Future Buildings and Renewable Energy project update
Transcription
Future Buildings and Renewable Energy project update
Future buildings and renewable energy OULU – Update 2015 Pekka Seppälä, Lauri Mikkonen 19.11.2015 Average temperature and precipitation (1981- 2010) Reference: Ilmatieteenlaitos.fi Pekka Seppälä, Lauri Mikkonen 19.11.2015 Solar irradiation • Annual solar irradiation on horizontal plane in Oulu is around 890 kWh/m2, which nearly matches with conditions in Northern Germany • The amount of solar irradiation is greatly dependend on seasons Reference: PVGIS Pekka Seppälä, Lauri Mikkonen 19.11.2015 Biomass and water • 75 % of land area of Finland is forest (2306 million m3 of wood) • Annually 104 million m3 of wood grows (less than used) • • The target is to increase the use of forest to produce 25 TWh of energy by 2020 3 100 MW of hydro power installed nowadays (10 – 20 % of electricity production) Reference: Energiateollisuus Pekka Seppälä, Lauri Mikkonen 19.11.2015 Wind conditions In the end of 2013, 448 MW of wind power installed, producing 777 GWh of energy (0,9 % share of electricity consumption in Finland). Reference: Energiateollisuus and Tuuliatlas Pekka Seppälä, Lauri Mikkonen 19.11.2015 Energy end use 1970-2013 Other Traffic Heating of buildings Industry Total Reference: Tilastokeskus Pekka Seppälä, Lauri Mikkonen 19.11.2015 Building energy usage Other el. Devices 6% Energy use of living in 2012 Sauna 4% Cooking 1% Hot water 12 % Lighting 3% Energy source in buildings in 2012 Heating 74 % Electricity 34 % About 17-20 % of district heat and electricity in large scale centralized power plants is produced by peat! Other 1% Heat pump 6% District heat 29 % Wood 23 % Light petrol 7% Reference: Tilastokeskus and Energiateollisuus Pekka Seppälä, Lauri Mikkonen 19.11.2015 Oulu Building Supervision • Every new building in Finland needs a building permit given by the building supervision office a thousand dollar chance to change things! • The responsibility of BSOs in Finland is to control that houses will be built according to law, rules and city plan. Goals: · Produce measureable added value to our customers and help customers · · · · Give advices to customers and to have willingness to be co-operative Spreading of information Development work together with designers and builders Create a network with local, national and international actors Pekka Seppälä, Lauri Mikkonen 19.11.2015 Tools Quality control Pientalolaatu – application (www.pientalonlaatu.fi) Technical cards/Quality cards Keyword: Predictability Pekka Seppälä, Lauri Mikkonen 19.11.2015 Project target • The goal of the Future Buildings and Renewable Energyproject is to create common operating models to builders and to exchange and implement the best renewable energy and energy efficiency practices generated during the pilot project. • The joint project is intended to intensify the development of renewable energy technologies and to promote the spreading of successful solutions to other cities, to the whole country and to develop them into business models. • Companies and educational institutions can develop their products and execute research. • Continues previous projects (IEEB, RESCA). Pekka Seppälä, Lauri Mikkonen 19.11.2015 Pilot area • Platform for testing novel innovative products and solutions • Living lab - User experience and information about the operability of new solutions will be collected • Energy solutions and technologies can be compared efficiently in the pilot area • Novel information will be created in the pilot area. Best practices, which can respond to the challenge of developing construction and future zero-energy buildings will be identified, assessed and implemented. Pekka Seppälä, Lauri Mikkonen 19.11.2015 Quality path for future buildings Pekka Seppälä, Lauri Mikkonen 19.11.2015 Location of the pilot area Pekka Seppälä, Lauri Mikkonen 19.11.2015 Builder selection • • Builders had freedom to present the level of energy efficiency that they are reaching for 3 different selection groups: SELECTION GROUP 1: • Projects including nearly zero energy solution can freely choose a lot. (In this case, the definition for nearly zero energy building is E-number < 35, official definition does not exist yet). SELECTION GROUP 2 • Projects, in which heat loss and E-lnumber are max. 60% of the minimum level defined in norms can straightly select the best possible lot after the selection group 1 is processed. In the case of several same level applications, lottery is used. SELECTION GROUP 3 (minimum requirement) • Projects, in which heat loss and E-lnumber are equal or less than 70% of the minimum level defined in norms can get a lot, if it is not selected earlier. Ther building projects will take a part of a lottery, if free lots are available. Pekka Seppälä, Lauri Mikkonen 19.11.2015 Builders of the pilot area Block 22 1 Hybridiosaajat 2 JCT Rakennusliike 3 Design-Talo 4 Design-Talo 5, 6, 7 Oulun seudun ammattiopisto 8, 9 RESCA base Block 24 1, 2, 3 Kastellitalot 4 Oulun AS-invest 5 Reserved to pilot area, plot under search 6, 7, 8 Oulun seudun ammattiopisto 9 Kiirunatalot 10 Dometalot 11 Reserved to pilot area, plot under search 12, 13 JCT Block 25 