BUILDINGFEATURES
Houston Data Center
™
YEAR BUILT/RENOVATED:
1984/2009
™
TOTAL LEASE AREA (NRA):
784,143sf
™
LEASE FLOORS:
Twenty-Four (24) floors
™
CURRENT PERCENT LEASED:
87%
™
(NRA) AVAILABLE:
108,163sf
™
LARGEST CONTIGUOUS AVAILABLE 17,559sf-61,775sf (Data Center) &
(NRA):
52,544sf (Office)
™
OFFICE RENTAL RATES:
$20.00 NNN starting
™
DATA CENTER RENTAL RATES:
$23.00 NNN starting
™
OPERATING EXPENSES 2010
(EST):
$11.34
www.houstondatacenter.com
BUILDINGFEATURES
Houston Data Center
™
PARKING RATIO:
RESERVED PARKING:
UNRESERVED PARKING:
ADD-ON FACTOR (MULTI-TENANT):
HVAC AFTER HOURS:
1/1,400 in Building Garage
$190.00 per month
$140.00 per month
23.00%
$50.00 (Floor dependant)
™
SECURITY:
Card Key Access; 24-7 manned
security personnel, digital cameras
™
AMENITIES:
Onsite Mgmt; 24-7 engineering staff,
Luby’s Cafeteria (www.lubysetc.com);
Conference & Meeting Rooms; Garage
Parking; Onsite Storage; Dual Freight
Elevators; Generator(s), UPS,
Emergency Fuel, 14 Fiber providers,
ATM, Fitness Center with Showers,
Coffee Shop
™
LEASING INFORMATION:
GRIFFIN PARTNERS, INC.
5151 San Felipe, Suite 1300
Houston, Texas 77056
(713) 439-5323
™
™
™
™
www.houstondatacenter.com
BUILDINGLOCATION
Houston Data Center
™
LOCATED IN HOUSTON CBD
™
IMMEDIATE ACCESS TO ALL TRAFFIC
THOROUGHFARES
™
ONE BLOCK FROM LIGHT RAIL
SYSTEM
™
30 MINUTES FROM BOTH HOBBY &
INTERCONTINENTAL AIRPORTS
™
IMMEDIATLEY ACROSS FROM THE
HOUSTON PAVILIONS
www.houstondatacenter.com
BUILDING LOCATION
Houston Data Center
www.houstondatacenter.com
1301
CENTRAL DOWNTOWN LOCATION
www.houstondatacenter.com
NEXT TO NEW HOUSTON PAVILLONS
Central CBD Location
1
130
www.houstondatacenter.com
1
130
NEXT TO ABUDANT AMENITIES
Central CBD Location
www.houstondatacenter.com
LOW RISE FLOORPLAN
Houston Data Center
61,500sf (typical)
www.houstondatacenter.com
HIGH RISE FLOORPLAN
Houston Data Center
26,272sf (typical)
www.houstondatacenter.com
SYSTEMS INFRASTRUCTURE
™
™
™
™
™
™
POWER
HVAC
STRUCTURAL INTEGRITY
SECURITY SYSTEM
UPS
FIBER CONNECTIVITY
www.houstondatacenter.com
Houston Data Center
SYSTEM INFRASTRUCTURE: POWER
™
™
™
™
™
™
™
™
24 MEGAWATTS OF INCOMING POWER
TWO (2) DIVERSE ELECTRICAL FEEDS FROM POLK STREET
(REDUNDANCY);
SIX (6) 3,000 KVA TRANSFORMERS (16 MEGAWATTS
OF POWER);
2,000 KVA UPS SYSTEM (SUPPORTS ALL BUILDING
SYSTEMS AND TENANT CRITICAL LOADS);
TEN (10) 1,040-2,000 KW DIESEL GENERATORS
SYNCHRONIZED BY PARALLEL SWITCHING SYSTEMS;
70,000 GALLON FUEL SUPPLY FOR BACKUP
GENERATORS;
TWO ELECTRICAL RISERS CAPACITY EXITS TO ADD
ADDITIONAL BACKUP GENERATORS AND CHILLERS.
