Vircon PPT 20150829 (HKIE) publish.pptx

Transcription

Vircon PPT 20150829 (HKIE) publish.pptx
Civil Information Modelling (CIM) –
Applications in Civil Engineering Projects
DR NEO CHAN
28 AUG 2015
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
1
DR NEO CHAN
Director, VirCon Limited (Established BIM Consulting Company)
Honorary Secretary, Hong Kong Institute of Building Information Modelling
Lecturer (PT), Building and Real Estate, The Hong Kong Polytechnic University
Lecturer (PT), School of the Built Environment, Birmingham City University
Lecturer (PT), School of the Built Environment, Heriot-Watt University
Extensive BIM working experience (11 Years, more than 40 BIM projects) including
High-rise Commercial Building, Residential Building, Hotel, Shopping Mall, Road, Sport
Centre, Tunnel, Park, etc.
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
2 VIRCON SOLUTIONS
Heritage A&A COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
3 TABLE OF CONTENT
-  What is BIM?
-  Building Information Modelling
-  Civil Information Modelling
-  Smart City
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
4 WHAT IS BIM?
BIM – Definition
•  “Building Information Modeling (BIM) is a digital representation of
physical and functional characteristics of a facility. A BIM is a shared
knowledge resource for information about a facility forming a reliable
basis for decisions during its life-cycle; defined as existing from earliest
conception to demolition.”
- The National Building Information Model Standard Project Committee
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
5 WHAT IS BIM?
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
6 WHAT IS BIM?
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
7 WHAT IS BIM?
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
8 Building Information Life Cycle Management
Design
Development
Contract
Documentation
Physical
Construction
Handover
Documentation
Property
Management
Model &
drawing
coordination
Interactive
management
tool
Documentation
Link
Concurrent
update with
building
Change of BIM during life cycle
Design
coordination
Drawing
generation
Work
coordination
Clash
detection
BQ
generation
Clash
detection
Cost study
Tender
document
coordination
Quantity
measurement
Area
analysis
Visualization
Process
optimization
Visualization
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
Process
automation
Luxurious Residential Development in Kotewall Road, Mid-Level
• 
• 
• 
• 
GFA: ~153,000 sq. feet RC Podium above sloped site Three residenPal towers of 13 floors, with duplex units Target grade of Beam-­‐Plus submission : Gold SITE FORMATION DESIGN
Original surface based on survey map ExisPng surface (reference for excavaPon calculaPon) C
C1
CONCRETOR (grade 35D/20)
Mass concrete fillings
C1\01
D
D1
8273.77
8273.77
8274
8274
m3
m3
9490
9490
m3
m3
8273.77
EXCAVATION
9490.48
Excavate over site to reduce levels 9490.48
D1\01
9490.48
m3
Model-­‐based Takeoff SecPon across site COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
m3
11 SUSTAINABLE DESIGN
Shadow Study and Analysis to assist Master Planning and PV Panel AllocaPon
LighPng SimulaPon and DistribuPon for Flat
VenPlaPon SimulaPon for Typical Floor to Minimize Building Energy ConsumpPon
Daylight SimulaPon Thermal Comfort Analysis for Typical Floor
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
12 CLASH DETECTION ▼  IdenPfy clashes and revised design of building services in RCP unPl clashes are eliminated
Plan View
3D View
SecPon View
▼  IdenPfy clashes and revised design of building services in RCP unPl clashes are eliminated
Plan View
3D View
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
3D View
13 COMBINED SERVICE MODEL Section Drawings
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
14 ON-­‐SITE AND REAL-­‐TIME INSTALLATION DRAWING AND GUIDELINE
ü  The problems of installaLon of the services Ü 
USE OUTDATED DRAWINGS Ü 
DIFFICULT TO UNDERSTAND DRAWINGS Ü  INSUFFICIENT INFORMATION SUCH AS NOT ENOUGH SECTIONS DRAWINGS ü  BIM 3D Model – understand the design and drawings easily ü  Real-­‐Lme BIM Model – make sure the model is latest ü  Cloud-­‐based BIM Model – receive the new design immediately ü  BIM Model on your hand – easy to control the model anywhere – check the design anywhere – cut the secPon view anywhere COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
