YOU COVERED - Ellingson Companies

Transcription

YOU COVERED - Ellingson Companies
IF IT’S
UNDERGROUND
WE’VE GOT
T
M
YOU COVERED
FAMILY OWNED SINCE 1970
HDD | Pipe Bursting | Pipe Plowing | CIPP | Engineering
On behalf of Ellingson Trenchless, I would like to personally thank you for taking the time to
learn more about our organization. For over 44 years Ellingson has committed to providing
the finest quality workmanship, service and product at a great price.
We are a trusted contractor dedicated to staying on the cutting edge of the latest industry
technologies, which ensures we provide our customers with the best project. We pride ourselves
in making safety a top priority on every job site. Ellingson Trenchless works to accomplish this
goal by providing regular safety training, including training that is above and beyond what is
required by OSHA, and in-depth training on all our equipment including drills and plows.
Third Generation Company with 21st Century Ideas
Ellingson Trenchless is a third generation, full service Construction Company that specializes in
I am confident that we can assist you in completing a successful project from start to finish and
we would appreciate the opportunity to partner on current or future projects. We pride ourselves
in providing customers with the most efficient and cost effective solutions on their project. Our
attention to safety and quality assures we meet all the needs of our customers on their schedule.
Thank you for considering Ellingson Trenchless,
trenchless technologies. Since 1970, we have been committed to providing the finest quality service
that can be found in the industry. We believe that a quality project begins with quality employees.
This is why Ellingson Trenchless hires the most qualified employees in the industry. This fact along
with our continual commitment to safety and staying well informed of the latest industry technologies
ensure our commitment to provide you, the customer, with the best product available.
The experience of our project managers, engineers and operational managers has allowed us to
complete a wide array of projects throughout North America. Through a process of project evaluation,
planning and execution Ellingson Trenchless can successfully complete the most challenging projects.
Having completed projects within refinery facilities, along major right of ways and in congested urban
environments, Ellingson Trenchless is proven to have the capabilities to serve your Trenchless
Jeremy Ellingson, COO
construction needs.
Ellingson Trenchless
OUR HISTORY
Ellingson Companies is a leading provider
1989: Purchase of first AutoCad
1999: Ellingson Drainage
& computerized mapping
becomes Ellingson Companies
systems improving accuracy
of agricultural drainage and trenchless
1999: Begins offering
2003: Installs first gas line using
the plowing method
directional drilling solutions
construction solutions. Founded in 1970 on
of companies:
•E
mploy over 185 exceptional
individuals
the premise to help farmers enhance crop
production through agricultural drainage.
• 40 years of safe construction
Ellingson Companies has evolved to meet
the needs of our customers throughout
North America.
Today Ellingson family
1970: Ellingson Drainage is founded
in West Concord, MN
2001: Opens additional office in
Harwood, North Dakota
2010: Expands services to include
Cured in Place Pipe Repair
• Serve customers nationwide
The Company’s Experience Modification Rate (EMR) has
averaged 0.886 over the past five years, and has been
improving on an annual basis over the last few years:
EMR RATING
1. I will plan my day and job safely
0.98
0.96
percentage of adjustments
The Key Principles
to Stay Safe the
Ellingson Way…
2. I will ensure I do not put myself
or co-workers at risk.
0.94
0.92
0.90
3. I will ensure all employees
receive required training
0.88
0.86
4. I will create a safe work
environment for my co-workers
0.84
0.82
0.81
0.79
2010
2011
2012
2013
2014
EXTENSIVE TRAINING PROVIDES FOR A SAFE WORK ENVIRONMENT
ZERO
GOAL
ELLINGSON TRAINING
OPPORTUNITIES:
ZERO SAFETY GOAL IS A PRIORITY AT ELLINGSON
OSHA 10
At Ellingson Trenchless, we take our role in ensuring the safety of our employees, customers
Trench Safety
and the general public very seriously. We have an active safety program including a number of
HAZMAT
CPR/First Aid
components which are continually assessed for improvement in order to keep everyone focused
on working safely in everything we do.
Professional Engineer Training
Competent Person Training
Our culture focused on safety stems from our leadership team and our organization as a whole.
All employees are held accountable for the safety of the work site, 100% completion of daily
Pipe Layer Certification
Job Site Assessment (JSA’s), conducting incident investigations, and recognizing or disciplining
Pipe Fusion
employees as necessary to promote the highest level of safety in the workplace.
Leadership Training
Time Management Training
OQ Training
Safeland Training
Drug & Alcohol Training
Engineering & Bore Planning
TRENCHLESS SOLUTIONS
Bore Plan
Utilizing survey data, Ellingson Trenchless will produce a detailed route
design and provide visibility to underground utilities and soils. The bore
plan ensures product pipe is installed at the correct alignment, depth
and avoids conflict with existing utilities. Clients are provided access to
review proposed bore plans prior to drilling operations to ensure that all
Horizontal Directional Drilling
HORIZONTAL DIRECTIONAL DRILLING PROCESS
considerations for the project are met.
