Vircon PPT 20150829 (HKIE) publish.pptx
Transcription
Vircon PPT 20150829 (HKIE) publish.pptx
Civil Information Modelling (CIM) – Applications in Civil Engineering Projects DR NEO CHAN 28 AUG 2015 COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 1 DR NEO CHAN Director, VirCon Limited (Established BIM Consulting Company) Honorary Secretary, Hong Kong Institute of Building Information Modelling Lecturer (PT), Building and Real Estate, The Hong Kong Polytechnic University Lecturer (PT), School of the Built Environment, Birmingham City University Lecturer (PT), School of the Built Environment, Heriot-Watt University Extensive BIM working experience (11 Years, more than 40 BIM projects) including High-rise Commercial Building, Residential Building, Hotel, Shopping Mall, Road, Sport Centre, Tunnel, Park, etc. COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 2 VIRCON SOLUTIONS Heritage A&A COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 3 TABLE OF CONTENT - What is BIM? - Building Information Modelling - Civil Information Modelling - Smart City COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 4 WHAT IS BIM? BIM – Definition • “Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility. A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition.” - The National Building Information Model Standard Project Committee COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 5 WHAT IS BIM? COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 6 WHAT IS BIM? COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 7 WHAT IS BIM? COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 8 Building Information Life Cycle Management Design Development Contract Documentation Physical Construction Handover Documentation Property Management Model & drawing coordination Interactive management tool Documentation Link Concurrent update with building Change of BIM during life cycle Design coordination Drawing generation Work coordination Clash detection BQ generation Clash detection Cost study Tender document coordination Quantity measurement Area analysis Visualization Process optimization Visualization COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. Process automation Luxurious Residential Development in Kotewall Road, Mid-Level • • • • GFA: ~153,000 sq. feet RC Podium above sloped site Three residenPal towers of 13 floors, with duplex units Target grade of Beam-‐Plus submission : Gold SITE FORMATION DESIGN Original surface based on survey map ExisPng surface (reference for excavaPon calculaPon) C C1 CONCRETOR (grade 35D/20) Mass concrete fillings C1\01 D D1 8273.77 8273.77 8274 8274 m3 m3 9490 9490 m3 m3 8273.77 EXCAVATION 9490.48 Excavate over site to reduce levels 9490.48 D1\01 9490.48 m3 Model-‐based Takeoff SecPon across site COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. m3 11 SUSTAINABLE DESIGN Shadow Study and Analysis to assist Master Planning and PV Panel AllocaPon LighPng SimulaPon and DistribuPon for Flat VenPlaPon SimulaPon for Typical Floor to Minimize Building Energy ConsumpPon Daylight SimulaPon Thermal Comfort Analysis for Typical Floor COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 12 CLASH DETECTION ▼ IdenPfy clashes and revised design of building services in RCP unPl clashes are eliminated Plan View 3D View SecPon View ▼ IdenPfy clashes and revised design of building services in RCP unPl clashes are eliminated Plan View 3D View COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 3D View 13 COMBINED SERVICE MODEL Section Drawings COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 14 ON-‐SITE AND REAL-‐TIME INSTALLATION DRAWING AND GUIDELINE ü The problems of installaLon of the services Ü USE OUTDATED DRAWINGS Ü DIFFICULT TO UNDERSTAND DRAWINGS Ü INSUFFICIENT INFORMATION SUCH AS NOT ENOUGH SECTIONS DRAWINGS ü BIM 3D Model – understand the design and drawings easily ü Real-‐Lme BIM Model – make sure the model is latest ü Cloud-‐based BIM Model – receive the new design immediately ü BIM Model on your hand – easy to control the model anywhere – check the design anywhere – cut the secPon view anywhere COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 15 ON-‐SITE AND REAL-‐TIME INSTALLATION DRAWING AND GUIDELINE COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 16 CONSTRUCTION SEQUENCE COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 17 QUANTITY TAKEOFF AND COST ESTIMATION BIM Model è QuanLLes x Rate COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. = Total $ 18 3D PRINTING ↑ The print file preview in CubeX BIM MODELS OF THE CENTRAL (THE BUILDING IN DARK GREY COLOR IS THE FORMER CENTRAL GOVERNMENT OFFICES SITE) ↑ 3D PrinLng Model FORMER CENTRAL GOVERNMENT OFFICES SITE COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 19 PREFABRICATION Precast Facade Prefabricated Pump Elements Staircase Landing Bathroom COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 20 CIVIL INFORMATION MODELLING COPYRIGHT © 2014 VIRCON LIMITED. ALL RIGHTS RESERVED. 21 Civil Building Information Life Cycle Management Design Development Contract Documentation Physical Construction Handover Documentation Property Management Model & drawing coordination Interactive management tool Documentation Link Concurrent update with building Change of BIM during life cycle Design coordination Drawing generation Work coordination Clash detection BQ generation Clash detection Cost study Tender document coordination Quantity measurement Area analysis Visualization Process optimization Visualization COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. Process automation CIVIL INFORMATION MODLELING Design ? Data -‐ UPliPes COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 23 UTILITIES How to get the utilities information for your design or construction? - Non-Destructive Underground Utilities survey - Trail Pit Excavation - Existing utilities record COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 24 UTILITIES If BIM model is ready …… - Routing - Level - Network - Function - Materials - Maintenance record - Real-time data COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 25 CIVIL INFORMATION MODLELING Design ? Data -‐ Building COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 26 TERRESTRIAL LASER SCANNING AND BIM 3D Scanning BIM Model Drawing Production COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. CIVIL INFORMATION MODLELING ConstrucPon ? Management Monitoring COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 28 RFID APPLICATION ON BUILDING PROJECT COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. RFID APPLICATION ON CIVIL PROJECT Review the quality control record anywhere Review the progress anywhere - Reducing lost time - Increasing Productivity - Increasing efficiencies COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. CONSTRUCTION PROGRAM (MASTER PROGRAM) COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. CONSTRUCTION PROGRESS MONITORING It is a program, not real. But, RFID + 4D program is a real-time progress. COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. Central – Wan Chai Bypass - Tunnel Configurable Reactive Construction Simulation Logistics Optimization Construction Modeling and Control Plan (CMC) COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 33 WORKING SPACE AND PRODUCTIVITY FOR PLANT COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. SMART CITY COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 35 What to control the crowd? COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 36 FIRES / ACCIDENT - Map - Escape Routes - Floor Plan for buildings - Storage location of Combustion materials - Public Transport Roadmap (How to change) - Location of Fire Equipment - Who will be affected - How to notice to Department and Citizen and de - Etc. COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 37 BIM AND CIM PROVIDES THE DNA Water Resources Metro System Utilities Underground Drainage Bridges Tunnel Buildings Road & Highways COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 38 SMART CITY COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED. 39