LSP Parkland Stage 27 (8.5x11) 15JAN09 Part 2.cdr
Transcription
LSP Parkland Stage 27 (8.5x11) 15JAN09 Part 2.cdr
Stage 27 G Hodgins Road 24 G G 84 20 90 Lan e La n e 30 30 30 30 30 28 69 28 70 26 71 30 26 28 74 73 72 G G 46 G G G G ay Hemingw 63 30 62 30 61 30 59 60 26 26 58 28 32 BLK. 44 Walkway 47 ue 58 Aven G G G G 57 26 56 26 55 28 54 26 52 53 28 26 51 26 28 Wa lkw ay 48 G G G G G G G 30 20 99 G G G G G 64 BLK. 44 45 G O 32 42 G G G G G G G 65 20 40 39 44 43 41 75 G 66 30 98 50 26 49 28 28 Wa lkw ay 30 BLK. 44 Road 22 101 * 30 28 30 32 34 32 G G G 67 22 100 28 32 32 G 22 97 22 Road Hodgins 24 102 24 103 22 105 Storm Water Management Facility La ne 22 104 20 106 20 107 108 eet 208 Str 22 22 109 110 Trees and Shrubs (locations must be confirmed) Wood Fencing 30 30 G 24 96 Starter 30 24 95 * 30 68 22 94 G O 78 30 93 1 79 22 92 Suggested House Width in Feet at Frontage Shown Lot Requires Special Design Consideration Lot Frontage Garage Location Optional Garage Location Bollards Transit Zone Transformer Fire Hydrant Communication Cabinet Street Light Proposed Mailbox Street Light/Communication Cabinet(s) Move-Up 80 20 91 34 81 28 28 Legend 82 22 89 76 77 83 34 34 32 ad Ro 85 34 36 37 38 sement BLK. 44 22 88 B 35 eet 208 Str 87 G G G G G G 24 G G ins dg Ho 86 G G G G Special Ea * LK. 44 111 24 Play Ground Area TZ 24 ue 57 Aven TZ Revised January 2009 This plan is for marketing purposes only, and is subject to errors and omissions. Street furniture are in approximate locations and are subject to change. All green spaces, trees and the storm water facility is conceptual only. Water level will fluctuate from year to year. Dimensions are in feet and decimals. Refer to registered subdivision plan to confirm all lot information. The water level and plant material may very from year to year.