Instructions to fit the Snorkel Kit S064D for the Jeep JK Wrangler
Transcription
Instructions to fit the Snorkel Kit S064D for the Jeep JK Wrangler
Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com Instructions to fit the Snorkel Kit S064D for the Jeep JK Wrangler Diesel 1.0 Introduction Airflow Vector Pty Ltd thanks you for your purchase and the trust you put in our products. We strive to supply our customers with the highest quality equipment based on the most efficient design and best styling. We are confident that you will enjoy using our Snorkel system. It should improve the power of your vehicle as well as reduce its fuel consumption. 1.1 General instructions Follow carefully the instructions listed on these provided, do not over tighten bolts. Do not use use mastic. Ensure that safe work practices are followed Snorkel. Protective ear and eye wear should be power tools. pages and use the template silicone on any connections, when installing your Airflow worn at all times when using 1.2 Disclaimer It is highly recommended that installation is undertaken by a qualified mechanic or panel beater. Airflow Vector will not be held responsible for any damage incurred through incorrect fitment of the templates and workmanship. It is the responsibility of the fitter to ensure that particular care is taken when assembling the Snorkel kit to the vehicle as it may cause damage to the windscreen and or electrical components. Safe work practices must be used at all times when undergoing installation. We guarantee Airflow Vector’s kits against manufacturing defects as long as proof of purchase can be established. All models produced by Airflow Vector are verified to suit right hand drive vehicles according to Australian specifications. Variations in vehicle specifications may occur in other markets. If you're in doubt about the product suitability, please forward a photograph of the engine bay, air filter housing and of the vehicle at frontal/side position to info@airflowvector.com SD064DE (S064D Instructions booklet).doc 22 March 2011 \\Server\d\AirflowSnorkels\Products\Snorkels\S64D\SD064DE (S064D Instructions booklet).doc Page 1 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 2.0 List of Components S064D Kit content Ref Designation Qty Fasteners included Leng th Unit Ref Designation Qty SP114 Snorkel JK 1 SP118 A Pillar bracket JK 1 SP019 Hose Clamp 60/80mm 4 SP026 Screw Plug Nylon 2 SP063 Air Ram 3.5" 1 SP024 G/Bolt M6 x 12mm Z/P 8 SP018 Hose Clamp 80/100mm 1 SP029 Screw Self Tap 10gx5/8 Z/P 3 SK020 Bolt kit 1 SP023 Washer Spring 1/4 x 1/4 Z/P 2 SP115 Under Bonnet 1 SP033 Washer 1/4 x 3/4 Z/P 2 SP116 Under Bonnet 1 SP112 Pop rivet Bulbex 4x20mm 18 SP117 Under Bonnet 1 SP025 Washer Panel 1/4 x 1.1/4 x 16g Z/P 4 SP104M Under Bonnet 1 SP170 Plastic bag 75x125mm 1 SP015 TPR Hose 76mm 1 100 mm SP015 TPR Hose 76mm 1 250 mm SP120 Blocking Plate JK 1 SP119 Bracket JK 1 SP171 Plastic bag 280x380mm 1 SD064 Template 1 SD064DA Template Air Box 1 SD064DE Booklet 1 Page 2 of 16 Ensure that all parts listed are included in the parcel before starting any work. The total expected time of installation is around 6 - 8 hours. 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 2.1 List of tools and additional parts required Masking tape, clear tape, black mastic, hammer, centre punch Assorted screw drivers, sockets and spanners, pop rivet gun 76mm hole saw, 52mm hole saw Assorted drill set, wet / dry sand paper, ½ round file, small square file, Zinc rich primer It may be necessary to acquire new fixings from Chrysler to replace the inner guard fixings if they get damaged during their removal 3.0 Detailed Instructions 3.1 3.2 Prior starting any work, ensure that the configuration 3.3 of the air box is as shown. If it is not, the fitting of this kit will not be possible. Contact your dealer for further assistance Remove the splash panel Remove the step 3.4 Read the templates carefully Cut out the hole for the aerial SD064DE (S064D Instructions booklet).doc 3.5 22 March 2011 Page 3 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.6 