the implementation of a number of mitigation measures, the overall significance of environmental effects during the site preparation and construction phases of the proposed development in relation to ground conditions will be negligible. Any identified ground contamination will be mitigated, such that on completion of the construction phase of the proposed development, the overall significance of environmental effects with respect to ground conditions during the operational and occupational phase will be slight beneficial. This issue is discussed further in paragraphs 313-314 below. 85 Hydrology, flood risk and drainage; A Flood Risk Assessment including Utilities, Foul and Surface Water Assessment has been undertaken to inform the ES. A reduction in surface water runoff will be achieved through the use of Sustainable Urban Drainage Systems in all phases. The residual effects on the public sewer and water supply network during construction and operation is considered to be negligible with mitigation. The effect on public sewer flows and the potable water supply network will be negligible long term. Slight beneficial effects to public sewer flows and water quality are expected such as peak run-off from the site to surface water sewers being decreased. Providing the mitigation identified in the Flood Risk Assessment is in place the residual flood risk will be negligible. This issue is discussed further in paragraphs 324-325 below. 86 Cultural heritage; The construction phase of the scheme is likely to result in direct impacts upon archaeological features and deposits. A combination of responsive design and a phased programme of archaeological investigation within the site are proposed to ensure suitable mitigation. The following mitigation is proposed:Geoarchaeological monitoring and assessment of the palaeoenvironmental deposits within the proposed development site; A watching brief on groundworks for the scheme, and associated excavation of any significant deposits (ensuring the recording of any Roman deposits or features); A watching brief of groundworks to record any features associated with Albion Pond, Quebec Pond, Canada Pond and Canada Yard. Following the above mitigation, the ES concludes that the impact from the development would be a permanent residual neutral to slight adverse effect. 87 Re-use of the dry dock will require minor modification to its structure. A watching brief will be maintained during its re-excavation accompanied by recording of the exposed structure. Bringing the dry dock back into both visibility and functional use would have a moderate beneficial impact. Landscape and heritage interpretation will have a moderate beneficial impact translating to a slight beneficial residual effect lasting the lifetime of the development. This issue is discussed further in paragraphs 334-335 below and in the Planning Obligations section. 88 Noise and vibration; The ES identifies that there would be significant noise and vibration impacts during the construction phase of the proposed development. It is intended that a detailed Construction Environmental Management Plan be prepared prior to commencement of construction and that this will contain mitigation measures to reduce impacts. The mitigation measures will result in short to medium term residual effects of moderate adverse significance to the closest receptors. This issue is discussed further in paragraphs 127-128 below. 89 During the operation of the development noise may result from mechanical ventilation and road traffic associated with the buildings. It is proposed that operational mitigation measures reduce impacts from the development, including the location of plant at basement / ground level, specification of acoustic glazing and the use of high sound insulation building envelope constructions. The internal ambient noise levels and noise from fixed plant within the proposed development will result in residual effects of negligible significance in the long-term. Predicted road traffic noise was modeled with committed development and proposed developments and has shown that there will be a negligible daytime effect during the operational phase of the proposed development. There will be negligible residual vibration effects from the London Underground Jubilee Line. 90 Air quality; Impacts during construction will be mitigated by following the Greater London Authority best practice guidance for control for dust emissions from demolition and construction sites. The Construction and Environment Management Plan will be used for mitigation measures to minimise emissions from construction machinery. The emissions from the Combined Heat and Power units and boilers during the operational stage will be mitigated by means of the design to ensure that the release height is sufficient to ensure the impacts on air quality are negligible. The air quality effects during construction have been classified as slight adverse residual effect. During operation there will be a negligible air quality residual effect assuming that the required mitigation measures are in place.This issue is discussed further in paragraphs 328-329 below. 91 Townscape and visual; The submitted ES concludes that the new buildings will provide a new focal point and landmark for views of the site. The residual effects of the development from the applicants Townscape and Visual assessment have been concluded to be beneficial in the submitted ES. The Townscape and Visual Assessment was updated in August 2013 and confirms that the proposal, taken together with the proposals at Mulberry Business park, would have no adverse impacts. This issue is discussed further in paragraphs 188-201 below. 92 Socio-Economics; During construction it is predicted that the proposed development will support 418 full time equivalent construction jobs. Once operational, the new residents and commercial tenants (retail, restaurant, office and medical spaces) will contribute directly to the local economy through the purchase of local goods and services. The proposed development would contribute to meeting Southwark’s housing targets by providing approximately 1,000 new homes. Landscaping around the development will improve the public realm and provide enhanced green links for pedestrians and cyclists to the wider area. If a health centre is provided, this could produce a moderate beneficial effect on health care provision. The increased residential population of the proposed development will result in demand for school places, but this will be mitigated through appropriate section 106 contributions. During construction disruption, noise and dust impacts will be mitigated through effective communication and good construction practice; the residual effects will be of slight to moderate adverse significance. The operational phase will result in long term socioeconomic residual effects of substantial beneficial significance. This issue is discussed further in paragraphs 296-312 below. 93 Waste; The residual effects from waste production during construction will be slight adverse, due to the production of cut material during basement and foundation excavations and any hazardous waste. The residual effects of waste production during the operation phase from residential, commercial and public realm will be negligible. This issue is discussed further in paragraphs below. 94 Daylight and sunlight; The residual effect of loss of daylight and sunlight to surrounding properties as a result of the proposed development is categorised in the applicants ES as minor adverse, with one incidence of moderate adverse effect, being the loss of sunlight to Heligan House. Following review of the documents Officers are of the view that the daylight and sunlight impacts of the proposal should be re-classified as at least moderate adverse. It should be noted that there is a degree of subjectivity in terms of quantifying the impact, in this case the Council consider the number of windows affected to result in a moderate adverse impact. This issue was raised previously with the applicant however the Environmental Statement has not been revised in this regard as the applicants maintain that there will be a minor impact. As such no mitigation measures are suggested or offered. Issues surrounding daylight and sunlight are discussed further in paragraphs 103-123 below; 95 Wind; All existing areas at street level of neighbouring residential properties and open spaces will be suitable for their intended use resulting in a negligible significance of effects. The proposed development is anticipated to have a negligible effect on the wind climate of the wider area. The residual effect from wind across the site of the proposed development and neighbouring areas is negligible. This issue is discussed further in paragraphs 326-327 below. 96 Ecology; The residual effects to the ecology within and surrounding the proposed development are unlikely to have significant effects on the designation of sites of importance surrounding the proposed development or protected species. Landscaping and other ecology enhancements will result in a long term beneficial residual effect. These impacts are discussed further in paragraphs 274-279 below. 97 Transport; Subject to the mitigation measures being in place, it is concluded in the ES that the proposed development will not have an adverse impact on the public transport services in the area. The major transport issues can be divided into two main sections, namely those impacts associated with the construction period and the key transport mitigation measures. 98 The main issues associated with construction include the routing of HGVs, servicing and construction logistics, onsite accommodation/storage and parking, sustainable transport options for staff and commitments to utilise local staff and suppliers/contractors where possible. 99 The main issues associated with construction include the routing of HGVs, servicing and construction logistics, onsite accommodation/storage and parking, sustainable transport options for staff and commitments to utilise local staff and suppliers/contractors where possible. 100 The Key transport mitigation measures include the submission of a Framework Travel Plan, preparation of a delivery and servicing plan prior to occupation, cycle and pedestrian signage strategy, land allocation for potential future cycle hire docking station, car club bays with membership for residents, transport network improvements and the preparation of a full construction and logistics plan prior to commencement of works on site, which can be secured through a planning condition. Transport impacts are discussed further in paragraphs 136-156 below. 101 A detailed assessment of the potential and residual impacts of the proposed development taking into account the findings of the ES is discussed further below; Impact of proposed development on amenity of adjoining occupiers and surrounding area 102 Policy Saved policy 3.2 'Protection of amenity' of the Southwark Plan, states that planning permission will not be granted for developments that result in a loss of amenity to surrounding occupiers. The SPD: Residential Design Standards (2011) contains detailed design and planning advice for new developments in order to safeguard and retain acceptable levels of amenity for adjoining or nearby occupiers in terms of outlook, privacy and daylight/sunlight. The Building Research Establishment (BRE) provide further detail on site layout planning for daylight and sunlight. 103 Daylight and sunlight The Building Research Establishment (BRE) 2011 guidelines – Site Layout Planning for Daylight and Sunlight: a guide to good practice is the document referred to by most local authorities. The BRE Guide covers amenity requirements for sunlight and daylight to buildings around any development site. The introduction to the guidelines state: "The guide is intended for building designers and their clients, consultants and planning officials. The advice given here is not mandatory and this document should not be seen as an instrument of planning policy. Its aim is to help rather than constrain the developer. Although it gives numerical guidelines, these should be interpreted flexibly because natural lighting is only one of the many factors in site layout design." 104 The amount of light available to any window depends upon the amount of unobstructed sky that can be seen from the centre of the window under consideration. The amount of visible sky and consequently the amount of available skylight is assessed by calculating the vertical sky component at the centre of the window. 105 If the vertical sky component is greater than 27% then enough skylight should still be reaching the window of the existing building. Any reduction below this level should be kept to a minimum. The guidance states that If the vertical sky component with the new development in place, is both less than 27% and less than 0.8 times its former value (more than a 20% reduction), then occupants of the existing building will notice the reduction in the amount of skylight. The VSC calculation only measures light reaching the outside plane of the window under consideration, so this is potential light rather than actual. Depending upon the room and window size, the room may still be adequately lit with a lesser VSC value than the target values referred to above. The guidelines advise that bathrooms, toilets, storerooms, circulation areas and garages need not be analysed. The guidelines also suggest that where layouts of existing neighbours are known that the distribution of daylight within rooms is reviewed although bedrooms are considered to be less important. 106 Paragraph F6 of the BRE guidelines (page 62) states that when assessing loss of daylight to an existing building the VSC methodology is generally recommended as it does not depend on numerous variables outside of the control of a developer which form part of the ADF formula. 107 A Daylight and Sunlight Report has been prepared by Waldrams Chartered Surveyors for the application site, which assesses the proposed development against the Building Research Establishments (BRE) guide ‘Site Layout Planning for Daylight & Sunlight 2011: A Guide to Good Practice, Second Edition’. 108 In terms of daylight, two methods were used to test levels, the Vertical Sky Component (VSC) was used both within the development and for surrounding properties, and in the development VSC and ADF was calculated. The ADF calculation assesses the quality and distribution of light within a room served by a window and takes into account the VSC. The VSC calculates the amount of daylight reaching the outside face of the window. The applicants surveys do not include a 'No Sky Line' which is an additional method of assessing impacts of a development by looking at daylight distribution within a room. 109 As previously stated, the BRE guidance explains that a property should retain a VSC level of at least 27%, in order to confirm that diffused daylighting remains satisfactory. Should a property receive a VSC level of less than 27% following construction of a new development, then the proposed VSC should not be less than 0.8 times its former (existing) value, if the reduction in daylight is to remain unnoticeable. When the internal layout and room-use in a dwelling is known, ADF can be used to assess whether the resulting daylight levels are acceptable. ADF uses VSC to confirm the angle of sky visibility and then formulates the quality of daylighting within the room, taking into account the room’s use. 110 The BRE recommends the following minimum ADF values: - 2% for kitchens and open plan living, 1.5% for living rooms, and 1% for bedrooms. The BRE advises against the use of ADF as a tool to measure the impact of a development on adjoining or nearby occupiers which instead should be considered using VSC. ADF is only considered as an appropriate measure of assessing daylight to proposed dwellings. 111 As the site forms part of the wider Canada Water Area Action Plan, the applicant has argued that the area is an overall emerging development and as such ADF should be considered an appropriate tool. Officers are of the view that the existing dwellings surrounding the site have been completed/occupied for a significant period of time prior to the publication of the CWAAP and as such are not considered part of the overall emerging scheme for Canada Water. Additionally, the room layouts and room use for all buildings within the Water gardens are assumptions made by the developer as opposed to being confirmed by either inspection or review of consented building regulations drawings. For this reason the remainder of the assessment will focus on VSC as this is seen to be the most accurate and relevant assessment. 112 Page 17 of the Waldrams report refers to Summary Table 2 which provides a distilled summary of the existing vs. proposed VSC results only (i.e. without Daylight Distribution or APSH results). This table confirms that in relation to Eden House, Helligan House, Giverny House and Toronto House the majority of windows assessed would experience material VSC losses, in excess of 40% of existing values. An analysis of each building follows below. 113 Cedar House Cedar House contains 24 windows which overlook the application site, of which 13 have an existing VSC in excess of 27%. The previously consented scheme retained five windows with a VSC in excess of 27% whilst the proposed scheme retains three windows with a VSC in excess of 27%. This results in 21 windows having less than 27% VSC and 13 windows that will experience a reduction of more than 20%. This results in seven previously compliant windows (existing V. proposed) now failing to meet the minimum requirements in terms of VSC as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 114 Eden House Eden House contains 54 windows which overlook the application site, of which 22 have an existing VSC in excess of 27%. The previously consented scheme retained seven windows with a VSC in excess of 27% whilst the proposed scheme will retain only five windows with at least 27% VSC. This results in 49 windows having less than 27% VSC and 45 windows that will experience a loss of more than 20%. Overall this will result in 16 previously compliant windows (existing V. proposed) now failing to meet the BRE guidance as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 115 Heligan House Heligan House contains 59 windows which overlook the application site, of which 28 have an existing VSC of at least 27%. The previously consented scheme retained 14 windows in excess of 27% VSC whilst the proposed scheme will retain eight windows with at least 27% VSC. This results in 51 windows with less than 27% VSC and 53 windows that will experience a loss of at least 20% VSC. This demonstrates that 20 previously compliant windows (existing V. proposed) will now fail to meet the BRE VSC guidelines as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 116 Giverney House Giverney House contains 103 windows which overlook the application site, of which 52 have an existing VSC of at least 27%. The previously consented scheme retained 45 windows with at least 27% VSC whilst the proposed scheme will retain 14 windows with at least 27% VSC. This equates to 89 windows having less than 27% VSC and 89 windows that will experience a loss of VSC in excess of 20%. A total of 37 previously compliant windows (existing V. proposed) will now fail to meet the minimum VSC requirements outlined by the BRE as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 117 Pavilion House Pavilion house contains 65 windows which overlook the application site, of which 52 have an existing VSC of at least 27%. The previously consented scheme retained 51 windows with at least 27% VSC whilst the proposed scheme will retain 32 windows with at least 27% VSC. This results in 33 windows with less than 27% VSC and 33 windows that will experience a loss of more than 20% VSC. There will be 19 previously compliant windows that now fail to meet the minimum requirements in terms of VSC as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. The results demonstrate that 47 previously compliant windows (existing V. proposed) will no longer meet the guidelines as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 118 Toronto House Toronto House contains 144 windows which overlook the application site, of which 81 have an existing VSC of at least 27%. The previously consented scheme retained 71 windows with a VSC in excess of 27% whilst the proposed scheme will retain 21 windows with at least 27% VSC and 107 windows that will experience a loss of at least 20% VSC. The results demonstrate that 47 previously compliant windows (existing V. proposed) will no longer meet the guidelines as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 119 Montreal House Montreal House contains 175 windows which overlook the application site, of which 65 have an existing VSC in excess of 27%. The previously consented scheme retained 56 windows with at least 27% VSC whilst the proposed scheme will retain 42 windows with 27% VSC. As such, 133 windows will experience a VSC of less than 27% under the current proposal and 39 windows will experience a loss of VSC in excess of 20%. Overall there will be 20 windows that previously complied with the guidance (existing V. proposed) that no longer meet the minimum requirements as a result of having a VSC figure below 27% and experiencing a loss of at least 20% of the former value that previously had a VSC in excess of 27%. 120 In terms of sunlight, there are a number of occurrences in all surrounding buildings, where the APSH with the proposed development in place is less than the recommended BRE level. However in most cases, the total retained APSH level is in excess of 25%, and reductions in winter are generally only marginally below the 5% APSH criteria. It should also be noted that only livingrooms are considered important in relation to sunlight, and most livingrooms retain adequate sunlight in the post development condition. Again as room use has not been confirmed for the majority of buildings on site, the focus of the assessment should be in relation to VSC. The applicants assessment studied a number of alternative scenarios: mirror image, removing overhanging balconies, and an assessment of the previous 2011 consent. These have some value as a comparison with the proposed scheme, but primary consideration must be the impact of the proposed development in relation to the existing situation. It should however be noted that proposed scheme has a worse impact than mirror image, which would confirm that existing buildings are not 'bad neighbours' in the sense of being built too close to site boundary, or taking unreasonable extent of light from the application site. 121 Conclusion on daylight and sunlight The Council have had the applicants daylight and sunlight information assessed independantly by an external consultant who has verified that the model used is broadly accurate however the only way to completely confirm accuracy of the model would be to complete a new one independant from that of the applicants. The consultants shared the Councils concerns regarding the applicants over reliance on ADF as a means to assess the impacts of the development mainly as a result of the room size, layout and use being based on an assumption that cannot be verified. As outlined above the appropriate tool for assessing the impact of the proposal on adjacent buildings is VSC. In terms of VSC it is clear that the development will have some moderate adverse impacts, as illustrated by the fact that 166 windows which previously had levels of VSC in excess of 27% will now achieve levels below 27%, in addition to experiencing at least a 20% reduction in VSC. This equates to 27% of windows across all neighbouring buildings. 122 It is acknowledged therefore that there will be a noticeable adverse impact on some local residents and officers consider this to be more significant than the slight/minor adverse impacts outlined in the ES. However, the proposals would meet wider and important policy objectives which are considered to outweigh these impacts on balance. The residential units would make a significant contribution towards the housing targets for Southwark and the Canada Water area, as reflected in policy and the Council’s Strategic Housing objectives. The form of development would enable substantial improvements to the public realm and townscape. The proposals would also contribute to Canada Water achieving the policy objective of performing as a Major Town Centre. If it is to realise its potential to become a housing, retail and entertainment destination in line with the functions of a Major Town Centre then certain adverse impacts are to be anticipated, including effects on daylight levels which can be expected to a degree in highly urbanised areas. Overall officers consider as a matter of judgment that the ability of the proposals to achieve these wider policy objectives outweighs the effect on the daylight and sunlight of existing residents. 123 The previous planning consent did demonstrate that there would be an adverse impact in terms of daylight and sunlight, however that scheme was unable to be implemented and did not deliver a similar quantum of benefits to the Canada Water Area. The current scheme is deliverable albeit with a greater degree of impact. Officers consider as a matter of judgment that it would be appropriate in the absence of any suitable alternative scheme,on balance and having consideration to the proposed benefits and amenity impacts, to approve this current scheme to enable the timely regeneration of the area to be brought forward, consistent with policy aspirations. 124 Privacy and outlook Supplementary Planning Guidance for Residential Design Standards 2011 states that in order to prevent unnecessary problems of overlooking, loss of privacy and disturbance, development should achieve the following distances: • A minimum distance of 12m at the front of the building and any elevation that fronts onto a highway; • A minimum distance of 21m at the rear of the building. 125 The application proposal has been designed in accordance with these minimum distances, both to surrounding properties and between habitable room windows within the development site. The proposal is 20m away across the Albion Channel to the closest neighbouring residents and each block is located over 12m away from each other across new streets within the development site. This facade of the building is considered a front with a very public face. Across the courtyard for C1 there are only oblique relationships between blocks that are generally over a 30m distance. Between blocks proposed on the development site and the Water Gardens development on Surrey Quays Road a distance of 21.3m is retained. It is therefore concluded that this will be sufficient to safeguard privacy. Outlook is a function of both distance and the height of the surrounding buildings. As discussed above, there are some concerns about daylight impacts, but it may be that notwithstanding, a reasonable outlook can be maintained. 126 In terms of policy it is clear that the proposed development will provide a satisfactory and policy compliant level of outlook for existing occupiers in adjacent blocks and will maintain reasonable levels of amenity consistent with the Town Centre site. The proposal is therefore compliant with saved policy 3.2 of The Southwark Plan and the SPD: Residential Design Standards. Noise and vibration 127 During construction, there is potential for noise and vibration impact upon existing residents in the area. To reduce these potential impacts, a detailed Construction Environmental Management Plan will be required prior to any works on the site, to be agreed by the Planning Authority, and to include mitigation measures to reduce the potential for adverse impacts from noise and vibration. The plan will need to include measures to minimise vibration generation and noise, such as avoiding breaking out concrete using percussion techniques, and using progressive building collapse. An acoustic screen or barrier can also be used for static items of plant and work areas where feasible. This impact was addressed in Paragraph 88 as part of the conclusions on the Environmental Statement which considered any potential adverse impacts as being part of the construction phase. It is intended that a detailed Construction Environmental Management Plan be prepared prior to commencement of construction and that this will contain mitigation measures to reduce impacts. The mitigation measures will result in short to medium term residual effects of moderate adverse significance to the closest receptors. This is considered an acceptable approach in order to enable development. 128 During the operation of the proposed development there are no expected adverse impacts in relation to noise. Any permanent plant associated with uses on the site will be conditioned to ensure insulation that will prevent noise breakout. It is also recommended that hours of opening of the retail uses are restricted up to 23:30 at night, to prevent possible noise from visitors departing any new bars or restaurants during night time hours. 129 Impacts resulting from increased population in the area Strategic Policy 14 – ‘Implementation and Delivery’ - seeks to protect, enhance and regenerate Southwark by working with infrastructure providers, using planning obligations to mitigate development and carrying out meaningful consultation. A number of objections have been received from residents, raising concerns about the impact upon existing infrastructure in the area, from the increased population that would result from the development. This is particularly in relation to impacts upon public transport (the underground), the road network, schools, nurseries and healthcare. 130 Policies within the Core Strategy and AAP describe how we can ensure that development can achieve growth sustainably. Strategic targets are set out in the Core Strategy for the growth in population in different parts of the borough, and policy 1 'Sustainable development' describes how we can allow the intensification of areas through development, while considering the needs of the community where development occurs. This means we can regenerate areas while requiring developments to contribute positively to the surrounding environment and infrastructure. As part of this, strategic policy 14 'Implementation and delivery' describes how development should use planning obligations to reduce or mitigate its possible impacts. 131 In relation to impacts upon infrastructure that could result from an increased population in the area, it should be noted that the as part of the development, the applicant will be providing financial contributions to mitigate the impacts of the development. The Canada Water AAP designates this site and a number of others for development, and there is an expectation that population numbers will increase as a result, particularly as the site is listed as an Intensification Area in the London Plan. The AAP includes 'Policy 33: s106 Planning Obligations' which describes how planning obligations will be used to deliver key infrastructure to mitigate the impact of development. Appendix 6 and Appendix 7 go onto explain that the creation of a successful and sustainable town centre will depend upon the creation of shared infrastructure from which all future residents will benefit. 132 The plan describes what improvements are required, and the planning obligations sought as part of this application proposal would be used in accordance with the Plan's strategy for mitigating impacts of development in the Canada Water Area. While the level of accommodation proposed in this development is in excess of that set out in the adopted CWAAP designation, the level of financial contribution is based upon quantum and uplift in population as a result of a development. Therefore these planning obligations can be used to increase the capacity and quality of infrastructure in the area, including transport, education, health and open space in the area, in proportion to the size of the development, and this is discussed further below in this report. It is also intended that a health centre form part of the development which will provide additional GP capacity on the site for both future occupiers and neighbouring residents. Impact of adjoining and nearby uses on occupiers and users of proposed development 133 The policy background for this section remains the same as that outlined in paragraph 102 above. Namely, Saved policy 3.2 'Protection of amenity' of the Southwark Plan, states that planning permission will not be granted for developments that result in a loss of amenity to surrounding occupiers. The SPD: Residential Design Standards (2011) contains detailed design and planning advice for new developments in order to safeguard and retain acceptable levels of amenity for adjoining or nearby occupiers in terms of outlook, privacy and daylight/sunlight. The site is located within an area of mixed commercial/retail and residential uses in addition to public uses such as the library. 134 Adjacent to the site is the existing Harmsworth Quays Printworks site. This site has historically created a noisy environment, that would potentially have adversely impacted new residential nearby. However, the printworks have announced that they will be vacating the site, and the departure of the printworks has already commenced. Therefore it is not considered that any adverse impact would result from the operation of the printworks upon future occupiers of this development proposal. Although the Harmsworth Quays site could potentially be used for a new printworks, this is unlikely given the nature and location of the site. The relocation of the printworks will result in the removal of the requirement for a noise buffer and the revised CWAAP sets out a designation for mixed uses on the HQP site. 135 There are no other uses in the area that would adversely impact future occupiers of this development scheme, the character of which is in keeping with existing uses in the area. Transport issues 136 Policy Saved policies 5.1 'Locating developments', 5.2 'Transport impacts', 5.3 ' Walking and cycling', 5.6 'Car parking' and 5.7 'Parking standards for disabled people and the mobility impaired' of the Southwark Plan (2007), require the impacts that a development may have upon the transport network, be taken into account in the determination of planning applications. Strategic policy 2 'Sustainable transport' of the Core Strategy (2011) details that developments should seek to encourage walking, cycling and the use of public transport rather than travel by car. Policy 6.3 of The London Plan (2011) seeks to assess the effects of development on transport capacity whilst CWAAP policies 6 ‘Walking and cycling, 7 ‘Public transport’, 8 ‘Vehicular traffic’, 9 ‘Parking for retail and leisure’ and 10 ‘Parking for residential development in the Core Area’ seeks to ensure that the area is highly accessible, particularly by sustainable types of transport and to reduce the impact of new development on congestion and pollution. Traffic movements 137 A revised Transport Assessment (TA) was submitted as part of the revised / addendum submission in May 2013. This sets out an assessment of predicted transport impacts in relation to the proposed development, using a revised modal split methodology that uses more up to date survey results than that included in the originally submitted TA. Officers are satisfied that the information that has informed the preparation of the TA is now accurate and reflects the existing transport characteristics of the area. This then allows a more precise assessment of the expected impacts as a result of the development proposal upon the surrounding highway network. 138 The TA presents modeling of junctions that could be impacted by the traffic generated as a result of the development. As a result of the traffic associated with the development proposal, alongside other committed schemes in the area, it is predicted that the junction of Surrey Quays Road with Deal Porters Way and the Bus Station will experience an increased ‘cycle time’ (the time of signal change at traffic lights) and this could generate delays to bus and pedestrian movements. However the developer proposes to install adaptive signal timing control that will reduce this impact. A sum of £20,000 is required to provide for the installation of an adaptive signal timing system at this junction, and will be secured through the legal agreement. There are also some impacts on the traffic flows at the junction of Surrey Quays Road with Redriff Road, and the applicant describes the possibility of works to improve the junction layout that would reduce these impacts. The Canada Water Area Action Plan also sets out aspirations to improve this junction, and a contribution from the developer towards this would adequately mitigate possible impacts from this development. In addition to this, and in line with the CWAAP, contributions have been secured towards for the Lower Road Gyratory scheme which is included within the Strategic Transport Contribution detail in the Planning Obligations section below. 139 Impacts on the bus network; The development will result in an increase in the population in the area, which will in turn increase demand upon the public transport network. While capacity is identified, this has not been assessed in light of demand further along the bus route. For example, while there may be space on buses at this particularly location, additional demand as a result of this development will mean that passengers will be unable to board at later bus stops in order to mitigate this issue Transport for London (TfL) have requested a contribution of £330,000 to mitigate the impact on the bus services and this has been agreed with the applicant. 140 Car parking: general The car parking for Decathlon would be available as town centre parking for all visitors to the area. The spaces will be available free to visitors to the town centre for a period of up to four hours, after which a charge would be applied. The phasing of car parking provision is linked to the construction of buildings in phases 1 and 2/3/4 (single phase). The table below describes the parking phasing strategy. Phase Land Use C1 Basement Phase 1A/B Decathlon Phase 2 Phase 3 and 4 Total C2-C4 Basement Site E Temp E1 Basement 152 (18*) Site C Temp Area 98 (7*) - - - Residential - - - 49 (24*) - Decathlon 148 (14*) - 102 (11*) - - Residential - - (62*) - 93 (47*) Decathlon - 102 (11*) - - Residential 148 (14*) - - (62*) - - Decathlon 148(14*) - 102 (11*) - - Residential - - 62 (*) - 93 (47*) *Figure in (brackets) represents the number of total spaces that are disabled/enlarged spaces. NB:- Site E basement car parking is to be provided before occupation of phase 3&4 to ensure adequate disabled parking provision. 141 A Car Parking Management Plan can be secured through the legal agreement to allow monitoring of car park use in the development as it becomes occupied. The following information can be requested through the plan:- A regime of monitoring the use of spaces allocated to each user group (e.g. shoppers, residents) and sub-groups (e.g. disabled drivers, electric vehicle users, those shopping at Decathlon), including duration of stay; - Measures to amend the allocation of spaces to ensure that disabled drivers and those using electric vehicles are adequately accommodated; - Proposals to convert any underused space to more productive uses (such as additional cycle storage, display space or gym facilities; - Methods of allocating parking to residents to ensure there is minimal financial penalty if, at a later stage, they choose not to keep a car and no longer need their parking space; - Involvement of the Council in setting the regime of parking controls, including maximum duration of stay and differential charging arrangements for Decathlon customers versus other shoppers; and - Provision and monitoring the use of electric vehicle charging points. This will be agreed through the S106 Agreement. 142 Car parking for Decathlon and non-residential uses According to Saved Southwark Plan requirements, a maximum of 142 spaces would be considered acceptable for the quantum of Decathlon retail floorspace proposed, while the London Plan would permit between a maximum of 208 and 312 spaces. TfL have however stated that the existing parking associated with the Decathlon store is lightly used, and in the context of the high Public Transport Accessibility Level (PTAL) of the site (6a – highest accessibility), the proposed 250 spaces for Decathlon is considered to be high. 143 The revised TA estimates the demand for car parking spaces based on surveys undertaken in April of this year (2013). The peak demand is then factored as follows:- A factor is applied according to Decathlon’s records of customer numbers, so that the April figures can be used to represent the peak month (August); - A factor is applied to represent the anticipated increase in numbers resulting from the increased retail floorspace/range of goods offered; - A factor is applied to represent the expected increase in duration of stay resulting from the increase in retail floorspace. The result of this forecasting is that, in the busiest period, between 297 and 310 spaces are required. This indicates that, at the peak of demand, there may be an overspill of up to 60 cars. However the proposed Travel Plan measures together with good accessibility for pedestrians (including those walking from public transport services) and cyclists will encourage the use of non-car modes of transport. Additionally, while there is limited on-street parking available in the area, large car parks are provided at Surrey Quays Shopping Centre and Leisure Park which are open to other Town Centre users. Parking in those car parks is normally restricted to drivers visiting those facilities, but it is likely that car drivers will visit a number of facilities while they are in the area, and so will be able to leave the car elsewhere while shopping at Decathlon. It is therefore unlikely that the overspill parking will lead to queuing to the Decathlon car park or inconsiderate or unsafe parking in nearby streets. 144 Residential car parking and disabled car parking The quantum of residential car parking proposed on the site, is less than the maximum that could be accepted in accordance with policies of the Saved Southwark Plan. This is welcomed, given the high PTAL of this area, and the high level of cycle storage spaces proposed. The development will be required to be ‘permit free and therefore all occupiers of the development will be ineligible to apply for an on street parking permit’ when the proposed CPZ extension is put in place. This will prevent any overspill of parking that will occur as a result of this development. This will be secured by condition and through the legal agreement, with a contribution of £160,000 from the developer. The interim arrangements for residents’ parking in phase 1 building C1 rely on a temporary parking solution within site E. Overall this is considered acceptable; however the arrangements for disabled parking have disadvantages in the short term. Spaces for disabled drivers should be located conveniently to residential cores, while this proposal requires disabled drivers to cross Surrey Quays Road in order to access residential cores. This is however a temporary solution, with parking in the complete development provided in the linked basement under phases 1 and 3/4. 145 The applicant will need be required to provide a parking management strategy to ensure that the disabled parking spaces are always allocated on the basis of need. Given that not every wheelchair accessible unit owner will own a vehicle and not every disabled driver will require a wheelchair unit. This will be secured by condition. 146 Three Car Club bays are to be provided. Discussions with regards to the location of these bays are ongoing. The introduction of car club bays will reduce reliance on private car ownership. The developer will be required though a legal agreement, to provide a contribution covering 3 years membership to Zipcar car club for each eligible adult of the residential element of the development. 147 Servicing and refuse collection Saved policy 5.2 of the Southwark Plan requires major developments to accommodate servicing requirements within the site boundary. This proposed development has sought to address this through limited servicing access onto the site between buildings C1 and C2, and the provision of loading bays on Surrey Quays Road. Overall it is felt that the level of servicing and servicing provisions proposed by the applicant has underestimated the level of goods vehicle movements required however this can be given further consideration as part of a Service Management Plan condition. 148 Decathlon servicing Goods vehicles servicing the Decathlon would use a dedicated facility accessed from Surrey Quays Road, from a southbound direction only as the facility is inaccessible from a northbound direction. In addition there is potential conflict between residential, customer and servicing vehicles will occur when vehicles are exiting the site onto Surrey Quays Road as a combined egress is proposed. Compared to other retail uses of this size, and the service bay provision in unlikely to be sufficient for other A1 uses. Servicing should be made personal to the applicant allowing re-assessment of servicing should the end user change. 149 Other retail use servicing At grade, servicing is proposed for the use of residential block C1 and all uses in C2. Servicing will be controlled through this space as the space remains restricted (through provision of bollards) and servicing is facilitated through a manned service. All servicing vehicles will be required to undertake a three-point turn within the public realm including larger vehicles reversing in close proximity to the front doors of the Decathlon store. Further details of this management are required due to the potential conflict with users of this space. 150 Residential servicing Servicing for the residents is located on Surrey Quays Road close to sites C3 & C4 whilst the proposed super lobby is located at the northern end of the site. Therefore further information is required to ensure that servicing occurs in the designated facility as the proposed area for residential servicing is located some distance from the residential core and not from Surrey Quays Road, (as close to the super lobby as possible). 151 There are no specific provisions made for residents moving in/out, given that there is no space to accommodate this it is anticipated that residents will want to get as close to the entrance as possible for ease and reduce carry distance. 152 A detailed and robust Service Management Plan detailing all elements of servicing that will associated with the proposed development will be required to satisfy the council that the proposed development can be serviced without causing a negative impact on the highway network. 153 Cycle storage The proposed development falls short of meeting all policy required cycle storage provision (residential) set out in Southwark and London Plan requirements. In line with the London Plan and Southwark Plan a minimum of 1,322 cycle spaces are required. The shortfall of cycle storage should be sought through condition. Decathlon (Class A1 Use) – 62 customer spaces, 12 staff spaces (min 49 required); Classes A1-A4 / D2 Cinema floorspace – 25 staff spaces (min 17 required); Class B1 floorspace – 19 staff spaces (matches minimum required); Residential units – 1,251 spaces, of which 281 for phase 1 (min required 1322/304) 154 Within Phase 1 Customer cycle parking for Decathlon customers is provided on street within the landscaping of the C1-C2 shared surface road and along Surrey Quays Road. There is also 12 staff spaces provided at basement level, with showers and lockers also provided. Residential cycle parking provision has been improved in the revised submission for phase 1. In building C1, separate provision is proposed to the townhouses and on terraces to units at courtyard level. There are now 281 residential bike spaces provided, 57% (159) of these are provided via either Sheffield Stands or bike boxes (105 and 54 respectively) and 43% (122) provided via two tier racks. However, this does not take into account the need for additional cycle parking for the family sized (3 and 4 bedroom) units. Therefore it is necessary to amend the layout to achieve an additional 23 spaces. In addition to this, lockers have been provided within the residential bike stores for residential helmets, tools etc. The range of storage types, and location of stores at courtyard, terrace and to individual townhouses, in addition to larger cycle store areas, should encourage a maximisation of cycle use associated with the development. The provision of bike lockers and individual stands closer to residential units at courtyard / terrace level will be particularly attractive for residents who are less inclined to use larger cycle store areas. Final details, including the dimension of lifts and details of access arrangements to these internal storage areas should be reserved by condition, this will ensure that sufficient space is provided both for the trip to and from stores, and within a store area itself. 155 Travel plan A good quality draft Travel Plan has been submitted with the application. In the event that planning permission is granted and the development constructed, a final Travel Plan will be required for the development. This should include a secure commitment to surveying residents at 75% occupation of the development and at 3 and 5 years post initial occupation. This survey should be via a TRAVL-approved Independent Field Company in accordance with TfL policy. Commitment to updating the Travel Plan following each survey, and commitment to measures identified through the Travel Plan should also be provided. 156 Conclusion on Transport Issues The proposed development will put increasing pressure on the demand of the public transport network, in particular the bus network.. However, the applicant has been required by TfL to contribute £330,000 to mitigate the impact on the bus service to support additional services in the area. The traffic generated by the proposed development will have an adverse impact on the highway. The applicant predicts that the junction of Surrey Quays Road with Deal Porters Way and the Bus Station will experience an increased ‘cycle time’. To mitigate the impact on this junction a sum of £20,000 is required to provide for the installation of an adaptive signal timing system at this junction. Further impacts have been identified at the junction of Surrey Quays Road with Redriff Road. The council’s aspirations for improving this junction are set out in the Canada Water Area Action Plan and a contribution from the developer towards this would adequately mitigate impacts from this development. On a wider scale, contributions have been secured towards for the Lower Road Gyratory scheme. The applicant seeks 250 car parking spaces, whilst the applicants studies indicate that a maximum of 297 to 310 spaces may be required. Therefore at the peak of demand, there may be an overspill of up to 60 cars. As mitigation the applicant phase undertaken a Travel Plan, identifying mitigation measures to encourage non-car modes of transport. Limited on street parking, parking restrictions and the availability of Surrey Quays Shopping Centre and Leisure Park will also help militate against the overspill of any parking that will occur. The proposed development is expected to have an adverse impact on public transport and the surrounding highway network. However, mitigation measures have been identified and if implemented alongside the development this is satisfactory. Design issues 157 Policy context Strategic policy 12 of the Core Strategy, 'Design and conservation' states that development should 'achieve the highest possible standards of design for buildings and public spaces to help create attractive and distinctive places which are safe, easy to get around and a pleasure to be in'. The policy goes on to assert that development should conserve or enhance the significance of Southwark's heritage assets their settings and wider historic environment. Saved policy 3.13 'Urban design' of the Southwark Plan asserts that the principles of good urban design must be taken into account in all developments. This includes height, scale and massing of buildings, consideration of the local context, its character and townscape as well as the local views and resultant streetscape. Saved policy 3.12 'Quality in design' asserts that developments should achieve a high quality of both architectural and urban design, enhancing the quality of the built environment in order to create attractive and high amenity environments people will choose to live in, work in and visit. London Plan (2011) policies 3.5 ‘Quality and design of housing developments’ and 7.6’Architecture aim to secure the highest quality of design. CWAAP ‘Policy 14: Streets and public spaces’, ‘Policy 15: Building blocks’, and ‘Policy 16: Town centre development’ describe the CWAAP objectives for the design and form of development in the Canada Water Action Area. The adopted AAP establishes a vision for a town centre around a new high street that links the Canada Water underground station in the north, to the Surrey Quays station in the south, and runs along the eastern edge of the Canada Water Basin. The AAP proposes a small civic space at the southern edge of the Basin to complement the Canada Water Plaza with its distinctive Library building. This concept for the town centre not only reflects the prevailing connections around the main transport interchanges, but also places the civic core around the significant urban feature of the Canada Water Basin. 158 Saved Policy 3.20 ‘Tall Buildings’ of the Southwark Plan, requires that buildings that are significantly taller than their surroundings or are over 30 metres tall should ensure that they contribute positively to the landscape, are located at a point of landmark significance, are of the highest architectural standard, relate well to its surroundings, and contribute positively to the skyline or provide key focus within views. Policy 7.7 ‘Tall buildings’ of the London Plan (2011) states that tall buildings should be limited to areas of intensification, CAZ or town centres that have good access to public transport and should relate well to the form, proportion, composition, scale and character of surrounding buildings, urban grain and public realm. 159 CWAAP Policy 17 ‘Building heights on sites in and adjacent the core area’ describes the expected height of development proposals in the area, as well as the circumstances when taller buildings will be considered acceptable. The draft CWAAP tales a different approach to tall buildings given the relocation of the HQP. 160 NPPF Section 7 ‘Requiring good design’ details that good design is a key aspect of sustainable development, good planning and should contribute positively to making places better for people. 161 Tall buildings The proposed development includes a number of tall buildings, and it is recognised that the adopted AAP does anticipate buildings over eight storeys in height on this site. Notwithstanding this, the opening up of the town-centre to the west and the implications of Harmsworth Quays likely redevelopment has meant that the Council is reviewing the AAP in response to the changing context and the identification of Canada Water as an intensification area. As detailed above, CWAAP Policy 17 ‘Building heights on sites in and adjacent the core area’ describes the expected height of development proposals in the area, as well as the circumstances when taller buildings will be considered acceptable. The prevailing building heights in the surrounding area are 5-8 storeys and tall buildings over 30m in height will be situated in important locations, including a local landmark up to around 15 storeys located on the south west of the corner of the shopping centre site. The policy designation notes that this part of the site is less sensitive as it falls outside the strategic viewing corridor between Greenwich Park and St Pauls Cathedral and would help mark the tube station and form part of a cluster of tall buildings with the 16 storey towers on the Hawkstone Estate. The draft CWAAP takes a different approach to building heights with an aspiration for taller buildings of between 20-25 storeys, with taller buildings being assessed on their contribution to the area in terms of regeneration and the wider London skyline. 162 Site C takes up the prominent western face of the Canada Water Basin, equidistant from the future high street and the transport hub at Canada Water. It is on the intersection of important pedestrian routes to the Mast Leisure site and Russia Dock Wood to the East and Southwark Park to the West. This intersection of important local routes and connections suggests that the location has some significance to the emerging town centre. 163 Within site C there are a number of tall buildings being proposed; three in Phase 1A and two on the Phase 3 and 4 site. The tall buildings range from around 11 storeys in height in Phase 1 and culminate in a 40 storey tower on Phase 4, which including its roof-top garden will stand at 144.9m AOD. At the proposed scale, this is a similar height to the Strata tower at the Elephant & Castle. As such it will be more than a local landmark and it will instead become a London landmark., visible from a wide area. 164 Saved policy 3.20 of the Southwark Plan applies to the proposals as follows.. i) Makes a positive contribution to the landscape Landscape and the public realm is an important part of any proposal for a tall building. It will not only create a setting for the towers, allowing them to ‘land’ appropriately but also an opportunity for such a development to demonstrate the benefits that can flow from expanding vertically in this way freeing up more space at grade in a congested part of the city such as this. The urban context in this part of Southwark has been affected by large footprint buildings and car parking filling sites and interrupting local connections, poorly defined streets and a lack of legibility. 165 The proposal includes a number of notable public realm features: • a substantial landscaped public space addressing the Basin in Phase 3/4; • a new edge to the basin, with steps leading down to the water’s edge; • an improved Albion Channel edge; • a new route between Phases 1 and 3/4 which leads from the Basin to Surrey Quays Road and Canada Street; • a new ‘green link’ along the southern side of the Basin across Surrey Quays the first step in a connection to Russia Dock Woods to the east. 166 The inclusion of these public realm features in the proposal is welcomed and will be a positive addition to the character and facilities in the town centre. 167 The applicants have sought to address the implications of their proposal on the local and wider context through the public realm including: • The micro-climate effect on the public realm of tall buildings; • Replacing of existing tree canopy that would be lost as a result of the development; • Improving access to and across the Albion Channel with a publically accessible lift at the Surrey Quays bridge over the Albion Channel; 168 In conclusion, the proposals for the public realm are extensive, wide ranging and will complement the existing and proposed townscape. The buildings themselves have no curtilage or boundaries, instead they site directly within the public realm. The involvement of the landscape architects from the outset has resulted in a development that prioritises landscape and seeks to maximise its quality with the lawn as a positive feature and the hard landscaping providing potential space for events. This is a matter that can be reserved by conditions linked to the phased delivery of the development to ensure that the quality envisaged by the application is adhered to in the constructed scheme. 169 ii) Is located at a point of landmark significance A point of landmark significance is defined by the Southwark Plan (2007) as: “where a number of important routes converge, where there is a concentration of activity and which is or will be the focus of views from several directions.” 170 The site is roughly equidistant between the local transport hubs and, as such the focus of activity is not simply around the Basin itself, but for residents and visitors seeking the wider town centre and leisure site to the east. The recently constructed Ontario Tower at Site A has established a focus for the area centered on the Station. This proposal matches the public offer at Library Plaza with a new public space on this side of the Basin, and together the two spaces complement each other, reinforcing the Canada Water Basin as a point of landmark significance in its own right. 171 iii) Is of the highest architectural standard The proposed development can be described as divided into three parts:• the new Decathlon Store encircled by residential accommodation in Phase 1; • the new residential-led mixed-use scheme in Phase 3/4; and • the mixed-use scheme on Site E in Phase 2 – proposed in outline. The assessment will now consider each building in turn. 172 Phase 1A/1B - Building C1 The proposal for this site faces a number of challenges, the most complex challenge being the enclosure of the large footprint Decathlon Store which takes up most of the site. It has to accommodate this large and predominantly blank ‘box’ without allowing it to dominate the surrounding context. The scheme achieves this in a similar way to the earlier consented scheme reference 13/AP/1429 by encircling the ‘box’ with entrances and residential accommodation, and providing the remainder of the accommodation above it. 173 At the lower levels the accommodation comprises some single-aspect residential units out of necessity. There is a mix of multi-level houses as well as flats but the majority of the lower storeys, facing the street and water frontages, are taken up by the public faces of the store and its associated office and servicing space, the separate residential entrance lobbies to the blocks above, and some independent retail units. 