2 - Fieldbus Foundation

Transcription

2 - Fieldbus Foundation
Asia Pacific Update
Automation 2014
Mumbai, India
October 16th , 2014
Hisashi Sasajima
Agenda
October 16th ,
Automation 2014
1. AP-EAC/SteCom organization and Migration
2. F-ROM Reports
•
2
Japan: F-ROM JEMIMA Demonstration/Site Test Plan
Asia Pacific Executive Advisory Council (AP-EAC)
and
AP- Steering Committee (AP-SteCom)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
as of August, 2014
Company
EAC
SteCom
ABB
Madhav Kalia
Jack Vanderhorst
Azbil
Hisashi Sasajima
Hisashi Sasajima
Emerson
Vidya Ramnath
Jonas Berge
Honeywell
Lin, Yew Chai
Yeo Hwee Khoen (Withdraw in 2013)
GE Oil & Gas
Invensys
Mahajan, Amar
(To be appointed)
Leoni
Vincent Foo (New from 2012)
Moore Hawk
Michael Carolan (New from 2012)
MTL(Cooper Ind.)
P T Lim
Andreas Agostin
Pepperl+Fuchs
Shane Parr
Arasu Thanigai
Rockwell Automation Eugene Yeo
Glen Chang
R Stahl
Alain Schellings
Wilson Lim
Smar
Lesley Leong (New from 2012)
Turck
Frank Rohn
Yokogawa
Prasad CNN
Jerry Shi Shuai / Kaoru Onodera
Softing
Alfred Quintero (Withdraw in 2013)
Endress+Hauser
Jonathan Soanes(Australia) (New from 2013)
3
Phoenix Contact
Johnny Low(Singapore)
(New from 2013)
•
•
•
•
•
•
•
•
ABB
Azbil
Cooper Ind. (MTL)
Emerson
Endress+Hauser
Invensys
Leoni
MooreHawk
•
•
•
•
•
•
•
Fieldbus Foundation
Asia Pacific Organization
Pepperl+Fuchs
Phoenix Contact
Rockwell
Smar
Turck
R. STAHL
Yokogawa
Asia Pacific
Executive Advisory Council
AP Steering Committee
AP-EAC Funding Regions
Independent Funding Regions
China
(CFFC)
FCTP
Yanshan
4
India
(FFIMC)
Japan
(FF-J)
EUC-India
EUC-J
FCTP
UL
FCTP
Waseda
Korea
(FFKMC)
Taiwan
Thai
(FFTA)
Malaysia
FCTP
KMITL
FCTP
Petronas
Indonesia
Australia
Asia Pacific Organization
Asia Pacific
Executive Advisory Council
Chairman
Shane Parr
Asia Pacific
Executive Advisory Council
Vice Chairman
Parasad CNN
5
as of March, 2014
AP Steering Committee
Vice Chairman
Arasu Thanigai
Asia Pacific
Steering Committee
Chairman
Hisashi Sasajima
AP Steering Committee
Secretary
Jonas Berge
AP Steering Committee
Assist. Secretary
Andreas Agostin
India
Marketing Committee
Thampy Mathew
Japan
Marketing Committee
Takashi Ikeda
Thai
Marketing Committee
Srinakorn Nontanakorn
China
Marketing Committee
Yuenian WU
Korea
Marketing Committee
Beom-Sik Lee
Taiwan
Marketing Event Team
Malaysia
Marketing Event Team
Indonesia
Marketing Event team
Australia
Marketing Event Team
AP Executive Advisory Council (AP-EAC)
Membership