Cut around the air box template 3.7 3.8 3.9 Centre punch all marked holes 3.10 Cover the areas to be drilled with masking tape 3.11 Mark the centre punch with a felt pen on tape 3.12 Pre-drill all holes at 5mm (6 snorkel mounting holes, 2 hole saw holes)… Page 4 of 16 Line up the template to the guard Tape it to the guard 3.13 … then drill the 6 fixation holes at 10mm 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.14 Using the hole saw, drill at LOW SPEED two 52 mm holes 3.15 Join the outside edges of the holes with a marker 3.16 Cut along the lines with a grinder 3.17 Paint ALL raw metal surfaces with Zinc rich primer (6 snorkel fixing holes, 1 air intake hole) 3.18 Unbolt the air box from the engine bay and remove it 3.19 Remove the air intake 3.20 Grind the lip down to make a flat surface SD064DE (S064D Instructions booklet).doc 22 March 2011 Page 5 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.21 While holding the blocking plate SP120 inside the air box, drill six 4mm holes for the rivets. 3.22 Please wear gloves 3.23 Use only NON SILICONE BASE black mastic as sealant 3.24 Apply sealant to the edge of the blocking plate SP120 3.25 Rivet the blocking plate SP120 with six rivets SP112 3.26 Grind off all the ridges inside that face of the air box 3.27 Use the template to locate the 3.28 Pre-drill to 5mm according to position of the drilling the template Page 6 of 16 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.29 Using the hole saw, drill at 3.30 File to remove any burrs on LOW SPEED one 76mm hole the air box 3.31 Slide the connector SP104M from the inside as shown and drill four 4mm holes in the tongues (two on each side) for the rivets 3.32 Please wear gloves 3.33 Use only NON SILICONE BASE black mastic as sealant 3.34 Smear some sealant on outside of the SP104M as shown on the picture 3.35 Rivet the connector SP104 with four rivets SP122 3.36 This is what needs to be achieved SD064DE (S064D Instructions booklet).doc 22 March 2011 Page 7 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.37 Remove two bolts on the lower panel and two bolts inside the door jam. 3.38 Remove the outer scuttle panel 3.39 Remove the main scuttle panel 3.40 Remove the mud guard / fender (don’t forget to disconnect the aerial) 3.41 File to remove any burrs 3.42 Paint ALL raw metal surfaces with Zinc rich primer (six snorkel fixing holes, one air intake hole) 3.43 Install the snorkel SP114 3.44 Fit washers SP025 (x4) and bolts SP024 (x4) and washers SP033 (x2) and nuts SP024 (x2) to secure the snorkel to the guard Do not over tighten fixings to avoid damage to the snorkel Page 8 of 16 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.45 Insert the short side of the SP115 into the snorkel 3.46 Drill four 4mm holes (two on the top, two from under ) 3.47 Remove the SP115 3.48 Please wear gloves 3.49 Smear some sealant on inside of the SP114 as shown on the picture 3.50 Re-insert the short side of the 3.52 Insert the SP116 about SP115 into the snorkel 20mm onto the SP115 3.51 Rivet it in place with four 3.53 Drill four 4mm holes (two on rivets SP112 the top, one on each side) 3.54 Remove the SP116 3.55 Please wear gloves 3.57 Re-insert the SP116 onto the SP115 3.56 Smear some sealant on inside of the SP116 as shown 3.58 Rivet it in place with four on the picture rivets SP112 SD064DE (S064D Instructions booklet).doc 22 March 2011 Page 9 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.59 Fit the “A” pillar bracket SP118 with the washer SP023 and bolt SP024 Do not over tighten fixings to avoid damage to the snorkel 3.61 Mark to contour of the “A” pillar bracket onto the paint 3.62 Remove the mud guard / fender 3.60 Re-assemble the mud guard / fender temporarily Note: This Snorkel is fitted with a second “A” pillar location to be installed if one intends to use the Collector Pre-Cleaner instead of the Air Ram. If required, please contact us to obtain the Bolt Kit SK220 3.63 Using the “A” pillar bracket as 3.65 Pre-drill at 4mm the two a template, mark the centre of holes the two holes 3.66 Drill the two