FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED
Transcription
FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED
FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED FESCO OFFICE OF THE Phone No. 041-9220242 Fax No. 041-9220217 Email: fdfesco_cpc@Yahoo.com No 1o7g(c--R FINANCE DIRECTOR FESCO FAISALABAD Dated FD/FESCO/CPC R8 06 /2013 The Registrar NEPRA, rd Floor, OPF Building, Sector G-5/2, Islamabad PETITION FOR DETERMINATION OF CONSUMER END TARIFF FOR FY 2013-14 IN RESPECT OF FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED (FESCO). Subject: - I am pleased to file Tariff Petition for FY 2013-14 on behalf of Faisalabad Electric Supply Company Limited (FESCO) in accordance with rule 3 (1) of NEPRA Tariff d Procedure Rules, 1998. The Demand Draft No. and ,3524582.-4 dated alq--06.-2tt3 for Rs. 744,192/- (Seven Lac Forty Four Thousands One Hundred & Ninety Two Only), is attached as petition fee. Subsequent changes, documentation and information will be communicated/ provided for becoming a part of the accompanying Tariff Petition. It is requested that the attached Tariff Petition of FESCO for the FY 2013-14 may be admitted. DA/ As Above Yours Truly, (DR. RANA ABDUL JABBAR KHAN) CHIEF EXECUTIVE OFFICER C.0 To: Joint Secretary (Power), Ministry of Water & Power Islamabad. Faisalabad Electric Supply Company Limited FESCO TARIFF PETITION FY 2013 - 14 FESCO Tariff Petition FY:2013-14 TABLE OF CONTENTS 1. 2. PETITION SUMMARY 1.1 Details of petitioner L1.1 Name & address 1.1.2 License Details 1.1.3 Representatives of FESCO 1.1.4 Grounds for petition 1.2 Concise Statement (Grounds and facts forming basis of the Petition) 1.3 Key aims and features of the petition REVENUE REQUIREMENT 2.1 Power Purchase Price 2.1.1 Transmission and distribution losses 2.2 Distribution Margin 2.2.1 Operation & Maintenance Expenses Fresh Employment ➢ Basic pay ➢ Allowances ➢ Employees benefits ➢ Retirement benefits ➢ Repair & Maintenance ➢ Other operating expenses ➢ 2.2.2 Return on rate base 2.2.3 Depreciation 2.2.4 Investment Plan 2.2.5 Other Income 2.3 Prior Year's Adjustment 2.4 Other Issues 2.4.1 Late Payment Surcharge/ Cost of Working Capital 2.4.2 TFC Loans and Mark-up by DISCOs 2.4.3 Safeguard the Interest of Majority of Industrial Consumers from the Invasion of Temporary/Captive Power Industrial Consumers through Consumer Discipline 2.4.4 Bifurcation/Creation of Operation Sub-Divisions, Divisions and Circles 2.4.5 Target of Pay Out Ratio • 2.4.6. Incentive to Consumers in terms of Reduction in Tariff in accordance with their Savings in Energy Consumption 3. PRAYER/ REQUEST 1 FESCO Tariff Petition F1:2013-14 THE TARIFF PETITION 1. PETITION SUMMARY 1.1 Details of the Petitioner 1.1.1 Name and Address Faisalabad Electric Supply Company Limited (FESCO), Canal Road, Abdullahpur, Faisalabad 1.1.2 License Details FESCO is the licensee of National. Electric Power Regulatory Authority (NEPRA) and holds the Distribution License bearing No. 02/D1./2002. 1.1.3 Representatives of FESCO The petition is being filed through Dr. Rana Abdul jabbar Khan. Chief Executive Officer of FESCO who has been duly authorized by Board of Directors vide Resolution (ANNEXURE-A) passed in its 111 th / 37th meeting held on 14th May 2013 to sign and file annual tariff petition for FY 2013-14 along with the following officers of FESCO have also been authorized by the Board to sign individually or jointly the tariff petition FY 2013-14 and the necessary documents in support of the petition and also •to appear- before the AuthoritY as needed and do all acts necessary for completion and processing oldie application:a. Muhammad Iqbal Ghori Finance Director. b. Muhammad Naeeni Ullah Director (HR&A) c. Ghazanfar Ali Baloch G.M. (Operation) d. Khurshid Alam • Chief Technical Officer, (then-C(:O) e. Ch. Ghulam Rasul Chief Commercial Officer, (then,(;1.1 .1.&(;) f. Sheikh Akhtar Hussain • Chief Engineer (T&G), (then-( ;1'O) Aziz Ahmed Addl; D.G (IS) g. h. Abdul Razzaq Addl; D.G (L&L) The Affidavit of the signatory/ CEO is appended as ANNEX R E-B and the deposit receipt of the requisite fees is ANNEX URE-C. 1.1.4 Grounds for Petition Under the "Regulation of Generation, Transmission & Distribution of Electric Power Act, 1997 (hereinafter called as `NEPRA Act')", the Regulator is responsible for determining tariffs and other terms and conditions for the supply of electricity by the generation, transmission and distribution companies. NEPR.\ is also responsible for determining the process and procedures for reviewing tariffs and recommending tariff adjustments. 2 FESCO Tariff Petition FF:2013-14 FESCO is a licensed public limited company distributing and supplying electricity to the distribution area within jurisdiction of company, as set out in I'I :.SCO's license. The tariff petition for FY 2013-14 is being filed by FESCO in order to ensure its financial viability through timely recovery of its prudently incurred costs/expenditure and reasonable return, to comply regulatory standards and future investment for network expansion. The petition is being filed in accordance Rule 3 of "NEPRA (Tariff Standard and Procedural) Rules, 1998 (hereinafter called as `Tariff Rules')". 1.2 Concise Statement As per Rule 17 (3) (i) of Tariff Rules, the tariff should allow licensees the recovery of any and all costs prudently incurred to meet the demonstrated needs of their consumers. These 'Revenue Requirements' of FF,SCO for 1;Y 2013-14 have formed the basis for this petition on the following Facts & Grounds The existing Distribution Margin (DM) is not sufficient for FESCO to meet the anticipated Revenue Requirement in FY 2013-14 due to inflationary impact, increase in regulatory asset base, expansion of network (addition of sub-divisions & divisions), construction of new grids, increase in salaries wages, repair & maintenance and increase in depreciation etc. It is obvious to determine the Distribution Margin keeping in view the narrated above factors for onward reflection in consumer end tariff. i. ii. Due to delayed Determination & Notification of tariff for IN: 21)12-13, FESCO remained unable to recover its Revenue Requirement which. has increased the requirements of FY 2013-14. iii. Allow FESCO to pay mark-up on TI'(; Loan arranged by Power Holding (Pvt.) Limited. iv. Allow FESCO to maintain Consumers Discipline (on B-3, B-4 categories). v. To allow FESCO to create 12 new Sub Divisions and 03 new Divisions in the Phase during FY 2013-14: vi. Promote conservation of energy that may include incentives to consumers in terms of reduction in tariff in accordance with their savings in energy consumption. vii. The line losses (10.83%) and sales mix (8,767 NIKV,h) etc., have been estimated as per existing trend. However, the order of Supreme Court of Pakistan dated 21-05-2013, "to supply available electricity equitably in between the domestic and industrial consumers" May change the consumer mix and load profile. Copy of the decision attached at ANNEXU E- D. 3 FESCO Tariff Petition FF:2013-14 1.3 Key Aims and Features of the Petition The aim of this petition is to request the Authority to determine FI ,ISCO's Tariff well in time for FY 2013-14 that may be prejudiced by decision of the Authority on Motion for Leave to Review filed by FESCO. The purpose of filing this petition is to obtain approval for the immediate implementation of cost reflective tariffs to yield FESCO's required revenues on annual basis for ultimate benefit of consumers. The objective of tariff petition is to: i. ii. iii. iv. v. vi. vii. viii. ix. x. Instant recovery of Cost of Service to protect existing as well as future consumers. 1'o provide efficient usage of installation, and investment in, FFISCO's distribution network. To provide protection to FESCO against uncontrollable risks. To promote financial sustainability of FESCO to the ultimate benefit of consumers. To recover on account of Prior Year Adjustment. To provide safe and secure working environment to its work force. To provide sufficient working capital in order to pay its current liabilities promptly to avoid accumulation of circular debt at central level. Induction of . Emerging Technologies like Smart Metering • (Real Time Monitoring), Smart Grids and SCADA etc. To motivate the determination of tariff to meet the Revenue Requirements those are explained hereinafterImplementation of ERP. 2. REVENUE REQUIREMENT NEMO. Act allows the Distribution licensee to recover the prudently incurred cost of services as well as the rate of return which promotes continued reasonable investment in equipment and facilities for improved and efficient services. This is to meet with the requirement of revenue; to ensure financial viability; for continuity in operations and reliability in supply of electricity; funding for system expansion; improvement/ rehabilitation and thereby benefiting the consumers in the end. No doubt that advanced tariff is developed/ determined on notional basis and law provides the mechanism of adjustment however to save the consumer from unwanted fluctuations the more realistic approach in making references shall be appreciated. On basis of trend of demand and availability, the projected revenue requirement of FESCO for FY 2013-14 is calculated on anticipated sale of 8.767MKWh units with a growth of 2.80".a over previous year actual/projected sales of 8,528 MKWh. As per law, the "Annual Revenue Requirement" of FESCO consists of:1. Power Purchase Price including impact of T&D Losses; ii. Distribution Margin; and iii. Prior Year Adjustment 4 FESCO Tariff Petition FF:2013-14 Table — I FY 2013-14 (Projected) Description Rs./KWh Rs. in Million Energy Transfer Charges (ETC) 8.214 80,857 Capacity Transfer Charges (CTC) 2.186 21.493 Use of System Charges (UoSC) 0.185 1,823 Total Cost of Power 10.595 104,173* • See Serial # 4 of the Cakulation Tahk 2.1.1 Transmission and Distribution Losses NEPRA has to determine. the difference between the units procured and units sold within the distribution. service territory that includes the Technical as well as Administrative Losses. In the determination for FY 2012-13 the NEPRA has allowed the T&D Losses as 10.83°•0. In our view point, the impact load growth, addition in distribution network and number of consumers may not not be ignored on mere ground of impact of investment. It is therefore again specifically pleaded that 11:.SCO is facing the continued T&D losses due to factors named above as well as due to un prudent village/ rural electrification (that is explained here in after). It is further asserted that despite the above causes of increase in T&D Losses, FI.7.SCO is maintaining the allowed limit of T&D Losses as 10.83"o for last 2 years and has set th same target for the third year. In the meanwhile FESCO is committed to make all efforts to further reduce the losses for which the studies arc being, carried out and the results are anxiously awaited by FESCO. To achieve the designated target of 10.83° u, Fl SC() has drawn a roadmap, which includes revamping of secondary transmission (66, 132 KV) lines, augmentation of HT & ur lines, provisOn of T&P items, inductiot of low loss transformers, theft detection by enforcement agencies and replacement of meters, with static meters and its up gradation into Automated Meter Read* (AMR) and Advanced Metering Infrastructure (11\11). Impact of Un-prudent Village/Rural Bectrification:In past years in Pakistan it was not of atical importance that the load be carefully analyzed before grid stations and circuits were added/ extended in the system. Now it is very important that the load conditinis both present and projected, be carefully analyzed before any additions are contemilated. In certain cases the complete system needs planning de novo because unrudent village (rural) electrification has confronted the utility with numerous negaive impacts such as:- 6 FESCO Tariff Petition F)':2013-14 Table for Calculation of Revenue Requirement Sr. No. Description' .. 2013-14 (Projected) 1 11(V11) Total Units Purchased (1■ 9,832 2 Total Units Sold (MI(V11) 8,767 3 Losses (°'o) 1 ►.83 4 Power Purchase Price (Rs. in Million) 104,173 5 Operation & Maintenance Cost (Rs. in Million) 11,815 6 Return on Assets (Rs. in Million) 4,962 7 Depreciation (Rs. in Million) 1,847 8 Other Income (Rs. in Million) (2,-IOU) 9 Distribution Revenue (Rs. in Million) (5+6+7+8) 16,223 10 Prior Year's Adjustment (Rs. in Million) 21,426 11 Annual Revenue Requirement (Rs. in Million) (4+9+10) 141,823 12 Average Tariff (Rs./K\\11) (11/2) 16.18 In order to substantiate this "Calculation Table", the detail of each component of Revenue Requirement is as follows:2.1 Power Purchase Pre (PPP) FESCO pays the cost of generation and transmission of electricity to Central Power Purchasing Agency (CPPA) and other generation licensees, as is determined and notified, which is a pass through item and known as "Power Purchase Price (PPP)". The end consumer has to pay this PPP which is transferred to D1S( X ) according to the Transfer Price Mechanism (11)14) subject to adjustments. The average power purchase pice for FY 2013-14 is anticipated/projected Ro0.595/KWh with total cost 6 Rs.104,173 Million with an increase of 7"0 over previous financial year i.e. 2012-13being no clear trend found during past years. The units b be purchased have been pojected 9,832 NIKW11 for IN 2013-14 keeping in view the historical data as well as new scenario now. The component wise detail is given below: 5 FESCO Tariff Petition FY: 2013-14 a. b. c. d. e. h. I .ow voltage at consumer's end Increase in line losses Decreased reliability Trend of power theft Enhanced maintenance cost .. Low revenue turn-over Over loading of the system • Increased and un-economical operating cost etc. Voltage drop in a distribution system is the difference at any instant between the voltages at the source and utilization ends of a circuit, branch circuit, or the transformer. A basic service requirement is that the voltages will vary no more than ± 5 percent following the contractual agreement. The liberal extension of HT & :1' circuits for the purpose of rural electrification results in inflating the technical losses as well as making the distribution system more vulnerable to frequent breakdown and outages. The down turn in purchasing power and tariff hike has increased the number of erring electricity consumers particularly in scattered rural areas where command and control of utility's staff is generally loose than that in cities and towns. The problem of power theft aggravates in the absence of strong legislative support for utilities. It is also a fact that frequent and long traveling by the utility's staff for attending faults and maintenance of the distribution system in rural areas, has increased the cost of maintenance exorbitantly. On the top of that the revenue earning from rural area is far less than one from urban settlements. The IRR of the investment has never been taken into account while making decisions for projects of village electrification. The financial loss per annum occasioned by conductors of electricity is made up of:Interest on the capital cost of the conductors, plus an allowance for (a) depreciation. The cost of energy wasted by virtue of the ohmic resistance of the (3) conductor. 