Gentry Classic Gable1
Transcription
Gentry Classic Gable1
16778 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance April through October M-F 8:00 AM to 6:00 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST (This page intentionally left blank.) 16778 A Backyard Products Company 01/18/12 ASSEMBLY MANUAL CLASSIC GENTRY GABLE 12' x 12' (365,8 x 365,8 cm) BUILDING SIZE ACTUAL FLOOR SIZE 12' x 12' (365,8 x 365,8 cm) 12' x 12' (365,8 x 365,8 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY. BEFORE YOU BEGIN • BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specic restrictions and/ or requirements before building. • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. • SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are listed on page 8. • CHECK ALL PARTS Inventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged. • ADDITIONAL MATERIALS You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities. - CUSTOMER SERVICE Call: 1-800-577-9663 email: customerservice@backyardproductsllc.com 1 TOOLS Required ❑ Phillips Screwdriver Optional ❑ Tool Belt/ Nail Pouch ❑ Utility Knife ❑ Shingle Blades ❑ Drill / Driver ❑ 3/8" Drill Bit ❑ #2 Philips Drive Bit ❑ Tin Snips (for drip edge) ❑ Caulk Gun ❑ Hammer ❑ Chalk Line ❑ Paint Tools ❑ Level ❑ Nail Gun ❑ Pencil ❑ Safety Glasses ❑ Tape Measure ❑ Ladder ❑ Square • gun nails ❑ WoodGlue ❑ Gloves ❑ Sawsall or Safety! Always use approved safety glasses during assembly. HELPFUL REMINDER SYMBOLS Look for these symbols for helpful reminders throughout this manual. = Assistance Required; two or more people. = Mark part with pencil. = Ensure squareness. BEGIN = Important required step or operation. FINISH = You have nished the assembly or installation. = Helpful assembly hint. = Beginning of steps for assembly or installation. = Level ORIENT LUMBER AND TRIM FOR BEST APPEARANCE Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side. Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way negatively affect the strength or integrity of our product. (See Fig. A, B, C.) A B 2 C ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials: 3-TAB SHINGLES (Bundles)................... 7 PAINT FOR TRIM ......................1 Quart PAINT FOR SIDING (Gallons)................. 2 WOOD GLUE ................. Exterior Rated Use 100% acrylic latex exterior paint. Use 100% acrylic latex exterior paint. (2) coats recommended. 1" GALVANIZED ROOFING NAILS(lbs)... 2 3 CAULK ............................................ 3 Tubes Use acrylic latex exterior caulk that is paintable. For shingles. OPTIONAL MATERIALS DRIP EDGE (Feet)................................. 60 #15 ROOFING FELT (Sq ft. to cover)..... 180 1" GALVANIZED ROOFING NAILS(lbs)... 1/2 lb. For roong felt. REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT. FLOOR PANELS (Not Included) You will need oor panels and nails to complete your oor. Floor panel sizes and quantities are shown below. NOTE: Use a minimum of 5/8" (1,6 cm) Oriented Strand Board (OSB) x3 5/8" x 48" x96" (1,6 x 121,9 x 243,8 cm) x3 5/8" x 48" x48" (1,6 x 121,9 x121,9 cm) x1 2" (5,1 cm) 1 lb. of 2" (5,1 cm) Hot Dipped Galvanized Box-Type Nails. 3 PARTS IDENTIFICATION AND SIZES Double letter part identication is stamped on some parts. WOOD SIZE CONVERSION CHART RS 2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) RS Nominal Board Size Actual Size 1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm) RS 2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp. CLASSIC GENTRY GABLE 12' X 12' PARTS LIST RAFTERS WALLS INVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in. x7 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x5 2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm) x24 TJ AI x2 UM x2 AM 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) x1 x1 x6 x5 x1 F 3/8 x 3 x 66" (1 x 7,6 x 167,6 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) AV SP 2 x 4 x 60-1/2" (5,1 x 10,2 x 153,7 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) STL 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) SG x1 AJ x5 AL x14 x4 ADA AF TRIM DOOR x1 GAA 2 x 4 x 12-1/2" (5,1 x 10,2 x 31,8 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) x12 2 x 4 x 77-15/16" (5,1 x 10,2 x 198 cm) 2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm) 6 x 24" OSB (15,2 x 61 cm) 3/8 x 1-3/4 x 83-1/2" (4,4 x 212.1 x 1 cm) x4 x2 WYR 19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm) x2 WYL 19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm) x2 x1 x1 OO ZJ AHR 19/32 x 3 x 62" (1,5 x 7,6 x 157,5 cm) x1 x2 AHL 19/32 x 3 x 62" (1,5 x 7,6 x 157,5 cm) x2 x2 1" x 3" x 5" (2,5 x 7,6 x 12,7 cm) 2 x 4 x 34" (5,1 x 10,2 x 86,4 cm) x4 OVERHANG GAUGE BLOCK FOR 3/4" (1,9 cm) MEASUREMENT. 3/4" (1,9 cm) 3/8 x 1-3/4 x 81-1/2" x 3/8" (4,4 x 207 x 1 cm) AH 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) 19/32 x 2-1/2 x 72" (1,5 x 6,4 x 182,9 cm) VX AS 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) 19/32 x 2-1/2 x 26 5/8" (1,5 x 6,4 x 67,6 cm) 2 x 6 x 96" (5,1 x 15,2 7/16 x 243,8 cm) x 96" (1,1 x 58,7 x 243,8 cm) x 23-1/8 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) 4 WINDOW LOFT/ BENCH/ SHELF PARTS IDENTIFICATION AND SIZES x4 x2 TP KP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 x1 BE 1 x 3 x 96" (2,5 x 7,6 x 243,8 cm) PT 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) x4 x1 x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) WJ 1 x 4 x 48" (2,5 x 10,2 x 121,9 cm) FO 1 x 3 x 48" (2,5 x 7,6 x 121,9 cm) x1 NK 2 x 3 x 48" (5,1 x 7,6 x 121,9 cm) x1 HYA x4 AO 1 x 4 x 96" (2,5 x 10,2 x 243,8 cm) 1 x 4 x 44-1/2" (2,5 x 10,2 x 113 cm) 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,2 cm) x6 3/8" x 14-1/4 x 22-1/2" (1 x 36,2 x 57,2 cm) x1 x7 PYA x1 BG x7 AC x6 AZ 19/32 x 3 x 30-1/8" ( 1,5 x 7,6 x 76,5 cm) x2 DT 19/32 x 3 x 28-1/8" (1,5 x 7,6 x 71,4 cm) x1 x1 x4 BWR 19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm) BWL 19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm) 2 x 4 x 19-3/4" (5,1 x 10,2 x 50,2 cm) LR DF 2 x 3 x 19" (5,1 x 7,6 x 48,3 cm) 2 x 4 x 11-5/8" (5,1 x 10,2 x 29,5 cm) 2 x 3 x10" (5,1 x 7,6 x 25,4 cm) 19/32 x 3 x 8-1/2" (1,5 x 7,6 x 21,6 cm) LOFT/ BENCH/ SHELF PANEL PARTS LIST NOTE: Panel parts are not stamped with part identication. x1 x1 x1 x1 7/16 x 36 x 96" (1,1 x 91,4 x 243,8 cm) x1 1/4 x 23-7/8 x 48" (0,6 x 60,6 x 121,9 cm) Peg board 7/16 x 11-1/2 x 96" (1,1 x 21,2 x 243,8 cm) x1 7/16 x 19-1/2 x 48" (1,1 x 49,5 x 121,9 cm) x1 7/16 x 11-1/2 x 48" (1,1 x 21,3 x 121,9 cm) 7/16 x 19-1/2 x 