Since 1999 Ellingson Trenchless has provided horizontal directional
Bore Progress Monitoring
drilling (HDD) solutions to numerous clients throughout North America.
Ellingson Trenchless provides specialized monitoring of the bore progress.
At Ellingson Trenchless, we approach each project with steadfast
Documentation of daily construction records ensure that your project is in
professionalism. With over 80 years of combined experience we take
compliance with pipe bend radius, project specifications and permits.
Site Bore Plan
pride in the experience of our personnel, quality of our equipment, and
our commitment to deliver the highest quality of project available.
Record Plan
Ellingson Trenchless has the capabilities to complete projects up to
After successful project installation, Ellingson Trenchless exports drill data
54 inches in diameter and lengths up to 8,000 feet. Whether your
from locating software, a plan and profile of the installed pipe are created
projects are large, small, require a shore approach, or are through
for incorporation into the as-built drawing.
Detailed route design, alignment, depth and conflicts in the drilling process.
hard rock; Ellingson Trenchless approaches each with the same level
of service, professionalism, and commitment. We are dedicated to
delivering projects that are focused on the success of our customers,
business partners, suppliers, employees and the environment.
Rock Drilling
Drilling in rock can be a daunting to some, but not to Ellingson Trenchless.
Having completed many crossings in a wide variety of rock, Ellingson
Trenchless does not shy away from demanding projects. Whether your
UP TO 54"
DIAMETER
LENGTHS UP TO 8,000 FT
project is in limestone, shale or granite – Ellingson Trenchless is the best
choice to get it done.
Properly evaluating the conditions and bringing to bear our experience
and knowledge, Ellingson Trenchless approaches each project with the
best equipment, tooling and planning.
NATIONWIDE TRENCHLESS EXPERTISE
Cured in Place Pipe Repair (CIPP)
Cured in Place Pipe Repair (CIPP) is a proven trenchless method to repair
cracked, broken or root infiltrated pipes. CIPP is one of the most widely
used pipeline rehabilitation methods amongst residential homeowners,
Pipe Plowing
manufacturing facilities, hotels, restaurants and food processing plants.
Ellingson Trenchless has the capability to repair existing pipelines ranging
in diameter from 3 to 18-inches.
From small diameter cable or conduit, to large diameter gas mains,
Ellingson Trenchless offers a minimal impact installation method
The CIPP process consists of first cleaning and inspecting the existing service
through static plowing. Ellingson Trenchless has the capabilities
line with an inspection system. A measurement of the lateral length is taken.
to install pipe up to 14-inches in diameter and unlimited lengths
The CIPP process is completed by inverting a resin saturated PVC coated
without obstructions. The pipe or cable is installed by pulling a
polyester liner into the existing pipe. Once in place and properly inflated the
blade through the ground allowing us to reach depths of 7.5-feet
PVC coated polyester liner is heated with hot water, cooled and cured.
of cover on the pipe as well as installing tracer wire and marking
tape in synchronization if required. Our team of in-house design
experts and engineers ensure that our equipment is engineered and
After
fabricated to allow for accurate placement of piping through pipe
plowing without surpassing the manufacturer’s recommendation.
Pipe Ramming
Pipe Ramming is a process where steel pipe is installed with a
CIPP
PIPE REPAIR
pneumatic hammer. Grade can be set and controlled from the launch
pit and distances of up to 250 feet can be achieved. This process
Before
allows installation as an alternative to the traditional jack and boring
installation. As the steel line is installed, the soil is forced into the
interior of the pipe. Once the pipe is installed to its desired locations
the soil is removed from inside. Typical application would include
casing pipe and culverts among many others.
Pipe Bursting
Pipe Bursting is an extremely cost effective solution for infrastructure
Slip Lining
rehabilitation. The pipe bursting process is a trenchless method of
replacing or upsizing failing, outdated or undersized infrastructure.
Slip Lining is a cost effective trenchless rehabilitation method used to
Pipe bursting replaces the existing pipe by a pneumatic hammer or
repair leaks or restore structural stability to water, sewer and storm
static pulling head through the failing pipe. The existing pipe is then
sewer pipelines. Slip lining is performed on pipes ranging in diameter
broken and displaces the surrounding soil allowing the new pipe to
from 4 inches up to 42 inches and lengths of up to 5,000 feet. The Slip
follow in place, all during the same process. Ellingson Trenchless has
Lining process is completed by winching or pushing a new pipe through
the capabilities to pipe burst and replace pipe ranging in diameter
the existing pipe, grouting the annular space between the two pipes and
from 4 inches up to 54 inches and offers the ability to accommodate
sealing the ends.
runs of up to 1,000 feet or more.
TESTIMONIALS
SERVING OUR
CUSTOMERS
NATIONWIDE
“I would highly recommend [Ellingson Trenchless] to
anyone that needs their project to come in on time with
no scope change or added cost.”
-Ricky S.