2.2 Distribution Margin (DM) The detail of each component of Distribution Margin of FESCO for the FY 21113-14 is discussed in heads of:Operation & Maintenance Expenses Fresh Recruitment • Basic Pay • Allowance • Employee's Benefits • Retirement Benefits • Repair & Maintenance • Other Operating Expenses • 7 FESCO Tariff Petithm FF:2013-/4 • • • • Return on Rate Base Depreciation Investment Plan Other Income 2.2.1 Operation & Maintenance (O&M) Expenses The abstract of O&M Expenses, as have been anticipated / proposed by FESCO, for FY 2013-14 is as under:- Table — II (Rs. in Million) 2011-12 2012-13 Description . Audited Actual/Projected Fresh Employment Basic Paw 2013-14 Estimated 201 1,114 Allowances 1,904. Employee Benefits Retirement Benefits • /,180 2,469 with bonus 2,348 2,476 2,719 349 419 508 7,371 /.922 3,431 514 699 1,321 Other Operating Expenses 1,633 1,222 1,287 Total 8,986 10,207 11,815* Ratio of Pay & Allowances 79". 81"0 78",, Ratio of Other O&M 21". 19"0 12"0 Repair & Maintenance * See Serial # 5,,I the Caked:tram Table Notes: i) ii) Working regarding estimated O&M for FY 2013-1-1 is enclosed at ANNIA1 . 10:•1: As per audited figures for FY 2011-12 Rs.318 Million have been adjusted against total O&M. 2.2.1.1 Fresh Employment: FESCO's work force and line staff is back bone of its progress. The management of FESCO along with its team is striving hard to ensure an efficient, coordinated and economical operational network in view of increasing load growth and economic activity. The emerging growth and network expansion needs competent, and skilled professionals in technical, finanCe and customer care area of service. 8 FESCO Tariff Petition FY: 2013-14 Currently FESCO is a staff deficient company and endeavoring to provide reliable, affordable and safe electricity to its consumers with the available less staff. The following analysis clearly describes the shortage of staff in the company:- MANPOWER STATISTICS AS ON 31.03.2013 Working Strength Sr. No Description Sanction Strength Reg. Contract Daily Wages Total Deficiency %age 8- 26.52". OffiLers (BPS-17 and above) . a. Technic l 328 235 6 - 24 I Non'Technical 129 84 3 - 8- 42 32.55" . b. 457 319 9 - 328 129 28.22% Sub-Total Officials (BPS-01 to 16) Technical 10,35)) 8.230 661) 351 9,241 1.109 10.- I". a. Non- 'Technical 7.639 5." 12 5-13 . I 15 6.3-1) 1.269 16.61" h. (: (:imunercial 570 425 63 0 488 82 14 . 3')"" Sub-Total - 18,559 14,367 1,266 466 16,099 2,460 13.26'%) 19,016 14,686 1,275 466 16,427 2,589 13.61% Total Manpower In order to meet the technical and operational targets, the l'ESC( ) management intends to recruit 1,131 Nos. personnel in different cadres BPS 2-17 during FY 201314. Table-IV Recruitment Plan for FY 2013-14 Sr. No 1. 2. Name of Post BPS Iunior l'Ingineers )thers (. \ N1(:S, \ NININI, . \NI-. \ ccounts, \MDR, . \ NI-Social Impact) 17 91 47 Financial Impact/ Month (Rs) 2,384;80 17 34 13 467,220 5,606,640 32 16 50 1 9 284,6-0 1711.802 20 3:9,560 5.416,040 )49,624 4554:20 IS 284,6-0 3.416,1)40 20 08 323,82)1 129,528 I 13,33" 926,820 3.885,840 1.554,336 1.560,1)44 3. 4. \ ccounts \ ssistants \ udit \ ssistant 14 14 5. 6. Commercial \ ssistant Data ( :oder/ Data him. IperattU 1S-1 SS( )-1 Senior Store keeper 14 7. 8. 9. 10. Financial Impact/ Annum (Rs) 28,6 ".360 Total No of Vacant posts IS-I I 14 "31 13 13 12 11 • 56 13 5 92 • No. of Posts to he filled '7 60 11,121,840 9 FESCO Tariff Petition FE-2013-14 11. SS( )11 11 28 20 308,940 3,707080 12. 13. junior Story Kecper UDC 11 9 16 12 185.364 2.224.368 71 35 513.555 6.162,660 14. 15. 16. NIctur Ruder 7 131 100 1.361,900 16.342,800 1.1)(:MC . \ SS. \ 7 89 60 81-.140 9,84)5,680 5 96 75 978.9'5 17. 11.-4-.7 0 Bill 1)istribtiter 18. 19. ALM Nail) Qiiiiid 4 16.4 14(1 1,741,460 '0.897520 03 495 450 4.910_300 594413,600 02 Total • 39 ' 1,540 40 4"3,600 5.681.210 1,146 16,766,441 201,197,292" *See Tabk: 11 Justification for Recruitment mentioned in Table-IV Sr. No Name of Post Category. of . Staff 1• Junior Engineers Officers (Technical) 2• Others (AM-CS, AM-MM, AMAccounts) 3. 4. Accounts Assistant & Audit Assistant Commercial Assistant , Officers (NonTechnical) Staff (Accounts & Audit) Staff (Commercial) Justification 228. sanctioned posts in liESCO arc allocated to Operation, Planning, Development and Construction departments. During dune 2012, due to shortage of qualified Junior Engineers Management is compelled to make temporary arrangement by assigning charge of the Sub Divisions to the junior staff which has not yielded pragmatic results. In order to ensure the efficiency and performance of the Operation Sub Divisions, recruitment of 47 qualified Junior Engineers from open market is essential. r Recruitment of 4-.\ NICS out of 06 vacant posts has been recommended for monitoring the customer service relations ins and billing of electricity connections. .. (16 posts of ANI(NINI) out of 14 have been planned to be filled to ensure proper transaction of the material as per inventory procedure to save the Company loss from embezzlement & misappropriation of material. r ►3 posts of AM (Accounts) out of 07 are required to be filled for performing the functions of banking/imprest, establishment/ audit, budget, accounts consolidation, It 117 receivable & payable etc. Recruitment has been planned to reinforce Account & Audit Department in cam ing out the work in accordance with the prescribed manuals. Recruitment has been planned to reinforce Commercial Department in improving the customer relations and timely disposal of billing related issues. 10 FESCO Tariff Petition FY:2013-14 Data Coder/ Data Entry 5. Computer • Staff (OP) 6. I LS-1 & Line Staff 7. SSO-I & SSO-II Grid Station Staff 8. Senior Store Keeper & Junior Store Keeper Material Management Staff LIDC&I,DC/ TCC 9. 10. 11. Recruitment has been planned to reinftmrce Computer Centre for preparing the reporting data for printing the monthly bills. Recruitment has been planned to reinforce Maintenance, Operational & Construction activities for extension works and ensuring the continuity- of electricity supply. Recruitment has been planned to reinforce Grid System Operation, maintenance works and ensuring the continuity of electricity supply. Ministerial Staff Meter Reader Reading Staff ASSA 12. Bill Distributer 13. ALM 14. Naib Qasid Grid Station Staff Bill Distribution Staff Line Maintenance Staff Support Staff Recruitment has been planned to reinforce Material Management Department in storing, stocking, stacking, issuance and disposal of stores in accordance with the prescribed manuals. . I Inge quantum of establishment work has been increased due to devolution of powers from PEPCO in favour of Companies. Recruitment has been planned to reinforce the I leadquarters as well as to improve the efficiency of field Offices. Recruitment has been planned to reinforce Operational Sub Divisions to fill the shortage of Reading Staff for catching the energy stealers and timely / correct recordings of electricity meter readings fii.r reduction of line losses. Recruitment has been planned to reinforce the Supervisory Grid Station Staff in maim and other essential works. Recruitment has .been planned for timely distribution of electricity bills to the consumers enabling timely payment by the consumers. Recruitment has been planned um reinforce Supervisory Line Staff working on lines for ensuring the maintenance, extension, operation & continuity of the electricity supply. Support Staff 2.2.1.2 Basic Pay and Allowances and Employee Benefits The pay & allowances for FY 2013-14 have been estimated for present working employees. Total against sanctioned manpower strength of 19,016 strength of 16,427 posts of 2,589 are lying vacant since long out of which 1,028 posts in different cadres needs to be filled up on priority for smooth working of the Company. Pay & allowances and employee benefits including retirement benefits constitute a major portion of FESCO's O&M expenses. FESCO has projected Pay and Allowances including Employee Benefits of Rs.5,575, Million for FY 2013-14 against the expenditure of Rs.5,364 Million during FY 2012-13. 11 FESCO Tariff Petition FE.2013-14 A comparative analysis of the three years pay and allowances and employees benefits is given below: Table-V (Rs. in Million) . Description Basic Pay Allowances Employee Benefits Total %age Change , • 2011-12 2012-13 2013-14 . Audited Actual/Projected Projected . 2.214. 2.469 2,348 1,914 2,476 2,719 349 419 51)8 4,467 5,364 5,575 18.42% 20.08% 3.93% Sec Table II Basic pay for FY 2013-14 has been increased @ 5'1 0 by giving annual incremental impact of Rs. 67 Million after eliminating last year bonus. Free Electricity Supply has been increased -@ 26'1 0 equal to increase in tariff (Rs. 14.39/KWh) determined by NEPRA for FY 2(112-13 over previous financial year (11.34/KWh). Increase @ 10'1 '0_ on basic pay as Adhoc Relief for 2(113-14 with financial impact of Rs. 235 Million announced by GoP for said financial year. 2.2.1.3 Retirement Benefits The post retirement benefits include pension, medical facility, free supply and leave encashment to the retired employees. It is apprised that FESCO is in process of creating of funds however until the creation of fund FESCO is under liability under all canons of law to pay the retirement benefits those have been estimated after giving an overall increase of 17.42% over last year. Detail is given below:- Table-VI (Rs. in Million) 2011-12 2012-13 2013-14 .Audited Actual/Projected Projected Pension 1,499 1,933 2,358 Medical 132 168 105 Free Supply (Retired) 167 215 262 Leave Encashment 574 606 606 2,372 2,922 3,431 46.78% 23.19% 17.42% Description Total %age Change See Tathle tt 12 FESCO Tariff Petition f1':2013-I4 2.2.1.4 Repair & Maintenance Implementation of all its service standards and improvement of customer services is vigorously persuaded by the Authority. The issue of the customer, service is a subject of concern and something that should be the responsibility of utility, consumer and regulator. The adherence of these standards is only possible through continuous repair and maintenance of distribution network. The timely repair and maintenance is vital to continuous and reliable supply of electricity and not less important to control the increase in tariff. The system breakdowns are bad enough as they not only impede industrial and agricultural production but also damage distribution network. Presently, a huge number of damaged/sick transformers are prevailing in FESCO distribution system which require immediate repair. (Details attached at A NNEXUR E-F). In addition to routine repair and maintenance Of Rs.753 Million, FF.SCO has planned to repair 6,145 Nos. transformers (2,302 Nos. damaged and 3,843 Nos. sick) in the FY 2013-14. The 2,302 Nos. damaged transformers, will get repaired at an estimated cost of Rs. 234 Million. As regards 3,843 sick. transformers, in-house repair w of 65 "'o of total quantity will be arranged which would cost Its. 205 Million. The repair of the remaining 35 quantity will be got outsourced at an estimated cost of Rs. 129 Million as the damaged and sick transformers are not only impeding the regulatory compliance but also burdening end consumer through increase line losses of the Company. The R&M expenses estimated for FY 2013-14 are summarized below. Table-VII (Rs. in Million) Description Routine Repair & Maintenance 2011-12 2012-13 2013-14 Actual Actual/ Projected Estimated 514 699 753 Repair of rlamqgedTrans formers 234 In-I-louse Repair of sick Transformers 2(15 Outsource Repair of sick Transformers 129 1,321 Total Repair & Maintenance Cost See Table II These repairs and maintenance are beyond ordinary wear & tear and could not have been carried in my-r where MSC() was allowed tariff that was not sufficient to meet such expenses. The Authority is requested to allow FESCO the estimated amount of Rs.1,321 Million as R&NI cost for FY 2013-14. 13 FESCO Tariff Petition F1':2013-I4 2.2.1.5 Other Operating Expenses All other operating expenses have been worked out after giving an increase of 7.75" (worked out keeping in view the change in CPI for April 2013 over July 21)12) over last year actual/project-ea expenditures except TA/DA and some other/mist expenses. Table-VIII (Rs. in Million) 2011-12 2012-13 2013-14 Actual Actual/Projected Estimated Traveling expenses 178 251 251 Transportation 286 281 3111 Misc/Others 1,169 6911 735 Total Other Operating Expenses 1,633 1,222 1,287 Description See Ethic. II 2.2.2 Return on Rate Base (RORB) RORB Rate Base x WACC Where Rate Base Sum of existing net fixed assets + - Closing work in Deferred credit - Surplus on revaluation of fixed assets WA CC Weighted Average Cost of Capital i.e Expected return on a portfolio of all kinds of capital of Company \VACC = [K*(E/V)J+11cd.'"(D/V)1 Assumptions for \VACC arc as under: Debt Equity Ratio 3r5 Tax Rate Risk Free Rate (Yield on 10 Years Bond) 12.0(1" Sector Risk 8" 0 Regulatory Risk 6') Equity Beta (Source: NEPRA) 1.33 Cost of Equity (K.) = R1 , + (RM — R,) = 12.000 0 + (8° i• 1.33) = 12.00"o + 111.64" 22.64 + 6° 0 Regulatory Risk = 28.64" '0 14 FESCO Tariff Petition FY:2013-14 Cost of Debt ( Post Tax = 17'0 Pre Tax = 170- 6 4" (1-35" a) = 11.05" WACC =.IKC*(EIV)1 I Kti t (1)/ V)I II = 128.64" '0*(650 0)1 + 111.05"o (35" ")I = 18.62"0+3.87"'. = 22.48°'o = Rs. 4,962 Million RORB The following table shall show the Regulatory Asset Base (proposed) for FY 2013-14 and comparison with the last determined:Table — IX (Rs in Million) Regulatory Asset Base for FY 2013-14 2012-13 2013-14 Description Determined Projected Gross Fixed Assets in Operation Opening. Balance 45,274 57,542 Addition in Fixed Assets . 5,435 8,627 - Fixed Assets in Operation - Closing Balance Less: Accumulated Depreciation Net Fixed Assets in Operation Add: Capital Work In Progress - Closing Balance Total Fixed Assets Less: Deferred Credits Less: Surplus on Revaluation of Assets Regulatory Assets Base Average Regulatory Assets Base Rate of Return Return on Rate Base 50,709 66,169 (15,305) (I 6,982) 35,404 49,18' 6,643 7,963 42,047 57,15() (24,416) 25,333 6,097 6,094 17,631 15,714 16,495 22,075 11.25" 22.48" 0 1,856 4,962 *See Serial # 6 of the Calculation Table 15 FESCO TariliPetitio► Fi':2013-14 2.2.3 Depreciation Depreciation is charged on the straight-line method so as to write off the cost of an asset over its estimated useful life at the prescribed rates. As per Company's policy, building and civil works are depreciated @ 2",0, distribution equipments (i. 3.5()0, other plant/equipment and vehicles ct 10'0. The depreciation for FY 2013-14 works out Rs 1, 847 Million. The detail is given below: Table — X (Rs. in Million) Assets as on July 01, 2013 Addition Total assets as on June 30, 2014 Rate 9/0 Land 5,814 - 5,814 - Buildings 1,832 269 1,101 2" .. 