92-1/2" (1,1 x 49,5 x 235 cm) x2 7/16 x 47-7/8 x 48" (1,1 x 121,6 x121,9 cm) 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) x2 7/16 x 36 x 40-7/8" ( 1,1 x 91,4 x 103,8 cm) 1/4 x 23-7/8 x 96" (0,6 x 60,6 x 243,8 cm) Peg board x2 ROOF x1 7/16 x 36-1/2 x 96" (1,1 x 92,7 x 243,8 cm) 5 x2 7/16 x 36-1/2 x 47-7/8" (1,1 x 92,7 x 121,6 cm) WALL PANELS x2 x2 x2 x1 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) x9 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) x1 x1 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) x1 x1 LEFT DOOR RIGHT DOOR FASTENER/HARDWARE BAG (Not Actual Size) 2” (5,1 cm) x120 3” (7,6 cm) x91 x19 2” (5,1 cm) x64 1-1/4” (3,2 cm) 1” (2,5 cm) x18 x92 3/4” (1,9 cm) NAIL BOXES (Not Actual Size) x4 Boxes 3” (7,6 cm) x6 Boxes 2” (5,1 cm) Other HARDWARE (Not Actual Size) x4 x12 22-1/4" x 29-3/4" (56,5 x 75,6 cm) x1 3/4” (1,9 cm) x1 x2 16" x 8" ( 40,6 x 20,3 cm) x2 x12 x1 x12 1-1/2” (3,8 cm) 1/2” (1,3 cm) x12 x2 64” Metal Threshold 3/4” (19 mm) x6 x8 6 1” (2,5 cm) CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundatIon as shown, and continue on to page 11. Treated Sill Plate Caulk between sill plate and concrete. D D C 3-1/2" (8,9 cm) B A 4" (10 cm) Sill plates MUST be treated lumber. Building Size Actual Floor Size 12'x 12' (365,8 x 365,8 cm) 12'x 12' (365,8 x 365,8 cm) A B C D 144" (365,8 cm) 137" (348 cm) 144" (365,8 cm) 203-5/8" (517,2 cm) 12' x 12' Building Requires: x2 2 x 4 x 11'-5" (5,1 x 10,2 x 348 cm) x2 2 x 4 x 12' (5,1 x 10,2 x 365,8 cm) x1 Caulk Allow new concrete slabs to cure for at least seven (7) days. • A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Purchase full length treated lumber. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included). • Check local code for concrete foundation requirements. 7 FLOOR LEVELING OPTIONS There are multiple ways to level your oor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. FOUNDATION OR FLOOR MATERIALS • This shed does not include any oor or leveling materials. • See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your oor, as this will vary depending on your specic site. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" Screw angled into 4x4. • (2) at each point frame and 4x4 touch. 4x4 Runners (not included). 12" (30,5 cm) Measurements to centers of 4x4's. 12" (30,5 cm) DOOR MATERIAL REQUIRED x3 4" x 4" x 12' (10,2 x 10,2 x 365,8 cm) Treated Lumber x42 Fasteners for Frame to 4"x 4". (3" Screws shown as one option.) Minimum 3" screws / exterior grade. 3" (7,6 cm) Use only wood treated for ground contact and fasteners approved for use with treated wood. Always support frame seams. Maximum between leveling material locations. Shingle 4x4 Runner Level 48" 12" 12" Shingle Do not exceed 16". Gravel 2" Block LEVELING METHODS Gravel 4" Block 2x4 Treated Lumber 8" Block • Level under 4x4 runners only. • Locate leveling material 12" from ends of runners and no more than 48" apart. • Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground. • For best results and aiding in water drainage use gravel under each concrete block. LEVELING MATERIALS Gravel 2x4 Treated Lumber Asphalt Shingles Solid Masonry Blocks in 1", 2", 4" or 8" thickness Leveling higher than 16" not recommended. 8 FLOOR FRAME LEVEL AND SQUARE FLOOR FRAME Before attaching oor decking, it is important to level and square the oor frame. A level and square oor frame is required to correctly construct your shed. BEGIN 1 See page 8 for the preferred oor leveling method. 2 Use level and check the frame is level before applying oor panels. 3 Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 203-5/8" (517,2 cm). 4 When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A). FINISH 5 Once the oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners. First, secure at ends with one fastener. Fig. A 203-5/8" (517,2 cm) 203-5/8" (517,2 cm) DOO R Second, secure at ends with one fastener. 9 IMPORTANT! IMP O R TA N T ! Check the oor frame is level after installing oor panels. Re-level if needed. DO OR • The oor should be used as a level work surface for wall construction. HINT: • Organize your wall sections during subassembly to avoid over-handling of the walls. BACKWALL SIDEWALL FRONTWALL DO SIDEWALL OR 10 SIDE WALL FRAME PARTS REQUIRED: x4 x64 SP 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x14 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x4 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) IMPORTANT! You will build two walls the same. BEGIN 1 Orient parts on edge on oor as shown. 2 Nail using two 3" nails at each connection. HINT: DO 144" (365,8 cm) 120" (304,8 cm) 96" (243,8 cm) 48" (121,9 cm) 72" (182,9 cm) 96" (243,8 cm) 24" (61 cm) TP 3" (7,6 cm) Nails SP 78-1/2" (199,4 cm) AIx7 SP TP 96" (243,8 cm) 48" (121,9 cm) 3" (7,6 cm) Nails 3" (7,6 cm) Nails 11 OR SIDE WALL PANELS PARTS REQUIRED: x2 x100 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) GAA 2" (5,1 cm) AL 3/4" GAUGE BLOCK 1-1/2" GAUGE BLOCK Ensure your wall frame is square by installing one panel and squaring frame. BEGIN 1 Place LEFT panel onto wall frame with primed side up as shown. Locate the panel 1-1/2" above the top plate. Use AL as a gauge block for the 1-1/2" top overhang measurement. Use GAA as a gauge block to mark the 3/4" side measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A). 2 3 Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B). Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel. For squareness maintain 3/4" and 1-1/2" measurement along panel edge. 1-1/2" (3,8 cm) 48" (121,9 cm) BEGIN HERE 2 Nails DO 1-1/2" (3,8 cm) Overlap Fig. A 3/4" Gauge Block 12" (30,5 cm) Primed side UP Flush Lip Edge Square Edge 12 1-1/2" (3,8 cm) Overlap 3/4" (1,9 cm) AL 6" (15,2 cm) OR 3/4" (1,9 cm) 3/4" (1,9 cm) 2 Nails Fig. B SIDE WALL PANELS PARTS REQUIRED: x200 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm ) x4 2" (5,1 cm) AL 1-1/2" GAUGE BLOCK 4 Place middle panel on frame as shown with primed side facing up ush with rst panel. Nail using 2" nails 6" apart on edges and 12" apart inside panel. 5 Repeat STEP 4 to secure right panel. Do not nail in groove. DO FINISH 6 OR You have nished building your side wall. 3/4" (1,9 cm) Repeat process to make second wall. 3/4" (1,9 cm) To draw panels tight at seams angle nail. AL Flush 1-1/2" (3,8 cm) 48" (121,9 cm) 48" (121,9 cm) 12" (30,5 cm) Flush 6" (15,2 cm) Flush Primed side UP Square Edge Lip Edge 13 Lip Edge Square Edge FRONT WALL FRAME (Door Header) PARTS REQUIRED: x1 x18 3" (7,6 cm) F 3/8 x 3 x 66" (1 x 7,6 x 167,6 cm) x2 AM 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) BEGIN 1 Apply glue to parts as shown. Align parts on a at surface as shown. 