engineering service center
Transcription
engineering service center
PT. GUNUNG GARUDA ENGINEERING SERVICE CENTER DEPARTMENT www.grdsteel.com the introduction th Gunung Garuda, PT is a Steel Company established on July 18 , 1986. It is the only one Indonesian Steel Company who is producing high quality steels in various shape through Hot Rolled Process. All of Gunung Garuda's products are certified by Indonesia Industrial Standard (SII) and for international standard refer to Japanese Industrial Standard (JIS) and equivalent with other international standards such as ASTM, BS, DIN, etc. Gunung Garuda provides and serves started from raw materials supplying up to steel structure providing by “From Scrap to Building”, where all of raw material production processes till steel structure are provided in single roof system, so for that purpose raw materials are provided in ready stock condition. Gunung Garuda is supported by one department, i.e. Engineering Service Center Department (ESC) , who is handling in steel structure engineering for any kinds of steel structure from design till fabrication. The ESC Department was established on 1997 to serve the customer in PreFabricated Steel Structure providing. ESC Department provides component standard For the above purpose, products for steel structure standard, which is developed by Gaining Garuda in Pre-Engineered Building (PEB) concept. With our high quality products, ready stock a raw material, component standard product, supporting professional engineering teams, Per Engineered Building Concept and CNC machine facilities, the customer can be satisfied by our services. The increment of domestic and export demand proves that ESC Department is ready to face up the free trade era, and in accordance with our mission " Being Steel Manufacture who is applying the latest technology to get many kinds of some steel products till steel structure and machinery." company information legal name and ownership Company Name Head Office & Factory : GUNUNG GARUDA GROUP, PT : Engineering Service Center : Imam Bonjol 4, Warung Bongkok, Suka Danau, Cibitung, Bekasi 17520, West Java, Indonesia. Phone : (+62-21) 8910 7977 / 8910 7981 : (+62-21) 8900 111 ( Hunting) ext.6177, 6181, 6184 Facsimile E-mail : (+62-21) 89108030 / 8910 8031 : gunung@grdsteel.com : esc@grdsteel.com : http :// www.grdsteel.com Website Date of Establishment PT. GUNUNG GARUDA Engineering Service Center TH : July 18 1986 : September 28 1997 TH Ownership Board of Directors : 100 % Indonesian Company Owned by : Djamaluddin Kamaruddin DR. Chairuddin And Brothers Commercial Registration : C2-260 H.T.01.01 Year 1987 Industrial Licences Bank References : C2-260 H.T.01.01 Dated April 1987 : Bank Mandiri ex Exim C.Q.ESC Cab. JKT Wisma Metropolitan organization and management team organization chart BOARD OF MANAGEMENT ENGINEERING SERVICE CENTER DEPARTMENT BOARD OF DIRECTOR GENERAL MANAGER DEPUTY GENERAL MANAGER SECRETARY HRD MANAGER CUSTOMER SERVICE MANAGER SISTEM & GA MANAGER MRK & SALES MANAGER ESTIMATION MANAGER RECRUITMENT SYSTEM & PROCEDURE MARKETING & ADVERTISING ESTIMATOR ENGINEER PROJECT COORDINATOR PROJECT ENGINEERING MATERIAL PREPARATION QUALITY CONTROL DEVELOPMENT GENERAL ADMINISTRATION SALES COSTING ENGINEER ADMINISTRATION RESEARCH & DEVELOPMENT FABRICATION CALIBRATION QC COSTING & ACCOUNTING AGENT COORDINATOR PACKING & DELIVERY ADM & DOCUMENTATION ADMINISTRATION ENGINEERING MANAGER PPC MANAGER QC MANAGER organization and management team Senior Management Team President Director General Manager Deputy General Manager DR. Chairuddin Ir. Khenji Pangestu Ir. Dwi Wahyu Pramono Manager Team Engineering Manager P P C Manager Q C Manager Sales & Estimate Manager System & Adm Manager H R D Manager Ir. Sukanta Saha Ir. Herdin Ekalaksana Subandi Ardani Ir. Agus Hermawan, MT Ir. Sondi Budiharjo Humiras L. Tobing, SE organization and management team Senior Management Team KEN PANGESTU ESC General Manager Mr. Ken Pangestu joined PT Gunung Garuda in June 1992. He has architectural background from Catholic Saint Thomas Medan University. Mr. Khenji Pangestu has had a long experience in the steel structure, machine Design and Equipment Operation. Presently, Mr. Khenji Pangestu is as Engineering Service Center General Manager. AGUS HERMAWAN Sales & Estimate Manager Mr. Agus Hermawan joined PT Gunung Garuda in March 1999. Mr. Agus