Betung_POM_RSPO_ASA
Transcription
Betung_POM_RSPO_ASA
PT. MUTUAGUNG LESTARI ASSESSMENT REPORT Roundtable on Sustainable Palm Oil Certification RSPO [ ]Stage-1 [ ] Stage-2 [√] Surveillance [ ] Re-Certification Plantation Management/Owner : Plantation Name : Location : Certificate Code Date of certificate issue Date of expiry of certificate : : : Assessment ASA-1 PT LAGUNA MANDIRI – SIME DARBY Plantation Sdn Bhd. Betung Factory; Betung Estate and Sekayu Estate. Betung Village, Sub District of Pamukan Utara, District of Kotabaru, Province of Kalimantan Selatan, Indonesia. MUTU-RSPO/035 01 April 2014 31 March 2019 Assessment Date PT. Mutuagung Lestari Auditor Review by Approve by 15 – 18 February 2015 Yudwi Wisnu Rahmanto (Lead Auditor); Moh Arif Yusni; Sapto Hadi Winarno; Brigitta Prita; Entin Hendartin Toni Arifiarachman Taufik Margani Assessment Approved by MUTUAGUNG LESTARI on: ASA-1 6 March 2015 Mutuagung Lestari • Raya Bogor Km 33,5 Number 19 • Cimanggis • Depok 16953• Indonesia Telephone (+62) (21) 8740202 • Fax (+62) (21) 87740745/6 Email : agri@mutucertification.com ● www.mutucertification.com MUTU Certification • Accredited by Accreditation Services International on March 12th, 2014 PT. MUTUAGUNG LESTARI ASSESSMENT REPORT 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 TABLE OF CONTENT FIGURE Figure 1. Location Map of Betung Factory Figure 2. Operational Map of Betung Estate Figure 3. Operational Map of Betung Estate SCOPE of the SURVEILLANCE ASSESSMENT Assessment Standard Used Organization Information Type of Assessment Location of Plantations, Mill and Area Statement Description of Supply Base Planting Year and Cycles Approximate Tonnage Certified Other Certifications Time-Bound Plan 2.0 2.1 2.2 2.3 2.4 2.5 ASSESSMENT PROCESS Certification Body Assessment Team Assessment Methodology, Assessment Process and Locations of Assessment Stakeholder Consultation and Stakeholders Contacted Determining Next Assessment 3.0 3.1 3.2 3.3 3.4 3.5 3.6 ASSESSMENT FINDINGS Summary of Assessment Report of the RSPO Certification Summary of Assessment Report of Supply Chain Requirement Conformity Checklist of Certificate and Logo Use Summary of RSPO Partial Certification Identification of Findings, Corrective Actions, Observations, Opportunity for Improvement and Noteworthy Positive Components Summary of Arising Issues from Public, Management and Auditor Responses 4.0 4.1 CERTIFIED ORGANIZATION’S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY Formal Signing of Assessment Findings 59 1. 2. 3. APPENDICES List of Stakeholders Contacted in the RSPO Certification Process Assessment Program Glossary 60 61 63 SPO – 4006a.5 ii Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) 1 2 3 4 4 4 4 5 5 6 6 7 10 10 10 13 13 14 36 46 47 49 53 PT MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Figure 1. Location Map of PT Laguna Mandiri – Betung Factory SPO – 4006a.5 1 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Figure 2.Operational Map of PT Laguna Mandiri - Betung Estate SPO – 4006a.5 2 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Gambar 3.Operational Map PT Laguna Mandiri – Sekayu Estate SPO – 4006a.5 3 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 1.0 SCOPE OF THE CERTIFICATION ASSESSMENT 1.1 Assessment Standard Used 1.2 1.2.1 Organization Information Company name 1.2.2 1.2.3 Contact person Company address and site address 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 National Interpretation, RSPO Principles and Criteria (P&C) for Sustainable Palm Oil Production, Republic of Indonesia - RSPO INA-NIWG, May 2008 and RSPO Supply Chain Certification Standard November 2011 for CPO Mill. PT LAGUNA MANDIRI – SIME DARBY Plantation Sdn Bhd Men Kon Tang Malaysia : No 2, Plantation Tower Jalan PJU 1A/7 Petaling Jaya,Malaysia 47301. Telephone Fax E-mail Web page address Company status Management Representative who completed the application for certification Registered as RSPO member 1.3 1.3.1 Type of Assessment 1.3.2 1.3.3 Type of certificate 1.4 1.4.1 Locations of Mill, Plantations and Area Statement Location of Mill Scope of Assessment and Number of management unit Company names listed in the certificate Name of Mill Betung Factory 1.4.2 Location Village of Betung, Sub District of Pamukan utara, District of Kotabaru, Kalimantan Selatan Province Indonesia : The Plaza Lt. 36 Jl MH Thamrin Kav. 2830 Jakarta 10350. +62-21-2992600 +62-21-29922686 mohamad.pirabaharan@simedarby.com www.simedarby.com Swasta Mohamad Pirabaharan (Head of PSQM Plantation) 1-0008-04-000-00 – 7 September 2004 Palm Oil Mill and supply base Betung Factory, Betung Estate and Sekayu Estate Single. PT LAGUNA MANDIRI – SIME DARBY Plantation Sdn Bhd. GPS Latitude Longitude 2° 22’ 45” S 116°12’ 11” E Location of Supply Base Name of Supply Base Betung Estate (BTE) Sekayu Estate (SKE) Location Village of Betung, Sub District of Pamukan utara, District of Kotabaru, Kalimantan Selatan Province Village of Sekayu, Sub District of Pamukan utara, District of Kotabaru, GPS Latitude Longitude 2°24’16” - 2°18’25” S 116°10’51” – 116°14’10” E 2°23’19” -2°18’23” S 116°06’31” – 116°11’55” E SPO – 4006a.5 Page 4 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Kalimantan Selatan Province 1.4.3 1.4.4 1.5 1.5.1 Tenure State Community Area Statement Total area Mature area Mill Emplashment Infrastructure (Road, Bridge and Canal) Elevation Area, River, valley and Swamp Occupation HCV Betung Factory Ha Ha Ha Ha Ha Ha Ha Ha 7,580 5,943.83 17.18 90.68 272.61 22 1,076.66 157.04 Capacity (tonnes/ hour) FFB Processed (tonnes/ year) Out put (tonnes) Extraction (%) Out put (tonnes) Extraction (%) 45 106,670.32 25,008.34 23.44 5,071.50 4.75 CPO Palm Kernel *Source Production Data on February 2014 – January 2015 Description of Certified Estates Total Area (Ha) Planted Area (Ha) FFB (tonnes/year) Yield (tonnes/ha/year) Betung Estate 3,314.00 2,705.52 45,937.32 Sekayu Estate 4,266.00 3,238.31 TOTAL 7,580 5,943.83 Name of Estates 1.5.3 Ha Ha Description of Supply Base Description of Mill Name of Mill 1.5.2 7,580 Supplied to Mill FFB (tonnes/year) % 16.98 45,937.32 100 61,062.96 18.86 61,062.96 100 107,000.28 18.00 107,000.28 100 *Source Production Data on February 2014 – January 2015 FFB description from other source Name of source Member - Location - TOTAL *Betung Factory didnt receive FFB from another source 1.5.4 Product categories 1.6 1.6.1 Planting Year and Cycles Age profile of planting year Planting Year - FFB / CPO / PK Hectarage Page 5 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 Supplied to Mill FFB % (tonnes/year) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Name of Estate (Ha) Name of Estate (Ha) Total (Ha) 1994 - 320.25 320.25 1995 - 1,194.99 1,194.99 1996 741.64 801.49 1,543.13 1997 893.73 872.20 1,765.93 1998 882.75 49.38 932.13 2007 133.20 - 133.2 2009 54.20 - 54.2 TOTAL 2,705.52 3,238.31 5,943.83 1.6.2 1.6.3 New Planting area after January 2010 Planting Cycle 1.7 1.7.1 Approximate Tonnage Certified Past Annual Claim Certified Product 1.7.2 1.7.3 1.8 1st/2nd Ha Years Cycle Previous Certificate Claim (tonnes/year) FFB Production 125,408 CPO Production 29,095 Palm Kernel (PK) Production 6,326 ** Certificate Claim period 01 April 2014. – 31 Maret 2015 ** Actual Claim periode 01 April 2014. – 14 February 2015 Claim Certified of FFB Actual certified product (tonnes/year) 94,845.96 21,910.94 4,516.88 Name of Estates Total Area (Ha) Planted Area (Ha) FFB (tonnes/year) Yield (tonnes/ha/year) Betung Estate 3,314.00 2,705.52 51,000 18.85 Sekayu Estate 4,266.00 3,238.31 68,000 21.00 TOTAL 7,580 5,943.83 119,000 20.02 Claim Certified of Palm Product Name of Mill Capacity (tonnes/ hour) FFB Processed (tonnes/year) Out put (tonnes) Extraction (%) Out put (tonnes) Extraction (%) Betung Factory 45 119,000 27,965 23.5 5,625.5 4.75 Other Certifications ISO 9001:2008 ISO 14001: 2004 OHSAS 18001:2007 ISCC Others CPO Palm Kernel ISPO (Indonesian Sustainable Palm Oil) MUTU-ISPO/004 valid from 4 December 2012 until 3 December 2017 Oth Page 6 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 1.9 1.9.1 Time Bound Plan Time Bound Plan for Other Management Units MANAGEMENT UNIT Estate (Supply Time Base) POM Bound Sekunyir. Certified Sekunyir PT. Indotruba Tengah 2010 Seruyan Manggala. PT. Tunggal Mitra Plantations Certified 2010 PT. Sime Indo Agro Certified 2010 Teluk Siak. PT Aneka Inti Persada Certified 2011 Sungai Pinang. PT. Bina Sains Cemerlang Certified 2012 Sukamandang. PT. Kridatama Lancar Certified 2011 Pemantang. PT. Teguh Sempurna Certified 2011 Alur Dumai. PT Lahan Tani Sakti Teluk Bakau. PT. Bhumireksa Nusa Sejati Certified 2011 Certified 2011 Mandah. PT. Bhumireksa Nusa Sejati Angsana Mini. PT Sajang Heulang Certified 2014 Angsana. PT Ladangrumpun Suburabadi Certified 2011 Mustika. PT Sajang Heulang Certified 2013 Certified 2011 Time Bound LOCATION Certified 2010 Certified 2010 Seruyan and West Kotawaringin District – Central Kalimantan Manggala 1 Manggala 2 Manggala 3 PT. Sime Indo Agro Certified 2010 Certified 2010 Certified 2010 Certified 2010 Rokan Hilir District – Riau Teluk Siak Pinang Sebatang Aneka Persada Sungai Pinang Bukit Pinang Sukamandang Sapiri Baras Danum Kuala Kuayan Pemantang Kawan Batu Hatan Tiring Batang Garing Alur Dumai Certified 2011 Certified 2011 Pekanbaru, Siak District – Riau Teluk Bakau Nusa Perkasa Nusa Lestari Mandah Rotan Semelur Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Indra Giri Hilir District – Riau KKPA-1 PT.SHE Pantai Bonati Angsana Gunung Sari KKPA-4 PT.SHE KKPA-2 PT.SHE KKPA-3 PT.SHE KKPA-5 PT.SHE Certified 2013 Tanah Bumbu District – South Kalimantan Certified 2011 Certified 2012 Certified 2012 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2011 Certified 2013 Certified 2013 Sanggau District –West Kalimantan Musi Rawas District – South Sumatera Seruyan and East Kotawaringin District – Central Kalimantan Seruyan and East Kotawaringin District – Central Kalimantan Rokan Hilir District – Riau Indra Giri Hilir District – Riau Tanah Bumbu District – South Kalimantan Tanah Bumbu District – South Kalimantan Certified 2013 Certified 2013 Page 7 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Gunung Aru. PT Bersama Sejahtea Sakti Bebunga. PT. Langgeng Muaramakmur Certified 2011 Pondok Labu. PT Paripurna Swakarsa Certified 2012 Selabak. PT Swadaya Andhika Certified 2012 Rantau. PT Laguna Mandiri Certified 2012 Gunung Aru Gunung Kemasan Laut Timur Pantai Timur Sungai Cengal Bebunga KKPA Sungai Cengal Binturung Pondok Labu Rampa Sesulung Selabak Randi Sangkoh Lanting Rantau Matalok Betung. PT Laguna Mandiri Certified 2014 Betung Sekayu Certified 2012 Certified 2012 Kotabaru District – South Kalimantan Ungkaya. PT Tamaco Graha Krida Certified 2012 Ungkaya Certified 2012 Morowali District – Sulawesi Tengah Plasma TGK Ladang Panjang Plasma BGR Rantau Panjang Bumi Ayu Karang Ringin Napal Mangun Jaya KKPA Sungai Pinang Tamiang (PT PPP) Batang Ara ((PT PSK)) Blang Simpo-01 (PT PPP) Blang Simpo-02 (PT PPP) MAS 1 MAS 1 MAS 1 Lembiru Awatan 2015 Certified 2012 Ladang Panjang. PT Bahari Gembira Ria Certified 2011 Certified 2012 Rantau Panjang. PT Guthrie Pecconina Indonesia Certified 2012 Blang Simpo. PT Perkasa Subur Sakti Certified 2013 MAS. PT Mitra Austral Sejahtera 2020 Lembiru. PT Sandika Nata Palma Certified 2014 Certified 2011 Certified 2011 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Kotabaru District – South Kalimantan Certified 2011 Certified 2011 Certified 2011 Certified 2011 2014 2015 Certified 2012 Certified 2012 Certified 2012 Certified 2012 Certified 2012 2015 Certified 2013 Certified 2013 Kotabaru District – South Kalimantan Kotabaru District – South Kalimantan Kotabaru District – South Kalimantan Kotabaru District – South Kalimantan Muaro Jambi District - Jambi Musi Banyuasin District – South Sumatera Aceh Tamiang and East Aceh District – Nanggroe Aceh Darussalam Certified 2013 Certified 2013 2020 2020 2020 Certified 2014 Certified 2014 Sanggau District – West Kalimantan Ketapang District – West Kalimantan Page 8 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Pelanjau (PT 2014 BAL) Sungai Putih 2014 (PT BAL) Baturus (PT 2014 BAL) Sime Darby has achieved 39 managament units in Malaysia and 21 Management Units in Indonesia RSPO certified. There was change of the Time Bound Plan under Sime Darby cause the Sime Darby postpone the others certification process. Change of the Time Bound Plan explaination: PT Mitra Austral Sejahtera. There are social issue still unresolved from the Serikat Petani Kelapa Sawit (SPKS) Sanggau, however the improvement are in progress. Based on RSPO website the progrest between PT MAS and Serikat Petani Kelapa Sawit (SPKS) Sanggau preseentaed as a below: - On 29 May 2014, DSF had a dialogue session with the Kerunang & Entapang community to understand their position and to explain the services DSF can offer. - In a letter dated 12 June 2014, the villagers of Kerunang & Entapang wrote to RSPO requesting among others, that DSF assist and facilitate the resolution of the dispute pertaining to partnership arrangement with PT MAS. - On 27 August 2014, a meeting was held in Entapang village comprising representatives from Sime Darby, Kerunang & Entapang villagers, TuK, WALHI, Oxfam & RSPO. At that meeting, the community presented their claims and points of view. - It was agreed that Sime Darby will look into their claims and it was also agreed that the parties will meet every 2 months towards the resolution of the dispute. - Further meeting was held between the disputing parties in the village on 12 December. Several bilateral meetings were also held between Sime Darby and TuK to discuss the appropriate way forward. - Latest progress (as of February 2015): TuK, on behalf of the Kerunang/Entapang community would propose solutions to Sime Darby by March 2015 on the settlement of the land issues especially those pertaining to HGU 1.10 Sime Darby has informed the Time Bound Plan progress, MUTUAGUNG has consider that Sime Darby still comply with the RSPO requirement for partial certification. Progress of Associated Smallholders and Outgrowers for Certifiable Standard PT LMI – Betung Factory didnt receive FFB from another source 2.0 ASSESSMENT PROCESS Page 9 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 2.1 Certification Body PT Mutuagung Lestari Jl. Raya Bogor Km 33,5 No. 19, Cimanggis - Depok 16953 Telp. +62-21-8740202; Fax +62-21-87740745/46 Website: www.mutucertification.com Email : agri@mutucertification.com 2.2 ASA-1 Assessment Team 1. Yudwi Wisnu Rahmanto (Auditor) Bachelor of Forestry with Silviculture background. He worked at professional independent Certification Body as an Auditor for last 3 years and has involved in auditing activities with various certification schemes. Selected training which have been followed, such as RSPO Endorsed Lead Auditor Training Course, ISPO Auditor/Lead Auditor Course, Quality Management System (QMS) ISO 9001:2008 Auditor/Lead Auditor Course, GIS-Basic Mapping and Spatial Analysis, Timber Legality Assurance System (SVLK), Verification Organization Training C.A.F.E Practices (Starbucks) and others internal training programs. He has involved in auditing activities, such as Sustainable Forest Management by FSC FM/COC Scheme, Sustainable Palm Oil by RSPO and ISPO Scheme, Coffee And Farmer Equity (C.A.F.E Practices) Starbucks, Organic Standard (EU, NOP, JAS) for Coffee Farmers and Organic Exchange for Textile. During this audit, he assignedto verify of Land Legality, SCCS, and Conservation (HCV) aspect. 2. Moh. Arif Yusni (Auditor) A bachelor of Agriculture, majoring of Plant Pest and Diseases (Plant Protection). He has a working experience for 2 (two) years in oil palm Plantation Company in Indonesia. Selected training which have been followed, such as RSPO Endorsed Lead Auditor Training Course, ISPO Auditor/Lead Auditor Course, Quality Management System (QMS) ISO 9001:2008 Auditor/Lead Auditor Course. During this audit, he assignedto verify of BMP and OHS aspect. 3. Sapto Hadi W (Auditor). ). Forest Product, Faculty of Forestry, Bogor Agriculture Institute. He has work experience as air sensing photograph consultant since 1994 to 1997. He was working on company of plywood and he was appointed as IPK Manager of Palm Oil Company. He was also appointed as Company Operational Director of PMDN and PMA Manufacture Company on 1998 to 2005. He has certificates of assessor/ /auditor/lead auditor on Forest Management and Wood Assurance Certificate since 2005 to recently. He has competence certificate for PHPL and VLK auditor. The professional experience he was dealing with was as the trainer of PHPL and SLK workshop for the Supervisor of Forest. He is now as professional consultant for forestry. In ASA-01 he conducted an assessment on Social and Environmental Impact Assessment and conservation aspect. 4. Entin Hendartin (Auditor). Doctor from the Faculty of Forestry, Bogor Agricultural University in 2011. She was attended training RSPO Lead Auditor, ISPO Lead Auditor Training and Sustainable Forest Management (SFM) with LEI Scheme) and the Ministry of Forestry. Experts in the Environmental, Social, Economic and Cultural. Previously has been a lecturer at the Institute of Technology Bandung. On this assessment was observations on environmental and social aspects. 5. Brigitta Prita ( Auditor) Bachelor of Forestry, Department of Forest Resources Conservation and Ecotourism, Bogor Agricultural University. Attended training ISPO Auditor training, certification of ISO 9001:2008 Quality Management System (QMS), Training IHT Awareness RSPO, Training QMS 19011, IHT Awareness 17021 and 17065 and Training HCV On this assessment was observations on environmental and social aspects. 