174 On the roof of the store the scheme proposes an elevated communal garden offering views across the Basin and to the streets and waterways below. Surrounding the elevated garden are a series of buildings that rise to between four and 14 storeys above the rooftop in three stepped blocks. A prominent feature of the roof-top garden is the public MUGA (multi-use games area) which will be run by the store and create a dynamic facility facing the Basin. 175 The proposed building varies in scale in response to their local context and result in a highly modulated development. The tallest element takes up the prominent location on Surrey Quays Road with a second tall element facing onto the Basin and marking the entrance to the Albion Channel. At its base is a new ‘super-lobby’ which will be the main entrance for this phase. Along the street – between the two phases – the proposal is for a building that establishes a strong edge to the street, and matches the proposed building to be located opposite as part of Phase 3/4 – building C2. It includes a taller element at the centre of that important elevation. On Surrey Quays Road, the curved edge of the street has given rise to a curved and terraced building made up largely of duplexes on top of the Decathlon offices. At the junction of Surrey Quays Road and the Albion Channel a mid-height block forms a ‘bookend’ to the development and marks the corner before it drops in scale at the channel edge. The Albion Chanel facade includes 5 individual multi-level houses which address the promenade and a small public space established at the ‘elbow’ to the channel at the former entrance to the dry-dock, which is proposed to be preserved under the store. 176 During pre-application discussions important aspects of the design were developed in detail. These included: • The relationship of the taller elements to the lower perimeter blocks was improved with set-backs on either side to allow the taller elements to distinguish themselves from the main block and ‘land’ appropriately in their public realm • Each block was considered both individually and as part of the wider development. The main unifying devices are: brick is the predominant facing material; pre-cast features highlight openings; and partly inset balconies give the elevation depth and variety. In addition to this, in each block, the designers have used these elements differently to give each building its own identity. For example the block facing Basin has full-height windows and balconies whilst the terraced houses use double-height openings and feature windows. • The development has a well-established base, middle and top. At the perimeter, the design of the base extends over the first two storeys with double-height openings to lobbies and a colonnaded appearance at the retail frontages. The edge of the elevated garden is similarly marked with a unifying pre-cast parapet line that runs around the whole development. Finally, at the top of each of the taller elements, a subtle increase in the attic storey heights coupled with full-height windows and balconies give each building a more • • • refined roof-line. The landscaping of the elevated garden has been developed in pre-application discussions into a detailed and highly articulated landscaped space. This is an important part of the communal residential amenity and includes a range of spaces or ‘rooms’. Mature planting coupled with pathways and furniture establish three distinct spaces or zones. The MUGA is intended to be outward facing and is screened from the elevated garden by a planted screen The prominent frontage on to Surrey Quays was highlighted as an important public face of the scheme. Here the design has to reconcile the servicing requirements of the store as well as the main parking access for town centre/retail users whilst maintaining an active frontage. In addition, the level changes significantly across the site as the roadway approaches the bridge over the Albion Channel. The design is reinforced by the landscaping to the public realm and includes shop fronts, an entrance lobby and, at the upper level, the offices for Decathlon themselves. In this way the scheme has attempted to respond to Surrey Quays and maintain an outward-looking and active presence on this important route. 177 Phase 2 – Building E1 This block is designed in outline at the moment with a maximum height of 37.8 metres. As described above, its main purpose is to define the western edge of the wider public space that stretches from the Canada Water Basin, across Surrey Quays, to Site E. At the moment this block appears to be a simple block-like form. It has been designed as a podium block with an elevated communal garden and is chamfered on its western side to create a small public space on Surrey Quays. 178 The appearance of this block is reserved for future approval. Officers are satisfied that with the inclusion of a comprehensive design code that embeds the council’s current residential design standards and a consideration of the context, this part of the application can be considered acceptable as the appearance of the building and its internal layout will be secured through reserved matters. The quality of accommodation section of this report discusses the design specification for building E1 in more detail. 179 Phase 3 and 4 – Buildings C2, C3 and C4 This proposal is for three large blocks which are located within a substantial new public space to the west of the Canada Water Basin. This proposal envisages these blocks as “elements” of a composition within a wider public space defined by Sites C and E. They have been designed as pure forms, one lower and long (C2 – eight storeys) forming a street along the edge of Site C1, a tall and slim block (C4 – 40 storeys) located at the south-east corner of the Basin and a mid-range block aligned with Surrey Quays Road (C3 – 20 storeys). 180 In order to fulfill their purpose in the design, these blocks will have to be of exceptional, almost sculptural quality in their own right and work together as a group. From the outset this design has taken on a simple, starkly elegant design that accentuates the geometric qualities of each individual block. 181 The long low block (C2) is raised at either end and hovers close to the edge of the Basin. The horizontal emphasis of the balconies gives it a striking appearance. The tall slim tower (C4) is designed as a simple square extrusion encircled by a ring of balconies and columns. It has classical proportions and is topped by a simple glass box that houses a garden and a communal space. The intermediate block (C3) is proportioned to give the space a degree of enclosure whilst encouraging permeability to the public space beyond. 182 The themes that the designers have developed on this site are the following: • The material finishes of the buildings have been developed as a common theme with each developing the theme individually. All are proposed to be constructed with floor-to-ceiling glass with simple circular concrete columns. • In C3 the columns sit proud of the facade and are an integral feature of the elevation. This gives this intermediate block a confident gridded appearance. This block plays the dual role of acting as a backdrop to the public space and an important frontage onto Surrey Quays. It does this by staying true to the grid and having a unified appearance in the round. It has neither a front nor a back. • Finally, C4 brings the structure to the edge of the building and sets the accommodation back creating a block that is encircled by balconies. In this design the columns have been turned into a delicate lattice that encloses the building and gives it its verticality. 183 The strength of this design will depend to a large degree on the architectural detailing during construction and the scheme is considered to be of an exceptional standard of architectural design. The use of conditions will ensure that the simple, elegant proportions and the clean relationship of column to glass is not affected by extraneous features like grilles or bulky window frames. 184 The relationship between the public space and the wider town centre has been considered in greater detail and found to be acceptable. Here the designers have looked at how the gap between C4 and C3 relates to the wider town centre to the south and east. The importance of this route to the wider town centre has led to review of this space, and a re-design of the turning circle resulting in a significantly improved pedestrian route which still ensures that C3 retains its elegant architectural proportions, maximises the retail offer at grade and the public space preserves its sense of enclosure. More has also been done in the design of the lower storeys to make the base of the building double-height and maximise its transparency resulting in a generosity at grade that encourages permeability to the emerging town centre beyond. 185 The communal amenity provision for future residents has been designed in each of the separate buildings but the most successful is a mature garden which will be located at the top of C4. The design offers the whole roof over to communal amenity and surrounds it with a triple-height glazed screen which forms the crown of the building. As the most visible and the most public feature of this tower it will become synonymous with this design. The garden will also have some public access, and the arrangements for this are described in more detail in the planning obligations section of this report. The public access to this most prominent feature of the development, as seen in long views, is a significant benefit of the scheme and will provide members of the public with opportunity to view stunning vistas across the London skyline. 186 iv) Relates well to its surroundings, particularly at street level This aspect of the policy relates to the public realm and the appreciation of the proposed buildings in the round. The nature of the design is that each block has frontages on all its sides and Officers are satisfied that every effort has been made to maximise the active frontages around each block. 187 In particular, the significantly improved relationship to the Basin, the emphasis on double-height retail frontages and the creation of varied and interesting spaces around and between the buildings and along the waterways has resulted in an outwardlooking development that will complement its public setting. 188 v. Contributes positively to the London skyline as a whole consolidating a cluster within that skyline or providing key focus within views Additional policy guidance is provided in London Plan (2011) policy 7.11 – London View Management Framework which designates a number of views that make a contribution to the image and character of London at the strategic level. In urban design terms the scheme reinforces the concentration of activity around the Canada Water Basin and creates a focus for local and wider views. The C4 tower establishes an urban counterpoint to the Ontario Point tower at Site A and sits at the eastern edge of the emerging town centre which rises from the Underground station by way of Ontario Point, C1, C3 and onwards to C4. The two towers, the Ontario Point tower at Site A and the proposed C4 tower, would provide a stepped relationship to each other at either end of important routes through the emerging town centre, they act to reinforce the significance of the town centre, and give it a focus around the basin which is appropriate with C4 and its height, giving prominence to the heart of the Town Centre and being supported by the further tall elements at C1 and C3. 189 The site forms part of the Canada Water Town Centre and the suitability of the site for tall buildings is accepted as they give a unique identity and focus to the area, improving legibility within the Action Area Core and shifting the focus of the Town Centre to the central area of the basin between the Shopping Centre and the Canada Water Underground Station. The use of tall buildings has enabled the creation of generous area of public open space and new public routes creating an improved sense of openness to the Basin and wider Town Centre. An important consideration of a scheme of this scale is an assessment of the proposal both in its local setting and on the wider London skyline. The contribution of this development to the London skyline and local and wider views have been tested in the strategic views as well as the important local and wider views, and was found to be acceptable. The Strata Tower has demonstrated that towers of this scale are able to improve the legibility of the townscape and consolidate the town centre placing Canada Water on the wider London map. Given the substantial scale of the development, views from the Tower of London World Heritage Site as well as views from Tower Bridge and the neighbouring boroughs, especially those across the river, have been considered and accurate visual representations prepared to demonstrate the impact of the proposal on its local and wider context. 190 The scheme has been tested in the local and wider views which has included: • Not just the statutory views, but also wider and local views in relation to sensitive heritage assets and their settings • The impact of the scheme on the Tower of London World Heritage Site - which was considered to be acceptable. • The view of the scheme in relation to the impact on Tower Bridge. • All views comply with the requirements set out in the LVMF and include Accurate Visual Representations (AVR). 191 Two points were raised by English Heritage in their consultation response. The first related to the view from London Bridge (LVMF View 11B) where the tower at C4 is visible to the right of Tower Bridge in the central view. The second related to the view from the playing fields at Southwark Park which is a Grade II Registered Park and Garden (listed in its own right as a heritage asset). Here the C4 tower is visible over the tree canopy however this is not considered to compromise the heritage setting or enjoyment of the open space. 192 Strategic view 11B; This is a River Prospect and the most significant features in the view are, firstly, the Tower of London World Heritage Site on the north bank and secondly, the Grade I Listed Tower Bridge which gives the view a river focus and a sense of enclosure. To the north the cluster of towers at Canary Wharf is visible and to the south, in the distant backdrop, the tall buildings around Ontario Point are visible at Canada Water. The new tower C4 would be visible in the distant backdrop of this view and to the right of the south bastion to the south of Ontario Tower. This is not considered to intensify any current established impacts either from Canary Wharf or Ontario Point and will consolidate the taller elements around Canada Water without compromising the heritage assets or the river views. 193 The LVMF emphasises the Outstanding Universal Value of the World Heritage Site and stresses, in paragraph 205 that “Development should not cause adverse impact to the World Heritage Site and should not compromise a viewer’s ability to appreciate the Outstanding Universal Value of the World Heritage by unacceptably imposing on the Tower, or have a negative impact on a person’s ability to recognise and appreciate this Strategically Important Landmark.” 194 This is a dynamic view starting at the southern edge of the bridge (11B.2) and extending to the middle of the bridge (11B.1) to take in the northern bank and the world heritage site. The rendered view demonstrates that the C4 tower would be invisible at the southern edge but drift into the view as the viewer approaches the middle of the bridge. The limited visibility of the development in this view, as it is to the south of Tower Bridge, will not affect the viewer’s ability to recognise or appreciate the world heritage site in this view. At its most visible, (View 1B.1) it does not impact on the visibility of Tower Bridge and is to the south of its prominent bastions. 195 The view from Grade II Registered Park and garden – Southwark Park The rendered view demonstrates that the C4 tower will be visible over the tree canopy from the football playing fields at the southern end of the park near the sports ground. This area was originally called ‘The Oval’ which like its namesake at Kennington, was a popular place for cricket and also athletics, training and football. The listing description fro the park is extensive and concentrates on the gardens and the Pleasure Grounds and charts the historic development of the park. It notes that “the Oval was reduced in size when a new sports ground was constructed to the southeast in 1980. This includes floodlights, and all-weather running track, and football pitches”. 196 The view submitted with the application demonstrates that the tower at C4 will be visible only from this southern part of Southwark Park and the view includes Ontario Tower to the north. In this location the park has been altered significantly and does not benefit from the sense of enclosure at the better preserved northern or central parts of the park which are defined by the bridle path and lake. In this location a view of an elegant tower is not necessarily harmful. Indeed it could assist to orientate the viewer towards the nearby town centre and transport hub at Canada Water and help to establish the east-west ‘green’ link between Southwark Park and Russia Dock Woods. In this way a singular elegant slender tower of this nature could be considered in a similar vein to other London parks where taller elements were considered appropriate where they mark key gateways or links and help to establish a hierarchy in the townscape when the viewer is completely surrounded by nature. 197 Conclusions on design The scheme was reviewed by the Southwark Design Review Panel in September 2012 [comments in appendix 2 of this report]. The Panel looked at the proposal’s relationship with the Canada Water Basin, the Decathlon store and the wider town centre and they considered the detailed design of the individual buildings. Whilst there were differences of opinion among the Panel, there was a consensus on the proposed height and the majority felt the design could be beautiful but needed to be exemplary. They felt the scheme had benefitted from designers who had the ability to deliver high quality buildings and they endorsed this strategic vision for the area. They felt the challenge for the client, as much as the designers, is to secure the delivery of this vision in its purest form. 198 The development does provide the opportunity to optimise the potential of the Canada Water town centre site and provides a good level of public space. The NPPF reinforces this and requires proposals to achieve a balance between: site coverage, mix of uses and scale of development; and, in this case, the local character and identity of the Canada Water town centre. The new public space will be a valuable local resource and benefit from high levels of sunlight due to the open setting of this space. Its location on the edge of the basin coupled with its scale ensures that the new public space has a generosity and grandeur, becoming a new focus for the wider town centre leading to the east. At the same time the narrower spaces between the large buildings, the relationship of the main tower to the public space, as well as the frontages onto Surrey Quays and the Albion Channel, have been the focus of officer attention during discussions with the applicant. 199 The proposal results in a significant and meaningful positive addition to the London skyline. Building C4 itself consolidates the emerging cluster at Canada Water and will appear as an elegantly proportioned and reeded tower that is capped with a mature garden. At this scale it is a London landmark and is of a quality that could make it the pre-eminent marker in the emerging cluster. 200 The scale of buildings C1, C2, C3 and C4 is considered to be a driver of the redevelopment of the Canada Water area, giving the Town Centre a new focus centered around a tall building (C4) of exemplary design that allows major improvements to be undertaken to the public realm at ground level and also results in a much higher ratio of public space/private space than could be achieved with a low rise development. The sculptural quality of the building will renew the focus of the Canada Water Town Centre, putting Canada Water on the wider London Map as a well-designed high quality retail/commercial and residential town centre in an accessible location, enabling the intensification of the Canada Water area and the realisation of the Councils aspirations to develop the area into a Major Town Centre. The taller elements around buildings C1 and C3 help define the area as a major town with a much more urban feel 201 In conclusion, this is a scheme of exemplary quality of architectural design and urban design. It is led by a significant and meaningful contribution to the public realm which complements a wider vision for the emerging town centre. It will result in a consolidation of the emerging cluster of tall buildings at Canada Water and includes a landmark building that could become its pre-eminent marker and has been endorsed by the council’s Design Review Panel. Quality of residential accommodation 202 Policy context Saved policy 4.2 'Quality of residential accommodation' states that planning permission will be granted for residential development, where it achieves good quality living conditions, and includes high standards of accessibility, outlook, privacy, natural daylight, ventilation, outdoor amenity space, safety, security and protection from pollution including noise and light. An assessment of the quality of accommodation has been carried out below, taking each phase of the development in turn. the standard of accommodation will need to be exemplary due to the high density of the proposals 203 Strategic Policy 5 ‘Providing new homes’ of the Core Strategy describes the density range that development is expected to fall within in different parts of the borough. This is also described in saved policy 4.1 ‘Density of residential development’ in the Southwark Plan. This development site is located within the ‘urban density zone’ and developments in this zone are expected to be between 200 and 700 habitable rooms per hectare. The policy then goes on to describe that within the opportunity areas and action area cores the maximum density range may be exceeded when developments are of an exemplary standard of design. The criteria for what can be considered an exemplary standard of design, is then set out in detail within the Residential Design Standards Supplementary Planning Document 2011 (SPD). Outlook, privacy and disturbance - As described above, Supplementary Planning Guidance for Residential Design Standards 2011 states that in order to prevent unnecessary problems of overlooking, loss of privacy and disturbance, development should achieve the following distances: • A minimum distance of 12m at the front of the building and any elevation that fronts onto a highway; • A minimum distance of 21m at the rear of the building. 204 Phase 1 – Building C1 This is the only building within the development whereby the internal layouts and full design detail has been submitted for approval. The predicted daylight levels within the proposed development have been assessed according to the BRE methodology described in the impact on amenity section of this report. The method for assessing internal daylight to proposed residential accommodation according to the BRE Guidelines is the average daylight factor (ADF) and for sunlight, the annual probable sunlight hours (APSH). The submitted Daylight and Sunlight Report prepared by Waldrams for the planning application, shows that out of 676 rooms, there are 668 in the proposed C1 building that meet the BRE Guidelines ADF criteria, which amounts to 99% of the first phase. In relation to sunlight, the report shows that the majority of habitable rooms, and in particular living rooms, will be sufficiently close to the BRE Guidelines to be considered acceptable. 205 Outlook, privacy and disturbance - As described above, Supplementary Planning Guidance for Residential Design Standards 2011 states that in order to prevent unnecessary problems of overlooking, loss of privacy and disturbance, development should achieve the following distances: • A minimum distance of 12m at the front of the building and any elevation that fronts onto a highway; • A minimum distance of 21m at the rear of the building. These minimum distances are fully complied within both around building C1 and across the courtyard. Therefore officers are satisfied that there would be no adverse impact upon future occupiers' outlook, privacy or resulting disturbance in relation to the proximity between buildings. 206 Outdoor amenity space - Policy 4.2(ii) of the Southwark Plan and Section 3.2 of the SPD on Residential Design Standards states that development should provide high standards of outdoor/green amenity space. The draft SPD advises that development should as a minimum meet and seek to exceed the following standards: • 50m² of communal space per development; • For units containing 3 or more bedrooms, 10m² of private amenity space; • For units containing 2 or less bedrooms, ideally 10m² of private amenity space, and where this is not possible the remaining amount should be provided to the communal amenity space requirement. 207 The application proposal for building C1 includes a minimum of 10sqm private amenity space to all units with 3 or more bedrooms. All units in the scheme benefit from private amenity space provision in the form of a balcony or terrace of 5sqm or more, and where any units with less than 3 bedrooms has any shortfall from 10sqm of private amenity space this has been sufficiently accounted for within the extensive communal courtyard area of 3,051sqm. The quantum of amenity space provided in this phase and the inclusion of private amenity space to all units, including smaller 1 bedroom or studio units is a significant benefit of the proposed development. There are also a number of large private amenity spaces provided to the family size units, providing over 20sqm of terrace or balcony space to some units. 208 The communal courtyard provides 3,051sqm of shared amenity space, well in excess of the required amount. The courtyard is made up of 155m of bench seating, 25no. moveable seats, 272 trees and over 400sqm of lawn area for flexible amenity space. A ‘woodland room’ is also proposed, with a dense planted area and seating providing a quieter space for residents. A dedicated ‘play area’ and ‘outdoor dining’ area will also be included, this design maximises the opportunities for residents outdoor amenity, and will encourage residents to fully utilise this amenity area. Final details and specification of planting should be required by condition to ensure that the scheme achieves the high quality finish described in the application documents. 209 In terms of playspace, phase 1 (Building C1), includes within the courtyard a 100sqm dedicated area for under 5’s play, in addition to the wider more flexible lawn spaces that also provide opportunity for play. For 5-11 year olds and over 12’s, access to the 700sqm MUGA space will be provided, with residents able to use this area outside of trading hours, specifically residents access is between 7pm – 10pm weekdays and 5pm – 10pm on weekends, with bookings to be made through the concierge. During daytime hours it will be possible to access the MUGA through Decathlon as any other member of the wider public would. The provision of playspace as part of building C1 is considered acceptable given the large size of the central communal courtyard, however final details and specification, particularly of the dedicated play for under 5’s, should be reserved by condition. Further opportunity to locate play equipment sporadically for older children across the courtyard should also be considered as part of the submission of any condition details, i.e. basket ball hoops or table tennis tables. 210 Internal space standards - Supplementary Planning Document for Residential Design Standards 2011 in line with the Core Strategy and London Plan 2011 details minimum space standards for residential units. 211 The table below shows the minimum sizes in the Residential Design Standards compared with the range of unit sizes in the scheme: Table 7:- Size of units Unit size Studio 1 bed (2 persons) 2 bed (3 persons) 2 bed (4 persons) 2 bed (average) 3 bed (4 persons) 3 bed (5 persons) 3 bed (6 persons) 3 bed (average) 4 bed (5 persons) 4 bed (6 persons) 4+ bed (average) Minimum standard (sqm) Proposed size range (sqm) 36 50 61 70 66 74 86 95 85 90 99 95 39.7 – 48.1 50.0 – 56.6 62.5 – 88.0 90.1 – 146.8 150.5 – 210.4 212 The proposed total floorspace areas in phase 1 building C1 meets Southwark’s minimum standards in all cases, and generally exceed minimum standards by a significant margin. The large size of the family units proposed is a particularly beneficial feature of the proposed development. All individual room sizes within units also comply with Southwark’s minimum requirements. 213 In summary, building C1 establishes an excellent standard for the quality of residential accommodation in the development that can be followed in the submission of reserved matters for later phases in compliance with the saved policies of the Southwark Plan 2007 (July), The Core Strategy 2011, The London Plan 2011 and the SPD: Residential Design Standards. 214 Phase 2 – Building E1 The Design Specification and Place Making Document for the application sets out the minimum criteria to be fulfilled by any reserved matters application on Phase 2 building E1. 215 The maximum floorspace allocated to E1 is less than the maximum volume as defined by the parameter plans, ensuring modulations between blocks, and allowing flexibility to internal arrangements allowing units to meet minimum quality standards set out in policy. A private communal courtyard with a minimum area of 1,258sqm (excluding lightwell areas) will be provided at podium level centrally within the site, and wrapped by the blocks for residential accommodation. Private amenity space is to be provided in accordance with the Mayor’s SPD (2012) and Southwark’s Residential Design Standards SPD (2011). 216 A large majority of units (2/3) are to be designed as dual aspect, with no more than 5% of units as north facing and single aspect. All dwellings will comply with the BRE guidelines for daylight and sunlight, and units will need to exceed both the GLA Housing SPG and Southwark’s Residential Design Standards. 217 Phase 3 and 4 – Buildings C2, C3 and C4 The internal arrangement and distribution of units within each building will also reinforce their quality of design. All three buildings are significant in scale and their quality would be affected if the internal arrangement resulted in long internalised corridors and single-aspect flats. As the internal layout to buildings C2, C3 and C4 are reserved at this stage, and it will be necessary to condition the internal layout appropriately, to avoid single aspect units with long internalised corridors. This will assist in reinforcing their external design quality. 218 Indicative internal layouts have been provided at this stage to demonstrate that it is possible to arrange the buildings appropriately internally. The indicative layout for C2 has been designed with 5 separate cores each serving at least two dual aspect units on every floor. These cores appear as separate entrances between retail units at the ground floor and would add interest and activity at the street level. The indicative layout for C3 has similarly been designed with two separate cores each serving 3 dual aspect units and two single-aspect flats on each floor. The Development Specification and Place Making Document provides the approved blueprint to ensure that reserved matters applications will achieve internal layouts of at least equal quality to the indicative layouts described, and this is set out in more detail in the quality of accommodation section of this report. 219 The design of C4 places great emphasis on achieving a slender narrow footprint. The indicative internal design arranges a maximum of 7 units on each floor – similar to that achieved at Ontario Tower – and results in a predominance of dual aspect units. Its slenderness is demonstrated in the application material through a drawing, showing that despite its height, which broadly matches that of the Strata Tower, it will be approximately 22% narrower than Strata. 220 The Development Specification and Place Making Document sets out the following standards and guidance that will be adhered to in relation to the internal layouts of buildings C2-C4: • Street frontages will be maximised and transparent; • Double height, dual aspect commercial units at ground and mezzanine level; • Fully accessible residential units to be built to South East London Housing Partnership (SELHP) standard; • All residential units to be designed to exceed the dwelling space standards as set out in the Mayor’s Housing SPD (2012) and Southwark’s Residential Design Standards SPD (2011) in line with SP5(4) of the SPD as follows:• opportunities for bulk storage to be provided; • each building to maximise the numbers of dual aspect units - in total 62.3% (min) of units in C2, C3 and C4 to be dual aspect which is policy compliant; - no more than 2.5% of units in C2, C3 & C4 to be single aspect north facing due to construction and design constraints; - facade elements to all units to be entirely glazed, ensuring a highquality environment is achieved for all units, including single aspect units; • each building to exceed the minimum ceiling height of 2.3m in the principal living spaces; • kitchens to be open plan, will receive natural light and ventilation via the living / dining rooms. Bathrooms are internal and will be ventilated using whole house vent systems; • each building to exceed the amenity space standards; • each building to exceed the BRE guidance; • the units to meet Lifetime Homes standards; • corridor lengths minimised as far as possible; • the flat plans to stack so that bedrooms are above bedrooms, lounges above lounges; and • the development to meet CFSH4 and BREEAM excellent. 221 This development has a density of 1,006 habitable rooms per hectare, and therefore standards for the quality of accommodation should be exceed, not merely met. The above criteria, as set out in the Design Specification and Place Making Document submitted with the application for approval, will ensure that at reserved matters stage phase 2&3 will comply with the requirement for a high standard of accommodation and there may be opportunity to further improve this at reserved matters stage where there will be an opportunity to further refine and improve the scheme. 222 In addition to the Design Specification and Place Making criteria set out above, an initial Daylight and Sunlight Assessment has been carried out for all outline phases of the development (buildings C2, C3, C4 & E1). This assessment has been undertaken using a number of assumptions in association with the provided indicative room layouts, and in accordance with the set parameters of the external facades, including the location of balconies, in phases 2&3. These ADF results show that all rooms on the facades of buildings C2, C3, C4 & E1, even when taking the balconies into account for C2, C3 & C4, all will meet an average daylight factor in excess of 2%, which is the recommended level for the highest criteria room use – a kitchen. There is a limited area in building C2, where due to the presence of balconies above, the ADF level is below 2%, but still above 1%, which is the criteria for a bedroom. Therefore the analysis shows that in practice, the BRE minimum criteria for daylight in new developments is achievable in the outline phases, even without set internal layouts at this time. The results of the APSH sunlight facade analysis also shows that most facades will meet the BRE Guidelines for winter sunlight, with full compliance in the tower building C4 and building E1. Buildings C2 & C3 do not meet the BRE criteria for sunlight in all rooms, but this is because of the presence of balconies above, which in themselves provide important access to sunlight for all occupiers as part of the use of their external private amenity space. Therefore this is considered acceptable. 223 Conclusions on quality of accommodation Officers are satisfied that the development meets and generally exceeds minimum residential design standards in phase 1, and provides the appropriate mechanisms for the achievement of minimum standards in later phases through the criteria set out in the Design Specification and Place Making Document submitted for approval. The achievement of these policy standards can also be secured by condition. Overall the proposals satisfy policy requirements. Mix of dwellings 224 General Strategic Policy 7 'Family homes' of the Core Strategy 2011, requires that developments of 10 or more units provide at least 60% 2 or more bedrooms and at least 20% 3, 4 or 5 bedrooms in the urban zone. Saved policy 4.3 'Mix of dwellings' of the Southwark Plan requires all major residential development to provide at least 10% wheelchair accessible units. London Plan (2011) policy 3.5 ‘Quality and design of housing developments seeks the highest quality of housing developments. . CWAAP policy 23 ‘Family homes’ seeks a minimum of 60% of units with two or more bedrooms, a maximum of 5% studio flats and minimum of 20% with 3 or more bedrooms with directly accessible amenity space in the core area. 225 The table below shows the proposed mix of dwellings set out in phase C1 and possible as indicative arrangements for phases 2, 3 and 4. It would be necessary to condition a grant of planning consent to require the delivery of a policy compliant mix of dwellings in the outline phases, at reserved matters stage. Table 8:- Mix of Dwellings by Bedroom Number & Percentage of Phase or Total Phase / Studio 1 bedroom 2 bedroom 3 bedroom 4 bedroom Building 1 / C1 11 (4.7%) 2&3/ C2, C3 & C4* 28 (4.95%) 4 / E1* - Total 39 (3.8%) 70 (29.9%) 106 (45.3%) 174 (30.8%) 237 (41.9%) 92 (39.8%) 91 (39.4%) 336 (31.6%) 434 (42.1%) 41 (17.5%) 6 (2.6%) (65.4% 2+beds) (20.1% 3+beds) 126 (22.3%) 0 (64.2% 2+beds) (22.3% 3+beds) 40 (17.3%) 8 (3.5%) (60.2% 2+beds) (20.1% 3+beds) 207 (20.1%) 14 (1.4%) (63.6% 2+beds) (21.5% 3+beds) *Indicative at this stage The development proposal complies with the required dwelling mix within each phase and as a total of the development. The number of family sized units is policy compliant however it is disappointing that more are not being proposed in the affordable accommodation (Building E1 Phase 2). 226 Wheelchair accessible housing Saved policy 4.3 also requires major residential schemes to deliver 10% wheelchair accessible housing. The table below shows the number of wheelchair units in the proposed development. Table 9:- Wheelchair Units Building / Phase Studio C1 / Phase 1 C2-C4 / Phases 2 and 3 E1 / Phase 4 Total - 1 bedroom 29 11 40 2 bedroom 2 28 29 59 3 bedroom 3 6 9 227 The development proposal includes a total of 106 wheelchair accessible units, amounting to 10.1% of the scheme. Two studio apartments are also being provided as wheelchair units however these have no been counted towards the total. It is unfortunate that each phase does not provide the minimum 10% of units as wheelchair accessible; however it is possible to secure the delivery of wheelchair units across the scheme. Overall the proposed mix of dwellings, including accessible homes, is policy compliant and acceptable in planning terms. Density 228 Policy context Policy 3.4 Optimising Housing Potential of the London Plan states that development should optimise housing output for different types of location within the relevant density range shown in Table 3.2 of the Plan. It also requires local context, the design principles and public transport capacity to be taken into account. Strategic Policy 5 – Providing new homes of the Core Strategy sets out the density ranges that residential and mixed use developments would be expected to meet. This application site is located in the Canada Water Action Area Core, and is identified as an Intensification Area in the London Plan 2011 and therefore in accordance with Strategic Policy 5 density may be higher than the normal range where an exemplary standard of design and quality of accommodation is demonstrated. An assessment of the development proposal against the criteria for excellent living standards as set out in Southwark’s Residential Design Standard SPD 2011, is provided in the ‘Quality of accommodation’ section of this report. 229 Assessment The proposed development has a density of 1,006 habitable rooms per hectare, based upon the calculation method described in saved Appendix 2 of the Southwark Plan. This density is in excess of the Urban Density range described for this area, which is expected to be between 200-700 habitable rooms per hectare. The application proposes buildings of a scale, height and quantum that greatly exceed the expectation set out in the designations CWAAP 7 & 8 (2012). Policy 24 states that the only exceptions to the above density range are when development has an exemplary standard. The density of a development should respond to the location, context and the index of public transport accessibility level (PTAL) with higher density development being more acceptable in areas with excellent access to all forms of public transport. The application site has a PTAL rating of 6a, which indicates the highest level of accessibility to public transport, therefore densities in the upper end of the range would be expected. The site is also located in a town centre where higher density development would be considered appropriate. The site is identified as an intensification area in The London Plan 2011 and the growth in housing is not considered to harm the surrounding context or the amenity of existing residents. The existing infrastructure is capable of accommodating the growth in housing and retail and the S106 Agreement includes provision for funding to expand capacity. 230 The quantum of development is accommodated on the site in a series of taller buildings, largely made up of commercial ground floors with residential flats above. This allows a generous proportion of the site to be given over to public routes and a new public space in the form of a central lawn. Therefore while the development proposes a higher density of accommodation, this is well balanced with the provision of open space located throughout the site. Whilst it is acknowledged that there will be an impact on the townscape of the area as a result of the taller buildings, at ground level the openness created within the site will help the proposal to contextualise with the wider open spaces around the area and the Basin itself. Officers are therefore satisfied that a density of this level can be accommodated on the site, provided the quality of accommodation is of an exemplary standard in accordance with Strategic Policy 5, as detailed in the ‘Quality of accommodation section’ above. Affordable Housing 240 Policy context The NPPF adopted in March 2012 states that local planning authorities should set policies for affordable housing need on site, unless off-site provision or a financial contribution of broadly equivalent value can be robustly justified and the agreed approach contributes to the objective of creating mixed and balanced communities. Such policies should be sufficiently flexible to take account of changing market conditions over time. 241 The regional policies and guidance relating to affordable housing are set out in the London Plan and the Mayor’s housing supplementary planning guidance (2012). The London Plan forms part of the development plan for Southwark. The key relevant policies within the London Plan in relation to this aspect of the application are: 242 Policy 3.8 Housing choice - The policy requires boroughs to take account of housing requirements and identify the range of needs likely to arise. It sets out a number of factors to take into account including to ensure that: • new developments offer a range of housing choices • provision of affordable family housing 243 Policy 3.12 Negotiating affordable housing on individual private residential and mixed use schemes. Part A of the policy requires that the maximum reasonable amount of affordable housing should be sought with regard to a number of factors including: • current and future requirements for affordable housing • the need to encourage rather than restrain development • the need to promote mixed and balanced communities • the specific circumstances of individual sites • resources available to fund affordable housing, to maximise affordable housing output and the investment criteria set by the Mayor • the priority to be accorded to provision of affordable family housing 244 Part B of the policy sets out that negotiations on sites should take account of their individual circumstances including development viability. 245 The Mayor’s Housing supplementary planning guidance (SPG) (2012) provides further guidance on implementing the London Plan housing policies. 246 The local policies are saved Southwark Plan Policy 4.4 Affordable housing, and Core Strategy Strategic Policy 6 – Homes for people on different incomes Further guidance on how to implement the policies is contained within the Council’s adopted Affordable Housing SPD 2008 and draft Affordable Housing SPD 2011. 247 Core Strategy Strategic Policy 6 'Homes for people on different incomes' requires as much “affordable housing on developments of 10 or more units as is financially viable”. It also sets a minimum target of 8,558 net affordable homes between 2011 and 2026. It requires a minimum of 35% of affordable housing on developments with 10 or more units. Saved Southwark Plan Policy 4.4: Affordable housing, is used alongside the overarching Core Strategy policy 6. 248 The Council’s adopted Affordable Housing SPD 2008 (Section 3.6) together with the draft Affordable Housing SPD 2011 (section 6.3) clarifies the Southwark Plan and Core Strategy policy framework and sets out the approach in relation to securing the maximum level of affordable housing from developments 249 Strategic policy 6 'Homes for people on different incomes' of the Core Strategy 2011 requires a minimum of 35% affordable housing within the action areas in the borough. The application site is located within the Canada Water Action Area and as such it is expected for the development to secure 35% of the development as affordable, calculated on a habitable room basis. The affordable housing should then be split between social rent (70%) and intermediate (30%) units: see policy 22 of the adopted AAP. 250 Strategic policy 6 of the Core Strategy and policy 22 of the AAP require the provision of 875 affordable homes in the Canada Water Action Area between 2011 and 2026. The draft Affordable Housing Supplementary Planning Document gives guidance on how to calculate the level of affordable housing a development provides. It describes the habitable room calculation for affordable housing purposes, which takes into account an additional habitable room where the size of a room is 27.5sqm or more. Saved policy 4.5 'Wheelchair affordable housing' of the Southwark Plan, also states that for every affordable housing unit which complies with the wheelchair design standards, one less affordable habitable room will be required. 251 Assessment The applicant is currently unable to provide the minimum of 35% affordable housing on the basis that financial viability will not accommodate this provision. In order to support this, the applicant has submitted a comprehensive financial viability appraisal which has been reviewed on behalf of the Council by the District Valuers Service (DVS). The initial offer of was considered unacceptable by the DVS and further negotiations and modeling allowed the offer to be increased slightly which again was not supported by the DVS. Detailed negotiations and revisions to the model and review mechanisms has resulted in an improved offer of 22.5% which is considered by the DVS to be the highest amount of affordable housing that can viably be delivered on site without compromising the deliverability of the scheme. 252 The viability report included reference to outstanding costs incurred by the applicant in bringing the proposed development forward. The applicant has had substantial land acquisition costs and together with the need to meet the requirements of Decathlon by decanting them from the existing site to allow them to continue trading during the construction of Phase 1 and then re-install them in the new retail unit has also added significant costs and these have been accepted by the DVS as part of the viability assessment. 253 In terms of affordable housing, all affordable provision will be provided in building E1, which has now been brought forward to Phase 2 of the development. The applicant is providing a total of 22.5% affordable housing which will equate to 711 habitable rooms (approximately 231 units). 254 The affordable housing offer can be broken down as follows: Affordable Rent Social Rent Shared Ownership (Southwark Affordability Criteria) Shared Total Ownership (GLA Affordability Criteria) 13 92 1 Bed 64 0 15 2 Bed 64 0 13 14 91 3 Bed - 28 6 6 40 4 Bed - 6 1 1 8 Total 128 34 35 34 231 255 In terms of affordable rent the rents will either be capped at 60% of market rents or they will be in line with Local Housing Allowance figures, whichever is the lowest. The applicant has submitted a viability report seeking to demonstrate that the proposed development cannot support any more affordable housing. This has been reviewed by the DVS and whilst there are some differences of opinion over certain elements of the assessment, the DVS conclude that 22.5% is the maximum the development can provide on the condition that E1 be brought forward to Phase 2 allowing the development to be front loaded. 256 Whilst each site should be required to make a fair and reasonable contribution to affordable housing in accordance with adopted policy, the DVS has advised that no more affordable housing could be provided. No affordable housing is being provided on Phase 1; instead all affordable housing is being brought forward to Building E1 in Phase 2 as this front loading of the development would have a positive impact on cost flows and in turn viability, allowing a higher level of affordable housing to be secured than was initially offered. As detailed in the table above the social rented housing is all 3 and 4 bedroom units with all affordable rent units being 1 and 2 bedrooms. The affordable rent units have been secured at 60% of Market Rent or Local Housing Allowance whichever is the lower. Market rent in the SE16 area is currently £192 for a 1 bed unit and £225 for a 2 bed unit (at 60% of market rent) whilst Local Housing Allowance is £188 for a one bed unit and £245 for a 2 bed unit. 257 The review mechanism has to be robust and effective. It has been established that C1 would be constructed as the first phase in order to accommodate Decathlon and will not contain any affordable housing. In the event that building C1 is not substantially commenced within 3 years of the date of the permission, then the entire scheme would be reviewed. 258 Further appraisals are to be linked to construction rather than submission of reserved matters applications and the reviews will be time limited to 12 months; if construction of the relevant building (rather than phase) has not commenced within that period then a further appraisal would be needed. As such, C2, C3 and C4 would each be treated separately in the event they are not constructed simultaneously. 259 The review mechanisms are in place in order to secure the remaining shortfall in affordable housing (currently 12.5%) as a commuted sum should land/property values continue to increase over the course of the development period. This will allow the Council to capture any increase in value as a commuted sum towards affordable housing provision. 12.5% equates to 395 habitable rooms and using the standard calculation of £100,000 per affordable habitable room, this would equate to a maximum commuted sum of £39,500,000. This would result in a proportion of affordable housing being provided off-site however it would provide the full policy compliant quantum of affordable housing with the greater majority of it (22.5%) being provided on site. 260 Members are being asked to approve the scheme with a review mechanism which, if it is triggered, will provide a commuted sum for the delivery of further affordable housing elsewhere. This is being recommended as the viability appraisal relies upon the fact that there is no affordable housing in later phases of the development. Introducing an element of affordable housing into these later phases would have impacts on the viability assumptions which allow for the delivery of 22.5% affordable housing on site as is proposed in advance of any possible review 261 Conclusions on affordable housing and viability It is appreciated that the inability to provide a policy compliant 35% affordable housing is contrary to AAP policy, particularly given the scale of the current proposals. The viability appraisal submitted with the application outlines that a policy compliant affordable provision would make the scheme unviable and the provision of 22.5% affordable housing can be achieved through bringing the affordable housing phase forward to Phase 2, thereby frontloading the development. This conclusion has been carefully considered by the DVS who are of the opinion that 22.5% is the maximum that can be achieved on this site without compromising the deliverability of the scheme. In this respect the proposals are consistent with the general policy objectives. 262 The need to accommodate the requirements of Decathlon have added substantial costs to the development which in turn has had an impact on financial viability and the ability to provide affordable housing. Decathlon benefit from a lease until 2028 and any scheme that comes forward on this site prior to the lease expiring will need to accommodate the needs of Decathlon and, given the benefit in maintaining their presence on the site, bear the costs of accommodating them as part of any proposals. In this case this has meant delivering a necessary quantum of car parking and an acceptable layout/size of unit with acceptable acquisition terms. 263 The retention of Decathlon on site is considered a benefit to the creation of a Major Town Centre as they will, as an established retailer, become the anchor within an extended and improved retail unit and will encourage other retail tenants to the area, as part of a deliverable scheme that will provide a substantial number of homes as part of the beneficial regeneration of the area. In this case the provision of 22.5% affordable housing, supported by the DVS, is considered on balance to be acceptable. If Members consider that the longer term aspiration of creating a Major Town Centre in Canada Water and that the wider benefits that could ensue from these proposals is a key priority for the area, then in this instance a lower level of affordable housing on the site could be accepted as the proposal will be a major driver of the Canada Water regeneration. Landscaping 264 Policy London Plan Policy 7.21 ‘Trees and Woodlands’ states that through planning decisions, trees of value should be retained and any lost as the result of development should be replaced following the principle of ‘right place, right tree’ and that wherever appropriate, the planting of additional trees should be included in new developments, particularly large-canopied species. The London Plan also advises that the assessment of trees should be undertaken using a combination of amenity assessment (BS5837) and a recognised tree valuation method (CAVAT or i-tree) that also takes into account social, economic and environmental factors. Southwark’s policies also recognise the importance of trees, with Core Strategy policy 11 ‘Open spaces and wildlife’ stating that through development the protection of woodland and trees will be undertaken, improving the overall greenness of places. Policy 11 also identifies that development is required to avoid harm to protected and priority plants and animals, to help improve and create habitat. Saved Southwark Plan policy 3.28 ‘Biodiversity’ also confirms that in the determination of all planning applications the local planning authority will take into account biodiversity and encourage the inclusion in developments features which enhance biodiversity. 265 The Canada Water Area Action Plan 2012 includes Policy 18: ‘Open spaces and biodiversity’ sets out the strategy in the Canada Water area to protect, maintain and enhance a network of open spaces, green corridors and habitat for wildlife. In the Core Area where the application site is located, development must:- Provide a high quality of public open spaces. These should have a variety of functions, which could include a market, children’s play areas, performance space, ecological and learning areas, places to sit, relax and take part in recreational activities such as fishing; - Provide safe, direct and attractive pedestrian and cycle routes to connect open spaces and help link into the surrounding network; - Improve the overall greenness of the area, through planting street trees, creating living roofs and walls and providing habitats for wildlife which increase biodiversity. 266 Existing trees; A Tree Survey and Arboricultural Impact assessment has been submitted with the application. This identifies the dominant tree species to be found existing on the site as London Plane, Crack Willow and Common Horse Chestnut. In total 93 trees plus 7 groups were surveyed of varying maturity and quality. Tree groups are defined as self seeded and contain many small trees. Hence they were not counted individually as they may be within dense undergrowth, too young or a low category in terms of value, or a combination of these. In the revised submission, the applicant makes clear that those trees intended for transplantation, are counted as removed, in order to account for the possibility that transplantation may not be successful in practice – this is in accordance with the advice provided by council officers. The tables below provide a breakdown of the trees to be removed and retained on the site as a result of the development. 267 Table 11 (a):- Trees to be removed to facilitate the development Trees Removed Girth Size Total Plane Trees on Surrey Young & semi-mature 25 Quays Road (11.5-40cm girth) Albion Channel Semi-mature to mature 14 (22-48cm girth) Other Young to semi-mature 35 Groups Young 7 groups Total trees removed 74 Total trees removed: 74 individual trees plus 7 groups. Table 11 (b):- Trees to be retained Existing trees retained Girth size Total Plane Trees Surrey Young to semi-mature 16 Quays Road (15.5-35cm girth size) Total trees retained 16 268 A total of 74 individual trees and tree groups require removal in order to facilitate development. These trees were planted in the mid 1980’s as part of that phase of the redevelopment of Canada Water. None of the trees on site are subject to a Tree Preservation Order. Of these at least 32 are category B trees, the rest being category C or R, and none are categorised as the highest quality (A) which would have merited redesign to ensure retention. The trees earmarked for removal are required in order to enable development and are not of a high enough quality to retain. As such it is considered that comprehensive replanting is an acceptable approach. Given the difficulty in successfully removing and re-establishing substantially sized trees in hard surfacing, it is unlikely that the plan for transplanting will be feasible, therefore new planting represents an improved strategy. 269 Proposed landscaping and tree planting It is proposed to provide replacement tree planting for all trees removed, as well as additional tree planting to mitigate the loss of trees on the site. The tables below provide a breakdown of trees to be planted, and explains the net gain of trees after implementation of all phases on the site. 270 Table 12 (a):- Trees to be planted Trees Proposed Girth Size Total 14 Plane Trees Surrey Quays All proposed to be semiRoad mature (min 35cm girth size) Street Alignment (species 16 to be agreed) 19 E1 alignment (species to be agreed) Lawn Feature Trees 22 Green Link 3 Feature Clumps (Pine 28 Trees) Albion Channel Young to semi mature based 9 on species selection Total Proposed 111 271 Table 12 (b):- Final landscaping strategy net tree gain Total number of individual trees on site 127 (after implementation of all phases) Net gain of trees on site (after 57 implementation of all phases) 272 Landscaping includes a total of 111 new specimen trees at grade which adequately replaces the existing trees lost as a result of the development taking the total number of trees on site to 127 (including the 16 retained trees). In addition to this, there are 272 small to medium trees proposed within the Courtyard at C1, and 12 at the top of the C4 tower. Of the replacement trees at grade, nine are located on the Albion Channel and 14 on Surrey Quays Road, with the rest located throughout the site, above the basement level. The proposed tree planting will provide a net gain in tree numbers and volume. In order to ensure that the type and quality of landscaping aspired to, is sustainable, it needs to achieve a reasonable level of maturity and longevity. This requires ample soil, water and exploitable rooting volumes which, in turn, will rely on sufficient weight loading above the basement level, as well as maintenance and other engineering tolerances to be considered at an early stage within the design process. Tree pit sections are therefore required to show a greater plant depth, than currently illustrated. In order for the tree planting to be sustainable where tree planting is above basements and within hardscape, greater volumes of exploitable soil need to be specified including load bearing cellular confinement systems, and tree grills will not be acceptable. Details of this can be secured through conditions. 