Hermawan was graduated from Parahyangan University in Civil Engineering and Master in Management Engineering from Bandung Institute Technology. He has had experiences in civil engineering, sales and had skills in computer. Presently, he is the Sales & Estimate Manager. Ir. IKHSAN LUBIS Planning Production Controlling Manager Mr. Ikhsan Lubis joined PT Gunung Garuda in March 2004. He was graduated from Gajah Mada University in Nuclear Engineering. Mr. Ir. Ikhsan Lubis started with PT. Gunung Garuda as a Planning Production Controlling Manager. Before joining, he has had experience as PPC Manager of the many companies. Beside that, he has skills in the Welding Works and Certified by Migas & Depnaker. Presently, he is the Planning Production Controlling Manager. organization and management team Senior Management Team SUKANTA SAHA Engineering Manager Mr. Sukanta Saha joined PT Gunung Garuda in September 1996. Mr. Sukanta Saha was graduated from University of North Bengal, Derfeding, India. He has many skills in the computer program like STAAD III, AUTOCAD, STEEL CAD, Excell, Visual Basic ,and etc. Mr. Sukanta comes from Calcuta, India. Presently, he is the Engineering Manager. SUKANTA SAHA Engineering Manager Mr. Humiras Luman Tobing joined PT. Gunung Garuda in November 1996, he was graduated from University of US XII South Sumatera, With Majored Sciences economi Management discipline and many experience in steel industry. Mr. Humiras Limban Tobing have experiences in qualitu control and presently he is the quality control manager of Department Engineering Service Center product and services Engineering Service Center Product ESC Department always gives the best Product and Services to the customer, started from design, fabrication till to the erection guidance. ESC Department’s Products and Services consist of : Design Shop Drawing Fabrication Galvanizing APPLICATIONS The application from the products and services are : Factories Warehouses Distribution Center Comercial Showroom Sport Halls Aircraft Hangers Super Market Workshops Bridges Restaurant Office Building Temple Mosque Church High Rise Building Transmission Tower Telecommunication Tower / Radio / TV Substation product and services Production Capacities With the professional Engineering Team and sophisticated facilities, we are always ready to handle all of the project, so our production capacity per year is : - Industrial & Commercial Building - Bridges - Steel Tower - Galvanizing Facilities = = = = + 48.000 MT + 20.000 MT + 18.000 MT + 30.000 MT facilities and equipment list Engineering Facilities For analyzing and designing all kind of steel structures such as telecommunication or transmission tower, bridge and ware house. ESC has been equipped by latest software to accelerate process. 3D software is used to detail and to draw. The facility will automatically make cutting and drilling drawing, assembly drawing, bill of material and erection drawing. Besides that We have nesting drawing facility for profile and plate. The engineering facilities consist of : Main Power General Manager Division Manager SPV Engineer SPV Fabrication SPV Assembling Sales Estimator PPC QC Project Coordinator Engineer Checker Drafter CAD Drafter Detailing Welder : : : : : : : : : : : : : : : 1 6 6 10 5 4 5 10 10 5 20 10 8 10 12 ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) ( Personel ) Software / Program - Design & Analysis : STAAD III Ver. 22.3 - Detailing : X-Steel Ver. 5.4 = 5 Licences SteelCAD Ver. 4.1 = 6 Licences - Nesting : - Bar Nesting - Auto Nesting engineering service center profile 12 facilities and equipment list Plant Faciliities Workshop Fabrication (SSC) ( Cutting, Drilling, Punching, Bending) Space : + 40.500 sqm Over head Crane 5 Ton : 18 Units 10 Ton : 6 Units Workshop Assembly Space Over head Crane 5 Ton 10 Ton 25 Ton : + 6.000 sqm : 6 Units : 2 Units : 1 Unit Workshop Trial Erection Space Over head Crane 5 Ton 10 Ton 25 Ton : + 2.000 sqm : 2 Units : 2 Units : 1 Unit Workshop Painting & Packing Space Over head Crane 5 Ton 10 Ton 25 Ton : + 6.000 sqm : 3 Units : 1 Unit : 1 Unit Workshop Galvanizing (Bukit Terang Galvanizing, PT) Space Over head Crane 5 Ton 10 Ton For Klipt Zinc Bath : + 8.500 sqm : 4 Units : 2 Units : 4 Units :12,5m x 1,8m x 2,6 m page 13 facilities and equipment list Machineries and Equipment List NO NAME TYPE UNIT CAPACITY 1 SCANNER 