2 Assemble header with 3” (7,6 cm) nails in a staggered pattern. 3 Turn assembled header over and repeat staggered nail pattern. DO OR FINISH 4 You have nished building your door header. HINT: AM 1/2” (1,3 cm) 1/4” (,6 cm) AM F F 1/4” (,6 cm) 1/2” (1,3 cm) AM Glue Flush 3" (7,6 cm) Nails 1/2” (1,3 cm) 3" (7,6 cm) Nails 14 FRONT WALL FRAME PARTS REQUIRED: x1 x2 AJ 2 x 4 x 12-1/2" (5,1 x 10,2 x 31,8 cm) AO 2 x 4 x 22-1/2" (5,1 x 10.2 x 57,2 cm) STL x1 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) x1 AV x30 2 x 4 x 60-1/2" (5,1 x 10,2 x 153,7 cm) 3" (7,6 cm) AI x5 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 TJ 2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on oor as shown. 2 Nail using two 3" nails at each connection and four 3" nails at seam. DIMENSIONS ARE TO CENTER OF STUDS. DO OR 137” (348 cm) 126-3/4” (321,9 cm) HINT: 58-1/4” (148 cm) 44-1/2” (113 cm) 92-1/2” (235 cm) 36-3/8” (92,4 cm) 12-3/8” (31,4 cm) STL TJ (4) 3" (7,6 cm) Nails AO (2) 3" (7,6 cm) Nails (2) 3" (7,6 cm) Nails AI x5 AO MAINTAIN DIMENSION 67” (170,2 cm) 69-1/4” (175,9 cm) 78-1/2” (199,4 cm) 38” (96,5 cm) 1-1/2” (3,8 cm) 1-1/2” (3,8 cm) AV AJ 12-3/8” (31,4 cm) 64” (162,6 cm) 60-1/2” (153,7 cm) 15 12-1/2” (31,8 cm) FRONT WALL FRAME PARTS REQUIRED: x32 SG x1 3" (7,6 cm) 2 x 4 x 34" (5,1 x 10.2 x 86,4 cm) BG x1 2 x 4 x 11-5/8" (5,1 x 10.2 x 29,5 cm) x5 AL 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) Pre - Assembled Header BEGIN 1 Orient the pre-assembled header, AL, BG and SG as shown. 2 Secure using 3" nails at each connection as shown. HINT: DO OR DIMENSIONS ARE TO CENTER OF STUDS. 68-1/2” (174 cm) 44-1/2” (113 cm) 20-1/2” (52,1) cm AL x5 7” (17,8 cm) Header 11-5/8” (28,6 cm) (2) 3" (7,6 cm) Nails 78-1/2” BG (199,4 cm) Flush MAINTAIN DIMENSION 34” (86,4 cm) 67” (170,2 cm) SG Flush 16 FRONT WALL FRAME PARTS REQUIRED: x14 3" (7,6 cm) x1 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) BEGIN 1 Orient parts on edge on oor as shown. 2 Secure using 3" nails as shown. FINISH 3 DO You have nished your front wall frame. OR HINT: UM UM 68" (172,7 cm) MAINTAIN DIMENSION 64" (162,6 cm) (2) 3" (7,6 cm) Nails 17 FRONT WALL PANELS PARTS REQUIRED: x50 2" (5,1 cm) GAA x1 2x4" TEMP. SPACER 3/4" GAUGE BLOCK BEGIN 1 Place the left front wall panel onto wall frame as shown with primed side up. 2 Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel 1-1/2" from the top plate. 3 Nail panels to frame with two 2" nails 6" apart on edges. DO FINISH 4 Do not nail in groove. Proceed to attaching your other front panel. 3/4" Gauge Block OR 1-1/2" (3,8 cm) 2 x 4" 3/4" (1,9 cm) Lip Edge 6" (15,2 cm) 6" (15,2 cm) 3/4" (1,9 cm) Primed side UP MAINTAIN DIMENSION 64" (162,6 cm) Square Edge Flush 3/4" (1,9 cm) 18 FRONT WALL PANELS PARTS REQUIRED: x64 2" (5,1 cm) x1 2x4" TEMP. SPACER BEGIN 1 Place window panel onto wall frame as shown with primed side up. 2 Use the measurement on the wall stud. Locate the panel 1-1/2" from the top plate. 3 Nail panels to frame with two 2" nails 6" apart on edges. DO FINISH 4 Proceed to attaching your other panels. 2 x 4" Flush 1-1/2" (3,8 cm) 6" (15,2 cm) 6" (15,2 cm) 12" (30,5 cm) 64" (162,6 cm) Primed side UP Square Edge 3/4" (1,9 cm) Flush Lip Edge Do not nail in groove. 19 OR FRONT WALL PANELS PARTS REQUIRED: x1 x2 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x35 Temporary Support 2" (5,1 cm) x1 BEGIN 1 2 Place right front wall panels onto frame with top of panels ush to previously installed panels. Nail panel to frame with 2" nails 6" apart on edges. 3 Attach tempoary support TP using two 3" screws as shown. DO FINISH 4 Square Edge Proceed to assembling your side wall frames. Flush Lip Edge 1-1/2" (3,8 cm) 6" (15,2 cm) 64" (162,6 cm) Primed side UP Hint: Use part “TP” (2 x 4 x 96") as a temporary support until wall is installed. 3" Screw 20 OR 3" Screw BACK WALL FRAME PARTS REQUIRED: x2 x24 3" (7,6 cm) STL 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) x2 TJ 2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm) x5 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) BEGIN 1 Orient parts on edge on oor. Measure and mark from end of boards. 2 Use two 3" nails at each connection and four 3" nails at seams. FINISH 3 DO OR Repeat process to make second wall. Proceed to attach wall panels. HINT: 137” (348 cm) 116-1/2” (295,9 cm) 92-1/2” (235 cm) 44-1/2” (113 cm) 68-1/2” (174 cm) 92-1/2” (235 cm) 20-1/2” (52,1 cm) (4) 3" (7,6 cm) Nails (2) 3" (7,6 cm) Nails TJ STL 78-1/2” (199,4 cm) AIx5 TJ STL 92-1/2” (235 cm) (2) 3" (7,6 cm) Nails 44-1/2” (113 cm) (4) 3" (7,6 cm) Nails 21 BACK WALL PANELS PARTS REQUIRED: x35 GAA 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) x1 2" (5,1 cm) 3/4" GAUGE BLOCK 2x4" TEMP. SPACER Ensure your wall frame is square by installing one panel and squaring frame. BEGIN 1 Place a 48" x 84" panel onto wall frame with primed side up as shown. Locate the panel 1-1/2" above the top plate. Use a 2 x 4" as a gauge block for the 1-1/2" top overhang measurement. Use GAA as a gauge block to mark the 3/4" side measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A). 2 3 Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B). Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel. For squareness maintain 3/4" and 1-1/2" measurement along panel edge. 1-1/2" (3,8 cm) 1-1/2" (3,8 cm) Overlap 6" (15,2 cm) 6" (15,2 cm) 1-1/2" (3,8 cm) Overlap 3/4" (1,9 cm) BEGIN HERE Fig. A 12" (30,5 cm) OR 3/4" (1,9 cm) 48" (121,9 cm) 2 x 4" 3/4" Gauge Block Lip Edge 2 Nails DO Primed side UP 3/4" (1,9 cm) Square Edge 22 2 Nails Fig. B BACK WALL PANELS PARTS REQUIRED: x2 x85 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 2" (5,1 cm) 2x4" TEMP. SPACER 4 Place middle 48" x 84" panel on frame as shown with primed side facing up ush with rst panel. Nail using 2" nails 6" apart on edges and 12" apart inside panel. 5 Place right 48" x 84"panel on frame as shown with primed side facing up ush with second panel. Nail using 2" nails 6" apart on edges and 12" apart inside panel. DO OR FINISH 6 You have nished building your back wall. Do not nail in groove. To draw panels tight at seams angle nail. 48" (121,9 cm) Flush Flush 2 x 4" 48" (121,9 cm) 1-1/2" (3,8 cm) 6" (15,2 cm) 12" (30,5 cm) Primed side UP Flush 3/4" (1,9 cm) 3/4" (1,9 cm) Flush 6" (15,2 cm) Square Edge Lip Edge 23 Lip Edge Square Edge SIDE WALL INSTALLATION PARTS REQUIRED: x4 3" (7,6 cm) x24 3" (7,6 cm) x50 2" (5,1 cm) BEGIN 1 Center side wall assembly on the oor. Ensure 1-1/2" measurement is on top 2 Use OO as a temporary brace. Secure with two 3" screws. 