273 In policy terms the replacement of existing trees, as part of a comprehensive landscaping scheme that will ensure substantial areas around the basin are given over to public space, is considered acceptable and is supported by officers. Ecology and biodiversity 274 The submitted ES includes an assessment of potential impacts as a result of the development upon ecology and biodiversity in the area. The site is located adjacent to the Canada Water Basin, a designated Site of Importance to Nature Conservation (SINC) surrounded by densely planted green edges on one side, designated as protected Borough Open Land. Therefore key potential impacts receptors have been identified as the Canada Water Basin SINC, breeding / nesting birds, wintering birds and bats. 275 The development does have the potential to cause dust and disturbance during construction that would adversely impact birds. However measures will be incorporated to reduce potential impacts, in the interest of surrounding residents, and therefore birds will also be provided with some protection. There is also surrounding nesting and suitable bird habitat within 500m of the site, at Greenland Dock and Russia Dock Woodland. Conditions are also recommended by the Councils Ecology Officer to reduce impacts and off-set negative impacts upon biodiversity in the area. Overall, the impacts during construction would be temporary, and the final development will incorporate measures to improve biodiversity permanently here. 276 In relation to bats, there is no record of bats roosting on the site, but bats are known to be in the surrounding area. During construction, lighting could change foraging behaviour, but given the close proximity of surrounding alternative habitat impacts are likely to be negligible. During construction, measures will also need to be in place to prevent adverse impact to fish within the Basin, and this can be secured by condition. 277 Measures are included within the design of the proposed development to improve the biodiversity value of the scheme, and mitigate negative impacts, measures consist of the following:- Habitat loss has been mitigated through new planting and landscaping across the development, including roof gardens, biodiverse roofs and a species rich lawn; - The proposed development has been designed to avoid impacting on the vegetation on the western side of Canada Water which is habitat for waterfowl, birds and other wildlife. The proposals include like for like aquatic planting to replace any aquatic vegetation removed (as a result of the new steps from the public realm into the water); - Landscaping design includes replanting of trees removed; - A range of facade treatments on buildings and avoidance of large expanses of uninterrupted plate glass has been incorporated into building designs to reduce risk of bird strike; and - The lighting proposals aim to limit light pollution around Canada Water and avoid directing light at the dock edge and water. 278 The existing site condition is largely comprised of car parking areas and large retail warehouse sheds, which have little value in terms of supporting a wide range of species. The proposed development will include a new public space with lawn and wildflower planting, biodiverse roofs and food growing areas, tree planting to generate a net gain in tree numbers and enhancement of green links to Greenland Dock. Coupled with conditions to require additional features such as bird and bat boxes in the development, and mitigation of impacts during construction, officers are satisfied that the development will not generate any significant permanent adverse impacts upon ecology and biodiversity in the area, and that the proposed development offers opportunity to enhance biodiversity in the area. 279 The issue of Ecology was considered as part of the Environmental Statement which concludes that the residual effects to the ecology within and surrounding the proposed development are unlikely to have significant effects on the designation of sites of importance surrounding the proposed development or protected species. Landscaping and other ecology enhancements will result in a long term beneficial residual effect. This view is supported by officers. Planning obligations (S.106 undertaking or agreement) 280 Saved policy 2.5 of the Southwark Plan and Policy 8.2 of the London Plan advise that planning obligations should be secured to overcome the negative impacts of a generally acceptable proposal. Saved policy 2.5 of the Southwark Plan is reinforced by the Supplementary Planning Document (SPD) on Section 106 Planning Obligations, which sets out in detail the type of development that qualifies for planning obligations. The Community Infrastructure Levy Regulations provide at regulation 122 that for a planning obligation to be lawfully taken into account when determining a planning application for a development, or any part of a development, that is capable of being charged CIL, the obligation must be: - necessary to make the development acceptable in planning terms; - directly related to the development; and - fairly and reasonably related in scale and kind to the development and in accordance with the NPPF. 281 The table below demonstrates the standard contributions generated from the Supplementary Planning Documents s106 toolkit and the contributions proposed by the applicant: Table 13:- Planning obligations; Planning Obligation Amount of planning gain Amount of planning gain calculated by toolkit (£) agreed by applicant (£) Education Employment in the Development Employment During Construction Employment During Construction Management Fee Public Open Space Children’s Play Equipment Sports Development Transport (Strategic) Transport (Site Specific) Transport for London Public Realm Health Archaeology Community Facilities Admin Fee Total 1,368,243 274,314 1,368,243 274,314 1,061,233 1,061,233 83,169 83,169 335,133 133,971 1,208,511 1,481,291* 794,678 330,000 1,051,578 1,162,762 16,135 177,378 124,784 9,603,180 335,133 133,971 1,208,511 1,481,291* 794,678 330,000 1,051,578 1,162,762 16,135 177,378 124,784 9,603,180 * Based on uplift in retail space. These figures are broadly indicative and may be subject to change further to negotiations with the applicant relating directly to the outline and mix which is subject to refinement. 282 A contribution towards education provision in Southwark is required as part of the development, in order to cover the capital cost of providing new school places required as a direct result of a proposed development. Without appropriate mitigation of the impacts from residential development upon education, schools will be put under undue pressure and reduce the ability of the Local Education Authority (LEA) to fulfill its statutory function, which will be unacceptable in planning terms. The Council is currently looking at options for new schools in the area. The applicant has agreed to pay the sum required under the section 106 SPD toolkit. 283 High levels of unemployment, low incomes and deprivation persist in the borough because of certain barriers to employment that people experience, most notably the lack of skills that are required in the jobs market. Reducing deprivation is an essential part of developing socially sustainable communities, especially in growing and intensifying communities. Sourcing local labor, and reducing the need to travel is a fundamental part of creating of sustainable communities, and delivering the objectives of the London and Southwark Plans. The WPC contribution would secure the cost of providing a WPC to assist in the placement of unemployed jobseekers from the local area into jobs within the final development either through an existing WPC programme, or through setting up a new programme to target the employment sector of the final development. The applicant has agreed to pay the sum required under the S106 toolkit. 284 Residents in the Borough require access to primary healthcare; they will need to use local PCT GP clinics, and acute and mental services which will directly impact on demand for existing services. Standard charges apply to mitigate the additional demand as per the S106 Planning Obligations SPD and the applicant has agreed to pay the sum required under the S106 toolkit. 285 Strategic Transport contributions are sought for improvements to the Lower Road Gyratory which is in close proximity to the site. Improvements are also sought to increase the capacity of public transport provision across the borough, through the delivery of the Local Implementation Plan (LIP). The transport measures sought through the LIP include the facilitation of major public transport infrastructure projects, bus network improvements, road safety education, training and publicity, extension and improvement of the strategic cycle network, travel awareness publicity and events, continuing development of the freight quality partnership, road safety and speed reduction environmental measures, walking and cycling improvements, interchange accessibility improvements and controlled parking zones. The applicant has agreed to pay the sum required under the S106 toolkit and CWAAP. 286 The Council has a team of project and monitoring officers who ensure a consistent and fair approach to the monitoring and delivery of planning obligations. The charge collected is 2% of the monetary contributions up to £3m to be provided under S106 agreement and 1% above £3m. This is set out in the Council’s SPD and is an essential part of the ensuring the delivery of the Council’s strategy on contributions from new developments as reflected in the SPD. 287 It is the opinion of the Council that the planning obligations sought meet NPPF guidance. The contributions would be spent on delivering new school places as a result of the development, job creation during construction and in the final development, improvements to open spaces and sports facilities, improvements to increase the capacity of transport provision across the borough, improvements to the public realm, new health facilities and improvements to community facilities. These are necessary in planning terms, directly related to the development and fairly and reasonably related to the impacts of the development. The S106 Agreement includes provisions for public access to the roof garden of Building C4, public access to the Dry Dock, public use of the MUGA in Building C1 and the use of the Decathlon car parking for other Town Centre users. In addition to the financial contributions outlined above, the applicant is also offering the following sums towards the following projects identified by Friends of Russia Dock Woodlands: pathways resurfacing (£100,000); solar panels (£30,000); wind turbine (£25,000) and weirs (£10,000). These contributions were offered by the applicant during their consultation exercise, and are outside of the normal toolkit provisions. Since the projects are not specifically listed in the local Project Bank, and have not been subject to feasibility testing or costing by the Council, then it would not be appropriate to fund them from within the toolkit sums. They are however included within the S106 agreement in order to ensure that the monies are secured and the projects then developed. The application is also CIL liable for 129,304 sqm of floorspace resulting in a Mayoral CIL charge of £4,525,640. 288 In the absence of a legal agreement being completed by 14 January 2013, the applicant would have failed to adequately mitigate against the impacts of the development and, in accordance with Article 22 of the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2003, it is recommended that the application be refused for the following reasons: 289 1. The development fails to adequately mitigate against the adverse impacts of the development in accordance with London Plan policy 8.1 - Implementation, Policy 8.2 Planning obligations, Southwark Plan saved policy 2.5 - Planning Obligations, Core Strategy policy 14 - Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). 290 2. The development fails to contribute towards increasing accessibility to employment through training and other schemes in accordance with London Plan policy 3.1 Ensuring equal life chances for all, Southwark Plan saved policies 1.1 - Access to Employment Opportunities and 2.5 - Planning Obligations, Core Strategy policy 14 Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). 291 3. The development fails to contribute towards increasing the quality and quantity of open spaces and associated facilities in accordance with London Plan policy 2.18 Green infrastructure: the network of open and green spaces , Southwark Plan saved policies 2.5 - Planning Obligations and 3.2 - Protection of Amenity, Core Strategy policies 13 - High environmental standards and 14 - Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). 292 4. The development fails to contribute towards increasing the capacity of public transport provision and improving accessibility to the development in accordance with London Plan policy 6.4 - Enhancing London’s transport connectivity, Southwark Plan policies 2.5 ‘Planning Obligations’ and 5.2 ‘Transport Impacts’, Core Strategy policies 2 - Sustainable transport and 14 - Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). 293 5. The development fails to contribute towards increasing the quantity of health facilities in accordance with London Plan policy 3.2 - Improving health and addressing health inequalities and policy 3.16 - Protection and enhancement of social infrastructure, Southwark Plan saved policy 2.5 - Planning Obligations, Core Strategy policy 14 - Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). 294 6. The development fails to contribute towards increasing the quality and quantity of community and leisure facilities, in accordance with London Plan policy 3.2 - Improving health and addressing health inequalities and policy 3.16 - Protection and enhancement of social infrastructure, Southwark Plan saved policy 2.5 - Planning Obligations, Core Strategy policy 14 - Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). 295 7. The development fails to contribute towards the provision of affordable housing in accordance with London Plan policies 3.11 - Affordable housing targets, Southwark Plan policies 2.5 - Planning Obligations and 4.4 - Affordable Housing, Core Strategy policies 6 - Homes for people on different incomes and 14 - Implementation and delivery and the Section 106 Planning Obligations Supplementary Planning Document (July 2007). Socio economics 296 The National Planning Policy Framework (NPPF) 2012 sets out the government’s commitment to ensuring that the planning system supports and encourages sustainable growth and development. The social and economic dimension of sustainable development can be broken down into 4 broad themes:Building a strong, competitive economy; Delivering a wide choice of high quality homes; Ensuring the vitality of town centres; and Promoting healthy communities. 297 Policies in the London Plan, Southwark Plan and Canada Water Area Action Plan also support the strategy for sustainable growth in London, and specifically the Canada Water area as an opportunity area for growth. Taking each of the above themes in turn, the impacts of this development upon socio-economics is assessed in more detail below. 298 Building a strong, competitive economy Southwark’s Economic Development Strategy (2010) explains that there are high levels of economic inactivity, and a large number of benefit claimants in Southwark. The borough remains the second most deprived borough in London for employment, with a higher percentage of persons on state benefit, unemployed or with lowest grade work when compared to the England average. 299 The vision for the regeneration of the Canada Water Area set out in the CWAAP includes the objective to create more local employment opportunities. Southwark’s strategic economic development priorities are to build sustainable, inclusive and prosperous communities by reducing worklessness and sustaining high quality employment for all residents. 300 During construction, it is estimated that the development will support 418 full time equivalent construction jobs. The proposed development will also generate a number of indirect economic benefits including the purchase of local goods for use in construction and the spending of staff and visitors during the construction phase at nearby retail units. 301 During the operational phase of the development, commercial tenants will contribute to the local economy through the creation of new long-term employment opportunities. It is estimated that approximately 194 new jobs will be created post construction during the operational phases of the development. Overall the significance of this effect is concluded to be moderate beneficial in the submitted ES. In addition to this, the proposed development is estimated to create £15 million annually in household spending, which may not all be spent in the Canada Water area, but it can be expected that a high proportion of spending will be in Southwark. 302 Delivering a wide choice of high quality homes Both the Rotherhithe and Surrey Docks wards have a mix of housing tenures, with a higher proportion of homes that are houses and / or affordable in the Rotherhithe ward. There is need for more affordable housing in the area, as currently the price of an average property is around 8 times the average earnings of someone working fulltime in Southwark (Annual Survey of Hours and Earning national Statistics and HM Land Registry). 303 The CWAAP sets out the expectation for a net increase of 2,500 new homes in the area, with policies in both the Core Strategy and CWAAP requiring 35% of these homes to be affordable. 304 The proposed development will provide a significant contribution to the achievement of these housing targets by providing approximately 1,000 new homes, with a mix of bedroom number. The proposed development would deliver the required 20+% of larger family size units in each phases and across the development as a whole, whilst also providing 60+% of units with 2 or more bedrooms. The number of affordable homes to be delivered would amount to 22.5% of the scheme, and in light of the current economic climate and the assessment of viability in this scheme (discussed in more detail in the affordable housing section of this report), the overall number of homes, family sized homes and affordable homes to be delivered in the development is acceptable. 305 Ensuring the vitality of town centres The existing Surrey Quays shopping centre was built in 1988 and sits alongside the Decathlon retail shed. The town centre area is currently dominated by parking, which gives an out of centre character to the area. Existing retail and leisure sites in the area are identified in the CWAAP as development opportunity areas, indicating the need to up grade existing facilities and the opportunity to intensify and diversify the uses. 306 Strategic Policy 3 of the Core Strategy seeks the expansion of retail space within Canada Water and confirms that Canada Water will become a Major Town Centre. The CWAAP sets out development designations that estimate the provision of around 35,000sqm of additional shopping space and increased leisure space creating a range of retail opportunities. 307 The proposed development supports the creation of retail provision, including waterside restaurant and case outlets increasing the amount of active retail frontage in the area. The quantum of retail floorspace would largely be dominated by the provision of a new Decathlon store and would represent a contribution to the achievement of additional shopping space envisaged in the CWAAP. 308 Promoting healthy communities There are 10 GP practices within 1 mile of the proposed development, with 9 of these accepting new patients. There are a number of hospitals located within 5 miles of the site. 309 The CWAAP sets out the plan to regenerate the area around Canada Water, with a vision to provide more and enhanced educational, health and community facilities which meet the needs of the growing population. 310 During construction, there are likely to be effects associated with vehicle and plant movements resulting in changes to air quality, however with the employment of mitigation measures to reduce the effect of the development on local people, effect upon the health of existing local residents, is concluded within the ES to be of slight to moderate adverse significance and temporary in nature. 311 New open spaces, play areas, sports facilities, planted spaces and green links through the site will have a beneficial, long term permanent effect on the provision of recreational opportunities for local residents which in turn are likely to generate associated health benefits. The proposed development includes opportunity for a new health centre, which could provide services to new and existing neighbouring residents. The health centre is a possible use in building E1, and as such would be delivered Phase 2, and as a flexible space, this delivery of the health centre cannot be assumed as a definite outcome of the development. Overall the impact on healthcare provision, given existing capacity in the area, is concluded in the submitted ES to be negligible; changing to moderate beneficial should the healthcare centre be delivered as part of the development. 312 Conclusion on Socio-Economics Overall, Officers agree with the conclusions of the submitted ES, and consider that the impact of the development upon principle social and economic factors is expected to be beneficial and in compliance with planning policy The development would support the Town Centre by providing additional and high quality retail and leisure floorspace, with provision for new public open spaces and the generation of jobs both during the construction and operation phases of the development. The provision of new homes would also be a significant contribution to meeting Southwark’s housing targets. Ground Conditions and Contamination 313 On the site, as well as adjacent to the site, there is potential for historical and industrial land uses that have generated contamination, including timber ponds, docks, dockyards, timber sheds, land reclamation with unknown materials (including infilled docks), depots, warehouses, a whitelead, sulphur and saltpetre works, tram and rail lines and printing works. 314 Site investigation works will identify potential contaminates and suggest appropriate mitigation, both during the construction and operational phases of the development. Controlled working practices during construction, including the appropriate storage of materials, will reduce potential exposure of construction workers to contamination. During site investigation, if contaminated land is discovered, measures for either the removal or treatment of the contaminated land will be explored, reducing the risk of exposure to future residents or visitors to the site. These measures should be secured by condition to ensure that appropriate mitigation is in place to respond to the discovery of contaminants on the site. Environment and Sustainability 315 Policies 5.2, 5.3, and 5.7 in The London Plan 2011 outline the measures that the Mayor expects developments to incorporate as part of the sustainable design and construction of energy efficient development schemes. In the consideration of energy efficient measures, application proposals should apply the Mayors Energy Hierarchy, using passive design and energy efficient measures to reduce heating and cooling loads, and feasibility assessments for low and zero carbon energy systems described in the London Renewable 'Toolkit'. Policy 5.6 ‘Decentralised energy in development proposals’ states that development proposals should evaluate the feasibility of Combined Heat and Power (CHP) systems, and where a new CHP system is appropriate, also examine opportunities to extend the system beyond the site boundary to adjacent sites. The London Plan also encourages developers to investigate opportunities to incorporate energy from waste, or where technically feasible, renewable energy in developments. In addition to this, where a district CHP system provides part of a developments power and / or heating and / or cooling demand, suitable renewable energy technologies should also be considered in addition to the CHP system. 316 Southwark’s Core Strategy sets out the approach to achieving sustainable development in the borough in Strategic Policy 1, describing that development will be supported if it meets the needs of Southwark’s population in a way that respects the limits of the planet’s resources and protects the environment. Strategic Policy 13 ‘High environmental standards’ then sets out how this can be achieved, by requiring development to meet the following targets relating to Code for Sustainable Homes, BREEAM, renewable energy, CHP and surface water run-off. 317 The Canada Water Area Action Plan 2012 sets out in policy 20: ‘Energy’ the strategy to establish a district heating system to serve both new and existing development. To facilitate this, a strategic district heating area (SDHA) has been designated around the core of the AAP area, which includes the application site. Development located in the SDHA should be future proofed and designed for connection to the district heating network. Southwark’s Sustainable Design and Construction Supplementary Planning Document also provides further guidance on how to incorporate sustainable design and construction methods into development. 318 The National Planning Policy Framework (NPPF) sets out that the purpose of the planning system is to contribute towards the achievement of sustainable development. Sustainable development is described as consisting of three broad dimensions, economic, social and environmental. In relation to environmental implications of development, section 10 ‘Meeting the challenge of climate change, flooding and coastal change’ describes the key role that planning has in securing radical reductions in greenhouse emissions, providing resilience to the impacts of climate change and supporting the delivery of renewable and low carbon energy and associated infrastructure. 319 The development proposes the inclusion of phased CHP units and integrated thermal storage to serve residents annual energy demand, and provide the carbon savings required by the London Plan and Southwark Plan. The Energy Strategy Addendum has been submitted as part of the revised application, and explains how the phased implementation of CHP systems on the site can maximise carbon savings across the development as a whole. 320 At the completion of Phase 1 Building C1, temporary gas boilers will be put in place to serve the development, prior to the initial CHP unit being included as part of Phase 2 to serve both residents of Phases 1 and 2. The temporary gas boilers will then be demoted to backup boilers at the completion of the Phase 2 Buildings C2, C3 & C4. At the point that Building E1 is completed (currently envisaged as Phase 2), the second CHP unit will be commissioned to serve the whole development, this will be through a thermal storage system that has increased capacity in conjunction with the addition of CHP capacity. Through the integrated thermal store / CHP arrangement, it is anticipated that after completion there will be a saving of 15.9% carbon dioxide emissions. 321 It is also proposed to include Photovoltaic Panels, to reduce carbon emissions by a further 5% from the development, and these will be located in all phases on the roofs of buildings C1, C2 and E1. In conjunction with passive measures, CHP and PVs, the overall reduction in carbon dioxide emissions will be by 29.6%. This is in excess of the required reduction in carbon set down in London Plan policies. While the proportion of this carbon saving from renewable energy is less than the required 20% set out in Strategic Policy 13, officers are satisfied that the only practical solution for the development is the incorporation of photovoltaics, which through the provision of electricity combines well with the CHP solution, and would not double up heat generation for the site. The incorporation of Biomass boilers in the CHP system has been investigated; however the incorporation of a biomass system would make the boiler less efficient, with an increased particle emission impacting air quality, and an increased maintenance regime. 322 Both the Canada Water Action Plan and London Plan, ask developments to be designed to allow future connections to district wide energy networks. The incorporation of a site with CHP solution will go some why to achieving this aim. It is also recommended that the legal agreement include provisions to require further investigation and, if feasible, connection to an area wide South East London CHP District Heat Network (SELCHP). The energy centre to be included within the proposed development can be designed to accommodate the potential for future connection to the SELCHP should it become a feasible option. 323 The residential element of the development has been designed to achieve a minimum Code for Sustainable Homes Level (CSH) 4, and the commercial elements are expected to achieve BREEAM ‘excellent’, while community uses are required to achieve a minimum BREEAM ‘very good’ level. The requirement to achieve these minimum CSH and BREEAM levels should be secured by condition. 324 Water resources and Flood Risk The development will require connection to existing water facilities, and in consultation with Thames Water, it has been confirmed that capacity exists for the development. The developer will need to continue to liaise with Thames Water regarding water supply, and an informative is suggested that can be included on the decision notice relating to this. Thames Water have also confirmed that a drainage strategy is required to investigate how waste water from the development will be dealt with, and conditions can be used to secure the submission of this for Planning Authority approval in consultation with Thames Water. 325 A site specific flood risk assessment has been undertaken for the development. This investigates the potential for flood risk, and how flood mitigation measures can be incorporated into the scheme to respond to this. The Environment Agency has confirmed that through the securing of these measures by way of condition, the development will adequately deal with flood risk exposure. As part of the proposed surface water strategy, a proportion of surface water runoff from the drainage servicing the hardstanding areas in Phase 1, 2 &3 will be designed to discharge unattenuated direct to Canada Water Basin and Albion Channel, and this drainage solution is supported by the councils Ecology Officer. 326 Wind The impact of the proposed development on the surrounding environments in relation to wind speed, have been assessed as part of the ES submitted with the application. This assessment shows that the ground level resulting winds following construction of the development are predicted to be at level C4’ on the Comfort Assessment Criteria, which is the lowest impact, meaning that the area would be suitable for long periods of standing or sitting, without discomfort resulting from wind speeds in the area. This is the case for the ground levels adjacent to neighbouring residential properties, in streets and surrounding open spaces, including the Albion Channel and adjacent to the Canada Water Library. Adjacent to the tower element of the proposed development, building C4, and the walkway to the existing shopping centre site, wind comfort is predicted to be ‘C3’ level or comfortable for short periods of sitting or standing at times of strong wind. Largely impact to the wider area is categorised as ‘C4’ rating – lowest impact, with some limited areas with a ‘C3’ impact. Overall the wind speeds during strong wind periods is predicted to remain acceptable for the use of Canada Water for residents and visitors to the area. 327 In relation to wind comfort within the development, the new public space area is predicted to have a comfort rating of ‘C4’ suitable for long periods of sitting or standing during strong wind periods. On balcony levels in buildings C2, C3 & C4, additional balcony wind protection screens have been included in the revised submission to ensure comfort ratings of ‘C4’ or ‘C3’, that will allow future occupiers to fully utilise these areas for private amenity, without disruption from uncomfortable wind exposure. 328 Air Quality The majority of the borough is within an Air Quality Management Zone, and as a result, developments are required to take account of any impacts upon air pollution as a result of, or during construction of, a proposed development. An Air Quality Assessment has been prepared by ADM Ltd and submitted as part of the ES for the application. 329 There are potential impacts upon air quality as a result of construction of the development, and in order to reduce this impact, it is necessary to secure appropriate mitigation by way of condition or through provisions in the legal agreement. Measures will need to be employed through the Construction Environmental Management Plan to reduce dust during demolition and construction. During the construction phase and occupation of the development, it is not expected that increased road traffic as a result of this development, or adjacent developments combined, will increase the predicated concentrations of NO2 significantly in the area. A Travel Plan will also be provided to minimise emissions from vehicles. Other mitigation measures to reduce exposure of future occupiers to poor air quality include, the use of Mechanical Heat Recovery systems in residential, retail and car park areas; The fitting of a catalyst to CHPs to reduce the emission concentration; and designing CHPs and boilers to minimise emissions, including locating flues at a release height a sufficient distant from sensitive receptors. 330 Estate Management A Draft Estate Management Plan has been prepared for the application. This describes the management arrangements that will be developed for the site, throughout the construction and operation phases. The Plan sets out the following arrangements during operation of the development:- Access to the roof garden on top of C4 will be made available to members of the public by arrangement through the Estate Management Company. On the day the staff will meet and escort the public to and from the roof. The roof garden will be accessible to the public from 10:00 - 14:00 on three days per calendar month, one of which will be a weekend day; - A team will be put in place by the Estate Management Company to manage the public realm elements of the Estate, including the soft landscaping components of the Central Lawn; - The Central Management Office will be set up in the base of building C1 (phase 1), and this will provide residents with direct access to the range of services they manage; - The main concierge facility for the development will be based in the residential lobby of building C1; each building will also have a satellite concierge office at ground floor. - The streets are not proposed for adoption and instead will be managed through an Estate Management Company. - The Estate Management company will also be responsible for the lift access to the Albion Channel, cleaning of public areas and safety on the proposed steps to the Basin. 331 A detailed Estate Management Plan for the operation of the development in accordance with the framework set out in the draft plan can be secured by condition, in addition to a Construction Management Plan for the demolition and construction phases of the development. 332 Secured by Design The application details have been developed in consultation with the Secured by Design Officer, and the intention is to achieve secured by design certification in the final development. 333 Impact on aviation Some residents have raised concerns regarding the possible impact that the proposed tall buildings, and cranes used to build these buildings, might have upon aviation movements in the area. The council has consulted with the relevant aviation bodies surrounding the site and no objections have been raised to the proposal. In addition to this, separate legislation requires the inclusion of safety measures (such as beacons on top of buildings / cranes over a certain height), and therefore no further planning mitigation would be appropriate or required. Archaeology 334 The proposed development site lies within the former Surrey Docks, which historically formed part of the wider London Dock network. While Canada Water sites C and E are not actually located within an archaeological priority zone, there is material of interest on site likely to survive from earlier arrangements of the dock and the remains of the dry dock that has been preserved on site under the present development. Due to the long and recent history of the docks and those who worked there, there is a significant public interest in the heritage of this area. The proposal provides some opportunity to uncover some buried heritage assets and provide a level of display and public access. 335 The proposals here would enable the excavation of the dry dock (lighter repair dock), its conservation and display at pre-arranged times, under the proposed building. The design of the proposed development incorporates the interior of the dry dock for building services, and therefore the impact of locating this within the dock, would need further consideration, to ensure that works are undertaken in a sensitive manner given the historical significance of the dock feature. Conditions can ensure that work is undertaken appropriately, and should include the monitoring of its excavation, recording of features, and any other conservation works necessary. Conditions have therefore been recommended by the councils Archaeology Officer, and would be attached to any decision to grant planning permission for this development. Conclusion on planning issues 336 Canada Water is identified in the development plan as an area in need of regeneration where the application site forms a principal component of the wider Action Area. The site is identified within the London Plan 2011 as an intensification area. The area around Canada Water Basin has long been identified as being in need of redevelopment and has the opportunity to build on the success of the previous redevelopment around Canada Water Underground Station to make Canada Water a Major Town centre to deliver the Council’s wider vision for the SWAAP as an attractive Inner London destination. 337 The development proposal would deliver a high density mixed use scheme on a brownfield site in a sustainable and easily accessible location. It will make a significant contribution towards meeting London-wide and local housing targets for new homes, including affordable housing, built to a high standard and providing excellent standards of living accommodation. The proposal will help to consolidate the reputation of Canada Water as a retail and entertainment destination as part of the aspirations to become a Major Town Centre the provision of a varied mix of land uses on the site, including a range of business, retail, community and leisure uses. In this respect the scheme would generate a significant amount of employment opportunities in the area, both at construction phase and within the completed development. In addition, the proposal would result in an increase in local open space through the new open space between C1 and C2/3/4 and the opening up of the Canada Water Basin as well as smaller open spaces, accessibility to Albion Channel and new public routes which will significantly improve pedestrian and cycle permeability around this part of the Rotherhithe Peninsula as well as provide opportunities for enhancing biodiversity. The proposal will assist in the delivery of public transport improvements on both buses and by underground. 338 The outline application for C2/3/4 and E1 is broad in nature and as such matters such as internal layouts and landscaping will be dealt with at the detailed design Reserved Matters stage. However, no impacts at this stage have been identified that suggest that the scheme have a significantly harmful impact on strategic and local views, heritage assets or World Heritage Sites. 339 It is recognised that the redevelopment of Canada Water C and E has the potential for significant environmental impacts and therefore an Environmental Statement was submitted in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011. In coming to a decision on the detailed and outline applications, officers had full regard to the Environmental Statement and all submissions relating to considerations contained in the Statement. This includes an assessment of possible alternative options and why these were not feasible as well as an assessment of the cumulative impacts of this and other nearby developments. Following mitigation measures, there will be some adverse impacts associated with the demolition and construction phases (for example, increased noise, dust, vibration and construction traffic) but these impacts are short to medium term and none of these issues are considered to amount ot such significant harm that would justify the refusal of planning permission. Furthermore, they would not outweigh the significant and long term benefits that would be gained from the redevelopment of the site. 340 Post construction it has been identified that there will be an adverse impact on a number orf residents in terms of a loss of daylight/sunlight. It is acknowledged that there will be an adverse impact on local residents and officers considered this to be more significant than the slight/minor adverse impacts outlined in the applications ES. 341 In terms of daylight and sunlight it is clear that the development will have some significant adverse impacts as demonstrated by the fact that 166 (equating to 26.6% of windows across all neighbouring buildings) windows that previously had levels of VSC in excess of 27% will now achieve levels below 27% in addition to experiencing at least a 20% reduction in BSC and as such will have a noticeable impact. 342 This is ullustrative of the lower daylight levels that can be expected in urban areas, and while high density developments should not maximise the devlopment potential of sites at the expsne of existing residents, the benefits that would result from this development would outweigh those areas where harm will result to surrounding residents’ daylight and sunlight. This is particularly relevant in light of the number of residnetial units being proposed, as a significant contribution towards Southwark’s (and the Canada Water area) housing targets and the public realm and townscape contribution of the development scheme. The proposal will have significant employment and retail benefits and mitigation through S106 monies (albeit no mitigation for loss of daylight/sunlight). The development will be a significant contributor to the Council’s Strategic Housing Objectives and the intention for Canada Water to become a high density Urban Town Centre. If the opportunities in Canada Water are to be realised to their full potential to become a Major Town Centre housing, retail and entertainment destination in line with the functions of a Major Town Centre then certain adverse impacts are unavoidable in urban areas 343 It is acknowledged that the proposal does not deliver all of the development plan requirements, most notably: • The proposals do not meet the minimum business floorspace for CWAAP 7; • They do not include a hotel use as required by CWAAP 7; • The proposals would involve tall building of a more substantial scale than that anticipated by the AAP; • The proposals would provide affordable housing at a level below that required by the AAP; and • The proposals would involve environmental effects, including impacts on the daylight and sunlight; • The overall development would be in excess of the required density for the area; • The quantum of parking being proposed is in excess of policy requirements. Whilst it is noted that the proposal does not deliver all of the development plan requirements for CWAAP7 it is considered reasonable not to expect the development to deliver all of the requirements of SWAAP7 as this proposal site includes a wider site that does not form part of this application and as such there is scope for further provision on the extended site. The boundaries of site CWAPP7 are being revised in the revisions to the SWAAP to exclude the Surrey Quays Leisure Park. 344 However, the proposals are considered deliverable and are consistent with the key policies and objectives of the development plan which seek to bring forward the redevelopment of Canada Water as part of the aspirations to create a Major Town Centre. Whilst it is noted that the residential provision for CWAAP7 is in excess of that specified in the CWAAP overall the residential provision is policy compliant across the combined area. 345 The failure to provide the minimum business floorspace and hotel use should also be considered on the basis of the wider site designation and the proposals would not preclude the provision of this floorspace elsewhere within the CWAAP area. In this case the application is not considered to be a departure from the development plan as the application site is only part of the wide site designation. The proposed land uses are all acceptable within the designation although it is noted that the quantums are different to hose set out as required in the CWAAP. However, it is the view of officers that these quantums would be capable of being delivered elsewhere within the wider designated site. The proposed building heights are higher than expected under the adopted CWAAP; however whilst the expected heights are set out in the CWAAP in the text, they are not a fixed item in the actual allocation. As such the proposed development is not considered to be a departure from the development plan. 346 The departure of the printworks, which in the past has placed constraints upon the residential development of nearby sites, means that the character of the area would be altered and that there is further scope for large-scale residential development beyond that anticipated by the AAP policies, which are out of date insofar as they assume the existence of that constraint. It is of course relevant that the designation in the 2012 adopted CWAAP was formed on the basis that the Harmsworth Quays Printworks remained on the neighbouring site. The location of the printworks here has in the past placed complicated constraints upon neighbouring sites, particularly in their ability to be developed for residential accommodation as there was a requirement for a noise buffer to both protect residents from noise emanating from the Harmsworth Quay Printworks, and to protect the functioning and operation of the printworks. The vacation of the printworks from this site does therefore significantly alter the character of the are, under which the original designation was made as there is no longer a need for a noise buffer and there is an opportunity to change the character of the Town Centre, opening up routes and links through the site to the wider Rotherhithe/Canada Water area. 347 Insofar as affordable housing provision is below policy requirements in the AAP, viability constraints demonstrate that this is the maximum provision which could be achieved in order to bring forward the development of the site. Furthermore the proposal includes the possibility of a review where there is a delay in the commencement of affordable housing (Phase 2) implementation beyond three years from the initial consent. Such a review would determine whether there is scope to provide and increased level of affordable housing up to a maximum of 35%. Given the improving market conditions this could result in an improved affordable housing offer, however it would only come forward if the applicant does not meet the obligation to provide the affordable housing within the first three years. Additionally, should all of the affordable housing not be capable of being provided in Phase 2 then it will overspill into Phase 3 to ensure it is provided in full. 348 Whilst there would be a loss of amenity to some local residents, a degree of harm is to be anticipated if the opportunities in Canada Water are to be realised to their full potential, particularly in an evolving area and the identified harm is substantially outweighed by the benefits that would be achieved by the grant of permission for the scheme. The previous planning consent for the site and the cut-back models are considered undeliverable, albeit that they showed reduced impacts, and there is no alternative scheme before the Council, whereas the current scheme is deliverable and would provide substantial benefits. 349 The tall buildings are part of a scheme which is of exemplary design quality which would make a substantial positive contribution to the skyline, whilst enabling substantially improved pedestrian and cycle permeability on the ground, in compliance with policies in the Core Strategy and London Plan. The proposals would make a significant contribution to the wider regeneration of the area and would act overalll as a driver for regeneration which strengthened and developed the reputation of Canada Water as a retail destination and retain Decathlon who have themselves become part of the identity of Canada Water, and a flagship tenant. 350 Having regard to all the policies considered, and any other material planning considerations, it is recommended that planning permission is granted subject to conditions, the completion of a legal agreement and referral to the Mayor of London. Equalities Implications 351 Section 149 of the Equality Act provides that the council must, in the exercise of its functions, have due regard to the need to: a) Eliminate discrimination, harassment, victimisation and any other conduct that is prohibited by or under this Act; b) Advance equality of opportunity between persons who share a relevant protected characteristic and persons who do not share it; c) Foster good relations between persons who share a relevant protected characteristic and persons who do not share it. 352 The submitted ES includes assessment of the Socio-Economic impacts of the development. Overall it is considered that the development will have beneficial impacts, providing job opportunities, new public spaces and facilities, and a significant number of new homes. There is no significant adverse impacts identified that would impact specific groups of particular characteristics. 353 The Council therefore consider that the proposed scheme and the regeneration of the area that the development will bring about, which aims to deliver a mixed and balanced community, is compatible with its equalities duties and will have some beneficial impact on protected groups, the advancement of equality of opportunity and the fostering good relations between persons who share a relevant protected characteristic and persons who do not share it. Community impact statement 354 In line with the Council's Community Impact Statement the impact of this application has been assessed as part of the application process with regard to local people in respect of their age, disability, faith/religion, gender, race and ethnicity and sexual orientation. Consultation with the community has been undertaken as part of the application process. The consultation undertaken by the applicant has also been described in the applicants ‘Statement of Community Involvement’ which accompanied the application. 355 The applicant’s consultation was undertaken by a Project Team, through engagement with the local community, dating back to the Examination in Public of the Draft CWAAP in September 2011. This included the following:- Two public exhibitions held at the Canada Water Library on 17 and 19 May and 20 and 22 September 2012; - Stakeholder Group meetings; - Meetings with key representatives; and - Mailouts. - Informal presentation to Planning Committee and Ward Members on 3rd July 2013. 356 Main stakeholder groups were identified and consulted by the applicant including:Canada Water Forum; Rotherhithe Area Housing Forum; Friends of Russia Dock Woodland; Friends of Southwark Park; Toronto and Montreal Residents Association; St Olaf’s Norwegian Church; Local Community Councils; Rotherhithe Anglers Club; and MP, AM and Local Councillors. 357 The applicants Statement of Community Involvement report describes that a range of key themes emerged, including:- Support for the regeneration and better use of the site; - Support for new and improved pedestrian routes, public realm, green routes an open spaces; - Support for new high quality of waterside retail, restaurants and commercial activities, including a new cinema; - The demand for a high quality convenience store and support for small independent retailers; - Support for the retention of Decathlon on site; - Safety and security; - New and improved street lighting, furniture and trees; - The need for new children’s playspace; - The protection and enhancement of wildlife; - The amount, type and quality of residential accommodation to be provided; - The amount of car parking to be provided; - The need to minimise adverse impacts on neighbouring residents. 358 The submitted report describes the responses received, the method of consultation undertaken and how the responses informed the development of the proposal. Consultations 359 Details of consultation and any re-consultation undertaken in respect of this application are set out in Appendix 1. Consultation replies 360 Details of consultation responses received are set out in Appendix 2. 361 Summary of consultation responses 172 responses were received during consultation. The table below provides a summary of the main neighbour objections to the application and describes where in the report these matters are addressed. Table summarising key neighbour objections No. Issue Officer assessment/paragraph numbers dealing with points raised. 1. Heights of buildings not in keeping with the character of the area, or the policy designation for the area, particularly 40 storey tower. 52-62 157-201 2. Adverse impacts upon neighbours daylight and sunlight / outlook / privacy and overshadowing. 103-132 3. Heights on C1, adjacent to canal harmful to area and adjacent residents. 157-201 4. Cumulative impacts not taken fully into account. 78-82 Cumulative Impacts 5. Questionable urban design – materials not in keeping with the area. 157-201 Design Section 6. Wind impacts not taken fully into account – high winds already in the area because of proximity of the Basin and the River Thames. 95, 326-327 7. Adverse impacts upon ecology and biodiversity. 96, 274-279 8. Additional strain on public transport 129-132 and other infrastructure (nurseries, schools, healthcare, roads etc). 136-156 9 Fails to take full account of all environmental effects. 64-101 10. Errors in the submitted Transport Assessment. 136-156 Addressed through revisions to TA. 11. 136-156 12. Not enough car parking for the retail element. Too many cycle spaces provided. 13. Lack of affordable housing. 240-263 14. Lack of open space. 202-223 15. Not in keeping with the character of the area. 157-201 16. Adverse impacts during construction, disturbance and pollution. 64-101 17. Increased traffic. 136-156 18. Increased noise. 88-89 19. Applicant’s consultation inadequate. 20. Commercial units in this area are vacant, don’t let or sell easily. The applicant has undertaken a consultation exercise in addition to the consultation exercises undertaken by the Council as part of the application. Paras 355-358. 296-312 21. Height of the buildings and cranes during construction could create dangers in relation to helicopter flight. London City Airport and BAA have been consulted on the proposal and have raised no objections. Para 333. 22. Access to the roof of the 40 storey tower should be given to the public. 23. No need for new cinema – one existing in the area. 24. Too many 1&2 bedroom units, need more family sized units. This will be provided and is accommodated within the S106 Agreement. Para 287. The provision of a cinema is compliant with policy and is appropriate in the proposed Town Centre location. Paras 46-63. 224-225 25. No play options for children. 202-223 26. Telecommunications is interfered with in this area as a result of tall buildings. The Council have consulted Arqiva (responsible for BBC and ITV transmission) and no objections have 136-156 been raised. Appendix 2. 64-101 296-312 27. Negative social and environmental effects will result. 28. Steps into the basin will be dangerous. 29. Limited benefits will result from the development. 30. Not enough residential parking proposed. 31. The development won’t provide housing for the local population and will be purchased by foreign investors – won’t be affordable. The development will provide 22.5% affordable housing for Southwark Residents plus the potential for more through the review mechanism. 32. The proposed application is premature based on the fact that the current AAP modifications are in draft form only. The application notes that the updated CWAAP is in draft form only and as such very limited weight is afforded to that document. Paras 49-57. A detailed health and safety audit will take place as part of a reserved matters application. The development will improve community facilities whilst providing homes in a sustainable location.Paras 280-295 and 336-350. 136-156 362 62 Identical letters and five individual letters/email responses received from neighbours in support of the development proposal. The key reasons for supporting the application proposal are as follows:1. Redevelopment / regeneration of the area welcomed; 2. More / improved open space, public space adjacent to the basin; 3. More and better quality shops, cafes, bars and restaurants as a result of the development; 4. Public access to the top of the 40 storey tower will allow beneficial viewing platform for the public; 5. Quality of architecture; 6. Employment, training and jobs programme during construction welcome. Human rights implications 363 This planning application engages certain human rights under the Human Rights Act 2008 (the HRA). The HRA prohibits unlawful interference by public bodies with conventions rights. The term ’engage’ simply means that human rights may be affected or relevant. 364 This application has the legitimate aim of providing a mixed use redevelopment. The rights potentially engaged by this application, including the right to a fair trial and the right to respect for private and family life are not considered to be unlawfully interfered with by this proposal. BACKGROUND DOCUMENTS Background Papers Site history file: TP/86-36-4 Application file: 13/AP/3260 Southwark Local Development Framework and Development Plan Documents Held At Chief executive's department 160 Tooley Street London SE1 2QH Contact Planning enquiries telephone: 020 7525 5403 Planning enquiries email: planning.enquiries@southwark.gov.uk Case officer telephone:: 020 7525 5365 Council website: www.southwark.gov.uk APPENDICES No. Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Title Consultation undertaken Consultation responses received List of schemes Revision Development specification list of consultees AUDIT TRAIL Lead Officer Gary Rice Report Author Terence McLellan, Team Leader, Planning Version Final Dated 28 October 2013 Key Decision No Head of Development Management CONSULTATION WITH OTHER OFFICERS / DIRECTORATES / CABINET MEMBER Officer Title Comments Sought Comments included Strategic director, finance & corporate services No No Strategic director, environment and leisure No No Strategic director, housing and community services No No Director of regeneration No No Date final report sent to Constitutional Team 28 October 2013 APPENDIX 1 1 Consultation undertaken Site notice date: 14/02/2013 and subsequent re-consultations in May and August 2013. 2 Press notice date: 07/02/2013 and subsequent re-consultations in May and August 2013. 3 Case officer site visit date: Numerous, most recent 15/08/2013 4 Neighbour consultation letters sent: 07/02/2013 and subsequent re-consultations in May and August 2013. 5 Internal services consulted: Archaeology Officer Design and Conservation Ecology Officer Environmental Protection Team Planning Policy Public Realm Transport Urban Forester Parks and Open Spaces Housing Regeneration Initiatives Economic Development and Strategic Partnerships 6 Statutory and non-statutory organisations consulted: Greater London Authority London Fire and Emergency Planning Authority Metropolitan Police Transport for London Civil Aviation Authority London City Airport Natural England CABE English Heritage Environment Agency London Borough of Lewisham London Borough of Tower Hamlets London Borough of Greenwich London Borough of Camden City of London City of Westminster London Underground Southwark Primary Care Trust Aquiva Royal Parks BAA EDF Thames Water Waste Management 7 Neighbours and local groups consulted: See Appendix 5 8 Re-consultation: May 2013 August 2013 APPENDIX 2 Consultation responses received Internal services 1 Urban Forester - A total of 74 individual trees require removal in order to facilitate the development. Of these 17 are category B trees. These numbers do not correlate with the arboricultural impact assessment, which states 39 removals and 15 category B trees respectively; - No stem diameters have been provided, these are needed to gauge the effect of the proposed felling and how any proposed landscaping can mitigate this loss; - Of the remaining semi-mature trees on site 17 are recommended for transplantation (13 category B) either to locations within new landscaping post development, or as agreed to open space elsewhere. Given the difficulty in successfully removing and reestablishing substantially sized trees from hard surfacing it is unlikely that all or many of these are feasible; - Green / blue roofs are proposed with attenuation across the site; - Landscaping includes a total of 37 new trees at grade within phase 1, 16 of these are located on a concrete slab above the basement level; - The landscape design has responded (in areas) to pre-application comments regarding the need to re-establish avenues and the provision of a greater sense of enclosure within open spaces which are likely to suffer from exposure and winds related to adjacent towers; - Conditions recommended in relation to tree planting and landscaping. 