1. HP Scanjet 3200 C 2. UMAX Astra 6005 3. XEROX 7356 4. OCE 9400 1 1 1 1 Size : letter, B5, B4, A4 Size : letter, B5, B4, A4 Size : letter, B5, B4, A4, A3, A2, A1, A0 Size : letter, B5, B4, A4, A3, A2, A1, A0 2 PRINTER 1. HP (Hewlett Packard) 2. CANON BJC 4550 (Colour) 3. EPSON LX 800 (Dotmatrix) 4. LASERJET GL HP 5. XEROX DDS 8830 6. OCE 9400 7. CANON (Microfilm) NP Printer 680 8. HP Laserjet 4V 9. HP Laserjet 4 1 Size : letter, B5, B4, A4, A3 1 Size : letter, B5, B4, A4, A3 1 1 1 1 Size : letter, B5, B4, A4 Size : letter, B5, B4, A4, A3 Size : letter, B5, B4, A4, A3, A2, A1, A0 Size : letter, B5, B4, A4, A3, A2, A1, A0 1 2 1 Size : letter, B5, B4, A4, A3 Size : letter, B5, B4, A4 Size : letter, B5, B4, A4 1. XEROX DDS 8830 2. OCE 9400 3. MUTOH XP 500 SERIES 4. ENCAD (Novajet 4) 1 1 Size : letter, B5, B4, A4, A3, A2, A1, A0 Size : letter, B5, B4, A4, A3, A2, A1, A0 1 Size : letter, B5, B4, A4, A3, A2, A1, A0 1 Size : letter, B5, B4, A4, A3, A2, A1, A0 1. XEROX DDS 8830 2. OCE 9400 3. VIVACE 670 4. CANON NP 4050 5. CANON NP 6241 6. SHARP SF-8871 1 1 1 1 1 1 Size : letter, B5, B4, A4, A3, A2, A1, A0 Size : letter, B5, B4, A4, A3, A2, A1, A0 Size : letter, B5, B4, A4, A3 Size : letter, B5, B4, A4, A3 Size : letter, B5, B4, A4, A3 Size : letter, B5, B4, A4, A3 3 4 PLOTTER PHOTO COPY page 21 facilities and equipment list Quality Control Q.C. EQUIPMENT NO NAME TYPE 1 Meter Roll 7.5 Meter 20 Meter Merk :TAJIMA Merk : ITO 2 Vernier Caliper Merk : TRICLE BRAND 3 Coating Thickness Meter Merk :ELCOMETER 4 Dye Penetrant Test - Cleaner-Remover - Penetrant - Developer Merk :MAGNAFLUX 5 Ultrasonic Equipment Test - Calibration Block - Probe Normal & Degree - Main Equipment Merk :CTS - 23 6 Welding Gauge Merk :NIGARA SEIKI 7 Spectrometer Emission 25 Element Baird Spectrovac/USA SN : 262477 - 1057 A For Chemical Composition Test Calibration July 5 2001, By B4T Bandung TH 8 Capacity 600 KN Made in ACS, Australia SN : 790139 For Mechanical Test Calibration dated July 7 2001 Universal Machine Test TH engineering service center profile 22 facilities and equipment list Machineries and Equipment List NO MACHINE DESCRIPTION 1 CNC CUTTING & SAWING MACHINE 2 3 CNC CUTTING & SAWING MACHINE CNC CUTTING & SAWING MACHINE MACHINE NAME AND TYPE DAITO ST. 5070 ( 45 o ) DAITO o ST. 6090 ( 90 ) TRANNJAEGER PMC 12-N ( Two Units ) MACHINE CAPACITY Square Bar Round Bar Plate IWF/H-Beam Rectangle : 500 X 500 mm : 500 mm : 750 X 730 mm : 750 X 730 mm : 750 X 730 mm Square Bar Round Bar Plate IWF/H-Beam Rectangle : 500 X 500 mm : 500 mm : 750 X 730 mm : 750 X 730 mm : 750 X 730 mm 760 mm MITER CUT AT 90O height width (mm) 235 1000 H-STEEL ROUND BAR (mm) 235 1000 PLATE (mm) 235 1000 800mm 910mm height width height width 250 1000 30~310 1000 250 1000 30~310 1000 250 1000 30~310 1000 800mm 910mm O 760 mm height width height width height width H-STEEL (mm) - 30~310 700R-L ROUND BAR (mm) - 30~310 700R-L PLATE (mm) - 30~310 700R-L MITER CUT AT 45 4 CNC CUTTING & SAWING MACHINE engineering service center profile TRANNJAEGER PMC 12-N ( Two Unit ) 14 760 mm MITER CUT AT 90O height width (mm) 235 1000 H-STEEL ROUND BAR (mm) 235 1000 PLATE (mm) 235 1000 800mm 910mm height width height width 250 1000 30~310 1000 250 1000 30~310 1000 250 1000 30~310 1000 760 mm 800mm 910mm MITER CUT AT 45O height width height width height width H-STEEL (mm) - 30~310 700R-L ROUND BAR (mm) - 30~310 700R-L PLATE (mm) - 30~310 700R-L facilities and equipment list Machineries and Equipment List NO MACHINE DESCRIPTION MACHINE NAME AND TYPE 5 CNC CUTTING & SAWING MACHINE 6 CNC CUTTING & SAWING MACHINE 7 CNC CUTTING & SAWING MACHINE EVERISING H - 1060 S 8 CNC CUTTING & SAWING MACHINE PEDDINGHOUSE BS 38/18 9 CNC DRILLING MACHINE DAITO DNF 1000 KALTENBACH HDM.800A WAGNER KV.6 MACHINE CAPACITY Cap. Material Process Square Bar Round Bar Plate IWF/H-Beam P L T 760 mm 200 230 - 800 mm 220 250 500x170 500x500 910 mm 240 300 600x200 600x300 : 3280 mm : 1250 mm : 2000 mm Cap 90 : Cap 75 : Cap 60 : Cap 45 : 710mm, 1000x650mm 710mm, 900X700mm 710mm, 800X700mm 550mm, 550X700mm Cutting Capacity Plate Overall Dimensions WXH WXH WXH WXH : 37.4 " x 18.1 " : 37.4 " x 6 " : 150" x 52" x 85" H-STEEL : Max. H1010 X 400 mm Min. 150 X 75 mm JOINT PLATE : For Above said Steel Max. lap thickness 55 mm ANGLE 10 CNC DRILLING MACHINE WAGNER B6 U-CHANNEL H-STEEL : Min 80 X 65 mm Max 1000 X 450 mm : Min 80 X 45 mm