2.3 2.3.1 ASA-1 Assessment Methodology, Assessment Process and Locations of Assessment Figure of person days to implement assessment Number of auditors : 5 auditor Number of days for ASA-1 at site : 3 days Number of working days for ASA-1 at site : 15 Working days 2.3.2 ASA-1 Detail process of assessment The assessment was conducted by measuring the sufficiency of implementation with the consistency done by the PT Laguna Mandiri – betung factory to the requirements of National Interpretation of the Republic of Indonesia from RSPO Principles and Criteria for Sustainable Palm Oil Production (RSPO INA-NIWG, May 2008 and Supply Chain Requirement for CPO Mill SPO – 4006a.5 Page 10 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT The assessment was conducted in three methods: (1) document review, aiming to observe the sufficiency of types or substances from required documents; (2) interview, aiming to obtain more detailed information and cross check the information; and (3) field observation, aiming to observe directly the sufficiency of implementation on site. Some opportunities for improvement of the results ASA-1 delivered by the MUTU auditor to the management unit and the results are the subject will be verified at the next assessment phase (ASA-2). Improvement of findings from main assesment findings were observed by auditors at this ASA-1 assessment. All information obtained was recorded in Check List of PT Mutuagung Lestari (MUTU) The assessment program please find Appendix 2 2.3.3 ASA-1 Locations of Assessment Locations of field observation are as presented below: Betung Mill Betung Reservoir (Block K31). Auditor team observed the reservoir for POM operational. According to the result of observation, company has well maintained reservoir. Therefore, water will always be available for POM. Betung POM WWTP Pool. Auditor team observed the system of Rantau POM waste management. According to the result of observation, the Rantau POM WWTP is well functioned for supporting operational such as daily effluent monitoring and measurement of effluent quality periodically. Processing Stage. According to field observation and interview with the processing station employees; the employees have aware of the procedure in each of their job position, company has provided PPE and employees have used PPE to support their work, there are also safety sign in each processing station, regular medical check up has been conducted by company and employees have been trained to achieve certificate and SIO. (during the field visit, mill was not processing FFB due to the lack of FFB). Betung Estate Land Use Title Boundary Pool of Division 3 Betung (Block J.31/32, I.30/31, I.29/H.29, I.27). Enclave area of Division 3 Block K.39/40, Belong to community of Srogok Hamlet, Bakau Village. Landfill of Block J.39 Observation related to landfills operation. According to the field observation, the domestic waste hoarding and filling has been conducted by referring to the procedures applied by company. For example, the waste is collected and transported periodically to landfills. HCV 4.1 Area: Riparian Area and Forest Area of Block I.29. Warehouse of Land Fire Extinguish Equipments. According to the observation on land fire extinguishing facilities and interview with land fire team . Workshop. According to the observation and interview with workers in workshop, the workers have used standard PPE, they have been aware of the risk of their job and its level as well, the welding expert has achieved certificate of training and they have received regular medical check up. Chemicals Warehouse. According to the interview and observation with the warehouse workers, employees have been equipped with proper PPE, they have received regular medical check up and they have been aware of the work procedure in chemical warehouse. Chemicals and Oil Warehouse. According to the observation of ex pesticide containers waste management, the waste reporting and transporting to the licensed warehouse is monthly monitored. Block D37/36 Division 2. According to the observation on location of NK Blen Dosage Manuring refer to the research team recommendation, the manurer has implemented occupational health and safety princples. Entire workers have been equipped with PPE, avron, and masker in order to avoid the direct fertilizer contamination. There is no pregnant or breastfeeding women workers who work closely with chemicals. Block D37, D36, According to the inspection on the nest box, there are signs of the existence of Tyto Alba in form of its owlet, rest of the food, feather, and mature owl. Harvesting program in Block C10 Division 2. Observation on haresting program. According to the field observation, the harvesting program has been conducted by referring to the applied SOP. Harvester has aware of the procedure of OHS, harvest basic, and the applied waging system. Page 11 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Herbicide Application Programs D38/39 Division 2. Observation and interview related to the herbicide application. According to the observation, the sprayers have used PPE such as helmet, apron, gloves, and boots. Sprayers have aware of the target and the type of weed that must be exterminated. There is no breastfeeding nor pregnant women who conducts herbicide application. The workers have been aware of the waging system (the wage received is not less than the wage minimum standard). The workers have also receive regular medical check up. Housing Complex. According to the observation and interview with the employees in housing complex, employees have aware of the procedure of complaint delivery, domestic waste management, and they have received emergency response situation when fire occured. Diesel Fuel Tank. According to the observation in diesel fuel tank, the person in charge has aware of the procedure of diesel fuel tank filling, there is proper PPE and proper safety sign. BSS Station. According to the observation, there are proper safety signs, workers have been aware of the SOP of PPE and knapsack washing and they have received OHS training and regular medical check up. Clinic. According to the field observation, the management of medical waste has been conducted by referring to the applied regulation. According to the interview with the medical assistants, they have received hyperkes training with the permits from the associated agency as well. Sekayu Estate Warehouse of Land Fire Extinguish Equipments, Observation on land fire extinguishing equipments and interview with the land fire officer. Workshop. According to the observation and interview with workers in workshop, the workers have used standard PPE, they have aware of the risk of their job and its level as well, the welding expert has achieved certificate of training and they have received regular medical check up. Chemicals Warehouse, According to the interview and observation with the warehouse workers, employees have been equipped with proper PPE, they have received regular medical check up and they have been aware of the work procedure in chemical warehouse. Chemicals and Oil Warehouse. Observation on used pesticide package, known that there is monthly monitoring on its reporting and delivery to permitted hazardous waste storage. Block G25 Divisi 2. According to the observation on location of NK Blen Dosage Manuring refer to the research team recommendation (3.5 Kg / Plant), the manurer has implemented occupational health and safety princples. Entire workers have been equipped with PPE, avron, and mask in order to avoid the direct fertilizer contamination. There is no pregnant nor breastfeeding women workers who work closely with chemicals. Block D37, D36, According to the inspection on the nest box, there are signs of the existence of Tyto alba in form of its owlet, rest of the food, feather, and mature owl. Harvesting program in Block G 29/30 Division 2. Observation on harvesting program. According to the field observation, the harvesting program has been conducted by referring to the applied SOP. Harvester has been aware of the procedure of OHS, harvesting payment system by production target, and the applied waging system. Land Use Title Boundary Pool of Division 2 of Sekayu Estate (Block G.31, H.31, G.25/F.25), Division 3 (Block G.19, G.13). Enten River Riparian (Block D.26/E.26), Kulum River Riparian (Block D.16/E.16). HCV 3 Area: Rabah Cave (Cave location is beyond the Land Use Title Area and directly bordering community’s land). Housing Complex, According to the observation and interview with the employees in housing facility, employees have been aware of the procedure of complaint mechanism, domestic waste management, and they have received emergency response situation training when fire occured. Diesel Fuel Tank, According to the observation in diesel fuel tank, the person in charge has been aware of the procedure of diesel fuel tank filling; there is proper PPE and proper safety sign. BSS (Block Spraying System) Station. According to the observation, there are proper safety signs, workers have been aware of the SOP of PPE and knapsack washing and they have received OHS training and regular medical check up. Page 12 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Empty Fruit Bunch Application. Observation in term of solid waste utilization in form of empty fruit bunch to the land. According to the result of observation, the empty fruit bunch application is effective to reduce POM solid waste and reduce the usage of fertilizer in estate as well. Company has implemented empty fruit bunch application refer to the applied procedure (dosage: 40 Ton / Ha). 2.4 Stakeholder Consultation and Stakeholders Contacted 2.4.1 Summary of stakeholder consultation process. ASA-1 Summary of stakeholder consultation process Consultation of stakeholders for Laguna Mandiri – Betung Factory was held by: 1. Public Notification 30 days before assesment on Website of PT Mutu Agung Lestari 2. Public consultation meeting with internal stakeholders by interviews and local stakeholders conducted by visits to villages and interviews with local peoples on 16 February 2015 3. Public consultation meeting with goverment on 16 February 2015 4. Quesioner by email to NGO Numbers of input from stakeholders were clarified by PT Laguna Mandiri be a part of this report Stakeholder contacted Please find appendix 1 2.4.2 2.5 3.0. Determining Next Assessment The next visit (ASA-2) will be determined one year after this ASA-1 ASSESSMENT RESULT Page 13 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.1. Summary of Assessment Report of the RSPO Certification MUTUAGUNG LESTARI has conducted an assessment of Betung Factory – PT. Laguna Mandiri, Minamas-SIME DARBY Plantation Sdn Bhd operation existing one mill and two palm oil estate During the assessment, there were two (2) Nonconformities were assigned against Major Compliance Indicators and three (3) opportunities for improvement were identified. Further explanation of the non-conformities raised and corrective actions taken by the company are provided in section 3.5. The company has already prepared and implemented the corrective action(s) that had been reviewed and accepted by Auditors in form of documentation evidences e.g. (document record/photographic/etc...). Those corrective actions taken that consist o two 92) Major non-conformities had been closed out shall be verified during next assessment. MUTUAGUNG LESTARI found that Betung Factory – PT. Laguna Mandiri, Minamas-SIME DARBY Plantation Sdn Bhd complied with the requirements of RSPO Principles & Criteria and National Interpretation, RSPO Principles and Criteria (P&C) for Sustainable Palm Oil Production, Republic of Indonesia - RSPO INA-NIWG, May 2008 Therefore MUTUAGUNG LESTARI Recommends RSPO Certification of compliance is maintained Std. VERIFICATION RESULT of MUTU-Certification NCIPLE #1 COMMITMENT TO TRANSPARENCY tation and Palm Oil Factory have to give adequate information for stakeholders in appropriate language and forms, to ensure the effec cipation of stakeholders in decision-making. ord over the incoming information request is documented on the book of incoming letter and response letter to the stakeholders. According to the res ment verification on January 2014 – February 2015, there was no information request from the stakeholders despite there was assistance req rding to the result of interview with Employees, Chief of Village, the nearby community, and the associated agencies during the public consultation, t no information request purposed to the company. pany has regulated the information request and response record maintaining period on the SOP of record Control with Policy Number : 743/TQEM-ES oint 6.5 which was describing that the valid period and termination period of the documents were as follows: For the need of assessment (3 years) For the need of reference (10 years) Government Law and Statutes (until revision) Request of costumers and response of information (2 years) Company policy (until revision) Record of land compensation will always be maintained as long as the company keep operating. Status: Full Compliance agement documents are publicly available, except where this is prevented by commercial confidentiality or where disclosure of information d result in negative environmental or social outcomes. agement unit has the list of documents that can be given to the stakeholders as written on SOP of Information Request (012/LMI-PI/2012) dated Jan 2012 as follows: 1. Hectarage of LC, Immature Plant, Mature Plant, Facilities 2. Evidence of Payment to Labour Social Assurance 3. Evidence of Employees Medical healing payment 4. Employees Public Facilities 5. Data of Pest and Disease Attack Page 14 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Data of Heavy and Light Equipment Data of the supporting machines Data of CSR that was used to be applied Data of Bridge Data of Road Length Data of Operational Building Data of Public Building Data of School Building Type of the Fertilizer used by Type of the Agrochemical used by Data of Permanent Employees Data of School Students e are classified data that cannot be given to the stakeholders unless the data shown previously. Status: Full Compliance NCIPLE #2 COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS e is compliance with all applicable local, national and ratified international laws and regulations. ence of the law compliance is proven by the List of the must-complied Regulation owned by PT Laguna Mandiri (up dated September 2014) for Be unit. The regulations are associated with Land Acquisition, Environment and Manpower. rding to the result of field visit and interview with the associated agencies (Forestry Agency, Plantation Agency, and Environment Agency) of Kota ct on February 16th 2015, PT LMI (including Betung POM) has consistently complied the regulation in term of palm oil estate management and pal essing. For example, Report of Environmental Management and Monitoring Plan is always been reported on time and refer to the EIA document guidan ence of the effort to conduct adjustment over the changes of the rule. Auditor team was interviewing several workers. According to the interview result workers of estate and mill (represented by labour union) on February 16th – 17th 2015, the manpower aspect, specifically in term of wage and s rance have been referred to the minimum wage standard in District, Province, and National. The workers were also admit that the wage offere pany has referring to the minimum wage standard for period of 2015. documented system of the law requirements for PT LMI unit (Betung POM) was conducted by reviewing the evaluation over the regulation complian associated statutes and regulations such as must complied Regulation List associated with Land Acquisition, Environment and Manpower. uation of regulation compliance and its changes, entire Minamas Plantation estate unit and mill was conducted by Plantation Services Department (P Plantation Sustainable and Quality Management (PSQM) Officer in each region. PSQM Officer was in charge of the unit of Betung POM and its e lier. Status: Full Compliance right to use the land can be demonstrated, and is not legitimately contested by local communities with demonstrable rights ng POM unit is a part of PT LMI with Sekayu and Betung Estate supplier. Therefore, the ownership of land is includded on the hectarage of the Land owned by PT LMI. Total of the land right in form of PT LMI Land Use Title is 15,300 Ha, it consisted of 10 Land Use Title certificate. Meanwhile, the s etung POM, Sekayu and Betung Estate Unit, the total area is 7,580.00 Ha. It consisted of 4,266.00 Ha for Sekayu Estate and 3,314.00 Ha for Be e. Entire copy of the document of the land ownership are well maintained. ence of the demarcated legal area is clearly maintained as follows: ng Estate (BTE): Field visit to Division 3 on February 16th 2015 Page 15 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Figure 1. HGU poles in block J31-32, Div.3 Figure 2. . HGU poles in block I30/31 Figure 3. . HGU poles in block I30/31; border of enclaved area. yu Estate (SYE): Field visit to Division 2 & 3 on February 17th 2015 Figure 4. . HGU pole 131 in blockBlok G31 Div.2 SYE; HGU pole 133 in Block G31-H31 Figure 5. HGU pole 129 in Block H31 Figure 6. HGU pole 9 in Block F/G 25 rding to the result of interview with Betung and Sekayu Village community on February 16th 2015, there was no conflict and disputes over the land with by community in last 5 years. The community’s land within Betung and Sekayu Estate work area are considered as enclaved area (exclude Land Use dastral Map). Furthermore, the commodities planted by community is not palm oil. ng Estate (BTE): Field visit to Division 3 on February 16th 2015, Enclave of Srogok Hamlet community, Bakau Village, Block K39 – 40. yu Estate (SYE): Field visit to Division 2 on February 17th 2015, Enclave of community. Page 16 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT of enclaved area in BTE and SYE is 1,076.66 Ha. The area is considered as the area excluded from PT LMI Land Use Title area. Land compens ment on the Land Use Title achievement process was conducted during period of 1995 – 2003. Entire data are provided on the office of PSD (Plant ice Department). rding to the result of interview with Betung and Sekayu village community, there is no land conflict occured due to the establisment of the establishme A Sungai Cengal (Division 7 of Betung) Bepara Village. Meanwhile, the community of Betung and Sekayu village are willing to be involved on eration for scheme smallholders establishment. However, no available land left. Status: Full Compliance of the land for oil palm does not diminish the legal rights, or customary rights, of other users, without their free, prior and informed consent rding to the result of interview on February 16th 2015 in Sekayu and Betung Village, there was no traditional right within Sekayu and Betung Es ever, there was community’s land that was planted with rubber and agroforestry commodities in order to make a living. e community’s land is considered as enclaved area. Entire of the identified enclaved area have been mapped on the Sekayu and Betung E ational area. Status: Full Compliance NCIPLE #3 Commitment to long-term economic and financial viability e is an implemented management plan that aims to achieve long term economic and financial viability. ument of company’s long term plan for minimum 3 years work plan in term of production projection with the budget year for Betung Estate and agement unit on period of July – June. The 3 years term production plan is as follows: No 1 Keterangan Produksi (ton): 2014/2015 Proyeksi 2015/2016 Proyeksi 2016/2017 Proyeksi 2017/2018 TBS - Betung Estate - Sekayu Estate 2 Actual Budget 2014/2015 34,966.83 68,005.00 26,042.33 36,112.48 50,445.62 72,643 48,161.00 67,080 49,349.62 59,644 20.30 21.00 28,820 9.67 13.36 15,108.16 20.63 22.43 27,663 21.80 22.99 26,565 22.34 22.45 26,447 Yield (ton/Ha): - Betung Estate - Sekayu Estate 3 CPO (ton) 4 OER (%) 5 PK (ton) 6 KER (%) 23.50 23.39 6,132 5.00 3,022.75 4.91 23.30 5,936 5.00 23.50 5,785 5.10 23.75 5,679 5.10 of Replanting Program for period of 2015/16 to 2029/30 tate ung ayu 2015/16 246.04 - 2016/17 235.65 315.25 2017/18 261.77 2018/19 257.77 228.17 2019/20 264.65 111.73 Total 1,004.11 916.92 Page 17 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 al PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 246.04 550.90 261.77 485.94 376.38 1,921.03 e was also map of replanting area per period. Meanwhile, replanting review should be conducted at least 1 month before its implementation. There nting analysis for Betung Estate unit shall be conducted on the next budget year on July 2015. Status: Full Compliance NCIPLE #4 Use of appropriate best practices by growers and millers rating procedures are appropriately documented and consistently implemented and monitored. agement unit has SOP of Cultivation and Mill Practice as reference for estate operational. In order to ensure the implementation runs well, the com procedure of monitoring in form of ‘Mill and Plantation Advisory and internal operational audit”. The program is conducted in each semester. agement for each estate and mill is periodically report its operational to top management. Report of the operational program is a result of daily com ational recapitulation. Company has also had dicussed each item of the program. Procedure of evaluation over the estate and