2 Ecology Officer - Ecologically this development has potential to improve the boundaries of the Borough SINC. The inclusion of biodiverse brown roofs, green wall and new trees, nesting and roosting features and soft landscaping will offer real enhancement to the area for ecology and health and wellbeing; - Any lighting along the Canada Water and Albion Channel buffer zone edge should be bat friendly. Trees should be beneficial to wildlife so limes would be welcome; - A soft edge to the dock is desirable, Albion Channel also has the potential to be softened and provide enhanced ecological habitat; - Conditions recommended concerning vegetation clearance, biodiversity mitigation / enhancement, ecological management plan, prevention of damage to a waterbody, ecological monitoring, green roofs and bird / bat boxes. 3 Environmental Protection Officer - No objections, recommend conditions concerning air quality, noise (construction and operation phases), land contamination and environmental management plan. 4 Strategy and Partnerships Team (Local Economy) - The total number of jobs provided on the site once completed will be small both as an absolute figure and in relation to the amount of non-residential space proposed; - Because so much of the non-residential space will be for Decathlon, the nature of the functions of that type of retail store means that the number of staff employed is low, when considering the size of the store. 5 Planning Policy Providing new homes - The application seeks permission for a maximum level of residential floorspace of 97,541.4sq.m. This could deliver up 1,046 units depending on the precise mix of units; - Policy 21 of the AAP sets a target of 2,500 net new homes to be provided between 2011 and 2026. The provision of additional homes on these sites will significantly contribute towards this target and is welcome. At detailed reserved matters application stages, the exact quantity of housing will need to be specified as well as viability information on the overall number of affordable homes to demonstrate the applicant will be able to meet current policies; - Policy 24 sets out the density range that new development is expected to comply with. Sites C&E are within the Core Area density range which is 200 to 700 habitable rooms per hectare. These ranges may be exceeded in the opportunity areas when developments are of an exemplary standard of design. The factors that would constitute exemplary design are set out within our Residential Design Standards SPD 2011. The proposals are above the density ranges set out in the policy, therefore a detailed justification will be required; 6 Affordable housing - Policy 6 of the Core Strategy requires as much affordable housing on developments of 10 or more units as is financially viable. Policy 22 of the AAP requires 35% affordable housing with a 70:30 social rented/intermediate split; - The planning statement does not commit to an amount of affordable housing but instead sets out a number of options which are still being discussed with the Council. - Our priority is for on site affordable housing although the options which include on site provision are pushing the delivery of affordable housing to the very final stages of the scheme which is concerning - The planning statement sets out that viability information will be used to establish the final amount of housing that the scheme can provide. - Suggest that mechanisms be put in place through the section 106 agreements for each phase to include a review mechanism to ensure that the maximum amount of affordable housing is delivered throughout the process; - The information in the housing statement seems to suggest that they are aiming to meet the tenure split, albeit at 60/40 social rent/intermediate. 7 Housing size, design and type - Strategic Policy 7 'Family homes' of the Core Strategy 2011, requires that developments of 10 or more units provide at least 60% of units with 2 or more bedrooms and at least 20% with 3, 4 or 5 bedrooms in the urban zone. This mix is reiterated in CWAAP Policy 23; - The housing statement proposes that these requirements will be met across the phases, although phase 1 does not meet the policy as it proposes a higher number of studios (7%). It should be noted that policy sets out the minimum requirements that need to be met and where possible the number of larger units, particularly three bedroom family units, should be maximised. This is because Southwark’s housing evidence base shows there is a greater need for more family housing across all tenures. The planning statement shows that there are a small number of 4 bed units being proposed as well as 3 bed units; - Policy 4.2 of the saved Southwark Plan requires new residential development to meet high quality living standards. It also requires all the residential accommodation to be designed to Lifetime Homes standards. Supporting this policy we have the Residential Design Standards SPD 2011 which sets out our minimum room sizes and requirements for the provision of amenity space etc. All new units will need to meet the minimums set out within Southwark’s SPD and if the proposal is above the density range set out above they will need to be exceeded to show exemplary design. The planning statement sets out that all the units will meet or exceed these standards; - Policy 4.3 of the saved Southwark Plan requires that a minimum of 10% of the development needs to be suitable for wheelchair users. Whilst Policy 3.8 (Housing Choice) of the London Plan allows 10% of new housing to be designed to be wheelchair accessible or easily adaptable, Southwark requires the wheelchair units to be fitted out as such from the outset in accordance with the South East London Housing Partnership Wheelchair Housing Design Guidelines. This is irrespective of the tenure of the wheelchair accommodation. Further detail will be required at the reserved matters application stage to ensure that the Council’s standards can be achieved. 8 Design Review Panel [Comments on pre-application proposal September 2012] The Panel considered the notion of pure forms or object buildings within a wider public space. They welcomed the overall size of the wider public space which matches the scale of the Canada Water Basin. They understood the further subdivision of that public space into sub-spaces but questioned the hierarchy of spaces and highlighted the difficulties of designing object buildings in this way because they need to occupy that public space without disrupting it. In addition to the microclimate implications of these forms on the open space, pure object buildings like those proposed here need to create active frontages and meaningful uses on all four sides. Certain uses are difficult to manage when they have more than one frontage and could result in one side of these object buildings becoming a ‘front’ and the other a ‘back’. The Panel felt the design team could rise to the challenge of these buildings but needed to consider them in the round through rigorous testing of local environmental conditions and with a coherent, site-wide strategy for the proposed ground floor uses and their associated car parking, servicing and deliveries. In relation to the proposal for Phase 1 the Panel acknowledged the way the designers had managed to accommodate the substantial rectangle of space required by the Decathlon store. Notwithstanding this they felt the proposed arrangement of the store on two levels encircled by residential accommodation raised a number of detailed questions and concerns about: the interrelationship between these two distinct uses; how this substantial building relates to its neighbours on Site B on the other side of the Albion Channel and the existing buildings on Surrey Quays Road; the nature and quality of public access to the store and the residential accommodation; as well as the quality of the residential accommodation its associated communal amenity. The Panel felt the Phase 1 proposal was less resolved in its architectural expression and confused in its elevation. They encouraged the architects to refine their proposals and to try to articulate the distinct parts more deliberately perhaps to break up the overall form into smaller, more distinct parts. 9 In a scheme of this scale, the nature and quality of the residential accommodation is a significant consideration. In both phases the delivery of exemplary quality of accommodation should include a high proportion of dual aspect units and should be defined in the planning application. The challenge with pure object buildings and a wraparound proposal of this type is to retain the purity of the proposed forms but also achieve a high quality of design. The Panel felt the designers had the ability to rise to the occasion but needed more detail to demonstrate how the scheme will deliver the residential quality and adhere to the purity of the proposed form. The Panel raised a question over the longer term sustainability of the design for Phase 1 given its reliance on the Decathlon Store. The scheme is characterised by its substantial scale due to the proposed occupier. They asked the designers to consider the nature of the scheme if this occupier was not always there or a different occupier was to take up the space. Aspects of the scheme like its servicing as well as the provision of car parking for residents and visitors alike remained unresolved and had not been presented to the Panel. They felt this remained a substantial concern over the Phase 1 proposals. If they were to remain unresolved these issues would affect the nature and quality of the public spaces on Phase 2. The Panel asked the designers to design these fundamental aspects of the Phase 1 prior to submitting an application. In conclusion, the Panel welcomed the ambition and elegant qualities of this scheme. However, they viewed the scheme with optimism and suspicion in equal measure. Whilst there were differences of opinion, there was a consensus on the proposed height and the majority felt the design could be beautiful but needed to be exemplary. The question remains whether this ambition can be delivered to the desired quality, taking into account the environmental concerns and without being value engineered by cost or diluted by technical concerns like servicing or car parking. On balance, they encouraged the design team’s longer term involvement on these sites. They felt the scheme had benefitted from designers who had the ability to deliver high quality buildings and they endorsed this strategic vision for the area. The challenge for the client, as much as the designers, is to secure the delivery of this vision in its purest form. [Application revised prior to submission] Statutory and non-statutory organisations 10 Cllr Paul Noblet, Cllr Lisa Rajan, Cllr David Hubber – Surrey Docks Ward Cllr Wilma Nelson, Cllr Jeff Hook, Cllr Columba Blango – Rotherhithe Ward - welcome the aspiration of the development to help deliver some of the key aspects of the Canada Water Area Action Plan such as additional health facilities, the creation of a new open space and the retention of retail employment at Decathlon, however regretfully oppose the outline application; - Welcome the dwelling mix, with approximately 20% of units being at three or more bedrooms, but extremely concerned about the level of affordable housing, the amount clearly does not comply with Southwark’s Core Strategy; - Also concerned about the evidence base for dealing with transport elements of the development, contrary to both what our constituents and we have observed, the traffic study suggest that traffic in the local area is falling and therefore the increase in vehicle numbers will be acceptable; - Given the high level of public transport accessibility in the area, six bus routes, the Jubilee Line and the recently extended Overground services, the number of residential vehicles should be reduced from current plans; - Concerned about the impact of the new buildings at the north of the development on the right to light of neighbouring Montreal and Toronto Houses, also concerned about the light levels to building C2; - Share the concerns of constituents about the height of the proposed residential tower, believe that 41 storeys is simply too high and not in keeping with either the local area or the delivery of the Canada Water Area Action Plan. The 41 storeys is far above both the aim of the AAP to restrict development in the core are to between generally 5 to 8 storeys and the already secured planning permission for 10 storeys on site C. 11 Thames Water - Following initial investigation, Thames Water has identified an inability of the existing waste water infrastructure to accommodate the needs of this application. Should the Local Planning Authority look to approve the application, Thames Water request a condition be imposed, requiring the submission of a drainage strategy for approval by the local planning authority in consultation with the sewerage undertaker. Other informative / conditions are also recommended concerning non-return valve devices, no impact piling, requirement for trade effluent consent, installation of properly maintained fat trap on catering establishments, surface water drainage, and petrol / oil interceptors in car parks; - Recommend that an impact study of the entire redevelopment area of Canada Water is carried out to confirm the extent of any network reinforcement required. 12 Tower Hamlets - No objection. 13 City of Westminster - No comments. 14 London Borough of Camden - No objection. 15 Royal Borough of Greenwich - No objections. 16 London Borough of Lewisham - No comments issued. 17 Greater London Authority Stage 1 Referral - The application does not fully comply with the London Plan, a summary of the report conclusions and remedies is set out below; - Principle of development: The principle of redevelopment for a mix of uses is consistent with the Local Plan and the objective of the London Plan to regenerate the town centre promoting high level of growth and investment in this area of intensification; - Affordable housing quantum, mix and density: The housing offer remains to be agreed by the GLA would expect that affordable housing is delivered on site. This is subject to further viability testing and discussion regarding possible review mechanism; - Urban design: The principle of a tall building is supported and overall the development is of a very high design standard. Some further work is required regarding the layout arrangements to C1 and further consideration is also needed regarding the Quality and Design Standards in the Mayor’s Housing SPG; - Access: The route through from Surrey Quays Road needs to be resolved so that there is an inclusive access solution; - Climate change mitigation: The applicant needs to approach the energy strategy on the basis of the site as a whole. The timing of the delivery of the CHP will be dictated by the timing of the optimum heat loads. This needs to be modelled and carbon savings presented along with a strategy for how the network could grow over time linked to the phasing plan; - Climate change adaptation: some matters can be controlled through suitable conditions however further works is needed regarding drainage as set out in this report and further details should be provided regarding the ventilation strategy; - Biodiversity: Broadly acceptable subject to conditions; - Air Quality: The GLA is currently in the process of further review of the air quality impacts along wit the ventilation strategy; - Noise: Broadly acceptable subject to conditions and review of the ventilation strategy; - Transport: A number of transport matters are raised as set out in this report, please refer to comments from Transport for London (TfL). 18 Transport for London (TfL) Trip Generation Assumptions - Consider the use of a pan-London average mode split for trips made by London Overground inappropriate, given the development is significantly closer to Canada Water Station than the average distance in London to a station served by London Overground Stations; - In relation to car driver mode share, consider that it is inappropriate to assume that this has remained stable. Request submission of actual mode splits for the present day as well as the number of customers accessing the store in 2008 and presently; - Trip generation figures derived for the proposed development appear low, particularly for public transport use; - Trip generation for the office element of the site also appear low, and appear to have been generated on a per employee basis as opposed to a floor space basis; - The sites selected for assessment are appropriate, but the methodology should be revised to ensure that trip generation is generated on a floorspace basis; - Request further information on the size of the surgery and expected local catchment before confirming this position is acceptable; Modelling - Concerned about the modelling provided in Section 7.2, particularly with regards to the Surrey Quays Road / Deal Porters Way junction. Request evidence of model validation by the model builder for the base situation, in order to provide TfL with sufficient confidence that the models submitted, are valid representations of the existing conditions; - Request a capacity analysis of the proposals in relation to the Surrey Quays Road / Lower Road junction; - Welcome the commitment of the applicant to delivering the highway improvements at this junction, and request this is secured through an appropriate planning condition / s106 agreement; 19 Highway Impact of the Scheme - Note proposals to extend cycle times of signalised junctions at both the Surrey Quays Road / site access junction, and the Deals Porters Way / Surrey Quays Road junction. TfL have concerns regarding the latter, given the heavy use of the unction by pedestrians accessing both Canada Water bus station and Canada Water station; - Also concerned about the impact of the extended cycle time upon the operation of Canada Water bus station; Car Parking - Consider the level of car parking for the retail element to be excessive and advise the applicant to adopt a restrained approach to car parking, reflecting both local conditions and demand; - Welcome the proportion of Blue Badge car parking for the retail element of the site, which equates to 10% of all car parking spaces being designated for Blue Badge holders; - in relation to the car parking for the residential element of the site, welcome the proposed parking ratio of 0.2 spaces per residential unit, and consider that such provision accords with both the London Plan parking standards and Policy 10 of the Canada Water Area Action Plan. Also welcome the commitment to provide electric vehicle charging points which should be secured by condition; London Underground / Overground - TfL are content that the proposed level of development would have no adverse impacts upon London Underground and London Overground services; Buses - request contributions to improve bus services and to relocate the southbound bus stop, as well as contributions to improve the waiting environment of the northbound bus stop; 20 Cycling - Welcome the level of cycle parking for both the residential and retail elements of the site, however concerned that the office cycle provision is below London Plan standards; - Request showers and lockers for retail and office staff; - Highway works should be sought to promote safety and security of cyclists; - Welcome commitment to the promotion of cycling through the safeguarding of land for future expansion of the Barclays Cycle Hire scheme; Pedestrians - Request contributions towards the provision of wayfinding across the site; Construction - Request the submission of a Construction Logistic Plan (CLP); Servicing - Consider the servicing arrangements to be acceptable; Travel Plan - Welcome the submission of a Framework Travel Plan for the site, and support the aims, targets and objectives put forward. Request a full Travel Plan for retail, residential and commercial elements of the site to be secured through a s106 agreement. 21 London Underground - No objection in principle to the application, subject to the imposition of conditions restricting the potential for any structural constructions relating to this development impacting the London Underground stations or tunnels. 22 Environment Agency - No objection subject to conditions relating to flood risk, groundwater and contaminated land, ecology, fisheries and pollution prevention. 23 Sports England - Although a MUGA is proposed, no further sports facilities are currently proposed as part of the proposed development; - New developments should be required to contribute towards meeting the demand they generate through the provision of on-site facilities and / or providing additional capacity off-site; - Sport England’s Sports Facilities Calculator (SFC) can help to provide an indication of the likely demand that will be generated by a development for certain facility types, it indicates that a population of 2,615 will generate a demand for 0.14 swimming pools (£421,309), 0.21 sports halls (677,875), 0.02 indoor bowls centres (£32,792) and 0.09 artificial turf pitches (£92,959 3G or £81,759 Sand) – without such contributions, Sports England object to this application. (There is a shortfall of £5224 in comparison to that identified under the S106 Toolkit). 24 English Heritage - Wish to comment that an impact has been identified on the LVMF view looking downriver from London Bridge (LVMF11B.1), where the proposed new tower will appear to the right of the south tower of Tower Bridge, thereby reducing the visual prominence of Tower Bridge as the principal landmark in this view. In addition, note that the proposed tower will be visually very prominent above the tree line in some views within Southwark Park, which we believe causes some harm to the setting of the grade II registered park. 25 Natural England - The ecological survey submitted with this application has not identified that there will be any significant impacts on statutorily protected sites, species or on priority Biodiversity Action Plan habitats as a result of this proposal. However measures to improve biodiversity in and around the area should be incorporated. 26 On behalf of Heathrow Airport Limited (BAA & Stansted) - The proposed development has been examined form an aerodrome safeguarding perspective and does not conflict with safeguarding criteria. Therefore no objections to the proposal; - For information, wind turbines can impact on the safe operation of aircraft through interference with aviation radar and/or due to their height. Any proposal that incorporates wind turbines must be assessed in more detail to determine the potential impacts on aviation interests. 27 London Fire and Emergency Planning Authority - No objections, plans should be sent to the London Office. [Case Officer Comment:- disk of all documents sent.] 28 Lambeth and Southwark Public Health - The Canada Water AAP (4.7.20) stated that the London Plan Policy 3.2 would be followed, this requires Health Impact Assessments (HIA) to ensure major developments consider the impact of the development on health; - Many aspects of the development do not appear to offer improved opportunities for people to lead healthier lifestyles as recommended by the AAP (CWAAP: 2.2.1) but the lack of a HIA makes it hard to be sure that this theme runs consistency through the development; - There are many health issues such as obesity and long-term conditions within the area which may be ameliorated by thoughtful town planning and urban design. In particular, the existing and new population would greatly benefit from an environment that encourages higher levels of physical activity and restricts fast food outlets. Rotherhithe ward also has higher levels of alcohol attributable admission to hospital than the Southwark and national average, hence there needs to be good consideration of how licensed premises and off licenses will operate in the new development; - The proposal includes a new health centre of up to 658sqm, the proposal appears to be in line with the AAP which stated that the preferred site for a new health centre was on the Surrey Quays site as the site is close to public transport and in a central location. Note that all matters relating to E7 are reserved. This is helpful as it will be important for developer and NHS to work together to ensure that the new Health Centre is fit for purpose, since over the whole life of the AAP there will be considerable rise in population in the area; - The nature of the peninsular means there is no scope for access to services north and east of the area as the River Thames is the cut off point; - Overall the report concludes that the additional population will be accommodated within the existing health provision as there are ten GP practices within one mile of development, nine of which are accepting patients, as well as the proposed new health centre. The report states that ‘it is felt likely that the additional population will be accommodated within the existing healthcare provision and the magnitude of the impact is considered to be negligible.’; - More evidence is required to underpin this judgments and use of the HUIDU model might have been helpful here in order to make things more explicit. Given the increasing amount of work that is going on in primary and community care as outlined above, more information is needed to verify this claim. The cumulative impact of all the development in this area also needs to be taken into account more fully in this or another appraisal. One thing that is not clear is the number of new residents and commuters who will wish to register with practices in the area and although it is not considered that the demographic structure will alter, greater clarity about the actual numbers coming to the area is also an important consideration. 29 Arqiva (BBC and ITV Transmission Engineers) - No issues. 30 Royal Parks - Objection on the basis that the proposal goes against Royal Parks Policy of encroachment through the height of buildings around the parks and those that would adversely impact the views from the parks. 31 Metropolitan Police Service - Secured by Design should be a requirement for this development along with consultation with the Crime Prevention Design Advisor. Neighbours and local groups 32 2 responses received from Local Groups 33 Rotherhithe Area Housing Forum (T&RAs represented at the meeting – Canada Estate, Bonamy/Bramcote, Mayflower, Parkside, Swan Road, Hawkstone, St Helena & Oldfield, Tissiba & Haddonfield) - Fully support the application which offers substantial benefits for the local area; - The application will establish a high quality town centre for Canada Water with facilities designed to meet the needs of local people; - The scheme provides a large and attractive public square next to the dock basin; - The RAHF members particularly like the architectural design of the scheme and consider that the white tower will become a symbol of confidence and regeneration. The quality of the scheme reflects the Forum’s pride and confidence in Rotherhithe and sets the highest standard at the start of a period of major regeneration; - The scheme will commit to providing job training and apprenticeship to help get local people into permanent employment. Sellar have a good record in doing this with the Shard and we welcome their involvement here; - The Forum welcomes the developer’s willingness to work with tenant and residents and with the Council to agree local priorities for s106 expenditure. 34 Toronto and Montreal House Residents Association (Fuller Long Planning Consultants) - Wish to register the strongest possible objection to the proposed development; - The proposal would be almost wholly contrary to the vision and development parameters set out in the principle statutory document managing the development of this site and the wider Canada Water Opportunity Area; - The submission has not fully taken into account issues of acknowledged importance within the Environmental Statement, and therefore the submission is not in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011; - The Environmental Statement has not fully taken account of the cumulative impact of likely development around the site and moreover, the submission of this hugely significant development now, will significantly prejudice and unduly influence the review of the current CWAAP, which is not due to for public consultation until April 2013, with a view to adoption in April 2014; - The proposed development, by reason of its siting, layout, design, height, mass and bulk, would have a significant harmful impact upon the amenities of residents already living in properties at Canada Water and especially those living in Montreal and Toronto Houses. This will be particularly harmful to the levels of outlook, privacy, daylight and sunlight, which they may reasonably expect to enjoy, even as part of an opportunity site. The buildings on Albion Channel should be set-back; - The daylight and sunlight assessment presents a marginal threshold of acceptability, and warrants a thorough and independent scrutiny of assumptions made and conclusions reached, by a suitably qualified person; - The development would represent questionable urban design; - The proposed building heights are unjustified in this area and would have an illogical setting, the consequences of which would significantly harm the peaceful and human scale of the Canada Water basin and the suburban character of the wider Rotherhithe Peninsula, and could lead to an unexpected and harmful wind environment; - There is no requirement to further ‘mark’ the regeneration of the area. The heights of buildings are at odds with the CWAAP and with the prevailing character of the area, a key criterion for assessing the suitability of sites for tall buildings; - The proposals would fail to physically respect and interact with the heritage assets of the Surrey commercial Dock system of which the whole area was, and remains, a part; - The proposals are likely to have an adverse impact upon the ecology and biodiversity of the Canada Water SINC and the public enjoyment of connecting waterways and green-links; - The proposed development would place exceptional, additional burdens on public transport and other infrastructure, which may not have been fully taken into account in the submitted planning application documents or in the adopted CWAAP; - As such the development fails to fully take into account the environmental impacts, would have a significant, detrimental impact on matters of acknowledged importance and, would be dangerously prejudicial to the proper planning process of reviewing the Canada Water AAP. [A detailed critique- of the application is contained in the response letter. The above is a summary of the points raised.] 35 71 responses received from Neighbours in objection to the application 36 49 John Kennedy House - The applicant has submitted a flawed and error ridden Transport Assessment authored by Rambolls, which has been integrated into the Environmental Assessment. The applicant has carried out an erroneous approach and failed to adequately consider inevitable, significant and likely impacts on people and the environment. Impacts including traffic congestion and polluting emissions were not adequately considered and adverse impacts were excluded by reducing (and wrongly framing) the area of TA study; - A great many objections have been received to this application concerning traffic and congestion which is also linked to pollution. To ensure good and proper planning these matters and issues need to be tackled and sorted out; - The applicant should make contributions to improve the surrounding road networks through planning obligations; - Very concerned about loss of view, outlook and light, affecting neighbours of the proposed development; - Very concerned that there is no barrier between the large round TFL vent in the plaza and the development site, because of pollutants, and emissions from SELCHP; - If Decathlon’s demands and requirements are far too onerous and depriving the community of s106 / CIL, social housing, and viable delivery of the AAP etc, then Southwark Council should consider compulsory purchase of the lease and putting in a direct competitor to Tesco; - The store is going to double in size and the sports facility provision to the public community is disappointing; - Rotherhithe also requires an updated robust, honest, comprehensive and transparent road traffic study in order that changes to our AAP and wider area roads are well planned and effective in reducing the adverse impacts and damage from pollution and traffic; - Car parking for the retail element is inadequate; - The requirement to provide 1700 bicycle stands is wasteful, inflexible and is not appropriate for the residential users because it would be better to provide less provision using quality secure cycle lockers for residents and visitors; - Car club vehicles can be in use a great deal on the road adding to congestion and pollution unless they are electric etc. And club cars are likely to increase car use; - In relation to affordable housing, the Rotherhithe area Housing Forum (a ‘representative’ forum) has endorsed a very low provision of affordable housing in this development, clearly not in agreement with local elected Councillors, and more weight should be given to elected Councillors; - The CWAAP quantum for housing is going to be significantly and substantially exceeded and this exposes 2009/10 assurances about AAP sustainability given to residents and the CWAAP EiP as clearly being extremely flawed; - It is essential, for good and proper planning, equality – fairness – etc. that all developments in our area contribute towards facilities and improvements put in place in Rotherhithe AAP area so that the Rotherhithe AAP area is sustainable and developments gain the support of the Rotherhithe community affected by the intensification. 37 30 Montreal House - This new development, as a result of the proposed heights, will definitely affect the amount of sunlight received during the summer seasons; - The decision to have the development very close to the canal and with the proposed height will mean that the buildings will be so close and facing each other and therefore very little spaces between buildings and therefore a lack of privacy; - The decision to place this building very close to the canal will deny residents the open spaces which are vital for the outlook and enjoyment of this area. Lots of people with young families live in this area. This lack of open spaces will make it look like ‘cement and concrete city’; - Construction very near the canal will definitely affect the water quality in the canal and this will affect the ecology of Albion canal. 38 Flat 29 Toronto Court, Canada Water - The proposed building heights are unacceptable and will have an adverse effect upon properties and all occupiers at Toronto Court; furthermore the plans are contrary to the Area Action Plan which stipulates building heights of between 5 and 8 storeys; - The development as proposed is poorly designed in its siting, appearance and scale, and it will be detrimental to the Albion Channel and the surrounding areas. Whereas the Barratt development at Maple Quays has been design to display a range of contrasting architectural styles, this is not the case for the proposed development which is not appropriate in this area; - Especially concerned about the excessive height of the building which will overshadow and overlook both Toronto House and Montreal House; it will have a detrimental effect upon natural light received into properties and will adversely affect privacy; - No objection to the redevelopment of the site in question but call upon the Local Authority to excise its control in ensuring that what is approved is sensitive to the location and to the needs of local residents. 39 39 Toronto House, Surrey Quays Road - Strong concerns regarding the planning application; - Most residents move into Canada Water because of its unique qualities within London, it has clean, open spaces, a unique river/pond/lake, and already sufficient facilities (Tesco, Surrey Quays shopping centre, and the library), it is not as congested and claustrophobic as compared to central London; - The current population in Canada Water / Surrey Quays is at its optimum, with extra new residents moving once the Barratt Homes buildings are completed. The Canada Water tube station is already very busy in the mornings / evenings, and with the upcoming new residents following completion of existing constructions, the public transport will be even more congested; - The existing facilities in Canada Water are fine – Tesco, shopping centre, a good number of restaurants, cinema, bowling centre, library, estate agents and open spaces. No need for extra facilities; - The proposed development is extensive and the construction projects will cause a lot of pollution during the day (noise, air) and impact on limited natural environment; - Canary Wharf is already extremely convenient for Canada Water residents to do shopping, go to work to the Wharf; - On the other hand, Surrey Quays needs some significant redevelopment. The shops and buildings (either residential or commercial) are all rather shabby, there are not a lot of restaurants, is very dark at night and susceptible to crimes. Surrey Quays / Deptford is the area that needs extensive regeneration. 40 No address, representation on behalf of residents in the area - Letter on behalf of 19 residents in the area who strongly oppose the construction of high rise building(s) on the Decathlon plot. The area has recently had a construction of a 26 storey building which has greatly affected the quality of life of residents; - The Decathlon plot is one of the few open areas left in Canada Water; - The buildings (particularly high rises of 20 and 40 storeys) will completely block the very little sunlight received by neighbouring homes; - Sunlight has already been compromised by the Maple Quays construction; - Environment Statement Volume 1 Chp 2 para. 2.3.1 states the factors contributing to the need for redevelopment in Canada Water, however the allocated proposed max floorspace areas for retail (other than Decathlon) is just 3.2% or 4334sqm of total proposed development floorspace area; - The road near the plot is narrow and the development will increase traffic, and hence noise dramatically; - Already been living with construction noise and pollution for the last 4 years, more construction would take away at least another 4 years of quality of life. The blocks constructed don’t have enough space for any vehicle to enter, delivery vans are constantly blocking the road near these blocks leading to hazardous driving conditions; - Residents are not aware of the proposals, there should have been more publicity; - Infrastructure in the area needs to be improved before more blocks can be given permission to build (i.e. Primary Schools, GPs, Leisure Centre and Tube Station). 41 No address, resident of Woodland Crescent - Strong objection to the proposed 40 storey tower proposed for the development of the current Decathlon site; - Tall structure would be obtrusive and out of keeping with the generally low rise nature of the area, impacting on sunlight for many as well as overlooking may residences; - Such structures are more suitable for the high rise Canary Wharf area and no the area around Canada Water which has new building heights with the exception of Ontario Point of 8 to 12 storeys; - Previous Conrad Phoenix proposals for the site are completely in keeping with the area. 42 No address, by email - Completely oppose any construction of further high rise plots at Decathlon; - Do not want more high rise towers and the potential noise, pollution this will invariably bring. 43 No address, by email - Overall consider that the area would benefit by replacing the existing retail units with the new mixed development; - Concerned about the proposed 40 storey building, consider 40 storeys to be far too high a development for the area and it will block light to existing developments in the area. 44 27 Harwood Point, 307 Rotherhithe Street - Strong objections to development plans regarding the height of proposed buildings; - Oppose any construction higher than 5 storeys and find it unsightly as well as environmentally unfriendly to the area. 45 13 Bywater Place - A 40 storey building in this area would be obtrusive to the current landscape; - Not keen on the idea of replacing useful commercial real estate with residential real estate as it will mean that there is less on offer for the residents of the area; - The volume of additional residential units is dubious in light of current challenges to local infrastructure (broadband, roads, tube etc); - Also concerned about the impact of local wildlife along the canals and Russia Dock Woodlands. 46 18 Baltic Court, Timber Pond Road - Public consultation too short, exhibition needs to be held again for longer, with more publicity and local councillors in attendance; - No family homes of 3 and 4 bedrooms provided for; - Nothing to stop affordable homes being bought by developers to rent out to the students attending the facilities proposed for the Harmsworth Quays development; - No provision to extend Alfred Salter Primary School by purchasing the land opposite on Robert Close, to cater for the influx of extra children; - Strain on Canada Water Station due to population increase; - No car parking provided, residents will park on street; - The units opposite the Library remain ‘to let’ or ‘unsold’; - The tower is too tall and an eyesore. Views from Stave Hill across London slowly disappearing. The Water Gardens, Ontario Tower and possibly the development at Harmsworth Quays have, or will impact on any view. The area is low rise, the tower is out of character with the rest of the area, and there is a privacy issue with tall towers looking down on those houses and flats lucky enough to have a garden or balcony; - Height could be an issue for helicopters, also City Airport; - If the tower is granted permission, then local residents should be allowed to have access to the roof garden. 47 SE16 6RG, Residents at the Water Gardens - Huge development for a small site; - Long low block looks like a cross between the Heygate and Churchill Gardens; the mid-rise has stumpy proportions – ugly looking, big concrete of the bad constructions of the 60s/70s – very ugly huge concrete blocks with no respect for the environment the area, wildlife living in the area; - Darkness, decrease of light and sunlight in the area; - The garden square is nice, but the massing doesn’t make much of the lakeside location. Why not something more festive along the water front, a missed opportunity for a water side location; - It’s not really using the facing to Canada Water very well, this building could be anywhere; - The tower and two other lighter blocks are enormous; - Huge and uninspired; - Not a nice place to live, no green space, not environmentally friendly, not human friendly, no plants. 48 No address - Very opposed to the high rise nature of the proposals. The surrounding area is predominantly low rise and 40 storeys would change the nature of the area altogether; - Block light to surrounding dwellings; - Concerned that the schools and medical facilities in the area cannot cope with the number of new dwellings proposed; - Already have local schools that are oversubscribed; - No need for a cinema when there is one very close to the site at Surrey Quays leisure park. This would lead to increased noise late at night, disturbing the surrounding residential areas; - Concerned that the number of parking spaces seem very insufficient for the development proposed both for the residents and for the shoppers at any retail site. This will lead to increased parking and traffic on the surrounding road; - The area has plenty of 1 and 2 bedroom units, and a severe lack of 4 bedroom units or more, or larger dwellings suitable for families with secondary school aged children. In order to build a community we need families to stay, not to move out when children are 7 or 8. 49 16 Wolfe Crescent - The height and massing are inappropriate for a development in this area and contrary to all Southwark Plans; - The 41 storey block, with 20 storey block alongside, is particularly offensive. It will dominate the skyline and with the block already permitted alongside Canada Water Station will give the appearance of an American city centre; - Nothing said about affordable housing, made clear in the CWCF that none is intended. Told that the ideal of 25% affordable housing is not provided, that there will be no 3 bedroom apartments with private recreation space, that all residential properties will be1 and 2 bed bought as pieds-a-terre. The development despite it’s massive size will make no significant contribution to Southwarks housing stock; - Nothing said about the impact on the wildlife at Canada Water or the lake or Albion Channel, could there be an assessment by TRUE? 50 19 Fishermans Drive - Objection to the plans to build a 41 storey tower block in the Decathlon plot; - Concerned that a building of this dimension and height would significantly reduce the skyline of the area, and is not in keeping with the original surrounding developments which are classified suburban; - A development of this size will reduce light. Once occupied the accommodation would significantly increase traffic and parking congestion to the surrounding roads. 51 No address - Greatly concerned at the impact this would have on the travel links in the area, with the tube station already being overcrowded at peak times. Feels it would have a significant negative effect on the local community. 52 44 Montreal House, Surrey Quays Road - Whilst the plan on a whole is a big improvement on the existing plan, want to object to the height of the south end of building C1; - The 13 storey slab will be much closer to the canal than the existing building and the make the canal appear a gloomy canyon; - This building will dominate the edge of the dock, as well as the plaza and iconic library building; - Buildings should be lower nearer to the dock and canal, and rise in height further away from the canal and water edge. This would preserve the vista across the plaza to the dock and the new development, rather than blocking it with an unimaginative hulk of building. 53 No Address - These developments will block sunlight to existing buildings and houses, parking is already a problem and it will only get worse. Noise pollution will increase greatly reducing the quality of life in this area. Furthermore, the construction and the existence of these proposed towers will severely disrupt the wildlife that currently exists in our area (i.e. assorted waterfowl – some migratory, hedgehogs, foxes etc.). 54 No address, resident of Water Gardens Square - High rise buildings will destroy the enjoyment of living in the area; - Construction work for high-rise building to the new developments near Canada Water tube station is a hazard to residents and the environment; - There will be large vehicles operating on the site, which is dangerous for residents especially children. Cranes on high rise buildings are dangerous (accident at Vauxhall); - Dust from construction will be harmful to residents and the environment; - This area has the benefits of the city, but also the benefits of suburban life. It has been quiet and peaceful, the proposal will change this; - High-rise buildings will block natural sunlight for a large number of flats nearby; - The existing construction work around Canada Water tube station has been disturbing already, more construction work is unacceptable. 55 No address, resident of Water Gardens Square - Unacceptable to start more construction work in the area, let alone more high rises; - The area gets very crowded with heavy traffic, unbearable noise and less available public facilities over recent years; - There are lots of children in the area and more building work will cause more pollution, dust, noise and the high rise buildings will block sunlight. 56 Flat 461 Heligan House, Water Gardens Square - Opposed to high rise developments being built on Decathlon site; - Character of the area is low rise, with the exception of building by the Station. High rise buildings will disrupt the character of the general neighbourhood; - High rise buildings would affect the right to light of many residents in the Water Gardens Square development; - The proposed new development would contribute to noise and traffic problems in an area which isn’t designed to support a high volume and / or frequency of motor or pedestrian traffic. A development that is smaller than the proposed 40 floors would be much more acceptable, and would not contribute unduly to congestion in the area. 57 No address, Needleman Street - Opposed to the proposed 40 floor high rises at Surrey Quays site; - The view from Stave Hill, which has offered a panorama around London, is beginning to be eroded away with the constant building of high rise developments; - The infrastructure, i.e. schools, transport etc. which are struggling as it is without this proposed project; - Value sunlight and open skies. 58 No address, Bywater Place - Objection to the proposed development around the Decathlon site; - With all the existing building and development work going on currently, approval of further development, especially around Decathlon, by the council would negatively and more importantly permanently overload the existing infrastructure and fundamentally change our current quality of life. 59 13 Woodland Crescent - Opposed to high rise buildings in the Surrey Quays area; - Main attraction of this peninsula was the feeling of space and openness; - Supportive of the redevelopment of the Surrey Quays area, the area lacks good bars, restaurants, quality shops and leisure facilities, the new library is fantastic; - High rise buildings will spoil the skyline, reduce daylight, block out the sunlight and turn the area into yet another anonymous commercial zone; - Other considerations of noise, parking etc.; - A 40 storey tower will look incongruous with the surrounding area and dominate the peninsula. 60 445 Heligan House - Concerned with proposals to construct 5 buildings ranging from 5 to 40 storeys on the Decathlon plot; - If buildings are higher than 5 storeys, all the south-west facing flats in Water Gardens lose their direct access to sunlight and daylight and would in effect be in shadow for most of the daylight hours; - All the south facing flats will face the north facing facade of one of the buildings in the complex resulting in a loss of privacy not to mention a loss of the view of Canada Water; - Such a large complex of so many storeys indicates an increase of persons in the area, this implies an increase in noise levels in the area as well as an increase in vehicular traffic and its concurrent risks as well as an exacerbation of the problem of too many cars for too few parking spaces. 61 No address, resident of Eleanor Close - Strongly oppose the construction of any further high rise buildings anywhere in the Surrey Quays site, particularly on the Decathlon site; - The original consultation of the area regeneration concluded that the maximum height of any buildings should be 8 storeys; - There was a promise that along with the huge increase of population through this property expansion, not only would public spaces, transport services and community facilities be created / improved or expanded to support demand and alleviate pressure on new and existing residents and business, also a new atmospheric, lively and community feel to our streets and paved areas was a huge selling point for earlier planning sign offs – so far only positive is the library with no facilities; - No play options for children, poor take up of commercial units, shopping centre lacking in so many ways, ponds and canal terribly neglected, Rotherhithe tunnel has a debilitating effect on traffic around the entire island, there are no community centres / spaces, the sports facilities are totally inadequate, telecommunications don’t work, phones drop out frequently and broadband is cripplingly slow; - All original and existing developments prior to the new Barratt’s expansion are maximum 4-5 storeys which are essential limits to maintain healthy levels of light and air space and encourage the natural spaces to remain a home for nature; - Surrey Quays is a family environment and should remain as it is unobstructed. 62 51 Acorn Walk - Opposition to the construction of high rises in this area; - Detrimental effect of this type of development is well documented in terms of the negative social and environmental impact. 63 No address, resident of Fishermans Drive - Against multifloor buildings on Decathlon plot; - Area cannot fit so many new flats; - Already problems getting on the tube, and getting doctors appointment; - The area is overcrowded, there are not enough nurseries in the area or even playgrounds; - Traffic is a nightmare with traffic jams everyday on Lower Road. 64 No address, SE16 6AU - Please sort out the local roads before allowing redevelopment which will result in an influx of people to the area to live; - The height of the proposed Tower is too tall and out of keeping with the surrounding low level housing and flats. The Ontario Tower on Surrey Quays Road went above the promised height so the height of these towers will create a precedence for the height of any future towers; - The proposed steps / seating onto Canada Water are a possible danger. 65 No address, resident of Timber Pond - There is already a cinema, why is another cinema needed?; - Why is office floorspace needed in this area? There is empty office floorspace in zones 1, 2 and 3 that needs filling. Industrial businesses like the printworks would be a better option; - Is it necessary to have a green space when Stave Hill (ecology park) is just a stones throw away and the area is not far from Southwark Park; - The towers will block sunlight to the green space; - The towers will create a wind tunnel; - There is a bridge near the canal that should be left unchanged and cleaned up; - A second hill should be put forward, that is higher than the existing Stave Hill; - No need for more retail space (other than Decathlon) when already plans to improve the shopping centre; - There is already a huge issue with leaving Rotherhithe by road at certain times and more people in the area will mean more people using cars. Restricted parking is needed, Dominion Drive should be a through road, and another way of leaving Rotherhithe should be created; - More affordable housing needed; - Local people should have first opportunity to buy homes; - Should be a mixture of 1, 2, 3 and 4 bedroom homes and not just 1 and 2 rooms with decent liveable size of floorspace for each home; - Lots of new buildings in the area being constructed with little time for locals to consider how they feel about the new buildings, and how these buildings effect the environment and community; - Wrong type of buildings for this area, green space is pointless when the concept art shows buildings that look morbidly dark, dank and depressive; - Buildings should reflect the history of Rotherhithe or be built with lighter bricks that generate a light and non-aggressive atmosphere; - The tower should not be built for many reasons, including the following, there are many helicopters in the area, blocking sunlight, invading privacy and creating uncomfortable atmosphere to live in, impact on wildlife, doesn’t fit in with anything in the area, there is a restriction on heights in the area, skyline / view from Stave Hill would be ruined, and a lot could still be done without building the tower; - This plan echo’s the mistakes of the past with 1950’s housing boom. 66 144 Montreal House - Support the redevelopment of these sites, but do have concerns with the current proposal; - The height of Core A of building C1 at the corner of Albion Channel and Canada Water Basin, part of this building is 6 storeys rising to 12 storeys near the Basin. The 12 storey segment is too high and there will be loss of daylight and sunlight caused by this 12 storey building; - In order to blend in with other developments in the area, the building should be of similar height, 6 and 8 storeys would be more in keeping with the area. 67 Flat 573 Giverny House, Water Gardens Square - The applicant presents their enormous buildings as the new town centre of the Canada Water area and that a forty storey tower would act as a landmark for the Rotherhithe peninsula. This is wholly unnecessary as Barratt’s twenty six storey Ontario Point can already be seen from miles around and Canada Water has an existing focal point in the Canada Water Basin nearby the station and the public plaza between them. Any further towers should be clustered around the public transport hub; - The Canada Water Action Area Plan estimates the capacity of Site C to be 430 residential units with a further 140 on Site E. It also states that the sites are suitable for buildings of between 5 and 8 storeys; - Public transport in the area is already heavily congested; - The applicant is reluctant to provide the normal percentage of affordable homes within the development, with any that they do provide being in the final ‘Site E’ phase; - If the sites only become viable if the buildings permitted are grossly disproportionate, when compared with those around them, then perhaps the applicant paid the previous landowner, Conrad Phoenix, too much money. See no reason why the area should be bighted in order to satisfy a speculator’s investment; - The arrangement of blocks in Water Gardens allows more light to reach Albion Channel and the properties in the pre-existing Woodlands Crescent development, and maintains the South-East facing vista established by Woodlands Crescent which means the morning sunlight can reach the communal gardens of both developments; - The images supplied by BKR Sustainable Solutions suggest a significant loss of sky / sunlight to neighbouring properties, yet this is dismissed in Ramboll’s Environmental Statement – Non-technical Summary as ‘minor’; - The height, width and placement of the various blocks would result in a distinctly ‘canyon-like’ and oppressive streetscape. 68 No address, SE16 6SF - Against the plan to build a 40 storey high building, it will increase the population significantly, putting pressure on limited public resources, including transportation, schools, shopping, nursery, health care, and library. It will significantly change the outlook of this area; - Support plans to create retail stores, health centres, especially another large supermarket. Currently the 24 hour Tesco store did not cope with the high volume of customers. 69 No address, Toronto House - The volume and height of the new buildings is too high, it will completely change the area; - It will decrease the value of every other property in Maple Quays; - Currently a convenient but quiet location, the amount of new residents will change this; - With the new buildings, the volume of people living in the area will increase dramatically and will make it unbearably crowded. Taking the tube in the morning will be a bigger nightmare than it already is and this is not acceptable; - The new buildings will be too close to Toronto House and Montreal House and will change the view dramatically. The height of buildings will also cause a loss of sunlight for the south facing flats; - Don’t object to the idea of having a town centre but don’t see the need to have this amount of residential and commercial units, which in my opinion are unnecessary. 70 Helier Court, Eleanor Close, SE16 6PZ - At 40 storeys the proposed building will further change the character of the area. Canada Water has principally been a low-rise residential area; - This application will further increase traffic on Surrey Quays Road, which has already been increased with the recent new developments; - Application includes up to 698.2sqm of cinema floorspace. There is already a local cinema in the Mast Leisure Centre; - The application will further imbalance the ratio of residential to commercial premises in the area. Canada Water has very few commercial outlets, it badly needs more high quality shops, restaurants and cafes to provide a balanced environment and provide a high street feel; - Important that the frontage onto Canada Water remains clearly accessible to the general public and is not restricted to the occupiers or owners of the new buildings. Canada Water is a resource for the whole community and should not be restricted to those who can afford to live in the new developments. 71 253 Dovecote House, Water Gardens Square - Strongly against this proposal, and don’t believe this benefits in anyway the local residents, the area and the local wildlife, but only Sellar’s own financial interests; - Not against the construction of new houses in the area or the development of Canada Water in anyway, however very strongly object to the Sellar development; - Scale and size of New York / Canary Wharf and not in line with the nature of the area or other developments already completed; - Impact on light, especially due to the size of the buildings; - Impact on residents quality of life, impact on local infrastructure and transport; - Very limited to no green areas proposed; - Very limited to no benefits to the area; - Increase in noise in the area, due to scale of work required and post completion; - Impact on traffic and transport in the area; - Negative Impact on wildlife and not pleasant looking. 