39 Distribution Equipments ts 48,808 8,199 57,01)7 3.5" ., 1,746 Vehicles 724 106 830 10".. 37 Other Plant & Equipment 364 53 417 10" ,, 25 57,542 8,627 Description Total . 66,169 Depreciation for the Year 1,847 • Sur Scn'al # 7 of the Calculation Table 2.2.4 Investment Plan FESCO intends to invest an amount of Rs. 10,895 Million for FY 2013-14 keeping in view its system requirements under the projects i.e. Secondary Transmission and Grid Stations (STG), Distribution of Power (DOP), Energy Loss Reduction (ELR), Power Distribution Fnhancement Investment Program (PDEIP) and consumers Financing. The company has kicked off the implementation of "Enterprise Resource Planning (ERP)" and tender for RFP has been published in the newspapers. The company has planned to initiate the following modules in FY 2013-14:➢ Accounting and Financial Information System; ➢ Material Management System; ➢ Project Management System; and ➢ Billing Module In this regard, all the supporting information is also attached as NiN NEN Ri -as desired by the Authority under clause 10.5 of last tariff determination. The summary of investments is given below: 16 FESCO Tariff Petition F1':2013-14 Table — XI Investment Plan FY-2013-14 DESCRIPTION S No a I Secondary Transmission & Grid Station (STG) b Distribution of Power (DOP) Cost as per PC-1 Cost of Enterprise Resource Planning (ERP) Execution of 537 IIT/I:1' Proposals c Energy Loss Reduction (ELR) Cost as per PC-1 Execution of 815 TIT/I:1' Proposals ANNEXURE RS. 11 2,067 K 1,834 919 1►0 715 iiilion.,) 1. N1 6,122 Sub Total I (a + b Power Distribution Enhancement Investment Program (PDEIP) Asian Development Bank Loan Own Sources Sub Total (II) II III Consumer Financing Deposit Works Capital Contribution Sub Total (III) GRAND TOTAL (I + II + III) 2,221 1,142 1,079 N 937 586 1,523 1,850 3,250 - 10,895 2.2.5 Other Income Other Income includes markup on bank deposits, amortization of deferred credit and income from other sources. As there is no clear trend found during the past, hence, the other income has been increased by taking average of last three financial years except for the amortization of deferred credit which has been calculated on the accumulated balance of contributions against connection installed/ 3.5% deposit works. It is further added that Late Payment Surcharge has been excluded from the Total Other Income of FY 2013-14 as it represents a cover of short term financing cost for FESCO. The detail of other income is as under. 17 va FESCO Tariff Petition F1':2013-14 Table — XII (Rs. in Million) 2010-11 Actual Description 2011-12 2012-13 2013-14 Actual Act/Prof Estimated Profit on the bank deposit 708 380 -143 511) Meter/ service rent 47 47 48 48 Reconnection fee 5 9 16 1)) Nlisc income including. sale of scrap 15)) 30 ► 17 156 Gain on installation of new connections 301 296 145 '47 Late payment surcharge 833 683 948 - Repair, testing and inspection fee 107 8► 184 124 Recovery of late delivery charges 27 91 95 71 114 118 131 121 2 ' 3 4 3 Reversal for slow moving items 67 27 0 11 Non-utility operations 58 1) 73 44 Amortization of deferred credits 765, 953 1,1)66 3,057 2,400 Service fee on collection of Excise . Duty and PTV License fee Quarter rent FESCO colonies Total _ - 86)) 3,184 2,896 * See Serial # 8 of the Cilculathm Table 2.3 Prior Year's Adjustment l'ESCO's revenue requirement determined by NEPRA for FY 2012-13 was Rs.126,157 Million consisted upon Rs.103,839 Million for Power Purchase Price, Its.7,716 Million for Distribution Margin and Rs.14,604 Million for Prior Year/Quarterly Adjustment (1s1 & 21'd quarter of IA' 2012-13). 1:1:.SC( )'s tariff for l'N. 2012-13 determined by NEPRA has not been notified so far. Any adjustment in prior year's unrecovered cost upon its notification would be made accordingly. The actual revenue (unadjusted) earned by FESCO during FY 2012-13 is Rs. 100,990 Million including Tariff Differential Subsidy of Rs. 21,957 Million. The detail of Prior Year Adjustment is summarized below:- Table-XIII Description S. No. Rs. (Millions) 1 Un recovered Power Purchase Price 7,777 2 Un Recovered Prior Year Adjustment 9,867 3 Consumer Mix Variance (106) 4 Financial Impact, of 51-35)) Units w.e.f..Aug-2011 to Jun-2012 3,888 5 Total Prior Year's. Adjustment* (1+2+3+4) 21,426 The working substantiating the data is attached at ANNEXURI.::-" 18 FESCO Tariff Petition F1:2013-14 2.4 Other Issues 2.4.1 Late Payment Surcharge/ Cost of Working Capital Late Payment Surcharge (LPS) has been excluded from the estimated other income for FY 2013-14. The fact is that FESCO is not allowed to recover cost of working capital and surcharge on late payment represents a cover of short-term financing cost for FESCO rather than a source of income. OR FISCO may be allowed cost of working capital as calculated below:On the basis of 45 days Power Purchase Cost a) Estimated Power Purchase Price for FY 2013-14 = Rs.104,173 = 365 No. of days in a year = 104,173/365 = Rs. 285 Million Power Purchase Price per day = Rs. 12,825 Million Power Purchase Price for 45 days = 12.91",, Rate of Interest = Its. 12.825 Million ' 12.91" Cost of Working Capital = Rs.1,656 Million Cost of Working Capital h) On the basis of 45 days Receivables (for May 2013), one month O&M Expenses and 2 months Stores and spares( Estimated for FY 2013-14) S. No. 01 02 03 04 05 06 Description Receivables O&1\1 Expenses Stores & Spares Total Working Capital Required Rate of Interest Interest on Working Capital' Months 11 2 1 Rs. in Millions 8,117 .985 • 210 9,312 12.91 1,202 The Interest Rate has been taken as ,1 month KIBOR i.e. 9.91" tt of 31'' May, 2013 plus 300 basis points. . 2.4.2 TFC Loans and Mark-up by DISCOs Nlinistry of Water & Power Islamabad has directed vide letter No.Pf.05 (06)/2012PHPL dated 15th May 2013 (copy attached at ANN [XV RE-P.) that DISCOs may be accepted the debit/ credit notes issued by CPPA in respect of their share in TFC- loans and mark-up. The Companies should be recorded the loan liability in the books of accounts arranged by Power Holding Private I .td. ( PFIPL) on their behalf alongwith mark-up cost debited by CPI'.\. It has been further clarified that DISCOs would not be affected by incorporating said loans in their books of accounts as the loans would be replaced with CPP.\ payables and resultantly be reduced to the extent of loans. Moreover, Companies equin would not be negative and remain same. In addition to above, it has been advised by NIoWP to take up the such issues with NEPRA requesting to allow them to transfer mark-up cost through their tariff determination. 19 FESCO Tariff Petition FI':2013-14 It is worth mentioning that Power Holding (Private) Limited arranged Syndicated Term Finance Facility of PKR 136.454 Billion out of which ITSCO share is Rs.6977.954 Million. CPPA has issued debit note of Rs.238.818 Million as Fl Markup payment share vide vide No.PPA-26/FESCO-2 dated 12' h July 2012. The same has not been accepted by FESCO so far. Keeping in view the above, it is requested to incorporate the cost of I" mark-up share as mentioned above in the tariff determination of FESCO 1:Y 2013-14 so that the adjustment of the loan could be made in the books of accounts as desired by MoWP. In future, the mark-up payment on said loans may also my allowed. 2.4.3 Safeguard the Interest of Majority of Industrial Consumers from the Invasion of Temporary/Captive Power Industrial Consumers through Consumer Discipline NEM\ determined FESCO's tariff vide No. 9847-50 dated August 23, 2008, notified by Government of Pakistan vide SRO No.960 (1) /2008 dated September 5, 2008 wherein recovery of fixed minimum charges from industrial consumers was allowed on the basis of flat rate. The current flat rates have altogether changed the basis of the tariff structure of industrial consumers as was applicable in the past and the basis on which FESCO is being charged by CPPA. NEPRA has determined NTDC tariff on the basis of M1)I recorded on the system as a fixed capacity charges whereas I:ESC:0 has not been allowed to recover this component from industrial customers rather recovering from remaining consumers. In addition to above, the said mechanism is also creating the following complications:i. Freedom to enter and exit the network without any prior notice causing consumer indiscipline; ii. The mechanism shifting the burden of uncertain demand and cost of indiscipline consumers to disciplined consumers; • iii. High network maintenance cost is being recovered from disciplined and regular consumers; iv. Restricting FESCO's ability to recover tariff in the respective period and shifting the burden to future consumers; v. Compromising FESCO's plans for the enhancement and augmentation of distribution networks; vi. Load management issue resulting into frequent supply interruptions and forced load shedding; vii. The present structure of industrial tariff also provides leverage to the consumers to maintain FESCO connection throughout the year and Fl{SC( is bound to ensure provision of power supply to the consumers. The consumers, Who have 'their own electricity generation, must often shift on FESCO system due to _shortage of input material for their electricity generation units .and. resultantl•,• aggravate the crisis of load shedding. The fact is that the consumer, who is a regular and remains on FESCO system throughout the vcar and pays legitimate claim of I:ESC:0, has the first right of service which is compromised due to shifting of these consumers on FESCO system. - 20 FESCO Tariff Petition FY:2013-14 2.4.4 Bifurcation/Creation of Operation Sub-Divisions, Divisions and Circles FF.SCO has 4 circles, 18 operation divisions and 118 operation sub-divisions. The total number of consumers being served by the company as on May 31, 21)13 is 3.21 Million. Many of the Operation Sub Divisions, Divisions and Circles have consumers beyond permissible limits and required to be brought within the standard limit. The standard limit/criteria for bifurcation/creation of Sub Divisions is tabulated below:Standard Criteria (Connections) Type of Sub-Divisions Bifurcation criteria Maximum limit Minimum I imit Urban 16,000 24,0(1(1 Rural 12,0M 18,18 ))) Connections >24,)))))) ( :onnections >18,000 .1 scrutiny committee in the convenership of Chief Technical Officer FI:SCO was constituted to examine in detail various aspects of bifurcation Cases of Operation Sub Division, Divisions and circles. The committee held a series of meetings and recommended creation of 11 Divisions and 42 Sub Divisions as given below. Circle Name No. of Existing Division No. of No. of No. of Proposed Proposed Existing S/Division Division S/Division No. of Addl. Staff Required Fin. Impact (Rs. in MIns) I'l 5 29 3 5 Me 263.34 1,1,1 4 23 3 II 1,201 446.48 )hang 6 32 3 15 1,707 574.58 Sargodha 6 34 2 . 11 1.288 379.6)) Total 21 118 11 42 4,998 1,664.00 The above bifurcation will be carried out in 3 — Phases during IN 2013-14, 2014-15 and 2015-16 respectively. The work propos.ed to be undertaken in these Financial Years is detailed here in below:Circle S# Proposed Sub-Division/ Division Financial Implication Total PHASE — I (Rs. in Million) 1-' 1 Bold-lad:in S/Divo. 42.93 2 Muslim Town S/ Divn. 35.14 3 (21wirab Nagar Div n & . \ NI (( :5) "'Lindh:nov.11.1-11 S/Divo. 26.42 62.63 3 Killiarovala S/1)ivo. Tandlianwala-11Divo & . \ ;31(( :5) 4 ( ;ojra Ibmd S/l)ivn. 66.79 1 NlagInana S/Divn 1 'Ind )hang 2 104.49 93.54 245.38 22.42 21).9 I 126.12 21 FESCO Tariff Petition FF:2013-14 Circle Sargodha S# Proposed Sub-Division/ Division Financial Implication 2 Ashral Shaliccd S/Divii 3 Sargodha Road S/I)ivn T.32 4 (hang-II Divn & .1 N1((:S) 28.111 Total 30.89 I NiM PuT l'1141 Sil)ivn 31.96 2 liahara 5/I )ivn 25.66 3 loharabad Rural S/Divn 18.54 4 Nisluar .Thad S/Divn 94.11 18.1- Total 570.32 570.32 PHASE - II (Rs. in Million) 1-' -, ..,1 - lhang Sargodlia I Ncmat ( :olom 5/ Divii. 2 . \ wagat 5/1>ivn. 39.14 3 Shvikhpura Read Div0 & .\M(( :S) 19.112 2-.01 I Iteliamat ' I.(wil S/1)1y0. 21.16 2 Nladina .\bad S/Divn. 21.84 3 Sadar lia/ar S/1)ivn 21.49 4 ( ; ulbcrg I )ivn & .1N1(( :5) 19.-2 I lihakhar Rural S/I )ivn • 36.811 2 Nlankura S/ I )ivn 35.-0 3 Kamalia-111 S/I)ivn 4 ( :ivil lam. .1 '..I. Singh S /1 )ivn 34.44 36.-9 S l'oba Road ('mina S/I )ivn 23.51 6 (hang Road ( hijra S/Divn 2-.08 7 Nia I.:dun-v-11 S/I)ivn 19.325.32 I Khushab Rural S/Dit ii 2 Sial N1ore S/Divri 18.00 3 Sahnval _# 3 5/ Divn 31.6- 4 Urban Nlilmwali-11 S/ Div') 51.38 5 2" Divii Mianwali & . \ N1(( :5) 9i.1- 8 4.21 221.-1 152.-16 26.119 Total 555.57 555.57 PHASE - III (Rs. in Million) 14 lua _ jhang Sargodlla I Chak Jhumra Nii I. 3 S/Divn. 38.91 3 Khainiana ))ivn & .1NI (1:S) 24.- 1 Dalowal S/I)ivn. 2 Karcum '1'0W11 S/I )ivn. 3 - Samanabad Divn & 4 22.114 28.92 .\ \I(( :5)- 22.56 NItijahitlabad S/I)ivn. 18.83 5 I.akar Nlandi S/1 )ivn.. 11.27 6 Sir Slunk S/Divn. 1 11.13 Shah 511)ivli I 3.2311.29 2 Kmmt Shakir S/1)it'n 28.95 3 Sandclianwali. S/1)ivn . 3-.14 4 Darya Khan ))ivn & .1M(( :5) r.63 5 jhandanwala 5/.1)ivn• 36.211 6 1>tilluywala S/ ()nl 7 18 Ilazari 1)1\1 & \ N1(( :S) 1 Ludt:wall' 5/1 )ivn Silanwali # 2 S/Dwo 311.11 2 31 Qamar Nlashani S/1)ivn 4-.18 4 lillaghtanwala 1)ivil & . \ N1((:S) Total 61.68 116.89 22-173 39.33 . 25.19 29.4- 112.111 26.1)9 538.11 538.11 22 FESCO Tariff Petition FT:2013-I 4 Creation of the above said Divisions and Sub Divisions will benefit to the tune of Rs.1,920 Million against expenditure of Rs.1,664 Million. The detailed justification, benefits and staff requirement arc attached at A NNEXURE-Q. The Authority is requested to allow FESCO to create 12 No. Sub Divisions and 3 No. Divisions with financial impact of Rs.570.32 Million in the first phase in FY 2013-14. 2.4.5 To set Target of 'Pay - Out Ratio' of Power Purchase Price (PPP) Payable to CPPA The Pay - Out Ratio gauges the company performance about the payment of Power Purchase Price to CPPA. Though, the Authority set various targets like T&1) Losses, Investment Plan and others but does not allocate targets to DISC( s for the payments of power purchase price. Poor Pay - Out Ratio of a company not only accumulates the circular debt but also paralyze the whole power sector and, consequently, severe load shedding traps the whole country. Foregoing above, the authority should fix this indicator for the interest of whole sector. The formula of Pay — Out Ratio is given below:PP Price Payout Ratio Payment to CPPA* / PP Price billed by CPPA '* Paym•nt to CPP.•1 will include amount 'milted to (;PP.-1. by a DISCO, .-lmonnt paid to .S'ITs1 C1) Ps CI )Ps or any other payment by a DISCO on behalf ofCPP.-1, direct receipt of all)' amount like Dtgemllial Subsidy! .-1glicultini. Subsidy eh . /nm/ GOP/ Pnwineial Aorernments or any o/ lir depart/Heal by (PP.-1 on behalf of a 1)1.S.