mill operationa ucted by manager. rding to the result of field visit to Division 2 of Betung and Sekayu Estate, the company operational programs have referred to the applied procedure mple, on the harvesting program, the harvesters have been aware of the FFB maturity standard, frond arrangement, and PPE usage. Furthermore, on ment program (chemist and manuring), the employees have been aware of the work technical, PPE usage and the foreman has been aware of the firs n. Status: Full Compliance tices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield. pany conducts annual leaf analysis for the recommendation of the manuring for the manuring period of the next year. The result of leaf analysis is w yzed by MRC (Minamas Research Centre) Riau Province. Measurement over the substance of Nitrogen, Phospore, Kalium, Magnesium and Boron. arch team was analyzing the substance of the soil nutrient (Nitrogen, Posfat, Kalium, Magnesium, Boron and Carbon) in order to recommend manu e next year. n effort to maintain and improve soil fertilizy, the company has conducted manuring, empty fruit bunch application and land application. Manuring, e bunch application is conducted by referring to the recommendation of the soil and leaf analysis result. According to the field visit conducted by comp rogram has been in accordance with the applied recommendation. Furthermore, according to the field visit to Betung and Sekayu Estate, the man ram has referring to the applied recommendation. For example, NK Blen fertilizer is 3.5 Kg / Plan in Block D37/36 Division 2 of Sekayu Estate and B 29 Division 2 of Betung Estate. Status: Full Compliance tices minimize and control erosion and degradation of soils. pany has conducted Survey of Tinjau Soil which was then followed up by conducting Detail Soil Survey for Betung Estate on 2011 and for Sekayu E 010. It was authorized to Minamas Reserch Centre (MRC), Minamas Plantation. According to the review of the both document, there was no margina n Betung and Sekayu Estate Area. rding to the result of the detail soil survey on 2010 (Sekayu Estate) and on 2011 (Betung Estate), PT LMI (SYE ad BTE) operational area was domin rea with slope level between 3 – 8% which was covering 3,226 Ha or 53.67%. Therefore, the entire PT LMI operational area has slope level below h means it is suitable for palm oil plant cultivation. nd effort to manage the area with specific slope (by considering soil and climate condition), company has compiled SOP 724/TQEM-SPMS/09 d ust 27th 2010 which was legalized by CEO. Meanwhile, in order to monitor the erossion level, company has also compiled Guideline of Soil Ero surement Number 008/LMI-SYE/2010 which was legalized on December 16th. 2010. pany has conducted efforts to reduce erosion and surface water overflow such as; eveloping cover crop vegetation by conducting selective weeding and developing Nephrolepsis sp as well. Page 18 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT reating siltpit in order to reduce surface water overflow as well as improving water infiltration to the ground. Realization of siltpit construction untill A udit was as follow; Siltpit Realization Estate Unit Ha Betung Sekayu Jumlah 19,774 28,306 48,080 2,717 1,668 4,385 rond arrangement in order to form alphabet “U” (U shape front stacking), empty fruit bunch application and planting of Vertiver zizanioides. For examp ock J 33 (BTE) and Block E 18 (SYE). Water Management in order for balancing water availability on the dry season and water overload on the wet season. Status: Full Compliance tices maintain the quality and availability of surface and ground water. rding to the field visit to the Pinang Riparian, Betung Estate, company has conducted water current protection by installing signboard informing rip , constructing riparian area boundary: the mark of riparian is painted with yellow, planting buffer area with forest plants or vertiver grass, prohibitio uring application and spraying along the riparian area, cycle cleaning shall be conducted manually, and testing river water quality each seme hermore, company has also conduct water quality over employees well and reservoir used for providing employees water need. For example, Betung P ervoir, Well of Division 2 and 1 Housing Complex (Betung Estate), and Well of Division 2 and 4 Housing Complex (SYE). agement unit has had program of water management as described on the environment document, specifically on the Report of Environm agement and Monitoring Plan Implementation which is reported to the associated agencies each semester. According to the report, the condition of PT condition has pretty big land slope (8 – 30% and 45.60% of land slope according to the detail soil survey result) with the length of cliff is 50 met age, land infiltration and land permeability are considered slow and frequent rainfall rate (>200 mm/month) in specific months. Furthermore, the effor age water quality are conducted as follows; Maintaining cover crop vegetation by conducting; selective weeding and developing Neprolepsis sp, Creating siltpit in order to reduce surface water overflow as well as improving water infiltration to the ground and Frond arrangement in order to alphabet “U” (U shape front stacking), empty fruit bunch application and planting of Vertiver zizanioides. Water management by constructing sewer system and water gate. Maintaining river water quality by several efforts such as weed control by implementing concept of ground management and also by develo Nephrolepsis sp and selective weeding. Controling pest and disease by implementing IPM. For example, raising owl to prey rats (pest) and planting beneficial plant to control bagworm. Testing river water quality and monitoring well quality in community’s settlement in laboratory each semester. Utilization of POM effluent for land application. agement unit conducts routine test over the effluent quality monthly by cooperating with the laboratory of Research Department and Ind dardization of Banjarbaru District, South Kalimantan (accreditation number: KAN LP-543-IDN). According to the result of effluent quality test, the e is still below the quality threshold determined by referring to the Environment Ministry Decree Number 28 Year 2003 in term of technical guideline o oil-generated effluent utilization in palm oil estate. pany has reservoir to maintain water availability for water usage in POM. During the period of 2014, mill has processed 107,782,527 Kg FFB with me of water usage for 141,986 m3. Therefore, the ratio of water usage per ton of FFB was 1.32 m3 per ton of FFB. According to the data, it was still b udget determined by company (1,5 m3 per ton of FFB). Status: Full Compliance s, diseases, weeds and invasive introduced species are effectively managed using appropriate Integrated Pest Management (IPM) technique ipally, company is always prioritizing Pest and Disease control by conducting preventive action such as census and biological control. Company ral procedures to control palm oil pest and disease. For example: uidance of Rhinoceros Beetle control on the immature palm oil plant (110/EST-ARM/08 part 16.1) uidance of general pest control chemically (110/EST-ARM/08 part 16.1.1) Page 19 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT uidance of bagworm and nettle caterpillar control (110/EST-ARM/08 part 16.2) he use of beneficial plant to control leaf pest through cultivation control (110/EST-ARM/08 part 16.2.1) uidance of barn owl usage for controling Rats (110/EST-ARM/08 part 16.3.1) uidance of the control of rod tip decomposing process (110/EST-ARM/08 part 16.4). rding to the document review on the budget period of 2014 – 2015 (July – June), there was pest attack exceeding economy threshold which was the ant leaf eater. Sekayu Estate According to the document review and the interview with census officer, there was palm oil plant leaf eater attack exceeding economy thresho division 1 with hectarage 151.69 Ha. For example in blocks D27, D28, C27, C28, C22 and C55. Company has conducted action by using deltame active substance to overcome the pest attack. According to the census on February – December, the pest attack level has been considered below economy threshold. Betung Estate According to the document review and the interview with census officer, there was no palm oil plant leaf eater attack exceeding the econ threshold. For example, on period of December, the hectarage of census was 278.03 Ha with average of attack was 0.79. rding to the result of field visit and interview with the census officer in Sekayu Estate, the officers have been aware of the method used for taking ple and identifying the pest and disease attacking palm oil plant. der to anticipate the palm oil leaf eater attack, company was planting beneficial plants such as Turnera Subulata and Antigonon leptosus. Furthermor r to prevent rats attack, company was monitoring the existence of barn owl box monthly (there are 61 barn owl box in Betung Estate and 44 barn owl b yu Estate). According to the inspection on barn owl box in block B44 and B45 of Betung Estate; and in block E25 and E26 of Sekayu Estate, there s of Tyto alba existence refer to the bones of its prey and the owl feather. agement unit has conducted monitoring of pesticide usage per Ha and per ton of FFB which is reported monthly in each estate refer to the type o cide used by, active substance, unit (liter or kg), and period of its usage. Status: Full Compliance ochemicals are used in a way that does not endanger health or the environment. There is no prophylactic use of pesticides, except in spe ations identified in national Best Practice guidelines. Where agrochemicals are used that are categorized as World Health Organization Typ B, or are listed by the Stockholm or Rotterdam Conventions, growers are actively seeking to identify alternatives, and this is documented. agement unit is able to show the list of pesticide used by company. According to the result of field visit to the pesticide warehouse in Betung Estate yu Estate, entire of the agrochemicals substances used by company have been registered and allowed by the authority (government agency) refer to tration code written on the agrochemicals containers. Record of the pesticide usage is written on the Document of Pesticide Usage Per Hec toring. It describes the total volume of the pesticide used by company, number of applications and quantity of the pesticide used by company. agement unit has had MSDS (Material Safety Data Sheet) for each of the type of agrochemicals (pesticide). It was describing the guideline of its sto od and substance handling, handling when accident occured (first aid action), danger identification, physical and chemical property, reactivity and sta ology information, ecology information, waste disposal, and its transport. The usage of agrochemicals was referring to the dosage recommendation w e label of each type of pesticide and the applied budget. According to the field visit to Division 2 of Betung and Sekayu Estate, the dosage for spraying and interrow was 0.25 liter /Ha. In order to manage the pesticide containers, company was managing the pesticide containers by washing the ex-pest ainers and then collecting the ex-pesticide containers and then transporting the ex-pesticide containers to the licensed hazardous waste storage in Be It was proven by the result of the field visit to the Sekayu and Betung Estate. agement unit has held regular medical check up for the employees whom working closely with chemicals. The latest medical check up was hel pany on July 6th 2014. According to the result of medical check up, entire employees were in good condition and ready to work. The medical check up sing on Spirometri and Cholinesterase along with the physical medical check up. Furthermore, according to the result of field visit to Division 2 of Se Betung Estate, there was no pregnant nor breastfeeding women workers whom work as sprayer. The employees have been aware of the policy her pregnant or breastfeeding women are not allowed to work with chemicals. Status: Full Compliance ccupational health and safety plan is documented, effectively communicated and implemented. Page 20 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT agement unit has had OHS policy on December 2011 which was describing that Plantation Upstream Indonesia has committed to provide and mai y and healthy work environment by implementing effective management to prevent work accident to be occured and create healthy work environm rding to the result of interview with employees in Sekayu and Betung Estates, the commitment has been socialized to the employees each mor ng and by installing posters and signboards in term of safety work practice. Furthermore, company was holding trainings in term of OHS. agement unit has formed OHS Guiding Committee in each management unit (Betung Mill, Sekayu and Betung Estate) and it has been legalize baru District Manpower and Transmigration Agency. According to the document review, management unit has informed the report of OHS Gu mittee routinely (each quarter). The report of OHS Guiding Committee covers entire OHS programs such as OHS Guiding Committee Recomenda t of work accident investigation, recapitulation of work accident, report of OHS Guiding Committee program, report of employees medical check up tes of meeting of OHS Guiding Committee assembly (monthly). agement unit has registering entire permanent employees (SKU H and SKU B) on the Labour Social Assurance program which covers the work acc ance, death insurance, and pension insurance. According to the result of document review and interview with the labour union, harvester, and treat oyees in Division 2 of Betung and Sekayu Estate, entire employees have been registered to the Labour Social Assurance Program. rding to the result of document review and interview with workers in Betung Mill and workers in Division 2 of Betung and Sekayu Estate during the the management unit has conducted medical check up for the high-danger risk workers. The latest medical check up for treatment employees ucted on July 6th 2014 and for mills employees, it was conducted on May 5th 2014. It was authorized by Mandiri Healthycare Clinic, Kotabaru. Acco e result of medical check up, the employee was healthy. agement unit has had document of risk analysis for OHS program. The document was compiled to support dangers potential analysis and identific n entire company operational area and to minimize the work acident as well. According to the result of document review and field visit to mill and es pany has conducted socialization of risk analysis document to entire employees. Company has evaluated the socialization on the morning briefing. rding to the result of field visit to Division 2 of Betung and Sekayu Estate during the field visit, the management unit has provided PPE for employees mple, harvester was given helmet, glasses, and gloves. According to the result of field visit, the foreman has also equipped with first aid kit and there aid kit in Betung Mill. The foreman has also aware of the method to conduct the first aid action and the foreman will then transport the victim to the polic treated by estate medical assistant. Furthermore, there were informations when emergency situations occured such as earthquake and so on. Acco e result of field visit to Betung Mill, there was gathering area when emergency situation occured, evacuation route, and 4 monthly-monitored hydr ng the field visit, the auditor team has conducted fire simulation and entire fire extinguishing equipments were well functioned as well as the competen re team when handling fire. agement unit has consistently monitored the work accident and completely inform it. It was informing the month of the incident, number of case, dent location, type of work accident, impact, missing work hours, causes, follow up, and the result. Work accident was monitored monthly. Evaluation on accident was also conducted by OHS Guiding Committee each quarter. The analysis was conducted by making safety statistic to recognize the cau accident. According to the result of analysis, the main cause of the work accident was the employee recklessness at work. Preventive and corre n conducted by company were HIRAC socialization, and implementation of regular briefing in term of work accident. Status: Full Compliance taff, workers, smallholders and contractors are appropriately trained. agement unit has had program of POM and Estate employees training in PT LMI as written on the program of training & matrix of training identificatio d of 2014 – 2015. For example, IPM training, training of beneficial plants planting, training of bagworm control, training of barn owl box installation, tra PE implementation, training of OHS, training of first aid simulation, training of fire extinguishing program, etc. hermore, management unit has shown the evidence of Betung POM and estate training implementation. For example: IPM training which was conducted on January 31st 2015, the trained materials were identification of bagworm attack, selective method to co bagworm attack chemically; and method to control bagworm attack biologically. The training attendants were BTE supervisors. (Photographs available). Health & Safety briefing training which was conducted on January 18th 2014. The attending participant was Betung POM Grading Team. The tra materials were the procedure of work; PPE usage; HIRAC; accident alert; and prohibition. agement unit has committed to cooperate with well trained contractor. The company was able to show the memorandum of Sungai Durian Estate ber GM-est/008/SD/VII/2013/M dated July 11th 2013 in term of local tender process. According to the point 1m the chosen contractor must show record. SPO – 4006a.5 Page 21 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Status: Full Compliance NCIPLE #5 Environmental responsibility and conservation of natural resources and biodiversity ects of plantation and mill management, including replanting, that have environmental impacts are identified, and plans to negative impacts mote the positive ones are made, implemented and monitored, to demonstrate continuous improvement. MI (Betung and Sekayu Estate) has had document of Environment Impact Assessment which covers the Document of Environment Impact Assessm Report, Document of Environmental Management and Monitoring Plan for the scope of study: a. EIA Document, Legalization of Agriculture Department, Division of Agribusiness Number 008/ANDAL/BA/II/1995, dated February 27th 1995 which compiled by PT. ANIMA REKAYASA PERKASA, Jakarta. The document is valid for the estate area of PT. Laguna Mandiri, PT. Langgeng M Makmur, PT. Paripurna Swakarsa and PT. Swadaya Andika. The capacity of each mill is 60 Ton of FFB / Hour. b. Betung POM; Betung POM is the second mill of PT LMI and it has had EIA documents which have been approved by Commision of Assessor Technical Team of EIA of Kotabaru District with legalization Number 660/22/BLHD-AMDAL, dated August 20th 2010. It was compiled by Facu Forestry, Lambung Mangkurat University, South Kalimantan for the Plan of Palm Oil Mill Establishment of PT LMI with hectarage for 20 Ha capacity up to 60 Ton of FFB / Hour. It has been legalized by Kotabaru Regent refer to the Legalization Letter Number188.45/293/KUM/2010 in ter Environment Suitability for Palm Oil Mill Establishment in North Pamukan Sub-District, Kotabaru District, South Kalimantan. agement unit has compiled the Report of Environmental Management and Monitoring Plan Implementation of PT LMI Estate and POM as follow: It has