15 ON-­‐SITE AND REAL-­‐TIME INSTALLATION DRAWING AND GUIDELINE
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
16 CONSTRUCTION SEQUENCE COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
17 QUANTITY TAKEOFF AND COST ESTIMATION
BIM Model
è QuanLLes
x Rate
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
= Total $ 18 3D PRINTING
↑  The print file preview in CubeX
BIM MODELS OF THE CENTRAL (THE BUILDING IN DARK GREY COLOR IS THE FORMER CENTRAL GOVERNMENT OFFICES SITE)
↑  3D PrinLng Model
FORMER CENTRAL GOVERNMENT OFFICES SITE COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
19 PREFABRICATION
Precast Facade
Prefabricated Pump Elements
Staircase Landing
Bathroom
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
20 CIVIL INFORMATION MODELLING
COPYRIGHT © 2014 VIRCON LIMITED. ALL RIGHTS RESERVED.
21
Civil
Building Information Life Cycle Management
Design
Development
Contract
Documentation
Physical
Construction
Handover
Documentation
Property
Management
Model &
drawing
coordination
Interactive
management
tool
Documentation
Link
Concurrent
update with
building
Change of BIM during life cycle
Design
coordination
Drawing
generation
Work
coordination
Clash
detection
BQ
generation
Clash
detection
Cost study
Tender
document
coordination
Quantity
measurement
Area
analysis
Visualization
Process
optimization
Visualization
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
Process
automation
CIVIL INFORMATION MODLELING
Design ? Data -­‐  UPliPes COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
23 UTILITIES How to get the utilities information for your design or construction?
-  Non-Destructive Underground Utilities survey
-  Trail Pit Excavation
-  Existing utilities record
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
24 UTILITIES If BIM model is ready ……
-  Routing
-  Level
-  Network
-  Function
-  Materials
-  Maintenance record
-  Real-time data
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
25 CIVIL INFORMATION MODLELING
Design ? Data -­‐  Building COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
26 TERRESTRIAL LASER SCANNING AND BIM 3D Scanning
BIM Model
Drawing Production
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
CIVIL INFORMATION MODLELING
ConstrucPon ? Management Monitoring COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
28 RFID APPLICATION ON BUILDING PROJECT COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
RFID APPLICATION ON CIVIL PROJECT Review the quality control record anywhere
Review the progress anywhere
- Reducing lost time
- Increasing Productivity
- Increasing efficiencies
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
CONSTRUCTION PROGRAM (MASTER PROGRAM) COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
CONSTRUCTION PROGRESS MONITORING It is a program, not real. But, RFID + 4D program is a real-time progress.
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
Central – Wan Chai Bypass - Tunnel
Configurable Reactive Construction Simulation
Logistics Optimization
Construction Modeling and Control Plan (CMC)
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
33 WORKING SPACE AND PRODUCTIVITY FOR PLANT COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
SMART CITY
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
35
What to control
the crowd?
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
36 FIRES / ACCIDENT -  Map
-  Escape Routes
-  Floor Plan for buildings
-  Storage location of Combustion materials
-  Public Transport Roadmap (How to change)
-  Location of Fire Equipment
-  Who will be affected
-  How to notice to Department
and Citizen and de
-  Etc.
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
37 BIM AND CIM PROVIDES THE DNA Water Resources
Metro System
Utilities
Underground
Drainage
Bridges
Tunnel
Buildings
Road & Highways
COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
38 SMART CITY COPYRIGHT © 2015 VIRCON LIMITED. ALL RIGHTS RESERVED.
39 

Similar documents

Part 2

Part 2 Meta-­‐Analysis  

More information