3 First, nail lower edge of panel to oor frame using 2" nails 6" apart. Angle nail to hit oor frame (Fig. A). 4 Nail side wall bottom plate to oor using eight 3" nails. (Nail two 3" nails between each stud through bottom plate) DO Do not nail in groove. FINISH 5 You have nished standing your side wall. Repeat steps 1-4 to attach second side wall. 1-1/2" (3,8 cm) 6" (15,2 cm) 3" (7,6 cm) Nail R CENTE Install 2" nails rst. Angle to nail into oor frame. OR ON FLO 144” (365,8 cm) OO DO OR 2" (5,1 cm) Nail Fig. A 24 OR BACK WALL INSTALLATION PARTS REQUIRED: x12 x4 3" (7,6 cm) 3" (7,6 cm) x55 2" (5,1 cm) BEGIN Stand backwall on oor. It is important to secure the back wall in the following order. 1 Center back wall on oor between side walls. DO Nail the lower back wall corner to the side wall with one 2" nail (Fig. A). OR 2" (5,1 cm) Nail Fig. A CENTER 2" (5,1 cm) Nail 2 Be sure the measurement between the panel edge and side wall is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. B). Fig. B 6" (15 cm) Nail along the panel edge using 2" nails spaced 6" apart into framing. Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit oor frame (Fig. C). 6" (15 cm) 2" (5,1 cm) Nail 3 Same Measurement Panel Fig. C 3" (7,6 cm) Screws Fig. D Secure framing using two 3" (7,6 cm) screws. Remove temporary brace. Repeat process to secure back wall to other side wall. 3" (7,6 cm) Nail 25 FRONT WALL INSTALLATION PARTS REQUIRED: x4 3" (7,6 cm) x10 3" (7,6 cm) x45 2" (5,1 cm) BEGIN Stand frontwall on oor. It is important to secure the frontwall in the following order. 1 Center frontwall on oor side-to-side. DO OR Nail the frontwall ush to the oor using 2" nails 6" apart. Angle nails to hit oor frame (Fig. A). 64" (162,6 cm) Nail the lower sidewall corner to the frontwall with one 2" nail (Fig. B). TP 2" (5,1 cm) Nail Fig. A 2" (5,1 cm) Nail 2 6" 6" (15,2 cm) (15,2 cm) CENTER Fig. B 2" (5,1 cm) Nail Be sure the measurement between the panel edges are the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. C). Fig. C 6" (15 cm) Nail along the panel edge into the trim using 2" nails spaced 6" apart. 2" (5,1 cm) Nail Remove tempoary support TP. 6" (15 cm) 3 Same Measurement Panel 3" (7,6 cm) Screws Secure the frontwall frame to oor using two 3" nails (Fig. D). Fig. E Secure framing using two 3" screws (Fig. E). Repeat process to secure the right side of the frontwall. 3" (7,6 cm) Nail 26 Fig. D WALL DOUBLERS INSTALLATION PARTS REQUIRED: x2 x64 x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) STL 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) x16 3" (7,6 cm) TJ x2 2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm) x2 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on top of wall frames. Measure and mark from end of boards. 2 Secure from top using two 3" nails spaced every 24" (Fig. A). 3 Secure from bottom using four 3" screws at each corner (Fig. B). DO OR FINISH 4 You have nished securing the wall doublers. 44-1/2” (113 cm) 3" (7,6) cm Nails 92-1/2” (235 cm) Fig. A 48” (121,9 cm) STL TJ TP SP 96” (238,8 cm) Ensure all doubler seams are not-aligned over seams of wall top plates. 96” (243,8 cm) TP DOOR SP TJ Nail 24” (61cm) TYP. 3" (7,6) cm Screws STL Fig. B 92-1/2” (235 cm) 27 44-1/2” (113 cm) 48” (121,9 cm) RAFTERS PARTS REQUIRED: x1 x144 x12 OO 6 x 24" (15,2 x 61 cm) 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) x14 2" (5,1 cm) ADA 2 x 4 x 53-1/4" (5,1 x 10,2 x 135,3 cm) BEGIN 1 Place two rafter-halves (ADA) in the corner of back and side walls. Rafters contact at peak. Assemble (5) Rafters with gussets on both sides. Assemble (2) Rafters with gussets on one side. DO OR 144” (365,8 cm) HINT: Fit base of rafters in corners of back wall. Use oor and walls to help assemble rafters! Temporary support (OO) Contact at peak 2 Apply glue to rafters where gusset will t. 3 Secure gusset to rafters using 2" (5,1 cm) Nails as shown. 4 Flip over rafter assembly and repeat STEPS 2-4 to attach second gusset to other side. 5 Repeat STEPS 2-5 to build additional assembles. Remove OO. FINISH 6 Flush You have nished assembling your rafters. 1/4" gap (6 mm) GUSSET x2 2" (5,1 cm) Center Glue Contact at peak Glue 28 RAFTER INSTALLATION PARTS REQUIRED: x28 x5 3" (7,6 cm) x2 Rafter Assemby 2 gusset plates Rafter Assemby 1 gusset plate BEGIN 1 Locate rafters directly over the wall studs. Check you have the measurements shown. 2 Secure with two 3" screws angled at each end. DO OR FINISH 3 You have nished installing your rafters. DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS ARE TO CENTER OF RAFTERS. 24-3/8” (61,9 cm) 24” (61 cm) 24” (61 cm) 24” (61 cm) 24” (61 cm) 24-3/8” (61,9 cm) Align over studs. Flush to panel Flush to panel Maintain the measurements between rafters. 29 GABLE PANELS PARTS REQUIRED: x12 x4 x2 x2 1-1/2" (3,8cm) AF 2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm) x2 BEGIN 1 Place center gable panel on AF primed side up as shown. 2 Mark middle gable panel at center on primed side. 3 Place left panel on AF ush to center gable panel and secure using three 1-1/2" nails. 4 Repeat STEP 3 for right panel. 5 Repeat STEP 1-4 for front gable panels. DO OR FINISH 6 You have nished assembling your gable panels. 1-1/2" (3,8cm) 3-1/2" (8,9 cm) 6" (15,2 cm) AF 1-3/4" (4,4 cm) 2-1/2" (6,4 cm) Flush Flush 6" (15,2 cm) 2" Nails (5,1 cm) 2-1/2" (6,4 cm) Flush Mark 30 Flush 2-1/2" (6,4 cm) GABLE INSTALLATION PARTS REQUIRED: x8 3" (7,6 cm) x114 x2 2" (5,1 cm) Pre - Assembled BEGIN 1 Center gable assembly on side wall and overlap side wall panels. 2 Attach using 2" (5,1cm) nails 6" (15,2 cm) apart. 3 Secure uprights using two 3" (7,6 cm) screws as shown. DO FINISH 4 Repeat steps 1-3 to secure the other side wall gable panels. 2" Nails (5,1 cm) 6" (15,2 cm) 6" (15,2 cm) Flush Center Mark 3" Nails (7,6 cm) 31 Flush OR ROOF PANELS PARTS REQUIRED: x8 2" (5,1 cm) x2 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. You must square the roof by attaching one panel rst. You must use the panel's long edge as a lever to bring your roof into square. Commonly known as "racking". DO 2" Nails (5,1 cm) OR Flush at peak BEGIN 1 Attach panel to end of rafter with rough side up (Primed grid-line side) 3/4" (1,9 cm) from outside edge of rafter (Fig. A) and panel ush at peak (Fig. B ). Fig. A Secure with two 2" nails at the corners. Fig. B DO OR 3/4" (1,9 cm) Roof Panel Flush at peak Fig. D Truss Gabel Panel 2 Fig. C Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-toside until the top corner is ush with the peak (Fig. C), and there is 1/2" (1,3 cm) measurement to the rafter (Fig. D). 