been reported to the associated agencies (Regional Environment Agency of Kotabaru District) on 2nd Semester of 2013 (July – December 2013 February 26th 2014 refer to the evidence of its handover received by Kotabaru District Environment Agency Officer (Mr. H. Syahrudin, S.Sos). It has been reported to the associated agencies (Regional Environment Agency of Kotabaru District) on 1st Semester of 2014 (January – June 2014 September 29th 2014 referring to the evidence of its handover received by Kotabaru District Environment Agency Officer (Mrs. Hj Wardiah, M.Kes). ort of Environmental Management and Monitoring Plan has been compiled by referring to the parameters of environmental management and monito legalized by Kotabaru Regent via Legalization Letter Number 188.45/293/KUM/2010 in term of Environment Suitability for Palm Oil Mill Establishme h Pamukan Sub-District, Kotabaru District, South Kalimantan. Status: Full Compliance status of rare, threatened or endangered species and high conservation value habitats, if any, that exist in the plantation or that coul cted by plantation or mill management, shall be identified and their conservation taken into account in management plans and operations. ord of the result of identification of the protected species was written on the document of PT LMI HCV assessment for Rantau estate, Matalok es yu estate and Betung estate. According to the result of HCV identification conducted by ISPOF (Indonesia Sustainable Palm Oil Foundation) on Decem , there were forest-identificed and HCV-identified area. rding to the result of interview with foreman 1 of Division 3 of Betung Estate and field visit to HCV 4.1 and HCV 5 area of Pinang River and the ne t area, there are still many of wildlife found such as Bekantan (Nasalis larvatus), Beruk (Macaca nemestrina), Freshwater Crocodile, Skunk, and Deer. of the effort for protection over the species and habitate included on HCV is by conducting socialization and installation of HCV area signboard. rding to the result of interview with employees on February 16th – 17th 2015, (Harvester, Manuring, Chemist Operator, people of Betung Viilage yu Village) socialization over the protected wildlife and HCV area has been routinely conducted by company. There is no wildlife hunting nor trap ucted by employees and community. board and posters which informing the protection over wildlife and habitate. Page 22 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Figure 7. Sign Board of forbidden hunting Figure 8. Sign Borad HCV 4.1 dan HCV 5 Riparian Zone of Pinang River Figure 9. Sign Board of HCV 3 Figure 10. The condition of Pinang River Riparian Zone S Figure 11. Rabah Cave (HCV 3), located outside HGU area Officer in Estate Management are: CV Officer of Betung Estate unit refer to the Decree of Manager Number EST-Int/099/X/2014, dated October 13th 2014. CV Officer of Sekayu Estate unit refer to the Decree of Manager Number 004/SYE-Int/IV/2014, dated April 1st 2014 in term of HCV Foreman Prom ee. Evidence that the officers have been well trained are proven by HCV Identification they conducted on 2009 in form of their involvment on cting program conducted by ISPOF. Status: Full Compliance te is reduced, recycled, re-used and disposed of in an environmentally and socially responsible manner. agement unit has conducted waste source identification and stages to manage the generated waste. For example: Hazardous waste is placed in permitted hazardous waste storage. Domestic was is disposed to landfills. The ex-pesticide containers are collected in permitted hazardous waste storage and then it will be delivered to the licensed collector. Effluent generated by mill processing stage is utilized for land application. Solid waste (shell and fiber) is utilized for diesel fuel substitution. Page 23 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT rding to the result of field visit and document verification, management unit has implemented waste management by referring to the applied plan mple: Betung Mill - Company has permits of hazardous waste storage in PT LMI POM, North Pamukan Sub-District, Kotabaru District by referring to the Decre Kotabaru Regent Number 188.45/883/KUM/2014 dated Deceber 5th 2014 which was describing the permits of hazardous waste storage as desc by Diktum KESATU was granted to: Company Name : PT Laguna Mandiri Betung Factory Address : North Pamukan, Kotabaru District Type of Business : Palm Oil Estate and Palm Oil Mill Location of Business : North Pamukan, Kotabaru District Type of Waste : Used Oil, Rag and Used Gloves, Used Filter, Used Battery, Laboratory Waste, Elector Waste, Pesticide Containers, Used TL Lamp. Hazardous waste Coordinate and : Effluent storage on Coordinate storage size S :020 22’40.0”, E: 1160 12’21.3” Size 7m X 5m X3m Source of Waste : Business Operational - According to the result of field visit to Betung Mill, the shell and fiber were re-utilized as boiler fuel. According to the field visit to Betung Mill WWTP pool and Betung Estate LA area, the effluent was applied to the land. According to the field visit, the empty fruit bunch was applied to the land. Betung Estate and Sekayu Estate - According to the interview with workers and their families, the domestic waste was transported by company once a week to be disposed to landfills - According to the field visit to hazardous waste storage, entire of the generated hazardous waste storage was collected in the licensed Betung hazardous waste. - Medical waste was managed by cooperating with Sengayam Public Health Center (West Pamukan Sub-District) with Cooperative Agreement L Number 445/02/VII/TU-PUSK which was agreed for period of July 16th 2014 to June 16th 2015. According to the result of field visit, medical w was transported once a month to the central policlinic. - According to the result of field visit to BTE Clinic, there were medical waste storage symbolized “Infectious Waste”. - Furthermore, there was official record of medical waste delivery from Betung Estate Policlinic to Central Policlinic on January 23rd 2015. There 10 types of medical waste, spuit 3 cc, neddle, vial kb, vial neuro, flabot infus, infus set, bisturi, needle and medicine package. hazardous waste was still stored by company untill ASA-1 audit (have not yet delivered to the licensed collector). However, the company was still ab w hazardous waste monitoring and hazardous waste balance sheet. Furthermore, according to the result of field visit to Block J39 of Division 03 of Be e, the landfills was in full capacity and has not yet hoarded by company. It did not run properly referring to the result of waste identification, the dom e was one of the waste type that should be managed. SOP of domestic waste management (097/LMI-DOM-2013 dated October 1st 2013) was descr the non organic domestic waste such as plastic, metal, can, glass and other solid materials should be hoarded when the landfills has reached it city. Nonconformity Number 2015.02 on the Major Indicator 5.3.2 ication on February 19th 2015 ng Estate management has conducted corrective action over the landfills by hoarding the landfills in Block J39. The delivered evidence in form of O ord of the old landfills hoarding and new landfills hole digging. Therefore, the auditor team considers that Nonconformity Number 2015.02 on the M cator 5.3.2 has been Closed Status: Full Compliance iency of energy use and use of renewable energy is maximized. agement unit has had record of renewable energy usage monitoring along with the efficiency analysis as follows: Page 24 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 ONTH PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT PROCESSED FFB SHELL FIBER kg Kg /KWH kg Kg /KWH TOTAL of Kwh ptember 7,952,277 516,898 4,135 1,415,505 42,465 46,600 ctober 6,797,915 441,864 3,535 1,210,029 36,301 39,836 vember 9,027,740 586,803 4,694 1,606,938 48,208 52,903 cember 11,895,746 773,223 6,186 2,116,253 63,488 69,673 Total 106,422,239 6,917,446 55,340 18,885,936 566,578 621,918 pany has provided the record of petroleum fuel usage monitoring for the reference of operational purpose along with the efficiency for period of Janua ust 2013 as written on the tabel below: Month ptember ober vember cember Total Kwh TURBIN 204,142 188,481 273,343 320,367 2,462,468 Total Kwh Generator 60,184 57,760 51,511 58,212 839,538 TURBIN & Generator 264,326 246,241 324,854 378,579 3,302,006 Efficiency 143,958 130,721 221,832 262,155 1,622,930 calculation of diesel fuel efficiency and retrenchment for the period of 2014 is shown below: Month ptember ober vember cember Total TOTAL KWH TURBINE & EFFICIENCY GENERATOR RETRENCHMENT KWH / KG of FFB DIESEL FUEL Diesel Fuel Retrenchment Ltr / Kwh Diesel Furel Price (IDR 12,000) 264,326 246,241 324,854 378,579 143,958 130,721 221,832 262,155 0,018 0,019 0,025 0,022 20,825 21,265 19,108 17,050 377 409 470 376 4,523,875 4,907,002 5,634,322 4,508,915 3,302,006 1,622,930 0,015 19,108 291 51,207,841 Status: Full Compliance of fire for waste disposal and for preparing land for replanting is avoided except in specific situations, as identified in the ASEAN guideline r regional best practice. agement unit has policy of zero burning written on the procedure of land preparation. The procedure was supported by Manual SOP with Policy Num PTK-LPG/2004 Index Number II/04, dated December 1st 2004. On the SOP, entire land clearing program must refer to the Decree of Plantation Direc eral Number KB.110/SK/DJ BUN/05.95 dated May 30th 1995 in term of technical guideline of land clearing mechanically. Meanwhile, in order to man estic waste in housing complex of Betung and Sekayu Estate, the management unit was collecting the was in one garbage bin and then the waste w ported to the landfills. It was supported by the result of field visit to housing complex in both estates. rding to the result of field visit, document review, and interview with management unit, there was a land fire occured in 2014, specifically in October with the hectarage of the burned area was 0.2 Ha and the number burned plants were 27 plants. According to the result of investigation, the fire ed by the community whom was burning the land and the wind which directing the fire right to the Block H30. The action conducted by fire team guishing the fire as soon as possible. Therefore, the land fire was totally handled at 6 P.M. The preventive action conducted by company wa ucting socialization to the community in term of the prohibition to burn the land. Company has reported the land fire the the associated agencies. agement unit has conducted identification of the high-potential fire area. According to the identification, most of the high-potential fire area are the Page 25 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT h directly adjacent to the community’s estate. Furthermore, company has conducted mapping of the water source that can be used for supporting the . According to the water source mapping program conducted by company, there are 21 water sources in Betung Estate and 6 water sources in Se e. agement unit has facilities to handle the fire by referring to the risk level. The facilities are monthly monitored. According to the result of inspection ove ies warehouse, the facilities are well functioned. Status: Full Compliance s to reduce pollution and emissions, including greenhouse gases, are developed, implemented and monitored. agement unit has had the result of emission source’s identification and management of PT LMI as shown on the tabel below: Location Betung POM Emission Source Boiler Generator POME Land Clearing (if exist) Manuring Betung and Sekayu Estate Diesel Fuel Usage Transportation POME Industrial Waste Domestic Waste Type of Emission Management CO2, partikulat, NO2, SO2, Regular air quality monitoring debu and measurement, and preventive maintenance CO2 Regular air quality monitoring and measurement, and preventive maintenance reforestration, diesel fuel usage CO2 Plan of methane trap usage CO2 Zero burning policy for entire land program CO2 dan NO2 Fertilizer usage reduction and empty fruit bunch application to reduce fertilizer CO2 Diesel Fuel Reduction CO2 Regular emission test CH4 Plan of methane trap usage CO2 No burning conducted CO2 No burning conducted rding to the result of document verification, management unit has conducted: - Routine air quality test twice a year and reporting the result of test on the report of Environmental Management and Monitoring Plan. According to result of the test, the substance of NO2, SO2 and CO in the location of the test was still below the quality threshold. - Noise and vibration intensity tests in Boiler Station, Engine Room Station, Pressing Station, Loading Ramp Station, Office Front, and Kernel St were conducted. According to the result of laboratory test, there was noise parameter exceeding quality threshold in Kernel Station. The conducted by company to reduce the bad impact was by providing proper PPE (ear plug and ear muff) for the employees stationed in the high-n station. - Non-Moving Emission Source Test was conducted by Banjarmasin Safety Work and Hyperkes Department. According to the test result, there wa air emission parameter exceeding the determined quality threshold. e effluent were processed on the POM WWTP ponds. The effluent must have pH 5 – 9 and BOD ≤ 5000 mg/l before it can be used for land applica TP management was conducted by company using biological system through anaerob process, aerob process, and control pool. Effluent from the W outlet was then pumped and flowed to the location determined by company. company has had permit for using effluent to the land in PT LMI estate, N ukkan Sub-District, Kotabaru District refer to the Decree of Kotabaru Regent number 188.45/884/KUM/2014 which was legalized on December 5th valid for 5 years. Hectarage of the land permitted for land application program was 180.3 Ha. It was located on Block J35, J36, I34, I35, I36, I37, H33, H36, and H37. Method of effluent utilization was using irigation method and Flatbed system. According to the result of the test conducted by laborato earch Department and Industry Standardization of Banjarbaru District with acreditation number LP-543-IDN, there was no parameter of the eff eding the quality threshold. pany also conducts monitoring well water quality to ensure that the effluent used for land application was no contaminating water. According to the res Page 26 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT est conducted by laboratory of Research Department and Industry Standardization of Banjarbaru District with acreditation number LP-543-IDN, there arameter of the monitoring well water exceeding quality threshold. Status: Full Compliance NCIPLE #6 Responsible consideration of employees and of individuals and communities affected by growers and mills ects of plantation and mill management, including replanting, that have social impacts are identified in a participatory way, and plans to miti negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate the continuous improvement. e was no differences of the management unit owned documents since ST-1, ST-2 and Surveillance-1. The documents were: 1. Report of PT LMI Social Impact Analysis which was conducted by Indonesia Sustainable Palm Oil Foundation (ISPOF) on 2010 was creating se recommendations such as: a Assigned person / division to communicate with the stakeholders. b Compiling SOP of External Communication as reference for public relation to communicate with stakeholders. c Forming Specific Division to handle CD/CSR. d Creating more participative and sustainable CSR programs. The compilation of the Document of Social Impact Assessment has involving the nearby community with FGD (Forum Group Discussion) method. 2. Record of management /monitoring of social impact analysis result for period of 2011 has considering the impacted-parties, social management compilation was conducted by company’s involvment on Forum of Planning and Development in Sungai Durian Sub-District on February 15th and the assembly between company with Mangka Village representative on April 4th 2011. 3. Environment Impact Analysis of POM within PT LMI Estate Area (Betung Mill), according to the Decree of Kotabaru Regent Num 188.45/293/KUM/2010, dated July 13th 2010 with the scope of study up to ± 20 Ha and Mill Capacity up to 60 ton of FFB/hour). der to reduce the negative effect and improve the positive impact over social aspect, the management unit used the data of Forum for Planning elopment as reference for compiling CSR plan. For example, according to the result of Ekayu Village Forum for Planning and Development for perio , there were plans for adding new classroomin at Sekayu Baru Secondary School (3 locals), provision of village electricity, and construction of produ . Meanwhile, the result of Betung Village Forum for Planning and Development was to increase to honorarium of the village apparatus. ord of impact management and monitoring conducted by management unit was written on the report of Environmental Management and Monitoring h was reported to the Kotabaru District Environment Agency. The report of Environmental Management and Monitoring Plan has described the s ct management and monitoring such as community’s restlesness, workforce absorption, and increase of income. It was all the result of questionn adt by company to the community. e was no revision of social management untill surveillance 1 due to there was no changes on the scop of operations implemented by management managed and monitored social economy aspects were: Social aspect such as population growth, community’s health, community’s perception Economy aspect such as smallholders business scheme, job opportunity, employees and community’s income e was a report of the implementation of Environmental Management and Monitoring Plan in 1st Semester of 2014 (January – June 2014 which has rted to the Kotabaru District Environment Agency, there was evidence of the agency’s receipt over the document. Meanwhile, the report of Environm agement and Monitoring Plan has not yet reported to the associated agencies due to late of Hyperkes Data.. aguna Mandiri does not has scheme smallholders. However, Minamas Plantation has conducted scheme smallholder establishment that is specifi aged by KKPA Sungai Cengal Management. rding to the data of KKPA Areal Statement, the scheme smallholders program has been realized for 2,385.50 Ha. Menawhile, for the area nearby PT ealized scheme smallholders program in Bepara Village was 157.57 Ha of the 585 Ha of the planned area. Status: Full Compliance e are open and transparent methods for communication and consultation between growers and/or millers, local communities and other affe terested parties. Page 27 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT agement unit has had SOP of Complaint Handling Procedure for Entire Parties (060/LMI-RAM/2012) which was used as a guideline to handle plaint over PT LMI operation sent by stakeholders to Operational Unit. Furthermore, management unit has had Procedure of Communication (058/ 2010) dated December 16th 2010 and Procedure of Information Request (012/LMI-PI/2010) dated December 16th 2010 as reference for communic several parties. agement unit was also able to show the record of communication and consultation with the community. For example, by participating on the Forum ning and Development for period of 2014 and 2015. The result of forum discussion was used as legal standing for compiling company’s CSR program. agement unit has the list of partner stakeholders for managing estate. Those are