Promote the Foundation Technology more and encourage End User
challenge in Asia with strategic allocation of event funding for
developing new regions, sponsoring EUCs and marketing promotions
 AP-EAC funded by 15 companies in 2013;
–
ABB
–
Azbil
Cooper Ind. (MTL)
Emerson Process Management
Endress+Hauser
Invensys
Leoni
MooreHawk
Pepperl+Fuchs
Phoenix Contact
Rockwell Automation
Smar
Turck
R. STAHL
Blue: New in 2013
Yokogawa
–
–
–
–
–
–
–
–
–
–
–
–
6
–
FCG Boards
•ABB
•Azbil
•Emerson Process Management
•Endress + Hauser
•Fuji Electric
•Foxboro/Schneider Electric
•
•
•
Honeywell
Pepperl+Fuchs
Rockwell Automation
•Siemens
•Yokogawa
Asia Pacific Executive Advisory Council (AP-EAC)
and
AP- Steering Committee (AP-SteCom)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Company
EAC
ABB
Madhav Kalia
Azbil
Hisashi Sasajima
Emerson
Vidya Ramnath
Invensys
Mahajan, Amar
Leoni
Moore Hawk
MTL(Cooper Ind.)
P T Lim
Pepperl+Fuchs
Shane Parr
Rockwell Automation John Watts
R Stahl
Alain Schellings
Smar
Turck
(To be appointed)
Yokogawa
Prasad CNN
Endress+Hauser
Phoenix Contact
7
as of September, 2013
SteCom
Jack Vanderhorst
Hisashi Sasajima
Jonas Berge
(To be appointed)
Vincent Foo (New from 2012)
Michael Carolan (New from 2012)
Andreas Agostin
Arasu Thanigai
Glen Chang
Wilson Lim
Lesley Leong (New from 2012)
Andrew Lim
Jerry Shi Shuai / Kaoru Onodera
Jonathan Soanes (New from 2013)
Johnny Low
(New from 2013)
Asia Pacific Organization
Asia Pacific
Executive Advisory Council
Chairman
Shane Parr
Asia Pacific
Executive Advisory Council
Vice Chairman
Parasad CNN
8
as of March 2013
AP Steering Committee
Event Accounting
(Andreas Agostin)
Asia Pacific
Steering Committee
Chairman
Hisashi Sasajima
AP Steering Committee
Vice Chairman
Arasu Thanigai
AP Steering Committee
Secretary
Jonas Berge
China
Marketing Committee
Yuenian WU
Singapore
Marketing Committee
Korea
Marketing Committee
Beom-Sik Lee
Malaysia
Marketing Committee
(Bala Subramaniam?)
Indonesia
Marketing Committee
(Djoni Lukman?)
Japan
Marketing Committee
Takashi Ikeda
Thai
Marketing Committee
Srinakorn Nontanakorn
Australia
Marketing Committee
T.B.D.
Dissolved
India
Marketing Committee
Thampy Mathew
2014 Marketing Events in Asia Pacific
(as of January 2014)
East Asia
 China
 Japan
 Taiwan
 Korea
June 16
October 23
March 12
November 19-21
November 21
ChongQing
NingBo
Waseda U., Tokyo
Osaka
End User Seminar
End User Seminar
End User Seminar
JEMIMA 2014 Exhibition
Seoul
End User Seminar
OGA 2015
November 7
May 7
-
Kuala Lumpur
End User Seminar
Pataya
Jakarta
End User Seminar
End User Seminar
October 15-18
Mumbai
Automation 2014 Exhibition
South East Asia
 Malaysia
 Vietnam
 Thailand
 Indonesia
 Singapore
India
 India
Oceania
 Australia
9
-
Fieldbus Foundation Certified Training
Program
(FCTP)
as of December , 2013
SINOPEC
Beijing Yanshan Petrochemical
Waseda Univ.
Open Network Lab.
Tokyo
Simulation Center
SAIT, Canada
STC Brielle, Netherlands
Trine University, IN
University Of Miskolc
Hungary
IIT
UL
Petronas University
KL, Malaysia
Fieldbus Center
Lee College, TX
MIT
STC Sohar
Oman
IDX Johannesburg
South Africa
• UL Group- Pune
• Indian Institute of Technology
• Madras Institute of Technology
India
10
Edith Cowan University
Perth, Australia
Bandung
Institute of Technology.
Indonesia
Petrobras
Rio de Janeiro
King Mongkuts’
Institute of Technology
Ladkrabang
Bangkok, Thai
Fieldbus Foundation
Asia pacific
Regional Situation
ROM End User Site Test 2015
• Waseda University
ROM Demonstration
• JEMIMA 2014 Osaka (Nov.19-21)
12
Preliminary Version
F-ROM Event in Japan
(F-ROM Workshop at Waseda)
IONL (Industrial Open Network Laboratory), Waseda University
(FCTP site) provides an event site and their test facilities for
F-ROM event.
EUC-Japan members (including Mitsubishi Chemical) will
participate F-ROM Workshop to study, evaluate F-ROM
technology and its related technology including H1 itself.
Workshop plan




