• Air Quality Monitoring Results • Diesel Equipment Inventory
Transcription
• Air Quality Monitoring Results • Diesel Equipment Inventory
• • • • • Air Quality Monitoring Results Diesel Equipment Inventory Construction Mitigation Plan Schedule Recess Alternatives The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. CO, PM 2.5, PM 10, Lead • Interior and exterior monitoring began 12/2 • Results to date show compliance with all NAAQS* *National Ambient Air Quality Standards, developed to protect sensitive populations, e.g., children, elderly, asthmatics The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. Black Carbon • Average levels significantly lower than benchmarks developed by CA & US EPA • Short term peaks correlated with construction activity and wind direction The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. Reduction of PM when going from Tier 1 to Tier 2/3 of approximately 72%. The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. DESCRIPTION Sumitomo Crane Grove RT750 2013 Grove TR 880E Crane 2008 Grove 760E Crane 1996 Lorain LRT 230E Crane 2011 Cat 950H Loader 2005 Case 450 Skid Steer 2008 Volvo 460 Skid Steer 1996 Cat 800 KW Generator 2008 Multiquip 56 KW Generator 2008 Multiquip 56 KW Generator 2007 Multiquip 56 KW Generator 2006 Multiquip 56 KW Generator 2004 Komatsu PC-400 Exc 2006 Komatsu PC-78 Exc 2010 Komatsu PC-27 Exc 1999 Tadano TR 500 XL Crane 2004 IR 185 Compressor 2002 IR L-6 light Plant 2007 Wacker RT820 Compactor TRANSIENT (average) The Narragansett Bay Commission HOURS/ WEEK 120 S/B 100 5 S/B 100 50 S/B 100 100 S/B S/B S/B 40 S/B 15 20 24 S/B 10 20 CSO Program Phase II WEEKS/ 6MONS 26 26 8 8 8 8 8 8 8 8 8 8 8 4 4 16 12 4 26 TIER 0 1 4I 3 2 4I 2 3 2 3 3 3 3 2 3 3 2 2 2 3 DISTANCE TO AQ MONITOR ‘80 100’ 80' - 600' 80' - 600' 80' - 600' 80' - 600' 200' 200' 200' 200' 200' 200' 200' 80' - 120' 80' - 120' 80' - 120' 80' - 120' 80' - 120' 80' - 120' 80' - 120' 90’-600’ The Louis Berger Group, Inc. • Particulate filters not applicable • Possible CO scrubber • Replacement prohibited by cost, delay, and availability of alternate crane The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Noise Reduction • Installation of noise barrier curtain (11/19/13) -2 db • Installation of insulated attenuator on adit fan (12/14/13) -12 db • Reduce operating level of venting fan by 50% by April 2014 The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Fugitive Dust Reduction • Stabilize emissions with water or calcium chloride • Prohibit use of blower devices • Expeditiously remove mud or dirt related to construction activities along Promenade Street The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Diesel Emissions Reduction • • • • • • • • Prepare equipment inventory (completed 1/10/14) Identify feasibility of emission controls (ongoing) Perform air quality monitoring (ongoing) Require use of Ultra Low Sulfur Fuel for all transient vehicles (FTL 1/9/14) Prohibit staging of vehicles along Promenade (FTL 1/9/14) Limit idle times to 5 minutes (FTL 1/9/14) Signage regarding idling times at staging areas Ensure diesel equipment is properly maintained The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Diesel Emissions Reduction • Contractor will use pre-cast concrete segments vs castin-place concrete to line tunnel • Fewer trucks and less total truck time on site The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Approximately 1515’ of 1800’ completed (84% complete) • Anticipated completion of blasting and tunneling operations in March 2014 The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Contractor will reduce traffic impacts in area by scheduling Rathbone St. construction during summer months • Blasting complete by end of February • Microtunneling completed by end of March • Adit completed by end of June • Crane should be off-site by end of summer • Sheet-driving for approach channel to tunnel, 3-5 days • Schedule TBD The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Indoor recess • Transport to alternate recess location (NBC to fund transportation) • Erect contained outdoor structure on site The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. • Monday, February 10, 2014 Meeting The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc. Jamie Samons jsamons@narrabay.com NBC Public Affairs 401.461.8848x377 Joe Pratt jpratt@louisberger.com Program Manager 401.415.9454 The Narragansett Bay Commission CSO Program Phase II The Louis Berger Group, Inc.