Sub-District Apparatus, Village Apparatus, Hamlet, Police, Hos ernment Agencies, Pers, NGO, Supplier and Contractor. ord of community’s aspiration and management response is written on the book of incoming letter and response letter to the stakeholders. There wer s sent by stakeholders during period of 2014. Most of the letter contains assistance request for fund, assistance request for equipment, assistance req e clean water, assistance request for ambulance, and other assistance requests. agement unit has appointed incharge personnel for responding information request from the parties outside (Head of Administration). Acording to view with the Chief of Village, Village Apparatus, and community in Sekayu and Betung Cillage, they have had the telephone number of the offic ge to conduct communication and consultation with the community. Status: Full Compliance e is a mutually agreed and documented system for dealing with complaints and grievances, which is implemented and accepted by all partie agement unit has had procedure to receive complaint and solve the complaint with the parties. Those are: SOP of Complaint Handling for All Parties (060/LMI-RAM/2012). The purpose was to guide the management unit to overcome the complaints sen parties or stakeholders over the PT LMI operation. SOP of Conflict Management (059/LMI-PK/2010). The purpose was to guide the management unit to overcome the dispute occured with the commun erm of land acquisition and other traditional rights. rding to the result of interview on February 16th 2014 with the Chief of Betung and Sekayu Villages and the communities as well, there was no compl m of estate nor mill operational. edure of compensation was regulated on the Procedure of Land Acquisition on the Occupied Land Number 343/PSD-OKUP/11 dated February 23rd 2 procedure regulates the future-acquisitioned land on the occupied land, negotiation with the land owner, map of compensation, map of the main isition, Citizen ID (KTP), Compensation Receipt, documentation of land compensation, waiver, official record of the forum, recapitulation of pensation, formulir of land inventory, plants and other businesses, report of land acquisition payment in estate, soil sketch, land certificate, declaration l land ownership. Furthermore, management unit has also procedure in term of compensation which was written on the procedure of conflict managem /LMI-PK/10) dated December 16th 2010. According to point 6 (Forum), it must involve Estate Manager, PSD, Land Owner, Village Apparatus, and or H ub-District Forum along with the research division for its measurement. The result of the forum was the agreement of the compensation value and pay ning. It was also supported with the evidence of payment along with the Official Record of Forum. Status: negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that ena genous peoples, local communities and other stakeholders to express their views through their own representative institutions. rding to the result of interview on February 16th 2015 in Sekayu and Betung Village, there was no traditional right within Sekayu and Betung Es ever, there was community’s land that was planted with rubber and agroforestry commodities in order to make a living. e community’s land is considered as enclave area. Entire of the identified enclave area have been mapped on the Sekayu and Betung Estate operat . of enclave area in BTE and SYE is 1,076.66 Ha, the area is considered as the area excluded from PT LMI Land Use Title area. Land compens ment on the process of Land Use Title achievement was conducted during period of 1995 – 2003. Entire data are provided on the office of PSD (Plant ice Department) Status: Full Compliance and conditions for employees and for employees of contractors always meet at least legal or industry minimum standards and are sufficie Page 28 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT ide decent living wages. wage in PT LMI was referring to: Decree of South Kalimantan Governor Number 188.44/0595/KUM year 2013, dated December 24th 2013 in term of South Kalimantan Sec Minimum Wage Standard for period of 2014 was IDR 1,675,000. Memorandum of HRM General Manager in term of Daily Permanent Workers Payment and Monthly Permanent Workers Payment Structure for pe of 2014 in South Kalimantan. Memorandum of Sungai Durian Estate GM in term of contract workers that was determined for IDR 67,000/day (IDR 1,675,000/25 day) which since January 1st 2014. Decree of South Kalimantan Governor Number 188.44/0633/UM/2014 dated December 16th 2014 in term of Minimum Wage Standard for perio 2015 was as much as IDR 1,913,000 rding to the result of employees list review and interview with management unit, there is no employees wage below the determined sectoral wage stan to the Decree of South Kalimantan Governor for IDR 1,675,000. The minimum wage standard for period of January 2015 has not yet still complied to minimum wage standard for period of 2014) by management unit due to the unissued Morandum of HRM General. However, the rest of unpaid w 238,000) standard for period of 2015 will be calculated to be paid to employees. For example: ayu Estate: Leto, Harvester. Wage on January 2015: IDR 1,675,000 Premium 10,501, Social Assurance (Company’s expense): IDR 82,174, Rice: IDR 262 Gross Income: IDR 2,029,755. First Wage Period + deduction: IDR 250,000, Total of Social Assurance: IDR 118,374, Allowance: IDR 262,080, To Deduction: IDR 630,454, Nett Income: IDR 1,399,301. Opi Pobutangan, Wage on January 2015: IDR 1,675,000. HRV Premium: IDR 1,149,360, Non HRV Premium: IDR 191,600, Social Assur (Company’s expense): IDR 82,174, Rice: IDR 430,704, Gross Income: IDR 3,438,838. First Wage Period + deduction: IDR 468,675, Total of S Assurance: IDR 118,374, Allowance: IDR 340,704, Total of Deduction: IDR 927,753, Nett Income: IDR 2,511,085. ng Estate: Suna, Plant Treatment Employees. Wage on December 2014: IDR 1,675,000. Non HRV Premium: IDR 200,000, Social Assurance (Compa expense): IDR 81,629, Rice: IDR 125,085, Gross Income: IDR 2,081,714. Tax Income Clause 21: IDR 13,550, First Wage Period + deduction: 250,000, Total of Social Assurance: IDR 117,589, Allowance: IDR 125,085, Total of Deduction: IDR 506,224, Nett Income: IDR 1,575,490. Sukidi, Plant Treatment Employees. Wage on December 2014: IDR 1,675,000. Social Assurance (Company’s expense): IDR 81,629, Rice: 200,136, Gross Income: IDR 1,956,765. Tax Income Clause 21: IDR 3,200, First Wage Period + deduction: IDR 250,000, Total of Social Assura IDR 117,589, Allowance: IDR 200,136, Total of Deduction: IDR 570,925, Nett Income: IDR 1.385.840. ng Factory: Noor Ipansyah, Security Officer. Wage on January 2015: IDR 1,752,355. Overtime: IDR 3,234,695, Social Assurance (Company’s expense): 92,292, Rice: IDR 399,110, Gross Income: IDR 5,478,452. First Wage Period + deduction: IDR 300,000, Total of Social Assurance: IDR 130 Allowance: IDR 399,110, Total of Deduction: IDR 829,149, Nett Income: IDR 4.649.303. Rano, Security Officer. Wage on January 2015: IDR 1,702,505. Overtime: IDR 3,606,974, Social Assurance (Company’s expense): IDR 89,854, R IDR 270,365, Gross Income: IDR 5,668,698. First Wage Period + deduction: IDR 300,000, Total of Social Assurance: IDR 126,604, Allow Rp270.365, Total of Deduction: IDR 696,969, Nett Income: IDR 4,971,729. or the legal standing of cooperation between company with the workers, company has had Cooperative Labour Agreement which has been legalize ring to the Decree of the Head of Kotabaru District Manpower, Transmigration, and Social Agency Number 568/KEP-1511/HIPK/PDF.PKB/VIII/Na 13 dated December 31st 2013 in term of Registration of Cooperative Labour Agreement between PT Minamas Gemilang with the Labour Unio mas Plantation, Sungai Durian Area Labour Union, and Sungai Pamukan Area Labour Union (PT Laguna Mandiri Labour Union is a part of Sungai Du Labour Union of Minamas). rding to the result of field visit, management unit has been providing shelter, education, clean water, and other public facilities such as place of wo sport hall. According to the result of field observation, the company-provided facilities are accessible. rding to the result of document verification and interview with contractor, the contract of cooperation with the management unit has required contract ort Minamas plantation policy in term of OHS-zero work accident and required contractor to comply the applied OHS standard as part of manp ation. It was referring to the Clause 10.4 in term of manpower aspect. The termination of contract was written on Clause 10.5 in condition that there Page 29 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT tion over Clause 10.3 and 10.4. Status: Full Compliance employer respects the right of all personnel to form and join trade unions of their choice and to bargain collectively. Where the right to free ssociation and collective bargaining are restricted under law, the employer facilitates parallel means of independent and free association aining for all such personnel. rding to the document of Guideline of Sustainable Estate Management (No. POLICY: 724/TQEM-SPM/09) which was issued by Minamas Plant agement since November 8th 2010 in term of Social Policy point 5, company was expected to respect entire rights of the employees for forming and jo ur Union and company was expected for willing to negotiate with them as well. hermore, the policy in term of Labour Union was also regulated on clause 5, clause 6, clause 7, and clause 8 in term of company’s recognition over La n and vice versa, Facilities Provided to the Labour Union, and Industrialist Dispensation to the Board of Labour Union. r the implementation of the policy, the company showed: - Record of Labour Union of Kotabaru District Manpower, Transmigration, and Social Agency Number 568/100/SP/Dissosnakertrans dated Febr 26th 2013 for Labour Union in Sekayu Estate - Record of Labour Union of Kotabaru District Manpower, Transmigration, and Social Agency Number 568/099/SP/Naker-2/2013 dated December 2013 for Labour Union in Betung Estate - Labour Union of Kotabaru District’s Manpower, Transmigration, and Social Agency Number 568/100/SP/Naker-2/2013 dated December 18th 201 Labour Union in Betung Mill ce, labour union within PT LMI operational area has complied with Clause 2 Verse 1 of RI Manpower Agency Decree Number 16/MEN/2001 d uary 15th 2001 in term of Labour Union Recording Procedure. pany has shown the evidence of assembly with the Labour Union. For example: - Offical record and minutes of meeting of the assembly between Betung Estate Management with the Betung Estate Labour Union on July 5th 20 term of eid mubarak day off replacement. - Record and minutes of meeting of the assembly between Betung Mill Management with the Betung Mil’ Labour Union in term of employee’s medication, permit of the head of labour union in term of socialization of minimum wage standard of reimbursement of employees wife medication. - Offical record and minutes of meeting of the assembly between Sekayu Estate Management with the Sekayu Estate Labour Union on November in term of Kotabaru Minimum Wage Standard development. Status: Full Compliance dren are not employed or exploited. Work by children is acceptable on family farms, under adult supervision, and when not interfering cation program. Children are not exposed to hazardous working conditions. pany policy in term of workers minimum age requirements was written on the policy Number 028/PSQM-UM/VII/2012 dated December 2011 in ter al policy which was describing that Plantation Upstream Indonesia did not allow the recruitment of underage workers or slave. Furthermore, managem has memorandum in term of Children Protection Policy Number PUD-UM-121/VI/2010 dated June 7th 2010 which was regulating the prohibition to rage workers refer to the Manpower Statute. rding to the PT LMI employees data on January 2015, the employees age is about 18 – 47 years old. Furthermore, according to the field visit and inter sprayer and manurer in Division 2 of Betung and Sekayu Estate, there is no underage workers and the employees have aware of the minimum rement. Status: Full Compliance form of discrimination based on race, caste, national origin, religion, disability, gender, sexual orientation, union membership, poli ation, or age, is prohibited. y in term of equal opportunity and treatment was written on the policy Number 028/PSQM-UM/VII/2012 in term of social policy to treat entire emplo lly regardless their tribes, skin colour, gender, etc. Page 30 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT rding to the data of employee for period of January 2015, employees are coming from several regions such as Java, Sumatera, Maluku, NTB, and hermore, according to the result of field visit and interview with sprayer and manurer in Division 2 of Betung and Sekayu Estate, the company does rd the race, caste, nationality, religion, disability and etc. Status: Full Compliance cy to prevent sexual harassment and all other forms of violence against women and to protect their reproductive rights is developed ied. he document of Guideline of Sustainable Estate Management (No. POLICY: 724/TQEM-SPM/09) dated November 8th 2010 in term of social polic 4, it was described that company shall implement their policy to protect women workers away from sexual harasshment and protect their reprodu hermore, Management unit (Betung Mill, Sekayu Estate and Betung Estate) has had policy in term of Gender Committee which describes: . Company respects the right and obligation equality of the country citizen refer to Statute 1945 on Clause 4 and Verse 27. . Company respects the right of workers to form labour union refer to Manpower Statute Number 13 Year 2003 on Clause 104 Verse 1. . Company maintains the security of women workers in the workplace refer to the Manpower Statute Number 13 Year 2003 on Clause 76 Verse 3B. . Company prevents the sexual harasshment and any type of violation over women in order to protect their reproduction right refer to the RSPO P& indicator of Major 6.9. or the implementation of the policy, the Gender Committee was formed in the level of management unit and guided by Estate Manager. According to t of interview with the secretary and member of gender committee in Betung and Sekayu Estate, and Betung Mill, each employees have been aware o ific complaint delivery procedure in term of gender issue. Furthermore, according to the interview with sprayer and manurer in Divsion 2 of Sekayu ng Estate, and the Board of Gender Committee, there was no complaints in term of sexual harasshment and violation in household and women wo been aware of the procedure of report delivery when sexual harashment occured. policy in term of protection over reproduction right was written on the Collective Labour Agreement such as childbirth leave for 45 days before and 45 and they have right to receive 45 days leave when they experience misbirth refer to the doctor’s or midwife’s recommendation with full paid sa rding to the result of interview with the employees and the document verification, the policy has been implemented by company refer to the ap ation. Status: Full Compliance wers and mills deal fairly and transparently with smallholders and other local businesses. ng Mill receives only the FFB from estate (within one management) untill ASA-1. Status: Full Compliance wers and millers contribute to local sustainable development wherever appropriate. ribution of management unit over the regional development is implemented in form of CSR, and tax payment along with regional retribution. Accordin esult of document observation and interview with village apparatus along with community figure, the company’s contribution are implemente owering the workforce nearby, providing education assistance, empowering economy, scholarship, assistance for any villages event. Status: Full Compliance NCIPLE #7 Responsible development of new plantings omprehensive and participatory independent social and environmental assessment is undertaken prior to establishing new planting ations, or expanding existing ones, and the results incorporated into planning, management and operations. e is no new planting nor expansion over PT LMI estate area, the entire plants are located within the scope area of Land Use Title owned by PT LMI. e are documents such as; EIA Document, Legalization of Agriculture Department, Division of Agribusiness Number 008/ANDAL/BA/II/1995, dated February 27th 1995 which compiled by PT. ANIMA REKAYASA PERKASA, Jakarta. The document is valid for the estate area of PT. Laguna Mandiri, PT. Langgeng Muara Mak PT. Paripurna Swakarsa and PT. Swadaya Andika. The capacity of each mill is 60 Ton of FFB / Hour. The EIA Document Analysis was identifying crucial impact such as: - Land Acquisition SPO – 4006a.5 Page 31 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT - Land Clearing - Waste Disposal / Waste Management - Recruitment - Implementation of Estate Plants Cultivation System. The managed and monitored follow-up refer to the guidance of Environmental Management and Monitoring Plan Matrix are: - Air Quality - Soil Chemical and Physical Property - Erossion and sedimentation - Hydrology / flood - Effluent (liquid) - Vegetation and the protected wildlife - Community Restlesness - Job Opportunity - Community’s and Employees income - Agriculture business scheme nvironment Impact Analysis of POM within PT LMI Estate Area (Betung Mill), according to the Decree of Kotabaru Regent Number 188.45/293/KUM/2 ated July 13th 2010 with the scope of study up to ± 20 Ha and Mill Capacity up to 60 ton of FFB/hour). ecord of management /monitoring of social impact analysis result for period of 2011 has considering the impacted-parties, social management ompilation was conducted by company’s involvment on Forum of Planning and Development in Sungai Durian Sub-District on February 15th 2011 and ssembly between company with Mangka Village representative on April 4th 2011. eport of PT LMI Social Impact Analysis which was conducted by Indonesia Sustainable Palm Oil Foundation (ISPOF) on 2010 was creating se commendations such as: a. Placing person / division to communicate with the stakeholders. b. Compiling SOP of External Communication as reference for public relation to communicate with stakeholders. c. Forming Specific Division to handle CD/CSR. d. Creating more participative and sustainable CSR programs. compilation of the Document of Social Impact Assessment has involving the nearby community with FGD (Forum Group Discussion) method. e is no new area development within PT LMI estate area. Entire plant is located within company’ land use title area. Example of the socialization re the records of the estate establishment of PT LMI at the beginning. For example, document of socialization of estate establishment plan on Block D socialization was conducted in forum which was attended by estate representative, Public Service Department of Minamas Group, North Pamukan Di ernment and Village Community Representatives on May 1st 2007. There were also Official Record of Implementation and Attendance List. ord of the existed land compensation was a record of land compensation at the beginning of the estate establishment. Example of the record of pensation (report of land compensation over the occupied land stage IV including permits in the PT LMI Estate Area) for 34 Ha in Mangka Village, N ukan Sub-District, Kotabaru District on 1998 was supported with the document of the result of Forum between PT LMI and smallholders witnessed by C angka Village and the Head of North Pamukan Sub-District. There