72 19 Woodland Crescent - The buildings C2, some of C1 and all of C4 together will completely obstruct all the sun that its received to all floors of neighbouring houses; - Strongly oppose buildings over 6-7 floors in line with all other developments in this area; - The developments like what is being proposed should be balanced with some additional benefit to the area. The openness of Decathlon and adjoining areas will fast disappear concrete jungle taking over with no one caring about the quality of life of the residents around; - The traffic between Canada Water tube station and Seven Islands is extremely busy at best of times, this will make matters worse; - Canada Water and surrounding areas have seen unprecedented development. There are numerous other developments increasing the population of the area, the shopping mall is creaking at its seams, Canada Water tube station is becoming overcrowded at peak hours making it difficult to commute to work, lack of health centre, lack of school space, etc. all facilities under further stress. 73 32 Toronto House, Surrey Quays Road - The Sellar proposals are not at all compatible with the CWAAP conclusions; - Sellar’s proposal will ignore the current building line, remove trees and result in a 13 storey high building within a few feet of the water. This will create a claustrophobic effect of the towering height in combination with the substantial encroachment. Also object to the subsequent loss of the trees / wildlife and a serious loss of natural light; - Understand that the development plans to construct a new, additional, pedestrian footbridge over the canal, quite close to Toronto House, in the area of the current children’s’ playground. This would create a huge increase in pedestrian traffic from their new development to Canada Water bus and tube station. This will create additional and unwanted noise, litter, security risk all under balconies in Maple Quays; - Sellar have had ineffective consultation with residents; - Substantial loss of amenity (photo’s provided), the current natural light and views from the lounge and balcony of the flat will be substantially impacted by the proposal. The proposals will have a devastating impact on the enjoyment of the homes in Maple Quays. 74 No address - Object strongly to the proposal for a 40 storey building on the current ‘Decathlon’ site, totally out of character with the area and greatly exceeds the already high buildings being built at present; - Not opposed to some degree of high rise development in the area, but this is totally over the top; - Would like to understand more about how the residents of these new dwellings are going to be serviced for schools, medical needs, etc as the existing services in the area are already stretched to breaking point. 75 No address, SE16 7TZ - Concerned about the number of residential units proposed as well as the height of the 40 storey building; - The supermarket and station have now reached their peak usage capacity. During the peak times the station is always very crowded and, then there are delays on Jubilee line, platforms sometimes even have to be closed due to overcrowding, there are no concrete proposals in the application to address these problems; - The 40 storey building proposed in the plan does not seem to fit into the general architecture of the neighbourhood particularly around the basin. Canada Water has always been dominated by 7-8 storey buildings, which has allowed for a lot of sunlight and less wind, especially taking into account the fact that the area is already quite windy due to its proximity to the river. Concerned that having a second high building will make the area significantly darker and windier and will prevent residents from enjoying the beautiful open area around the basin; - A 40 storey building will also take away from the general architecture of the area. 76 No address - The 41 storey building proposed will completely destroy the views from Stave Hill and various other points such as Greenland Dock of the City, 5-8 storeys would be supported. 77 70 Bywater Place - These plans will irrevocably change the nature of the area, clearly there is a need for more housing, but not such tall blocks; - Acutely aware of the need for housing for local people to have homes and not foreign investors to raise the price of housing to make a quick profit; - The transport system cannot cope with such an influx of numbers. 78 563 Giverny House, Water Garden Square - Object to the access of vehicles related to phase 4 (What shop) via Canada Street. This street is extremely busy with pedestrians mainly primary school children and mothers walking to and from the local primary schools; - Any more traffic down this street will increase risk of a traffic incident and proposed that the access is changed to Surrey Quays Road instead. 79 Anonymous, no address - Forty-storeys is a very tall building and looking at the artists impressions, the whole plan includes not only the forty storey block but quite a few other developments around it; - This may be a big mistake as it will bring up too much of a population into the neighbourhood, the level of traffic has already built up to a borderline manageable level; - The police station at Lower Road is closed down, more people in the area will require more police; - Residents support more restaurants, shops and particularly food stalls, and restaurants on the streets. 80 17 Wolfe Crescent - The density of the proposed development will bring the area to saturation point. With the transport and congestion getting on and off the peninsular is already at near breaking point; - Not enough consideration to open and green spaces; - The development proposed is obviously aimed at singles or couples and in doing so the investor buy to let market; this means the people who then move into the area are often just in ‘transit’ this has the effect of a disjointed community; - A 40 storey tower block is questioned and reflects past mistakes; - The proposal has absolutely no regard for people and a community. 81 No address - Oppose the 40 floor development at the Decathlon plot due to the level of noise, the construction it will create and how much sunlight will be blocked. The maximum height of the development should be restricted to no more than 8 floors. 82 No address, resident of SE16 - In support of some aspects of the proposal, the principle of redevelopment of the existing underused site, the separate affordable housing provision, and the massing of that block (E1) which offers a sense of human scale to the site and in keeping with surrounding housing, also welcome the introduction of much needed coffee / craft shops / non-supermarket retail outlets; - However feel that the proposed 40 storey (plus) tower is entirely inappropriate for Canada Water especially when considered in the context of the size of the wildlife sanctuary it faces; - The only other nearby towers are 20-25 storeys high and already dominate the skyline. Strongly believe that a new 40 storey tower in this location would not only be inappropriate but would be intimidating to the users and residents alike; - Need to carefully consider the excessive use of full height glazing and clear-glass balconies when facing public spaces or roads, as can be seen from the occupied apartments nearby, and become a patchwork of tenants’ bed-sheets / blinds / curtains, with personal items such as boxes, bicycles and rubbish bags stored on balconies, which will downgrade the appearance of the public space. 83 53 Plough Way - Supportive of the need to develop this area, however a 41 storey building is physically too large, intrusive on the area and puts extra pressure on already-busy public transport infrastructure. Also note the proportion of affordable housing falls significantly below Southwark’s own requirement. 84 No address - The health and quality of living, transport infrastructure, geography, the demographic balance and a long forgotten ban that was to stop more high rises seem to have been overlooked and fallen by the way side due to promise of huge money; - Bermondsey is unique in its ample amount of open spaces such as Southwark Park, Kings Stairs Gardens, Stave Hill and of course the river side. Challenge whom would want to sit in a manmade concrete surround with such beauty and variety easily accessible; - Building a 42 level block with over 200 new residents is pure greed in an already over built small area that has no real community or soul, a condensed army of commuters who all leave at around the same time and the public transport system is already dangerously overcrowded at rush hour at Canada Water. 85 No address - The reasonable position supported by the community and agreed by the London Borough of Southwark is in danger of being steam-rolled; - The environmental impact of any development on this sensitive site should be of utmost concern, the balance of development should be such that Canada Water is not dwarfed by inappropriately high buildings, its environmental benefits should be preserved, bird and wildlife surrounding Canada Water should not be impacted and sight lines should be preserved. 86 362 Eden House, Water Gardens - Daylight and sunlight and overshadowing is a concern. According to the available documents there have been no assessments done on the impact of the new development on existing properties. Creating high rise buildings in the close proximity to existing properties will lead to reducing daylight availability. The assessments of sunlight in open spaces was done for just one day and does not take into account seasonal variations in daylight and therefore does not give a representative picture of the sunlight limitations that the new buildings create; - Industrial dust pollution, during the recent construction of the buildings around Canada Water the level of dust in the air was unacceptable. Not worried about the aesthetic consequences of the dust, but unfortunately it also leads to exacerbation of lung diseases such as bronchial asthma and common dust allergy; - Aesthetic considerations, according to the existing plans the proposed buildings are hideous and its an insult to London and its architecture and one might hope that in itself it should be a valid enough reason to stop this development; - Visually aggressive designs such as this one are well known to correlate negatively with emotional states of people residing or visiting the area, and also suggested that it has a negative impact on crime rates. 87 17 Wolfe Crescent - Residents do not want a Canary Wharf look nor a Manhattan one; - The height and density are too much, Canada Water does already have difficulties dealing with the enormous influx of people over the past 5 years, so does Lower Road; - A 40 storey tower is objectionable, and the developer fails to mention 3 other buildings that are over 15 storeys, and over the normal height of the area; - Convinced that the maquette is not to scale and the new buildings will look, and be, even higher. Am sure that the developer does not count the very high roof terrace on the top of the 40 storeys within the height; - The Canada Water Basin looks very much threatened by the ‘nearness’ of the buildings, nothing is said about the impact on wild-life either; - There is a huge environmental impact. 88 67 Bywater Place - concerned that the height of some of the proposed buildings and the nature of the development will have a negative impact on local residents, traffic congestion and the environment; - The proposed 40 storey height of the building is completely out of character with the area, and only 10 floors shorter than One Canada Square of Canary Wharf; - The creation of nearly 1050 residential units in such a concentrated area will put even greater strain on the already restricted local amenities, school facilities, shopping facilities, parking and traffic for the area; - The application does not refer to the building of any day-care or school facilities, there are currently two schools within walking distance of the proposed development; - The amount of parking seems insufficient to accommodate residents, office workers, retail shoppers, and other visitors to the development. The streets are already jam packed with parked cars; - Unclear whether a new supermarket proposed, currently only have one serving the area; - The erection of tall buildings so close to the natural habitat in Canada Water Basin may interfere with the flight pattern of birds. 89 42 Elephant Lane - The plan contains one extremely tall building, which will dwarf everything else in the area; - The tall tower is going to cast a massive shadow over everything in the area, including the water itself; - The plan indicates that there will be a public ‘garden’ the majority of which will be between and behind two buildings, including the tall tower. The current design appears to give the public a view of the back of two blocks of flats, and the area will be overshadowed; - The majority of the potential restaurant and cafe areas will be on the inside, looking at on the public area, which will be dark, and have no view of the water; - The style of the architecture looks very futuristic on the plans, but is apparently going to be made of a shiny white material. Is this appropriate for the surrounding brick built developments that currently exist there – it appears there is no attempt to balance with current building; - The whole application has been very badly publicised. 90 No address, resident of Water Gardens - The plans are completely disproportionate to the area and the 5 tower blocks would be ugly and do not fit in with the area heritage an environment; - The facilities proposed by Sellar are also minimal (no new schools or swimming pool) and in some cases redundant (cinema), and the small addition of facilities will only be enough to serve the residents that the development will bring to the area, not sufficient to improve current facilities. It will create further stress on the transport system that cannot cope with further influx on a massive scale; - The new development would bring considerable noise and stress to the area; - The new development does not cater for families, but proposes mainly 1 and 2 bed flats. What is the point of regenerating an area if no community facilities are provided; - The people of the area do a great deal to maintain the area and wildlife and it is unfair of the developer to profit from the hard work done by local people; - Canada Water is a nesting area with a lot of bird species residing there, what will be done to support and attractive wildlife to the area; - The proposal would bring a lot of darkness to the area, to the neighbouring flats and to the Albion Channel, this is unacceptable and a breach of the right of the local people and neighbouring flats; - The agreement for the area is to build 5-7 storeys so why is this proposal being considered; - The regeneration should focus on building sustainable family accommodation of reasonable, good local schools, community facilities. 91 46 Elephant Lane - How can an underground car park be dug and be made safe so close to the huge volume of water in Canada Water Lake; - Not clear what percentage of housing will be social; - There will be further impact on the environment of such high rises, the area around Canada Water station is already quite oppressive and dangerously windy. 92 No address - 40 floors is a terrible idea, it is going to be ugly; - Big problem in relation to schools, transport, doctors, nurseries and many other utilities that the area is already lacking. There are not enough primary schools to cater for all these new people; - The development will devalue the area. 93 33 Brandrams Wharf, Rotherhithe Street - 41 storeys is simply too high, and not in keeping with either the area or the delivery of the Canada Water Action Plan. 94 169 Montreal House - The proposed development is completely out of scale and context for the site, area and AAP. This proposal is being driven by the desire for profits thinly veiled as being in the interests of the community; - The number of towers together with the height of the tallest tower, are completely out of scale and context with the immediate area; - The proposed development is contrary to the Area Action Plan, particularly in relation to building heights; - The amount of apartments being introduced will place a strain on local infrastructure and community resources. The Transport Assessment is insufficient and should be undertaken at peak times, congestion on roads and lack of community facilities (including child-care) already; - The positioning of tall buildings up to 52.1m immediately adjacent to the canal and Montreal and Toronto House will have a significant detrimental impact on outlook and living environment; - Building C1 will cause a significant reduction in the sunlight and daylight to Montreal and Toronto House, as acknowledged in the application documents; - The proposal will have a significant detrimental impact on the privacy of the neighbouring residents, with flats proposed directly looking across and / or down into their dwellings from a short distance. Single aspect dwellings in Montreal House. The lower floors of the proposed development will equally have problems with privacy; - Building C1 is positioned too close to the boundary of the site, resulting in loss of walkway / public space. 95 10 Murdoch House, Moodkee Street - Object to the application on grounds of density, height, environmental impacts, traffic and lack of parking provision; - Understand from the applicant that the planned density is 997 habitable rooms per hectare, this is around 4 times the 2005 London average; - The proposed 40 storey tower will be twice the height of Columbia Point and Regina Point – the highest existing buildings in the area; - The designers have not given adequate consideration to the windy character of this area; - The design is generally tired and uninspiring; - Lower Road is already significantly overloaded with queues stretching from Deptford and St James’s road at peak times; - The scheme only provides 222 residential parking places for 1046 units, this will cause parking problems in neighbouring streets. 96 45 Frederick Square - Oppose the 41 storey tower at Canada Water which is out of context with the surrounding area and will overwhelm it; - Concerned about he infrastructure available for all these new units in Rotherhithe, Bermondsey and Canada Water; - Southwark is becoming a borough that only the rich can afford, it has historically had a rich diverse community. 97 41 Toronto House, Surrey Quays Road - Key objection relates to the height of the proposed development, which at times is 40 storeys high, also the developers have not met Toronto / Montreal House residents concerns about height, the loss of sunlight and the monolithic nature of the proposed developments; - The proposed development does not fit will with either the Albion Channel or the Canada Water Basin; - The development does not provide sufficient information about he extra pedestrian and vehicle impacts, the Canada Water transportation links are already congested; - There is insufficient information in the application about he impact on wind flows and loss of daylight for existing residents around Canada Water Basin. The Albion Channel and Canada Water support a good amount of birdlife which makes the area a pleasant place to live, shop and work. This proposed development is unsympathetic to the existing land use and natural environment; - Despite many interactions, the developers did not take account of our objections about height and loss of daylight. 98 26 Toronto House (multiple) - The proposal is not consistent with the Canada Water Area Action Plan; - The regeneration of this area should be consistent with the style of the Maple Quays developments; - The proposed design appears to do little to either maintain, or enhance the existing site with respect to open space, local ecology and heritage; - The buildings that border Albion Channel will see the eradication of existing green / open spaces near the junction of the Albion Channel with the Basin, due to the encroachment of the proposed buildings, it would appear that these buildings will effectively be immediately adjacent to the old mooring posts along the channel, this is not a sympathetic way to treat the scarce remaining feature of the areas past; - The availability of sufficient light plays an important role in local ecology systems and the area of the channel is a breeding area for local bird wildlife. The loss of light will clearly impact upon the growth of local reeds and other plant-like material required to sustain the ecology of the local area; - Loss of existing open space, the height and design of these buildings immediately adjacent to the Albion Channel and the building and population density are of concern; - Also concerned about the impacts of light reduction to Toronto and Montreal House; - Fail to see how residents concerns have factored into the design proposals; - From the information that has been supplied in the planning submission, based upon the equinox, a number of apartments will be impacted by a reduction in light that exceeds the BRE – it is then stated by the proponent that this is acceptable; - The testing and modelling of daylight and sunlight impacts should be repeated, with increased scope; - Toronto and Montreal House have been designed to maximise energy efficiency and carbon footprint, if potential environmental impacts from the proposed development will reduce solar heating that was previously considered a benefit by the council in Montreal and Toronto House, this should be of concern to the council; - Concern that a wind tunnel effect will also be created; - Loss of outlook will result; - Unless there is a committed specialist retailer willing to take on the economic risk of the retail space at this stage, how can local residents feel confident that this space will be taken up given the current empty units beneath Montreal House and the fact that even when properly fitted out retail spaces have become available in Surrey Quays Shopping Centre can remain empty for periods at a time; - Concerned about potential impacts upon the already heavily congested Jubilee Line and buses during peak period that have not been allayed and require proper analysis; - Concerned about the potential precedent that would be caused by the approval of any phase or aspect of the submitted proposal in its current form. This proposal represents a significant deviation to the current AAP and as a result of it, creates a range of unacceptable consequences upon the local area. 99 25 Toronto House - The proposed development is out of scale and context for the site, area and AAP; - The development is monumental rather than human in scale; - It will tower over the basin and channel, rather than sensitively interact with it, the height of the existing building is quite similar – these buildings will not go with the rest, they have absolutely nothing to do with it; - If this is approved, it will be very difficult to keep to the perimeter block approach advocated in neighbouring sites, and a key opportunity to develop this site into a vibrant and interesting place will be lost to be replaced a corporate development of little character; - The scale and siting of the buildings will seriously harm the amenity of existing neighbours in terms of light, outlook and privacy; - There are significant questions over the ecological impact of the development, i.e. there’s already been a reduction in the bird population in the channel and this plan will make it worse; - The developers have presented their plans to residents, but despite their assurances, have failed to properly interact with them or take their views on board in a meaningful way, i.e. we have expressed concern about the height of the new buildings in every meeting and asked that these are lowered but no change to the plan has been made; - The volume of residents in the area will be too high for the existing infrastructures, i.e taking the tube will be impossible:– something that’s already very hard today given the existing high number of residents and passengers changing at Canada Water. 100 9 Toronto House - The development will have a negative effect on occupiers of Montreal House and on Canada Water as a whole; - The development is completely out of character compared to the surrounding area and the Canada Water AAP; - Instead of integrating with other immediate developments in the area, the proposed development will tower over them including the Albion channel and the Canada Water Basin; - Very concerned about the direct impact it will have on residents of Toronto House, the closest neighbours to the proposed development; - Loss of light to properties is of great concern. 101 105 Montreal House - The Canada Water Area Action Plan was intended to foster development in a sensitive and cohesive manner such as to facilitate in the long term a thriving community. One of the key points of CWAAP was the stipulation of building heights, a restriction to adhere to buildings of between 5 to 8 storeys high, at least within the vicinity of Canada Water basin; - The proposed development by Sellars, which included buildings 13 storeys high and a tower block of 40 storeys high, as far as I can see makes no attempt to be sensitive to the surroundings; - Sellars promised the highest of design quality of buildings but if no attention is paid to its surroundings they will sit like sore thumbs and contribute nothing to the area; - The layout of the proposed buildings appears to restrict movements and linkages to the Basin and the Channel. It would seem that the proximity of the proposed buildings would have an adverse impact on the biodiversity value of the channel which feeds into Canada Water; - The adopted CWAAP was subject to the Habitats Directive and a significant move away from this as proposed should warrant a rigorous reassessment of environmental impacts; - The developers have not properly taken into account the historic assets of the area and demonstrated how the development will mitigate the adverse impacts upon the heritage of the historic dock system and the manner as to how they will preserve and enhance them; - Another environmental factor would be the possibility of the creation of wind tunnels created by the height and proximity of the proposed buildings; - The heights of proposed buildings and their proximity to existing buildings will affect the access of residents of the existing buildings to sunlight and daylight. The loss of sunlight and daylight will have an impact on the usage of energy inside both existing as well as the proposed homes; - There is also the concern of privacy as the proposed taller buildings will enable the new residents to look into the dwellings of existing residents and vice versa; - Do no object to the redevelopment of the site, but do object to the current proposal submitted by Sellars. 102 161 Montreal House - The design of the proposed development is uncharacteristic of the area and is in significant conflict with the Canada Water AAP, particularly in relation to building heights. The development will tower over the Canada Water basin overshadowing any surrounding structures and changing the character and perception of Canada Water. The design of the proposed buildings is simplistic and unexciting, with crude rectangular forms being dominant throughout the development, which is uncharacteristic of the surrounding area; - The proposed development comprises several tall buildings (8, 10 and 13 storeys) in close proximity to Toronto and Montreal Houses, the impact upon privacy and outlook will therefore be detrimental. The green open space that currently exists at the junction of the Albion Channel with the Canada Water Basin is planned to be removed by the developers; - The developer has carried out a sunlight / daylight assessment, which shows the significant impact the development will have on surrounding structures and in particular Montreal House. Disappointed thatimpacts are discarded as minor adverse. Particularly astounded by the claim made by the developer that ‘since some of the rooms in Montreal House are already suffering less light than BRE guidelines further light loss is acceptable’; - The proposed development will comprise over a 1000 new apartments, which may put a strain on local infrastructure and community resources. Tube networks particularly may suffer, as even now there is significant congestion during peak hours at Canada Water Station. Road traffic is also a major concern. The study provided by the developer is insufficient and does not consider the worst case scenario; - Wind tunnelling will be created by the proposed high rise buildings, making the existing strong winds even worse in the area. The wind study provided by the developer is insufficient and does not provide an objective picture of the impact the new development will have on wind environment. 103 16 Wolfe Crescent - The height and massing are inappropriate for a development in this area and contrary to all Southwark Plans; - The forty-one storey tower block situated between Canada Water and BHS, with a 20 storey block alongside, is particularly offensive. It will dominate the skyline; - Nothing is said in your outline about affordable housing and it was made clear at the CWCF briefing that none is intended. We were told that talks were taking place with Southwark Council about renovating affordable housing elsewhere instead. This development, despite its massive size will make no significant contribution to Southwark’s housing stock; - Nothing is said in the outline nor at the developers consultation briefing, about the impact on the wildlife at Canada Water nor indeed about the lake on Albion Channel. 104 131 Montreal House - Object to the positioning of a tall building up to 52.1m immediately adjacent to the canal and Montreal and Toronto House will have a significant detrimental impact on the outlook and therefore living environment of neighbouring residents; - Loss of sunlight and daylight will have a tangible impact upon the energy use inside both existing and proposed homes, contrary to the Councils Residential Design Guide; - Also adverse impacts upon privacy of adjoining occupiers. 105 106 Montreal House - The proposed development is unsympathetic to the existing area, and consists of massive high rise buildings in close proximity to the existing Maple Quays development and impacting on the pleasure of living in a reasonably open area and the enjoyment of Canada Water and the Albion Channel as natural and unspoilt attributes to the area; - The specific impact on residents of Toronto and Montreal Houses is the proximity of a tall building in such close proximity that it takes light and heat from flats in those two buildings. In addition the effect on the Albion Channel is likely to construct a wind tunnel with effect strong enough to drive away the wildlife, which is the main attribute of the Albion Channel, but also to effect potential damage on balconies and windows of nearby flats. 106 2, 11 & 35 Toronto House (3 letters raising the same concerns) - The proposed development is out of scale and context for the site, area and AAP; - Specifically the number of towers together with the height of the tallest tower which is 40 storeys in height are completely out of scale and context with the immediate area and ugly in appearance; - The proposed development is contrary to the Area Action Plan, particularly with regards to the proposed buildings heights where the plan stipulates building heights should be between 5 and 8 storeys high. The planning regeneration of the area should therefore be used as a strong guide to consider the proposal against; - The amount of apartments being introduced will place a strain on local infrastructure and community resources especially the local health clinics and the infant school; - Specific concerns relate to impacts upon transport infrastructure in the area; road traffic; and the positioning of the tall building up to 52.1m high immediately opposite Montreal and Toronto House; - The development is monumental rather than human scale, it will tower over the basin and channel, rather than sensitively interact with it; - The scale and siting of the buildings will seriously harm the amenity of existing neighbours in terms of light, outlook and privacy; - The layout, siting and height of buildings will be likely to dramatically alter and increase winds in the area, effecting amenity and ecology; - The application fails to properly assess and take account of the built and community heritage of the area, historic assets and ecological impacts. 107 32 Toronto House -Would like to object to several aspects of the plans. (No further information given) 108 9 responses received from individual neighbours and 61 identical letters in support of the application 109 22 Bywater Place - Fully support the application and nice to see the area being developed. 110 No address, Brunswick Quay - In general support the application, subject to one condition, that there is public access to the top levels of the 40 storey block. I think the views from the top floors from this peninsular location will be spectacular. If top floors were restaurants that would put Surrey Quays on the map. 111 No address - Overall a good impression of the plans; - To make the area more lively and liveable, the key is to have more retail and entertainment spaces; - Shops should be small sized and merged with living areas, to remove the ‘mall feeling’ that Maple Quays has, it should get more of a ‘high street’; - Restaurants, pubs, etc are key for the development. 112 SE16 6YN - The planning details presented by the developer are clear and through, although there were some doubts about the 40 storey tower, this is acceptable as it leaves more open space at ground level. 113 SE16 6SW - Strongly support the plan and hope it will be approved by the council quickly. It would make the area more pleasing to the eye. 114 15 Poplar House, Woodland Crescent - The plans are superb, especially with regard to getting some shops, cafes and bars in the area. Would also like a gym. 115 33 Plover Way, Surrey Quays - The plans look great and very supportive of getting some bars, cafes and shops in the area, a gym would also be good. 116 1 Aberdale Court, Garter Way, Rotherhithe - In favour of the development, keen on increasing the vibrancy of the area, especially after dark and creating a night time economy, which doesn’t exist at present; - Keen on an Everyman cinema and a Waitrose or other supermarket, happy that Decathlon stay; - Only concern is loss of private parking spaces and increased use on the Jubilee line and overground. 117 No address - Impressed with the plans for Canada Water, it would be a shame if this were not given the go ahead, the only problem is the infrastructure has not been put in place. 118 61 identical letters received with the following comments - Fully support the planning application as submitted as a major step forward in creating the new town centre for Canada Water; - The proposed new shops, cinema and employment spaces will bring substantial benefits for existing and future tenants and residents in terms of local amenities, jobs and town centre activity. At the same time the scheme protects and expands the operation of Decathlon as a major employer and retailer in the area; - Support the proposed training programmes and jobs that will be generated by the construction and landscaping works and urge the council to confirm the proposals for local employment so that residents from the surrounding community can take up the opportunities that will be made available; - Also back the proposed large new public space on Site C, which make the best possible use of the waterside setting. Believe that this will become a much-loved local amenity right at the heart of Canada Water. 119 2 responses received from neighbours with comments on the application 120 No address, SE16 6YQ - Commendable plans for the area, and would change the profile of Canada Water, and have the following comments; - Parking, objective for Canada Water is to promote a family friendly area, see a good proportion of 2-4 bedroom developments in planning. However, there does not seem to be much parking especially in building C1, strongly believe that providing parking for at least the 2 bed plus apartments is very important and will make the development work for families ; - Building C2 does not seem to be adding much to the area and sticks out like a sore thumb in the plan. Ends up spoiling the views of quite a few flats in C1 and C2 and would also affect the amount of sunlight these flats receive; - Families need storage, plans don’t seem to support this requirement; - Opportunity for local residents to get the first choice in buying off plan should be made one of the conditions as quite often buildings go and launch their projects in Asia to investors who have never even been to London; - Unclear what proportion of the development will be affordable. 121 No address, Brunswick Quay - Would like to support the application, but think that there should be public access to the top levels of the 40 storey block and have the top floors as restaurants. This would be great for the area. Re-consultation 1 122 Re-consultation was undertaken on 24 May 2013 to take into account revisions undertaken by the applicant and the resultant changes to the development description. The relevant changes included the following; A reduction in the maximum number of residential units from 1,046 to 1,030; Increase in the overall amount of floorspace to 138,146.8sqm (GEA) [previously 137,612.4sqm (GEA)]; Internal and external detailed design amendments to building C1; The Decathlon retail car parking spaces to be made available to the general public as ‘town centre’ parking; Provision of disabled parking; Provision of additional street tree planting; Provision of additional balcony wind protection to buildings C2-C4; Amendments to the indicative internal layouts of buildings C2 and C3; Provision of indicative phase 2 and 3 basement plans; Revised sizing and phasing arrangement for centralised combined heat and power (CHP) plants to serve the entre proposed development; Provision of PVs to roof of Buildings C2 and E1 to increase renewable energy provision; Additional design detail and specification requirements for Buildings C2-C4 and E1; Revisions to the parameter plans to safeguard road between Site E and Mulberry Business Park and Harmsworth Quays. The description of development was changed accordingly, and the following documents were submitted as part of the revised planning application:Revised Development Specification and Place Environmental Statement Making Document; Addendum, Figures & Revised Parameter Plans; Appendices; Revised Context Elevations; New Document Draft Estate Revised Phase 1 Drawings; Management Plan; Revised Detailed C2, C3, C4 Drawings; New Document Temporary Revised Indicative C2, C3, C4 Drawings; Decathlon Car Park Plan; Revised Phase 1 Landscaping Drawings; Design and Access Statement Revised illustrative Masterplan Drawings; Addendum & Addendum Revised Illustrative Landscape Drawings; Appendices; Revised Transport Assessment; Revised Highway Planning Drawings; Revised Daylight and Sunlight Report Planning Statement Addendum; Energy Strategy Addendum. Consultation responses received following re-consultation 123 Following reconsultation on the 24 May 2013, 17 letters/emails of objection were received and two letters/emails of support. The main points have been summarised and addressed below; 124 26 Toronto House - The revisions are disappointing and do little to overcome or address any of the concerns previously outlined and the earlier objections/comments are therefore still relevant; - the Council should recognise the long term commitment of local stakeholders in the area and there are significant concerns regarding the deviation from the AAP; - The proposed design appears to do little to either maintain, or enhance the existing site with respect to open space, local ecology and heritage; - The buildings that border Albion Channel will see the eradication of existing green / open spaces near the junction of the Albion Channel with the Basin, due to the encroachment of the proposed buildings, it would appear that these buildings will effectively be immediately adjacent to the old mooring posts along the channel, this is not a sympathetic way to treat the scarce remaining feature of the areas past; - The availability of sufficient light plays an important role in local ecology systems and the area of the channel is a breeding area for local bird wildlife. The loss of light will clearly impact upon the growth of local reeds and other plant-like material required to sustain the ecology of the local area; - Loss of existing open space, the height and design of these buildings immediately adjacent to the Albion Channel and the building and population density are of concern; - Also concerned about the impacts of light reduction to Toronto and Montreal House; - Fail to see how residents concerns have factored into the design proposals; - From the information that has been supplied in the planning submission, based upon the equinox, a number of apartments will be impacted by a reduction in light that exceeds the BRE – it is then stated by the proponent that this is acceptable; - The testing and modelling of daylight and sunlight impacts should be repeated, with increased scope; - Toronto and Montreal House have been designed to maximise energy efficiency and carbon footprint, if potential environmental impacts from the proposed development will reduce solar heating that was previously considered a benefit by the council in Montreal and Toronto House, this should be of concern to the council; - Concern that a wind tunnel effect will also be created; - Loss of outlook will result; - Unless there is a committed specialist retailer willing to take on the economic risk of the retail space at this stage, how can local residents feel confident that this space will be taken up given the current empty units beneath Montreal House and the fact that even when properly fitted out retail spaces have become available in Surrey Quays Shopping Centre can remain empty for periods at a time; - Concerned about potential impacts upon the already heavily congested Jubilee Line and buses during peak period that have not been allayed and require proper analysis; - Concerned about the potential precedent that would be caused by the approval of any phase or aspect of the submitted proposal in its current form. This proposal represents a significant deviation to the current AAP and as a result of it, creates a range of unacceptable consequences upon the local area. 125 Resident - Water Gardens Square - The application shows a disregard for the local environment and character of the area; - The tower is excessive in size and does not comply with local policy; -Opening up the waterfront will result in increased rubbish in the water and adverse impacts on wildlife. 126 27 Orchard House - The tower is too high and will leave residents of Orchard House with little to no views, diminished daylight and virtually no sunlight. 127 169 Montreal House - The proposed development is completely out of scale and context for the site, area and AAP. This proposal is being driven by the desire for profits thinly veiled as being in the interests of the community; - The number of towers together with the height of the tallest tower, are completely out of scale and context with the immediate area; - The proposed development is contrary to the Area Action Plan, particularly in relation to building heights; - The amount of apartments being introduced will place a strain on local infrastructure and community resources. The Transport Assessment is insufficient and should be undertaken at peak times, congestion on roads and lack of community facilities (including child-care) already; - The positioning of tall buildings upon to 52.1m immediately adjacent to the canal and Montreal and Toronto House will have a significant detrimental impact on outlook and living environment; - Building C1 will cause a significant reduction in the sunlight and daylight to Montreal and Toronto House, as acknowledged in the application documents; - The proposal will have a significant detrimental impact on the privacy of the neighbouring residents, with flats proposed directly looking across and / or down into their dwellings from a short distance. Single aspect dwellings in Montreal House. The lower floors of the proposed development will equally have problems with privacy; - Building C1 is positioned too close to the boundary of the site, resulting in loss of walkway / public space. 128 Resident - Timber Pond - The reduction in units from 1046 to 1030 is insulting; - Why do we need new offices in this area, they should be in central London; - The transport system in already crowded during peak hours and traffic will increase; - Is a green space really necessary when Stave Hill is so close by, additionally the towers will block sunlight to the greenspace and will create a wind tunnel; - An additional hill should be made, higher than Stave Hill; - There is enough retail in the area; - More affordable housing needed; - Local people should have first opportunity to buy homes; - Should be a mixture of 1, 2, 3 and 4 bedroom homes and not just 1 and 2 rooms with decent liveable size of floorspace for each home; - Lots of new buildings in the area being constructed with little time for locals to consider how they feel about the new buildings, and how these buildings effect the environment and community; - Wrong type of buildings for this area, green space is pointless when the concept art shows buildings that look morbidly dark, dank and depressive; - Buildings should reflect the history of Rotherhithe or be built with lighter bricks that generate a light and non-aggressive atmosphere; - The tower should not be built for many reasons, including the following, there are many helicopters in the area, blocking sunlight, invading privacy and creating uncomfortable atmosphere to live in, impact on wildlife, doesn’t fit in with anything in the area, there is a restriction on heights in the area, skyline / view from Stave Hill would be ruined, and a lot could still be done without building the tower; - This plan echo’s the mistakes of the past with 1950’s housing boom. 129 Resident - Water Gardens Square - Massing is too high and there is no community benefit; - The development will result in high winds and there will be sunlight/daylight impacts; - no kids play areas or school provision or leisure facilities; - Impact on traffic, wildlife, public transport and quality of life of residents; - Poor design, over crowding, pollution, disconnect with the rest of the area, old fashioned design, breach of policy. 130 19 Eleanor Close - The tower is completely out of scale for the area and not in keeping with its character and will dominate the area; - The increase in the number of units will result in a negative impact on the amenities of existing residents; - the proposal is contrary to the CWAAP. 131 13 Wolfe Crescent - The proposed tower is too tall and the development will have an adverse imapct on the already overstretched transport links; - The development will result in increased parking problems and there is a potential for light issues to result in a negative impact. 132 Toronto and Montreal House Residents Association - Confirm that previous objections still stand; 133 Fuller Long Planning Consultants (on behalf of TMHRA) - The proposed revisions do not overcome the concerns of the TMHRA; - The development would be un-neighbourly and will have significant impacts on the existing residents in terms of residential amenity and daylight/sunlight; - A full independent daylight and sunlight review should take place; - The development is categorically contrary to the CWAAP; - The consideration of the scheme is premature given the ongoing work to update the CWAAP; 134 DP9 (on behalf of British Land) - British land have significant land interests in Canada Water, including Surrey Quays Shopping Centre and Harmsworth Quays and whilst supportive of the principle of the development there are concerns that the tower will result in a micro-climate that will make the area around Surrey Quays Shopping Centre and the Dock edge unsuitable for outdoor use (seating/public space). - British Land have an established Right of Way to the western entrance of Surrey Quays Shopping Centre and the indicative landscaping proposals have not been amended to reflect this right of way. 135 134 Montreal House - The proposal will have an impact on the areas ecosystem and services in the area are already stretched to beyond reasonable limits; - There is no space for car parking and the impact on health and other amenities is severe and the development will occupy the only remaining free space in the area. 136 SE16 6HW - The design of the Chipperfield buildings will be a depressing symbol of what could have been for Canada Water; - The style of buildings will look cheap and soiled after a time; - the Macreaver Lavington buildings are sympathetic to the existing architecture and will age in a more dignified manner. 137 10 Murdoch House - Object to the application on grounds of density, height, environmental impacts, traffic and lack of parking provision; - Understand from the applicant that the planned density is 997 habitable rooms per hectare, this is around 4 times the 2005 London average; - The proposed 40 storey tower will be twice the height of Columbia Point and Regina Point – the highest existing buildings in the area; - The designers have not given adequate consideration to the windy character of this area; - The design is generally tired and uninspiring; - Lower Road is already significantly overloaded with queues stretching from Deptford and St James’s Road at peak times; - The scheme only provides 222 residential parking places for 1046 units, this will cause parking problems in neighbouring streets. 138 No address - The proposed tower is too tall and is in breach of local recommendations and guidelines. 139 49 John Kennedy House - The letters of support are multiple and identical and no weight should be given to them. 140 573 Giverney House - The revised daylight and sunlight study uses the same argument repeatedly, namely that some dwellings in Montreal House are already quite dark. The development will have a significant adverse impact in terms of daylight and sunlight; - The viability of the scheme has been used as a threat allowing the applicants to do what they want or nothing will get built. 141 20 Harwood Point - Support for the development on the basis of the much needed benefiots it will bring to the area, including commercial, recreational and housing benefits. the development will attract businesses and will support jobs and economic growth in the area. 142 18 Princes Court - A great scheme that will help with the overall regeneration of the area however more recreation and leisure facilities are needed. Re-consultation 2 143 Reconsultation was undertaken on the 16 August 2013 in order to take into account additional and revised information in the determination and assessment of the application. The additional information received included; Tibbalds Covering Letter dated 9 August 2013; Daylight and Sunlight Report (and Appendices 1-7.3) by Waldrams dated 12th August 2013 Review of Mulberry Estate Planning Application by Ramboll, dated 9th August 2013; ES Addendum Documents: ES Addendum Technical Appendix A-1: Townscape and Visual Assessment by Ettwein Bridges Architects, August 2013; ES Daylight and Sunlight Addendum Chapter (and Appendices 12.1-12.5) by Waldrams, dated 12th August 2013 Consultation responses received following re-consultation 144 Following reconsultation on the 16 August 2013 eight letters/emails of objection were received and one letters/emails of support. the main points have been summarised and addressed below; 145 Toronto and Montreal House Residents Association - Advice sought on what documents have been submitted, their contents and the reason why they have been resubmitted; - Confirmation sought that previous letters of objection will still stand; - Provision of a summary of the resubmitted documents would be helpful; -What is the purpose and content of the cumulative impact assessment; - Will an assessment be made of how the proposals impact on the existing CWAAP and overall local strategy; - Have any of the issues previously raised been addressed? 146 169 Montreal House - The continual need to resubmit objections is frustrating; - Confirm that previously submitted letters/emails will be given equal weight; - All previous concerns and objections are still relevant. 147 15 Woodland Crescent - The height of the proposal has not been reduced and as such previous comments made should still be considered; 148 14 Midship Close - The proposed tower block is very tall and would alter the character of the area and mar the view from Tower Bridge. the tower should be reduced in height and perhaps made wider/longer; - The character of the Albion Channel will change forming a higher and less attractive horizon; - The design is boxy and the buildings have very little to commend them. 149 6 Woodland Crescent - Whilst generally in favour of the proposals, 40 floors is too high for a building in this area and would dwarf everything else around it in what is a residential area; - There would be increased pressure on local services; - The proposal should be reduced to 20 floors. 150 Water Gardens Square - The new buildings will block sunlight to the buildings at the Water Gardens; - It would be beneficial to know what the buildings are going to look like. 151 SE16 6XD - Concerned about traffic congestion, overcrowding on public transport, height of the tower and loss of open spaces. 152 573 Giverney House - Seeks to confirm that previous letter of objection has been received. 156 No address - The proposal sounds great and the area is in need of bars, restaurants and shops. It seems strange that so many buildings have been built with little or no commercial provision. 157 144 Montreal House - The development will result in an increased loss of VSC and ADF below the BRE guidelines and the situation will be much worse than under the consented scheme or the mirror image. -The proposed development needs to be lower in height and set further back from the Albion Channel. - Southwark Council, by allowing this, will let one of its developments become blighted in a way that is patently unacceptable. 158 Anonymous - The influx of people is more than the local community and infrastructure can sustain. Road traffic, medical centres and local schools will be extremely adversely affected. - The height of the buildings will be excessive. 159 4 Cedar House - There will be a loss of daylight/sunlight and an increase in noise/pollution. - The area around Canada Water Station and Surrey Quays Road will become a dangerous traffic zone, there is insufficient parking and existing dangerous parking due to lack of provision/traffic. - Canada Water suffers from a lack of local amenities (including medical centres/schools) and investment in public amenities should be made first. 160 Anonymous - Increased buildings on a relatively small site will reduce ground level light and make the community feel dark and claustrophobic. - Will there be enough infrastructure to cope with the increase in residents i.e. GP and A&E Services, nurseries, schools, public transport and parking. 161 8 Maple Leaf Square - Building C4 will be excessive in height and will be the tallest building in the area and the tallest building between the Shard and Canary Wharf. This building would be dominant in its locality and inappropriate in its context, its difficult to assign it any particular architectural merit and it should be reduced in height. 162 Cunard Walk Resident - The Jubilee Line is already extremely busy during peak hours. The development will put increased pressure on services (doctors, schools) and shops. 163 Toronto and Montreal House Residents Association 164 - The latest update is a hugely complex set of documents and we would request that any further updates come with clear, concise easy to read summaries as without this the submission of complex documents is prejudicial towards small local groups who do not have the technical expertise or resources to regularly review this level of complex information in short time frames available for providing comments. - The submission still fails to address most of the key concerns. - The daylight and sunlight review has errors particularly in terms of room function and this will impact on the conclusions taken. - There are several areas of concern such as; - The comment that only ADF needs to be considered as Toronto House and Montreal House are part of the same "Master Plan" incorporating the proposed scheme. As clearly argued in previous letters of objection, it is difficult for the developer to argue this case given that they are proposing a scheme that is so significantly different to what has been outlined in the Canada Water Area Action Plan - so other factors such as VSC, winter sunlight, etc must be considered as relevant and important considerations. - The principal argument upon which the results of the analysis are meant to be considered acceptable is the claim that although the new scheme will result in reductions in ADF and VSC that is well in excess of the BRE, that some "flexibility" should be allowed. However, there is no guidance available on what is an acceptable target. Considering the raw data presented in Tables 2 and 3 of the report dated 12 August 2013, for Toronto House: - Only 27% of the apartments will meeting minimum BRE requirements for VSC - the vast majority will in fact be below the standard. What is more concerning is that more apartments will infact be more than 40% below the standard than complying with it - with some apartments as high as 80%. Even excluding the impacts of balconies well in excess of 50% of the apartments are below the minimum BRE threshold. This is beyond the realms of being "flexible" and is not reasonable. - In terms of ADF, given that each of the apartments within Toronto House that faces the proposed scheme has a windowed living area and kitchens that face the scheme, we have a significant number of rooms that are falling below minimum levels - what is further concerning is that a number of our residents within social housing have limited mobility and spend a lot of their day time within the living areas of the apartment. This again suggests the impacts are beyond the realms of being "flexible" and is not reasonable. - The mirror image scenario analysis cannot reasonably be considered appropriate for Toronto House given that Toronto House doesn't even factor into the design of the mirror image. A mirror image of Toronto House would reflect the open space created by the children's playground and a building that sweeps away from its neighbour across the channel as it opens up to Canada Water. Using the mirror image of Montreal House (including the the vent for the Underground - which surely is not relevant as it is not part of the residential site) as the basis of analysis upon Toronto House appears to contradict the basis of "mirror" analysis. Unless a compelling and reasonable argument can be put forward, it would seem unreasonable for the mirror scenario analysis for Toronto House to be based upon the mirror image of Montreal House. - The comparison provided between the consented and proposed schemes between tables 2 and 6 further highlights the negative impacts of caused by the scale of the proposed scheme versus a previously consented plan and the extent to which the proposed scheme cannot be considered as part of the existing master plan. Again by way of comparison for Toronto House, a far greater proportion of apartments comply with the BRE for VSC but most notable is that for those apartments that will not comply with the BRE, the magnitude of the deviation is far less pronounced for the consented scheme versus the proposed scheme - for example the percentage of windows that would be more than 40% below the BRE is less than 10% for the consented scheme whereas the proposed scheme is almost 30% - highlighting our argument that the scale and massing of the proposed scheme is not appropriate and inconsistent with the Canada Water Area Action Plan. Again, this highlights that the scheme is beyond the realm of being "flexible" and unreasonably impacts upon Toronto and Montreal House. - Finally and perhaps most significantly, is the discussion around what is an appropriate threshold to apply given that the current proposal fails on such a large number of windows when applying the BRE guidelines. It is the view that the proposal fails the minimum BRE guidelines for so many existing neighbouring residents should be the primary concern - The report suggests the apparently tenuous argument that because a very small number of apartments experience daylight and sunlight well below the BRE in Montreal House, that this threshold creates a precedent that can be applied to all apartments. The logic of this argument is flawed - such discretion being applied by exception does not infer a reasonable minimum standard that can be applied across a development to a significant number of people who do not currently experience material issues with daylight and sunlight. Further, the residents who purchased the apartments in question could make their own investigations and an informed decision to live in these apartments - this is a significantly different proposition to the suggestion in the report that it would be reasonable to apply this standard across the board - despite the fact that this new development proposal has come subsequent to residents making their decision to live in their apartments in Toronto and Montreal House and the daylight sunlight report proving that the proposed development would have a significantly more negative impact upon these apartments than what they would have reasonably expected under the consented scheme or development consistent with the Canada Water Area Action Plan. What has been proposed in the report does not constitute what is "flexible" and is not unreasonable. - One thing that was mentioned in the introduction of the report, but no further analysis was provided in the body of the report, were the impacts during winter months - what is the summary view given the specific concerns raised around the massing, scale, proximity and relative location of the development and concerns that it will effectively block out winter sun for neighbouring apartments? - On a more general note, the statistics reported for Montreal House, probably does not convey the fact there are a significant subset of single aspect apartments that will experience quite adverse impacts. - Given the identified errors and the additional questions that have been raised, we feel uncomfortable in continuing to review this report and more importantly, question any trust that can be placed in its conclusions. On this basis we must object to the report’s submission as several discrepancies have been identified. In our opinion, and since this is now the THIRD iteration of daylight and sunlight analysis within this single application, we must again request that Southwark Council independently commission a daylight specialist to undertake further testing and analysis. Without this, residents will not deem it acceptable, at this point of the submission process, to simply change a few numbers on a report and resubmit. In the spirit of fairness and accuracy, it is felt that it would be reasonable to request that a surveyor and/or a daylight specialist comes out to review each apartment and to provide analysis on the impacts of loss of existing daylight and sunlight into each apartment, as well as to assess the outcomes under the range of standard input parameters used for conducting such analysis. Further, given that the report clearly demonstrates that such a large number of residents will be adversely impacted and experience daylight and sunlight well below the minimum BRE standard, we would call for an independent review of how the developer can continue to justify this as being acceptable. - As previously noted, this new scheme differs excessively and significantly from the original consented scheme. The massing and scale of the development proposed by the developer has caused alarm as residents acquired property in good faith on the understanding that they would have a certain level of enjoyment over the course of the 125 year lease e.g. natural daylight and sunlight across the entire year including the winter solstice consistent with the area action plan at the time. As mentioned previously, residents are required to source our heat from an energy centre and would therefore feel uncomfortable in incurring any additional costs with respect to energy because of the scale and excessive massing of this proposed scheme and the encroachment that has been identified as a high level concern. - Given the proximity and the fact that it has been clearly noted that Montreal/Toronto are the closest neighbours it is requested that further independent testing be undertaken by the Council at this time before consent is granted. - On a final note, it is a concern to hear that the project proponent intends to discuss the changes that were recently submitted on the 9th of September at the CW Forum but that the date for this application ends on the 8th of September, 2013. 