1/2" (1,3 cm) DO OR You may need to move your side wall to get the 1/2" (1,3 cm) measurement. Secure panel with two 2" Nails in the corners. 2" Nails (5,1 cm) 32 ROOF PANELS PARTS REQUIRED: x176 2" (5,1 cm) 7/16 x 36-1/2 x 47-7/8" (1,1 x 92,7 x 121,6 cm) x2 7/16 x 36-1/2 x 96" (1,1 x 92,7 x 243,8 cm) x2 3 Keep spacing between the center of each rafter at the lower edge of the panel and secure with one 2"nail into each rafter (Fig. E). 7/16 x 47-7/8 x 48" (1,1 x 121,6 x121,9 cm) x2 NOTE: Measurements from outside of panels 24-3/4" (62,9 cm) 24" (60,9 cm) Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E). Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel. 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) Fig. E 2" Nail 12" (30,5 cm) apart 6" (15,2 cm) apart 4 Attach the lower roof panel ush to the upper panel, with the 1/2" (1,3 cm) measurement at the rafter (Fig. F). DO OR Flush at peak Roof Panel Truss Gabel Panel FINISH Repeat process to attach roof panels on the opposite side. OR DO Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel. 5 24-3/4" (62,9 cm) Fig. F 6" (15,2 cm) apart 12" (30,5 cm) apart 6" (15,2 cm) apart Fig. G 12" (30,5 cm) apart 48" (121,9 cm) DO OR 96" (243,8 cm) 47-7/8" (121,6 cm) DO OR 33 36-1/2" (92,7 cm) GABLE TRIM PARTS REQUIRED: x56 x2 WYL 19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm) x2 WYR 19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm) 2" (5,1 cm) BEGIN 1 Install left front gable trim WYL ush to top of panel and ush at peak (Fig. A) as shown. 2 Secure to wall using 2" nish nails 7-1/4" apart. 3 Repeat steps 1-2 to attach right front gable trim. 4 DO OR Repeat steps 1-3 to secure the back wall gable trim. Flush FINISH 5 You have nished installing your gable trim. Roof Panel Fig. A Flush 2" Nails (5,1 cm) Flush to top of panel 34 EAVE TRIM PARTS REQUIRED: x2 x60 1-1/4" (3,2 cm) VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) x2 AS x8 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) 3" (7,6 cm) BEGIN 1 Orient AS between gable trim ush to edge of roof panel (Fig. A). 2 Screw through roof panel into eave side overhang using 1-1/4" screws approximately 7-1/2" apart as shown. 3 DO OR Orient VX between AS and gable trim, ush to edge of roof panel. FINISH 4 Repeat process on opposite side. You have nished your eave trim. Flush Fig. A AS VX 3” (7,6 cm) Screw 1-1/4” (3,2 cm) Screws AS 7-1/2" (19,1 cm) apart approximately 49 1/2" (125,7 cm) 96" (243,9 cm) DO OR VX 35 CORNER TRIM PARTS REQUIRED: x64 2" (5,1 cm) x4 3/8 x 1-3/4 x 81-1/2" (1 x 4,4 x 207 cm) x4 3/8 x 1-3/4 x 83-1/2" (1 x 4,4 x 212,1 cm) BEGIN 1 Secure 83-1/2" (212,1 cm) corner trim under side eave trim. Attach with 2" nails as shown in (Fig. A). 2 Secure 81-1/2" (207 cm) corner trim ush under gable panel. Attach with 2" nails as shown. 3 Repeat on other side. DO OR FINISH 4 Corner trim Proceed to installing your collar ties. Seam is ush. Caulk seam before painting trim. Fig. A DO OR 83-1/2" (212,1 cm) 81-1/2" (207 cm) 36 COLLAR TIE PARTS REQUIRED: x1 x6 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Locate collar tie TP on the rafter over the center of the door as shown. Check collar tie is level and ush to roof panel. 2 Nail collar tie to the rafter with three 3" nails at each end. DO FINISH 3 You have nished installing your collar tie. Flush 3" (7,6 cm) Nails TP HINT: For best appearance, install collar tie on back side of rafter. 37 OR LOFT JOIST ASSEMBLY PARTS REQUIRED: x48 3" (7,6 cm) x4 2 xTP 4 x 96" (5,1 x 10,2 x 243,8 cm) x4 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) BEGIN 2 Ensure parts TP and SP are aligned perfectly on a at surface. Spread glue across SP and TP as shown. Assemble joist with 3” (7,6 cm) nails in a staggered pattern. 3 Turn assembled joist over and repeat staggered nail pattern. 1 DO 4 Repeat steps 1-3 to assemble second loft joist. SP Glue TP TP SP Flush Flush 38 Flush OR LOFT INSTALLATION PARTS REQUIRED: x18 3" (7,6 cm) x2 LOFT JOIST ASSEMBLY x1 PT x12 3" (7,6 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) x1 NK 2 x 3 x 48" (5,1 x 7,6 x 121,9 cm) x2 AO 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,2 cm) x1 PYA 2 x 4 x 19-3/4" (5,1 x 10,2 x 50,2 cm) BEGIN 1 Locate NK and PT directly under the side wall top plates and secure with two 3" (7,6) nails at each backwall stud. 2 Secure AO and PYA as shown with two 3" screws on each side. 3 Secure with two 3" screws on each side. 4 Position loft joists on top of AO and PYA as shown. Secure with 3" nails. 3-1/2” (8,9 cm) 3" (7,6 cm) Screws DO NK 3-1/2” (8,9 cm) PT AO 3" (7,6 cm) Screws AO Flush 3” (7,6 cm) Flush Nails LEVEL PYA 3-1/2” (8,9 cm) SIDE WALL Flush at wall panel. 3" (7,6 cm) Nails Loft Joist Window OR 3" (7,6 cm) Screws 39 AO Flush 3" (7,6 cm) Screws BENCH ASSEMBLY PARTS REQUIRED: x2 3" (7,6 cm) x6 x36 3/8 x 8 x 12-1/2" (1 x 20,3 x 31,8 cm) 2" (5,1 cm) x7 LR 2 x 3 x19" (5,1 x 7,6 x 48,3 cm) BEGIN 2 Secure six LR to shelf panels using three 2" (5,1 cm) nails. Assemble 6 shelf supports as shown. Secure one LR to studs with two 3" (7,6 cm) nails as shown. 3 Secure shelf supports at shown heights with three 2" (5,1 cm) nails. 1 DO OR x6 2" (5,1 cm) Nail LR 11-5/8” 29,5 cm Flush Level 4-7/16” (11,3 cm) 7/16” (1,1 cm) 3" (7,6 cm) Nail LR Corner stud Refrence this height LR Same dimension Flush Level Flush Floor 2" (5,1 cm) Nail 40 BENCH PANELS PARTS REQUIRED: x1 7/16 x 19-1/2 x 92-1/2" (1,1 x 49,5 x 235 cm) x1 3" (7,6 cm) x62 2" (5,1 cm) 7/16 x 19-1/2 x 48" (1,1 x 49,5 x 121,9 cm) x1 x1 x1 1/4 x 23-7/8 x 96" (0,6 x 60,6 x 243,8 cm) Peg board KP 1 x 4 x 96" (2,5 x 10,2 x 243,8 cm) x1 x1 HYA 1/4 x 23-7/8 x 48" (0,6 x 60,6 x 121,9 cm) Peg board 1 x 4 x 44-1/2" (2,5 x 10,2 x 113 cm) BEGIN 1 Install shelf panels centered over shelf supports. Secure with three 2" (5,1 cm) nails at each support 2 Secure HYA and KP with two 2" (5,1 cm) nails at each support and four 2" (5,1 cm) nails at seams. Secure the end of KP with a 3" nail as shown 3 DO Secure pegboard with three 2" (5,1 cm) nails at each support and (6) 2" (5,1 cm) nails at seams. Ensure pegboard is in contact with top of bench. FINISH You have nished installing your shelves and pegboard. 