were also document of land waiver and evidence of compensation (receipt). Status: Full Compliance surveys and topographic information are used for site planning in the establishment of new plantings, and the results are incorporated s and operations. pany has conducted survey over the planting area before 2007 on 2005 and then followed-up by conducting Detail Soil Survey for Betung Estate on or Sekayu Estate on 2010. It was authorized to Minamas Reserch Centre (MRC), Minamas Plantation. According to the the result of both document, t no marginal soil within Betung and Sekayu Estate operational area. It was then described on the Internal Letter (No: 039/RST-BJB/06/2011, dated 2011) in term of BTE and SYE Marginal Soil Map. According to the description, there was no marginal soil in PT LMI. result of the survey was supported with Map of Soil Unit (SPT), Map of Land Slope, Map of Land Unit (SPL) and Map of Land Class with Scale 1:50 rding to the result of the detail soil survey on 2010 (Sekayu Estate) and on 2011 (Betung Estate), PT LMI (SYE ad BTE) operational area was domin ea with slope level between 3 – 8% which was covering 3,226 Ha or 53.67%. therefore, it shows that entire PT LMI operational area has slope level b (suitable for palm oil plant cultivation). e operational area of Betung and Sekayu Estate has been developed by considering the result of Soil Survey Monitoring in 2005 and then followed-u SPO – 4006a.5 Page 32 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT ucting Detail Soil Survey for Betung Estate on 2011 and for Sekayu Estate on 2010. Status: Full Compliance plantings since November 2005, have not replaced primary forest or any area required to maintain or enhance one or more High Conserva es. ing year of Sekayu and Betung Unit Estate was in period of 1994, 1995, 1996, 1997, 1998, 2007, 2009. Environment and Social Impact Assessment ucted on 1994. Meanwhile, Betung POM has had EIA since 2010. According to the result of EIA review, entire Betung POM and its Estate Sup ational area is not located within primary forest and the land is indeed purposed for palm oil cultivation refer to the spatial plan. Meanwhile, ification was conducted on 2009 where the HCV identified area was not planted with palm oil. Status: Full Compliance nsive planting on steep terrain, and/or on marginal and fragile soils, is avoided. rding to the result of the detail soil survey on 2010 (Sekayu Estate) and on 2011 (Betung Estate), PT LMI (SYE ad BTE) operational area was domin ea with slope level between 3 – 8% which was covering 3,226 Ha or 53.67%. therefore, it shows that entire PT LMI operational area has slope level b (suitable for palm oil plant cultivation). nd effort to manage the area with specific slope (by considering soil and climate condition), company has compiled SOP 724/TQEM-SPMS/09 d ust 27th 2010 which was legalized by CEO. Meanwhile, in order to monitor the erossion level, company has also compiled Guideline of Soil Ero surement Number 008/LMI-SYE/2010 which was legalized on December 16th 2010. Status: Full Compliance new plantings are established on local peoples’ land without their free, prior and informed consent, dealt with through a documented sys enables indigenous peoples, local communities and other stakeholders to express their views through their own representative institutions e is no new area development within PT LMI estate area. Entire plants are located within the scope of Land Use Title owned by company. Example o alization record was the records of the estate establishment of PT LMI at the beginning. For example, document of Socialization of estate establishm on Block D019. The socialization was conducted in forum which was attended by estate representative, Public Service Department of Minamas Gr h Pamukan District Government and Village Community Representatives on May 1st 2007. There were also Official Record of Implementation ndance List. Status: Full Compliance al people are compensated for any agreed land acquisitions and relinquishment of rights, subject to their free, prior and informed consent otiated agreements. e is no new area development within PT LMI estate area. Entire plants are located within the scope of Land Use Title owned by company. Record o ng land compensation was a record of land compensation at the beginning of the estate establishment. Example of the record of land compens ort of Land Compensation over the Occupied Land Stage IV including permits in the PT LMI Estate Area) for 34 Ha in Mangka Village, North Pam District, Kotabaru District on 1998 was supported with the document of the result of Forum between PT LMI and Smallholders and witnessed by Chi gka Village and the Head of North Pamukan Sub-District. There were also document of land waiver and evidence of compensation (receipt). Status: Full Compliance of fire in the preparation of new plantings is avoided other than in specific situations, as identified in the ASEAN guidelines or other regi practice. agement unit has policy of zero burning written on the procedure of land preparation. The procedure was supported by Manual SOP with Policy Num PTK-LPG/2004 Index Number II/04, dated December 1st 2004. On the SOP, entire land clearing program must refer to the Decree of Plantation Direc eral Number KB.110/SK/DJ BUN/05.95 dated May 30th 1995 in term of technical guideline of land clearing mechanically. Meanwhile, in order to man estic waste in housing complex of Betung and Sekayu Estate, the management unit was collecting the was in one garbage bin and then the waste w ported to the landfills. It was supported by the result of field visit to housing complex in both estates. rding to the result of field visit, document review, and interview with management unit, there was a land fire occured in 2014, specifically in October with the hectarage of the burned area was 0.2 Ha and the number burned plants were 27 plants. According to the result of investigation, the fire ed by the community whom was burning the land and the wind which directing the fire right to the Block H30. The action conducted by fire team Page 33 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT guishing the fire ASAP. Therefore, the land fire was totally handled at 6 P.M. the preventive action conducted by company was by conducting socializ e community in term of the prohibition to burn the land. Company has reported the land fire the the associated agency. agement unit has conducted identification of the high-potential fire area. According to the identification, most of the high-potential fire area are the h directly adjacent to the community’s estate. Furthermore, company has conducted mapping of the water source that can be used for supporting the . According to the water source mapping program conducted by company, there are 21 water sources in Betung Estate and 6 water sources in Se e. agement unit has facilities to handle the fire by referring to the risk level. The facilities are monthly monitored. According to the result of inspection ove ies warehouse, the facilities are well functioned. Status: Full Compliance NCIPLE #8 Commitment to continuous improvement in key areas of activity wers and millers regularly monitor and review their activities and develop and implement action plans that allow demonstrable continu ovement in key operations. e is a plan of management and monitoring refer to the result of social impact assessment on 2011 and it has considering the impacted parties. The s compilation was conducted by the involvment of company on the forum of planning and development of Sekayu and Betung Estate. According to the r erview with the Chief of Betung Village, Community and Apparatus of Sekayu Village, the company has been invited and participated on the foru e and sub-district level and the result of forum will be informed to the level of Kotabaru District. agement unit has conducted internal audit on January 21st 2015. It was conducted by internal audit team (according to the result of internal audit, th onformities have been corrected by PT LMI). Status: Full Compliance Summary of Assessment Report of Supply Chain Requirement 3.2. Clause 1 (Module D) CPO Mills - Segregation Requirements Documented Procedures 1.1 The facility shall have written procedures and/or work instructions to ensure the implementation of all the elements specified in these requirements. This shall include at minimum the following: a) Complete and up to date procedures covering the implementation of all the elements in these requirements. b) The name of the person having overall responsibility for and authority over the implementation of these requirements and compliance with all applicable requirements. This person shall be able to demonstrate awareness of the facilities procedures for the implementation of this standard. Betung POM has SOP of Supply Chain Certification System dated May 1st 2013: the document contains: a. Scope: The procedure is implemented started from the FFB receipt, production process, bulking station, and delivery process to the buyer; the supply chain implemented on the procedure is Segregation (SG). b. General Informaton Covers: - Description of Segregation. - Flow Chart of SG supply chain process. - Requirements of Supply Chain. c. Raw Materials Identification: FFB Covering Letter; Inspection on FFB Quality; Product Traceability. d. Special Condition when the mill receive FFB beyond the certified estate which is processed in same mill. Hence: - Document of weighbridge ticket must be separated (certified and non-certified). Page 34 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT - Making a quarter-based balance sheet over the CPO and Kernel production (certified and non-certified). Oficer in charge to implement the aplied requirements are: a. Mill Manager: - Maintaining entire documents and records associated with the raw materials usage for the production process. - Verifying the products delivered to the buyers refer to the document (invoice, Delivery order, sales contract, Official record of product delivery. - Holding the training of supply chain certification requirements for the entire involved staff. b. PSQM Assistant: - Inspecting the FFB quality in POM and making daily recapitulation. - Monitoring the product delivery and load / unload. c. Laboratory Assistant: - Analyzing and testing the raw materials and products in entire production process. - Maintaining and distributing the result of analysis and test of the raw materials and product. d. Assistant/Senior Assistant/Bulking Manager: - Monitoring the CPO and Palm Kernel Product transportation from POM to Bulking Station. - Handling CPO / Palm Kernel storage in Bulking Station Area. According to the result of interview with WB Operator and production clerk on February 16th 2015, they have aware of the certified supplier is marked by considering the stamp of RSPO Certified Segregation. Status: Full Compliance 1.2 The facility shall have documented procedures for receiving and processing certified and non-certified FFBs. Betung POM unit is receive and process only the certified FFB from Sekayu Estate and Betung Estate (RSPO-Certified). No uncertified raw materials allowed to be processed. Status: Full Compliance 2 Purchasing and goods in 2.1 The facility shall verify and document the volumes of certified and non-certified FFBs received. Betung POM unit is receive and process only the certified FFB from Sekayu Estate and Betung Estate (RSPO-Certified). No uncertified raw materials allowed to be processed. Page 35 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Status: Full Compliance 2.2 The facility shall inform the CB immediately if there is a projected overproduction. According to the attachment 1 of certificate of Betung POM (MUTU-RSPO/035) for period of April 1st 2014 – March 31st 2015, the claim of the certified products is as follow: FFB production total: 104,466 ton (BTE: 46,221 ton; SYE: 58,245 ton). CPO: 24,027 ton. PK: 5,223 ton. Capacity: 45 ton of FFB/hour (60 ton of FFB/hour is installed). Actual production for period of April 1st 2014 – February 14th 2015 is as follow: FFB production total: 94,845.96 ton (BTE: 40,555.17 ton; SYE: 54,290.79 ton). CPO: 21,910.94 ton PK: 4,516.88 ton Actual Capacity up to HI: 45.49 ton of FFB/hour. Production of the certified FFB, CPO and PK was still below the claim of certificate, despite there was still 45 days of the certificate valid period (April 1st 2015). Status: Full Compliance 3 Record keeping 3.1 The facility shall maintain accurate, complete, up-to-date and accessible records and reports covering all aspects of these requirements. Entire records of the certified FFB processing stage and certified CPO and PK production in Betung POM was recorded and maintained on the server system using SAP. The report of the certified production result is composed each quarter since April 1st to February 14th 2015 (ASA-1 audit) is as follows: MONTH April 2014 INCOMING FFB (TON) SEKAYU BETUNG ESTATE ESTATE 5,277.92 4,298.13 TOTAL of INCOMING FFB (TON) 9,576.05 PROCESSED FFB (TON) 9,953.56 Page 36 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT May 2014 5,572.80 June 2014 5,839.43 Sub total 16,690.15 July 2014 4,381.14 August 2014 5,993.66 September 2014 4,387.34 Sub total 14,762.14 October 2014 4,060.18 November 2014 5,443.40 December 2014 7,086.77 Sub total 16,590.35 January 2015 4,760.01 14 February 1,488.14 2015 Sub total 6,248.15 Grand total 54,290.79 Status: Full Compliance 4,499.88 4,616.38 13,414.39 3,397.58 4,662.71 3,388.35 11,448.64 2,730.18 3,816.91 4,570.76 11,117.85 3,475.82 1,098.47 10,072.68 10,455.81 30,104.54 7,778.72 10,656.37 7,775.69 26,210.78 6,790.36 9,260.31 11,657.53 27,708.20 8,235.83 2,586.61 9,213.65 10,569.77 29,736.98 8,133.50 10,394.95 7,952.28 26,480.73 6,797.91 9,027.74 11,895.75 27,721.40 8,178.72 2,659.01 4,574.29 40,555.17 10,822.44 94,845.96 10,837.72 94,776.83 3.2 Retention times for all records and reports shall be at least five (5) years. Entire records of the certified FFB processing stage and certified CPO and PK production in Betung POM was recorded and maintained on the server system using SAP Status: Full Compliance 3.3 The facility shall record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO, PKO and palm kernel meal on a three-monthly basis. Entire records of the certified FFB processing stage and certified CPO and PK production in Betung POM was recorded and maintained on the server system using SAP. The report of the certified production result is composed each quarter since April 1st to February 14th 2015 (ASA-1 audit) is as follows: MONTH April 2014 May 2014 June 2014 Sub total July 2014 August 2014 September 2014 Sub total October 2014 November 2014 December 2014 Sub total January 2015 14 February INCOMING FFB (TON) SEKAYU BETUNG ESTATE ESTATE 5,277.92 4,298.13 5,572.80 4,499.88 5,839.43 4,616.38 16,690.15 13,414.39 4,381.14 3,397.58 5,993.66 4,662.71 4,387.34 3,388.35 14,762.14 11,448.64 4,060.18 2,730.18 5,443.40 3,816.91 7,086.77 4,570.76 16,590.35 11,117.85 4,760.01 3,475.82 1,488.14 1,098.47 TOTAL of INCOMING FFB (TON) 9,576.05 10,072.68 10,455.81 30,104.54 7,778.72 10,656.37 7,775.69 26,210.78 6,790.36 9,260.31 11,657.53 27,708.20 8,235.83 2,586.61 PROCESSED FFB (TON) 9,953.56 9,213.65 10,569.77 29,736.98 8,133.50 10,394.95 7,952.28 26,480.73 6,797.91 9,027.74 11,895.75 27,721.40 8,178.72 2,659.01 Page 37 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 2015 Sub total Grand total MONTH 6,248.15 54,290.79 CPO PRODUCTIO N (TON) OER (%) April 2014 2,148.92 21.59 May 2014 2,236.80 22.45 June 2014 2,292.75 22.19 Sub total 6,678.47 22.08 July 2014 1,798.52 22.11 August 2014 2,465.99 23.72 September 1,953.87 24.57 2014 Sub total 6,218.38 23.47 October 2014 1,588.95 23.37 November 2,053.01 22.74 2014 December 2,740.33 23.04 2014 Sub total 6,382.29 23.05 January 2015 1,995.37 24.40 14 February 636.43 23.93 2015 Sub total 2,631.80 24.17 Grand total 21,910.94 Status: Full Compliance 4,574.29 40,555.17 KERNEL PRODUCTI ON (TON) 10,822.44 94,845.96 10,837.72 94,776.83 DISPATCH KER (%) CPO (TON) 452.89 468.20 449.56 1,370.66 332.40 487.50 418.29 4.55 4.70 4.35 4.53 4.09 4.69 5.26 1,945.66 2,491.20 2,176.00 6,612.86 1,974.35 2,067.00 1,621.76 KERNEL (TON) 422.09 554.66 423.35 1,400.10 273.99 601.16 445.05 1,238.19 355.43 455.87 4.68 5.23 5.05 5,663.11 1,616.35 2,567.90 1,320.20 371.90 395.78 578.65 4.86 2,431.00 670.58 1,389.95 394.97 123.11 5.05 4.83 4.63 6,615.25 2,668.51 529.82 1,438.26 396.70 72.65 518.08 4,516.88 4.73 3,198.33 22,089.55 469.35 4,627.91 3.4 The following trade names should be used and specified in relevant documents, e.g. purchase and sales contracts, e.g. *product name*/MB or Mass Balance. The supply chain model used should be clearly indicated. Betung POM management unit does not sales CPO product directly. The entire CPO products are dispatched to the Bulking Station within range +/- 7 km from Betung POM. According to the result of interview with one of the Bulking Station staff, the dispatched CPO from Betung POM are stored at the storage tank in each POM within Sungai Durian area. Therefore, Betung POM has 2 unit of storage tank bulking with capacity of 2,500 ton. Hence, the CPO from Betung POM shall always been separated from the CPO from other POM. Meanwhile, entire PK are dispacthed to the Rantau KCP (1 complext with Rantau POM – PT LMI). The attaching document during CPO and PK dispatch is as follows: Page 38 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Figure 12. CPO Dispatch Weighbridge Ticket Figure 13. PK Dispatch Weighbridge Ticket Status: Full Compliance 4 Sales and goods out 4.1 The facility shall ensure that all sales invoices issued for RSPO palm oil delivered include the following information: Page 39 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT (a) (b) (c) (d) (e) The name and address of the buyer The date on which the invoice was issued A description of the product, including the applicable supply chain model (Segregated) The quantity of the product delivered Reference to related transport documentation Betung POM management unit does not sales CPO product directly. The entire CPO products are dispatched to the Bulking Station within range +/- 7 km from Betung POM. According to the result of interview with one of the Bulking Station staff, the dispatched CPO from Betung POM are stored at the storage tank in each POM within Sungai Durian area. Therefore, Betung POM has 2 unit of storage tank bulking with capacity of 2,500 ton. Hence, the CPO from Betung POM shall always been separated from the CPO from other POM. Meanwhile, entire PK are dispacthed to the Rantau KCP (1 complext with Rantau POM – PT LMI). The attaching document during CPO and PK dispatch is as follows: Figure 14. CPO Dispatch Weighbridge Ticket Page 40 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Figure 15. PK Dispatch Weighbridge Ticket Status: Full Compliance 5 Processing 5.1 The facility shall assure and verify through clear procedures and record keeping that the RSPO certified palm oil is kept segregated from non certified material including during transport and storage and be able to demonstrate that is has taken all reasonable measures to ensure that contamination is avoided. The objective is for 100 % segregated material to be reached. The systems should guarantee the minimum standard of 95 % segregated physical material9; up to 5 % contamination is allowed. The entire supply of Betung POM is delivered from Sekayu Estate and Betung Estate (RSPO Certified). No RSPO Uncertified FFB allowed. The report of the certified production result