ALL ELECTRICAL, UPS, AND GENERATOR SYSTEMS ARE
LOCATED ON FLOOR THIRTEEN OF THE BUILDING TO
ENSURE FLOODING WILL NEVER BE A PROBLEM
www.houstondatacenter.com
Houston Data Center
SYSTEM INFRASTRUCTURE: HVAC
™
™
™
™
™
™
FOUR (4) 1,200 TON CHILLERS (ONE REDUNDANT);
TWO (2) COOLING TOWERS (ONE REDUNDANT);
TWO (2) CHILLERS CONNECTED TO UPS AND EMERGENCY
GENERATORS;
THREE (3) CHILLED WATER RISERS;
REDUNDANT COOLING TOWER FOR LOW RISE FLOORS (7-12);
MULTI-ZONE HVAC SYSTEM
CONTROLLED BY BUILDING
AUTOMATION SYSTEM (2 AHUs
PER FLOOR IN HIGH RISE, 4 AHUs
PER FLOOR IN LOW RISE).
www.houstondatacenter.com
Houston Data Center
SYSTEM INFRASTRUCTURE: STRUCTURAL INTEGRITY
™
™
™
™
™
™
™
™
Houston Data Center
PRIMARY MEP SYSTEM LOCATED ON LEVELS 13 & 13.5;
ROLLOVER SWITCH LOCATED ON LEVEL 2;
DATA FLOOR LIVE-LOAD: 150 PSF;
OFFICE FLOOR LIVE-LOAD: 125 PSF (50 PSF ALONG FLOOR
PERIMETER);
DATA FLOOR CLEAR HEIGHT: 16 FT (SLAB TO DECK);
18” RAISED FLOORING THROUGHOUT DATA FLOORS;
HURRICANE RATED WINDOWS (200 MPH);
HOME TO LARGE ACTIVE BANK VAULT IN TEXAS – CHASE BANK,
35,098 SQUARE FEET.
www.houstondatacenter.com
SYSTEM INFRASTRUCTURE: SECURITY
™
™
™
™
™
Houston Data Center
24 HOUR PATROLLED SECURITY – MINIMUM OF 3 OFFICERS ON-SITE
24-7;
24 HOUR DIGITIAL CAMERA SURVEILLANCE SYSTEM (31 BUILDING
CAMERAS);
PROGRAMMABLE AFTER HOURS CARD KEY BUILDING ACCESS;
RESTRICTED CARD KEY ACCESS TO DATA FLOORS;
24 HOUR ON-STIE ENGINEERING AND MAINTENANCE.
POST SEPTEMEBER 11TH UPGRADES
™
™
™
™
CLOSED GARAGE TO THE PUBLIC;
ADDED WEB-BASED VISTOR PROCESSING SYSTEM;
ADDED SECURITY GUARDS AT THE LOADING DOCK AND GARAGE
ENTRANCES;
LIMITED BREEZEWAY ACCESS TO COORDINATED DELIVERIES ONLY.
www.houstondatacenter.com
SYSTEM INFRASTRUCTURE: FIBER
™
™
™
™
™
PRIMARY FIBER LOOP IN CBD
LOCATED ALONG FANNIN ST;
CONSIDERED A “TELECOM HOTEL”
AMONG FIBER PROVIDERS;
10 FIBER PROVIDER TENANTS,
PLUS SBC;
NUMBEROUS OTHER PROVIDERS
LOCATED WITHIN Internap
(co-location Tenant);
ALL PROVIDERS HAVE REDUNDANT
POINTS OF ENTERY AND
REDUNDANT SYSTEMS.
www.houstondatacenter.com
Houston Data Center
EXTERIOR RENOVATION 2009
www.houstondatacenter.com
Houston Data Center
LOBBY RENOVATION 2009
www.houstondatacenter.com
Houston Data Center
BUILDING AMENITIES
™
™
™
™
™
™
™
™
™
™
™
™
™
™
™
™
LOCAL BUILDING OWNERSHIP;
ON-SITE PROPERTY MANAGEMENT;
Energy Star Designated (Tower)
24-7 SECURITY;
24-7 ENGINEERING/MAINTENANCE;
CARD KEY ACCESS;
ON-SITE LUBY’S CAFETERIA (www.lubysetc.com);
ON-SITE FITNESS CENTER (W/ SHOWERS);
ON-SITE COFFE SHOP (SEATTLE’S BEST);
TENANT CONFERENCE ROOMS;
WEB-BASED VISITOR PROCESSING SYSTEM
ON-SITE AND ADJACENT PARKING – 518 SPACES ON-SITE & 360 SPACES
UNDER LEASE WITH CITY OF HOUSTON IN CLAY GARAGE;
LOBBY & COMMON CORRIDOR RENOVATIONS 2008-2009;
BUILDING INFRASTRUCTURE UPGRADES 2009;
UNOBSTRUCTED DOWNTOWN VIEWS;
ADJACENT TO THE HOUSTON PAVILIONS & WITHIN TWO BLOCKS OF
DISCOVERY GREEN PARK, THE GEORGE R. BROWN CONVENTION CENTER, THE
TOYOTA CENTER, AND THE HILTON AMERICAS.
www.houstondatacenter.com