holes for the “A” 3.64 Centre punch the 2 holes pillar position at 7mm 3.67 File the holes with a square file to suit nylon plugs SP026 Page 10 of 16 3.68 Paint the two holes with Zinc rich primer 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.69 Once the paint is dry, fit the two square plugs SP026 3.70 Mount the bracket SP118 with the screws SP029 3.71 Re-assemble the mud guard / 3.72 Re-assemble the outer fender scuttle panel 3.73 It may be necessary to pull on 3.74 Secure the snorkel to the the snorkel to assemble the bracket with the washer panel SP023 and the bolt SP024 Do not over tighten fixings to avoid damage to the snorkel SD064DE (S064D Instructions booklet).doc 22 March 2011 Page 11 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.75 Re-assemble the scuttle panel 3.76 Re-fit the windscreen wipers 3.77 Please wear gloves 3.78 Smear some sealant inside both ends of the TPR hose SP015 x 100mm long 3.79 Slide a hose clamp SP019 on one end 3.80 Connect it to the under bonnet SP116 3.81 Tighten the hose clamp 3.82 Slide a hose clamp SP019 to the other end of the TPR hose SP015 3.83 Insert the tube SP117 through the engine bay and connect it to the hose 3.84 Do not tighten the clamp yet 3.85 Attach the bracket SP119 to this location 3.86 Secure the tube to the bracket with the washer SP023 and bolt SP024 3.87 Now tighten the hose clamp SP019 under the guard Page 12 of 16 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 3.88 Re-fit the air box 3.89 Slide the clamps SP019 at each end of the hose SP015 3.90 Smear some sealant inside both ends of the TPR hose SP015 3.91 Connect the TPR hose to the air box 3.92 Tighten the hose clamp SP019 3.93 Connect the TPR hose SP015 to the tube SP117 3.94 Tighten the clamp SP019 3.95 Re-install the air cleaner 3.96 Close the air box 3.97 Re-install the splash panel 3.98 SD064DE (S064D Instructions booklet).doc Re-fit the step 22 March 2011 Page 13 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com Slide the hose clamp SP018 3.101 Drill the hose clamp next to the worm drive on the air ram SP063 then slide it on the snorkel SP114 3.100 Ensure that the top of the snorkel matches the top of the slot cut in the Air Ram 3.99 3.102 Secure the Air Ram with the self tapping screw SP029 Note: The Air Ram is also available in Fluro, green or blue Important note: Do not turn the Air Ram away from the direction of travel because it will lessen the positive pressure necessary for proper operation. In extreme situation, at speed above 25km/h (15m/h) a vacuum may be generated causing irreversible engine damage Page 14 of 16 22 March 2011 SD064DE (S064D Instructions booklet).doc Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 4.0 Optional pre-cleaner (not included in this kit) 4.1 Remove the Air Ram SP063 4.2 Install Pre-cleaner filter sock SP065B 4.3 Air sock should neatly fit into the top of the snorkel body 4.4 4.5 Re-install the Air ram SP063 Tighten the hose clamp SP018 Screw the self tapper SP029 through the hose clamp 4.6 4.7 Polish with silicone cleaner SD064DE (S064D Instructions booklet).doc 22 March 2011 Page 15 of 16 Airflow Vector Pty Ltd 4 Collins Rd, DROMANA VIC. 3936 AUSTRALIA Ph: +61 3 5987 3733 www.airflowvector.com 5.0 Improvement program We strive to produce documentation and kits free of mistakes, however, should you discover any error or omission, please let us know by quoting the initials shown in the box below. Furthermore, if you think that a step of this procedure could be improved, please send us at info@airflowvector.com your suggestions indicating the procedure name, its release date, the step details and the photo if necessary. We appreciate your support. This kit has been carefully packed by Date Initials Note: The content of this manual may be modified from time to time to ensure that improvements brought to our kits are described accurately. Before starting the installation, try to obtain the latest version of the instruction manual from our web site www.airflowvector.com Page 16 of 16 22 March 2011 SD064DE (S064D Instructions booklet).doc