WELCOME TO Xayaburi Hydroelectric Power Project
Transcription
WELCOME TO Xayaburi Hydroelectric Power Project
Development overview Xayaburi Hydroelectric Power Project Type of Hydropower plant Storage Run of river Pump storage China Vietnam Myanmar Lao PDR Thailand Completed Upper Mekong Lower Mekong 7 Dams in China - Completed (6) 15,600 MW. (2 Storage dam + 4 Run of River) - Under construction (1) 155 MW. - Total 15,755 MW. 1 Development in Mekong Lower Mainstream 2 3 4 5 6 7 8 9 1. Pak beng 1,230 MW 2. Luang Prabang 1,410 MW 3. Xayaburi 1,285 MW 4. Pak Lay 1,320 MW 5. Sanakham 570 MW 6. Pak Chom 1,079 MW 7. Ban Khoum 2,000 MW 10 8. Lat Sua 800 MW 11 9. Don Sahong 360 MW 10. Stung Treng 980 MW 11. Sambor 460 MW Total 10,394 MW Xayaburi Project feature Mekong natural river flow Design Water Level 15,000 - 4,000 - 1,200 cms. 47,000 - 5,000 - 2,000 cms. U/S = 275 masl , Rated Head = 28.5 m Xayaburi Project feature 1. 2. 3. 4. 5. Navigation Lock Spillway = 144 + 154 length 12 m. width for 500 tons ship = 7 Surface gates (19 m x 21 m) + 4 Low Level Outlets for Sediment (12 m x 16 m) Intermediate Block = Fish pumps and passage + Powerhouse Erection Bay Powerhouse = 7 x 175 MW (EGAT) + 1 x 60 MW (EdL) Fish Migration = Multi – system , U/S + D/S migration Spillway Old design * New design 7 surface gates (19m x 21m) 4 LLO gates (12m x 16m) Spillway surface gate 7 gates 19 m. x 21 m. (WxH) Spillway Low level outlet gate 4 gates 12 m. x 16 m. (WxH) Spillway Powerhouse EdL 7 6 5 4 3 2 1 8 Kaplan Turbine 175 MW (7 units) + 60 MW (1 unit) with full capacity at discharge 5,000 cms Fish passing system Upstream Reservoir Switchyard Area Upper channel D/S Fish Passage Fish Lock Pump 2 for D/S Fish Migration U/S Fish Passage Pump 1 and Gravity pond for U/S Fish Passage D/S Exit U/S Fish Passage Fish Ladder Special design for Fish passing system Fish Locks Opening slot in Fish Ladder Transmission Line 115 kV to Xayaburi substation Line Route 17 km Number of Tower 51 500 kV to Thai-Lao border Line Route 196 km (3 sections) section 1 : 76 km section 2 : 58 km section 3 : 62 km Number of Tower 426 Tower design 12 type Construction Procedure First stage 2012-2014 Construction Procedure Second stage 2015-2019 Resettlement activities 15 Villages are affected 6 villages in XYB(1RS/5RL) 9 villages in LPQ(6RS/3RL) 2,986 Resettlement activities Completed work Site Affected Village Description RS1 Housysouy Resettlement 76 HH RS2 Paknoen Resettlement 93HH RS3 Khok-Yai, Houaydeua Resettlement 98 HH RS4 Talan Relocation 62 HH Host Village Neunsavang Paklan Thadua 1/3/2013 Talan 24 RS-8 3/11/2013 Thungjalern Thadua RS-7 55 Pakphai Pakkhon Thungjalern RS 5 170 20/10/2014 10/10/2014 Relocation 68 HH Khoktom Houaykheua 7/8/2013 Pakmon RS6 Hatxaykham RSH-1 12 3 RSH-3 1/10/2014 Resettlement 170 HH RSH-2 3 Pakhao 11/1/2012 Phonsavanh RS5 Date 3 RSH-4 68 1/11/2014 RS 6 Pakmon Thadeua Relocation Plan of 2015 Paklan Site Affected Village Description Host Village Target Date RS7 Pakkhon Relocation 55 HH Pakkhon 17/8/2015 Phonsavanh RS 4 62 HouayDeua Talan Relocation Plan of 2016 Neunsavang Site Affected Village Description Host Village Target Date RS8 Pakphai Relocation 24 HH Pakphai 5/4/2016 RSH-1 Khoktom Relocation 12 HH Khoktom 5/7/2016 RSH-2 Hatxaykham Relocation 3 HH Hatxaykham 12/7/2016 RSH-3 Houaykheua Relocation 3 HH Houaykheua 19/7/2016 RSH-4 Pakkhao Relocation 3 HH Pakkhao 25/7/2016 RS 3 98 KhokYai RS 2 HouaySouy CITY Neunsavang 93 Ongoing RS 1 76 Project Paknoen Completed Resettlement Site Relocation Site