Alstom and Ecotècnia
Transcription
Alstom and Ecotècnia
Alstom and Ecotècnia June 2008 Agenda ALSTOM Today Power: Power Systems, Power Services Alstom and Ecotècnia P2 The Group Two main activities, three sectors Power Service 21.6% 28.4% 4.1 € bn 50% Transport 5 4 € bn 5.4 Power Systems 9.5 € bn Total orders 2006/07: €19 bn P3 The Group A major international presence Orders by region Europe (60%) North America (17%) Asia-Pacific Asia Pacific (12%) Africa-Middle Af i Middl East E t (5%) South America (6%) Power Systems P4 Power Service Transport The Group More than 65,000 employees in over 70 countries Employees by sector Power Systems 34% Employees by region Transport 38% Power Service 28% Recruitment of 8,700 employees in 2006/07 P5 The Group A healthy financial position Operating income (€ m)* Sales (€ bn)* + 14% Net income (€ m) + 40% 957 448 14.2 12.4 686 178 2005/06 2006/07 2005/06 2006/07 2005/06 2006/07 Net debt / Shareholders’ equity (€ bn)* 22 2.27 1.84 N td Net debt bt / Shareholders’ equity 68% 1.25 Net debt / Shareholders’ equity 3% 0.06 1/4/06 31/3/07 Shareholders’ equity (€ bn) P6 1/4/06 31/3/07 Net debt (€ bn) *At same perimeter and constant exchange rates The Group The second best performance on the CAC 40 Base 100 on 1 April 2006 In Euros 120 +58% 58% 110 100 90 80 70 60 50 P7 Alstom CAC 40 +13 The Group Innovative technologies Preparation for the future z Significant increase in R&D expenditure dit in i 2006/07 (440 million illi euros, + 26%) z Cutting-edge technological programmes - Power Systems: launch of pilot plants for CO2 capture,.. - Power Service: development of robotics - Transport: world speed record in rail, AGV, ERTMS,.. P8 The Group Environment at the root of the strategy Environment is the main driver for Alstom z Clean Power challenge z Environmental benefits of rail transport P9 The Group Employees at the core of Alstom’s commitments z Shared Values: Team, Trust, Action z Safety as a priority z Large scale human resources policy for recruitment, integration and training (People Quest, Alstom University, Alstom Connection,…) z Social dialogue P 10 An ethical and sustainable growth model z Strict ethical principles z Cl Cleaner production d ti off more sustainable products z Responsible sourcing policy P 11 POWER Power Systems Power Service Agenda ALSTOM Today Power: Power Systems, Power Services Alstom and Ecotècnia P 13 Power Present in all markets Technologies adapted to all major energy sources Gas Hydro P 14 Coal Nuclear (conventional part) Wind The most extensive product offering Product portfolio compared with competition Large GT Large ST Boilers Genera tors HRSG HEX ECS Renewable Hydro Wind Alstom Comp. 1 Comp. 2 Comp. 3 Strong presence P 15 Medium presence No presence Nuclea rConv. Island Plant Alstom and Ecotècnia Sector: Evolución y tamaño del Mercado Mercado Español Mercado mundial 1996 - 2007 1996 - 2007 16.000 100.000 14.000 90.000 80 000 80.000 70.000 10.000 60.000 MW Potencia (MW) P 12.000 8.000 50.000 6.000 40.000 4.000 30.000 20.000 2.000 10.000 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Añ Año 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Año P 17 . CAGR = 38 % . CAGR = 28 % V l Volumen iinversión ió (2 (2.007) 007) V l Volumen iinversión ió (2 (2.007) 007) = 2.650.000.000 €/año = 25.000.000.000 €/año Crecimiento sostenido Sector: Perspectivas Mercado Mundial Cumulative Global Wind Power Development Actual 1990 1990-2006 2006 Forecast 2007 2007-2011 2011 Prediction 2012 2012-2016 2016 500,000 450,000 400,000 350,000 MW 300,000 250,000 200,000 150,000 100,000 50,000 0 1990 2006 Source: BTM Consult ApS - March 2007 P 18 Prediction 2011 Forecast Crecimiento exponencial 2016 Existing capacity Growing Regulatory Support for Renewables Canada Europe China 4GW by 2010 20% of primary energy (from < 7% today) - binding target Equivalent to 35% of electricity consumption in 2020 15% of primary energy in 2020 • Renewable energy production standards t d d iin almost l t every province i US Obligation to generate min. electricity: Renewable Portfolio Standard in over 20 States • Tradable RPS: 20% in California (2010) 20% in Nevada (2015) 25% in New York State (2013) 22.5% in New Jersey (2020) • Federal tax incentive (PTC): $1.9c/kWh Tax Credit P 19 • Guaranteed tariffs in 18 