Max 1000 X 450 mm : Min 80 X 42 mm Max 1000 X 450 mm page 15 facilities and equipment list Machineries and Equipment List NO MACHINE DESCRIPTION MACHINE NAME AND TYPE 11 CNC DRILLING MACHINE WAGNER B6 MACHINE CAPACITY ANGLE U-CHANNEL H-STEEL : Min 80 X 65 mm Max 1000 X 450 mm : Min 80 X 45 mm Max 1000 X 450 mm : Min 80 X 42 mm Max 1000 X 450 mm BEAMS : Web Height 12 CNC DRILLING MACHINE FICEP LFB-200.49 : Min 120 mm Max 2500 mm Flance Width : Min 55 mm Max 1000 mm U-CHANNEL Web Height : Min 120 mm Flange Width : Max 2500 mm EQUAL ANGLE & UNEQUAL ANGLE Min 120 X 120 X 10 mm Max 500 X 500 X 40 mm PLATES : Min 120 mm : Max 1200 mm Plate Thickness Max 75 mm Hole Diameter Max 45 mm CNC 13 DRILLING & CUTTING MACHINE WAGNER KL 38 & B 6 P L T : 3280 mm : 1250 mm : 2000 mm CNC 14 DRILLING & CUTTING MACHINE WAGNER KL 38 & B 6 P L T : 3280 mm : 1250 mm : 2000 mm engineering service center profile 16 facilities and equipment list Machineries and Equipment List NO MACHINE DESCRIPTION MACHINE NAME AND TYPE CNC 15 CUTTING, DRILLING & MARKING VERNET BEHRINGER HBP 360/704 16 CNC DRILLING MACHINE VERNET BEHRINGER FP, 600 17 OXY COPING MACHINE FICEP LTT.B 200-61 18 OXY COPING AND NOTCHING MACHINE PEDDINGHHAUSE ABCM-1250/3 19 BENDING MACHINE HERKULESS BO 233 K/1 TANAKA ASSEMBLING 20 WELDING MACHINE TR-PRA-N4-600 MACHINE CAPACITY Round at 90 (MM) HBP 360 at 90 (MM) Square HBP 340X340 Rectangular HBP :700X340 at 45 Right WXH (MM) 400X340 : at 45 Left WXH (MM) 400X340 Maximum Diameter 35 mm Rotation Diameter 200 / 800 rpm Useful Section 600 x 340 mm Angles 50 - 300 mm Ipe / Epn 80 - 600 mm Beams Min Web Width 80 Flange Height 45 Angles Flange Height 80x80x8 Max 2000 750 500x500x30 Minimum Beam Size Width 50"(1250 mm) Block Maximum Length Unlimited Flange Thinning : Maximum Length Unlimited Minimum Width Web Thickness Beams on flanges Min. inner Diameter Beams around the x-axis Min. inner Diameter 1380 2000 1180 3000 15"x6" 80" 7"x4" 120" Flange Width 125 - 600 mm Web Heigth 400 - 3200 mm Flange Thickness Min 9 - 50 mm Web Thickness Min 6 - 35 mm Outline 1250 X1910 X 1224 mm page 17 facilities and equipment list Machineries and Equipment List NO 21 22 23 MACHINE DESCRIPTION MACHINE NAME AND TYPE STRAIHGTENING MACHINE TANAKA TR-50BV-600 AUTHOMATIC SHOT BLASTING MACHINE OMSG LOUCO 1500 NS MACHINE CAPACITY Flange Width Flange Thickness 125 mm - 600 mm 9 mm - 50 mm Max. 1600 X 2100 X 600 mm AUTHOMATIC PAINTING MACHINE REXON AUTHOMATIC AG 1500 CNC ANGLE LINE 24 PUNCHING, SHEARING AND MARKING FICEP LPA 15-34.N Grade FE 41 Steel Min 35 x 35 3 mm Suitable Of Engles Max 150 x 150 15 mm Grade FE 41 Steel Min. UPN 100 Max.UPN 160 CNC ANGLE LINE 25 PUNCHING, SHEARING AND MARKING FICEP LPA 15-34.N Grade FE 41 Steel Min 35 x 353 mm Suitable Of Engles Max 150 x 150 x15 mm Grade FE 41 Steel Min. UPN 100 Max.UPN 160 26 27 CNC PUNCHING, SHEARING & MARKING MACHINE FICEP LPA 15-B-36 CNC PLATE LINE PUNCHING, CUTTING, PEDDINGHAUSE FPB-1500/3 MARKING AND PLASMA CUTTING engineering service center profile 18 Max. 1600 X 2100 X 600 mm Suitable of Engles Grade FE 41 Steel Suitable of Engles Grade FE 41 Steel Suitable of Engles Grade FE 41 Steel Min 35 x 35 x 3 mm Max 150 x 150 x15 mm Min UPN 100 Max UPN 160 Min 35 x 3 mm Max 150 x15 mm MAX. PUNCH. DIA. 1-3/4 "(44.5 mm) MAX. PLATE SIZE 12192 X 508 mm MAX. PLATE THICK. ( 31 mm) MAX. Plasma Cutting Thickness 1-1/4 "( 31 mm ) facilities and equipment list Machineries and Equipment List NO MACHINE DESCRIPTION AUTHOMATIC 28 BENDING, NOTCHING, AND SHEARING MACHINE 29 CNC PLATE LINE PUNCHING SHEARING AND MARKING MACHINE NAME AND TYPE KINGSLAND 85 X S APS H-1060S MACHINE CAPACITY PUNCHING Rated Capacity Max Capacity Dia. X Thickness Max. Stroke Length Speed - 20 mm travel Throath Depth Standard Trhoath Depth XSD Model Largest Hole Working Height Flange Punch SHEARING Flat Bar Alternative Blade Length Angle Flange Trim Working Height ANGLE CUTTING At 90 with non deform At 45 Mitre Working Height SECTION CUTTING Round/Square Bare Channel Beam Tee NOTCHING Material Thickness Width Depth : Vee-Rect Angle Flange Working Height BENDING Max. Bax Size 85 T 33x20 55x12 80 34 full cyucle 355 625 150 1050 305 380x20 480x15 485 120x 15 890 150x15 80x 10 890 50 160x90 100x12 13 52 70-100 100x13 890 250x50 500x3 Input Length Max.6200 mm, min 1000 mm Flat Steel Max 400x20mm ( sT.37 ) Min 50x5 mm ( Standard ) Angle Steel Max 150x150x15 ( sT.37 ) Min 50x50x5mm ( Standard ) page 19 facilities and equipment list Machineries and Equipment List NO MACHINE DESCRIPTION MACHINE NAME AND TYPE 30 CNC PLATE LINE DRILLING MACHINE JAMESON G-509-NC PUNCHING, DRILLING 31 AND MARKING MACHINE engineering service center profile FICEP LPP 803-2N 20 MACHINE CAPACITY MAX. AREA COVERED BY SPINDEL: 6700MM X 4680 mm VERT. TRAVEL OF SPINDEL SLIDE : 533 mm PUNCHING MAX. HOLE 32 mm DRILLING MAX. PLATE THICKNESS 40 mm MAX. HOLE DIAMETER 40 mm facilities and equipment list Heavy Equipment and Transportation NO NAME TYPE CODE 1 CRAWLER CRANE PH 440 S CR 01 2 CRAWLER CRANE PH 335 CR 02 3 CRAWLER CRANE PH 335 CR 03 4 CRAWLER CRANE DH 400 CR 04 5 CRAWLER CRANE TATA CR 10 6 CRAWLER CRANE PH 5045 CR 07 7 CRAWLER CRANE PH 335 CR 09 8 CRAWLER CRANE PH 320 CR 06 9 CRAWLER PANCANG D 207 C CR 08 10 MOBILE CRANE TADANO CR 05 11 EXCAVATOR K 907 B BC 01 12 EXCAVATOR K 907 B BC 02 13 EXCAVATOR R 909 BC 03 14 EXCAVATOR K 904 C BC 04 15 EXCAVATOR K 904 C BC 05 16 EXCAVATOR K 904 C BC 06 17 EXCAVATOR K 904 C BC 07 18 EXCAVATOR K 904 C BC 08 19 EXCAVATOR PC 400 BC 09 20 EXCAVATOR UH 07 LC BC 10 21 EXCAVATOR K 907 B BC 11 22 EXCAVATOR UH 07 LC BC 12 23 EXCAVATOR EX,200 BC 13 24 EXCAVATOR EX 200 BC 14 25 EXCAVATOR SK 200 BC 15 26 EXCAVATOR SK 200 BC 16 27 EXCAVATOR SK 200 BC 17 28 EXCAVATOR SK 200 BC 18 29 EXCAVATOR SK 200 BC 19 30 EXCAVATOR SK 200 BC 20 page 23 facilities and equipment list Heavy Equipment and Transportation NO NAME TYPE CODE 31 EXCAVATOR K 907 B BC 21 32 DUMP TRUCK PS 190 DT 01 33 DUMP TRUCK PS 190 DT 02 34 DUMP TRUCK PS 190 DT 10 35 DUMP TRUCK NISSAN CW 51 DT 03 36 DUMP TRUCK NISSAN CW 51 DT 04 37 DUMP TRUCK NISSAN CW 51 DT 05 38 DUMP TRUCK NISSAN CW 51 DT 06 39 DUMP TRUCK A CW 51 DT 07 40 DUMP TRUCK MITSUBISHI 8D CG DT 11 41 DUMP TRUCK MITSUBISHI 8D CG DT 12 42 DUMP TRUCK NISSAN CW 52 H DT 13 43 DUMP TRUCK CW 53 H DT 14 44 TANK AIR MITSUBISHI PS 120 TA 02 45 TRUCK/TRONTON PS 190 TRK 03 46 TRUCK/TRONTON PS 190 TRK 04 47 TRAILER PS 190 TL 02 48 TRUCK LOADER D 75 S-3 SC 10 49 TRUCK LOADER D 75 S-3 SC 11 engineering service center profile 24 project list local and export project list project list 2000 - LOCAL No PROJECT NAME 1 2 3 KPI PROJECT BONTANG TOWER - BRUNNEI DARUSSALAM WARE HOUSE PROJECT – BONTANG “ EXPANSION STRUCTURE “ WARE HOUSE ADDITIONAL WORK OF CPO PROJECT FACTORY “ TAPIOKA” GANTRY BUILDING WARE HOUSE OFFICE AND FACTORY TAHAP I 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 VIHARA MAITREYA TOWER SHOW ROOM TOWER 21 M WARE HOUSE WARE HOUSE SHEET PILE FRAME (62 UNIT) MUNICIPAL BUILDING FACTORY TOWER 20 M SHEETING OFFICE & FACTORY TOWER 32 M FACTORY OF PT. PUNCAK ARDI MULIA WARE HOUSE FACTORY PT. KAYU PERMATA CAR SERVICE BUILDING FRAME GIRDER TELECOMMUNICATION TOWER 70 M TOWER 30 & 36 M OF FEDERAL MOTOR SHOP HOUSE BRIDGE FACTORY BUILDING A & B FACTORY BUILDING C & D TELECOMMUNICATION TOWER 52 M CIKEAS BRIDGE BRIDGE HOUSING WARE HOUSE WARE HOUSE CAR GARAGE WARE HOUSE WARE HOUSE WARE HOUSE OF PT. PENY JAYA COMPRESSOR HOUSE CLIENT Weight ( Ton ) PT. CEMARA SEMITAMA ALAN DICK & CO. PT. CEMARA SEMITAMA 780 2 33 GEREJA METHODIST PT. PASIFIC WIRA BERJAYA PT. INDOMARINE 19 12 11 BP. AZIZ AMIR 18 11 144 300 HOEXT & THAIGOS (HONGKONG) LTD PT. WERNER INDOPEX TRISTAR GROUP (PT. SANEX QIANJIANG MOTOR INT.) YAYASAN SURYA BUDHI AGUNG PT. TORAYA KESU ‘SANGGALANGI’ PT. KARYA BUDI MANDIRI PT. CITRA SECTA PUTRA PT. PAN RAMA VISTA GARMENT PT. INDOMARINE PT. ADHI KARYA JEMAAT AHMADIYAH INDONESIA PT. SELAMAT SEMPURNA PT. CITRA SECTA PUTRA PT. SANEX QIANJIANG MOTOR INT. PT. CITRA SECTA PUTRA PT. WIRA BUANA 1,200 45 14 2 27 35 8 84 1,600 3 407 4 150 BP. RUSLIN PRAWIRA PT. TRIMATRA LIGUNA PT. KARYA BUDI MANDIRI PT. ADHI KARYA PT. TORAYA KESU ‘SANGGALANGI’ 24 46 5 5 25 PT. CITRA SECTA PUTRA 17 MR. F. MULIONO PT. MODERN SURYA JAYA (SBY) PT. BUMI SARIMAS KELAPA PT. BUMI SARIMAS KELAPA PT. CITRA SECTA PUTRA 20 12 25 23 5 PT. LIGHT INSTRUMENINDO PT. MODERN SURYA JAYA (SMR) BP. HUSEN TENGKONO BP. HANDRYANTO BP. IR. H.S.A. DAHLAN BP. RIYANTO PT. CIPTA GRAHA NATA KENCANA PT. MANDALIKA SAPTA KARSA PT. AUSTRA INDO GLOBAL PT. MULTI FABRINDO GEMILANG 3 107 8 45 52 7 103 50 45 74 project list continue (project list 2000 - LOCAL) No PROJECT NAME CLIENT 45 46 47 48 49 50 51 52 CPO – PASAMAN FACTORY WARE HOUSE OF PT. PENI JAYA SHEETING WARE HOUSE SUPPORTING LIFT WARE HOUSE CHURCH CB INDUSTRIAL