“Ellingson’s are very honest and do a good job in a
INDUSTRIES SERVED
Oil & Gas
timely manner.”
-Norbert M.
CLIENT
REFERENCES
COMPANY & PERSONNEL
PROJECT EXPERIENCE
CORPORATE
INFORMATION
Rockford Corporation
Antero Resources - Doddridge, WV
1,143’ of 24” Water Line
Banking
Commercial
Power &
• Food Processing
Telecommunications
• Hospitality
Water & Wastewater
Agriculture
and provided us with ongoing guidance and maintenance
services as needed. We look forward to continuing our
• Manufacturing Facilities
Treatment
“Partnering with Ellingson Trenchless has achieved success
relationship with Ellingson Trenchless as we tackle the
Josh Ramsey
214.740.5613
Appalachian Pipeline
Contractors
James Wade
615.264.8775
Hard Rock HDD
• Property Management
challenges of growth into an exciting future.”
-Gary H.
Aaron Schrandt
210.403.2086
Williams Midstream
Steve McKay
918.573.2000
NOTABLE CLIENTS
“Ellingson’s sales staff are the utmost professional to work
Holloman Corporation
with. Their bids are detailed and thorough. Ellingson has
Matthew Fitzen
724.514.5900
been fully able to understand the project by conducting
Aldridge Electric
their own site visits to ensure that their bid is represented
correctly. Their field installation crews are well versed on
the projects and often require very little or no guidance to
accomplish their tasks.”
-John O.
Phil Saari
847.680.5200
Enterprise - Trinity River - Corsicana, TX
2,400-ft. of 30-in Steel HDD
POET Energy - Sioux Falls, SD
60,000-ft. of 12-in. gas main
Williams Midstream - Uniontown, PA
1,400-ft. of 12-in. gas main
Hess Pipeline - Tioga, ND
1,800-ft. of 24-in. Steel HDD
-Kevin W.
Sterling State Bank
102 South Broadway
Rochester, MN 55904
507.282-1845
Insurance
Enterprise - Atex Express Pipeline Spread 2
- Circleville, OH
11 crossings of 20-in. Steel - Total footage 15,052-ft.
1400 American Lane
Schaumburg, IL 60196
800.987.3373
MarkWest - Hopedale to Majorsville 12-in. Pipeline
- Jefferson County, OH
3 crossings of 12-in. Steel - Total footage 4,747-ft.
Bonding
General Growth Properties – Several Locations
Total Footage of lining 5,630-ft.
Cobb Strecker Dunphy
& Zimmerman
Lake Shetek - Murray County, MN
144,700-ft. of small diameter Force Main,
252 Grinder Stations
150 South Fifth Street
Suite 2800
Minneapolis, MN 55402
612.349.2400
ONEOK - Watford City, ND
Creek, Pipeline, Highway and County Road Crossings of
16-in. Steel HDD – Total footage 8,560-ft.
the crew for always keeping the work areas clean and
nice to not have any comments or complaints from them.”
P.O. Box 7438
Rochester, MN
866.577.1831
Plains All American - Eagle Ford
Pipeline System; phase III - Corpus Christi, TX
16 crossings of 20-in. Steel and 2 crossings of 30-in.
Steel - Total footage 9,481-ft.
“I know this might not seem like a big deal, but thank
organized with mall workers and tenants coming in. It was
AgStar Financial
PROFESSIONAL MEMBERSHIPS
Zurich North America
When you work with Ellingson Trenchless you can always expect:
PROFESSIONAL
SURVEY
Ellingson Trenchless and their team of in-house engineers analyze each bore from start to finish utilizing the
ENGINEERED &
CUSTOM DESIGN
Ellingson Trenchless examines all pipe and geotechnical information and works to design the bore to meet your
project specifications. Plans are documented and reviewed before project approval.
PROFESSIONAL
INSTALLATION
Ellingson Trenchless and their team pride themselves on extensive experience and training in multiple
geographical and geotechnical situations. Most importantly. Ellingson Trenchless offers a solution based
installation approach focused on exceeding all tolerances to ensure successful project installation.
ELLINGSON
GUARANTEE
All Ellingson Trenchless installations have a one year workmanship warranty and a manufacturer warranty on
CUSTOMER
SATISFACTION
Ellingson Trenchless and their teams of in-house professionals dedicate themselves to delivering the best
possible project in accordance with the proposed schedule.
most up-to-date technologies.
all materials.
ELLINGSON TRENCHLESS | toll free (888) 527.2294 | www.EllingsonTrenchless.com
CORPORATE
OFFICE
56113 State Hwy 56
West Concord, MN 55985
Office: 507.527.2294
Fax: 507.527.2296
©2014 Copyright, Ellingson Companies, Inc. All Rights Reserved.
HARWOOD
OFFICE
500 Ellingson Road
Harwood, ND 58042
Office: 701.893.9030
Fax: 701.893.9040
WATFORD
CITY OFFICE
US Highway 85
Watford City, ND
Toll Free: (888) 527.2294