(.0 The Power Purchase Price Payout Ratio will reveal the real performance of a DISCO. A low ratio also will indicate the Company's poor, recovery, increased line losses, poor management control over the affairs of Company and more spending than the target. Conversely, a high payout. ratio. will indicate more company's earnings, management efficiency and most important reduction in the quantum of, and accumulation of circular debt at central level. Keeping in view the above the Authorityis 'requested to set a Power Purchase Price Payout Ratio for FESCO and.other Distribution Companies 'to fix circular debt. 2.4.6 Incentive to consumers in terms of reduction in tariff in accordance with their savings in energy consumption In order to promote the Energy Conservation Scheme keeping in view the current short fall of energy, it is suggested that consumers who consume less units while comparing with the corresponding period may be given relief in terms of reduction in tariff/subsidy in accordance with their savings in energy consumption to be adjusted in their monthly bills. 23 FESCO Tariff Petition FE:2013-I4 3. PRAYER On the basis of above it is, inter alia, submitted that while admitting and allowing this petition, the Tariff of FESCO for FY 2013-14 whereby:3.1 l'ESCO may be benefited by the timely determination and immediate application of the proposed tariff to ensure its financial viability and reliable system of supply of electricity to its approximately 3.23 Million consumers; 3.2 NEPRA may please allow the consistent application of the tariff and formulas and enable FESCO with sufficient time to recover the cost effectively; 3.3 NEPRA may determine with reasons and allow FESCO, on basis of anticipated sale of 8,767M kWh, to recover the Revenue Requirement as mentioned in the petition above including:3.3.1 Distribution Margin of Rs. 16,222 Million; and 3.3.2 Prior Year Adjustment of Rs. 21,426 Million. 3.4 Investment Plan, of Rs.10,895 Million including Rs.3,251) Million from Deposit Works and Capital Contribution may be allowed. 3.5 The other periodical adjustments as per determinations of NI:.PRA may please be allowed to be continued. 3.6 Surcharge on late payment be excluded from the head of Other Income as it represents a cover of short-term financing cost for FESCO rather than a source of income; in alternate, cost of working capital be provided to allow FESCO to pay its current liabilities promptly and also to avoid accumulation of circular debt at central level. 3.7 FESCO may be allowed for adjustment of debit note issued by CPPA on account of 1'1 Mark-up ..payment share of Rs.238.818 Million on the loan facility of Its 6,977.954 Million (I:ESC:( Share) arranged by PEIPI, by incorporating the impact in tariff for FY 2013-14. For future, the mark-up payments to PHPL, be allowed; 3.8 In order to maintain consumer discipline as well as to create parity between consumers and the company, it is requested that: 3.8.1 Tariff Policy for the industrial consumers may be reverted hacks to pre 2007-08 condition of fixed charges i.e. higher of actual MIDI or 50% of sanctioned load. 3.8.2 A minimum notice period to exit or rejoin the networks along with a reasonable charge may be applicable. It will improve the consumer discipline and ensure the stability of system. 24 FESCO Tariff Petition FY:21113-14 3.8.3 Introduction of load surrendering charge in case of a permanent exit. 3.8.4 Seasonal industrial tariff to protect the fixed charge revenue and remaining consumers. 3.9 3.8.5 Industry with Captive Power, which maintains a standby connection, should pay at least 80° "0 of the sanctioned load as minimum, throughout the year to enjoy security of service. As I I iSCO is to pay capacity charges to CPPA on the basis of actual MDI, even if the increase in MDI is for a short period of time only. 3.8.6 Any other regulatory measures to maintain consumer discipline may be introduced. FESCO may be allowed to create 12 Sub Divisions and 3 Divisions that may Phase of IN 21113-14. have the financial impact of Rs.570.32 Million in the 3.10 NII.PRA may set up a Payout Ratio for DISCOS on account of payment of Power Purchase Price billed by CPP.\. 3.11 Provide incentive to consumer who helps in conservation of energy; 3.12 Any other relief, order or direction which the Authority deems fit. 0-- 25 STANDARD PETITION FORMATS FOR DISTRIBUTION COMPANIES INDEX FORM NO. DESCRIPTION 1 Company Statistics 2 Profit & Loss Statement 3 Profit & Loss Statement ( Month wise ) 4 Balance Sheet 5 Cash Flow Statement 6 Power Purchase (Actual/Projected for FY 2012-13) 7 Line Losses Statement 8 DISCO load factors 9 Average Rate per Unit Purchased and Sold 10 DEMAND (Actual and Calculated) and Number of Customers 11 Sold Energy Evaluation and Setting up Sold Energy Average 12 Load Growth Evaluation and Setting up Load Average 13 Asset Register 14 Aging of Accounts Receivables 15 Projected Energy Sales by Tariffs 16 Operating Cost 17 Distribution Margin Comparison 18 Financial Charges 19 RORB Calculations 20 Revenue Requirement 21 Investment 22 Interest on Development Loans 23 Development Loans 24 BONDS 25 Domestic Consumer's Analysis 26 Provision for Tax 27 Determined & Proposed Subsidy 28 NEPEA & Subsidy 29 Proposed & Subsidy 2_ 6 FORM -1 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Units Sold Units Received Units Lost Sales Revenue Peak demand during FY (Computed demand) Number of Consumers Area 8,528 8,767 9,564 9,832 1,036 1,065 96,819 141,823 1,992 MW 2,164 MW 3.229 Mln. 3.348 Mln. 47,000 sq.KM 47,000 sq.KM 5 6 26 33 132 157 37,876 KM 39,551 KM 42 KM 43 KM 366 KM 184 KM 1 KM 1 KM 70,235 108,658 1,705 KM 1,854 1,292 KM 1,292 24,887 KM 27,690 KM 123 Nos. 137 Nos. 1 Nos. Nil 41 Nos. 41 Nos. 88,469 Nos. 92,892 Nos. Circles Divisions Sub Divisions Length of Feeders 11 kV Average Length of Feeders (766-783) Maximum Length of Feeder Minimum Length of Feeder Target for new connections Length of High Voltage Transmission lines (132 kV) Length of STG lines (66 kV) Length of Low Voltage Distribution lines (400 V) Number of HV transformers (Power Transformers) Number of burned down HV transformers • Number of STG transformers Number of burned down STG transformers Number of LV transformers 3,044 Nos. 2,537 Nos. ( Rs. in Million) Cost 2014 2013 Number of burned down LV transformers Strength A B Number of Employees Qualified Professionals Engineers Others Staff Technical Clerical Non Technical & Others TOTAL 2013 2014 Actual/Projected Projected 241 87 ; 9,241 1,030 5,828 16,427 Projected Un-Audited 288 100 79 28 95 33 9,321 1,169 6,577 17,455 3,018 336 1,903 5,364 3,084 387 2,176 5,776 FORM - 2 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Profit & Loss Statement _ , ,. u , ,. a . , ' ' ' . rnitTE75 Titi. ..,.,, Determined Projected Act/Proj Power Balances Units Received Units Lost Units Lost Units Sold 9,830 1,065 10.83% 8,765 [MkWh] [MkWh] [%age] [MkWh] 9,564 1,036 9,832 1,065 10.83% 8,528 10.83% 8,767 74,411 21,957 4,622 (4,171) 96,819 48 953 75,946 65,877 141,823 Revenue Sales Revenue Subsidy Fuel Price Adjustment [Mln Rs] [Mln Rs] - Prior Year Fuel Price Adjustment Total Sales Revenue Rental & Service Income Amortization of Def Credits Other Income Total Revenue [Min Rs] - Operating Cost Power Purchase Cost O&M Expenses Depreciation Amortization Provision for Bad Debt PYA/Other Adjustment Total Operating Cost EBIT Financial Charges EBT Tax EAT WPPF Profit for the period 126,157 [Mln Rs] 126,157 [Min Rs] [Min Rs] 2,896 [Mln Rs] [Min Rs] 129,053 2,056 99,876 [Min Rs] 103,839 7,164 1,591 97,358 10,190 1,620 [Min Rs] [Mln Rs] [Min Rs] • 48 1,067 1,286 144,224 104,173 11,798 1,847 [Min Rs] - - - [Min Rs] - - - [Min Rs] 14,603 127,197 [Mln Rs] 1,856 [Mln Rs] - [Mln Rs] 1,856 (7,914) 262 (8,177) [Mln Rs] - - [Mln Rs] 1,856 (8,177) [Mln Rs] - - [Min Rs] 1,856 [Min Rs] , (1,377) 107,791 117,818 26,406 268 26,138 377 25,761 - (8,177) 25,761 2 29 FORM - 3 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Profit & Loss Statement 20124 Power Etalancae Urns Received Units Lei Urns Lai Unts Sold Revenue Sine Revenue Subekly Full Noe Ad liner Lem prO yew AM pis aiminsn Tali •Iss 18ouriu ROW' & SIM1406 Imam [WN IMI[WM lunnl [MINA) [Min Rs) tun Rs) [Mn Rs) 1,048 207 19.71% 842 2,623 247 EST Tau EAT • WPPF ProMTer 519 period I 7.14% 798 2.65% 23,481 7,666 6,229 4,770 17,533 5.997 5,140 8,934 1,892 1,453 6,689 1,365 1,304 2,245 610 TAM 865' 1,900 258 489 721 14.61% 2,644 (2,629) 10.17% 833 725 (6401 (258) 8,121 6,103 (14), 51 6.62% 2,154 (3,627) 7.67% 616, -2.33%, 637 1,882 673 65 103 37 10.20%, 592 572, 4,971 1,209 (644,1 6,180 20,476 6,988 3 11 4 4 4 4 62 205 101 101 116 72 204 209 666 2,056 310 153 124 81 7,297 7,403 7,886 22,668 99,877 21,002 22,638 7,405 8.074 8,539 1,109 1,232 178 207 24,018 3,384 549 95,981 10,190 1,620 9,975 27,161 107,791 12 4 5 13 72 72 215, 72 72 72 219 251 064 191 10,777 22,477 7,564 7,113 $.416 6,620 6,326 33,809 194 7,641 105 516 6,719, 21,996, 8,585 8,586 7,387, 7,371 2,293 717 2,091 795 690 785 684 1,043 119 119 165 368 366 119 116 119 9,388 7,403 5,193 8,614 24,648 24,984 7,633 [Min Rs) [Mn Rs) 729 ' 119 27,425 2,421 358 10,478 9,094 30.205 8,759 1,604 1,683 3,602 1 1 8,245 Win Rs) [Min Rs) 10,636 5255 181 4 (1,219) 1 (1,219) 159 (1,113) [Mn Rs) [Mn Rs) 314 2 [Mn Rs) 312 1,603 1,682 3,596 312 1,603 1,682 3,696 (1,219) 159 (1,115) 312 1,603 1,652 3,5141 (1,219) Win Rs] [Mn Rs) [Mn RU [Mn Rs] 2 2 (1,1151. (2,171) (1,824) (290) (1,8681 (2,175), (1,8261. 1 (2911 (1,869), (2,176) (1,526) (2911 4 2 0 159 (1,116) 7,614, 6,914 7,089 7,383 215 956 119 4,622 21,685 4 9,403 21,692 12 318 (4,171) 98,519 48 953 3,1171 1,737 72 9,780 736 119 74,411 21,957 5,677 1,598 4 [Mn Rs] 16,686 4,504 5,492 4 - [Mn Rs] 1,038 101316 8,526 1,470 10,6113 7,907 733 119 14.40% 1,949 1,134 (6441 9,564 19.25% 678 5,519 [Mn Rs] 144 328 16,109 [Min Rs) 12,083 2.277 162 638 4 33,066 839 130 1,780 5.46% 7,271 4 10,510 765, 18.96% 835 5.46%, 11,863 181 10,960 EMT - 163 8.44% 7,640 [Mn Rs] [Min Rs] Fnenail Purim • 72 15.04% 940 2.700 778 Omer kcame Provision fa Red NM Teti Opening Coe 20 463 8,385 72 Amonin ion 2,308 80 2,363 874 IM Rs] Opera ding Coat Power Purina Can O&M Bowan OT9091919 704 3,097 7,456 ArnollaMen of Del Cain Total Revenue 745 942 863 578 667 859 61 1,106 186 (2,175) (1,826) MUM, 9,359 , (3,966) (1,316): (1,958), (2.338), (6,3631 250 (5,614) (3.966) (1,318) (1,968) (2-338), (6,614) (3,9821 4 (1,317) 1 (1,917) 1 (2•0901, 248 (291) (1,869) (3,966) (1,315) (1,955) (2,338) (5,614) (7,914) 263 (8,177) (8,177) (6,177) FORM -3 FAISALABAD ELECTRIC SUPPLY COMPANY UNITED Profit & Loss Statement (2013.14) Pow Saimaa Units Received Units Lost Units Lost Units Sold Revenue Sales Rwounue Subsidy Fuel Pace Ackolment Teta Sills 1919,011U11 Rental & Berne Income Amor0zation 51 051 Credits Othat Wane Total Illinmriaa Operating Cost Power Purchase Cost 01st Expanses Depreciation Amortization Provision for Bad DWI Total Opening Gist EBIT Finerolin ammo EBT Taz EAT WPPF Point ter the ward 75,948 68,377 24,762 10 264 321 29,377 16,333 3 88 107 10,631 11,486 4 88 107 11,684 11,691 33,409 3 88 107 9,797 4 11 99 109 11,383 275 323 34,015 141,823 43 1,067 1,286 144,224 8,895 830 152 7,757 799 152 73,666 2,421 466 9,639 1,208 152 9,128 1,284 152 8,398 1,426 175 27,166 3,915 479 104,173 11,798 1,847 9,965 7,877 8,707 26,543 10,999 10,664 sm 31,662 117,818 . 5,809 4 5.,303 304 1,441 1,069 1 1 303 1,440 1,088 2,534 3 2,531 0414.. 1 2 (470) 1,120 2 1,118 2,466 267 2,199 371 1,322 26,406 268 26,138 377 25,761 1,322 26,761 9,599 7,739 886 152 8,501 921 152 24,542 2,555 466 9,014 792 152 9,303 3,777 9,673 27,654 12.307 4 12,303 4,015 4,014 3,491 2 3,489 1.303 1 1,302 23.437 20,330 7,025 6,094 6,463 5,608 5,718 4,980 13,792 5 88 107 13,992 15,915 14,059 43,755 13,119 12,0119 5 88 107 16,116 5 88 107 14,259 16 244 321 44,366 4 88 107 13.319 4 88 107 12.21111 10,269 852 152 9,874 1,107 152 8,657 845 152 25,800 2,503 466 8,302 849 152 Min Rs/ (20nRsi 11,274 11,132 9,654 32,060 [Min Rs/ 2.718 4,963 [Mr Rs/ [MN Rs/ 17,1190 15,513 9,120 3 88 107 9,318 7,529 8,531 [Min RR 6,207 5,384 10,064 3 88 107 10,262 8,522 7,393 [IAN Rs/ 6,150 5,335 35,366 . 12 264 321 36,463 7,386 6,407 Win Rs/ /MR Rs] 5,533 4,800 13,677 4 88 107 10,575• 715 54 7.62% 660 OMR*/ /Ann Rs/ 16,413 13,339 5,140 4,459 769 23 2.95% 746 NM Rs/ 9,832 1,065 10.83% 8,767 4,884 4,238 859 48 5.60% 811 I Mln Rs) 2.413 353 14.59% 2,066 5,389 4,875 3,150 444 14.11% 2,7011 (Mmn RR 864 147 17.04% 717 19,206 16,560 944 75 7.90% 869 Marl 111101"/ 826 118 14.02% 710 673 580 79 18 2.84% 11.77% 593 584 1,154 170 14.71% 984 PAM/ 729 90 12.34% 639 669 47 7.02% 822 1,053 200 19.01% 853 2,342 126 6.33% 2,217 1,922 143 7.42% 1,779 IR/n{2s) (Mn Rs/ 1 1 /Min Rs) 2,717 4,982 4,306 2 4,603 /Ann Rs) (Min ns/ 4,603 12,303 4,014 3,439 1,302 5,505 303 1,440 1,066 2,531 (470) 1,113 2,717 4,982 1,304 253 1,551 377 1,174 Min Rs) jun RRI 4,962 4,403 12,303 4,014 3,481 1,302 cos 303 1,440 1,033 2,1131 (470) 1,116 1,174 2,717 1 FORM - 4 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Balance Sheet fin million Rupees1 FY 2011-12 ( Audited) Description Intangible Fixed Assets Net Fixed Assets in Operations Total Net Fixed Assets in Operations FY 2012-13 ActuaUProj FY 2013-14 ( Projected) 37,857 37,857 42,407 42,407 49,187 49,187 5,728 188 2 5,696 213 2 7,963 263 2 Current Assets Stores & Spares Trade Debts Advances, Prepayments, Other Receivables Tariff Subsidy (Receivable from GoP) Receivable from Associated Companies Short Term Investment Cash & Bank Balances Total Current Assets 1,164 12,116 25,690 4,770 43,740 1,217 7,370 25,000 1,531 4,462 39,580 1,260 7,729 38,000 1,607 6,567 55,163 Total Assets 87,516 87,898 112,579 Subscribed Equity Unappropriated Profit Total Equity 9,849 (22,876) (13,027) 9,846 (31,049) (21,203) 9,843 (5,284) 4,559 2,700 10,013 21,930 12,817 47,459 3,075 11,680 1,433 23,581 11,502 51,271 3,499 13,647 2,032 25,333 11,502 56,012 143 362 46,923 5,656 53,084 145 362 51,000 900 5,424 57,831 145 362 45,000 1,000 5,500 52,007 Total Liabilities and Commitments 100,544 109,101 108,019 Total Liabilities and Equity 87,516 87,898 112,578 Capital Work in Progress Long Term Loans to Employees Deferred Cost & Long Term Deposits Long Term Liability Security Deposits Employee Retirement Benefits TFCs /Development loan Deferred Credits Long Term Financing/Payable Total Long Term Liability Current Liability Current Maturity on Long Term Loans Subsidy Received in Advance from GoP Markup payable Payable to NTDC Payable to Associated Companies Creditors, Accrued and Other Liabilities Total Current Liability . 