PRODUCT SDN BHD PT. PANCARAN MULIA SEJATI PT. AUTRA INDO GLOBAL PT. PANCARAN MULIA SEJATI BRIMOB PT. SIMAXINDO PRIMADAYA PT. DIMAS DRILLINDO 53 54 55 56 57 58 WARE HOUSE OFFICE CPO OF PT. SWAKARSA CPO – LONGKALI SHOW ROOM WARE HOUSE PT. YOLAPRA PUTRA UTAMA PT. MANDALIKA SAPTAKARSA PT. SRIWIJAYA PRIMA LESTARI PT. REKAYASA INDUSTRI PT. BERINGIN MAS JAYA PT. YUDISTIRA BUMI BHAKTI TOTAL PANITIA PEMBANGUNAN GEREJA MONUMENTAL TNI - AD Weight ( Ton ) 430 12 19 4 5 4 25 20 4 10 200 380 30 20 6,773 project list 2000 - EXPORT No 1 2 3 4 5 PROJECT NAME WARE HOUSE WARE HOUSE COLOMBO HARBOUR WARE HOUSE FACTORY TOTAL WEIGHT 2000 = 7,556 Ton CLIENT Weight ( Ton ) MULTI BUILDING PRODUCT RING SHINE TEXTILE MAGA ENGINEERING RING SHINE TEXTILE PT. VIKING INDUSTRIES TOTAL 19 230 225 293 16 783 project list project list 2001 - LOCAL No PROJECT NAME CLIENT 1 2 3 4 5 6 7 8 9 10 11 12 SUPPORTING LIFT LATEX FACTORY WARE HOUSE WORK SHOP WARE HOUSE WARE HOUSE WARE HOUSE STRUCTURE AIRPORT OFFICE 4 FLOOR SUPPLY MATERIAL ADDITIONAL FASCIA TOWER OF CHURCH 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 WORK SHOP TELECOMMUNICATION TOWER SUPPLY MATERIAL WARE HOUSE PALM OIL MILL WORK SHOP RAK PALLET FRAME PENYANGGA CRANE GIRDER 22 M WARE HOUSE BRIDGE 24 M WARE HOUSE TOWER 42 M WARE HOUSE TRAIN BRIDGE WARE HOUSE PABRIKASI SIKU 200x200x20 WARE HOUSE WARE HOUSE PABRIKASI PENGGILINGAN PADI PABRIKASI SIKU 200 x 200 x 20 SUPPORTING LIFT 23 M CRANE GIRDER TELECOMMUNICATION TOWER BRIDGE B 75 M TELECOMMUNICATION TOWER TRADISIONAL MARKET BRIDGE 20 M RAK PALLET RAK PALLET TOWER 55 M FLOORDECK & WIREMESH engineering service center profile PT. SELAMAT SEMPURNA PT. SRIWIJAYA PRIMA LESTARI PT. KING PERDANA SAKTI CB INDUSTRIAL PRODUCT SDN BHD PT. MANDALIKA SAPTAKARSA PT. SIGMINDO BANGUN PERSADA PT. TRIBAKTI SARIMAS PT. ADHI KARYA 30 PT. ANEKA WARNA INDAH FOTO PT. YUDISTIRA BUMI BHAKTI PT. BAJA SEKAWAN INDAH ABADI PANITIA PEMBANGUNAN GEREJA MONUMENTAL TNI - AD PT. KARYA BUDI MANDIRI PT. DUTA SEMBILANTAMA KREASINDO PT. YUDISTIRA BUMI BHAKTI MR. IR. SAUT SIAGIAN PT. MULTI MECHINDO INDONESIA PT. SUMARA NIKARYA PT. TRIBAKTI SARIMAS AC & R PT. REJEKI JAYA LESTARI PT. NUSANTARA STEEL PT. SINAR SAMA SEJATI PT. CATUR NIKI PT. AKSAN - TOKESAN PT. BINA KERJA CEMERLANG PT. ISTANA PUTRA AGUNG PT. OLAGA FOOD INDUSTRI PT. PERFECT CIRCLE ENGINEERING PT. TIGA SAUDARA PT. CAHAYA ETERNA MR. ABU SOLEH PT. PERFECT CIRCLE ENGINEERING PT. SELAMAT SEMPURNA PT. BUKIT TERANG PT. BAHYUTAMA KERTA MUKTI PT. KENCANA AGUNG UTAMA PT. DUTA SEMBILANTAMA MR. SYAFEI AMRI PT. PARADISE PERKASA PT. BUMI SARIMAS KELAPA PT. COCOMAS INDONESIA PT. BAHYUTAMA KERTA MUKTI PANITIA PEMB. MASJID BAITURRAHMAN Weight ( Ton ) 156 17 63 33 50 90 12 55 68 28 5 9 20 478 30 10 275 15 4 5 3 68 33 7 12 11 50 104 250 72 20 7 95 27 6 40 31 16.8 27 30 16 8 54 8.3 project list continue (project list 2001 - LOCAL ) No PROJECT NAME 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 WORKSHOP INDOFOOD FACTORY TOWER 70 M BRIDGE 30 M ROOF FRAME TOWER 40 M NORTH DURI EXPANSION SUBSTATION WARE HOUSE ADDITIONAL GPI POM TOWER 70 M WARE HOUSE GALANGAN KAPAL WARE HOUSE WARE HOUSE PALM OIL MILL WARE HOUSE PERTAMINA - TUBAN TOWER 40 M 62 63 64 65 66 SHOP HOUSE 3 FLOOR LANTAI MEZZANINE ROOF STRUCTURE FOR MOSQUE TOWER 35M TELECOMMUNICATION TOWER 67 68 69 RESTAURANT SUPER KITCHEN WARE HOUSE CPO PT. GUNUNG SAWIT Weight ( Ton ) CLIENT PT. NOJORONO PT. ERA SANTAMA PERKASA PT. BAHYUTAMA KERTA MUKTI CV. SELINDUNG DELIMA MR. VICTOR PT. BAHYUTAMA KERTA MUKTI PT. ANGKASA BUANA CIPTA 161 670 19.5 50 16 13.5 27.7 PT. KARYA BUDI MANDIRI CB INDUSTRIAL PRODUCT PT. BAHYUTAMA KERTA MUKTI PT. TIGA SAUDARA PT. PRABINA AULIA SARANA PT. SAMA - SAMA PT. PASIFIK WIRA BERJAYA PT. VARITA MAJUTAMA PT. BERKAT ANUGRAH AGUNG PT. DUTA SEMBILANTAMA KREASINDO MR.. H. CAHYADI SUTANTO 49 5 19.7 23 70 15 10.5 281 14.5 15 40 11 4 14 16.54 PT. MEGA CIPTA BERSTARI PERSADA MR. EFFENDI SUDARSONO PT. GLOBAL REKAYASA INDONESIA PT. DUTA SEMBILANTAMA KREASINDO PT. INTERDECO PT. FIRGONIK DINAMIKA CB INDUSTRIAL PRODUCT 25.73 45 500 TOTAL 3,834.50 project list 2001 - EXPORT No 1 2 3 4 5 6 7 8 PROJECT NAME WORK SHOP WARE HOUSE WORK SHOP NAVO PALM OIL MILL WARE HOUSE WORK SHOP FLEMINGTON PALM OIL MILL JUDAN PALM OIL MILL Weight ( Ton ) CLIENT MAGA ENGINEERING RING SHINE TEXTILE MAGA ENGINEERING CB INDUSTRIAL PRODUCT SDN BHD RINGSHINE TEXTILE MODERN ERECTION CB INDUSTRIAL PRODUCT