13
Venue:
Kikuicho campus in Waseda Univ. (Tokyo)
Period:
May 2014 to June 2015
Facilities: Residential fuel cell cogeneration system test facility,
gas fired absorption pump test facility and seminar demo room
Press day: June 2015
Rack/Panel Equipment
Waseda’s facility
System Overview
Wireless device demo area
Lab Building Rooftop
Local Control Panel
Donation
Practical use area #2
Demo area
Pipe mounting
Pressure
Sunshine 
Temperature
ISA100
GW
ISA100Wireless
HSE
WirelessHART
WiHART
GW
: Adopter
FBPS
MOD
H1
LD
H1
JB
Gas fired absorption
pump
AC/DC
Temp. (2) Sensor (2)
CV (2)
H1 Display (1)
HSE
HUB
MOD
RIO
Host System
Wired or
Wireless LAN
Practical use area #1
HUB
FW
HSE
Campus LAN
Rack
HUB
FW
HSE/MODBUS
HSE
Azbil
F-ROM
Host
RIO
H1
LD
(Rack)
RIO
H1
Gas flowmeter (addition)
Mag flowmeter (exchange)
(Pressure transmitter (addition))
Lab
View
Residential Fuel Cell Cogeneration System
14
Test Facility (basement)
Test devices
Outside
Seminar
Demo Room
Call equipment criteria
Equipment for Practical use are #1 and #2 ( Class 1)

Specification and Date of deliver are tightly decided.
 These must be donation.
 All Gateways (including RIO) must be donation for permanent use.
Wireless demo area (Class 2)

A few devices are requested by Waseda. But unlisted devices are
welcome to donate or lend for the event period.
Demo area (Class 3)

