Line Aqueduct Concrete Block Line Aqueduct Concrete Block
Transcription
Line Aqueduct Concrete Block Line Aqueduct Concrete Block
Line Aqueduct Concrete Block Type F Curbstone having inside small water channel Extension of effective road width Removal of puddle Water splash prevention Workability Line Aqueduct Concrete Block Type F is a precast concrete pro developed as a substitute structure for L-shaped street gutter. Street gutter apron falls into disuse because of stormwater collection by road surface wate placed continuously and water passage through inside water channel. Line Aqueduct Concrete Block Type F Extension of 有効幅員 effective 拡大 road width Effective road width of road shoulder d is extended by falling iinto t di disuse of L-shaped street gutter. Safety passage of cyclists and vehicles can be accomplished by dissapearance of bump on the boundary between pavement and L-shaped street gutter. Extension of effective road width 有効幅員が拡がり ます。 Before Effective road width of road shoulder is extended by falling into 街渠エプロンが不要となるので、路面の横断勾配が一定となります。 disuse of L-shaped street gutter. ▽L-shaped street gutter 500 W 2% 6% After ▼Line Aqueduct Concrete Block Type F W+500 2% Removal 水溜り解消 of puddle Barrier free accomplished by removal of puddle Comfortable walking can be accomplished by removal of puddle as a barrier. Before After Removal of puddle! Comfortable walking accomplished by water splash prevention Provision of environment for pedestrian to pass at ease by water splash prevention. 水ハネ 防止 Water splash prevention Before After Sidewalk Sidewalk Roadway Roadway er slit Structure of standard portion Structure of pedestrian passing portion Road surface water slit Stormwater on pavement surface is collected into inside water channel. Inside water channel er ce lay Inside water channel Surfa Side surface water hole Butt portion slit Water slit Base layer W a te r c o lle ct io n t hr o ug h sl it In case of permeable pavement, stormwater penetrated into pavement body is collected into inside water channel. Backfilling can be accomplished on the day Line Aqueduct Concrete Block is installed. Because of shortning of working process, the road which pedestrian can pass with ease on can be restored as soon as possible. ▼ Range reduction of road traffic regulations Workability Even if backfilling is not carried out on the day, range reduction of road traffic regulations and effect mitigation for current road can be accomplished by deployment of safety fence in the range of removal and excavation. ▽L-shaped street gutter ▼Line Aqueduct Concrete Block Type F 大阪市 あ 00 12-34 → Regulation for road shoulder is required during downtime of work. → Safety fence can be deployed in the range of removal and excavation. ▼ Interference avoidance with underground facilities There is little probability that interference avoidance with underground facilities like gas, water and communication pipes occurs, because of compact section and narrowed excavation range. Large separation oduct Transversal bedded pipes ▼ Improvement of the surrounding work environment Contribution to enhancement of the image - Shortning of working process by adoption of precast concrete products and Effect mitigation for current road, local residents and road users by range reduction of road traffic regulations. Applicable sites It is an effective measure for puddle at the site that drainage slope is not insured or curve is mainly adopted. In addition, it is also adopted as measure for barrier free. ■ Station square ■ Roadside station ■ Parking lot Major products ⑥ ② ① ① ② φ125 L=600mm ③ φ150 L=600mm φ150 T y p e A 50 50 T y p e B 50 300 50 475 A (R1.5∼R12.0) ④ L=1,000mm ⑤ L=1,000mm 300 ⑥ ⑦ ⑧ 50 T y p e B 50 200 50 525 T y p e 300 150 φ200 50 200 φ150・200 L=1,000mm ④ 425 ① ⑦ 150 ⑧ ⑤ 375 ③ 300 L=600mm Number of construction results and Adoption examples Construction results in Japan : 2,711 Before Before Before After After After ITO YOGYO CO., LTD http://www.itoyogyo.co.jp/en ※As of November, 2013 (HEAD OFFICE) 6-3-14, Nakatsu, Kita-ku,Osaka 531-0071 JAPAN TEL: +81-6-4799-8853 FAX: +81-6-4799-8864 Two-story gutter having accommodation of pipelines for electric wires D.D.BOX ▲ Upper space : Original function as a gutter ▼ Lower space : Accommodation of electric wires Utilization of road space Shortning of working process Economic efficiency Workability Disaster recovery What is D.D.BOX