5 FORM - 5 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Cash Flow Statement Fin Million Rupeesj Previous for FY ending 30-06-2012(Actual) Description Current for FY ending 30-06-2013 (Act/Proj) Projected for FY ending 30-06-2014 (Estimated) Average Monthly Demand Index (MDI) Units Purchased Transmission Losses (132 kV) Distribution Losses Units Sold to Customers [MW] [GWh] [GWh] [GWh] [GWh] 1,943 9,632 123 929 8,580 1,836 9,564 155 1,036 8,528 1,769 9,832 167 1,065 8,767 Average Tariff Required Average Tariff Existing [Rs/unit] [Rs/unit] JRs/unitj 11.340 10.181 1.159 14.390 11.353 3.037 16.177 11.353 4.824 87,358 96,819 141,823 32,640 14,091 31,546 32,640 _ 14,091 31,546 Revenue from Sales Collection from Required inflows from Operations Cash generated from operations Interest received Total Inflows from Operations [%] _ . Outflow from Operations Financial charges paid Employee benefits paid Net working capital changes Total Outflow from Operations 29,239 815 10,285 1,050 21,188 1,150 30,054 11,335 22,338 Surplus/Deficit from Operations 2,585 2,756 9,208 Inflows from Other Sources Deferred credit received Security deposits received Proceeds from long term financing 3,010 526 312 2,605 375 368 2,819 424 744 Total Inflows from Other Sources 3,848 3,348 3,987 Outflow Others Capital expenditure incurred Repayment of Long Term Loans Principal repay/Adj of LTL Total Outflow Others 5,689 5,689 6,138 25 248 6,411 10,895 50 145 11,090 Surplus/Deficit Others (1,841) (3,063) (7,103) Total Inflows (Operations + Others) 36,488 17,439 35,533 Total Outflows (Operations + Others) 35,743 17,746 33,428 Opening Balance Surplus/Deficit for Fiscal Year Deficit from Financing/Loans 4,024 745 - Closing Balance 4,769 4,769 (308) - 4,461 4,461 2,105 - 6,566 6 FORM - 6 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Power Purchase (Actual/Projected for FY 2012-13) Demand & En* Units Received MDI MEIN EMBI EMEM21111111!Rs/ kW/ M] 1,106 942 859 2 112 2,193 2 137 1 777 7.299 6.650 6.607 7.035 7.230 1.857 1.680 1.947 1.990 0.173 0.170 0.195 7,652 7,357 1,947 Prior Year Ad ustment NEM Total 0 ratin Cost [kiln Rs] 704 667 578 637 673 765 839 1 936 1,932 9 564 1 450 1,659 1,629 1,669 8.956 10.554 8.312 9.136 8.435 7.669 7.814 2.330 2.130 2.792 2.243 2.357 2.672 2.168 2.168 2.458 0.208 0.187 0.246 0.220 0.213 0.218 0.198 0.178 0.211 0.198 6 307 7,040 4,809 5 818 5,864 74 732 5,385 6,554 6 044 5,676 6,227 1 640 1,421 1,615 1 429 20 733 1 830 1,818 1 710 2 044 1 835 1,586 1,858 184 149 125 140 1 893 188 143 181 155 186 166 153 143 6,719 8,585 6,566 8,539 95,981 7,371 8,074 8,245 7,907 7,405 9,403 7,387 9,780 769 715 669 580 673 729 826 864 9,832 2 2 21 41 Power Purchase Cost 1111111111119,11 M ITTE11 . 745 1,048 1 806 1 731 7.814 FORM - 6 ( A) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Power Purchase (Projected for FY-2013-14) Demand & Ensrgy Units Received MD1 [MANN 1,053 1,154 944 859 WW1 2 2 2 2 2 7.11 7.50 7.81 2 9.24 10.50 2 8.93 10.28 8.58 7.53 8.22 2.37 2.73 2.28 2.00 2.19 0.22 0.23 0.21 _ 0.20 0.19 0.19 5,344 6,004 7,494 7,081 6,502 80,856 1,596 1,992 1,882 1,728 21,493 153 165 167 1,823 9,639 9,128 8,398 104,173 9.21 Energy Purchase Price [Rs/ kWh] 7.58 6.85 Capacity Purdasse Price [Rs/ kW/ MI 2.02 1.77 1.89 1.99 2.08 Rs/ kW/ MI 0.16 0.14 0.17 0.17 0.18 0.20 0.18 Transmission Chow Win Rs] 7,982 7,668 8,709 6,442 6,003 6,603 7,024 Energy Charge Capacity Charge PAM Rs] 2,122 2,038 1,783 1,712 165 167 165 148 140 142 123 130 10,269 9,874 8,657 8,302 7,739 8,501 9,014 6,895 Power Purchase Coat Transmission Charge [kilo Rs] Aciusiment [PAM Rs] Total Operating Cost (MM Rs) 1,596 2.46 1,755 2.79 1,867 2 2.45 1,421 157 7,757_ FORM - 6 ( B ) Quarterly Adjustments - Qrt EPP Adjustment EPP - 1st month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed EPP - 2nd month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed a 1 0 E a t 5 E a E 0.8520 6.6965 6.6399 (0.0566) EPP - 3rd month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed 6.5484 6.6006 Target Losses for the quarter 10.83% 0.0522 1st month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (Min Rs) Adjustment that should have been with allowed costs only (Min Rs) Impact of disallowed costs (Min Rs) Remaining adjustment for the quarter only allowed (MIn Rs) Remaining adjustment for the quarter with allowed & disallowed (Min Rs) 1,048. 842 552 470 893 423 423 2nd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) Adjustment that should have been with allowed costs only (Min Rs) Impact of disallowed costs (MIn Rs) Remaining adjustment for the quarter only allowed (in Rs) Remaining ad ustment for the • uarter with allowed & disallowed Min Rs 1,106 940 827 (35) (63) (27) 27 3rd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) 0 5 6.4390 7.2910 Adjustment that should have been with allowed costs only (MIn Rs) Impact of disallowed costs (MIn Rs) Remaining adjustment for the quarter (Min Rs) Remaining adjustment for the quarter with allowed & disallowed (Min Rs) Total Adjustment on account of EPP allowed only (Min Rs) Total Adjustment on account of EPP allowed and disallowed (Min Rs) 942 863 533 28 49 21 . 21 417 CPP ADJUSTMENT Ref for the 1st month of the Qrt 1.5691 1st month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 1.8572 0.2881 302 Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Mln Rs) 1.6463 Ref. for the 3rd month of the qrt 3rd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 1.6824 Total Adjustment on account of CPP (Min Rs) 1.6797 0.0334 37 1.9469 0.2645 249 588 UoSC ADJUSTMENT Ref for the 1st month of the Qrt 0.1789 1st month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Mln Rs) 0.1731 (0.0058) (6) Ref. for the 2nd month of the Qrt . 2nd month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) 0.1591 Ref. for the 3rd month of the qrt 3rd month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Mln Rs) 0.1755 Total Adjustment on account of UoSC (Min Rs) Total Adjustment for the quarter allowed costs only (Min Rs) Total Adjustment for the quarter allowed & Disallowed costs only (Mln Rs 0.1703 0.0112 12 0.1948 0.0193 18 24 1,029 Impact of Extra or Less Purchases Ref Unit Purchased ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt 1,051 904 905 Actual Untt Purchased ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt 1,048 1,106 942 Difference ( MkWh ) let month of the Qrt 2nd month of the Qrt 3rd month of the Qrt (3) 202 37 PPP Ref ( Per kWh ) Ref PPP ( per kWh ) let month of the Qrt 2nd month of the Qrt 3rd month of the Qrt Impact of extra Purchases ( Rs. Millions ) 8.1870 8.5019 8.4063 2,004 FORM - 6 ( B ) Quarterly Adjustments - Qrt -II EPP Adjustment 1st month of the Cht EPP - let month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed a 5 6.9909 7.0302 —13715-313- EPP - 2nd month of the Qrt Reference Actual Disallowed Fuel PriceAdjustn , ent Allowed 6.3129 7.2257 EPP - 3rd month of the Qrt Reference Actual Disallowed Fuel Priced—""nerit ust Allowed 7.5902 8.9228 1.3326 Target Losses for the quarter 10.83% let month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) Adjustment that should have been with allowed costs only (Mln Rs) Impact of disallowed costs (MIn Rs) 859 798 487 19 34 Remaining ad ustment for the uarter on allowed MIn Rs Remaining a ustment for the uarter with allowed & disallowed Mln Rs 2nd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) Adjustment that should have been with allowed costs only (Mln Rs) Impact of disallowed costs (Min Rs) Remaining adjustment for the quarter only allowed (Min Rs) Remaining adjustment for the quarter with allowed & disallowed (Mln Rs) 3rd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) Adjustment that should have been with allowed costs only (Mln Rs) Impact of disallowed costs (Mln Rs) Remaining adjustment for the quarter (Min Rs) Remaining ad ustment for the • uarter with allowed & disallowed Mln Rs Total Adjustment on account Total Adjustment on account of EPP allowed and disallowed Mln Rs 15 745 725 445 406 680 274 704 633 415 553 938 385 6 CPP ADJUSTMENT Ref for the 1st month of the Qrt 1.7849 let month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 1.9905 0.2056 177 Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 1.8227 Ref. for the 3rd month of the qrt 3rd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 2.0896 Total Adjustment on account of CPP (81In Rs) UoSC ADJUSTMENT Ref for theist month of the Qrt let month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) Ref. for the 3rd month of the qrt 3rd month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) 2.4576 0.6349 473 2.3295 0.2399 169 819 0.1903 0.1777 (0.0126) (11) 0.1984 0.2083 0.0099 7 0.1958 0.2111 0.0153 11 Total Adjustment on account of UoSC Min Rs Total Adjustment for the quarter allowed costs only (Min Rs) Total Adjustment for the quarter allowed 8 Disallowed costs only Min Rs) 1,499 Impact of Extra or Less Purchases Ref Unit Purchased ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt Actual Unit Purchased ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt Difference ( MkWh ) let month of the Qrt 2nd month of the Qrt 3rd month of the Qrt 920 821 683 2424 859 745 704 2,308 (61) (76) 21 -116 PPP Ref ( Per kWh ) Ref PPP ( per kWh ) let month of the art 2nd month of the On 3rd month of the Qrt 8.9661 8.3259 9.8756 (972) Impact of extra Purchases ( Rs. Millions ) FORM-8(B) Quarterly Adjustments - Qrt -Ill EPP Adjustment EPP - let month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed EPP - 2nd month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed EPP - 3rd month of the Qrt Reference Actual Disallowed Fuel Price Adjustment Allowed E • let month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (Mln Rs) Adjustment that should have been with allowed costs only (Mln Rs) Impact of disallowed costs (Mln Rs) Remaining adjustment for the quarter only allowed (Min Rs) Remaining ad ustment for the uarter with allowed & disallowed Mln Rs 2nd month of the Qrt Target Losses for the quarter 2nd month of the on Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) Adjustment that should have been with allowed costs only (Mln Rs) Impact of disallowed costs (Mln Rs) Remaining ad ustment for the uarter on allowed Mln Rs & disallowed Mln Rs Remaining ad ustment a A 10 a 0 0 E 7, 3rd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MIn Rs) Adjustment that should have been with allowed costs only (Min Rs) Impact of disallowed costs (Mln Rs) Remaining adjustment for the quarter (Min Rs) Remaining ad ustment for the • uarter with allowed & disallowed Mln Rs account Total Adjustment Total Adjustment on account of EPP allowed and disallowed (Min Rs) 8.9561 10.5149 1.5588 7.6418 8.2719 0.8301 7.7601 9.0926 1.3325 10.83% 667 616 417 650 1,040 390 578 592 401 253 365 112 637 572 394 525 849 324 CPP ADJUSTMENT 2.1260 Ref for the 1st month of the Qrt 1st month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 2.1296 0.0036 2 2.0504 Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 2.7917 0.7413 429 1.8804 Ref. for the 3rd month of the qrt 3rd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) 2.2435 0.3631 231 662 Total Adjustment on account of CPP MIn Rs UoSC ADJUSTMENT 0.1929 Ref for the lst month of the Qrt 1st month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (MIn Rs) 0.1868 (0.0061) (4) 0.2201 Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) 0.2463 0.0262 15 0.2062 Ref. for the 3rd month of the qrt 3rd month of the Qrt ctual UoSC per kWh Actual Delta UoSc per kWh Adjustment Required for the Month (Min Rs) 0.2197 0.0135 9 20 Total Adjustment on account of UoSC (Min Rs) 1,507 Total Adjustment for the quarter allowed costs only (MIn Rs) Total Adjustment for the quarter allowed & Disallowed costs only (Min Rs) Impact of Extra or Less Purchases it Purchased ( MkWh ) Ref Unit month of the Qrt 2nd month of the art 3rd month of the On 627 650 778 Actual Unit Purchased ( MkWh) 667 578 637 1st month of the Qrt 2nd month of the art 3rd month of the Qrt Difference ( MkWh ) 1st month of the art 2nd month of the Qrt 3rd month of the Qrt 40 (72) (141) PPP Ref ( Per kWh ) Ref PPP ( per kWh ) lst month of the Qrt 2nd month of the Qrt 3rd month of the Qrt 11.2750 9.9123 9.8467 -1648 Impact of extra Purchases ( Rs. Millions ) FORM-8(B) Quarterly Adjustments - Qrt -IV EPP Adjustment EPP - 1st month of the Qrt Reference Actual/Projected Disallowed Fuel Price Adjustment Allowed EPP - 2nd month of the Qrt Reference Actual/Projected Disallowed Fuel Price Adjustment Allowed EPP - 3rd month of the Qrt Reference Actual/Projected Disallowed Fuel Price Adjustment Allowed Target Losses for the quarter 1st month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (Min Rs) Adjustment that should have been with allowed costs only (Min Rs) Impact of disallowed costs (Min Rs) Remaining adjustment for the quarter only allowed Min Rs Remaining adjustment for the quarter with allowed & disallowed (Min Rs) 2nd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (Min Rs) Adjustment that should have been with allowed costs only (Min Rs) Impact of disallowed costs (Min Rs) Remaining adjustment for the quarter only allowed (Min Rs) Remaining adjustment for the quarter with allowed & disallowed (Min Rs) 3rd month of the Qrt Units Received (MkWh) Units to be sold (MkWh) Units without Life line (MkWh) & 51-350 Units Adjustment already given (MM Rs) Adjustment that should have been with allowed costs only (Min Rs) Impact of disallowed costs (Min Rs) Remaining ad usbnent for the wirier Mln Rs Remaining ad ustment for the uartsr with allowed & disallowed Min Rs Total Adjustment on account o a owe on n Total Adjustment on account of EPP allowed and disallowed Min Rs 7.6842 8.4351 0.7609 6.5407 7.8689 1.1282 6.8956 7.8139 1.1183 10.83% 673 838 421 505 605 765 835 482 863 883 839 678 483 938 938 0 CPP ADJUSTMENT Ref for the 1st month of the Qrt 1st month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) Ref. for the 3rd month of the qrt 3rd month of the Qrt Actual CPP per kWh Delta CPP per kWh Adjustment Required for the Month (Min Rs) Total Adjustment on account of CPP (Min Rs) UoSC ADJUSTMENT Ref for the 1st month of the Qrt let month of the art Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) Ref. for the 2nd month of the Qrt 2nd month of the Qrt Actual UoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) Ref. for the 3rd month of the qrt 3rd month of the Qrt ActuaiUoSC per kWh Delta UoSc per kWh Adjustment Required for the Month (Min Rs) Total Adjustment on account of UoSC Min Rs Total Adjustment for the quarter allowed costs only (Min Rs) Total Adjustment for the uarter allowed & Disallowed costs on Min Rs 2.1214 2.3567 0.2353 168 1.6787 2.6724 0.9937 760 1.6585 2.1678 0.5093 427 1,346 0.2396 0.2131 (0.0265) (18) 0.1765 0.2175 0.0410 31 0.1829 0.1979 0.0150 13 26 3,678 3,678 Impact of Extra or Less Purchases Ref Unit Purchased ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt Actual Unit Purchased ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt Difference ( MkWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt 725 941 1000 873 765 839 (52) (178) (161) PPP Ref ( Per kWh ) Ref PPP ( per kWh ) 1st month of the Qrt 2nd month of the Qrt 3rd month of the Qrt Impact of extra Purchases ( Rs. Millions ) 10.0452 8.3959 8.5370 (3,380) FORM - 7 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED • LII IC 1-1.19*CO (1307.C.1.1) .. ..., .- v.,. .....ri. . .. .i.,:' :,- 4' iliM1-::-.-Pc-, 'S. 7 E.T.."'" ,-1--,d-r-. .:16;.:,. •._. - ..m 1- - •,--' 7•- '" "" ••• .