5 OR 4 92-1/2" (235 cm) Flush 48" (121,9 cm) 2” (5,1 cm) Nails 2” (5,1 cm) Nails HYA KP 3” (7,6 cm) Nail Flush Flush 41 SHELF ASSEMBLY PARTS REQUIRED: x72 2" (5,1 cm) x7 AC 2 x 3 x10" (5,1 x 7,6 x 25,4 cm) x1 FO 1 x 3 x 48" (2,5 x 7,6 x 121,9 cm) x1 BE 1 x 3 x 96" (2,5 x 7,6 x 243,8 cm) BEGIN 1 2 Secure AC to BE and FO using two 2" (5,1 cm) nails at each support and four 2" (5,1 cm) nails at each seam. Secure shelf support as shown with two 2" (5,1 cm) nails at each wall stud. DO OR 144" (365,8 cm) 120" (304,8 cm) 96" (243,8 cm) 2” (5,1 cm) Nails 72" (182,9 cm) 48" (121,9 cm) 24" (61 cm) Flush Flush BE FO AC x7 Flush with top of pegboard 42 3” (7,6 cm) Nails SHELF PANELS PARTS REQUIRED: x30 2" (5,1 cm) 7/16 x 11-1/2 x 96" (1,1 x 21,2 x 243,8 cm) x1 7/16 x 11-1/2 x 48" (1,1 x 21,3 x 121,9 cm) x1 x1 KP 1 x 4 x 96" (2,5 x 10,2 x 243,8 cm) x1 WJ 1 x 4 x 48" (2,5 x 10,2 x 121,9 cm) BEGIN 3 Install shelf panels centered over shelf supports. Secure with two 2" (5,1 cm) nails at each support 4 Secure WJ and KP with two 2" (5,1 cm) nails at each support and three 2" (5,1 cm) nails at seams. Secure shelf from oustide of the front wall panel using 1-1/2" Nails at shown measurments. 5 DO OR FINISH 6 You have nished installing your shelf. 1-1/4” (3,2 cm) Nails 24" (61 cm) 1-1/2” (3,8 cm) Nails KP WJ Level 14" (35,6 cm) 3” (7,6 cm) Screw 3” (7,6 cm) 62" Nails (157,5 cm) Flush 43 LOFT PANELS PARTS REQUIRED: x1 x48 2" (5,1 cm) 7/16 x 36 x 96" (1,1 x 91,4 x 243,8 cm) x1 7/16 x 36 x 40-7/8" ( 1,1 x 91,4 x 103,8 cm) BEGIN Install loft panels centered over loft joists and ledger board. Secure with 2" (5,1 cm) nails 8" (20,3 cm) apart. 1 NOTE: There will be a gap of approximately 1/2” on either side of installed deck panels. FINISH 2 DO You have nished installing your Loft. Flush 8” 20,3 cm 2” (5,1 cm) Nails 8” (20,3 cm) View of loft from above 44 OR DOORS PARTS REQUIRED: x2 x2 OO 1-1/4" (3 cm) 2 x 3 x 69" (5,1 x 6,5 x 175,3 cm) x4 2" (5,1 cm) HINT: Look for 3/8" SPACER attached to doors. GAA 3/4" GAUGE BLOCK x1 x1 Left Door Right Door BEGIN 1 Orient parts as shown on at surface. (right) and green (left) on hinge board. 2 Attach temporary supports OO with 3" screws in middle and at ends as shown. Tighten securely. 3 Attach tempoary supports GAA with two 1-1/4" screws. Tighten Securely. 3/8" offset is to top. Look for red GREEN OFFSET 3/8" (1 cm) DO OR RED Make sure spacer is attached. 3/8" OFFSET (1 cm) 3/8" (1 cm) 23-1/2" (59,5 cm) (4) 3" (7,6 cm) Screws Tighten screws securely. OO (2) 1-1/4" (3,2 cm) Screws GAA 23-1/2" (59,5 cm) Bottom edges ush. 3/8" (1 cm) 45 DOORS x13 PARTS REQUIRED: 3" (7,6 cm) x1 OO 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) 2 Attach tempoart support OO as a ledger board ush under wall panels for doors to rest on, Using 3" (7,6 cm) Screws (Fig A). DO OR Flush to panel 64" m) (162,6 c OO OO 3 4 Fig. A Measure and mark center of door opening (Fig. A). Center doors on mark as shown (Fig. B). Screw hinge boards into wall supports and oor using eight 3" screws as shown. Make sure screws go into framing and oor (Fig. C, D). Remove temporary supports and check doors open properly. 5 FINISH 6 You have nished installing your doors. Center 3/8" measurement on mark. Fig. B 3/8" (1 cm) Fig. C Angle 3" (7,6 cm) Screw 3" (7,6 cm) Screws into the wall support and oor frame. Fig. D 46 DOOR WEATHERSTRIP x10 PARTS REQUIRED: x2 2" (5,1 cm) OO 2 x 3 x 69" (5,1 x 7,6 x 175 cm) BEGIN 1 With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1" (Fig. B). 2 Secure OO using 2" (5,1 cm) screws through outside trim into OO (Fig. B). 3 On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C). 4 Secure OO using ve 2" (5,1 cm) screws through outside trim into OO (Fig. C). DO OR FINISH 5 You have nished installing your door weatherstrips. 1" OFFSET (2,5 cm) OO Center OO in door opening. Fig. B Fig. A 1" (2,5 cm) Overhang Fig. C Screws 2" (5,1 cm) Screws 2" (5,1 cm) x10 14" (35,5 cm) Approximately 47 DOORS AH PARTS REQUIRED: x2 19/32 x 3 x 26 5/8" (1,5 x 7,6 x 67,6 cm) x7 x2 x66 x1 AHR/AHL 19/32 x 3 x 62" @ 22.5* (1,5 x 7,6 x 157,5 cm @ 22.5*) 2" (5,1 cm) 3/4" (1,9 cm) ZJ 19/32 x 3 x 72" (1,5 x 7,6 x 182,9 cm) BEGIN 1 Reinforce the door trim using 3/4" (1,9 cm) screws through door panel into trim (Fig. A). Locate screws as shown in Fig. B. Use two screws at seams. 3/4” (1,9 cm) Screws DO OR 14" (35,6 cm) Approximately Two 3/4” (1,9 cm) Screws Fig. A 2 3 4 Fig. B Center trim ZJ over doors and secure using seven 2" nish nails into framing as shown. Center Remove 3/8" spacers from doors. Install AH and AHL/AHR as shown and secure from inside with eleven 3/4" (1,9 cm) screws ZJ FINISH 5 2” (5,1 cm) Screws You have nished securing your door and trim. 3/4” (1,9 cm) Screws Level AH AH Flush AHL AHR Flush 48 DOORS PARTS REQUIRED: x11 x4 3/4” (1,9 cm) Coated screws x1 x12 3/4” (1,9 cm) 64" (162,6 cm) METAL THRESHOLD BEGIN 1 Center metal threshold between door opening. 2 Secure Threshold using eleven 3/4" (1,9 cm) coated screws into oor as shown. DO OR FINISH 3 You have nished installing your door Threshold. 3/4” (1,9 cm) Coated Screws BEGIN 1 Level decorative hinges in position as shown and secure with 3/4" (1,9 cm) screws. FINISH 2 You have nished installing your decorative door hinges. Flush 49 3/4” (1,9 cm) Screws DOOR HARDWARE PARTS REQUIRED: x8 1” (2,5 cm) x2 3/8" (0,9 cm) Drill Bit BEGIN 1 2 Place bolt onto OO in open position with bolt end 1/4" (0,6 cm) down from frame (Fig A), and 1/2" (1,3 cm) up from oor (Fig B). Bolt is open when loop is contacting base. Mark and pre-drill holes for screws. Install bolt with screws supplied and drill 5/16" (0,8 cm) hole deep enough for bolt to slide into. DO OR FINISH 3 You have nished installing your door bolts. Fig. A LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD OVER DOOR FRAME 1/4" with bolt in open position. OO 2 x 3 x 69" LEFT DOOR 5/16" drill for bolt: 1" deep. x4 PRE-DRILL (4) HOLES OPEN POSITION, Spring is loose. Loop contacts base. HINT: With door closed extend bolt and tap hammer to leave a mark in wood for drilling. Fig. B LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD OO 2 x 3 x 69" OPEN POSITION, Spring is loose. Loop contacts base. PRE-DRILL (4) HOLES x4 1/2" with bolt in open position. FLOOR FRAME 50 5/16" drill for bolt: 1" deep. DOOR HARDWARE PARTS REQUIRED: x2 x1 1-1/2” (38 mm) 1/4" (0,6 cm) 1/2" (1,3 cm) Drill Bits 1 Measure and mark position on right door as shown. 2 Pre-drill 1/4" hole at mark. Finish hole with 1/2" drill bit. 3 Position hardware in hole and secure with screws as shown. 