is composed each quarter since April 1st to February 14th 2015 (ASA-1 audit) is as follows: MONTH April 2014 May 2014 June 2014 Sub total July 2014 August 2014 September 2014 Sub total October 2014 November 2014 December 2014 INCOMING FFB (TON) SEKAYU BETUNG ESTATE ESTATE 5,277.92 4,298.13 5,572.80 4,499.88 5,839.43 4,616.38 16,690.15 13,414.39 4,381.14 3,397.58 5,993.66 4,662.71 4,387.34 3,388.35 14,762.14 11,448.64 4,060.18 2,730.18 5,443.40 3,816.91 7,086.77 4,570.76 TOTAL of INCOMING FFB (TON) 9,576.05 10,072.68 10,455.81 30,104.54 7,778.72 10,656.37 7,775.69 26,210.78 6,790.36 9,260.31 11,657.53 PROCESSED FFB (TON) 9,953.56 9,213.65 10,569.77 29,736.98 8,133.50 10,394.95 7,952.28 26,480.73 6,797.91 9,027.74 11,895.75 Page 41 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Sub total 16,590.35 January 2015 4,760.01 14 February 1,488.14 2015 Sub total 6,248.15 Grand total 54,290.79 Status: Full Compliance 11,117.85 3,475.82 1,098.47 27,708.20 8,235.83 2,586.61 27,721.40 8,178.72 2,659.01 4,574.29 40,555.17 10,822.44 94,845.96 10,837.72 94,776.83 5.2 The facility shall provide documented proof that the RSPO certified palm oil can be traced back to only certified segregated material. The entire supply of Betung POM is delivered from Sekayu Estate and Betung Estate (RSPO Certified). No RSPO Uncertified FFB allowed. The report of the certified production result is composed each quarter since April 1st to February 14th 2015 (ASA-1 audit) is as follows: MONTH April 2014 May 2014 June 2014 Sub total July 2014 August 2014 September 2014 Sub total October 2014 November 2014 December 2014 Sub total January 2015 14 February 2015 Sub total Grand total INCOMING FFB (TON) SEKAYU BETUNG ESTATE ESTATE 5,277.92 4,298.13 5,572.80 4,499.88 5,839.43 4,616.38 16,690.15 13,414.39 4,381.14 3,397.58 5,993.66 4,662.71 4,387.34 3,388.35 14,762.14 11,448.64 4,060.18 2,730.18 5,443.40 3,816.91 7,086.77 4,570.76 16,590.35 11,117.85 4,760.01 3,475.82 1,488.14 1,098.47 6,248.15 54,290.79 4,574.29 40,555.17 TOTAL of INCOMING FFB (TON) 9,576.05 10,072.68 10,455.81 30,104.54 7,778.72 10,656.37 7,775.69 26,210.78 6,790.36 9,260.31 11,657.53 27,708.20 8,235.83 2,586.61 10,822.44 94,845.96 PROCESSED FFB (TON) 9,953.56 9,213.65 10,569.77 29,736.98 8,133.50 10,394.95 7,952.28 26,480.73 6,797.91 9,027.74 11,895.75 27,721.40 8,178.72 2,659.01 10,837.72 94,776.83 Examle of the document of raw materials traceability: Betung Estate Page 42 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Sekayu Estate: System for backtracking Status: Full Compliance 5.3 Page 43 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT In cases where a mill outsources activities to an independent palm kernel crush, the crush still falls under the responsibility of the mill and does not need to be separately certified. The mill has to ensure that: The crush operator conforms to these requirements for segregation The crush is covered through a signed and enforceable agreement N/A Entire Palm Kernel are dispatched and processed at Rantau KCP. Status: Full Compliance 6 Training 6.1 The facility shall provide the training for all staff as required to implement the requirements of the Supply Chain Certification Systems According to the interview result on February 16th 2015, POM does not operating: Weighbridge Opr. (Mr Junedi): HAS NOT YEAT RECEIVING SCCS TRAINING and Production Clerk (Mr Nasikun): Has received SCCS training. Evidence of SCCS Training Attendance List on December 15th 2014. Trainer: Trijono Production Clerk: Nasikun Weighbridge Operator: Frila Stefila OFI: Betung POM Management unit need to improve the awareness of supply chain model to entire associated operators. Status: Full Compliance 7 Claims 7.1 The facility shall only make claims regarding the use of or support of RSPO certified oil palm products that are in compliance with the RSPO Rules for Communications and Claims. Not Applicable Betung POM management unit does not sales CPO product directly. The entire CPO products are dispatched to the Bulking Station within range +/- 7 km from Betung POM. According to the result of interview with one of the Bulking Station staff, the dispatched CPO from Betung POM are stored at the storage tank in each POM within Sungai Durian area. Therefore, Betung POM has 2 unit of storage tank bulking with capacity of 2,500 ton. Hence, the CPO from Betung POM shall always been separated from the CPO from other POM. The support over CSPO and CSPK was declared on the Procedure of Product Identification and Product Traceability in Minamas Plantation POM (No. Dok: RSPO/65/SCPP/LMI, rev.01, dated May 1st 2013) on Declaration-7. Status: Full Compliance Page 44 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.3. Conformity Checklist of Certificate and Logo Use 1. ASA-1 2. ASA-1 3. ASA-1 4. ASA-1 Evidence of permission or approval certificate and logo from Certification Body which submitted by Client PT LMI – Betung Factory has received certificate usage approval with number MUTU-RSPO/035. Status: Complied Implementation of certificate and logo used by Client comply with size and type (shape) against Guideline of Logo Use PT LMI – Betung Factory has received certificate usage approval with number MUTU-RSPO/035. Status: Complied Implementation of Certificate and Logo is not used on product PT LMI – Betung Factory has received certificate usage approval with number MUTU-RSPO/035. Status: Complied Controlling of Certificate and Logo, including withdrawing inappropriate logo. PT LMI – Betung Factory has received certificate usage approval with number MUTU-RSPO/035. Status: Complied Page 45 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 X or√ √ X or√ √ X or√ √ X or√ √ PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.4. Summary of RSPO Partial Certification. Name of organization : PT Mitra Austral Sejahtera 2.1 2.2 6.3 6.4 7.3 There is compliance with all applicable local, national and ratified international laws and regulations. PT Mitra Austral Sejahtera is compliance with applicable laws and regulations. The right to use the land can be demonstrated, and is not legitimately contested by local communities with demonstrable rights. PT Mitra Austral Sejahtera has demonstrated land use and not legitimately contested by local communities. The company’s land acquisition process has been in accordance with the prevailing regulations There is a mutually agreed and documented system for dealing with complaints and grievances, which is implemented and accepted by all parties. PT Mitra Austral Sejahtera has documented system for dealing with complaints and grievances, which is implemented and accepted by all parties. There is a Communication Procedure No. Policy 501/MAS-KOM-03/11 dated 8 April 2011 implemented through the Mail Box, Email, Announcements, posters, brochures / pamphlets and meeting / briefing, etc. To resolve complaints / disputes associated with land, the company has prepared a Compensation Negotiation Process Mechanism No Policy 501/MAS-Doc 01/11 dated 8 April 2011, which contains a flowchart of (derasa) compensation payment process through a amicable discussion and meetings with Muspika (Task Force). Any negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that enables indigenous peoples, local communities and other stakeholders to express their views through their own representative institutions. PT Mitra Austral Sejahtera has a Compensation Negotiation Process Procedure No. Policy 501/MAS-Doc 01/11 dated 8 April 2011, which contains a flowchart of compensation payment process (Derasa) through amicable discussion and meeting with Muspika. The pricing of compensation is based on the Minutes of Agreement on Compensation (Derasa) Pricing dated December 8, 2005 as agreed by PT MAS, Community Leaders and KUD managers, acknowledged by Sub-District Chiefs (3 Sub-districts). Socialization was held on December 9, 2005 and attended by 35 representatives of related groups. Status: New plantings since November 2005, have not replaced primary forest or any area required to maintain or enhance one or more High Conservation Values. PT Mitra Austral Sejahtera has not replaced primary forest or any area required to maintain or enhance one or more High Conservation Values. Based on the company’s Plantation Concession issued through Decision of Land Agency Head of Sanggau District No. 400-56/IL-1999 dated January 8, 1999 on the Granting of Extension Concession the Purposes of Palm Oil Plantation located at Parindu, Bonti, Hulu and Kembayan Tayan sub-districts in the name of PT Mitra Austral Sejahtera with a total area of 20,000 hectares of 30,000 hectares reserved area, the concession of PT MAS is located within Other Use Area (APL) in accordance with the Spatial Plan of West Kalimantan Province The company management has declared to the community that the company will preserve and will not cultivate palm oil crops in areas that have been identified as HCV (MAS-3 Estate’s Statement Letter dated May 1, 2011). Local people / Indigenous Figures joined in Satlak were directly involved in the identification process of areas where palm oil planting is not allowed in accordance with the agreement. Page 46 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 X or√ √ X or√ √ X or√ √ X or√ √ X or√ √ PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 7.5 No new plantings are established on local peoples’ land without their free, prior and informed consent, dealt with through a documented system that enables indigenous peoples, local communities and other stakeholders to express their views through their own representative institutions. Available EIA documents as approved by the Central EIA Committee letter the Department of Forestry and Plantations, No: 242/Menhutbun-II/2000, on March 23, 2000. The company has conducted studies of social impact, but until the implementation of Stage-1 is still in draft form. SIA mentioned in the draft document; a. Positive Impacts 1. Direct Impacts - Significant local people are employed by the company. - Emergence of livelihood sources. - Increased revenue sources and incomes of the villagers. - Increased productivity, value and status of land (impact of KKPA plasma development). - Increased accessibility and mobility of people, goods and services. - Public’s positive perception to the company. 2. Indirect - The increasingly growth of local businesses - Increased cash flow and fund circulation in the surrounding villages. - Increased purchasing power of the local people. b. Negative Impacts; 1. Direct impacts; - Reduced size of public lands, - Public’s negative perception to the company, - Dispute/conflict 2. Indirect impacts and Accumulation - Clean water problem, - Impaired traditional value system of mutual cooperation, Change in lifestyles of rural people. X or√ √ Based on the Plantation Development Realization Report of the socialization of new land opening has been conducted in July to September 2010 for Bonti and Kembayan Sub-districts, and unit has done socialization of new land opening in March 2011 (Sedae, Canal, Mua, Kampuh, and Tapa sub-villages). Based on interviews with residents of RT Pinsam the company’s new plantation opening process also involved te Satlak Team consisting of Sub-village Chiefs, Indigenous leaders, KUD Sekayam Jaya Manager and Village officials as officers who perform verification of the land to be opened. 7.6 Local people are compensated for any agreed land acquisitions and relinquishment of rights, subject to their free, prior and informed consent and negotiated agreements. There is a Land Compensation Negotiation Process procedure No. 501/MAS-Doc 01/11 dated 8 April 2011 in which contains a flow chart of compensation process involving amicable deliberation and meetings with Muspika (Task Force). Documented process and agreement of land acquisition for new plantation area are maintained in MAS 3 Estate’s office and RSPO secretariat office in MAS 1 Estate. Page 47 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 X or√ √ PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.5 3.5.1 CAR No 2013. 01 2013. 02 Identification of Findings, Corrective Action, Observations, Opportunity for Improvement and Noteworthy Positive Components. Identification of Findings, Corrective Actions and Observations at Stage 2 Assessment Ref Std Finding Grade Area Major 2.1.1 Compliance with laws and regulations The company has shown a welder training certificate of class III on behalf Darmanto, No. 566.1118/Pelatihan K3/X/2012 dated 22 October 2012 from the Social, Labor and Transmigration of Kotabaru District. A welder of Betung Mill on behalf Ricardo AP has not attended appropriate training to obtain a certificate in accordance with Permenaker 2 Year 1982. NC Minor 5.5.1 Infrastructure and Facilities of Fire Countermeasures There is a nonconformance on types of facilities and infrastructure of fire countermeasures as set forth in SOP of Field Fire Countermeasures No. SOPPK/08-LMI dated 1 April 2013. NC Time Limits Corrective Action Observation Status Mill The Company must ensure that welders employed have attended a training to obtain certificate of welders in accordance with Permenaker 2 Year 1982. 15 November 2013 The company has sent Schedule of Training, Attendance list of Participants, the Minutes of Training, and Trainer Assignment Letter from Social, Labour and Transmigrations Agency of Kotabaru District and photos of training activities. In addition, provided certificates on behalf of Joko Agus Priyono, Nelson, Fahrul Raji who has followed training for welding on 11-13 November 2013 as Welder clas III (three) Traning facilitated by Social, Labor and Transmigration Agency of Kotabaru District dated 13 Nov 2013. Close Estate The Company must adjust the facilities and infrastructure types of field fire countermeasures with SOP of Field Fire Countermeasures No. SOP-PK/08-LMI dated 1 April 2013. 15 November 2013 The Company has showed SOP of Field Fire Prevention revision No. 01 SOP-PK/08-LMI dated 20 October 2013 that has been adapted to the condition of oil palm trees today. Close Page 48 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 Closing Date 15 November 2013 15 November 2013 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.5.2 CAR No 2015. 01 Identification of Findings, Corrective Actions and Observations at Surveillance 1 Assessment Ref Std Finding Area Grade Major 3.1.1 Minimum Three Years Work Plan Betung Mill management unit was unable to show the CPO and PK production projection for the next 3 years. Mill Major Time Limits April 17 2015 Corrective Action Observation Management unit must be able to show the Projection of CPO and PK production for the next 3 years. Root Cause: Data of budget projection was not able to be shown due to the mess of the file storing. Status Closed Closing Date February 18th 2015 Corrective Action: Showing the data of budget projection for the next 3 years (2015/16, 2016/17, 2017/18). Preventive Action: Documenting data of budget and projection refer to the RSPO standard request and fragmenting the file system. Auditor Verification: February 18th 2015 2015. 02 Major 5.3.2 Domestic Waste Management Estate According to the result of waste and identification, domestic waste is one of Mill the type of waste need to be managed. SOP of domestic waste management (097/LMI-DOM-2013 dated October 1st 2013) was describing that the domestic Major April 17 2015 Management unit needs to manage the waste refer to the applied procedure. Page 49 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 Betung POM management unit has shown the production budget projection for the next 3 years (2015/16, 2016/17, 2017/18). Therefore, NCR 2015.01 is considered CLOSED. Root Cause: Closed The landfills in Block J39 BTE was found unsuitable for further operational due to its overloading capacity. Corrective Action: Hoarding the old landfills and constructing February 18th 2015 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT CAR No Ref Std Finding Area Grade Time Limits Corrective Action waste in form of plastic, can, metal, glass, and other materials will be hoarded when the landfills has been fully filled. According to the field visit to Block J39, Division 03 of Betung Estate, the landfills has been fully filled and no hoarding conducted. Observation new hoarding location with size 5m x 5m x 1m in same Block. Preventive Action: Every 1 to 2 months, new landfills must be constructed. Auditor Verification: February 18th 2015 Betung Estate management unit conducted corrective action over landfills by hoarding landfills in Block and constructing new landfills. Therefore, auditor team considers 2015.02 CLOSED. 3.5.3 Ref Std 1. Major 2.2.2 Major 4.7.2 SCCS 6.1 3. NC Descriptions Land Use Title Pole Maintenance Estate management unit needs to improve the effort of monitoring and maintenance of legal boundary periodically. (Observation). The Board of OHS Guiding Committee Management unit needs to follow up the changes of OHS Guiding Committee board structure in Betung Estate to the associated agencies. (Observation). SCCS Training Betung POM management unit need to improve the awareness over supply chain model to the entire associated operators. Page 50 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 has the J39 Opportunity for Improvement No 2. Status Closing Date PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.5.4 No Noteworthy Positive Components Ref Std Descriptions 1 Company’s commitment to implement sustainable palm oil management principles 2 Personnel’s competence (staff) in their position 3 Zero Work Accident up to 919,133 Workhours in Betung Mill Page 51 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 3.6 Summary of Arising Issues from Public, Management and Auditor Response Issues from Stakeholders Kotabaru District Forestry Agency According to the result of consultation with Kotabaru District Forestry Agency, there was no issues in term of area status in Sekayu Estate and betung Estate Management Response Auditor Response It complies the criteria 2.2 and company needs to maintain positive performance shown by and shall No issues in term of area status in Sekayu Estate and keep implementing sustainable improvement. Betung Estate will be maintained Kotabaru District Environment Agency a. Reporting of Effluent will be routinely reported b. Reporting of Hazardous Waste will be routinely reported c. Reporting of Environmental Management and Monitoring Plan will be routinely reported Reporting of effluent, hazardous waste, and It complies the criteria 4.4; 5.1; 5.3 and company environmental management and monitoring plan were needs to maintain positive performance shown by and routinely reported. shall keep implementing sustainable improvement Kotabaru District Plantation Agency a. Plantation development report (LKUP) has been informed collectively and continously: i. Semester I dated August 12th 2014 ii. Semester II dated January 15th 2015 b. The assessment of operationals of the 4 estates were considered GOOD with score between 65-74 c. Permits for entire estate were issued before 2007 d. There were also scheme smallholders in each estate despite there was still dispute with the Scheme Smallholders Future Participants (CPCL) e. Scheme Smallholders existence was unsuitable with community’s expectation due to the scheme smallholders shall be managed by cooperative unit f. There was information in term of unproper profit share Management unit shall keep ensuring the compliance of estate operational to the applied regulation and shall keep maintaining the condusive circumstance with the community