• V. ,,. . --,11... ....i • Power Balances 1.106 1,049 [PAWN Unite Rectilved 859 942 704 745 687 578 637 873 765 839 9,564 835 678 8,528 130 182 1,036 hits Said 9111(WhI 842 940 863 798 725 833 818 592 572 836 Unita Lost [MitWisi 207 168 80 81 20 72 51 (14) 65 37 Units Lasi(T&D) lueel Teets** Losses Adrtinistadve Losses (Estimated) 19.50% 14.70% 9.80% Mewl fuss) 9.70% 8.30% 7.10% 10.83% 2.80% 9.90% 7.80% -2.40% 10.20% 5.80% 16.90% 19.90% 12.00% 10.40% 4.00% 7.80% 4.30% 9.80% 9.70% 9.13% -2.10% -2.80% -8.40% 2.40% 1.30% 7.30% 10.20% 1.70% 9.10% 9.90% 11.20% - 9.30% 5.60% -1.80% 4.10% -8.70% • • Technical Losses at Different Levels Transmission Lames 132 kV 1.20% 1.90% 04•9e1 2.00% 3.10% 1.40% 4.10% 2.50% -3.90% -0.10% -3.60% - 1.70% 1.80% 1.23% 7.90% 7.90% 7.90% 7.90% 7.90% 7.90% 7.90% 7.90% 7.90% 7.90% 7.90% 11 kV Losses 1,64941 7.90% 7.90% LT Lamm Total Technical Looses r144941 - - - - - (9.49•1 9.80% 9.10% 9.90% 11.00% 9.30% - 12.00%_ - - - - 10.40% 4.00% 7.80% 4.30% - - - 9.80% 9.70% 9.13% FORM - 7 (A) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED - I , . ,::•:. , ' ____. 'I ,.. ..._..._•.1,: m-•-"-v0x -. r.4-, .,- L.- r:G7 -. -4 - ;:...„ .:._...L._.__,.,_ . emili"g7 . 111 '.1* Loal 1..___1. . ;.: i:,..____... C41 _ !..,1 Power Balances Units Received nskyrsi 1,053 1,154 944 859 789 715 889 580 873 729 828 864 9,832 717 8,767 147 1,065 Units Said pAkWh] 853 984 869 811 748 880 622 584 593 639 710 Units Lost itskvom 200 170 75 48 23 54 47 18 79 90 118 Units Losi(T&D) 10.83% furl 19.00% 14.70% 7.90% 5.60% 2.90% 7.70% 7.00% 2.80% 11.80% 12.40% 14.00% 17.00% Tads** WINOS (%119111 9.10% 8.70% 9.00% 9.00% 9.00% 9.10% 9.10% 8.80% 9.20% 8.90% 8.90% 9.30% 9.00% Administrative Losses (Eadmstad) Maw) 9.90% 8.00% -1.10% -3.40% -8.10% -1.40% -2.10% -8.00% 2.60% 3.50% 5.10% 7.70% 1.83% 1.80% 1.40% 1.70% 1.70% 1.70% 1.80% 1.80% 1.50% 1.90% 1.60% 1.60% 2.00% 1.70% 7.30% 7.30% 7.30% 7.30% 9.00% Technical Losses at Different Levels Transmission Losses 132 kV 11 kV Losses 1%mel 0149111 7.30% 7.30% 7.30% 7.30% 7.30% 7.30% 7.30% 7.30% 7.30% LT Losses luool - - - - - - - - - - - - Toad Technical Losses i%•9111 9.10% 8.70% 9.00% 9.00% 9.00% 9.10% 9.10% 8.80% 9.20% 8.90% 8.90% 9.30% 10 FORM - 8 Operational and Technical Information DISCO load factors on yearly basis NTDC/DISCO Delivery Points metering accuracy 2014 12.50% 2013 12.70% 2012 10.74% 2011 11.02% 2010 11.17% 2009 11.39% 100.00% DISCO metering accuracy For all customers (residential, commercial, industrial, etc.) Estimated High Voltage Transmission lines losses (132 kV) 99.00% 1.70% 11 FROM - 9 Average Rate per Unit Purchased and Sold -Weighted Average Cost per Unit Sold to Customers Use of System Charges INTDC) Estimated Average Rate I FY 2012-13 I Estimated Maximum Demand Indicatori(MDI) (Table 11 -11.16) [Rs/kW/Month] (Table 11 -11.17) WW1 Number of Months (Fiscal Year) 1#1 L000,000 Rs Estimated Use of System Chivies = (10.02 x 10.03 x 10.04) MEM) 55.91 1,836 12 1,892.78 I Estimated Average Rate (Table 11 - 11.33) Estimated MDI Form 6 ( A) Number of Months (Fiscal Year) Estimated Capacity Charge = 10.07 x 10.08 x 10.09) Estimated Average Energy Charge Estimated Energy Purchase for Fiscal Year (Table 11 - 11.33) [Rs/kW/Month] 941.04 WW1 15 1 1,536 1,000,000 Rs 20,733 [Rs/kWh] 7.5139 12 [GM] 9,564 Estimated Energy Charges = (10.12 x 10.13) [,000,000 Rail 74,732 I I Estimated Power Purchase Price = r0.06 + 10.10 + 10.14) 1,000,000 Rail 97,358 / Fts/Millh li 10.18 Average Rate per Unit natant ■ 10.15 / 10.13) Estimated Energy Sold 1G1Nh1 I Avon? Energy Rate per Unit Sold ■ (10.15 1 10.17) Distribution Margin • Distribution Margin per UnitII = (10.19 / 10.17) Total Cost per Unk Sold to Customers - (10.20 + 10.18) I I I Estimated Revenue from Energyi Sold (10.15 + 10.19) I Prior Period AdJustementrneovered Costs) I I Required Estimated Revenue from Energy Sold (10.22 + 10.23) 5,525 1 FM/IOW) • 11.4157 4000,000 Rs) 838 [ Rs/kWh 1 - 0.0953 - ( Rs/kWh 1 1,000,000 11 [000,000 Ft? 4000,000 Rs) 11.5139 96,196 (1,377.00) 96,819 FORM -9 ( A ) Table 11 - CPPA Charges: Use of System, Capacity and Energy 11.01 Use of System Charms WW1 11.02 11.03 11.04 11.05 11.08 11.07 1118 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.15 11.17 Month 1 Jul Aug Sep Oct Nov Dec Jan Fab Mar Apr May Jun Year 2 Avg per month NW] 'r ' ' Demand (kW] 3 t111,130 , . 3.103,197 .. 2,137,113 , 1,777,160. 1,11d1,031 1,710,516 ' '1,480,470 • 1,858,781 '. 1,624932 ' 1,800,403 ...1,136971 . 1,984208 22,032,088 1,8911'. ..''''' .,,;‘. \'‘4..A Fbted Use of System Rate (Rs/kW] 4 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 Fixed Use of . System Charges [ Rs] 5 3x4 181,428,088 188,414,977 183,801,098 152,695,489 155,158,123 148,674,843 124,809,878 142,505,878 139,941,548 143,418,584 188,328,547 188,002,890 1,892,777,539 Avg per month (MWh], r''', Energy [kWh] 6 1,044338,004 1,100,317,706 042,413,471 809174,259 ' 744,814720 704,192,196 007,904437 078,404,413 834838.049 074913,218 704,083,643 ' 034821,457 9,663,613,020 ' , , MIN Variable Use of System Variable Use of System Charges Rate [RarkWh] ( Rs] 11 • 4 x 7 7 Sum Use of System Charges 1 Rs] 9 181,428,088 181,414,977 183,801,096 112,195,489 186,168,123 141,874,643 124,809,878 142,685,876 139,641,548 143,418,684 199,328,647 168,002,690 1,892,777,1139 1932288.882 11.18 Comity and Enemy 11.19 Month Year 11.20 11.21 11.22 11.23 11.24 11.25 11.28 11.27 11.28 11.29 11.30 11.3111.32 11.33 11.34 1 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2 Avg Cap. Charge • Capacity Charge Energy Charge (Rs] [Rs] 11 1,044973,181 1,168,129,341 1,104.800.345 1.710.160,950 1,1130,488,8241 .1,840,460,800 140,884275 1,814,893,841 tAanliga 1,804880,101 2,04386231 1.154 111431 20,733,039,690 '.. 7 ,., . 041319 , 12 7181,878,748 7,388,882,410 4228,819,205 4044,109.827 9,384,900,123 0,3013,063,054 7,080900.788 4,704.146 0914482,734 4874101,081 , 5.064,196.6ee 45044118,983 74,732,262,816 Capacity Final Rate Energy Rate per per kWh Rate per kWh kWh [ Rs/kWh ( RsIkWti I ( Rs/kWh ] C Rs/kWh 1 ' I [Rs] 11.111 1713111 19=12/6 6 14.919 • 9+11+12 13 ■ 9.3291 7.30 0.17 1.88 9,760,080,002 8.5002 8.85 1.68 0.17 9,403,221,801 8.7487 811 1.95 0.19 9,244,926,648 9.2030 7.03 1.99 0.18 7,908,1166,071 9.8957 7.23 2.48 0.21 7,370,624,874 11.4984 8.98 2.33 0.21 88,096,678,187, 12.8899 10.55 2.13 0.19 8,684,1148,939 11.3504 8.31 0.25 . 2.79 6,688,180,966 9.14 11.5997 2.24 0.22 7,387,132,138 11.0050 8.44 2.38 0.21 • 7,406,400,643 10.5588 7.67 2.87 0.22 4074,177,636 10.1798 7.81 2.17 0.20 8,134866,828 10.1797 7.8139 2.1678 , 117,388,079,9411 Sum of aq Charges Use Of System Rate per kWh 13 FROM - 9 Average Rate per Unit Purchased and Sold - Weighted Average Cost per Unit Sold to Customers 10.01 Use oflystem Charges INTDCI FY 2013-14 Proleted 10.02 Estimated Average Rate (Table 11 - 11.18) (Rs/kW/Month] 81.91 10.03 Estimated Mwdrnurn Demand Indicator (MDI) (Table 11 - 11.17) [MW] 1,769 10.04 Number of Months (Fiscal Year) 12 [51 10.05 Estimated Use of System Charges = (10.02 x 10.03 x 10.04) [,000,000 Rs] 1,823 [RsAcW/Monthl 1,01271 10.06 IlamItcasacitvCharge 10.07 Estimated Average Rate (Table 11 - 11.33) 10.08 Estimated MDI Form 8 ( A) 10.09 Number of Months (Fiscal Year) 1,759 WW1 12 I51 10.10 Estimated Capacity Charge = (10.07 a 10.08 x 10.09) [,000,000 Rs] 21,493 10.11 pony Charge 10.12 Estimated Average Energy Charge 10.13 Estimated Energy Purchase for Fiscal Year (Table 11 - 11.33) [Rs/kWn] 8.224 [GWh] 9,832 10.14 Estimated Energy Charges = (10.12 x 10.13) (000,000 Rs] 10.15 Estimated Power Purchase Price = (10.06 + 10.10 + 10.14) (000,000 Rs) - 80,866 104,173 Prior Year Adjustment 10.16 Average Rate per Unit Purchased = (10.15 / 10.13) 10.17 Estimated Energy Sold 10.18 Average Energy Rate per Unk aids( - (10.16 / 10.17) [ Rs/101M11 10.60 (13W111 5,767 [ Rs/kWh ] 11.882 (000,000 Re) 16,223 10.20 Distribution Margin per Unit 121§ w (10.19 1 10.17) 1 Rs/kWh 1 1.850 10.21 Total Cost per Unit Sold to Customers = (10.20 + 10.18) [ Rs/kWh ] 13.733 10.19 Distribution Margin 10.22 Estimated Revenue from Energy Sold (10.15 + 10.19) (000,000 Rs] 120,397 10.23 Prior Period Adlustentent (Uncovered Costs) (000,000 Rs] 21,426 10.24 Required Estimated Revenue from Energy Sold (10.22 + 10.23) (000,000 Rs] 141,823 FORM - 9 ( A ) Table 11 CPPA Charges: Use of System, Capacity and Energy 1101 Use of System Charon INTDC1 Demand 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11 13 11.14 11.16 11.18 11.17 Year 2 Month 1 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Avg per month pawl - - [kW] 3 1,925,215 1,940.125 1,915,360 1,725,110 1,835,200 1,655,225 1,435,870 1,512,215 1,825,840 1,785,885 1,220,575 1,945,480 21,222,060 1,769 Fixed Use of System Charges Fixed Use of System Rate [Ra/kW1 4 85.910 85 910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 [ Rai 6.354 165,395,221 166,676,139 184,548,578 148,204,200 140,480,032 142,200,380 123,355,592 129,914,391 156,857,914 153,423,862 164,998,598 • 167,134,489 1,623,187,176 : Avg per month pAWhl_ Energy - yanaoie Use of Variable Use of System System Charges Rate [Rs/kWh] [kWh] 7 6 1,052,673,543 1,153,583,723 943,835,825 859,055,895 788,745,923 714,508,735 689,081,565 580,235,365 672,523,818 728,823,724 825,733,815 883,883,742 9,832,066,671 619,339 Sum Use of System Charges [ Rs) 11.6x7 [ Rs] 9 185,395,221 186,878,139 164,548,578 148,204,200 140,480,032 142,200,380 123,355,502 129,9 14,391 158,857,914 153,423, 882 164,998,598 187,134,489 1,523,157,175 11.19 Capacity end Energy 11.20 11.21 11.22 11.23 11.24 11.25 1126 11.27 11.28 11.29 11.30 11.31 11.32 11.33 11.34 Year Month_ 11.15 - 1 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May • Jun 2 • Avg Cap. Charge * Capacity Charge - Energy Charge Sum of all Charges Use Of System Rate per kWh [Re] [Rs) WI I RaNIAM 1 11 .2,121,815,058 2,038,448,375 1,783,485,193 1,712,393,604 1,595,730,383 .1,755,288,414 1,867,112,040 - 1,420,583,580 1,595,953,087 1,992,016,737 1,882,289,653 1,728,395,151 21,493,491,274 . 1,012.79 12 7982,088,182 7,888,448,849 8,709,301,440 6,441,881,855 6,002,985,728 6,603,152,8013 7,023,897,675 5,344,100,138 8,003,823,516 7,493,777,248 7,080,994,409 6,502,057,950 80,5511,467,174 13.9+11+12 10,269,276,439 • 9,873,573,163 8,857,335,211 8,302,459,459 7,739,196,143 8,500,621,401 9,014,365,307 4,884,598,107 '7,758,634,517 • 9,639,217,648 9,128,280,680 8,397,587,570 •104,173,145,623' Capacity Rate per kWh [ Re/kWh 1 15..11 / 6 141116 2.02 0.16 1.77 0.14 1.89 - 0.17 1.99 017 2.08 0.113 2.48 0.20 2.79 0.18 2.45 0.22 2.37 0.23 2.73 0.21 2.28 0.20 2.00 0.19 2.18111 . Energy Rate per kWh Final Rate per kWh [ Rs/kWh I [ RsIkIfih ] 16.12 1 6 7.58 8135 7.11 7.50 7.81 9.24 10.50 9.21 8.93 10.28 8.58 7.53 5.22311 1316 17 ■ 9.7554 8.5592 9.1744 . 9.8848 10.0673 11.8972 13.4727 11.8824 11.5336 13.2293 11.0547 9.7230 10.6952 FORM -10 DEMAND (Actual and Calculated) and Number of Customers A. Actuals for Demands and Number of Customers B. Forecasted Demands and Number of Customers u Demand Demand Actual Calculated Fiscal Year change /Forecast /Forecast [,000 kW ] [,000 kW ] ---- - 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 12.16 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 1,999 2,203 2,285 2,298 2,538 2,812 2,747 2,942 3,078 3,209 [MW; Nu000 of Customers] 5000. 0.0% 10.2% 2.8% 1.5% 10.4% 10.8% -2.3% 7.1% 4.6% 4.3% 2,690 2,844 3,007 3,179 3,361 • Number of Customers [ ,000 ] 1,751 1,819 1,906 1,993 2,110 2,268 2,449 2,624 2,763 2,879 2,997 3,109 3,229 3,348 3,469 3,590 change 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.7% 5.7% 5.7% 5.7% change 3.8% 4.8% 4.5% 5.9% 7.5% 7.9% 7.2% 5.3% 4.2% 4.1% 3.8% 3.9% 3.7% 3.6% 3.5% Demand Actual/Forecasted and * of Customers 5000 4000 3000 2000 -- 1000 0 I I i i 1 a Fs . il r-, 2 Fl It 4 RI •■ ••■■ ••••••••01.0=•■■ ..4.4.1.•••••■ ••••■ MCO 14 FORM 11 12 months moving Load average Month 674.10 148.44 Jul-08 688.31 533.05 Aug-06 8op-05 67210 668.24 Oct-06 736.47 670.23 671.30 623.06 Nov-05 673.04 641.37 Dec-08 Jan-09 408.45 676.77 Feb-09 543.20 614.93 664.46 619.96 Mar-09 679.01 684.52 Apr-06 May-09 726.83 652.58 683.31 750.98 Jun-09 693.07 779.03 Jul-09 698.68 532.14 Aug-09 690.42 898.75 Sep-09 696.83 749.31 Oct-09 Nov-09 643.69 697.26 701.93 666.20 Dec-09 704.62 505.38 Jan-10 710.10 637.51 Feb10 713.21 554.56 Mas.10 716.10 62744 Apr-10 May-10 735.54 71482 715.74 065.04 Jun-10 716.36 646.43 Jul-10 715.96 840 94 Aug-10 720.12 865.75 Sep-10 722.77 754.45 Oct-10 Nov-10 69911 72198 729 31 617.25 Doc-10 731.44 573.25 Jan-11 733.11 574.68 Feb-11 735.07 577.17 Alm-11 735.96 524.19 Apr-11 73830 746.57 May-11 731.29 975.49 Jun-11 715.03 841.79 Jul-11 715.03 590.58 Aug-11 71113 697.56 Sep-11 716.24 804.96 Oct-11 71514 727.89 Nov-11 71641 542.1111 Dec-11 714.55 593.24 Jan-12 716 44 598 44 Feb-12 .715.90 557.91 Mar-12 714.67 621324 Apr-12 May-12 656.49 715.10 714.75 650.37 Jun-12 714.79 841.69 Jul-12 716.70 939.87 Aug-12 719.36 862.95 Sep-12 71910 797.80 Oct-12 720.98 725.09 Nov-12 722 73 632.59 Dee-12 725.02 . 615.12 Jan-13 725.53 592.00 Feb-13 723.16 571.91 Mar-13 724.97 635.56 Apr-13 May-13 651.38 725.24 727.66 650.84 Jun-13 730.84 552.60 Jul-13 719.55 983.62 Aug-13 693.12 869.10 Sep-13 673.57 910.99 Oct-13 858.39 746.07 Nov-13 643.55 860.05 Doc-13 Jan-14 62210 640.84 644.58 663.76 Feb-14 Mar-14 593.36 66478 655.55 635.74 Apr-14 713.52 710.41 May-14 716.62 716.62 Jun-14 Table/Graph 14 - Sold Energy Evaluation and Setting up Sold Energy Average ream is 1111M,l DISCO Evaluation of Sold Energy to Customers by using 12 month moving average 1110:00D ti I 111111111E1i 1111t111111 II ••• .-.....11131111=1•••=1/••=11• W/mge.,■ ••■■■■ -•■ •••,••••• 714.49 Average Sold Enemy for lost 12 months 730.64 Assumed AVM* Load for and Fiscal Voir 16 FORM-12 TabialGraph 13 - Load Growth Evaluation and Setting up Load Average 12 months moving Load overage Month Jul-08 976.68 754.55 Aug-08 008.72 746.67 Sap-05 900.20 754.54 Ord-08 093.19 75215 Nov-OS 70617 757.16 Doe-06 480.29 754.13 Jan-011 404.28 766.58 Feb-09 626.83 76012 Mer-09 708.60 714.73 Apr-09 706.16 761.44 May-09 892.29 713.53 889.74 766.40 Jun-09 777.42 906.07 Jul-09 Aug-09 962.74 783.87 Sep-09 975.35 78413 777.53 Oet-011 744.91 Nov-09 670.26 785.29 Dee-09 529.64 788.73 613.68 79103 Jan-10 601.85 575.28 Fob-10 869.19 002.59 Mar-10 805.25 Apr-10 733 14 802.66 May-10 926.77 Jun-10 1101.97 606.00 807.11 Jul-10 9113.52 991.80 605.31 Aug-10 510.11 Sep•10 690.27 612.51 Oct-10 537.95 711.58 61110 Nov-10 Dee-10 666.88 822.95 633.67 824.84 Jan-11 584.17 825.96 Feb-11 829.48 Mer-11 701.12 827.12 Apr-I1 702.03 628.52 May-11 966.87 Jun-11 1115.29 515.89 961.86 601.39 Jul-11 Aug-II 1,056.87 808.28 812.03 Sep-11 911.65 814.52 918.97 0c1-11 809.85 757.75 Nov-11 689.57 808.54 Dee-11 047.29 - 809.59 Jan-12 Fob-I2 626.43 61124 507.19 672.86 Mar-12 604.21 718.82 Apr-12 My-12 01523 804.85 805.27 841.31 Jun-12 Jul-12 1144.57 808.02 Aug-12 1,101.70 005.70 811.02 941.72 Sep-12 511.11 658.57 0c1-12 511.22 744 35 Nov-12 813.25 702.21 Dec-12 614.25 687.09 Jen-13 814.44 577 88 Feb-13 Mar-13 637.05 814.64 817.60 726.52 Apr-13 May-13 11227 517.77 811123 850.33 Jun-13 Jul.13 1,052.57 819.34 Aug-13 1,153.56 796.13 Sep-13 943.64 712.58 742.47 859 06 014-13 727.69 768.75 Nov-13 722.05 714.51 Doe-13 Jan-14 869.08 723.31 734.16 580.24 Feb-14 Mar-14 872.52 772.64 Apr-14 72612 808.01 May-14 825.73 844.71 863.65 863.65 Jun-14 [SW* In mwto DISCO Evaluation of Load Growth by using 12 month moving average 1800000 1600100 14011300 1100000 ICCOCOO .