All kinds of equipment are welcome for demonstration. Good
opportunity appealing your products to Japanese end user (EUC-J
members).
 If you want to participate JEMIMA show 2014 Osaka (Nov. 19 to 21)
using the same devices in the demo area, it is acceptable. Please
ask Hiroyuki Tsugane for details.
15
Field Device List (Required)
20A
Process
connection
Screw
Delivery
date
18-Jul-14
Analog (4-20mA)
32A
Screw
18-Jul-14
Analog (4-20mA)
R1/4
18-Jul-14
HART
3-Oct-14
HART
m3/h
RC1/2
18-Jul-14
Analog (4-20mA)
ºC
-
18-Jul-14
L/h
25A
18-Jul-14
ºC
-
18-Jul-14
3020
L/h
25A
18-Jul-14
CV in: Mpa, out: MPa
Fieldbus
50
10-30
ºC
2B pipe
3-Oct-14
Wireless
-10
50
10-30
ºC
2B pipe
3-Oct-14
Wireless
Atmosphere
90
150
101.3
kPa
2B pipe
3-Oct-14
Wireless
Atmosphere
90
150
101.3
kPa
2B pipe
3-Oct-14
Wireless adaptor for sunshine transmitter
Atmosphere
4
20
mA
2B pipe
3-Oct-14
Wireless adaptor for sunshine transmitter
Atmosphere
4
20
mA
2B pipe
3-Oct-14
Wireless
Analog sunshine transmitter
provided by Waseda Univ.
Analog sunshine transmitter
provided by Waseda Univ.
Location
No.
Residential
Fuel Cell
Cogeneration
System Test
Facility
(Basement)
F1
Fuel cell unit fuel city gas flow
F2
Heat pump city gas flow
F3
Fuel cell unit circulation water flow
(Electromagnetic Flowmeter)
F4
F5
F6
Hot water cooling line temperature
transmitter
Hot water
F7
Hot water cooling line control valve
Hot water
F8
Brine heating line temperature transmitter
Chilled water
F9
Brine heating line control valve
Chilled water
2000
4000
F10
Temperature transmitter (Wireless)
Atmosphere
-10
F11
Temperature transmitter (Wireless)
Atmosphere
F12
Pressure transmitter (Wireless)
F13
Pressure transmitter (Wireless)
F14
F15
Gas Fired
Absorption
Heat Pump
(Outside)
Lab Building
Rooftop
Device
Process
Min
Max
Nor.
City gas 13A
0.01
1.6
0.17
m3/h
City gas 13A
0.07
10
5
m3/h
Hot water
0.05
1
0.42
L/h
Pressure Transmitter
Chilled water
0.14
0.23
0.16
MPa
Gas heat pump city gas flow
City gas 13A
2
2800
8000
6340
Unit
Pipe size
Remarks
Waseda provides a sonsor
(Pt100)
Fieldbus
CV in: Mpa, out: MPa
Fieldbus
Waseda provides a sonsor
(Pt100)
Fieldbus
Delivery date: July 18th, 2014
 Since this site has small demonstration area as off-line use, if you want to provide other field
devices excluding above, please contact Hiroyuki Tsugane (h.tsugane.2a@azbil.com).
16
F-ROM Device List (Required)
No.
Device
Specification
Delivery date
Remarks
R1 Remote I/O
HART AIx8, DIx16, DOx16
2
18-Jul-14
Modbus acceptable
R2 Remote I/O
HART AIx8, DIx16
1
3-Oct-14
HSE
R3 H1 Linking Device
HSE/H1
1
18-Jul-14
HSE
R4 H1 Linking Device
HSE/H1
1
3-Oct-14
Modbus acceptable
R5 Device Coupler (JB)
8-12 spurs
1
18-Jul-14
For H1
R6 Device Coupler (JB)
8-12 spurs
1
3-Oct-14
For H1
R7 Fieldbus Power supply
8-12 spurs
1
18-Jul-14
For H1
1
3-Oct-14
For H1
100m
18-Jul-14
For H1
R10 ISA100 Wireless Gateway
1
3-Oct-14
HSE
R11 WirelessHART Gateway
1
3-Oct-14
Modbus acceptable
R8 Fieldbus Power supply
R9 Fieldbus cable
R12 Ethernet HUB
4-8 ports
1
18-Jul-14
R13 Ethernet HUB
4-8 ports
2
3-Oct-14
1 pair
3-Oct-14
R14 Wireless LAN router
R15 F-ROM Host system
Azbil provides
Delivery date: July 18th, 2014
17
Q'ty
3-Oct-14
Meets Japanese Radio law
Schedule (tentative)
Date
EUC-J
April, 2014
May
June
July
Aug.
Sept.
Oct.
Nov.
Dec.
Jan. 2015
Feb.
Mar.
April
May
June
IONL
FF-J
Sponsors
 FF-J approved F-ROM event plan at Waseda
FF-J meeting
 Explained the plan at EUC-J meeting
EUC-J
Call for
devices
Test plan (1 day)
Call EUC-J members for participations
Call F-ROM Sponsors for test devices
Make a test plan
Support
Study
H1, HART,
ISA100Wireless,
WirelessHART
F-ROM
(2 days)
Provide
devices
Study each technology before testing;
(1) H1
(2) HART
(3) ISA100 Wireless
(4) WirelessHART
(5) F-ROM
System staging and configuration (1-2 days)
Test (1-2 days)
Report (1 day)
Support
Press Day (1 day: preparation + the press day)
Note: Number of days above shows minimum days
18
Description
Make a test report
Invite media and sponsors
After F-ROM event
Waseda will continue use these facilities for
their study and is planning another class,
demo and/or training for digital integration
using these facilities. ( not as a part of FROM demo, so far)
19
Measurement and Control Show
2014 OSAKA
Date:
19th - 21st, November, 2014
Location: Osaka International Convention Center
(Nakanoshima, Kita-ku, Osaka City, Japan)
”Measurement and Control, lead to the future earth”
"Turning the key to the future"
20
20
Measurement and Control Show 2014 OSAKA
Key Messages
Smart
Manufacturing
Interface
between
Smart Grid
and
FEMS
Supply Chain
and
Logistics
“Sustainable
Growth”
while
“Protecting
Global
Environment
s”
Cloud
Application
and
Solution
Energy
Efficiency
Safety
and
Security
Technical Forum and Seminars
- IEC TC65 Forum: Measurement, Control and Automation: Industrie 4.0 and Energy
Efficiency
21
- Round Table Discussion
21
JEMIMA 2014 OSAKA
F-ROM Demo Plan
(November 19 – November 21)
Wired and Wireless ROM Installation
22
H1 Intrinsic Safety Installation
JEMIMA 2014 OSAKA
F-ROM Demo Plan
(November 19 – November 21)
23
Backhaul
Wireless
Host DCS
24
JEMIMA 2014 OSAKA
F-ROM Demo Plan
(November 19 – November 21)
Backhaul
Wireless
Host DCS
Wireless
Access Point
25
IEC TC65 Participating Countries
P-member:26 countries
O-member:15 countries
26
Thank You
27