165 Canada Water Resident - The Jubilee Line is already very busy at the moment during rush hour, the increase in the number of people will make it unbearable. - What about new bus routes? What about increasing the frequency of buses and the Overground? - Nurseries, schools, GP's and hospitals will need to be increased - can they provide services for the additional people. - Police surveillance should be increased to avoid vandalism that overcrowded places can encourage due to anonymity. - Stacking people in tall buildings without giving the appropriate infrastructure to have a good quality of life might help solve housing problems but it leads to many others. 166 Water Gardens Square Resident - None of the original objections have been addressed. - A 40 storey tower is not appropriate for the area - even the smaller Barratt scheme has put massive pressure on local services and the lack of investment in infrastructure is starting to show. 167 Brunswick Quay Resident - There have been 70 individual responses to the original proposals. 65% of which cited objections to the proposed tower. - The application was submitted ahead of the CWAAP review and was in clear conflict with these guidelines at the time of application. - The amended plans do not address any concerns in terms of scale, height, massing, density. - Measures should be considered to protect the long term occupancy intent for both private and social sectors and these measures should be identified in the Estate Management Plan. - What measures have been undertaken by Southwark Council to confirm that medical centres have additional capacity for the new residents. - It is appropriate that any new development make a contribution to the improvement of the local environment by way of a S106 agreement wit Southwark Council Street Cleansing Section who can address the issue of the cleansing responsibility of all publically accessible communal areas/walkways, pathways, tree pits, planting areas and passage ways. 168 Canada Water Resident -The number of new homes is more than the local infrastructure can sustain, particularly transport (Jubilee Line), GP's and schools. - The development should consider the cumulative impact, which it fails to do at present. - More attention should be given to the ecology of Canada Water Basin. - The buildings are bulky and disproportionate, the housing problem need to be resolved with ways that are considerate to the current look and feel of an area. - Daylight will be affected for a much bigger radius than just the immediate area. 169 Wolfe Crescent Resident - The whole area is now built up and crowded with many new development s having been erected in recent years. Traffic has increased which is an issue for nearby primary schools. the 40 storey building could clearly have an effect on lower buildings nearby. there are already shops and cinemas within a five minute walk, the need for this development is questionable. 170 SE16 Resident - The reduction in units from 1046 to 1030 is insulting; - Why do we need new offices in this area, they should be in central London; - The transport system in already crowded during peak hours and traffic will increase; - Is a green space really necessary when Stave Hill is so close by, additionally the towers will block sunlight to the greenspace and will create a wind tunnel; - An additional hill should be made, higher than Stave Hill; - There is enough retail in the area; - More affordable housing needed; - Local people should have first opportunity to buy homes; - Should be a mixture of 1, 2, 3 and 4 bedroom homes and not just 1 and 2 rooms with decent liveable size of floorspace for each home; - Lots of new buildings in the area being constructed with little time for locals to consider how they feel about the new buildings, and how these buildings effect the environment and community; - Wrong type of buildings for this area, green space is pointless when the concept art shows buildings that look morbidly dark, dank and depressive; - Buildings should reflect the history of Rotherhithe or be built with lighter bricks that generate a light and non-aggressive atmosphere; - The tower should not be built for many reasons, including the following, there are many helicopters in the area, blocking sunlight, invading privacy and creating uncomfortable atmosphere to live in, impact on wildlife, doesn’t fit in with anything in the area, there is a restriction on heights in the area, skyline / view from Stave Hill would be ruined, and a lot could still be done without building the tower; - This plan echo’s the mistakes of the past with 1950’s housing boom. 171 19 Fairmont House - Objection due to the lack of integrating the sites CHP heating system with the Southwark Wide District Heating System. LBS should ensure that Sellars are required to connect to the LBS DH Network and not dismiss it on the grounds provided. APPENDIX 3 Table: 3.1 List of schemes for consideration for the Cumulative Effect Site No. Application Reference Description of Development and Site Address London Borough of Southwark 1 09-AP-1999 Surrey Quays Leisure Site (AKA Mast Leisure Site) Surrey Quays Road, SE16 1LL Outline application for the demolition of all existing buildings and erection of buildings ranging from 2 to 10 storeys (36.3 AOD) comprising 11,105sqm leisure floorspace (including cinema) (class D2), 2,695sqm retail floorspace (class A1-A3), 49,276sqm of private and affordable residential accommodation (class C3), 495 car parking spaces and associated works including public and private open space, as well as detailed design for 123 rooms (4,250sqm) of student housing (sui generis use), 2,500sqm commercial floorspace (class B1), 86 residential units (including in the 49,276sqm referenced above) (class C3) and the external appearance of any elevation facing Harmsworth Quays Printworks. Planning Permission Granted:- 20/10/2010 Date permission lapses:- 19/10/15 Not yet implemented. 2 11-AP-4206 Hybrid outline / full application for the erection of an extension to the existing shopping centre comprising Surrey Quays retail floorspace (approximately 10,564sqm of use Shopping Centre, classes A1 retail, A2 services, A3 cafe / restuarant, A4 Redriff Road, SE16 drinking establishments and A5 hot food takeaways), 7LL alterations to the appearance of the existing shopping centre, landscaping, and reconfiguration of part of the existing car parking and associated highway works (full) together with the erection of a single level car parking deck above part of the existing car park, incorporating additional retail floorspace (approximately 450sqm of use classes A1, A2, A3, A4 and A5) (outline). Planning Permission Granted:- 20/03/2012 Date permission lapses:- 29/03/2015 Not yet implemented. 3 11-AP-2565 Demolition of three existing warehouse buildings and construction of 7 blocks between 3 and 6 storeys high Quebec Way (max 21m AOD); containing 366 residential units (142x Industrial Estate, 1 bed, 113x 2 bed, 98x 3 bed and 13x 4 bed) and Quebec Way, SE16 commercial floorspace for class A1 (shops) / A3 (restaurant / cafes) / D1 (non-residential institutions) / D2 (assembly and leisure) uses; with basement car parking, motorcycle and cycle storage, ancillary storage spaces and a new route through the site into Russia Dock Woodlands. New vehicle and pedestrian accesses to be created from Quebec Way. Planning Permission Granted:- 20/03/2012 Date permission lapses:- 29/03/2015 Not yet implemented. 4&5 09-AP-1870 & Erection of a series of buildings comprising a 26 storey variation reference tower, with ground floor mezzanine (maximum height 92.95m AOD), and 9 individual buildings ranging from 10-AP-2734 4 to 8 storeys in height to provide 668 residential units, Site A Canada Water, 958sqm of retail (class A1, A2, A3), and 268sqm of Surrey Quays Road, community use (class D1), creation of a new open SE16 space and construction of new roads, pedestrian and cycle routes and new access to the highway, together with associated works including the provision of public cycle facility, basement car parking for 166 cars and cycle parking, servicing, landscaping and plant areas. Planning Permission Granted:- 17/07/2010 Implemented and occupied. 6 07-AP-2806 Demolition of existing buildings and the erection of a series of buildings up to 8 storeys comprising 256 Mulberry Business residential units, 5,105sqm of class B1 (office) Centre, Quebec Way, floorspace, basement car parking with access to SE16 7LB Canada Street, and landscaping works. Planning Permission Granted:- 08/04/2008 Technically implemented, no construction of buildings on site. 7 08-AP-1563 Demolition of existing health centre and the construction of 212 new dwellings including affordable Land at Downtown housing, in 2 part one, part four storey residential Road and Salter buildings with undercroft car park (Blocks A/B and G); Road, SE16 6NP 1 part one, part two, part four storey residential building with undercroft car park (Block C); 2 part one, part two and part three storey terraced housing buildings (Block H); 1 part one, part four storey health centre (1,535sqm) including community centre (124sqm) and residential building (Block E), together with associated car parking, a new children’s play area, landscaping and infrastructure works. Planning Permission Granted:- 26/05/2010 Permission implemented, currently being constructed on the site. London Borough of Lewisham 8 DC/02-52533/X Revised outline application for the comprehensive redevelopment of Convoys Wharf to provide a mixedConvoys Wharf, use development of up to 445,200sqm. Prince Street, SE8 3JH Currently application decision pending. 9 DC/08/68523/lX The demolition of existing buildings at Cannon Wharf Business Centre, and construction of buildings 3 to 8 Cannon Wharf storeys plus two buildings 20 and 23 storeys in height, Business Centre, 35 comprising 6,588sqm commercial units (use classes Evelyn Street, SE8 B1, A1, A2, A3, A5 & D1) and 679 residential units with 5RT on-site energy centre, 401 car parking spaces, cycle parking, and associated landscaping, with accesses onto Evelyn Street, Rainsborough Avenue and Yeoman Street. Planning Permission Granted:- 30/03/2012 Date permission lapses:- 30/03/2015 Not yet implemented. 10 DC/09/73189/XC Crown, New Baltic Park, Bridge and Victoria Wharves, bounded by Grove, Dragoon and Evelyn Streets together with Oxestalls Road, SE8 The comprehensive redevelopment of land bounded by Oxestalls Road, Grove Street, Dragood Road and Evelyn Street SE8, but excluding Scott House, 185 Grove Street (formerly known as Diploma Works). Outline planning application for the whole site comprising: The demolition of existing buildings on the site, excluding former Public House on Grove Street. The phased redevelopment of the site to provide a maximum of 1,029,670sqm (gross external floor area) comprising up to 905 residential units (853,218sqm) ad 17,645sqm non-residential floorspace comprising A1 shops, A2 financial and professional services, A3 restaurants and cafes, A4 drinking establishments, A5 hot food takeaways, B1 business, D1 non-residential institutions and D2 assembly and leisure uses. Erection of buildings ranging in height from 4 to 8 storeys. Planning Permission Granted:- 20/09/2011 Date permission lapses:- 20/09/2014 Not yet implemented. 11 DC/10/73437/X The construction of new buildings between 1 and 8 storeys in height to accommodate 4,126sqm of Marine Wharf West, commercial floorspace (use classes Plough Way, SE16 A1/A2/A3/B1/B1c), 532 residential units (including 78 7UE units provided as an ‘Extra Care’ facility), car parking, pedestrian and vehicular access, landscaping, new public open space along the route of the former Grand Surrey Canal and other associated works. Planning Permission Granted:- 20/09/2011 Date permission lapses:- 20/09/2014 Not yet implemented. Appendix 4 Revised Development Specification and Place Making Document; Revised Parameter Plans; Revised Context Elevations; Revised Phase 1 Drawings; Revised Detailed C2, C3, C4 Drawings; Revised Indicative C2, C3, C4 Drawings; Revised Phase 1 Landscaping Drawings; Revised Illustrative Masterplan Drawings; Revised Illustrative Landscape Drawings; Revised Transport Assessment; Revised Highway Planning Drawings; Revised Daylight and Sunlight Report Revised drawings were also provided, and the main design changes comprised of the following:A reduction in the maximum number of residential units from 1,046 to 1,030; Increase in the overall amount of floorspace to 138,146.8sqm (GEA) [previously 137,612.4sqm (GEA)]; Internal and external detailed design amendments to building C1; The Decathlon retail car parking spaces to be made available to the general public as ‘town centre’ parking; Provision of disabled parking; Provision of additional street tree planting; Provision of additional balcony wind protection to buildings C2-C4; Amendments to the indicative internal layouts of buildings C2 and C3; Provision of indicative phase 2 and 3 basement plans; Revised sizing and phasing arrangement for centralised combined heat and power (CHP) plants to serve the entire proposed development; Provision of PVs to roof of Buildings C2 and E1 to increase renewable energy provision; Additional design detail and specification requirements for Buildings C2-C4 and E1; Revisions to the parameter plans to safeguard road between Site E and Mulberry Business Park and Harmsworth Quays. Appendix 5 - List of neighbour consultees 07/02/2013 07/02/2013 07/02/2013 07/02/2013 Time and Talents St Marychurch Street London SE16 via email x 26 Wolfe Crescent London SE16 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 111 BRUNSWICK QUAY LONDON SE16 7PX 109 BRUNSWICK QUAY LONDON SE16 7PX 107 BRUNSWICK QUAY LONDON SE16 7PX 57 BRUNSWICK QUAY LONDON SE16 7PX 115 BRUNSWICK QUAY LONDON SE16 7PX 113 BRUNSWICK QUAY LONDON SE16 7PX 9 BRUNSWICK QUAY LONDON SE16 7PU 7 BRUNSWICK QUAY LONDON SE16 7PU 55 BRUNSWICK QUAY LONDON SE16 7PU 105 BRUNSWICK QUAY LONDON SE16 7PX 103 BRUNSWICK QUAY LONDON SE16 7PX 101 BRUNSWICK QUAY LONDON SE16 7PX 59 BRUNSWICK QUAY LONDON SE16 7PX 77 BRUNSWICK QUAY LONDON SE16 7PX 75 BRUNSWICK QUAY LONDON SE16 7PX 73 BRUNSWICK QUAY LONDON SE16 7PX 83 BRUNSWICK QUAY LONDON SE16 7PX 81 BRUNSWICK QUAY LONDON SE16 7PX 79 BRUNSWICK QUAY LONDON SE16 7PX 65 BRUNSWICK QUAY LONDON SE16 7PX 63 BRUNSWICK QUAY LONDON SE16 7PX 61 BRUNSWICK QUAY LONDON SE16 7PX 71 BRUNSWICK QUAY LONDON SE16 7PX 69 BRUNSWICK QUAY LONDON SE16 7PX 67 BRUNSWICK QUAY LONDON SE16 7PX 53 BRUNSWICK QUAY LONDON SE16 7PU 23 BRUNSWICK QUAY LONDON SE16 7PU 21 BRUNSWICK QUAY LONDON SE16 7PU 19 BRUNSWICK QUAY LONDON SE16 7PU 29 BRUNSWICK QUAY LONDON SE16 7PU 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 27 BRUNSWICK QUAY LONDON SE16 7PU 25 BRUNSWICK QUAY LONDON SE16 7PU 11 BRUNSWICK QUAY LONDON SE16 7PU 1 BRUNSWICK QUAY LONDON SE16 7PU 99 REDRIFF ROAD LONDON SE16 7PS 17 BRUNSWICK QUAY LONDON SE16 7PU 15 BRUNSWICK QUAY LONDON SE16 7PU 13 BRUNSWICK QUAY LONDON SE16 7PU 3 BRUNSWICK QUAY LONDON SE16 7PU 47 BRUNSWICK QUAY LONDON SE16 7PU 45 BRUNSWICK QUAY LONDON SE16 7PU 43 BRUNSWICK QUAY LONDON SE16 7PU 51 BRUNSWICK QUAY LONDON SE16 7PU 5 BRUNSWICK QUAY LONDON SE16 7PU 49 BRUNSWICK QUAY LONDON SE16 7PU 35 BRUNSWICK QUAY LONDON SE16 7PU 33 BRUNSWICK QUAY LONDON SE16 7PU 31 BRUNSWICK QUAY LONDON SE16 7PU 41 BRUNSWICK QUAY LONDON SE16 7PU 39 BRUNSWICK QUAY LONDON SE16 7PU 37 BRUNSWICK QUAY LONDON SE16 7PU 85 BRUNSWICK QUAY LONDON SE16 7PX 6 BRUNSWICK QUAY LONDON SE16 7PY 58 BRUNSWICK QUAY LONDON SE16 7PY 56 BRUNSWICK QUAY LONDON SE16 7PY 64 BRUNSWICK QUAY LONDON SE16 7PY 62 BRUNSWICK QUAY LONDON SE16 7PY 60 BRUNSWICK QUAY LONDON SE16 7PY 48 BRUNSWICK QUAY LONDON SE16 7PY 46 BRUNSWICK QUAY LONDON SE16 7PY 44 BRUNSWICK QUAY LONDON SE16 7PY 54 BRUNSWICK QUAY LONDON SE16 7PY 52 BRUNSWICK QUAY LONDON SE16 7PY 50 BRUNSWICK QUAY LONDON SE16 7PY 66 BRUNSWICK QUAY LONDON SE16 7PY 110 BRUNSWICK QUAY LONDON SE16 7PZ 108 BRUNSWICK QUAY LONDON SE16 7PZ 106 BRUNSWICK QUAY LONDON SE16 7PZ 116 BRUNSWICK QUAY LONDON SE16 7PZ 114 BRUNSWICK QUAY LONDON SE16 7PZ 112 BRUNSWICK QUAY LONDON SE16 7PZ 8 BRUNSWICK QUAY LONDON SE16 7PY 70 BRUNSWICK QUAY LONDON SE16 7PY 68 BRUNSWICK QUAY LONDON SE16 7PY 104 BRUNSWICK QUAY LONDON SE16 7PZ 102 BRUNSWICK QUAY LONDON SE16 7PZ 100 BRUNSWICK QUAY LONDON SE16 7PZ 42 BRUNSWICK QUAY LONDON SE16 7PY 12 BRUNSWICK QUAY LONDON SE16 7PY 10 BRUNSWICK QUAY LONDON SE16 7PY 99 BRUNSWICK QUAY LONDON SE16 7PX 18 BRUNSWICK QUAY LONDON SE16 7PY 16 BRUNSWICK QUAY LONDON SE16 7PY 14 BRUNSWICK QUAY LONDON SE16 7PY 91 BRUNSWICK QUAY LONDON SE16 7PX 89 BRUNSWICK QUAY LONDON SE16 7PX 87 BRUNSWICK QUAY LONDON SE16 7PX 97 BRUNSWICK QUAY LONDON SE16 7PX 95 BRUNSWICK QUAY LONDON SE16 7PX 93 BRUNSWICK QUAY LONDON SE16 7PX 2 BRUNSWICK QUAY LONDON SE16 7PY 36 BRUNSWICK QUAY LONDON SE16 7PY 34 BRUNSWICK QUAY LONDON SE16 7PY 32 BRUNSWICK QUAY LONDON SE16 7PY 40 BRUNSWICK QUAY LONDON SE16 7PY 4 BRUNSWICK QUAY LONDON SE16 7PY 38 BRUNSWICK QUAY LONDON SE16 7PY 24 BRUNSWICK QUAY LONDON SE16 7PY 22 BRUNSWICK QUAY LONDON SE16 7PY 20 BRUNSWICK QUAY LONDON SE16 7PY 30 BRUNSWICK QUAY LONDON SE16 7PY 28 BRUNSWICK QUAY LONDON SE16 7PY 26 BRUNSWICK QUAY LONDON SE16 7PY 18 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 29 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL FLAT 6 SERPENTINE COURT CHRISTOPHER CLOSE LONDON SE16 6PR 3 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 42 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 19 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 2 SERPENTINE COURT CHRISTOPHER CLOSE LONDON SE16 6PR FLAT 1 SERPENTINE COURT CHRISTOPHER CLOSE LONDON SE16 6PR FLAT 12 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 5 SERPENTINE COURT CHRISTOPHER CLOSE LONDON SE16 6PR FLAT 4 SERPENTINE COURT CHRISTOPHER CLOSE LONDON SE16 6PR FLAT 3 SERPENTINE COURT CHRISTOPHER CLOSE LONDON SE16 6PR 25 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 27 RENFORTH STREET LONDON SE16 7JJ 25 RENFORTH STREET LONDON SE16 7JJ 23 RENFORTH STREET LONDON SE16 7JJ 33 RENFORTH STREET LONDON SE16 7JJ 31 RENFORTH STREET LONDON SE16 7JJ 29 RENFORTH STREET LONDON SE16 7JJ 15 RENFORTH STREET LONDON SE16 7JJ 13 RENFORTH STREET LONDON SE16 7JJ 11 RENFORTH STREET LONDON SE16 7JJ 21 RENFORTH STREET LONDON SE16 7JJ 19 RENFORTH STREET LONDON SE16 7JJ 17 RENFORTH STREET LONDON SE16 7JJ FLAT 11 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY 21 WOODLAND CRESCENT LONDON SE16 6YP 20 WOODLAND CRESCENT LONDON SE16 6YP 19 WOODLAND CRESCENT LONDON SE16 6YP 3 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 2 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 1 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 15 WOODLAND CRESCENT LONDON SE16 6YP 14 WOODLAND CRESCENT LONDON SE16 6YP 13 WOODLAND CRESCENT LONDON SE16 6YP 18 WOODLAND CRESCENT LONDON SE16 6YP 17 WOODLAND CRESCENT LONDON SE16 6YP 16 WOODLAND CRESCENT LONDON SE16 6YP 4 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 13 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 12 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 11 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR FLAT 10 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 9 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 8 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY 7 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 6 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 5 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 10 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 9 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 8 SYCAMORE HOUSE 22 WOODLAND CRESCENT LONDON SE16 6YR 35 RENFORTH STREET LONDON SE16 7JJ 84 NEPTUNE STREET LONDON SE16 7JP 82 NEPTUNE STREET LONDON SE16 7JP 7 NEPTUNE STREET LONDON SE16 7JP 103 REDRIFF ROAD LONDON SE16 7PS 101 REDRIFF ROAD LONDON SE16 7PS 9 NEPTUNE STREET LONDON SE16 7JP 39 NEPTUNE STREET LONDON SE16 7JP 37 NEPTUNE STREET LONDON SE16 7JP 35 NEPTUNE STREET LONDON SE16 7JP 5 NEPTUNE STREET LONDON SE16 7JP 43 NEPTUNE STREET LONDON SE16 7JP 41 NEPTUNE STREET LONDON SE16 7JP 105 REDRIFF ROAD LONDON SE16 7PS 123 REDRIFF ROAD LONDON SE16 7PS 121 REDRIFF ROAD LONDON SE16 7PS 119 REDRIFF ROAD LONDON SE16 7PS 97 REDRIFF ROAD LONDON SE16 7PS 127 REDRIFF ROAD LONDON SE16 7PS 125 REDRIFF ROAD LONDON SE16 7PS 111 REDRIFF ROAD LONDON SE16 7PS 109 REDRIFF ROAD LONDON SE16 7PS 107 REDRIFF ROAD LONDON SE16 7PS 117 REDRIFF ROAD LONDON SE16 7PS 115 REDRIFF ROAD LONDON SE16 7PS 113 REDRIFF ROAD LONDON SE16 7PS 33 NEPTUNE STREET LONDON SE16 7JP 53 RENFORTH STREET LONDON SE16 7JJ 51 RENFORTH STREET LONDON SE16 7JJ 49 RENFORTH STREET LONDON SE16 7JJ 59 RENFORTH STREET LONDON SE16 7JJ 57 RENFORTH STREET LONDON SE16 7JJ 55 RENFORTH STREET LONDON SE16 7JJ 41 RENFORTH STREET LONDON SE16 7JJ 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 39 RENFORTH STREET LONDON SE16 7JJ 37 RENFORTH STREET LONDON SE16 7JJ 47 RENFORTH STREET LONDON SE16 7JJ 45 RENFORTH STREET LONDON SE16 7JJ 61 RENFORTH STREET LONDON SE16 7JJ 25 NEPTUNE STREET LONDON SE16 7JP 21 NEPTUNE STREET LONDON SE16 7JP 19 NEPTUNE STREET LONDON SE16 7JP 31 NEPTUNE STREET LONDON SE16 7JP 29 NEPTUNE STREET LONDON SE16 7JP 27 NEPTUNE STREET LONDON SE16 7JP 11 NEPTUNE STREET LONDON SE16 7JP 9 RENFORTH STREET LONDON SE16 7JJ 7 RENFORTH STREET LONDON SE16 7JJ 17 NEPTUNE STREET LONDON SE16 7JP 15 NEPTUNE STREET LONDON SE16 7JP 13 NEPTUNE STREET LONDON SE16 7JP 11 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 10 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 1 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 14 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 13 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 12 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL FLAT 6 RISDON HOUSE ALBION STREET LONDON SE16 7JH FLAT 5 RISDON HOUSE ALBION STREET LONDON SE16 7JH FLAT 4 RISDON HOUSE ALBION STREET LONDON SE16 7JH FLAT 9 RISDON HOUSE ALBION STREET LONDON SE16 7JH FLAT 8 RISDON HOUSE ALBION STREET LONDON SE16 7JH FLAT 7 RISDON HOUSE ALBION STREET LONDON SE16 7JH 15 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 3 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 22 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 21 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 6 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 5 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 4 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 18 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 17 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 16 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 20 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 2 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 19 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL FLAT 3 RISDON HOUSE ALBION STREET LONDON SE16 7JH 59 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 58 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 57 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 61 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 60 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 6 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 53 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 52 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 51 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 56 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 55 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 54 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 62 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 8 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 7 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 69 ALBION ESTATE SWAN ROAD LONDON SE16 7DL FLAT 2 RISDON HOUSE ALBION STREET LONDON SE16 7JH FLAT 1 RISDON HOUSE ALBION STREET LONDON SE16 7JH 9 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 65 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 64 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 63 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 68 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 67 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 66 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 7 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 18 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 17 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 16 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 20 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 2 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 19 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 12 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 11 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 10 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 15 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 14 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 13 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 21 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 3 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 29 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 28 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 32 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 31 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 30 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 24 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 23 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 22 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 27 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 26 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 25 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 1 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 48 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 47 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 46 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 51 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 50 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 49 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 42 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 9 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 8 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JL 45 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 44 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 43 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 52 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 61 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 60 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 59 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 64 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 63 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 62 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 55 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 54 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 53 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 58 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 57 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN 56 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JN FLAT 5 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 4 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 3 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 8 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 7 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 6 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 10 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 1 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU 98 BRUNSWICK QUAY LONDON SE16 7PZ FLAT 2 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 12 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 11 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 9 NEPTUNE HOUSE MOODKEE STREET LONDON SE16 7AU FLAT 11 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 10 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 1 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 3 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 2 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 12 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 3 CLEGG HOUSE MOODKEE STREET LONDON SE16 7BH FLAT 2 CLEGG HOUSE MOODKEE STREET LONDON SE16 7BH FLAT 1 CLEGG HOUSE MOODKEE STREET LONDON SE16 7BH FLAT 6 CLEGG HOUSE MOODKEE STREET LONDON SE16 7BH FLAT 5 CLEGG HOUSE MOODKEE STREET LONDON SE16 7BH FLAT 4 CLEGG HOUSE MOODKEE STREET LONDON SE16 7BH 96 BRUNSWICK QUAY LONDON SE16 7PZ 134 BRUNSWICK QUAY LONDON SE16 7PZ 132 BRUNSWICK QUAY LONDON SE16 7PZ 130 BRUNSWICK QUAY LONDON SE16 7PZ 140 BRUNSWICK QUAY LONDON SE16 7PZ 138 BRUNSWICK QUAY LONDON SE16 7PZ 136 BRUNSWICK QUAY LONDON SE16 7PZ 122 BRUNSWICK QUAY LONDON SE16 7PZ 120 BRUNSWICK QUAY LONDON SE16 7PZ 118 BRUNSWICK QUAY LONDON SE16 7PZ 128 BRUNSWICK QUAY LONDON SE16 7PZ 126 BRUNSWICK QUAY LONDON SE16 7PZ 124 BRUNSWICK QUAY LONDON SE16 7PZ 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 142 BRUNSWICK QUAY LONDON SE16 7PZ 88 BRUNSWICK QUAY LONDON SE16 7PZ 86 BRUNSWICK QUAY LONDON SE16 7PZ 84 BRUNSWICK QUAY LONDON SE16 7PZ 94 BRUNSWICK QUAY LONDON SE16 7PZ 92 BRUNSWICK QUAY LONDON SE16 7PZ 90 BRUNSWICK QUAY LONDON SE16 7PZ 76 BRUNSWICK QUAY LONDON SE16 7PZ 74 BRUNSWICK QUAY LONDON SE16 7PZ 72 BRUNSWICK QUAY LONDON SE16 7PZ 82 BRUNSWICK QUAY LONDON SE16 7PZ 80 BRUNSWICK QUAY LONDON SE16 7PZ 78 BRUNSWICK QUAY LONDON SE16 7PZ FLAT 4 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ 36 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 35 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 34 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 39 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 38 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 37 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 30 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 3 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 29 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 33 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 32 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 31 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 4 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 48 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 47 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 46 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 50 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 5 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 49 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 42 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 41 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 40 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 45 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 44 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 43 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 28 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 12 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 11 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 10 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 15 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 14 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 13 ALBION ESTATE SWAN ROAD LONDON SE16 7DL FLAT 7 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 6 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 5 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ 1 ALBION ESTATE SWAN ROAD LONDON SE16 7DL FLAT 9 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ FLAT 8 MURDOCH HOUSE MOODKEE STREET LONDON SE16 7BJ 16 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 24 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 23 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 22 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 27 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 26 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 25 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 19 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 18 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 17 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 21 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 20 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 2 ALBION ESTATE SWAN ROAD LONDON SE16 7DL 12 WOODLAND CRESCENT LONDON SE16 6YP 9 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 8 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 7 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 12 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 11 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 10 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 3 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 2 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 1 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 6 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 5 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 4 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 13 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 8 GARTER WAY LONDON SE16 6XA 7 GARTER WAY LONDON SE16 6XA 6 GARTER WAY LONDON SE16 6XA FLAT 2 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 1 QUILTING COURT GARTER WAY LONDON SE16 6XF 9 GARTER WAY LONDON SE16 6XA 2 GARTER WAY LONDON SE16 6XA 1 GARTER WAY LONDON SE16 6XA 14 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 5 GARTER WAY LONDON SE16 6XA 4 GARTER WAY LONDON SE16 6XA 3 GARTER WAY LONDON SE16 6XA FLAT 8 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ 9 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 8 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 7 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 14 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 12 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 11 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 3 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 2 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 1 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 6 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 5 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 4 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 15 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW FLAT 4 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ FLAT 3 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ FLAT 2 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ FLAT 7 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ FLAT 6 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ FLAT 5 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ 18 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 17 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 16 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW FLAT 1 HELIER COURT ELEANOR CLOSE LONDON SE16 6PZ 20 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 19 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW FLAT 3 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 5 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 4 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 3 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 8 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 7 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 6 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 10 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 9 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 8 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 2 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 1 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 11 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 9 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 18 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 17 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 16 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 21 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 20 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 19 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 12 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 11 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 10 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 15 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 14 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 13 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 7 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 1 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 11 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 10 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 4 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 3 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 2 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 6 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 5 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 4 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 9 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 8 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 7 QUILTING COURT GARTER WAY LONDON SE16 6XF FLAT 5 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 3 ADELPHI COURT GARTER WAY LONDON SE16 6XB 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 2 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 1 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 6 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 5 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 4 ADELPHI COURT GARTER WAY LONDON SE16 6XB FLAT 8 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 7 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 6 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 11 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 10 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 9 ABERDALE COURT GARTER WAY LONDON SE16 6XG FLAT 14 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 13 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 12 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 1 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 16 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 15 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 8 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 7 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 6 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 11 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 10 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 9 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 2 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 11 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 10 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 9 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 2 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 1 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 12 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 5 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 4 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 3 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 8 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 7 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 6 FAIRWAY COURT CHRISTOPHER CLOSE LONDON SE16 6PJ FLAT 5 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 4 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 3 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 2 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 7 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 6 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 5 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 10 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 9 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 8 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 1 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 12 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 11 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 8 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 1 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 16 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 15 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 4 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 3 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 2 GRANTHAM COURT ELEANOR CLOSE LONDON SE16 6PT FLAT 11 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 10 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 9 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 14 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 13 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 12 DERWENT COURT ELEANOR CLOSE LONDON SE16 6PS FLAT 3 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 7 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 6 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 5 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 1 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 9 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 8 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 1 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 4 GORHAM HOUSE WOLFE CRESCENT LONDON SE16 6SP FLAT 3 GORHAM HOUSE WOLFE CRESCENT LONDON SE16 6SP FLAT 4 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 3 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 2 DURELL HOUSE WOLFE CRESCENT LONDON SE16 6SN FLAT 2 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 1 CARLETON HOUSE WOLFE CRESCENT LONDON SE16 6SL FLAT 10 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 9 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 4 CARLETON HOUSE WOLFE CRESCENT LONDON SE16 6SL FLAT 3 CARLETON HOUSE WOLFE CRESCENT LONDON SE16 6SL FLAT 2 CARLETON HOUSE WOLFE CRESCENT LONDON SE16 6SL FLAT 5 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 4 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 3 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 8 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 7 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 6 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR FLAT 2 GORHAM HOUSE WOLFE CRESCENT LONDON SE16 6SP FLAT 12 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 11 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 10 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 15 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 14 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 13 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 6 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 5 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 4 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 9 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 8 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 7 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 16 CAREER COURT CHRISTOPHER CLOSE LONDON SE16 6PN FLAT 9 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 8 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 7 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 1 GORHAM HOUSE WOLFE CRESCENT LONDON SE16 6SP FLAT 11 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 10 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 3 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 2 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 1 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 6 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 5 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS FLAT 4 MONKTON HOUSE WOLFE CRESCENT LONDON SE16 6SS 13 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 12 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 11 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 16 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 15 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 14 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 7 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 6 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 5 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 10 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 9 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 8 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL FLAT 1 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH 1 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF FLAT 9 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH FLAT 8 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH 4 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 3 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 2 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF FLAT 4 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH FLAT 3 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH FLAT 2 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH FLAT 7 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH FLAT 6 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH FLAT 5 YEW HOUSE 2 WOODLAND CRESCENT LONDON SE16 6YH 4 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL FLAT 133 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 132 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 131 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 136 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 135 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 134 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 127 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 126 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 125 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 130 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 129 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 128 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 137 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 11 JAMES HOUSE WOLFE CRESCENT LONDON SE16 6SR 7 WOLFE CRESCENT LONDON SE16 6SF ST JOHNS PRIMARY SCHOOL ST ELMOS ROAD LONDON SE16 6SD 3 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 2 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 1 CEDAR HOUSE 1 WOODLAND CRESCENT LONDON SE16 6YL FLAT 140 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 139 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 138 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 143 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 142 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 141 BASQUE COURT GARTER WAY LONDON SE16 6XE 5 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 8 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 7 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 6 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 2 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 1 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 9 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 2 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 1 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 10 WOODLAND CRESCENT LONDON SE16 6YN 5 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 4 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 3 CYPRESS HOUSE 5 WOODLAND CRESCENT LONDON SE16 6YQ 3 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 12 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 11 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 10 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 15 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 14 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 13 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 6 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 5 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 4 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 9 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 8 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 7 POPLAR HOUSE 11 WOODLAND CRESCENT LONDON SE16 6YJ 9 WOODLAND CRESCENT LONDON SE16 6YN 5 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 4 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 3 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 8 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 7 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 6 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 8 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 7 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 6 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 2 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 1 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 9 ROWAN HOUSE 3 WOODLAND CRESCENT LONDON SE16 6YF 9 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 18 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 17 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 16 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 8 WOODLAND CRESCENT LONDON SE16 6YN 7 WOODLAND CRESCENT LONDON SE16 6YN 6 WOODLAND CRESCENT LONDON SE16 6YN 12 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 11 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 10 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 15 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 14 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG 13 SPRUCE HOUSE 4 WOODLAND CRESCENT LONDON SE16 6YG FLAT 56 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 55 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 54 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 59 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 58 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 57 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 50 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 49 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 48 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 53 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 52 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 51 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 60 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 69 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 68 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 67 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 72 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 71 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 70 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 63 BASQUE COURT GARTER WAY LONDON SE16 6XD 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 62 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 61 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 66 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 65 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 64 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 47 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 30 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 29 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 28 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 33 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 32 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 31 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 24 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 23 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 22 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 27 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 26 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 25 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 34 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 43 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 42 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 41 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 46 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 45 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 44 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 37 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 36 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 35 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 40 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 39 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 38 BASQUE COURT GARTER WAY LONDON SE16 6XD FLAT 73 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 108 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 107 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 106 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 111 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 110 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 109 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 102 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 101 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 100 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 105 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 104 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 103 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 112 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 121 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 120 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 119 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 124 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 123 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 122 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 115 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 114 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 113 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 118 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 117 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 116 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 99 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 82 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 81 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 80 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 85 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 84 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 83 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 76 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 75 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 74 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 79 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 78 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 77 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 86 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 95 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 94 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 93 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 98 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 97 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 96 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 89 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 88 BASQUE COURT GARTER WAY LONDON SE16 6XE 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 87 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 92 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 91 BASQUE COURT GARTER WAY LONDON SE16 6XE FLAT 90 BASQUE COURT GARTER WAY LONDON SE16 6XE 33 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR FLAT 13 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 12 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 11 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 16 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 15 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 14 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 8 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 7 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 6 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 10 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 1 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 9 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 17 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 9 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 8 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 7 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 11 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 10 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 1 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 3 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 2 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 18 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 6 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 5 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 4 SCOTIA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AZ FLAT 5 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 6 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 5 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 4 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 9 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 8 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 7 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 17 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 16 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 15 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 3 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 2 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 18 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 1 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 18 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 17 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 16 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 4 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 3 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 2 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 12 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 11 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 10 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 15 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 14 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 13 MANITOBA COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7AY FLAT 12 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 11 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 10 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 1 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 14 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 13 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 12 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 6 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 5 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 4 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 9 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 8 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 7 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 15 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 7 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 6 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 5 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 1 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 9 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 8 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 