• ••••••••••••■ •••{■ ■ ••11111.1■ •••■ ••••••••■■ • ■■ •■ •■ •••■ •■ fortes! 12 months 806.02 Load Ave 819.34 Average Load for next Final Year r 0 FORM-13 -.. Accumulated Depreciation Cost Description No. July CH ' A. at 2012 Land A Free Hold 1 5013,510,237 - 5013,510,237 Charge during the veer As at July 01, 1010 As at June 30,2013 Addition1Deletion Book Value as on June 30,2013 As at June 30.2013 AdjustrneM - - - - 5.613,510,237 - - 6,613,510,237 - Lana Hold 2 5,813010,237 Total 141 - 6,813,110,237 - - 47,102,109 10,507,281.71 501,321,420 623,430,890 57009.471 74,423143 131,290,852 1076,701,025 148,901,123 1,643,080444 . Buildings 1 Residential Building 2 Non-Residenlial Bulkling 3 080 Non-Raddentlal Dulidinci 540,507.747 1,063,961,021 144,098,649 1,208,059,677 107.351,341 23,047,311 1013.468.771 118,121,715 1.431,940,007 114,453,630 34,414,603 718050,958 50,470329 1,095.019,288 222,083,407 1,001,040,575 760830,207 1,039,786.186 230,135.205 200092,018 991065,611 1,296,011.304 Non-OSO Residential Build • 4 Total C Sub Transmission 1 132KV Sub Transmission Lines 2 66KV Sub Tf11111111111111311 UlleS 379.701,944 51,425.326 431.127,310 214,985.821 15,149074 to19,4.1,112 273,601,733 2,292,976,415 931,338,779 44,638,802 1,514,072,972 187.911,927 5,142,033,062 813.976225 0.824,018,561 1081.984,899 0010042,330 i 17,792,062 178,224.204 305,937,698 484,101,162 180,432.201 1,674,600174 111,703,949 1,1100,209,163 11,447,971,361 33KV Sub Trensinission Linos 3 Total I D Grid Station 1 132 KV and Station 2 68 KV Grid Station 3 33 KV Orld Station 57.751,356 426010,606 r - 7,388,160,924 871,727,18114 6,416,411,642 Total - - - 11 KV Distribution Equipments IE 1 11 KV Poles 2 11 KV Lines 1.6.1 Eximmon Trinstonn. 3 r 24086,439,516 • 1.333.274040 9,844,313,512 4,878,707223 34,130,763,018 949.011,598 2,593,610,297 2.920110,000 8253,478,172 11,177,511,172 330.499,703 39,307,460011 10,041,018,617 1.279,411,30100 11,320.619,966 27.514,939,543 - .. 28,029.872679 3,343,433.163 LV Distribution EOWPMenta F I 1 LV Poles 2 440 LV Distribution Line 3 220 LV Distribution Line 4 KWh Masts 1 Seivka Cable 5 Iliac Equipment 1 13203/33 KV DSO Vehicles 2 VaNcles - - - - _ • - - - - 18,333102 723,785.450 408.200,020 32,515,013 637,451048 ess.no,em . 32,611,013 . - - - - 86,333,1101.81 723,785,480 - Detail at amoral Plant Assets H 1 Computer Equipment 2 Furniture EigUipmont 3 Wottalloil Equipment 4 Laboratort Equipment 5 Total TV Equipment Total I 1 - 137,481,548 Total 1 . - Vehicles 0 I - - • Total 19,633,452,721 7.447,4011,310 8096,410958 - • - - - 43,408,260 203,070.417 - - • 246,620,009 117295.881 363.915,757 224,680126 21.930.943 21,930,643.111 - 246,620.069 117,245,661 1,619,744,641 - 15,133,947027 41,407,872.36 320,1167,497 43,406260.31 311011,767 224,141,126 61,371,612.179 6,170208,012 17,141,920,271 13,614,203,264 0 & NI Equipments Grand Total 203,070.417 120,711,033 • . 320007,497 520.715.033 FORM-13 Agent Re liter as the Year ended 30th June 3014. Accumulated Depreciation Cost No. Description A • As at July 01, 2013 Charge during the year As at July 01, 2013 As at June 30,2014 Addition/Deletion As at June 30,201♦ .7. 1 Book Value ...on June. 30,2014 Land I Free Hold 2 Lease Hold Total 5 - " - 1,813,510,237 - 1,913,110,237 - 623,930,890 91,550.087 715,481,777 57,609.471 11,846,263 09,455,734 046,028,043 1,205,059,977 177,2131,515 1,385.321.192 131,298.652 26,999.1305 156,297,657 1.727,023,534 2 Non-Residential Building 3 G50 Non-Residentlai Buildina 4 Non-09O Residential Building Total 1 132KV Sub Transmission Lines WV Sub Transmission Lines 3 331(V Sub Transmission Lines ' - - ' - ' 268,812,401 2,190,802,819 191,901,123 35145,218 2 66 KV Oral Station 3 2,135,043,250 7138,030.287 92.735,544 656.565,830 1,275,477.430 431,127,310 63,260.352 494,387,662 230.135215 27.831,069 257.9813,363 236,421,279 - - 336,464,037 2,629,430,622 996,911111,611 1121118,8313 1,050,532.214 6.824,019.561 1001,304.727 7,825.323,299 1,611084,899 202,504,291 1,854,489.190 5,940034,099 484,161,062 71,042,254 565,204.216 178224.284 21.457,492 199,681,756 355,522,460 ' ' 11,310,127108 1,810,201,163 ' ' 32884.127,043 8,306,419.958 1,072,348,992 222961,793 2 11 KV Lines 3 28.029,872,679 Distribution Transformer Total 4,154,254,384 - 1,082,903,973 6.295.356,559 9,479,323,831 23,404.903,211 11.177,518,172 1,935,751,075 13,112339,247 2,924,110,000 377,125,593 3.301.238,593 9.612,100.654 39,207,4110,811 6,780,006,439 48,997,449,210 11,320,829,968 1,410,032,4116 12,790.562.424 33,219,983,510 - - - - - ' " • - - - - - - • " - - • - - - LV Distribution Equipments I LV Poles - 2 440 LV Distribution Line - 3 220 LV Distribution Line 4 KWh Meters 8, Service Cable 5 2,084,170,046 - 11 KV Poles 1.509,998,700 - ' 11 KV Distribution Equipments - Mc EquiPilent Total - - - - - - • Vehicle. 132116/33 KV 060 Vehicles - " Vehicles Total H - - 2,292.9711,985 7,306,190,124 1 2 - 273,193,6135 - 33 KV Grid Station 1,873,049,576 1,811,949,575 • Total 1 227.753,391 132 KV Grid SLaion G • - Odd Station 1 F 1,913,510,237 • 2 E ' • • Ilub Tiansmission D - - 1,1131,990.517 Total ' ' 106,202,787 921,9118.237 520,715,033 313,971041 557,696,974 272301164 733,7116,4111 108.202,787.40 829,118,237 820,718,033 211,671,141 557,686,174 272.301,284 - Computer Equipment 2 Furniture Equipment 3 Workshop Equipment 4 Laboratory Equipment 5 Traal TIP EquiPmellt - Grand Total -- - - - - - • ' ' ' - - .. - • - 363,915.757 53,396,231 417,312995 246,620,099 24,824,651 271,444,720 145,869275 363,911,787 63,391,236.14 417,313.915 245e20,819 24,624,811 271,444,720 148,1189,271 ' Total 0 & M Equippments - 722795,450 Detail of General Plant Assets I J • • Residerdisi Budding 5013.510,237 - 5,113,510237 - Buildings 1 c - - 5,913,510,237 - - . 87,541,820,271 8,827,2111,164 811,161,040,115 16,133,147,127 1,847,202,742 111,1111,160,61111 41,187,811,493 FORM-14 Aging of Accounts Receivables as on 30th June Actual for FY 2012 (Actual/Est) for FY 2013 Projected for FY 2014 Outstanding for current year Rs in Million 7,593 7,395 7,560 Outstanding for more than 1 year Rs in Million 66 90 Outstanding for more than 2 years Rs in Million 22 37 130 53 Outstanding for more than 3 years Outstanding for more than 4 years Rs in Million 20 27 Outstanding for more than 5 years Accrual impact of FPA & Cut-off units Rs in Million 30 41 37 Total Receivables as on June 30, Rs in Million 26 4,630 12,384 530 8,160 50 49 38 721 8,601 (Less) Provision for doubtful debts Rs in Million 268 835 835 Net Receivable Rs in Million 12,116 7,325 7,766 Rs in Million Rs in Million This form should be accompanied with a reconcilation of bad debts written off during the year . YEAR WISE DETAIL OF PROVISION FOR DOUBTFUL DEBTS Rs. In Million Opening Balance Financial Year Bad Debts Written Off 2005-06 131.53 (0.91) 2006-07 103.99 (5.56) 105.97 128.34 193.54 334.54 267.54 834.83 834.83 (0.87) (0.48) 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 (Actual/Projected) 2013-14 (Projected) • - Closing Balance Provision (26.63) 7.53 103.99 23.25 65.67 141 (67) 567 - 128.35 193.53 334.54 267.54 834.83 834.83 834.83 105.96 18 5v\ FROM -15 Projected Energy Sales by Tariffs Voltage Energy Purchased Energy Sales Level 2012-13 lAct/Proll 2012-13 lAct/Proll Category 6.1.Mgagi AMRale Fels , Upto - 50 1 -100 101 - 300 301 - 700 above 700 Temporary Domestic Al (TOD) ' ., LV ' ., ., , LV LV LV LV LV LV LV Summary A2 Commercial A2 - A LV LV LV LV > 20 kW A2(2) TOD Temporary Commercial Distribution Losses Summary ' Sales Growth Sales Projection Sales Growth rate 2013-14 rate :.•;.,' ' T- , , - -:,,r,. , 358.58 1,948.83 1,175.07 284.37 88.57 0.22 28.29 -0.12% 2.95% 3.99% 3.96% 3.81% 3.16% .0,20% 3,856.94 3.03% 258.72 8.58 193.06 8.14 3.18% 6.07% 2.18% -0.79% 464.48 2.74% -27.34% 0% -39.22% 4.87% 188.94 214.40 84.83 1,348.01 5.05% 0.94% 9.45% 2.69% 25.09% -9.23% 1,038.07 0.00 570.02 0.18 1.48% 0% 3.18% 3,420.48 2.54% 0.26 3.94 12.50 54.48 45.81 18.28 147.17 0.00 0.00 0.00 0.00 8.88% 3,44% 2.56% 3.74% 0.49% 2.37% 2.52% 0% 0% 0% 0% 282.23 2.43% 9.89% -15.35% 32.08 0.00 9.54 0.00 0.00 0.00 0.00 692.20 -16.90% 733.82 3.08% 8.98 0.00 3.73 0.00 0.00 0.00 2.89% 402.71 2,133.00 1,274.80 288.85 94.25 0.24 29.71 357.02 1,891.01 1,130.00 254.30 83.55 0.22 26.34 11.34% 11.34% 11.34% 11.34% 11.34% 11.34% 11.34% 4,221.36 3,742.46 11.34% 282.84 6.98 213.17 8.98 250.75 6.19 188.99 8.19 11.34% 11.34% 11.34% 11.34% 509.96 462.11 11.34% 202.88 239.59 88.81 1,478.44 0.00 1,151.84 0.00 823.14 0.22 179.86 212.41 59.23 1,310.71 0.00 1,020.99 0.00 552.45 0.19 11.34% 11.34% 11.34% 11.34% 11.34% 0.00% 11.34% 11.34% 3,762.72 3,336.84 11.34% 0.28 4.30 13.75 59.21 51.19 20.15 181.92 0.25 3.81 12.19 52.49 45.39 17.88 143.55 0.00 0.00 0.00 0.00 11.34% 11.34% 11.34% 11.34% 11.34% 11.34% 11.34% 0.00% 0.00% 0.00% 0.00% 310.80 275.54 11.34% 32.93 0.00 10.12 11.34% 0.00% 0.00% -37.25% - 759.95 29.20 0.00 8.97 0.00 0.00 0.00 0.00 673.74 11.34% 803.00 711.90 11.34% 7.85 0.00 4.06 6.79 0.00 3.60 0.00 0.00 0.00 11.34% 11.71 9,619.56 10.38 8,528.23 11.34% 11.34% 14.51% -0.83% -5.21% -7.55% -2.20% 20.14% 44.81% -1.24% -5.86% -42.22% 0.51% 90.33% -3.47% Industry B-1 400 V Upto 40 kW 61 (TOD) B-2 400 V Upto (41-500 kW) B-2 400 V (TOD) B-3 11/33 KV B-3 11/33 KV (TOD) B-4 86/132/220 KV B-4 86/132/220 KV (TOD) E-2 (58) TEMP. LV LV LV LV HV HV STG STG Summary 4.87% pulk Suoolv C-1(a) upto 20 kW C-1(b) above 20 kW C-lc TOD C-211/33 KV C2 (TOD) C-3 (88/1321220 KV) . C3 (TOD) Temporary (E2-iia,E2iib,E2iii) K(A) - AJK K(B) - KESC (Billing) K(C ) Rawat Lab LV LV HV STG STG STG HV HV STG HV Summary -14.81% -37.80% 29.96% -18.35% 29.42% 43.91% 31.30% 0.58% Tubewells D-1 Scarp D-1 (TOD) D-2 (i) Punjab 8 Sind D-2 (ii) NWFP 8 Balochistan AGRI TNV D-2 (1)STOD D-2 (ii) STOD 0-2 (1) TOD D-2 (II) TOD LV LV LV LV LV LV Summary . - 2.74% Mil G-1 Public Lighting G-2 Public Lighting H-1 Residential Colonies H-2 Residential Colonies I-Traction J-Co-Generation LV LV HV HV HV HV Summary Total 11.34% -5.60% -0.81% 10.71 8,767.63 3.59% 3.13% 2.81% 19 FORM -16 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED V ••• • •••■ • •••• ■ 11••• • •10,1■ 4 nff:MraLLi: t 1at Projected Act/Proj. Determined A Power Purchase Cost Energy Charge [MM Rs] 77,479 74,732 80,856 Capacity Charge [Min Rs] 21,990 20,733 21,493 Transmission Charge [Min Rs] 2,098 1,893 1,823 [Min Rs] 2,272 103,839 Variable O&M Cost Total Power Purchase Cost [min Rs] 104,173 Projected Actual/Proj Determined B Operation & Maintenance * (1,377) 95,981 Employees Cost** 5,560 5,364 5,776 [Min Rs] - 2,922 3,431 [Min Rs] 5,560 8,286 9,207 - - Salaries, Wages & Benefits [Min Rs] Retirement Benefits Total Employees Cost Admin Expenses [Min Re] - Repair & Maintenance [Min Rs] 555 699 1,321 Travelling [Mln Rs] 197 251 251 301 735 11,814 Transportation [Min Rs] 196 281 Miscellaneous Expenses Total O&M [Min Rs] 656 7,164 690 10,207 [Min-its] C Depreciation & Amortization Depreciation Amortization of Leased Assets Total D Provision for Bad Debts Provision for bad debts • Bad debts written off [Min Rs] 1591 [Min Rs] - iMln Rs] [Min Rs] [Min Rs] Projected Actual/Proj Determined 1,591 - 1,620 1,620 - 1,847 - 1,847 - " Basis of this provision should be eaborated 55 FORM-17 Distribution Margin Comparison: 1 Description 2010 2011 2012 Actual O&M Expenses 2013 2014 Act/Proj Projected 5,585 6,683 8,669 10,207 11,814 Increase in % 30.86% 19.65% 29.72% 17.74% 15.75% Depreciation 1,238 1,290 1,427 1,620 1,847 RORB 2,132 (757) (15,134) (7,949) 4,962 (3,184) (2,896) (3,057) (2,401) 821 16,223 8,580 8,628 8,768 Other Income (2,536) Distribution Margin 6,419 4,032 (7,934) Energy Sold 8,191 6,585 DM per unit 0.78 0.61 (0.92) 0.10 1.85 -22% -251% -110% 1844% DM per unit increase 3% 21 FORM -18 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Financial Char. es Actual A Act/Proj Estimated Lon • Term Loans GOP loans n Loans Bonds TFCs Asian Dave ment Loan 245 Total B Short Term Loan Runni Finance Short Term Loan Others Total C Total Financial Cha as (A+B) 22 FORM -19 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED RORB Calculation Description • 2011-12 2012-13 2013-14 Determined ActlProj Projected , . A Gross Fixed Assets in Operation- Opening Bal • [Min Rs] 51,371 51,371 57,542 B Addition in Fixed Assets [Min Rs] 5,435 6,170 8,627 C Gross Fixed Assets in Operation - Closing Bal [Min Rs] , 56,806 57,542 66,169 D Less: Accumulated Depreciation [Min Rs] (15,305) (15,134) (16,982) E Net Fixed Assets in Operation [Min Rs] 41,501 42,407 49,187 F Add: Capital Work In Progress - Closing Bal [Mln Rs] 6,643 5,696 7,963 G Investment in Fixed Assets [Min Rs] 48,144 48,103 57,150 H Less: Deferred Credits [Min Rs] (24,416) (23,581) (25,333) I Lsss: Surplus on Revaluation of Assets [Min Rs] (6,097) (6,097) (6,094) J Regulatory Assets Base [Min Rs] 17,631 18,426 25,724 K Average Regulatory Assets Base L Rate of Return magel 11.25% - 22.48% M Return on Rate Base [Min Rs] 1,856 - 4,962 • , [Min Rs] 22,075 16,495 , 59 FORM - 20 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED , . , ,r, + 'era XL at4.:. 4.1-,i Determined A Power Purchase Price B DM O&M De •reciation RORB Other income Projected Act/Proj 115,626 95,981 104,173 [Min Rs] 7,164 10,207 11,814 EN 1,591 1,620 1,847 PEI 1,856 7,932 4,962 MM Rs 2,896 3,057 2,401 7,715 838 16,223 96,819 120,397 [Min Rs Total DM C Revenue Re uirement A+B [Mln Rs] 123,341 D Prior ear/other ad'ustments Min Rs] 2,817 E Total Revenue Requirement (C+D) [min Rs] 126,158 - 21,426 96,819 141,823 FORM - 20 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED 2012-13 2012-13 2013-14 Determined Act/Proj Projected [Rs/ kWh] 13.192 11.189 11.882 [Rs/ kWh] 0.817 1.190 1.348 [Rs/ kWh] 0.182 0.189 0.211 [Rs/ kVVtil 0.212 (0.925) 0.566 [Rs/ kWh] (0.330) (0.356) (0.274) Total DM [Rs/ kWh] 0.880 0.098 1.851 C Revenue Requirement (A+B) [Rs/ kWh] 14.072 11.287 13.733 D Prior year/other adjustments [Rs/ kWh] 0.321 - 2.444 E Total Revenue Requirement (C+D) [Rs/ kWh] 14.393 11.287 16.177 A Power Purchase Price B DM O&M Depreciation RORB Other Income 24 FORM - 21 (A) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Investment 47 _ :, , _ A ActueUEstimated Budgeted 4 ILI.. , _ $...L i t A. Actual Projected Investment Plan 650 674 1,834 670 650 750 2,221 879 1,300 1,300 2,067 590 300 756 1,523 767 1,600 893 1,400 [Min Rs] 1,911 4,941 1,850 6,350 1,765 6,138 1,850 10,895 Local Banks [Min Rs] - - - - Asian Development Loan [min Rs] 310 50 368 937 PSDP / Own Resources wh Raj 1,953 2,850 3,112 6,708 GOP Grant [Min Rs] 767 1,600 893 1,400 Consumer Contribution [Min Rs] 1,911 1,850 1,765 1,850 6,350 6,138 10,895 DOP 1 ■ ELR IIIII ■ STG Min Rs ■ PDEIP • ■ Villa • e Electricification/De.osit Work Capital Contribution Total RN III [min Rs] B Financln Arrangement Others (Please Mention) [Min Rs] - Total PAM Rs] 4,941 25 FORM - 22 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Interest on Development Loans Rs. Million Loans Sr. No. FY 2012-13 Interest Rate % let Qrt 1 ADB-2438-PAK (US$ 23.290) 17 2 ADB-2727-PAK (US$ 20.300) 15 Loans Interest Rate % Sr. No. - 109.907 - ADB-2438-PAK (US$ 23.290) 17 2 ADB-2727-PAK (US$ 20.300) 15 3rd Qrt - 110.049 - 24.931 4rth Qrt Total 219.956 - 24.931 FY 2013-14 1st Qrt 1 2nd Qrt 108.718 - 2nd Qrt - 18.531 3rd Qrt 4rth Qrt 212.259 103.541 - Total 19.921 38.452 26 FORM -23 FAISALABAD ELECTRIC SUPPLY COMPANY UNITED Development Loan 2012-13 M. N. 2 Loan Itiosed Rua Oral I DitOurnoma I Rapnyormat I Third OR a.cad Ott First ad Reatratitu V.