SDN BHD CB INDUSTRIAL PRODUCT SDN BHD TOTAL 163 158 46 300 225 72 298 191 1,453 TOTAL WEIGHT 2001 = 5,287.50 Ton page 31 project list project list 2002 - LOCAL Weight ( Ton ) No PROJECT NAME CLIENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 HOUSE & SHELTER BOILER HOUSING TOWER 35 M PALM OIL MILL CPO IN SAMPIT WARE HOUSE PABRIKASI L200, L150, & PELAT TELECOMMUNICATION TOWER 40 M TELECOMMUNICATION TOWER 40 M ROOF STUCTURE FOR AUDITORIUM ST. YOHANES BOSCO CHURCH ADDITIONAL FACTORY ROOF FRAME ISLAMIC CENTER TOWER MONUMEN KAB. GORONTALO OFFICE BUILDING CPO PT. MULTRADA MULTI MAJU HOUSING WARE HOUSE ELEVATED & BRIDGE PROJECT FACTORY BAITURRAHMAN MOSQUE (PHASE II) 9 15 13 130 360 16 145 15 30 6 95 10 61 330 18 266 7 41 69 51 10 22 23 24 25 26 ROOF STRUCTURE FOR HOUSING SNF FLORINDO INDONESIA WORKSHOP PEKAYON TRAIN BRIDGE SEMARANG TELECOMMUNICATION TOWER PT. SATELINDO BRIDGE CV. LIMAN AGUNG PT. LILIN CEMERLANG PT. LILIN CEMERLANG PT. AGRO BINTANG DHARMA NUS. PT. KATINGAN INDAH UTAMA PT. META FISIKATAMA PT. KOKOH SEMESTA PT. DUTA SEMBILANTAMA KREASINDO PT. DUTA SEMBILANTAMA KREASINDO POLRES METRO BEKASI PANITIA PEMB. GEREJA SUNTER PT. DIRADA META RANCANGBANGUN YAYASAN AL -HARAMAIN PD. PEDAGO PT. CITRA SECTA PUTRA PT. MULTI MECHSINDO INDUSTRIES BP. WINARTO PT. MULTI FABRINDO GEMILANG PT. TOTALINDO BANGUN PERSADA PD. SARI SEDAP INDONESIA PANITIA PEMB. MASJID BAITURRAHMAN MR. SURYADI PT. HARJAGUNA KURNIAMITRA HENDRA TEKNIK PT. ISTANA PUTRA AGUNG PT. BAHYUTAMA KERTA MUKTI PT. BAKRIE CORRUGATED METAL INDUSTRY PT. MELANIA INDONESIA PT. KARYA MAKMUR ARMADA PT. TRANS BAKRIE PT. SAHITYA PRATISTA CIPTA 95 219 40 1,324 250 PT. AGRO BINTANG DHARMA NUS. CBIP PT. SALAWATI MOTOR IRJA PT. BAHYUTAMA KERTA MUKTI 20 400 40 157 CBIP PT. LIGHT INSTRUMENINDO PT. SAHITYA PRATISTA CIPTA PT. MULTIMAS NABATI ASAHAN 421 6 8 145 PT. SAMUDRA TEKNINDO HYDRAUMATIC 142 27 28 29 30 31 32 33 34 35 36 37 38 39 40 FACTORY ROOF STRUCTURE FOR VIHARA STEEL DECK TELECOMMUNICATION TOWER PT. TELKOMSEL LOADING RAMP PT. MAS PALM OIL MILL WORKSHOP TELECOMMUNICATION TOWER PT. SATELINDO PT. MINAMAS PALM OIL MILL CIKEAS BRIDGE 20 M TOWER RATELINDO ROOF TOP SST 30 M BUILDING CONSTRUCTION STRUCTURAL STEEL FACTORY engineering service center profile 32 10 22 20 125 350 project list continue (project list 2002 - LOCAL ) No PROJECT NAME 41 42 OFFICE AND FACTORY PT. SAMWOO BRIDGE 43 44 45 46 47 48 49 50 51 52 VIHARA AVALOKITESVARA STEEL DECK BRIDGE TYPE B-60M OFFICE MINI POM BRIDGE B-40M TELECOMMUNICATION TOWER PT. SATELINDO CHURCH HKBP TENNIS HALL WORK SHOP 53 54 55 56 57 58 59 60 61 WORSKHOP & WAREHOUSE BRIDGE 40 M TOWER 42 M BRIDGE B-35M BRIDGE B-55M BRIDGE B-60M BRIDGE TYPE C-45 FACTORY AMDK TENNIS HALL II Weight ( Ton ) CLIENT PT. AGRABUDI KARYAMARGA BAKRIE CORRUGATED METAL INDUSTRY YAYASAN SATYA GRAHA PT. TRANS BAKRIE PT. PERDANA PUTERA BAJATAMA SCHALA SCHALIM & ASSOCIATES CBIP PT. PRESTASI KARYA MULIA PT. BAHYUTAMA KERTA MUKTI 190 120 330 1,450 31 77 222 156 95 PT. ARCA BIMASAKTI KODAM JAYA PT. SAMUDRA TEKNINDO HYDRAUMATIC CV. BELAWAN INDAH CV. ARSA KEMBANG PT. INDOTECH JAYA LESTARI BCMI BCMI PT. DIMAS ESA PT. PERDANA PUTERA BAJATAMA PT. KOKINDO TROPICAL SPRINGS KODAM JAYA 27 36 31 49 78 495 39 99 1,100 54 18 43 TOTAL 10,231 project list 2002 - EXPORT No 1 2 3 PROJECT NAME OIL REFINERY BUILDING WARE HOUSE WARE HOUSE Weight ( Ton ) CLIENT CIDAR ENGINEERING RINGSHINE TEXTILE LTD. RINGSHINE TEXTILE LTD. 230 133 87 TOTAL TOTAL WEIGHT 2002 = 10,681 Ton page 33 450 project list project list 2003 - LOCAL No PROJECT NAME 1 TELECOMMUNICATION TOWER PT. SATELINDO TELECOMMUNICATION TOWER PT. SATELINDO PALM OIL MILL BRIDGE B-50M SALURAN STEEL DECK STEEL DECK TELECOMMUNICATION TOWER PT. TELKOMSEL BRIDGE B-60 M BASE FRAME ROOF TOP FACTORY ROOF STRUCTURE FOR AUDITORIUM BRIDGE B-20M & 30 M ANGSANA P O M SALURAN ANCHOR BOLT BRIDGE B-60 M INCENERATOR BUILDING TRANSMISSION TOWER BAITURRAHMAN MOSQUE (PHASE III) TELECOMMUNICATION TOWER PT. SATELINDO CPO PANGKALAN BUN CPO TANJUNG PINANG PALM OIL MILL 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 CLIENT 34 35 36 37 BRIDGE GIRDER BRIDGE TELECOMMUNICATION TOWER PT. SATELINDO TELECOMMUNICATION TOWER PT. TELKOMSEL T-72 M SCHOOL BRIDGE B-40M GIRDER BRIDGE B-20M & B-30M JEMBATAN PENYEBRANGAN KAPAL TELECOMMUNICATION TOWER PT. SATELINDO POWER HOUSE WARE HOUSE STEEL BRIDGE DECK TELECOMMUNICATION TOWER T 42M 38 39 40 TELECOMMUNICATION