D.D.BOX? .BOX? Two-story gutter having accommodation of pipelines for electric wires Various underground facilities exist in narrow road and there is no space to lay electric wires undergound. D.D.BOX is a two-story gutter having accommodation of pipelines for electric wires which utilizes road space under a road gutter. ←Utilize this space→ ■ PAT (Japan) ■ PAT.P (Thailand) Structure of D.D.BOX Upper space -Standard Type- Original function as a gutter H800 -Shallow Type- Capability of laying 4 pipelines for electric wires with100mm in diameter Capability of laying pipelines for electric wires in minimum space H600 [Dimension] [Dimension] ▲ Division by water channel bottom plate ▼ H600㎜×W480㎜ H800㎜×W480㎜ [Cross section] [Cross section] (▲Upper) (▲Upper) H124㎜×W300㎜ H300㎜×W300㎜ (▼Lower) (▼Lower) H300㎜×W300㎜ H300㎜×W300㎜ Accommodation of electric wires Water channel bottom plate Lower space Applicable location of Water channel bottom plate to support function of a gutter D.D.BOX ■ Road having narrow width In case there is no space to lay pipelines for electric wires in community road and school routes having narrow width and various underground facilities, the accommodation is accomplished to utilize empty space under a gutter. Handhole Gutter portion Catch basin Service line Low tension power High tension power - Image of D.D.BOX construction - ■ Utilization of space under a gutter Risk mitigation for existing underground facilities Current status Utilization of road space D.D.BOX to utilize empty space under a gutter is adopted Utility pole Gas pipe Gas pipe Communication Stormwater drain pipe Soil pipe Tap water pipe Narrow road width, Various underground facilities Advantage of Effect mitigation for local residents Soil pipe Communication Stormwater drain pipe Tap water pipe Cleanliness and tidiness by laying underground facilities under a gutter D.D.BOX Shortning of working process ■ Shortning of working process Economic efficiency ■ Economic efficiency Workability ■ Minimization of traffic control Control of existing underground facilities by D.D.BOX provides time-saving related to investigation of existing underground facilities and relocation work. Not only shortning of working process, but effect mitigation for local residents can be accomplished. Cost-saving related to investigation for existing underground facilities and relocation work as well as shortning of working process and reduction of entire construction expense can be accomplished. Reduction of excavation on the road provides less impact for traffic control during construction. ■ Risk mitigation for existing underground facilities Reduction of intervention in existing underground facilities provides risk mitigation of breakage by excavation during relocation work. ■ Protection of pipelines for electric wires Protection of pipelines for electric wires provides no necessity to consider external pressure for piping material and cost-saving of piping used. No use for pipe pillows provides easy pipework. Security of straitness of the pipelines can be accomplished by insertion of pipelines for electric wires into D.D.BOX. New function by Disaster recovery D.D.BOX ■ Acceleration of disaster recovery Recovery can be accomplished without any excavation by accomodaing pipelines for electric wires in road space under a road gutter. Composition of D.D.BOX D.D.BOX is composed of Body block, Water channel bottom plate and Concrete lid. ▼ Typical cross section (General portion) 480 270 ● Concrete lid※ Concrete lid ※Lid in compliance with the JIS standards is applicable. 90 ● Connecting fittings Connecting fittings ● Water channel 305 bottom plate 300 16 800 Water channel bottom plate Body block 89 Mortar Foundation material 50 90 300 90 50 580 D.D.BOX Lineup Body block Body offset block L=2,000mm Water channel block L=1,000mm Water channel offset block L=1,000mm L=1,000mm *Option : Water channel bottom plate Constructional example of around handhole Handhole Body offset block Body block ▲ Laying pipelines for electric wires ▲ Status of accommodating pipelines for electric wires ▲ Installation status of water channel bottom plate ▲ Done Catch basin A handhole is placed on extension of D.D.BOX and catch basin is offset toward road direction. ITO YOGYO CO., LTD http://www.itoyogyo.co.jp/en (HEAD OFFICE) 6-3-14, Nakatsu, Kita-ku,Osaka 531-0071 JAPAN TEL: +81-6-4799-8853 FAX: +81-6-4799-8864