1-1/2" (3,8 cm) DO OR TOP VIEW 1/2" 1,3 cm 1/4" Pre-drill and 1/2" Drill-through. SIDE VIEW 1-1/2" 3,8 cm 35-3/4" 90,8 cm Set Screw INSTALL ON RIGHT DOOR. FINISH 4 You have nished mounting your door hardware. 1-1/2" (3,8 cm) x2 51 WINDOW SHUTTERS PARTS REQUIRED: x6 x1 x18 AZ 19/32 x 3 x 30-1/8" ( 1,5 x 7,6 x 76,5 cm) x4 1" (2,5 cm) DF 19/32 x 3 x 8-1/2" (1,5 x 7,6 x 21,6 cm) BWR 19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm) x1 BWL 3/8" (0,9 cm) Drill Bit 19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm) BEGIN 1 Position parts primed side-down on oor, as shown. You will build two shutters the same. 2 Secure with 1" (2,5 cm) screws as shown. 3 Repeat steps to build your second shutter. DO OR FINISH 4 You have nished building your window shutters. Proceed to install your window. 8-1/2” (21,6 cm) 30-1/8” (76,5 cm) 2-1/2” (6,4 cm) 2-1/2” (6,3 cm) 1/2” (1,3 cm) AZ x 6 2-1/2” (6,4 cm) 2-1/2” (6,4 cm) BWR DF x 4 Install with primed side facing down. 2-1/2” (6,4 cm) BWL 52 WINDOW PARTS REQUIRED: x8 x18 2" (5,1 cm) x2 x1 3/4" (1,9 cm) x4 DT 1-1/4" (3,2 cm) 19/32 x 3 x 28-1/8" (1,5 x 7,6 x 71,4 cm) BEGIN 1 Postion window in front gable as shown and secure with four 1-1/4" (3,2) screws. Seal window with high-quality paintable exterior caulk 2 Mark center of window frame as shown. DO OR CENTER 2" (5,1 cm) CENTER CENTER HINT: Claulk behind frame CENTER 3 Tack trim (DT) and shutters in place Flush with 2" nish nails as shown. From the inside of the shed, use 3/4" screws to secure the shutter indicated at X . 4 Center FINISH 5 DT x 2 2-1/2" (6,4 cm) Flush You have nished mounting your window 30-1/8" (76,5 cm) Center Flush Flush 2-1/2" (6,4 cm) Center 5-5/8" (14,3 cm) 30-1/8" (76,5 cm) 53 5-5/8" (14,3 cm) Vent • Follow directions provided by manufacturer and these instructions. x12 x1 1/2” (13 mm) 16 x 8" ( 40,6 x 20,3 cm) BEGIN 1 Locate and mark for two vents in side walls as shown. (1) at top and (1) at bottom Cut out marked openings DO OR Caulk behind vent anges 2 Secure using 1/2" (1,3 cm) screws 14" (35,6 cm) FINISH 3 You have nished installing your vents. Caulk 6" (15,2 cm) 1/2" (1,3 cm) 3"- 5" (7,6 - 12,7 cm) 1/2" (1,3 cm) Caulk 7"- 8" (17,8 - 20,3 cm) 5" (12,7 cm) 6" (15,2 cm) 14" (35,6 cm) 54 PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.) ROOF FELT - NOT INCLUDED • Install felt ush to all roof edges overlapping 3". Use minimal amount of roong nails to hold in place. OK to overlap at ridge. 3" OVERLAP Flush Flush DRIP EDGE - NOT INCLUDED • Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A). • Do not use nails on side of drip edge that hangs over side of building. • Only nail top of drip edge as shown. Roof felt Drip edge Drip edge Edge ush to trim. Fig. A Snip bottom side of drip edge and bend over to other side of roof. (Follow directions provided by manufacturer.) 55 SHINGLES - NOT INCLUDED • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1" (2,5 cm) 1/2" (1,3 cm) Sealing Strip 1" (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN 1 Install rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles ush to drip edge. FRONT OF SHED BACK OF SHED (4) Nails TABS UP 1" (2,5 cm) overhang or ush with drip edge. Shingle overlaps roof decking. 1" (2,5 cm) overhang past roof deck. 56 SHINGLES continued... 2 2 Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge. Roof Deck FRONT OF SHED 1" (2,5 cm) BACK OF SHED Flush with starter row. Notch - or Drip Edge Flush with starter row. Notch 3 Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED Bend in roof 1" (2,5 cm) Notch Flush with rain slots. 4 Continue installing rows of shingles by staggering at front. Flush with rain slots. 1" (2,5 cm) FRONT OF SHED Notch 57 SHINGLES continued... 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. Cut Off. 5" (12,7 cm) MAX. CUT Top of rain slot. 5" (12,7 cm) or less. • If more than 5" to rain slot you must install another row of shingles. 6 Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 7 Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge. 8 Using your shingle hooked blade carefully cut shingles along chalk line. FINISH 9 You have nished shingling your roof. Proceed to capping the ridge. 58 SHINGLES - RIDGE CAP • You will nish off the top of the roof with a ridge cap made from shingles. BEGIN 1 Cut shingles into THREE pieces. Hint: Use cut-off pieces rst. 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) Score shingle, then snap-off angled cut. 12x12' Weather Seal Top of slot. Note: • You will need about 30 - 32 cut pieces for 12' x 12' model 2 30 to 32 Pieces Install rst ridge cap ush to shingles at front, as shown. (1) Nail per side through weather seal. Flush 3 Install second ridge cap 5" back, as shown. (1) Nail per side through weather seal. 5" 12,7 cm Flush FRONT OF SHED 59 SHINGLES - RIDGE CAP continued... 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. 4" (10,2 cm) 6 Trim cap off ush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Cap 7 Install ush to shingles. Flush to shingles (2) Nails per side. FINISH 8 You have nished your ridge cap. 60 Use as a visual aid only. 12-12-03 F L O O R K I T I N S T RU C T I O N S FOR 10X4 BUILDING EXTENDER ACTUAL SIZE 120” WIDE X 48” DEEP Parts Needed: A 2 - 2x4x24" Bond Boards B 2 - 2x4x96" Bond Boards C 9 - 2x4x45" Floor Joist D 1 - 48"x96"x5/8" Floor Panels E 1 - 23-7/8"x48"x5/8" Floor Panels - 2" and 3" Nails #16635 1-800-437-0784 This instruction may be different from the one specified in Building instruction. ● ● ● Generic floor extender for Marco and Premier Series buildings NOT for use with Solar Shed. Assemble extended floor 16" on center as shown or 24” on center if desired. B A C C C A C C C C C Using 3” nails, nail twice through each Bond Board A & B into each end of each Joist C , keeping pieces flush at top and ends, and maintain 16” and 12” spacing as shown. Where A & B join together use 4-3” nails. 48" (12 cm) 16" (41 cm) 16" (41 cm) Center of Stud A 16" (41 cm) Center of Stud 16" (41 cm) Center of Stud 16" (41 cm) Center of Stud 16" (41 cm) Center of Stud 12" (30 cm) Center of Stud ASSEMBLY OF 120” X 48” FLOOR FRAME A:Position Bond Boards A & B and Floor Joists C as shown. C B NOTE: Part letters are not stamped on floor kits. 12" (30 cm) Center of Stud 120" (305 cm) C B A (4) 3" (7.6 cm) Nails at Joint B Y C A (2) 3" (7.6 cm) Nails X B: Completed Floor Frame should be positioned at building site, leveled, using shims between floor frame and ground before proceeding to Floor Panel Attachment. Y X 10x4 Floor Instructions Square frame by making corner-to-corner measurements (X to X and Y to Y) the same. 10X4 F L O O R K I T I N S T RU C T I O N S CONTINUED Original Floor C C: 3" Nails (7.6 cm) Attach 10x4 Extender Floor Kit to original 10x8 or 10x10 floor kit with (2) 3” nails between every joist as shown. 