Aux Sable, Amine Project
Transcription
Aux Sable, Amine Project
Aux Sable, Amine Project Three towers were dressed out on their sides and then set on their pads. 30V-351 – 185,000 lbs. & 76’ Tall 30V-354 – 155,000 lbs. & 106’ Tall 60V-670 – 164,000 lbs. & 64’ Tall We used a Manitowac M2250 Series 3 Crawler Crane (300T Capacity) for the main crane and a Liebherr LTM 1250 6.1 Hydro Crane (300T Capacity) as the tail crane. All three lifts went according to plan and all three towers were set within a 4 day window. Shown in the picture – 30V-354 on the left, 60V-670 on the right Aux Sable, Prover Skid Fabrication @ Hammond Shop November 2012 Fabrication of a “Prover Skid” to meter gas transferred from the Aux Sable facility to their customer Lyondell installed at the Lyondell Plant. Weight 39,000 Lbs. BP- Whiting Refinery, Precision Lifting New Coker Downcomer Piping Weight: 28,000 Pounds Top Platform elevation: 300 + Feet New Coker, Hair Pin Piping, 1 of 6 units Weight: 21,000 Pounds Large fabrication assembled at grade to minimize elevated work. Carmeuse - Grinding Mill (Low Ceiling) Everything done two times for two units: Unit 7 & Unit 8 Section One, Low Ceiling, Weight: 25,000 lbs. Section Two, Low Ceiling, Weight: 42,000 lbs. Carmeuse - Grinding Mill (Low Ceiling), Continued # 7 Grinding Mill, 40,000 lbs., set inside of another piece Top Piece of Feed Bin: 22,000 lbs. Prefab Building, Awkward Weight Distribution, heavier at one end and side, Weight: 78,000 lbs. Praxair, Lakeside Facility- Argon Recondenser Project December 2012 Installation of Foundations, Equipment, Piping and Electrical to facilitate the recovery of argon that is lost at the facility. This was a “Rush” project successfully completed in 4 weeks. Weight: 15,000 lbs. PRAXAIR - Whiting Hydrogen Facility, SMR 5 & 6 Skid Installation There were four large skids and two small skids that were off loaded with rigging shown then set on skates and pulled into the building with grip hoist. This was tight quarters with limited access. Weight 60,000 Lbs. Large Skids (4) Weight 35,000 Lbs. Small Skids (2) Ratner Steel, New Equipment Line, Steel Coil Stretcher/Cutter Installation March 2013 Weight 147,000 Lbs. (2) stretchers, LOW CEILING, Close Quarters Safety-Kleen, Tank Farm March 2013 Long Reach over existing equipment, 18 tanks total Weight 20,000 Lbs. Vantage Oleo, Splitter Column #5 Installation of the middle section of Splitter Column #5 Due to site restrictions, the vessel was shipped in 3 sections and welded together in place. In order to meet QC requirements, Amex Nooter LLC and Nooter Corp. combined resources to complete the project. 2205 Stainless Steel Material Weight: 35,000 pounds