3D-engineering - Svenskt Vatten
Transcription
3D-engineering - Svenskt Vatten
3D-engineering Experience from 4 wastewater treatment plants in the engineering and construction phases Kristine Akervold Water and Sewerage Department Vann- og avløpsetaten • Fjøsangerveien 68 • 55 56 60 00 Topics • Our goal • 3D-design/BIM – What is it? – Why we started without BIM • Experience of using 3D • 3D for operation and maintenance of the plant Foto: Helge Skodvin Vann- og avløpsetaten • Fjøsangerveien 68 • 55 56 60 00 1630 m3/h 6600 m3/h 2500 m3/h 3200 m3/h 3D or BIM? • What is BIM? (Building Information Modelling) • BIM incorporates data on every element of a development’s design • 3D is BIM without «information» Vann- og avløpsetaten • Fjøsangerveien 68 • 55 56 60 00 In the beginning… Foto: Helge Skodvin Laser scanning • What is Laser scanning – A technology that uses light sensors to measure the distance between the sensor and the target object – It results in a set of "dots" suspended in a 3-dimensional space Vann- og avløpsetaten • Fjøsangerveien 68 • 55 56 60 00 Laser scanning • All 4 WWTP – Updated drawings were created – Developing 3D-models for existing plants – Less inspection/visiting the plants Use of the 3D-models in the engineering and construction phase Collision control When running the plants... • As-built drawings • Use 3D-models together with operation and maintenance manuals • …Finally make a BIM model? Vann- og avløpsetaten • Fjøsangerveien 68 • 55 56 60 00 What can YOU do? • The municipalities – use 3D/BIM and demand a «digital library» when buying a new process/equipment • Consulting firm – use 3D/BIM and inform your client of the possibilities • The industry – make a “digital library” with required information Vann- og avløpsetaten • Fjøsangerveien 68 • 55 56 60 00 Thank you for your attention