nearby estate. Page 52 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 It complies the criteria 2.1; 2.2; 6.2; 6.3 and 6.4 and company needs to maintain positive performance shown by and shall keep implementing sustainable improvement. PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Issues from Stakeholders g. h. i. j. Management Response Auditor Response CSR was considered well running There were existed proper and adequate fire extinguishing facilities. There was no community’s disturbance Management unit has also informing the report of Environmental Management and Monitoring Result to Plantation Agency Betung Village Positive Aspect Good Relation with Company. Company has given assistance for road repairment and assistance for rice for the old man, There was no land conflict. There was no environment contamination indication. Proposal or letter for assistance request was quickly responded by company. Company attended the forum held by company (invited only). Workforce empowerment from the Betung Village (30 – 40%). Announcement of contract work. The Village Party has the phone number of the Head of Division and Manager. Therefore, communication was easily conducted. There was HCV socialization Negative Aspect: There were still unpromoted villagers despite they have been working for 3 months such as Asdi Barsanasari, Sutrisno, Sumat, Wahyu Communication shall be improved Shall be maintained Communication with the community nearby estate will be improved Shall be maintained Assistance process authorized to the third shall be maintained. Shall be maintained Workforce composition (Local and Newcomers) shall be evaluated. Shall be maintained Comminication with the third party shall be improved (specifically with the village nearby estate) Shall be maintained Promotion of the employees is emphasizing work achievement and loyality. Therefore, the Page 53 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 It complies the criteria 1.1; 1,2; 6.2; 6.3 and 6.11 and company needs to maintain positive performance shown by and shall keep implementing sustainable improvement. Company needs to impove social communication and consultation whether for environment monitoirng or Community Development. PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Issues from Stakeholders Hardadi, Riduansyah, Irwansyah, Eman, Sunwenhenik, and Hendi.) Job opportunity seems to be only for specific parties, the job opportunity announced is just a field job such as harvester Job opportunity is announced orally Expectation for the Company: Donation for village operational for IDR 500,000 is multiplied twice to IDR 1,000,000 Assistance for the old men (old widow and those who are unable to work anymore) Scholarship for Elementary School, Secondary School, and High School Coordination with the village is expected to be improved. Management Response Auditor Response unpromoted employees are still on progress on office of KPW BJB and Head office of JKT Company is now need harvester and treatment workers more, employees recruitment shall be conducted in writting for the future Shall be evaluated and considered by company Scholarship is adjusted over the achievement of the students Coordination with village shall be improved Sekayu Village Positive Aspect Good Relation with company Nearly 60% of the villagers are PT LMI employees There is water assistance during drought in dry season Assistance for repairing roads Good relation between company with the community It complies the criteria 1.1; 1,2; 6.2; 6.3 and 6.11 Company shall maintain good relation with the and company needs to maintain positive performance community nearby estate. Company shall evaluate and shown by and shall keep implementing sustainable follow up the expectation informed by the community improvement. nearby estate. Negative Aspect Ask for assistance directly to the spot The information of contract work is announced by the chief of village only Page 54 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 Company needs to impove social communication and consultation whether for environment monitoirng or Community Development. PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Issues from Stakeholders Management Response Auditor Response Expectation for the Company: Request for estate teacher for Sekayu Secondary School The honorarium of the secondary school teacher should be paid Scheme smallholders for the community Local Contractor for Road Maintenance Positive Aspect: Workers are using PPE There is safety briefing held by company Nice payment referring to the Cooperative Agreement Letter Determining the wage more than the Minimum Wage Standard No underage workers recruited by contractor Negative Aspect: No workers insuranced by company due to the workers are shifted each 2 months Expectation: Contract Value is expected to increase Local Contractor for Transporting Kernel Aware of the content of contract Licenses of vehicle have been complied Hiring experience driver with valid driving license Determining the wage more than the Minimum Wage Standard No underage workers recruited by contractor Payment is always been paid on time Company shall alway keep good relation with the It complies the criteria 4.7; 4.8; 6.11 contractor. and company needs to maintain positive performance shown by and shall keep implementing sustainable improvement. Company needs to impove social communication and consultation whether for environment monitoirng or Community Development. BTM is empowering the local contractor from the Company needs to maintain positive performance nearby villages such as Betung Village, Sekayu Village, shown by and shall keep implementing sustainable Matalok Village, Balaimea Village, and Pukung Village. improvement The copy of vehicle police letter, tax and driving license along with the payment each 1 or 2 days after remise I in each month and no late experienced. The cooperation shall always been continued. Page 55 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Issues from Stakeholders Management Response Auditor Response Expectation: Cooperation shall always been continued Interim of the Head of Betung Mill Labour Union Company gives freedom to form union and unite. Colective Labour Agreement is composed by involving Labour Union. Company gives assistance in form of vehicle unit for labour union operational if they wish to. Business Trip outside estate shall not considered as bunking off action. The content of Collective Labour Agreement is complied by company The number of Labour Union Member are 62 members Harmonic relation between company with labour union is maintained. There is no unsolved issue. Head of Betung Estate Labour Union Company gives freedom to form union and unite. Colective Labour Agreement is composed by involving Labour Union. Company gives assistance in form of vehicle unit for labour union operational if they wish to. Business Trip outside estate shall not considered as bunking off action. The content of Collective Labour Agreement is complied by company The number of Labour Union Member are 458 members Employees dues for labour union is IDR 2,000 / month / person. Harmonic relation between company with labour union is maintained. There is no unsolved issue The issues which were faced by were the cost of inpatient for the Daily It complies the criteria 4.7; 4.8; 6.11 During its existence (Betung Mill Labour Union), the and company needs to maintain positive performance relation between company and the labour union is shown by and shall keep implementing sustainable running well. Communication between both parties are improvement. running well and each problem shall be solved in forum. Company needs to impove social communication and Company gives freedom to unite and form union. consultation whether for environment monitoirng or Community Development. Company is always granting freedom to unite and Company needs to maintain positive performance shown by and shall keep implementing sustainable form union. Company is always been involved on composing of improvement the Collective Labour Agreement. Management unit is able to give assistance when the operational vehicles are not being used. Business trip outside the estate shall not considered as bunking off action as long as the permits and procedures are correctly complied. Employees dues for labour union is IDR 2,000 / month / person There is no problem. However, when problem Page 56 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Issues from Stakeholders Workers and permit to leave the job Head of Sekayu Estate Labour Union Company gives freedom to form union and unite. Colective Labour Agreement is composed by involving Labour Union. Company gives assistance in form of vehicle unit for labour union operational if they wish to. Business Trip outside estate shall not considered as bunking off action. The content of Collective Labour Agreement is complied by company. The number of Labour Union Member are 512 members. Employees dues for labour union is IDR 2,000 / month / person. Harmonic relation between company with labour union is maintained. There is no unsolved issue. The routine issue was the 7 hours / day of workhour. Management Response occured, it will be solved in forum. Company shall keeping to facilitate labour union and support labour union activity. Page 57 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) SPO – 4006a.5 Auditor Response Company needs to maintain positive performance shown by and shall keep implementing sustainable improvement PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 4.0 CERTIFIED ORGANISATION'S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY 4.1 Formal Sign-off of Assessment Findings Hereunder sign by management representative from inspected company to acknowledge a field assessment and agree for all content explained in this assessment report, included of non-compliance findings. Signed on behalf of: Company Name Management Representative Mutuagung Lestari Lead Auditor Mohammad Pirabaharan Friday, 6 March 2015 Yudwi Wisnu Rahmanto Friday, 6 March 2015 SPO – 4006a.5 Page 58 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Appendix 1. List of Stakeholder Contacted in the RSPO Certification Process No Institution/NGO/Community Address Phone/Email Form of Communication Date of Contact 1 Head of Village Betung Villageof Betung - Focus Group Discusion 2 Head of Village Betung Village Betung - Focus Group Discusion 3 Locak Contractor (Road Maentenance) - Focus Group Discusion 4 Locak Contractor (Kernel Transporter) - Focus Group Discusion 5 Head of labour Union Betung Factory Betung Factory - Focus Group Discusion 6 Head of labour Union Betung Estate Betung Estate - Focus Group Discusion 7 Head of labour Union Sekayu Estate Sekayu Estate - Focus Group Discusion 8 Enviromental Agency, District of Kotabaru District Kotabaru of - Focus Group Discusion 9 Plantation Agency District of Kotabaru District Kotabaru of - Focus Group Discusion 10 Forestry Agency, District of Kotabaru District Kotabaru of - Communication by Email 11 Jakarta 12 Aliansi Masyarakat Adat Nusantara (AMAN) Sawit Watch 13 Wahana Lingkungan Hidup Jakarta 14 WWF Jakarta Communication by Email Communication by Email Communication by Email Communication by Email 15 Yayasan Selamatkan Teluk Balikpapan Balikpapan rumahaman@cbn.n et.id info@sawitwatch.or. id informasi@walhi.or.i d wwfindonesia@wwf.or.i d herryadi@balikpapa nbay.or.id Jakarta of Communication by Email Response Yes No 16 February 2015 16 February 2015 16 February 2015 16 February 2015 16 February 2015 16 February 2015 16 February 2015 16 February 2015 16 February 2015 16 February 2015 9 February 2015 √ - √ - √ - √ - √ - √ - √ - √ - √ - √ - - √ 9 February 2015 - √ 9 February 2015 - √ 9 February 2015 - √ 9 February 2015 - √ SPO – 4006a.5 Page 59 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Appendix 2. Assessment Program DATE TANGGAL Actual Time WAKTU AKTUAL Sunday, 15 February 2015 08.50 – 12.05 15 – 18 February 2015 PROCESSES / CLAUSES TO BE AUDITED PROSES / HAL YANG DIAUDIT AUDITOR Flight Jakarta to Balikpapan 12.05 – 13.15 Travelling of Auditor team (Balikpapan Airport – Penajam Port) 13.15 – 14.15 14.15 – 18.15 Lunch at Penajam Travelling (Penajam to Tanah Grogot) 18.15 – 19.15 Break and Dinner at Tanah Grogot 19.15 – 22.30 Continued travelling (Tanah Grogot to Betung Estate) 07.30 – 10.15 Flight Jakarta to Banjarmasin 13.30 – 14.10 Flight (continue) Banjarmasin to Kotabaru YWR, MAY, GIT, TIN SHW Stay overnight at Kotabaru Monday, 16 February 2015 08.00 – 08.30 Opening Meeting Auditee Speech (Introduction of PIC, Profile of Mill and EstatesManagement Unit) Auditor Team Speech (Introduction, Audit Objective, Audit Scope, Audit Plan Discussion, Determine of Audit Sample, Determine of Field Visit Audit, Transparency and Confidentiality Clarification) SPO – 4006a.5 Page 60 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) MR BETUNG YWR, MAY, GIT, TIN PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT 08.30 – 12.00 Field Visit of BETUNG ESTATE: Agronomy (Harvesting & Transportation, Manuring, Pesticides Application, Road Maintenance, Biological Control Monitoring, EFB Application, Land Application of POME) Environmental, Occupational Health & Safety Aspect (Inspection to Chemical Storage, Fertilizer Storage, Hazardous Waste Storage, Fire Control Facilities, Waste Management) Worker’s Facilities Aspect (Housing, Daycare, Sports Facilities, Employees Meeting Hall, Sanitary Facilities) Legal Demarcation Aspect (Inspection of Legal Boundary Stones/HGU Poles, Community Buffer Area/Enclave) Conservation Aspect (Inspection of HCV Identified Area, Riparian/Waterways Zone, Reservoir, Forest Area) Social Aspect (Visiting of Betung Village, Interview with villagers) 12.00 – 14.00 Break and Lunch 14.00 – 17.00 Re-verification of field visit result and previous assessment findings (Stage-2) Interview with Estate Worker Union, Local Contractor, Gender Committee. 15.00 – 17.00 08.00 – 15.00 16.00 – 24.00 Field visit of BETUNG FACTORY: Supply Chain verification (FFB Receiving, Weighbridge, FFB Sorting, Processing Activity, Despatch CPO) Occupational Health & Safety Aspect (Inspection to Chemical Storage, Hazardous Waste Storage, Fire Control Simulation, POME Pond) Interview with Worker’s Union Mill, Contractor of CPO Transporter, Gender Committee. Stakeholder consultation with relevant government agencies at Kotabaru Travelling from Kotabaru to Betung Estate SPO – 4006a.5 Page 61 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) MAY MAY GIT YWR YWR TIN YWR, MAY, GIT, TIN GIT, TIN YWR MAY YWR SHW PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Selasa / Tuesday 17 February 2015 08.00 – 12.00 Field visit of SEKAYU ESTATE: Agronomy (Harvesting & Transportation, Manuring, Pesticides Application, Road Maintenance, Biological Control Monitoring, EFB Application, Land Application of POME) Environmental, Occupational Health & Safety Aspect (Inspection to Chemical Storage, Fertilizer Storage, Hazardous Waste Storage, Fire Control Facilities, Waste Management) Worker’s Facilities Aspect (Housing, Daycare, Sports Facilities, Employees Meeting Hall, Sanitary Facilities) Legal Demarcation Aspect (Inspection of Legal Boundary Stones/HGU Poles, Community Buffer Area/Enclave) Conservation Aspect (Inspection of HCV Identified Area, Riparian/Waterways Zone, Reservoir, Forest Area) Social Aspect (Visiting of Sekayu Village, Interview with villagers) 12.00 – 14.00 14.00 – 15.00 15.00 – 16.30 16.30 – 17.00 18.00 – 20.00 Break and lunch Re-verification of field visit result Internal Team Discussion and Preparation of Closing Meeting Closing Meeting: Presentation of Assessment Findings by Auditor Team (Explanation of Identified Nonconformities and Completion of Corrective Timeline, Answer & Questions) Auditee Response against Assessment Findisngs Travelling to BEBUNGA FACTORY – PT Langgeng Muaramakmur SPO – 4006a.5 Page 62 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) MAY MAY, SHW GIT, SHW YWR YWR TIN YWR, MAY, GIT, TIN YWR, MAY, GIT, TIN MR BETUNG YWR, MAY, GIT, TIN PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT Appendix 3. Glossary AMDAL (SEIA) APAR APD (PPE) B3 BLH BOD BHL BPJS BPN BTE CHE CPO CSR DPPL E FFA FR HCV (NKT) HGB HGU HPT IK IPAL (WWTP) ISBPR (HIRARC) : : : : : : : : : : : : : : : : : : : : : : : : IUP Jamsostek JHT JJK (EFB) JKK JKM K3 (OHS) KCP KTD LA LC LCC LMI LSU NPWP P2K3 P3K PBB Pcs PHT (IPM) PK PKB PKO PKS (POM) : : : : : : : : : : : : : : : : : : : : : : : : Analisis mengenai dampak lingkungan (Social Environmental Impact Assessment)) Alat Pemadam Api Ringan (Fire Extinguisher) Alat Pelindung Diri (Personal Protective Equipment) Bahan berbahaya dan beracun (Hazardous Waste) Badan Lingkungan Hidup (Environmental Agency) Biological oxygen demand Buruh Harian Lepas (Daily worker) Badan Penyelenggara Jaminan Sosial (Social Insurance Agency) Badan Pertanahan Nasional (National Land Agency) Betung Estate Cholinesterase Crude palm oil Company Social Responsibility Dokumen Pengelolaan dan Pemantauan Lingkungan (Environment Monitoring Document) Emergency Free Fatty Acid Frequency Rate High Conservation Value (Nilai Konservasi Tinggi) Hak Guna Bangunan (Building Title) Hak Guna Usaha (Land Use Title) Hama Penyakit Tanaman (Pest and Disease) Instruksi Kerja (Work Instruction) Instalasi Pengolahan Air Limbah (Waste Water Treatment Plant) Identifikasi Sumber Bahaya dan Pengendalian Resiko (Hazard Identification Risk Assessment and Risk Control) Izin usaha perkebunan (Plantation Business License) Jaminan Sosial Ketenagakerjaan (Worker Social Insurance) Jaminan Hari Tua Janjang Kosong (Empty Fruit Bunch) Jaminan Kecelakaan Kerja (Work Accident Insurance) Jaminan Kematian Kesehatan dan Keselamatan Kerja (Occupational Health and Safety) Kernel Crushing Plant Kesiapsiagaan Tanggap Darurat (Emergency Response) Land Application Land Clearing Legume Cover Crop Laguna Mandiri Leaf Sampling Unit Nomor Pokok Wajib Pajak (Tax Registration Number) Panitia Pembina Kesehatan dan Keselamatan Kerja (Occupational Health and Safety Committee) Pertolongan Pertama Pada Kecelakaan (First Aid) Pajak Bumi dan Bangunan (Land and Building Tax) Pieces Pengendalian Hama Terpadu (Integrated Pest Management) Palm Kernel Perjanjian Kerja Bersama (Work Agreement) Palm Kernel Oil Pabrik Kelapa Sawit (Palm Oil Mill) SPO – 4006a.5 Page 63 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd) PT. MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT POME PP R RJP RKL RPL RTRWP RTRWK SBSI SCCS SD SEL SIA SK SKE SKU H SMK3 (OHSAS) : : : : : : : : : : : : : : : : : SPSI SOP SR STP UPDKS : : : : : Palm Oil Mill Effluent Peraturan Pemerintah (Government Regulation) Routine Rajawali Pramukti Rencana kelola lingkungan (Environment Management Plan) Rencana pemantauan lingkungan (Environment Monitoring Plan) Rencana Tata Ruang Wilayah Provinsi Rencana Tata Ruang Wilayah Kabupaten/Kota Serikat Buruh Seluruh Indonesia (Indonesian Labor Union) Supply Chain Certification Standard Sekolah Dasar (Elementary School) Studi Evaluasi Lingkungan (Environmental Evaluation Study) Social Impact Assessment Surat Keputusan (Decree) Sekayu Estate Syarat Kerja Umum Harian (Daily employee) Sistem Manajemen Keselamatan dan Kesehatan Kerja (Occupational Health and Safety Management System) Serikat Pekerja Seluruh Indonesia (Indonesian Worker Union) Standar Operations Procedure Severity Rate Sarana Titian Permata Ulat Pemakan Daun Kelapa Sawit SPO – 4006a.5 Page 64 Prepared by Mutuagung Lestari for Betung Factory – PT Laguna Mandiri (Sime Darby Plantation Sdn Bhd)