Nick Sargent - Wellington Modelling
Transcription
Nick Sargent - Wellington Modelling
Wellington Transport Models Nick Sargent Team Leader Data & Analysis Outline • About Us • Wellington Transport Models • Model System Usage • Asset Maintenance Data & Analysis Team • Chun Lee – Modeller/ Analyst • Nicky Durling – Snr Data Analyst • Snr Transport Modeller (appointed) • Marian McMillan – Administrator • Snr Data Analyst (vacant) • And me! NZ MUGS 2009 • Myself • Mike Vincent Project Model Excellence 1. High Quality Models 7. High Quality Operators 2. High Quality Validation Project Model Excellence 3. Quality Suppliers 4. Organisational Champion 6. Quality Assurance Processes 5. Stakeholder Satisfaction High Quality Models and Validation • WTSM updated to 2006 base and validates well on screenlines • System updated to Emme3 allowing for nicer graphical outputs • Modelling team continually reviewing input information to develop future scenarios – Model Input Tracking process Tracking Inputs • Population • Economy: Employment • Cost of motoring (fuel prices) • Car ownership Regional Population • Overall regional population in 2010 lies above medium and below high growth • Wellington City, Upper Hutt, and Porirua closer to the high growth • Lower Hutt, and Kapiti on or about medium growth Economy: Employment • Model assumes 1.8%pa growth as central, with low1.5%pa, and high 2.1%pa • 2006 and 2007 showed a trend towards the high growth - more recently economy in recession • However expect a higher than low trend in long-term given economic stimuli Fuel (Petrol) Prices Car Ownership (cars/capita) Wellington Transport Models • Project – Awarded to Opus and Arup – Conceived by GWRC and JB at TDG – Builds on all work to date – Improve PT predictive capability – Lay foundations for the future Wellington Transport Models • Data Collection – Vehicle screen line counts (TDG/ HTS) – ETM harvesting (NZ Bus & Mana) – Rail Passenger Counts (TDG) – Rail O&D Intercept Surveys (TDG) – Bus O&D Intercept Surveys (Research NZ) WTSM is a Regional Multi-Modal Demand Forecasting Model (225 zones) WTSM 4 key components: 1. Trip Generation, 2. Trip Distribution, 3. Mode Split, & 4. Assignment WPTM will be a Regional Public Transport Assignment Model (780 zones) WPTM • Uses fully observed demand data sourced from ‘Snapper’ cards • Combined with surveys to disaggregate data by trip purpose • Uses forecasts from WTSM to predict public transport behaviour in the future Shared Network • Development of new network to be used in both WTSM and WPTM • Additional access links when used in WPTM • Developed from – Road centre lines – Public Transport Database – 2006 Link and intersection coding Project Delivery Present & Future Network Travel Speeds Wellington Models System Present & Future Network Travel Speeds System Usage - RoNS Present & Future Network Travel Speeds System Usage – PT Spine Study Present & Future Network Travel Speeds System Usage - Whom • GWRC • NZTA RoNS Consultants • Authorized users (OPUS and DY) Asset Maintenance – What? • 2013/15 – Census Revalidation • 2013/15 – Commercial Vehicle Model • 2013/15 – Convert WTSM to ‘Modeller’ • 2018/21 – Model Rebuild – HTS, 780 zones in both, significant project Asset Maintenance – How $ • GWRC – Rates 50% from 25% • NZTA – NLTP (TPAC at 50%?) • NZTA RoNS – capital charge? • Consultant project levy? Acknowledgements • Beca and SKM • Andy Wilson of Opus • Julie Ballantyne of TDG