18 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 17 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 16 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 4 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 3 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 2 WELLS HOUSE HOWLAND ESTATE LOWER ROAD LONDON SE16 7BN FLAT 36 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 20 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 2 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 19 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 23 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 22 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 21 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 15 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 14 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 13 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 18 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 17 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 16 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 24 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 32 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 31 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 30 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 35 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 34 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 33 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 27 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 26 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 25 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 3 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 29 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL FLAT 28 RITCHIE HOUSE HOWLANDS ESTATE MOODKEE STREET LONDON SE16 7BL PIZZA HUT THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 1LL EAST WAREHOUSE CANADA WATER RETAIL PARK SURREY QUAYS ROAD LONDON SE16 2XU UNITS 52 AND 52A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNITS 51 AND 51A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNITS 50 AND 50A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNITS 24 TO 27 MULBERRY BUSINESS CENTRE QUEBEC WAY LONDON SE16 1LB UNITS 16 TO 18 GROUND FLOOR AND FIRST FLOOR MULBERRY BUSINESS CENTRE QUEBEC WAY LONDON SE16 1LB FORMER DOCK MANAGERS OFFICE LOWER ROAD LONDON SE16 2XU UNITS 46 AND 46A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 45 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNITS 44 AND 44A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNITS 49 AND 49A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 48 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNITS 47 AND 47A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT B QUEBEC INDUSTRIAL ESTATE QUEBEC WAY LONDON SE16 7LF STORE AYLTON ESTATE RENFORTH STREET LONDON SE16 1JL MANAGEMENT SUITE SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 1LL SURREY DOCKER REDRIFF ROAD LONDON SE16 2LW 53 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 1LL 46-50 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 1LL 27 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 1LL FLAT 11 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 10 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 1 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 14 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 13 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX FLAT 12 CALGARY COURT CANADA ESTATE NEPTUNE STREET LONDON SE16 7AX DAILY MAIL BUILDING SURREY QUAYS ROAD LONDON SE16 1PQ THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 1LL SURREY QUAYS LEISURE PARK SURREY QUAYS ROAD LONDON SE16 1LL SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LR 28 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 27 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 26 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 30 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 3 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 29 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 22 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 21 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 20 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 25 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 24 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 23 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 31 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 4 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 39 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 38 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 6 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 5 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 40 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 34 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 33 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 32 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 37 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 36 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 35 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 2 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB FLAT 51 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 50 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 5 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 7 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 6 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 52 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 46 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 45 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 44 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 49 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 48 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 47 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 8 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ 16 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 15 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 14 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 19 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 18 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 17 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 10 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 1 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB FLAT 9 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ 13 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 12 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 11 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 7 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 73 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 72 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 71 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 76 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 75 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 74 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 67 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 66 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 65 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 70 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 69 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 68 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 77 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 80 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 79 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 78 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 64 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 47 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 46 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 45 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 50 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 49 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 48 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 41 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 9 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 8 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BB 44 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 43 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 42 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 51 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 60 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 59 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 58 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 63 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 62 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 61 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 54 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 53 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 52 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 57 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 56 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD 55 REGINA POINT CANADA ESTATE RENFORTH STREET LONDON SE16 7BD FLAT 22 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 21 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 20 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 25 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 24 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 23 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 17 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 16 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 15 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 2 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 19 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 18 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 26 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 34 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 33 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 32 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 37 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 36 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 35 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 29 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 28 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 27 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 31 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 30 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 3 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 14 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 18 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 17 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 16 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 20 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 2 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 19 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 12 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 11 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 10 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 15 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 14 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 13 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 21 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 10 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 1 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 9 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 13 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 12 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 11 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 5 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 4 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 3 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 8 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 7 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 6 EDMONTON COURT CANADA ESTATE RENFORTH STREET LONDON SE16 7BQ FLAT 38 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 29 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 28 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 27 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 31 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 30 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 3 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 23 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 22 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 21 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 26 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 25 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 24 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 32 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 40 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 4 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 39 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 43 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 42 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 41 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 35 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 34 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 33 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 38 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 37 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 36 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 20 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 5 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 45 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 44 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 8 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 7 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 6 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 40 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 4 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 39 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 43 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 42 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 41 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 9 LARCH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DH FLAT 17 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 16 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 15 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 2 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 19 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 18 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 11 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 10 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 1 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 14 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 13 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ FLAT 12 BEECH HOUSE AINSTY ESTATE SWAN ROAD LONDON SE16 7DQ UNITS 42 AND 42A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 10 SWAN ROAD LONDON SE16 7DT 22 TURNER COURT ALBION STREET LONDON SE16 7JU 21 TURNER COURT ALBION STREET LONDON SE16 7JU 16 SWAN ROAD LONDON SE16 7DT 14 SWAN ROAD LONDON SE16 7DT 12 SWAN ROAD LONDON SE16 7DT 17 TURNER COURT ALBION STREET LONDON SE16 7JU 16 TURNER COURT ALBION STREET LONDON SE16 7JU 15 TURNER COURT ALBION STREET LONDON SE16 7JU 20 TURNER COURT ALBION STREET LONDON SE16 7JU 19 TURNER COURT ALBION STREET LONDON SE16 7JU 18 TURNER COURT ALBION STREET LONDON SE16 7JU 32 ALBION STREET LONDON SE16 7JQ 50 ALBION STREET LONDON SE16 7JQ 48 ALBION STREET LONDON SE16 7JQ 46 ALBION STREET LONDON SE16 7JQ 62 ALBION STREET LONDON SE16 7JY 60 ALBION STREET LONDON SE16 7JY 58 ALBION STREET LONDON SE16 7JY 38 ALBION STREET LONDON SE16 7JQ 36 ALBION STREET LONDON SE16 7JQ 34 ALBION STREET LONDON SE16 7JQ 44 ALBION STREET LONDON SE16 7JQ 42 ALBION STREET LONDON SE16 7JQ 40 ALBION STREET LONDON SE16 7JQ 14 TURNER COURT ALBION STREET LONDON SE16 7JU 3 TEMERAIRE STREET LONDON SE16 7JE 1 TEMERAIRE STREET LONDON SE16 7JE 14 CLACK STREET LONDON SE16 7JT 9 TEMERAIRE STREET LONDON SE16 7JE 7 TEMERAIRE STREET LONDON SE16 7JE 5 TEMERAIRE STREET LONDON SE16 7JE 6 CLACK STREET LONDON SE16 7JT 4 CLACK STREET LONDON SE16 7JT 2 CLACK STREET LONDON SE16 7JT 12 CLACK STREET LONDON SE16 7JT 10 CLACK STREET LONDON SE16 7JT 8 CLACK STREET LONDON SE16 7JT 1 TURNER COURT ALBION STREET LONDON SE16 7JU 10 TURNER COURT ALBION STREET LONDON SE16 7JU 9 TURNER COURT ALBION STREET LONDON SE16 7JU 8 TURNER COURT ALBION STREET LONDON SE16 7JU 13 TURNER COURT ALBION STREET LONDON SE16 7JU 12 TURNER COURT ALBION STREET LONDON SE16 7JU 11 TURNER COURT ALBION STREET LONDON SE16 7JU 4 TURNER COURT ALBION STREET LONDON SE16 7JU 3 TURNER COURT ALBION STREET LONDON SE16 7JU 2 TURNER COURT ALBION STREET LONDON SE16 7JU 7 TURNER COURT ALBION STREET LONDON SE16 7JU 6 TURNER COURT ALBION STREET LONDON SE16 7JU 5 TURNER COURT ALBION STREET LONDON SE16 7JU 64 ALBION STREET LONDON SE16 7JY 21 TEMERAIRE STREET LONDON SE16 7JE 19 TEMERAIRE STREET LONDON SE16 7JE 17 TEMERAIRE STREET LONDON SE16 7JE 10-12 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 1 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 8 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 5 SETH STREET LONDON SE16 7HA 3 SETH STREET LONDON SE16 7HA 1 SETH STREET LONDON SE16 7HA 15 TEMERAIRE STREET LONDON SE16 7JE 13 TEMERAIRE STREET LONDON SE16 7JE 11 TEMERAIRE STREET LONDON SE16 7JE 11-13 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 33 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 30-34 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 24-26 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 43 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 39-41 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 38-40 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 16 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 15 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 14 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 21-23 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 2-4 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 17 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 67 SWAN ROAD LONDON SE16 7DY 2 ATLANTA HOUSE REDRIFF ROAD LONDON SE16 7PN 1 ATLANTA HOUSE REDRIFF ROAD LONDON SE16 7PN LITTLE CROWN 56 ALBION STREET LONDON SE16 7JQ 3 BRUNSWICK HOUSE REDRIFF ROAD LONDON SE16 7PP 2 BRUNSWICK HOUSE REDRIFF ROAD LONDON SE16 7PP 1 BRUNSWICK HOUSE REDRIFF ROAD LONDON SE16 7PP 70 ALBION STREET LONDON SE16 7JY 68 ALBION STREET LONDON SE16 7JY 66 ALBION STREET LONDON SE16 7JY 28A ALBION STREET LONDON SE16 7JQ THE ALBION 20 ALBION STREET LONDON SE16 7JQ 72 ALBION STREET LONDON SE16 7JY 4 BRUNSWICK HOUSE REDRIFF ROAD LONDON SE16 7PP 59 SWAN ROAD LONDON SE16 7DY 57 SWAN ROAD LONDON SE16 7DY 55 SWAN ROAD LONDON SE16 7DY 65 SWAN ROAD LONDON SE16 7DY 63 SWAN ROAD LONDON SE16 7DY 61 SWAN ROAD LONDON SE16 7DY 1 CANADA HOUSE REDRIFF ROAD LONDON SE16 7PH 6 BRUNSWICK HOUSE REDRIFF ROAD LONDON SE16 7PP 5 BRUNSWICK HOUSE REDRIFF ROAD LONDON SE16 7PP 53 SWAN ROAD LONDON SE16 7DY 51 SWAN ROAD LONDON SE16 7DY 2 CANADA HOUSE REDRIFF ROAD LONDON SE16 7PH 62 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 61 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 60 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 65 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 64 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 63 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 56 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 55 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 54 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 59 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 58 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 57 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 66 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 30 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 29 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 28 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 33 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 32 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 31 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 24 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 23 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 67 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 27 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 26 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 25 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 53 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 41 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 40 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 4 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 44 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 43 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 42 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 36 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 35 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 34 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 39 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 38 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 37 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 5 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 49 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 48 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 47 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 52 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 51 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 50 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 8 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 7 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 6 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 46 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 45 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JS 9 IRWELL ESTATE NEPTUNE STREET LONDON SE16 7JR 34 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 198 BRUNSWICK QUAY LONDON SE16 7PT 196 BRUNSWICK QUAY LONDON SE16 7PT 194 BRUNSWICK QUAY LONDON SE16 7PT 204 BRUNSWICK QUAY LONDON SE16 7PT 202 BRUNSWICK QUAY LONDON SE16 7PT 200 BRUNSWICK QUAY LONDON SE16 7PT 186 BRUNSWICK QUAY LONDON SE16 7PT 184 BRUNSWICK QUAY LONDON SE16 7PT 182 BRUNSWICK QUAY LONDON SE16 7PT 192 BRUNSWICK QUAY LONDON SE16 7PT 190 BRUNSWICK QUAY LONDON SE16 7PT 188 BRUNSWICK QUAY LONDON SE16 7PT 206 BRUNSWICK QUAY LONDON SE16 7PT 224 BRUNSWICK QUAY LONDON SE16 7PT 222 BRUNSWICK QUAY LONDON SE16 7PT 220 BRUNSWICK QUAY LONDON SE16 7PT CHRISTIAN PENTECOSTAL MISSION INTERNATIONAL UNIT 1 MULBERRY BUSINESS CENTRE QUEBEC WAY LONDON SE16 7LB 228 BRUNSWICK QUAY LONDON SE16 7PT 226 BRUNSWICK QUAY LONDON SE16 7PT 212 BRUNSWICK QUAY LONDON SE16 7PT 210 BRUNSWICK QUAY LONDON SE16 7PT 208 BRUNSWICK QUAY LONDON SE16 7PT 218 BRUNSWICK QUAY LONDON SE16 7PT 216 BRUNSWICK QUAY LONDON SE16 7PT 214 BRUNSWICK QUAY LONDON SE16 7PT 180 BRUNSWICK QUAY LONDON SE16 7PT 146 BRUNSWICK QUAY LONDON SE16 7PT 144 BRUNSWICK QUAY LONDON SE16 7PT 41 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 152 BRUNSWICK QUAY LONDON SE16 7PT 150 BRUNSWICK QUAY LONDON SE16 7PT 148 BRUNSWICK QUAY LONDON SE16 7PT 37 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 36 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 35 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 40 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 39 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 38 AYLTON ESTATE RENFORTH STREET LONDON SE16 7JW 154 BRUNSWICK QUAY LONDON SE16 7PT 172 BRUNSWICK QUAY LONDON SE16 7PT 170 BRUNSWICK QUAY LONDON SE16 7PT 168 BRUNSWICK QUAY LONDON SE16 7PT 178 BRUNSWICK QUAY LONDON SE16 7PT 176 BRUNSWICK QUAY LONDON SE16 7PT 174 BRUNSWICK QUAY LONDON SE16 7PT 160 BRUNSWICK QUAY LONDON SE16 7PT 158 BRUNSWICK QUAY LONDON SE16 7PT 156 BRUNSWICK QUAY LONDON SE16 7PT 166 BRUNSWICK QUAY LONDON SE16 7PT 164 BRUNSWICK QUAY LONDON SE16 7PT 162 BRUNSWICK QUAY LONDON SE16 7PT 16 PUMP HOUSE CLOSE LONDON SE16 7HS 15 PUMP HOUSE CLOSE LONDON SE16 7HS 14 PUMP HOUSE CLOSE LONDON SE16 7HS 19 PUMP HOUSE CLOSE LONDON SE16 7HS 18 PUMP HOUSE CLOSE LONDON SE16 7HS 17 PUMP HOUSE CLOSE LONDON SE16 7HS 10 PUMP HOUSE CLOSE LONDON SE16 7HS 9 PUMP HOUSE CLOSE LONDON SE16 7HS 8 PUMP HOUSE CLOSE LONDON SE16 7HS 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 13 PUMP HOUSE CLOSE LONDON SE16 7HS 12 PUMP HOUSE CLOSE LONDON SE16 7HS 11 PUMP HOUSE CLOSE LONDON SE16 7HS 20 PUMP HOUSE CLOSE LONDON SE16 7HS 29 PUMP HOUSE CLOSE LONDON SE16 7HS 28 PUMP HOUSE CLOSE LONDON SE16 7HS 27 PUMP HOUSE CLOSE LONDON SE16 7HS 32 PUMP HOUSE CLOSE LONDON SE16 7HS 31 PUMP HOUSE CLOSE LONDON SE16 7HS 30 PUMP HOUSE CLOSE LONDON SE16 7HS 23 PUMP HOUSE CLOSE LONDON SE16 7HS 22 PUMP HOUSE CLOSE LONDON SE16 7HS 21 PUMP HOUSE CLOSE LONDON SE16 7HS 26 PUMP HOUSE CLOSE LONDON SE16 7HS 25 PUMP HOUSE CLOSE LONDON SE16 7HS 24 PUMP HOUSE CLOSE LONDON SE16 7HS 6 PUMP HOUSE CLOSE LONDON SE16 7HS 22 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 21 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 20 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 25 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 24 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 23 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 16 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 15 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 14 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 19 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 18 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 17 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 26 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 2 PUMP HOUSE CLOSE LONDON SE16 7HS 1 PUMP HOUSE CLOSE LONDON SE16 7HS 37 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 5 PUMP HOUSE CLOSE LONDON SE16 7HS 4 PUMP HOUSE CLOSE LONDON SE16 7HS 3 PUMP HOUSE CLOSE LONDON SE16 7HS 1 TEREDO STREET LONDON SE16 7LW 100 REDRIFF ROAD LONDON SE16 7LH 27 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 35 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 28 QUEBEC WAY LONDON SE16 7LF 2 QUEBEC WAY LONDON SE16 7LQ 33 PUMP HOUSE CLOSE LONDON SE16 7HS 159A LOWER ROAD LONDON SE16 2XL FLAT A 167 LOWER ROAD LONDON SE16 2XL FLAT 3 149 LOWER ROAD LONDON SE16 2XL FLAT C 167 LOWER ROAD LONDON SE16 2XL 159B LOWER ROAD LONDON SE16 2XL FLAT B 167 LOWER ROAD LONDON SE16 2XL 147B LOWER ROAD LONDON SE16 2XL FLAT 2 161 LOWER ROAD LONDON SE16 2XL 2A BRUNSWICK QUAY LONDON SE16 7PY FLAT 2 149 LOWER ROAD LONDON SE16 2XL FLAT 1 149 LOWER ROAD LONDON SE16 2XL FLAT 2 151 LOWER ROAD LONDON SE16 2XL 159C LOWER ROAD LONDON SE16 2XL 13 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW 10 COLLETTE COURT ELEANOR CLOSE LONDON SE16 6PW FLAT 3 151 LOWER ROAD LONDON SE16 2XL UNIT 4 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 28 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW GROUND FLOOR FLAT 171 LOWER ROAD LONDON SE16 2XL FLAT 1 161 LOWER ROAD LONDON SE16 2XL FIRST FLOOR AND SECOND FLOOR FLAT 171 LOWER ROAD LONDON SE16 2XL FLAT 3 161 LOWER ROAD LONDON SE16 2XL FLAT 1 151 LOWER ROAD LONDON SE16 2XL 147A LOWER ROAD LONDON SE16 2XL 1A BRUNSWICK QUAY LONDON SE16 7PU 42 PUMP HOUSE CLOSE LONDON SE16 7HS 41 PUMP HOUSE CLOSE LONDON SE16 7HS 40 PUMP HOUSE CLOSE LONDON SE16 7HS FLAT 2 70 RENFORTH STREET LONDON SE16 7JZ FLAT 1 70 RENFORTH STREET LONDON SE16 7JZ 7 PUMP HOUSE CLOSE LONDON SE16 7HS 36 PUMP HOUSE CLOSE LONDON SE16 7HS 35 PUMP HOUSE CLOSE LONDON SE16 7HS 34 PUMP HOUSE CLOSE LONDON SE16 7HS 39 PUMP HOUSE CLOSE LONDON SE16 7HS 38 PUMP HOUSE CLOSE LONDON SE16 7HS 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 37 PUMP HOUSE CLOSE LONDON SE16 7HS FLAT 3 70 RENFORTH STREET LONDON SE16 7JZ FLAT 12 70 RENFORTH STREET LONDON SE16 7JZ FLAT 11 70 RENFORTH STREET LONDON SE16 7JZ FLAT 10 70 RENFORTH STREET LONDON SE16 7JZ 147C LOWER ROAD LONDON SE16 2XL ALBION PRIMARY SCHOOL ALBION STREET LONDON SE16 7JD FLAT 6 70 RENFORTH STREET LONDON SE16 7JZ FLAT 5 70 RENFORTH STREET LONDON SE16 7JZ FLAT 4 70 RENFORTH STREET LONDON SE16 7JZ FLAT 9 70 RENFORTH STREET LONDON SE16 7JZ FLAT 8 70 RENFORTH STREET LONDON SE16 7JZ FLAT 7 70 RENFORTH STREET LONDON SE16 7JZ FLAT 2 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 1 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 12 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 5 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 4 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 3 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 8 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 7 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 6 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 11 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 10 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 9 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 6 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 3 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 2 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 1 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 6 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 5 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 4 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 9 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 8 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 7 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 12 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 11 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 10 BUCHANAN COURT WORGAN STREET LONDON SE16 7WB FLAT 5 BURRAGE COURT WORGAN STREET LONDON SE16 7WA 36 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7NA 7-9 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LJ 53-55 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7NB 23 NEPTUNE STREET LONDON SE16 7JP 44 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 31 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 49-51 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 47 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 45 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL UNIT 2A QUEBEC INDUSTRIAL ESTATE QUEBEC WAY LONDON SE16 7LQ 28 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 6 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 20 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL FLAT 1 BURRAGE COURT WORGAN STREET LONDON SE16 7WA 22 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL ALFRED SALTER PRIMARY SCHOOL QUEBEC WAY LONDON SE16 7LP FLAT 4 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 3 BURRAGE COURT WORGAN STREET LONDON SE16 7WA FLAT 2 BURRAGE COURT WORGAN STREET LONDON SE16 7WA 30 ALBION STREET LONDON SE16 7JQ 24 QUEBEC WAY LONDON SE16 7LF PETROL FILLING STATION SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL 16 CLACK STREET LONDON SE16 7JT SCHOOL HOUSE ALBION STREET LONDON SE16 7JF 26 QUEBEC WAY LONDON SE16 7LF FLAT 7 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 9 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 8 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 7 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 12 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 11 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 10 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 3 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 2 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 1 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 6 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 5 BURRHILL COURT WORGAN STREET LONDON SE16 7WG FLAT 4 BURRHILL COURT WORGAN STREET LONDON SE16 7WG 1 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 10 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 9 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 8 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 13 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 12 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 11 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 4 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 3 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 2 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 7 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 6 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW 5 LOCK KEEPERS HEIGHTS 117 BRUNSWICK QUAY LONDON SE16 7PW FLAT 8 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 4 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 3 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 2 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 7 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 6 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 5 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 10 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 9 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 8 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 1 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 12 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 11 BYARDS COURT WORGAN STREET LONDON SE16 7WD FLAT 8 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 4 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 3 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 2 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 7 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 6 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 5 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 11 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 10 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 9 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 1 ELBOURNE COURT WORGAN STREET LONDON SE16 7WF FLAT 14 CABOT COURT WORGAN STREET LONDON SE16 7WE FLAT 12 CABOT COURT WORGAN STREET LONDON SE16 7WE 56 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 55 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 54 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 59 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 58 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 57 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 50 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 49 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 48 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 53 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 52 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 51 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 60 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 69 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 68 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 67 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 72 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 71 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 70 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 63 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 62 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 61 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 66 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 65 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 64 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 47 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 30 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 29 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 28 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 33 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 32 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 31 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 24 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 23 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 22 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 27 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 26 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 25 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 34 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 43 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 42 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 41 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 46 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 45 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 44 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 37 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 36 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 35 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 40 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 39 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 38 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 73 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 108 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 107 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 106 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 111 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 110 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 109 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 102 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 101 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 100 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 105 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 104 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 103 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 112 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 121 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 120 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 119 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 124 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 123 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 122 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 115 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 114 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 113 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 118 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 117 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 116 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 99 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 82 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 81 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 80 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 85 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 84 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 83 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 76 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 75 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 74 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 79 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 78 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 77 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 86 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 95 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 94 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 93 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 98 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 97 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 96 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 89 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 88 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 87 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 92 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 91 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP 90 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AP FLAT 18 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 17 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 16 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 21 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 20 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 19 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 12 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 11 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 10 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 15 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 14 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 13 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 22 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 31 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 30 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 29 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 34 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 33 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 32 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 25 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 24 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 23 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 28 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 27 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 26 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 9 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ CAR WASH AT CAR PARK SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL UNIT 7 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 6 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 556 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 565 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 566 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 546 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 545 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 544 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 551 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 548 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 547 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 66 CANON BECK ROAD LONDON SE16 7DN FLAT 5 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 4 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 3 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 8 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 7 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 6 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ UNIT B TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ UNIT A2 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FIRST FLOOR AND SECOND FLOOR FLAT 68 CANON BECK ROAD LONDON SE16 7DN FLAT 2 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 1 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ UNIT C TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 35 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ 5 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 4 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 3 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 8 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 7 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 6 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 558 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL FLAT 63 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 62 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ 2 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 1 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 557 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 9 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 18 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 17 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 16 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 21 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 20 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 19 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 12 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 11 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 10 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 15 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 14 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN 13 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AN FLAT 61 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 44 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 43 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 42 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 47 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 46 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 45 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 38 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 37 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 36 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 41 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 40 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 39 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 48 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 57 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 56 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 55 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 60 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 59 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 58 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 51 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 50 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 49 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 54 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 53 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 52 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ FLAT 60 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 59 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 58 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 63 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 62 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 61 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 54 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 53 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 52 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 57 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 56 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 55 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 64 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 73 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 72 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 71 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 76 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 75 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 74 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 67 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 66 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 65 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 70 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 69 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 68 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 51 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 34 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 33 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 32 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 37 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 36 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 35 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 28 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 27 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 26 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 31 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 30 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 29 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 38 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 47 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 46 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 45 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 50 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 49 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 48 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 41 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 40 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 39 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 44 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 43 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 42 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 77 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 112 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 111 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 110 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 115 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 114 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 113 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 106 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 105 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 104 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 109 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 108 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 107 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 116 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 125 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 124 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 123 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 128 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 127 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 126 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 119 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 118 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 117 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 122 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 121 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 120 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 103 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 86 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 85 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 84 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 89 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 88 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 87 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 80 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 79 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 78 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 83 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 82 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 81 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 90 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 99 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 98 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 97 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 102 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 101 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 100 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 93 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 92 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 91 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 96 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 95 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 94 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT 159 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 158 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 157 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 162 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 161 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 160 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 153 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 152 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 151 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 156 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 155 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 154 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 163 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ UNIT C MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ UNIT B MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ UNIT A MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ UNIT C QUEBEC INDUSTRIAL ESTATE QUEBEC WAY LONDON SE16 7LF 555 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 5 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LR 166 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 165 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 164 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 169 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 168 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 167 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 150 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 133 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 132 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 131 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 136 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 135 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 134 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 127 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 126 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 125 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 130 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 129 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 128 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 137 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 146 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 145 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 144 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 149 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 148 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 147 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 140 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 139 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 138 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 143 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 142 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 141 MONTREAL HOUSE SURREY QUAYS ROAD LONDON SE16 7AQ 103B CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF FLAT 9 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 8 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 7 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 12 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 11 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 10 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 3 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 2 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 1 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 6 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 5 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 4 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 13 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 22 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 21 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 20 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 25 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 24 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 23 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 16 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 15 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 14 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 19 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 18 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 17 FAIRMONT HOUSE NEEDLEMAN STREET LONDON SE16 7AW FLAT 19 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 2 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 1 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS CANADA WATER LIBRARY 21 SURREY QUAYS ROAD LONDON SE16 7AR FLAT 5 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 4 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 3 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS LIVING ACCOMMODATION 20 ALBION STREET LONDON SE16 7JQ LIVING ACCOMMODATION THE CHINA HALL 141 LOWER ROAD LONDON SE16 2NQ UNIT 300 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH FLAT 2 1 TEREDO STREET LONDON SE16 7LW FLAT 1 1 TEREDO STREET LONDON SE16 7LW LIVING ACCOMMODATION 56 ALBION STREET LONDON SE16 7JQ FLAT 6 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 15 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 14 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 13 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 18 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 17 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 16 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 9 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 8 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 7 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 12 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 11 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS FLAT 10 HANOVER HOUSE DOMINION DRIVE LONDON SE16 7AS 543 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 4 CHINA HALL MEWS LONDON SE16 2XN UNITS 14 TO 18 GROUND FLOOR MULBERRY BUSINESS CENTRE QUEBEC WAY LONDON SE16 7LB UNITS 14 TO 18 FIRST FLOOR MULBERRY BUSINESS CENTRE QUEBEC WAY LONDON SE16 7LB 5 CHINA HALL MEWS LONDON SE16 2XN 3 CHINA HALL MEWS LONDON SE16 2XN 1 CHINA HALL MEWS LONDON SE16 2XN ASSEMBLY HALL 1 NEPTUNE STREET LONDON SE16 7JR UNIT 4 CANADA WATER RETAIL PARK SURREY QUAYS ROAD LONDON SE16 2XU FLAT C SECOND FLOOR 171 LOWER ROAD LONDON SE16 2XL GALA BINGO THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 1LL UNIT 41 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 40 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 6 CHINA HALL MEWS LONDON SE16 2XN FLAT 3 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 2 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 1 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP UNIT 24 MULBERRY BUSINESS CENTRE QUEBEC WAY LONDON SE16 7LD 43 RENFORTH STREET LONDON SE16 7JJ 2 CHINA HALL MEWS LONDON SE16 2XN 26-28 ALBION STREET LONDON SE16 7JQ UCI CINEMA THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 7LL FLAT B FIRST FLOOR 171 LOWER ROAD LONDON SE16 2XL 4 DRAKE CLOSE LONDON SE16 6RS 3 DRAKE CLOSE LONDON SE16 6RS 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 2 DRAKE CLOSE LONDON SE16 6RS 7 DRAKE CLOSE LONDON SE16 6RS 6 DRAKE CLOSE LONDON SE16 6RS 5 DRAKE CLOSE LONDON SE16 6RS FLAT 8 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 7 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 6 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA 1 DRAKE CLOSE LONDON SE16 6RS SOUTH AND WEST WAREHOUSES CANADA WATER RETAIL PARK SURREY QUAYS ROAD LONDON SE16 2XU FLAT 9 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA 8 DRAKE CLOSE LONDON SE16 6RS 173A LOWER ROAD LONDON SE16 2XL 163A LOWER ROAD LONDON SE16 2XL 163B LOWER ROAD LONDON SE16 2XL FIRST FLOOR FLAT CHURCH OF THE IMMACULATE CONCEPTION OF OUR LADY 2 ST ELMOS ROAD LONDON SE16 6SJ 173C LOWER ROAD LONDON SE16 2XL 173B LOWER ROAD LONDON SE16 2XL 11 DRAKE CLOSE LONDON SE16 6RS 10 DRAKE CLOSE LONDON SE16 6RS 9 DRAKE CLOSE LONDON SE16 6RS 14 DRAKE CLOSE LONDON SE16 6RS 13 DRAKE CLOSE LONDON SE16 6RS 12 DRAKE CLOSE LONDON SE16 6RS FLAT 4 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP 601 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 564 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 563 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 665 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 644 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 623 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 552 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL QUINCEYS THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 7LL HOLLYWOOD BOWL THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 7LL 562 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 554 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 553 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 681 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 612 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 611 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 604 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 615 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 614 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 613 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 691 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 683 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 682 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 603 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 602 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 692 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN FATTIE ARBUCKLES THE MAST LEISURE PARK SURREY QUAYS ROAD LONDON SE16 7LL FLAT 13 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 12 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 11 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP 4 HITHE GROVE LONDON SE16 2XP 3 HITHE GROVE LONDON SE16 2XP 2 HITHE GROVE LONDON SE16 2XP FLAT 7 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 6 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 5 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 10 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 9 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP FLAT 8 MYLES COURT 86 NEPTUNE STREET LONDON SE16 7JP 5 HITHE GROVE LONDON SE16 2XP FLAT 7 1 HITHE GROVE LONDON SE16 2XS FLAT 6 1 HITHE GROVE LONDON SE16 2XS FLAT 5 1 HITHE GROVE LONDON SE16 2XS UNIT 24 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 23 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB FLAT 8 1 HITHE GROVE LONDON SE16 2XS FLAT 1 1 HITHE GROVE LONDON SE16 2XS 7 HITHE GROVE LONDON SE16 2XP 6 HITHE GROVE LONDON SE16 2XP FLAT 4 1 HITHE GROVE LONDON SE16 2XS FLAT 3 1 HITHE GROVE LONDON SE16 2XS FLAT 2 1 HITHE GROVE LONDON SE16 2XS FLAT 37 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 36 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 