TOWER GIRDER BRIDGE A-25M WARE HOUSE 28 29 30 31 32 33 engineering service center profile 34 Weight ( Ton ) PT. BAHYUTAMA KERTA MUKTI 150 PT. DUTA SEMBILAN KARTIKA 130 PT. TIMAH INDUSTRI PT. ANUGERAH MITRA SETIA PT. CATUR BUMI PERTIWI PT. TRANS BAKRIE PT. TRANS BAKRIE PT. INDOTECH JAYA LESTARI 227 96 14 13 16 492 PT. FLORIDA DUTA KARYA PT. DUTA SEMBILAN KARTIKA PT. BUKIT BAJA NUSANTARA PT. PARAMA MATRA WIDYA PT. GLOBAL ERA MILLENIUM PT. CB. POLAINDO PT. CATUR BUMI PERTIWI PT. TIMAH INDUSTRI PT. B C M I PT. CAKRA NUSANTARA CILEGON PT. PLN (PERSERO) PAN. PEMB. MASJID BAITURRAHMAN PT. BAHYUTAMA KERTA MUKTI PT. ERACIPTA BINAKARYA PT. ERACIPTA BINAKARYA PT. CONARCO INDONESIA ENGINEERING CV. JASA UTAMA PT. NUSANTARA DHARMA CIPTA PT. BAHYUTAMA KERTA MUKTI PT. DUTA SEMBILAN KARTIKA PT. DIRADA META RANCANGBANGUN PT. ANUGERAH MITRA SETIA PT. AGRABUDI KARYAMARGA PT. TENGAN PERDANA BHAKTI PT. BAHYUTAMA KERTA MUKTI PT. PUSAKA JAYA BARU CV. RATU KRAKATAU PT. B C M I PT. WAHANA LINTASSENTRAL TELEKOMUNIKASINDO PT. TORAYA KESU ‘SANGGALANGI’ PT. HUTAMA KARYA BENGKULU BP. NG BURHAN 62 214 130 52 76 493 642 8 112 33 14,000 9 61 170 150 125 72 51.33 187 23 10 71.20 99.80 50 90 495.90 10.50 19 52.70 117.97 37 170 project list continue (project list 2003 - LOCAL ) No PROJECT NAME 41 42 43 44 45 46 47 48 49 50 51 52 GIRDER BRIDGE B 28M GIRDER BRIDGE B 30M BRIDGE B 25 M STEEL DECK BRIDGE B-60M HOUSE GIRDER BRIDGE B 20M & B 30M TELECOMMUNICATION TOWER T 25M & T 32M SIAK SRI INDRAPURA BRIDGE BRIDGE C-30M ROOF FRAME FACTORY 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 TOWER T 48M BRIDGE A-20M POWER HOUSE & UNLOADING SHED BRIDGE A-20M PALM OIL MILL BRIDGE B-60M BRIDGE B-40M BRIDGE C-15M & C-20M BRIDGE TYPE C-45 STEEL DECK BRIDGE TYPE C-40 BRIDGE CLASS C B-50M OFFICE EXTENTION FACTORY STEEL DECK POWER PLANT PROJECT TOWER T-90M (HEAVY) LOADING RAMP JEMBATAN C -45M SHOP HOUSE ADDITIONAL WARE HOUSE PALM OIL MILL TOWER T-25M, 29M, & 35M TOWER T-70M & 40M Weight ( Ton ) CLIENT CV. MULYA KARYA PT. DEWISRI RAHAYU CV. KARYA MAKMUR PT. TRANS BAKRIE SUMURANJA PT. HK – PT. WIKA JO. PT. IHAKA SAKA NUSANTARA PT. AGRABUDI KARYAMARGA PT. WAHANA LINTASSENTRAL TELEKOMUNIKASINDO PT. HUTAMA KARYA PEKANBARU PT. PERDANA PUTERA BAJATAMA PT. FARIKA DUTA AGUNG PT. MULTIPANEL INTERMITRA MANDIRI PT. CITRA SECTA PUTRA PT. WIJAYA KARYA PT. TIMAH INDUSTRI PT. WIJAYA KARYA PT. KARYA PUTRA NAGARI PT. EKA PENDAWA SAKTI PT. BINA MAJU TETAP JAYA PT. BINA MAJU TETAP JAYA PT. PERDANA PUTERA BAJATAMA PT. WAAGNER BIRO PT. PERDANA PUTERA BAJATAMA CV. BRANTAS PT. TRIMATRA LIGUNA PT. BANGUN PRIMATAMA SEDAYA PT. WAAGNER BIRO PT. ASRIGITA PRASARANA PT. BAHYUTAMA KERTA MUKTI PT. AGRO BINTANG DHARMA NUS. PT. CEMERLANG SAMUDRA KONTRINDO MR. LIM BOK SAN PT. MELANIA INDONESIA PT. TIMAH INDUSTRI PT. WAHANA LINTASSENTRAL T. PT. BAHYUTAMA KERTA MUKTI TOTAL 43 45 17 22.67 136.17 14 60.75 23 104.70 31.36 34 35 25.28 24.38 33.50 24.38 116 137.38 85.22 74.27 50 13.67 42 62.90 114 113 52.74 408.24 46.25 22 41 48.95 88 575 32 130.8 21,960 page 35 project list project list 2003 - EXPORT No 1 2 PROJECT NAME SUNGAI DINGIN P O M WORKSHOP Weight ( Ton ) CLIENT CB. INDUSTRIAL PRODUCT OLIVER ROONEY TOTAL 450 86 536 TOTAL WEIGHT TH 2003 = 22,496 Ton (UNTIL 31st DECEMBER 2003) project list project list 2004 - LOCAL No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 PROJECT NAME PALM OIL MILL STEEL DECK BRIDGE B-60 M BRIDGE A-20 M GOR PAMBUDI LUHUR STEEL DECK STEEL DECK TOSERBA YOGYA WORKOVER TRAILER STEEL DECK JEMBATAN B -60M STEEL DECK PINTU DOK KAPAL STEEL DECK Weight ( Ton ) CLIENT PT. MULTI JAYA PERKASA PT. WAAGNER BIRO PT. RIAU SEPADAN PT. OKA LINTAS MUARA MR. DANA AMIN PT. WAAGNER BIRO PT. WAAGNER BIRO PT. AKUR PRATAMA PT. METALINDO PERKASA MANDIRI MR. IR. HARYONO PT. GANESHA CIPTA INFORMATIKA MR. IR. HARYONO PT. DOK DUASATU NUSANTARA PT. WAAGNER BIRO TOTAL 133 10.25 137.62 24.48 14.40 15.95 27.35 342 10.50 12.70 220 6.5 65 20.65 1,040.40 project list project list project list project list 2010 - LOCAL TOTAL WEIGHT 2010 = 3,235 Ton company information Head Office and Plant Information engineering service center profile 2
Similar documents
Catalogue PT. Gunung Garuda
800,000MT. Today, Gunung Garuda remains one of the largest and most dominant private steel manufacturer in South East Asia due to advanced technological and human investment made, starting from the...
More information