5, 6, 7 Reserved to pilot area, plot under search Block 27 3, 4, 5 Reserved to pilot area, plot under search Block 29 1 Sonell 2, 3 TA Pekka Seppälä, Lauri Mikkonen 19.11.2015 Project network • INNER CIRCLE: 12 pilot site builders having several hundreds of co-operation companies (design offices, material suppliers etc.) • MIDDLE CIRCLE: Rakennusvalvonta’s (building control of the city of Oulu) and Business Oulu’s seminars/educational events having around 80 enterprises and almost 1000 participants • EXTERNAL CIRCLE: The E-mail list of the project has over 250 contacts Pekka Seppälä, Lauri Mikkonen 19.11.2015 Progress of the pilot area • Construction of Hiukkavaara’s energy efficient pilot area utilizing renewable energy resources started in 2013 • At the end of the project in February 2014 the construction of the area was well in progress. Foundation work was mainly ongoing • In summer 2014 first buildings were ready. For instance, Sonell Oy’s building had the first occupant in June • OSAO’s (vocational college) target will take more time to conduct construction so that education can be arranged on the spot • Approximately 80 % of the target area will be under construction by the end of 2015 • Building physical modeling started in the end of 2014 Pekka Seppälä, Lauri Mikkonen 19.11.2015 Currently: Building physical measurements and modeling • Saikotek Oy has planned and installed building physical measurements • Data acquired from measurements are saved centrally • University of Oulu is building physical modelling by utilizing the data from measurements Experience will be gained about building physical operation of structures Pekka Seppälä, Lauri Mikkonen 19.11.2015 Currently: Building physical measurements and modeling Pekka Seppälä, Lauri Mikkonen 19.11.2015 Sonell Oy • Sonell Oy’s has first occupants • Heat is produced by a ground- source heat pump and distributed to the room air by radiant floor heating system • About 30 m2 of solar collectors has been installed on the roof of a shared technical room • The control of heating, ventilation and safety systems is carried out by a home automation system Pekka Seppälä, Lauri Mikkonen 19.11.2015 Pohjolan Design Oy • E-number of 35 • Integrated home automation system, which makes use of real time measurements • Heat is produced by solar collectors and combined ground source heat pump and exhaust air heat pump • Electricity production is arranged by a 30 m2 solar PV system. Excess electricity is sold to a local energy enterprise. The energy consumption of the building can be followed in real-time Pekka Seppälä, Lauri Mikkonen 19.11.2015 TA-yhtymä • • • • 32 apartment row house area including CHP plant (combined heat and power) Annual energy production of the plant is estimated to be 400 MWh, where the electricity to heat ratio is 1:3 Produced heat is utilized in space heating and electricity as usage electricity in the property Excess electricity (40 MWh) is sold as farm power. Furthermore, 20 MWh of heat is taken from the ground by artesian wells. First occupants can move in by summer 2015 Pekka Seppälä, Lauri Mikkonen 19.11.2015 Dometalot Oy • • • • Dometalot Oy has started the construction work rapidly (see the pic) Air leakage number of 0,4 is a target for air-tightness (0,1 measured!) Thermal bridge free double frame structure minimizes heat losses. 3000 kWh of heat is extracted from wastewater by heat exchangers • Electricity is bought from the local energy company and used straightly in space heating simple and inexpensive solution Pekka Seppälä, Lauri Mikkonen 19.11.2015 AS-Invest Aurinkotalo • Hybrid building being almost ready for residence • Water circulating floor heating system combined with a wood fired water furnace and water-to-air heat pump • 6 kW solar system is in charge of electricity production • Almost zero energy level can be achieved in the target building Pekka Seppälä, Lauri Mikkonen 19.11.2015 JCT • Wood-frame building • Solar collectors, solar cells, ground-source heat pump • Passive house level structures Pekka Seppälä, Lauri Mikkonen 19.11.2015 Kastelli • Ground-source heat pump, water circulating floor heating • 3 buildings • Possibility to integrate solar collectors and PVs Pekka Seppälä, Lauri Mikkonen 19.11.2015 OSAO • Water circulating floor heating • Ground-source heat pumps + solar collectors • Ground circle for pre-heating or cooling the incoming ventilation air Pekka Seppälä, Lauri Mikkonen 19.11.2015 Pilot site in 2015 Pekka Seppälä, Lauri Mikkonen 19.11.2015 Pekka Seppälä, Lauri Mikkonen 19.11.2015 Future of the project • 80 % of the pilot area will be under construction by winter 2015 • Advicing occupants in the usage and maintenance of buildings • The performance of energy production and consumption, building automation systems and building physics will be measured and analyzed in the pilot area in future best practices will be duplicated and implemented! • Continuous piloting culture in the area of Oulu Pekka Seppälä, Lauri Mikkonen 19.11.2015 Challenges faced, examples • The level of energy design • Moisture management • Automation and control systems Pekka Seppälä, Lauri Mikkonen 19.11.2015 Thank you! Pekka Seppälä, Lauri Mikkonen 19.11.2015