countries such as Germany, Germany Spain Spain, France • Tradable certificates in 6 countries such as the UK or Italy • National tax incentives schemes • Guaranteed off take for wind • Guaranteed tariffs under discussion India 7 GW by y 2012 • State-level program with feed-in tariffs • Renewable Portfolio Standards Sector: Perspectivas Mercado Español Contribución actual al Mix de generación (2.007) Æ Objetivos 2.020: 9,5 % Contribución al Mix = 20 % Potencia instalada Æ 40.000 MW Inversión asociada 2.008 - 2.020 Æ 33.500.000.000 € P 20 Directiva Europea de Renovables: 20-20-20 en 2.020 Wind can already be cost competitive Cost of electricity (€/ MWh) 90 80 70 60 50 40 30 20 10 0 Coal Gas Source: Alstom analysis, Windpower Monthly 2007 P 21 Nuclear Wind 2006 Wind 2015 Ecotècnia. A history of success Main figures. Wind turbines installed since 1984 77 units 150kW - ECOTECNIA 20 12 MW 145 units 225kW - ECOTECNIA 28 33 MW 182 units 640kW - ECOTECNIA 44 115 MW 450 units 750kW - ECOTECNIA 48 333 MW 13 units 1.250kW - ECOTECNIA 62 17 MW 431 units 1.670kW - ECOTECNIA 74 720 MW 187 units 1.670kW - ECOTECNIA 80 312 MW 1 unit 2.000kW - ECOTECNIA 80 2 MW Total 1,486 wind turbines installed 1,543 MW T t l 184 wind Total i d turbines t bi under d construction t ti and d 321 MW P 22 As at 31/12/2007 Evolución tecnológica Potencia x 100 Superfície de rótor x 70 Fixed speed and stall control P 23 Variable speed and pitch control ECO 100: Magnitudes 140 m ECOTECNIA 100 / 3MW DIÁMETRO ROTOR 100 m TORRE 90 m ALTURA CON PALA 140 m PESO 500 T Ø CIMENTACIÓN 18 m P 24 ECO 100: Magnitudes Ecotècnia 100 100 m Airbus 380 P 25 Current Footprint Alstom Wind • ~ €400M sales in ’07 07 (350MW (350MW, 220 units) − 50% Spain, rest in Southern Europe − 90% Wind (WTG & O&M & Devel.) − 10% Solar PV • nearly 850 people as of December '07 • Closing: 31st October ‘07 • 5 factories in Spain: – – – – Assembly A bl WTG WTG: Buñuel, B l Somosas S Ctrl Panel Assembly: Rio del Pozo Tower Manufacturing: Coreses Solar Panels: Pla de Santa Maria • Sales S l offices ffi iin F France, It Italy l and d Portugal • Sourcing: Spain & Germany Ready to grow within Alstom P 26 Current Footprint Illustration TOWERS Altamira Plant (Zamora) P 27 COMPONENT ASSEMBLY CONTROL SYSTEM Somozas Plant (Galicia) Rio del Pozo(Galicia) WIND TURBINE ASSEMBLY Buñuel Plant (Navarra) Expertise across the Entire Value Chain Site Developm ent • Land localization • Wind Measurement • Land lease agreements • Complete permitting Spain and France P 28 System y Design • From conceptual design to detailed design of WTG (Functional specifications for components) Barcelona Key component Design and manufacturi ng • Component design • Sourcing/ Procurement raw material • Component Manufacturing & Assembly Towers: Coreses WTG Assembly WTG site installation • Sourcing/ Procurement of components • Assembly • • • • Transportation Civil Erection Commissioning Bunuel 5WTG/ week Somosas: Bloc 2 + Extenders Installation team in Barcelona O&M • Preventive & Corrective maintenance • Parts delivery • Upgrade packs O&M Teams in Europe Wind O&M Current Business: • Annual sales: 10-20M€ g • Offering: − O&M Contracts during warranty period − Extensions beyond warranty period • Team of 183 people in Spain and France • Ensures highest reliability to customer P 29 Wind farm development Current Business: • Annual Sales: 5-20M€ g • Offering: − Site identification and assessment − Grid connection permits − Complete Permitting • Team of 20 people in France and Spain • New Product Introduction accelerator P 30 Solar photovoltaic Current Business: • Sales: S l ~40M€ 40M€ in i S Spain i • Offering: − Assembly of solar modules (manufactured by Solon) − Trackers and roof mounted panels − Off-grid Off grid hybrid systems for rural remote electrification − Ciclops: electronic equipment (chargers & i inverters) t ) − Turnkey solar farm – 0.5 to 10MW − O&M for solar farms • Team of 54 people in Spain P 31 Ecotècnia. A history of success 2003 - Ecotècnia headquarters in Barcelona P 32 www.alstom.com
Similar documents
Electric Vehicle Conversion
• Exide Orbital ORB34DC‐36 – 12V marine deep‐cycle lead‐acid 12V i d l l d id – Group 34 battery – large format – 50Ah (20 hour rate) • 50Ah x 12V = 600Wh • 600Wh x 25 = 15kWh • 15kWh / 350Wh/mile ...
More information