2" Nails (5 cm) D C 48" (122 cm) D B A 120" (305 cm) D: Position a 48 x 96” Floor Panel D flush to the outside edges of sides and back of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at other corners. E Original Floor 32" (81 cm) 16" (41 cm) 16" (41 cm) D 2" Nails (5 cm) 32" (81 cm) 16" (41 cm) E 12" (30 cm) Nails every 12" (30 cm) through Floor Panels into all Floor Bond Boards and Floor Joists E: Position a 23-7/8” x 48” Floor Panel E flush against first panel and flush to edges of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at the other corners. Note: Mark a line on the Floor Panel over the center of each Floor Joist using a pencil and a piece of lumber from the kit (or use a chalk line) to make nailing easier. With Floor Panels flush to outside edges of Floor Frame, nail with 2” nails every 12” through Floor Panels into all Floor Bond Boards and Floor Joists. Your Floor is now complete. Check to be sure it is properly positioned and leveled to ground before beginning assembly of your Wooden Storage Building. 10x4 Floor Instructions 02-24-06 FLOOR KIT INSTRUCTIONS FOR 10x8 and 10x16 BUILDINGS ACTUAL SIZE • 120” WIDE x 96” DEEP (10X8) • 120” WIDE x 192” DEEP (10X16) Parts Needed: A 2 - 2x4x48" Bond Boards B 2 - 2x4x72" Bond Boards C 9 - 2x4x93" Floor Joist D 2 - 48"x96"x5/8" Floor Panels E 1 - 23-7/8"x96"x5/8" Floor Panels - 2" and 3" Nails #16630 1-800-437-0784 This instruction may be different from the one specified in Building instruction. NOTE: Part letters are not stamped on floor kits. Use for Premier Series Buildings only, cannot be used for a Marco Series Building or Premier Solar Shed A A C C ASSEMBLY OF 120” X 96” FLOOR FRAME B C C C C C C A:Position Bond Boards A & B and Floor Joists C as shown. C 96" (244 cm) B 16" (41 cm) 16" (41 cm) Center of Stud A 16" (41 cm) Center of Stud Using 3” nails, nail twice through each Bond Board A & B into each end of each Joist C , keeping pieces flush at top and ends, and maintain 16” and 12” spacing in middle as shown. Where A & B join together use 4-3” nails. 12" (30 cm) Center of Stud 12" (30 cm) Center of Stud 16" (41 cm) Center of Stud 16" (41 cm) Center of Stud 16" (41 cm) Center of Stud 120" (305 cm) C B A (4) 3" (7.6 cm) Nails at Joint B Y C A (2) 3" (7.6 cm) Nails X B: Completed Floor Frame should be positioned at building site, leveled, using shims between floor frame and ground before proceeding to Floor Panel Attachment. Y X 10x8 and 10x16 Floor Instructions Square frame by making corner-to-corner measurements (X to X and Y to Y) the same. 10x8 and 10x16 F L O O R K I T I N S T R U C T I O N S (CONTINUED) C 2" Nails (5 cm) C 96" (244 cm) D B A 120" (244 cm) C: Position a 48 x 96” Floor Panel D flush to the outside edges of sides and back of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at other corners. Nails every 12" (30 cm) through Floor Panels into all Floor Bond Boards and Floor Joists D 32" (81 cm) 16" (41 cm) 32" (81 cm) D 16" (41 cm) E 12" (30 cm) D 2" Nails (5 cm) 16" (41 cm) (2) 10x8 (2) 3” nails between every joist as shown FOR 10 x 16 FLOOR BUILD TWO 10 x 8 FLOORS, ATTACH PRIOR TO INSTALLING FLOOR DECKING D: Position a 23-7/8” x 96” Floor Panel E flush against first panel and flush to edges of Floor Frame. Secure panel with one 2” nail at outside corners. Position the other 48” x 96” Floor Panel D flush against second panel and flush to edges of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at each of other corners. Note: Mark a line on the Floor Panel over the center of each Floor Joist using a pencil and a piece of lumber from the kit (or use a chalk line) to make nailing easier. With Floor Panels flush to outside edges of Floor Frame, nail with 2” nails every 12” through Floor Panels into all Floor Bond Boards and Floor Joists. Your Floor is now complete. Check to be sure it is properly positioned and leveled to ground before beginning assembly of your Wooden Storage Building. 10x8 and10x16 Floor Instructions WARRANTY Backyard Storage Solutions, LLC warrants the following: Limited Conditional 1. Every product is warranted from defects in workmanship and manufacturing for one year. Warranty * 2. All hardware and metal components are warranted for two years. 3. Trim is warranted for 10 years. 4. Waferboard siding and sheathing is warranted for two years. 5. SmartSide™ siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings. 6. Timber series buildings’ siding and trim are warranted for 10 years. 7. Solar Shed windows are warranted for 1 year. 8. Cedar lumber is warranted for 15 years. 9. Cedar doors and Cedar Garden Center are warranted for 10 years. 10. Metal roof is warranted for 25 years. Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase. CONDITIONS The warranty is effective only when: 1. The unit has been erected in accordance with the assembly instructions. 2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter. 3. The failure occurs when the unit is owned by the original purchaser. 4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification of the failure in writing within the warranty period specified above. 5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to inspect and verify the failure prior to commencement of any repair work. REQUIREMENTS Storage Buildings & Playhouses To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of SmartSide™ and waferboard siding to include all exterior walls and all sides and all edges of doors. Gazebos, Pergolas & Timber Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty. Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit. This warranty gives you certain specific rights that vary from state to state. CLAIM PROCEDURE To make a claim under this warranty, you can either call 1-888-827-9056 or prepare a letter. Please have ready the information below when you call or include the information when writing: 1. The model and size of the product. 2. A list of the part(s) for which the claim is made. 3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice. 4. Run code, as listed on the yellow warranty card enclosed in the product package. Mail the above information to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A. IMPORTANT: This is your warranty certificate. Please complete and mail your warranty card to properly validate your warranty. 61