35 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 4 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 39 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 38 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 31 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 30 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 3 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 34 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 33 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 32 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 40 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 49 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 48 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 47 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 51 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 50 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 5 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 43 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 42 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 41 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 46 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 45 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 44 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 29 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 13 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 12 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 11 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 16 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 15 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 14 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE ROOM D 153 LOWER ROAD LONDON SE16 2XL UNIT 13A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 22-24 ALBION STREET LONDON SE16 7JQ FLAT 10 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 1 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE ROOM H 153 LOWER ROAD LONDON SE16 2XL FLAT 17 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 25 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 24 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 23 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 28 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 27 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 26 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 2 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 19 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 18 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 22 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 21 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 20 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 52 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FIRST FLOOR 59 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL FIRST FLOOR 57 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL CLUBROOM CANADA ESTATE NEPTUNE STREET LONDON SE16 7BE FLAT 1 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FIRST FLOOR 63 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL FIRST FLOOR 61 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL FLAT 79 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 78 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 77 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 9 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 80 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 8 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 10 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 2 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 18 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 17 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 5 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 4 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 3 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 13 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 12 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 11 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 16 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 15 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 14 NIAGARA COURT RENFORTH STREET LONDON SE16 7BA FLAT 76 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 60 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 6 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 59 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 63 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 62 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 61 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 55 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 54 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 53 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 58 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 57 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 56 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 64 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 72 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 71 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 70 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 75 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 74 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 73 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 67 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 66 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 65 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 7 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BE FLAT 69 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG FLAT 68 COLUMBIA POINT CANADA ESTATE MOODKEE STREET LONDON SE16 7BG 461 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 436 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 421 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 464 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 463 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 462 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 344 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 343 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 342 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 401 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 346 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 345 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 471 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 414 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 413 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 412 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 422 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 416 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 415 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 403 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 402 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 472 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 411 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 405 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 404 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 341 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 305 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 304 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 303 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 313 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 312 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 311 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 354 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 353 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 352 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 302 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 362 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 361 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 314 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 332 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 331 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 326 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 335 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 334 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 333 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 322 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 316 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 315 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 325 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 324 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 323 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 423 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 515 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 513 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 512 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 523 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 522 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 521 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 503 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 502 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 574 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 511 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 505 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 504 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 524 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 536 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 535 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 534 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 541 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 538 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 537 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 528 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 526 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 525 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 533 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 532 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 531 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 573 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 441 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 435 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 434 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 444 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 443 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 442 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 426 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 425 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 424 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 433 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 432 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 431 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 445 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 542 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 527 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 514 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 572 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 571 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 561 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 452 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 451 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 446 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 501 GIVERNY HOUSE WATER GARDENS SQUARE LONDON SE16 6RL 454 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 453 HELIGAN HOUSE WATER GARDENS SQUARE LONDON SE16 6RJ 102 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 162 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 161 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 105 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 104 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 103A CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 151 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 136 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 121 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 154 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 153 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 152 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 111 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 125 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 124 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 123 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 132 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 131 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 126 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 114 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 113 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 112 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 122 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 116 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 115 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 101 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 635 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 634 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 633 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 643 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 642 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 641 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 624 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 622 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 621 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 632 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 631 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 625 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 645 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 664 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 663 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 662 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 673 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 672 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 671 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 653 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 652 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 651 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 661 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 655 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 654 PAVILLION HOUSE WATER GARDENS SQUARE LONDON SE16 6RN 133 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 233 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 232 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 231 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 241 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 235 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 234 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 223 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 222 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 216 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 226 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 225 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 224 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 242 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 301 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 254 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 253 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 351 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 336 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 321 EDEN HOUSE WATER GARDENS SQUARE LONDON SE16 6RH 245 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 244 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 243 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 252 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 251 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 246 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 215 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 201 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 146 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 145 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 261 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 236 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 221 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 141 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 135 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 134 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 144 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 143 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 142 CHANNEL HOUSE WATER GARDENS SQUARE LONDON SE16 6RF 262 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 211 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 205 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 204 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 214 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 213 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 212 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 271 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 264 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 263 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 203 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 202 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG 272 DOVECOTE HOUSE WATER GARDENS SQUARE LONDON SE16 6RG FLAT 129 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT 29 KINBURN STREET LONDON SE16 6DW 28 KINBURN STREET LONDON SE16 6DW 27 KINBURN STREET LONDON SE16 6DW 32 KINBURN STREET LONDON SE16 6DW 31 KINBURN STREET LONDON SE16 6DW 30 KINBURN STREET LONDON SE16 6DW 23 KINBURN STREET LONDON SE16 6DW 22 KINBURN STREET LONDON SE16 6DW 21 KINBURN STREET LONDON SE16 6DW 26 KINBURN STREET LONDON SE16 6DW 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 25 KINBURN STREET LONDON SE16 6DW 24 KINBURN STREET LONDON SE16 6DW 33 KINBURN STREET LONDON SE16 6DW 42 KINBURN STREET LONDON SE16 6DW 41 KINBURN STREET LONDON SE16 6DW 40 KINBURN STREET LONDON SE16 6DW 45 KINBURN STREET LONDON SE16 6DW 44 KINBURN STREET LONDON SE16 6DW 43 KINBURN STREET LONDON SE16 6DW 36 KINBURN STREET LONDON SE16 6DW 35 KINBURN STREET LONDON SE16 6DW 34 KINBURN STREET LONDON SE16 6DW 39 KINBURN STREET LONDON SE16 6DW 38 KINBURN STREET LONDON SE16 6DW 37 KINBURN STREET LONDON SE16 6DW 20 KINBURN STREET LONDON SE16 6DW 3 CLIPPER CLOSE LONDON SE16 6DR 41 TIMBER POND ROAD LONDON SE16 6AG 40 TIMBER POND ROAD LONDON SE16 6AG 6 CLIPPER CLOSE LONDON SE16 6DR 5 CLIPPER CLOSE LONDON SE16 6DR 4 CLIPPER CLOSE LONDON SE16 6DR 36 TIMBER POND ROAD LONDON SE16 6AG 35 TIMBER POND ROAD LONDON SE16 6AG 34 TIMBER POND ROAD LONDON SE16 6AG 39 TIMBER POND ROAD LONDON SE16 6AG 38 TIMBER POND ROAD LONDON SE16 6AG 37 TIMBER POND ROAD LONDON SE16 6AG 1 IRONSIDE CLOSE LONDON SE16 6DS 4 WINDROSE CLOSE LONDON SE16 6DU 3 WINDROSE CLOSE LONDON SE16 6DU 2 WINDROSE CLOSE LONDON SE16 6DU 7 WINDROSE CLOSE LONDON SE16 6DU 6 WINDROSE CLOSE LONDON SE16 6DU 5 WINDROSE CLOSE LONDON SE16 6DU 4 IRONSIDE CLOSE LONDON SE16 6DS 3 IRONSIDE CLOSE LONDON SE16 6DS 2 IRONSIDE CLOSE LONDON SE16 6DS 1 WINDROSE CLOSE LONDON SE16 6DU 6 IRONSIDE CLOSE LONDON SE16 6DS 5 IRONSIDE CLOSE LONDON SE16 6DS 46 KINBURN STREET LONDON SE16 6DW 18 MIDDLETON DRIVE LONDON SE16 6RZ 16 MIDDLETON DRIVE LONDON SE16 6RZ 14 MIDDLETON DRIVE LONDON SE16 6RZ 22 MIDDLETON DRIVE LONDON SE16 6RZ 20 MIDDLETON DRIVE LONDON SE16 6RZ 2 MIDDLETON DRIVE LONDON SE16 6RZ 6 STANHOPE CLOSE LONDON SE16 6RX 5 STANHOPE CLOSE LONDON SE16 6RX 4 STANHOPE CLOSE LONDON SE16 6RX 12 MIDDLETON DRIVE LONDON SE16 6RZ 10 MIDDLETON DRIVE LONDON SE16 6RZ 7 STANHOPE CLOSE LONDON SE16 6RX 24 MIDDLETON DRIVE LONDON SE16 6RZ 2 GREENACRE SQUARE LONDON SE16 6SE 11 GREENACRE SQUARE LONDON SE16 6SE 10 GREENACRE SQUARE LONDON SE16 6SE 5 GREENACRE SQUARE LONDON SE16 6SE 4 GREENACRE SQUARE LONDON SE16 6SE 3 GREENACRE SQUARE LONDON SE16 6SE 4 MIDDLETON DRIVE LONDON SE16 6RZ 28 MIDDLETON DRIVE LONDON SE16 6RZ 26 MIDDLETON DRIVE LONDON SE16 6RZ 1 GREENACRE SQUARE LONDON SE16 6SE 8 MIDDLETON DRIVE LONDON SE16 6RZ 6 MIDDLETON DRIVE LONDON SE16 6RZ 3 STANHOPE CLOSE LONDON SE16 6RX 2 HARDY CLOSE LONDON SE16 6RT 15 HARDY CLOSE LONDON SE16 6RT 14 HARDY CLOSE LONDON SE16 6RT 5 HARDY CLOSE LONDON SE16 6RT 4 HARDY CLOSE LONDON SE16 6RT 3 HARDY CLOSE LONDON SE16 6RT 10 HARDY CLOSE LONDON SE16 6RT 1 HARDY CLOSE LONDON SE16 6RT 47 KINBURN STREET LONDON SE16 6DW 13 HARDY CLOSE LONDON SE16 6RT 12 HARDY CLOSE LONDON SE16 6RT 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 11 HARDY CLOSE LONDON SE16 6RT 6 HARDY CLOSE LONDON SE16 6RT 6 HAWKE PLACE LONDON SE16 6RU 5 HAWKE PLACE LONDON SE16 6RU 4 HAWKE PLACE LONDON SE16 6RU 2 STANHOPE CLOSE LONDON SE16 6RX 1 STANHOPE CLOSE LONDON SE16 6RX 7 HAWKE PLACE LONDON SE16 6RU 9 HARDY CLOSE LONDON SE16 6RT 8 HARDY CLOSE LONDON SE16 6RT 7 HARDY CLOSE LONDON SE16 6RT 3 HAWKE PLACE LONDON SE16 6RU 2 HAWKE PLACE LONDON SE16 6RU 1 HAWKE PLACE LONDON SE16 6RU FLAT 15 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 14 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 13 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 18 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 17 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 16 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 9 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 8 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 7 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 12 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 11 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 10 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 19 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG UNIT 22 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 21 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 17 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 9 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 27 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 26 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 1 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB FLAT 21 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 20 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG UNIT 14 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 13 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 10 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB FLAT 6 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 8 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 7 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 6 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH 169B LOWER ROAD LONDON SE16 2XL 169A LOWER ROAD LONDON SE16 2XL FLAT 9 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 24 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 23 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 22 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 5 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 4 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 3 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH 169C LOWER ROAD LONDON SE16 2XL FLAT 2 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG ROTHERHITHE POLICE STATION 99 LOWER ROAD LONDON SE16 2XQ THE CHINA HALL 141 LOWER ROAD LONDON SE16 2NQ FLAT 5 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 4 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 3 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG UNIT 7 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 4 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 1 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 14 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 13 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 8 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 28 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 129 LOWER ROAD LONDON SE16 2XL 127 LOWER ROAD LONDON SE16 2XL 125 LOWER ROAD LONDON SE16 2XL 193 LOWER ROAD LONDON SE16 2LW UNIT 9 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 36 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 117 LOWER ROAD LONDON SE16 2XL 16 HOTHFIELD PLACE LONDON SE16 2XJ 15 HOTHFIELD PLACE LONDON SE16 2XJ 123 LOWER ROAD LONDON SE16 2XL 121 LOWER ROAD LONDON SE16 2XL 119 LOWER ROAD LONDON SE16 2XL UNIT 35 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 129A LOWER ROAD LONDON SE16 2XL 133 LOWER ROAD LONDON SE16 2XL 131 LOWER ROAD LONDON SE16 2XL 181 LOWER ROAD LONDON SE16 2XL 133A LOWER ROAD LONDON SE16 2XL 131A LOWER ROAD LONDON SE16 2XL UNIT 14A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 31 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 187 LOWER ROAD LONDON SE16 2LW 19 HOTHFIELD PLACE LONDON SE16 2XJ 18 HOTHFIELD PLACE LONDON SE16 2XJ 17 HOTHFIELD PLACE LONDON SE16 2XJ 14 HOTHFIELD PLACE LONDON SE16 2XJ UNIT 3 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 5 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 12A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 153 LOWER ROAD LONDON SE16 2XL UNIT 8 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 32 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 20 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 11A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 2 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 10 TO 11 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 12 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 201-203 LOWER ROAD LONDON SE16 2LW 1 HOTHFIELD PLACE LONDON SE16 2XJ 10 HOTHFIELD PLACE LONDON SE16 2XJ 9 HOTHFIELD PLACE LONDON SE16 2XJ 8 HOTHFIELD PLACE LONDON SE16 2XJ 13 HOTHFIELD PLACE LONDON SE16 2XJ 12 HOTHFIELD PLACE LONDON SE16 2XJ 11 HOTHFIELD PLACE LONDON SE16 2XJ 4 HOTHFIELD PLACE LONDON SE16 2XJ 3 HOTHFIELD PLACE LONDON SE16 2XJ 2 HOTHFIELD PLACE LONDON SE16 2XJ 7 HOTHFIELD PLACE LONDON SE16 2XJ 6 HOTHFIELD PLACE LONDON SE16 2XJ 5 HOTHFIELD PLACE LONDON SE16 2XJ FLAT 9 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 8 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 7 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 12 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 11 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 10 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 3 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 2 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 1 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 6 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 5 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 4 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU FLAT 13 VIRGINIA COURT ELEANOR CLOSE LONDON SE16 6PU 15 CONISTON COURT ELEANOR CLOSE LONDON SE16 6PX 24 ELEANOR CLOSE LONDON SE16 6PE 23 ELEANOR CLOSE LONDON SE16 6PE 29 ELEANOR CLOSE LONDON SE16 6PE 28 ELEANOR CLOSE LONDON SE16 6PE 27 ELEANOR CLOSE LONDON SE16 6PE 19 ELEANOR CLOSE LONDON SE16 6PE 18 ELEANOR CLOSE LONDON SE16 6PE 17 ELEANOR CLOSE LONDON SE16 6PE 22 ELEANOR CLOSE LONDON SE16 6PE 21 ELEANOR CLOSE LONDON SE16 6PE 20 ELEANOR CLOSE LONDON SE16 6PE 16 ELEANOR CLOSE LONDON SE16 6PA FLAT 15 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 14 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 13 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB 2 ELEANOR CLOSE LONDON SE16 6PA 1 ELEANOR CLOSE LONDON SE16 6PA FLAT 16 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 9 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 8 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 7 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 12 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 11 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 10 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB 3 ELEANOR CLOSE LONDON SE16 6PA 12 ELEANOR CLOSE LONDON SE16 6PA 11 ELEANOR CLOSE LONDON SE16 6PA 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 10 ELEANOR CLOSE LONDON SE16 6PA 15 ELEANOR CLOSE LONDON SE16 6PA 14 ELEANOR CLOSE LONDON SE16 6PA 13 ELEANOR CLOSE LONDON SE16 6PA 6 ELEANOR CLOSE LONDON SE16 6PA 5 ELEANOR CLOSE LONDON SE16 6PA 4 ELEANOR CLOSE LONDON SE16 6PA 9 ELEANOR CLOSE LONDON SE16 6PA 8 ELEANOR CLOSE LONDON SE16 6PA 7 ELEANOR CLOSE LONDON SE16 6PA 30 ELEANOR CLOSE LONDON SE16 6PE FLAT 14 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 13 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 12 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL 14 CHRISTOPHER CLOSE LONDON SE16 6PQ FLAT 16 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 15 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 8 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 7 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 6 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 11 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 10 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 9 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL 15 CHRISTOPHER CLOSE LONDON SE16 6PQ FLAT 4 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 3 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 2 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 7 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 6 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP FLAT 5 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP 18 CHRISTOPHER CLOSE LONDON SE16 6PQ 17 CHRISTOPHER CLOSE LONDON SE16 6PQ 16 CHRISTOPHER CLOSE LONDON SE16 6PQ FLAT 1 HAROLD COURT CHRISTOPHER CLOSE LONDON SE16 6PP 20 CHRISTOPHER CLOSE LONDON SE16 6PQ 19 CHRISTOPHER CLOSE LONDON SE16 6PQ FLAT 5 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL 1 CHRISTOPHER CLOSE LONDON SE16 6PG FLAT 7 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 6 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY 4 CHRISTOPHER CLOSE LONDON SE16 6PG 3 CHRISTOPHER CLOSE LONDON SE16 6PG 2 CHRISTOPHER CLOSE LONDON SE16 6PG FLAT 2 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 1 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY 31 ELEANOR CLOSE LONDON SE16 6PE FLAT 5 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 4 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY FLAT 3 DEAUVILLE COURT ELEANOR CLOSE LONDON SE16 6PY 5 CHRISTOPHER CLOSE LONDON SE16 6PG FLAT 1 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL 13 CHRISTOPHER CLOSE LONDON SE16 6PG 12 CHRISTOPHER CLOSE LONDON SE16 6PG FLAT 4 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 3 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL FLAT 2 LACINE COURT CHRISTOPHER CLOSE LONDON SE16 6PL 8 CHRISTOPHER CLOSE LONDON SE16 6PG 7 CHRISTOPHER CLOSE LONDON SE16 6PG 6 CHRISTOPHER CLOSE LONDON SE16 6PG 11 CHRISTOPHER CLOSE LONDON SE16 6PG 10 CHRISTOPHER CLOSE LONDON SE16 6PG 9 CHRISTOPHER CLOSE LONDON SE16 6PG 5 MAPLE LEAF SQUARE LONDON SE16 6SB 4 MAPLE LEAF SQUARE LONDON SE16 6SB 3 MAPLE LEAF SQUARE LONDON SE16 6SB 8 MAPLE LEAF SQUARE LONDON SE16 6SB 7 MAPLE LEAF SQUARE LONDON SE16 6SB 6 MAPLE LEAF SQUARE LONDON SE16 6SB 15 MAPLE LEAF SQUARE LONDON SE16 6SB 14 MAPLE LEAF SQUARE LONDON SE16 6SB 13 MAPLE LEAF SQUARE LONDON SE16 6SB 2 MAPLE LEAF SQUARE LONDON SE16 6SB 17 MAPLE LEAF SQUARE LONDON SE16 6SB 16 MAPLE LEAF SQUARE LONDON SE16 6SB 9 MAPLE LEAF SQUARE LONDON SE16 6SB 10 WOLFE CRESCENT LONDON SE16 6SF 9 WOLFE CRESCENT LONDON SE16 6SF 8 WOLFE CRESCENT LONDON SE16 6SF 13 WOLFE CRESCENT LONDON SE16 6SF 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 12 WOLFE CRESCENT LONDON SE16 6SF 11 WOLFE CRESCENT LONDON SE16 6SF 3 WOLFE CRESCENT LONDON SE16 6SF 2 WOLFE CRESCENT LONDON SE16 6SF 1 WOLFE CRESCENT LONDON SE16 6SF 6 WOLFE CRESCENT LONDON SE16 6SF 5 WOLFE CRESCENT LONDON SE16 6SF 4 WOLFE CRESCENT LONDON SE16 6SF 12 MAPLE LEAF SQUARE LONDON SE16 6SB 17 FISHERMANS DRIVE LONDON SE16 6SG 15 FISHERMANS DRIVE LONDON SE16 6SG 13 FISHERMANS DRIVE LONDON SE16 6SG 23 FISHERMANS DRIVE LONDON SE16 6SG 21 FISHERMANS DRIVE LONDON SE16 6SG 19 FISHERMANS DRIVE LONDON SE16 6SG 8 GREENACRE SQUARE LONDON SE16 6SE 7 GREENACRE SQUARE LONDON SE16 6SE 6 GREENACRE SQUARE LONDON SE16 6SE 11 FISHERMANS DRIVE LONDON SE16 6SG 1 FISHERMANS DRIVE LONDON SE16 6SG 9 GREENACRE SQUARE LONDON SE16 6SE 25 FISHERMANS DRIVE LONDON SE16 6SG 23 ST ELMOS ROAD LONDON SE16 6SA 21 ST ELMOS ROAD LONDON SE16 6SA 40 FISHERMANS DRIVE LONDON SE16 6SQ 11 MAPLE LEAF SQUARE LONDON SE16 6SB 10 MAPLE LEAF SQUARE LONDON SE16 6SB 1 MAPLE LEAF SQUARE LONDON SE16 6SB 5 FISHERMANS DRIVE LONDON SE16 6SG 3 FISHERMANS DRIVE LONDON SE16 6SG 27 FISHERMANS DRIVE LONDON SE16 6SG 38 FISHERMANS DRIVE LONDON SE16 6SQ 9 FISHERMANS DRIVE LONDON SE16 6SG 7 FISHERMANS DRIVE LONDON SE16 6SG 14 WOLFE CRESCENT LONDON SE16 6SF FLAT 25 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 24 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 23 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 28 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 27 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 26 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 19 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 18 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 17 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 22 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 21 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 20 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 29 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 3 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 2 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 1 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 6 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 5 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 4 BALTIC COURT ARCHANGEL STREET LONDON SE16 6AB FLAT 32 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 31 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 30 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU CHURCH OF THE IMMACULATE CONCEPTION OF OUR LADY 2 ST ELMOS ROAD LONDON SE16 6SJ FLAT 34 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 33 BALTIC COURT TIMBER POND ROAD LONDON SE16 6AU FLAT 7 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW 23 WOLFE CRESCENT LONDON SE16 6SF 22 WOLFE CRESCENT LONDON SE16 6SF 21 WOLFE CRESCENT LONDON SE16 6SF 26 WOLFE CRESCENT LONDON SE16 6SF 25 WOLFE CRESCENT LONDON SE16 6SF 24 WOLFE CRESCENT LONDON SE16 6SF 17 WOLFE CRESCENT LONDON SE16 6SF 16 WOLFE CRESCENT LONDON SE16 6SF 15 WOLFE CRESCENT LONDON SE16 6SF 20 WOLFE CRESCENT LONDON SE16 6SF 19 WOLFE CRESCENT LONDON SE16 6SF 18 WOLFE CRESCENT LONDON SE16 6SF 27 WOLFE CRESCENT LONDON SE16 6SF FLAT 3 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW FLAT 2 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW FLAT 1 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW FLAT 6 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW FLAT 5 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 4 SAUNDERS HOUSE CANADA STREET LONDON SE16 6SW FLAT 3 AMHERST HOUSE WOLFE CRESCENT LONDON SE16 6SH FLAT 2 AMHERST HOUSE WOLFE CRESCENT LONDON SE16 6SH FLAT 1 AMHERST HOUSE WOLFE CRESCENT LONDON SE16 6SH FLAT 6 AMHERST HOUSE WOLFE CRESCENT LONDON SE16 6SH FLAT 5 AMHERST HOUSE WOLFE CRESCENT LONDON SE16 6SH FLAT 4 AMHERST HOUSE WOLFE CRESCENT LONDON SE16 6SH FLAT 21 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 74 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 73 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 72 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 77 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 76 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 75 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 68 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 67 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 66 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 71 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 70 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 69 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 78 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 87 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 86 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 85 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 90 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 89 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 88 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 81 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 80 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 79 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 84 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 83 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 82 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 65 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 16 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 15 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 14 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 19 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 18 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 17 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 10 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 9 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 8 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 13 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 12 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 11 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 20 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 61 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 60 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 59 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 64 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 63 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 62 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 23 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 22 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 21 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 58 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 57 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 24 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 91 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 8 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 7 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 6 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 11 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 10 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 9 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 2 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 1 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU UNIT B VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 5 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 4 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 3 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 12 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 21 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 20 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 19 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 24 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 23 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 22 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 15 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 14 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 13 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 18 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 17 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 16 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 117 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 100 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 99 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 98 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 103 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 102 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 101 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 94 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 93 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 92 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 97 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 96 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 95 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 104 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 113 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 112 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 111 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 116 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 115 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 114 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 107 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 106 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 105 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 110 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 109 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 108 VANCOUVER HOUSE NEEDLEMAN STREET SE16 7BW FLAT 18 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 17 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 16 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 21 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 20 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 19 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 12 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 11 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 10 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 15 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 14 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 13 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 22 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 31 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 30 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 29 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 34 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 33 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 32 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 25 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 24 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 23 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 28 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 27 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 26 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 9 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 138 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 137 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 136 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 141 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 140 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 139 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 132 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 131 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 130 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 135 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 134 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 133 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 142 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 5 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 4 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 3 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 8 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 7 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 6 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 145 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 144 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 143 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 2 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 1 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 146 FAIRMONT HOUSE ALBATROSS WAY LONDON SE16 7BT FLAT 35 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 34 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 33 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 32 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 37 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 36 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 35 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 28 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 27 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 26 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 31 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 30 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 29 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 38 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 4 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 3 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 2 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 7 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 6 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 5 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 41 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 40 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 39 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 1 BURLINGTON HOUSE PROVINCE DRIVE LONDON SE16 7BZ FLAT 43 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 42 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 25 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 8 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 7 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 6 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 11 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 10 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 9 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 2 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 1 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 36 OAKVILLE HOUSE DOMINION DRIVE LONDON SE16 7BX FLAT 5 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 4 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 3 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 12 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 21 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 20 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 19 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 24 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 23 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 22 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 15 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 14 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 13 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 18 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 17 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 16 OTTAWA HOUSE ALBATROSS WAY LONDON SE16 7BY FLAT 18 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 17 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 14 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 20 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 2 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 19 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 10 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 1 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 9 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 13 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 12 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 11 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 21 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 33 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 30 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 3 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 36 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 35 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 34 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 26 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 25 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 22 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 29 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 28 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 27 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 8 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 5 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 4 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 3 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 8 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 7 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 6 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 15 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 14 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 13 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 2 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 17 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 16 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 9 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 4 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 3 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 2 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 7 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 6 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 5 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 11 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 10 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 1 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 14 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 13 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 12 RAVEN HOUSE OSPREY ESTATE 1 TAWNY WAY LONDON SE16 2NQ FLAT 37 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 7 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 6 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 5 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 1 MANSION WHARF HOUSE 101 LOWER ROAD LONDON SE16 2XG FLAT 9 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 8 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 30 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 3 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 29 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 4 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 32 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 31 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 1 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 18 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 17 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 16 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 20 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 2 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 19 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 12 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 11 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 10 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 15 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 14 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 13 COURTHOPE HOUSE LOWER ROAD LONDON SE16 2XH FLAT 28 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 12 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 11 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 10 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 15 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 14 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 13 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 5 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 4 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 38 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 1 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 9 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 6 BLICK HOUSE NEPTUNE STREET LONDON SE16 2XE FLAT 16 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 24 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 23 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 22 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 27 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 26 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 25 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 19 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 18 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 17 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 21 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF FLAT 20 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 FLAT 2 ORCHARD HOUSE LOWER ROAD LONDON SE16 2XF ROOM B 153 LOWER ROAD LONDON SE16 2XL ROOM A 153 LOWER ROAD LONDON SE16 2XL UNIT A VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU ROOM F 153 LOWER ROAD LONDON SE16 2XL ROOM E 153 LOWER ROAD LONDON SE16 2XL ROOM C 153 LOWER ROAD LONDON SE16 2XL FLAT 53 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 52 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 51 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 56 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 55 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 54 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU ROOM G 153 LOWER ROAD LONDON SE16 2XL UNIT A3 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ UNIT A1 TORONTO HOUSE SURREY QUAYS ROAD LONDON SE16 7AJ 2B QUEBEC WAY LONDON SE16 7LB UNIT 2 TO 3 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 34 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 4 SURREY QUAYS SHOPPING CENTRE REDRIFF ROAD LONDON SE16 7LL ROOM K 153 LOWER ROAD LONDON SE16 2XL ROOM J 153 LOWER ROAD LONDON SE16 2XL ROOM I 153 LOWER ROAD LONDON SE16 2XL UNITS 16 AND 16A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2BX UNIT 1A QUEBEC INDUSTRIAL ESTATE QUEBEC WAY LONDON SE16 7LF UNIT 5 AND UNIT 15 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB FLAT 50 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 33 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 32 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 31 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 36 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 35 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 34 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 27 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 26 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 25 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 30 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 29 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 28 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 37 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 46 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 45 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 44 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 49 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 48 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 47 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 40 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 39 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 38 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 43 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 42 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU FLAT 41 VANCOUVER HOUSE SURREY QUAYS ROAD SE16 7BU UNIT 6 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU 36 TAWNY WAY LONDON SE16 2NG 35 TAWNY WAY LONDON SE16 2NG 34 TAWNY WAY LONDON SE16 2NG 30 TAWNY WAY LONDON SE16 2NG 29 TAWNY WAY LONDON SE16 2NG 28 TAWNY WAY LONDON SE16 2NG 33 TAWNY WAY LONDON SE16 2NG 32 TAWNY WAY LONDON SE16 2NG 31 TAWNY WAY LONDON SE16 2NG 157 LOWER ROAD LONDON SE16 2XL FLAT 1 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH 179 LOWER ROAD LONDON SE16 2XL 177 LOWER ROAD LONDON SE16 2XL FLAT 12 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 11 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH FLAT 10 DUNLIN HOUSE OSPREY ESTATE 2 TAWNY WAY LONDON SE16 2NH 165 LOWER ROAD LONDON SE16 2XL 27 TAWNY WAY LONDON SE16 2NG UNIT 40 AND 41 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 39 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 37 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 33 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 11 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 43 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 29 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 38 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 07/02/2013 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 UNIT 12 DOCK OFFICES SURREY QUAYS ROAD LONDON SE16 2XU UNIT 17A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 15A CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB UNIT 30 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 23 TAWNY WAY LONDON SE16 2NG 22 TAWNY WAY LONDON SE16 2NG 205 LOWER ROAD LONDON SE16 2LW 26 TAWNY WAY LONDON SE16 2NG 25 TAWNY WAY LONDON SE16 2NG 24 TAWNY WAY LONDON SE16 2NG 191 LOWER ROAD LONDON SE16 2LW 189 LOWER ROAD LONDON SE16 2LW UNIT 25 CITY BUSINESS CENTRE LOWER ROAD LONDON SE16 2XB 199 LOWER ROAD LONDON SE16 2LW 197 LOWER ROAD LONDON SE16 2LW 195 LOWER ROAD LONDON SE16 2LW SE16 6YQ by email by email by email by email by email 33 PLOVER WAY LONDON SE16 7TS by email BY EMAIL 27 Harwood Point 307 Rotherhithe Street London SE16 5HD 22 Bywater Place London SE16 5ND 13 Bywater Place London SE16 5ND BY EMAIL 19 Fishermans Drive London SE16 6SG by email by email by email by email 144 Montreal House Surrey Quays Road London SE16 7AQ by email by email Fishermans Drive SE16 6SG by email by email by email 13 Woodland Crescent London SE16 5XN by email Flat 461 Heligan House Water Gardens Square London SE16 6RG by email by email by email 44 Montreal House Surrey Quays Road London SE16 7AP by email by email by email By Email XXXX by email 67 Bywater Place London SE15 5NE 32 Toronto Place Surrey Quays Road London SE16 7AJ 17 Wolfe Crescent London SE16 6SF by email by email 563 Giverny House Water Garden Square London SE16 6RL by email 70 Bywater Place London SE16 5NE by email by email by email by email 53 Plough Way London SE16 2LS by email by email 362 Eden HOuse Water Gardens Square London SE16 6RH by email 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 169 Montreal House Rotherhithe area housing forum 10 Murdoch House Moodkee Street London SE16 7BJ 45 Frederick Square London SE16 5XR Flat 41 Toronto House Surrey quays Road London SE16 26 Toronto House London SE16 7AJ by email 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 by email 42 Elephant Lane London SE16 4JD 46 Elephant Lane London SE16 4JD 33 Brandrams Wharf 127-131 Rotherhithe Street SE16 4NF Flat 29 Toronto Court Canada Water London SE16 25 Toronto House SE16 9 Toronto House Surrey Quays Road London SE16 7AJ by email by email Unit 2 Toronot House Surrey quays Road London SE16 7AJ Fuller Long Planning Consultants Studio 107, Curtain House 134-146 Curtain road London EC2A 3AR 8 Troon Close London SE16 8 Troon Close London SE16 3DX 19 Glenbow Road Bromley Kent BR1 4RN 5 Scotia Court London SE16 7AZ 53 Skenfrith House Commercial Way London SE15 1NE 7 Scotia Court Canada Water London SE16 7AZ 11 Columbia Point Canada Estate London SE16 7BE 20 Regina Point Canada Estate London SE16 7BB 78 Regina Point Canada Estate London SE16 7BD 52 Regina Point Canada Estate Neptune Street London SE16 7BD 2 Niagra Court Canada Estate London SE16 7BA 12 Regina Point Renforth Street London SE16 7BB 75 Regina Point Canada Estate Neptune Street London SE16 10 Scotia Court Canada Estate London SE16 7AZ 75 Regina Point London SE16 74 Regina Point London SE16 7BD 63 Regina Point Canada Estate London SE16 49 Regina Point Canada Estate London SE16 7BD 2 Columbia Point London SE16 74 Ryan Point Canada Estate London SE16 7BD 79 Regina Point London SE16 7 Edmonton Court London SE16 7BQ 149 Woolstaplers Way London SE16 3UU 19 Regina Point London SE16 27 Regina Point London SE16 7BD 41 Regina Point London SE16 3 Edmonton Court London SE16 7BQ Flat 26 Regina Point Canada Estate London SE16 7BB 33 Esmeralda Road London SE16 5RJ 5 Niagara Court London SE16 7BA Flat 1 42 Cranswick Road London SE16 3BH 21 Hurst Road Erith Kent DA8 3EQ 33 Esmeralda Road London SE1 5RJ 24 Grafton House Trinity Estate Grove Street London SE8 3LP 7 Niagara Court Canada Estate London SE16 7BA 24 Grafton House Trinity Estate Grove Street London SE8 3LP 28 Credon Road Bonamy Estate London SE16 3AB 99 Caroline Gardens London SE15 2SE 162 Caroline Gardens Asylum Road London SE17 2BJ 6 Cragie House Balaclava Road London SE15 5PR Flat 1 54 Barkworth Road London SE16 3BZ 53 John Kennedy House Rotherhithe Old Road London SE16 2QE 18 Holywell Close London SE16 3EF 1 Birkdale Close Masters Drive London SE16 3DN 39 Caroline Gardens Asylum Road London SE15 2SF 18 Moreton House Slippers Place London SE16 7EQ 80 Chilton Grove London SE16 2DW 18 Janeway Street London SE16 PS 2 Kingsdown Close London SE16 3DW 13 Holywell Close London SE16 3EF 5 Ablett Street London SE16 3BL 28 Credon Road London SE16 3AB 68 Columbia Point Canada Estate London SE16 7BG 6 Barkworth Road London SE16 3BY 92 St Helena Road London SE16 2QY 18 Holywell Close London SE16 3GF 18 Rooke Way Greenwich London SE10 0JB 6 Holywell Close London SE16 3EF 12 Niagara Court Canada Estate L9ondon SE16 7BA 18 Rooke Way Greenwich London SE10 0JB 18 Prince's Court off South Sea Street Surrey Quays London SE16 7TD 49 John Kenney House Rotherhithe Old Road London SE16 2QE 34 Saint Helena Road London SE16 2QU Via Email by email Water Garden's Square SE16 3rd Floor Victoria House Bloomsbury Square WC1B 4SE by e-mail 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 by email Spectrum Planning, Arqiva Hill Village Road Four Oaks Sutton Coalfield B75 5JJ 26 Toronto House Surrey Quays London SE16 7AJ 20 Harwood Point 307 Rotherhithe Street London SE16 5HD by email 14 Midship Close Rotherhithe London SE16 6BT By Email XXXXXX Canada Water Resident by email SE16 6XD 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 20/06/1837 The Studio 5 Griggs Place London SE1 3AT By Email XXXX BY Email XXXX By Email XXXX 19 Fairmont House Needleman Street London SE16 7AW