-. alai WIWI I Distursomat Ilapormont I Ma Ma I Diatamonste 1 Remmeete I Mel 3.357 1,527.452 AD8-243$-PAK 93.032 1,524.125 1,527.482 1,431.093 1624.125 Man 92.549 173.250 A08.2727-PAK 65.123 92.549 173250 27.426 50.701 Mon (0.682) 45.903 I Clad OMO I Dtalvirsomra 1,526.820 1,526.820 31.887 222.153 222.153 45.614 245 443 1,310.284 287.787 27 FORM - 24 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED BONDS Particulars Interest Rate Opening Balance FY 2011-12 Closing Redemption Balance Interest Charges 28 FORM - 25 Slabs 0 - 50 1 - 100 No. of Customers 1,283,506 588,984 201 -300 148,509 301 - 400 37,664 401-500 12,418 501-800 4,964 601-700 2,419 701-800 1,386 801-900 832 901-1000 644 1001 -1100 477 2,619,396 1 - 100 101 - 200 401400 301-400 501400 501-700 701400 601-900 101-1000 1001-1100 Revenue Re.111111on Average Rate FteJkWh 395.736 862.681 2.18 663.121 2,834.764 4.27 1,158.708 7941.866 6.85 680.372 4,667.359 6.86 321.567 3,424.668 10.65 162.732 1,733.407 10.65 395.736 663.121 739,593 101 - 200 Total 040 201-300 Annual Consumption MAKINH) 1,158.706 680.372 - 321.567 162.732 94.052 62.470 44.479 32.314 ' 25.206 . 19.490 395.736 663.121 - 1,154,706 680.372 321.567 162.732 94.062 62.470 44.479 25.204 32.314 _ 19.490 94.052 1,001.641 10.65 62.470 665.302 10.65 44.479 591.112 13.29 32.314 429.475 13.29 25.206 334.996 13.29 19.490 260.028 13.34 3,660.245 24,747.299 6.76 29 FORM - 26 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Provision for Tax Rs. Million Sr. No. Provision for Tax allowed Actual tax paid during the FY 2011-12 1st CM I 2nd Qrt I 3rd Qrt I Total firth art ke 40° 4"f* 04Q‘e *OP. N _ _O _S) ' - 1 - I - I - I - 30 FORM - 27 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Existing & Proposed Tariff Statement .. asw Consolidated) . o Descripden Sales Sales Mlx (mawh) (44•2) No. of Consumers Load Factor Connected ', Load ' (kW) . . MDI Charged IMIAV) NEPRA Existing Tariff Variable Fixed Charge Charge (R•/kW/M) 14•20 (Rs/kWh) Difference Variable Fixed Charge Charge Proposed New Tariff Variable Reed Charge Champ (RWIMILI) (RslIAM.1) (ftalkWON) pa•AWn) Readdentlal Up to 50 Unita 3513.58 4.07% - 3.00 - - 9.80 - 14.22 - 4.62 13.00 19.25 3.00 - 1,019,395 - For peak load requirement up to 5 kW - 01-100 Units 1,946.83 22.20% 654,254 101-300 Units 1,175.07 13.40% 1,053,534 284.37 3.02% 168,969 - 15.50 - 22.95 - 6.25 301-7000nb 86.57 0.99% 22,253 - 16.50 - 24.43 - 7.93 Above 700 Unite 7.45 6,695,496 For peak bad requirement exceeding 5 kW Time of Use (TOIL) • Peak Timed Use (TOU) - Ort-Peak E•1(1) (55 )TERP. Total Residential Commercial - A2 Commercial For peak load requirement up to 5 kW Commercial (4100) Commercial (420 WM For peak load requirement exceeding 5 kW Regular Tble of Use (TOU) - Peak (A- 2) Time of Use (TOU) - OR-Peak (Tamp) Temp E-II (56) Total Commercial 4.37 0.06% - 0.016 - 15.00 - 22.21 - 7.21 21.92 0.22 3,811.94 0.25% 0.00% 1,874 184 54,590 •1,084 4.58% 2.35% 0.127 - - 9.50 16.50 - 14.07 4.57 - 24.43 - 43.118% 2,920,434 6,751,169 6.52% 0.142 - 258.72 2.95% 334,258 487,320 6.06% - - 25.17 - 8.17 - 0.00% - - - - - 8.97 7.21 4.57 8.17 - - 17.00 - 7.93 ' 0.07% - - - 8.56 73 6,273 11.94% 0.029 400 14.50 400 21.47 36.96 0.42% - 400 15.00 400 22.21 - 1.76% 0.07% 5,671 878 192,531 11,005 0.172 158.11 8.14 9.28% 6.37% 0.951 - 400 - 9.50 17.00 400 14.07 25.17 - 464.48 513% 340,978 697,129 7.61% 1.162 188.94 2.15% 23,820 131,628 16.39% 0.000 - 0.34% - 0.223 - 12.00 15.00 17.77 22.21 - 5.77 29.79 184.60 2.11% 12,234 178,729 11.92% 1.396 - 9.50 14.07 - 4.57 45,131 18.40% 0.172 0.743 400 400 - 7.21 Industrial B1 8-1 (09) TOO peak 13-1 (09) TOD off peak 8.2 A (10) - 64.83 0.74% 594 191.05 2.13% - 82 - TOU (Off-peak) 1,154.98 13.17% 83 • TOU (Peak) 83 - TOU (06-peek) 130.38 1.49% 5 9,863 905.89 10.33% 255 374,004 02 - TOU (Peek) 94 - TOU (Peak) . 84 - TOU (Off-peak) E-2 (58) TEMP. Total Industrial 8,411 _ 709,187 18.59% 27.64% - 400 15.00 400 18.29 22.21 - 5.29 4.209 400 9.30 400 13.77 - 4.47 0.448 380 14.70 21.77 2.547 380 9.20 380 380 13.62 - 4.42 0.196 380 14.50 360 21.47 - 6.97 1.158 - 380 - 9.10 12.00 360 13.48 17.77 : 4-.38 5.77 • 400 13.00 19.25 - 6.25 0.015 11.50 400 17.03 - 5.53 0.008 400 15.00 400 22.21 7.21 73.49 0.84% - 498.53 0.18 5.66% 0.00% 11 - 204,393 - 3,420.45 39.01% 41,331 1,650,935 23.55% 11.090 0.28 3.94 0.00% 38 195 56 4,599 15.33% 9.79% 0.001 0.04% 2.26 0.03% 27.73%_ 11.00 7.21 7.07 Bulk Cl(a) Supply at 400 Volts - up to 5 kW Cl(b) Supply at 400 Volts -exceeding 5 kW 0.033 400 9.30 400 13.77 - 0.103 0.033 380 380 11.40 16.88 21.77 - 15.23% 0.095 380 14.70 9.20 380 380 380 13.62 3.88% 0.087 360 11.30 380 16.73 - 1 30,958 44.97% 0.051 0.200 380 360 14.50 9.10 360 380 21.47 13.48 - 6.97 4.38 , 220 137,1511 23.49% 0.625 0.37% 3,297 30,852 11.95% - - 11.00 16.29 - 5.29 70 36,142 5,817 19.40% 0.052 200 9.50 200 14.07 103.18 589.02 0.11% tie% 6.72% 401,810 18.73% 0.939 3.980 200 200 14.50 9.10 200 200 21.47 13.48 - 6.97 4.38 733.82 , 9.37% 39,509 431,079 Public LAditing G 6.98 0 Oe% 1 518 10 505 15.00 • Residential Colonies ti 3.73 0.04% 111 8,080 - 14 00 - C-1C0309 T PEAK O-1O(23) T 0FF-PEAK C2 Supply 1111 kV Tkne of Use (TOU) - Peak Time of Use (TOU) - Off-Peak C3 Supply above 11 IN Time of Use (TOU) - Peak Tkne of Use (TOU) - Off-Peak Total Single Point Supply - - 10.24 0.12% 82 9,254 54.48 8.31 0.62% 0.09% 22 - 10,151 • - 37.30 0.43% 17 27,953 18.213 0.21% 4 54,048 25.23 121.95 0.29% 1.39% - 252.23 3.22% 32.08 9.54 12.63% 61.24% 4.47 5.48 7.07 4.42 5.43 Agricultural Tuba-walls - Tariff 0 01 Scarp 132 AgrIculluel Tube-web Time of Use (YOU) - Peak 0-113 Tem of Use • - Off-Peek D18 Total Agricultural Special Contracts - TarIRK (MK) Time of Use (TOU) - Peak Time of Use (TOU) - OR-Peak Railway TmclionTraction - 1 Co-Clovollon-J Orand Total 8,76783 - . 100% . 7.59% 7.00% , - .. . 3,348,000 9,891,055 10.33% 17.961 - 4.57 I - 7.21 - 6.73 - - 22.21 20.73 FORM - 27 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Existing & Proposed Tariff Statement (Monthly , Quarterly as well as Consalkiatod) Sales Saks. Mb) (MINA) (Mead) Description Load Factor Connected Load No. of Consumers MIN Charged (SKIN) Residential (Mn R.) 356.58 4.07% 1,019,395 1,070 1,070 2220% 654,254 18,690 27,877 8,987 1,946.83 1340% 3,02% 6,068 1,970 284.37 1,063,534 188,969 22,822 7,346 1,175.07 15,278 4,098 0.99% 22 253 1,428 2,115 687 86.57 Up to 50 Unto For peak load requirement up to S kW 01-100 Units 101-300 Units (min R.) (Min R.) Min Rs) (Min R.) (Min R.) (kW) Difference Variable Fixed Charge Charge Proposed New Tariff Variable Fixed Charge Charge NEPRA Existing Tartfi Variable Fixed Charge Charge 301-700UnIts Above 700 Units 6,695,495 For peak load remdrement exceeding 5 kW Tine of Use (TOU) - Peak Tins of Use (TOU) • Off-Peak E-109 (55 ) TEMP. Total Residential 0.02 66 97 32 4.58% 2.35% 0.127 208 4 308 5 100 2 6,751,169 6.52% 0.142 40,839 59,963 19,124 487,320 8.08% 4,398 8,513 2,115 334,256 73 8,273 11.94% 4.37 0.05% 21.92 0.22 025% 0.00% 1,874 184 54,590 1,084 3,865.94 43.05% 2,920,434 258.72 2.95% Commercial - A2 Commode' For peak load requirement up to 5 kW 0.00% Commercid (<100) Commerclsl(<20 KW) For peak load requirement exceeding 5 kW Regular Time of Use (TOU) Peek (A-2) Time of Use (TOU) - Off-Peak (Tamp) Tamp Commercial E-11 (56) Total Commercial 6.56 0.07% 141 48 89 821 380 2,196 154 267 713 50 451 9,526 3,191 3,358 882 1,090 215 2,597 843 0.42% 1.75% 0.07% 5,871 878 192,531 11,005 9.26% 8.37% 0.951 380 454.45 5.30% 340,575 697,129 7.111% 1.162 461 6,635 18994 2.15% 23,820 131,628 18.39% 0.00 12 234 176,729 11.92% 1.398 0.172 0.743 69 297 713 2,868 69 1,058 343 297 4,244 15,906 2,838 1,378 5,165 0.34% B-1 (09) TOO off peak 2.11% 192 A (10) 64.83 191.05 0.74% 1,154.96 13.17% 130.38 • 133 - TOU (Peak) 83 - IOU (Off-peek) 12 38.98 29.79 82 - TOU (Peek) 132 - TOU (Off-peek) 95 156.11 6.14 184.60 13-1 (09) TOD peak 12 69 554 1,483 104 Industrial B1 0.03 0 172 905.69 73.49 - 0.223 2,287 447 1,754 594 45,131 18.40% 8 411 709,187 18.59% 4.209 1,884 10,741 1,684 9 863 0.446 159 2.547 0.196 968 71 1,917 8,332 189 374 004 0.00% 27.64% 27.73% 1.158 417 2.15% 1.49% 10.33% • . 5 255 12,339 1,578 4,007 512 4,518 2 417 6,691 3 2,173 1 3,674 34,623 3,674 51,272 16,649 5 2 6 45 8 67 22 0.008 3 34 3 50 16 0.033 0.103 13 39 95 821 13 141 919 1,066 408.53 0.18 0.84% 5.66% 0.00% 11 . - 204,393 3,420.46 39.01% 45,331 1,660,936 23.66% 11.090 Bulk C1(s) Supply at 400 VaSt - up to 5 kW 0.26 0.00% 38 195 0.001 C1(b) Supply at 400 Vat'-exceeding 5 kW 3.94 0.04% 58 15.33% 9.79% 2.26 10.24 54.46 0.03% 0.12% 0.62% 8.31 0.09% 37.30 18.28 0.43% 0.21% 25.23 121.95 0.29% 1.39% 1 30,958 44.97% 20223 3.22% 220 137,155 32.08 9.54 0.37% 3,297 70 30,652 103.18 589.02 733.52 1.18% 6.72% 2.37% 3ff 142 39,509 401,810 438,079 8.98 0.05% 1 518 7.59% 0.04% 111 7.00% 52 3.73 10,505 8,080 105 5,767.63 100% 3,345,000 9,691,056 10.33% 64 --TOU (Peak) B4 - TOU (06.peak) TEMP. E-2 (58) Total industrial PEAK C-1C(26) T C-1C(26) T OFF-PEAK C2 Supply at 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peek C3 Supply above 11 kV Time of Use (TOO- Pail( Time of Use (TOU) - Off-Peek Total Single Point Supply Agricultural Tube-welts - Tariff D DI scarp D2 Agricultual Tube-wells Time of Use (TOU) Peek 0.18 Time of Use (TOU)- 011-Peak D113 Told Agriculture) Public U3111090 Residential Colonies H Special Conked. - Trot K (MK) 0.11% 82 22 17 4 4,599 9,254 10,151 27,953 54,048 5 617 1263% 81.24% 922 968 71 0.015 3 39 12 181 48 299 59 185 0.033 12 122 0.095 38 36 508 0.087 31 343 207 31 306 99 18 72 386 1,110 18 72 542 1,843 176 534 232 2,946 232 4,363 1,417 23.49% 0.051 0.200 0.626 0.052 10 353 91 10 523 134 170 11.95% 19.40% 0.939 3.960 4.951 188 792 990 1,496 5,380 7,300 15.23% 3.86% 18.73% 11.12% 188 792 MOO 2,215 7,938 10,610 155 77 44 719 2,578 3,510 50 25 Time of Use (TOU) - Peak Time of Use (TOU) • Off-Peak Railway TractionTraction - 1 Co-CienratIon.J Grand Total 17.961 6,367 92,500 6,357 136,4611 43,966 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED July 2012 Revenue & Subsidy Statement Sales Sales Mix (MWA) (16•00 Description No. of Consumers Connected Load Load Factor (kW) (1644•) EPRA Determined Ts Variable Fixed Charge Charge (lis/kW/M) (RWINVII) MDI Charged (MkW) Subsidy Variable Flied Charge Charge GOP Notified Tariff Vertable Fixed Charge Charge (R./kWh) (121/kW/M) (Rs dtaftwin IM) Residential 21.21 U. to 60 Units rrilATEIIIIIMMIE GOP 01.100 Una' 101-300 Units 301-700Un6s NEPRA 153.15 GOP 148.54 NEPRA 183.87 - 2.00 - 1.00 - 3.81 21.65% 548 401 - 9.80 - 5.79 17.41% 1 107,949 - 13.00 - 8 11 4.89 44.97 56.92 5.34% 251,1138 - 15.50 - 12 33 - 3.17 NEPRA GOP 15.85 1.88% 39,5138 - 18.50 - 15 07 - 1.43 NEPRA 15 85 0.002 - 15.00 a • 9 50 18 50 13.99 - 1.01 8 22 15 50 - 1.28 1.00 14.77 - 2.23 - - GOP Above 700 Units 18223 3.00 - 772,921 2.52% 8,513 119 11512 Time of Use TrEll 0.42 0.05% 2.46 0.02 029% 0.00% 1,885 155 37,409 992 9.02% 2.94% 0.013 • 413.81 49.13% 2,722,047 8151,120 6.16% 0.016 - 27.72 3.29% 310,999 480,605 7.90% 0.85 0.08% 3.25 0.39% 14.80 0.35 1.73% 0.04% 5,420 831 177,531 9,079 46.66 6.63% 317,311 B1 20.78 2.47% 21 858 B-1 2.77 17.29 0.33% 2.05% 11,719 142,781 8.35 0.75% 527 59,129 18.45 1.95% 843,781 9,833 19.67% 328,848 25.08% • - Ptak Time of Use (TOU) - Off-Peak E-1 p 55 TEMP Total Residential Commercial • A2 COTRISCIal For-peak load • utrement to 5 kW • 17.00 - COMMON 41 R • ular Tkne of Use (TOU) - OR-Peak E-1 56 TEMP. Total Conunerclal 0.004 400 14.50 400 9.72 - 4.78 0.022 400 15.00 400 13.20 - 1.80 1.13% 5.23% 0 119 400 9.50 17.00 400 8.01 15 00 - 1.49 2 00 676,224 9.46% 0.146 157 479 1807% - 1,01 - 1.28 2.23 8,009 65 11.12% ktdustrial 13-1 • • TOO ark TOO ce • ak - 12.00 - 10 51 - 15.00 18.59% 0.104 0.021 9.50 11.00 13 99 8 22 14.72% 400 400 9.14 0.086 400 15.00 400 12.77 - 0.372 0.024 400 9.30 14.70 400 8.01 - 1.29 380 - 0.187 380 9.20 0.012 MO 360 14.50 380 360 12.88 7.75 92.44 4.70 10.98% 0.56% . ' 7,872 5 83 - TOU 94 - TOU • sic 80.20 7.15% 238 2.65 0.32% 84 .. TOU (Off-peak) TEMP E-2 (55) 41.39 0.02 4.92% 0.00% 10 200,558 28.27% 0.099 266.03 31.49% 42,229 1 642,386 23.64% 0.902 0.03 0.00% 35 251 13.98% 0.38 0.05% 51 0.000 0.003 0.23 1.05 0.03% 82 - TOU (Off-peek) 83--IOU Total industrial Bulk ,,, at 400 Volts - • to 5 kW Ci • Cl • Sual ;;,400 Volts -exceed • 5 kW 0.-1C PEAK I C-1Ctui T OFF-PEAK - ......, This of Use • - Peek ...,, - Peak Time of Use Time of Use (TOU) - Off-Peak Total Shpts Point Supply 0.13% 77 . .4,889 8,449 18,502 380 Public 0 Residerdiel Colonies H Special Contracts -1.48 K (AJK) 0.50 - 1.45 • 400 13.00 11.50 400 11.55 0.001 400 15.00 400 13.01 - 1.99 n 39% 0.004 400 9.30 400 8.01 - 1.29 49.15% 0.018 0.002 380 11.40 380 10.25 - 1.15 380 14.70 380 12.80 - 2.10 10.75% 13.79% 0.10% 20 3.74 0.44% 18 18,883 27.13% 0.011 4 8.53% 0.012 380 360 9.20 11.30 380 64,718 380 7.75 10.10 380 360 14.50 9.10 380 380 200 11.00 - 9.50 120 6.77 200 200 14.50 9.10 200 200 - 15.00 14.00 4.03 0.45% 1.98 9.87 0.24% 1.15% 19,900 88.57% MINI 3.39% 1 204 0.003 0.0144 133,670 29.28% 0.066 3.83 0.45% 2,484 41,794 1.13 0.13% 608 5,522 12.55% 28.08% 11.02 71.29 1 31% 6.47% 33,842 381,817 25.59% 0.005 0.090 0.338 87.27 10.37% 912 428,933 27.117% 0.433 0.39 0.38 0.05% 0.04% 1,415 103 10 498 5.07% - 5,978 13.37% 100% 3,120,226 9,348,106 12.33% - Time of Use (TOU) - OR-Peak 641.69 1.661 • 1.15 10.35 8.64 0.80 Time of Use (TOU) - Peak Grand Total - 360 • Railway TrecuenTrecSon -1 Co-GenratIon-.1 - 12.37 7.48 11.50 2.02 1.45 2.13 9.10 12.00 •'Mullins! Tubs-wails - Tariff D • D1 Scarp 02 AgrIcullusi Tube-wels Time of Use • - Peak 618 Tins of Use (TOU) - Off-Peak 1318 ultural Total 1.49 0.017 1.45 - 1.20 12.18 7.35 - 2.32 1.75 10.00 80 2.73 13.00 8.00 - 1.50 1.10 - 13.73 - 1.27 - 12.92 - 1.08 1.00 FORM - 23 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quarterly as well as Consolldatete MDI Chirped (M6W) Load Factor Connected Load No. of Sales Mix Consume's Sales Description (tinge) (%em ) Residential 772,921 64 42 21 21.55% 548,401 1,470 1,055 415 17.41% 1,107,949 2,128 1,188 939 5.34% 251,168 882 555 328 1.88% 39,588 258 236 22 6 23 0 6 20 0 0 3 0 4,832 3,103 1,729 471 409 82 21.21 2.52% GOP 182.23 Up to 50 Units 0.00% For peak load requirement up to 5 kW 01-100 Units NEPRA 153.15 101.300 Units GOP 148.54 NEPRA 183.67 301-700UnIta GOP 44.97 NEPRA 56.92 Above 700 Units GOP 15.65 NEPRA 15.85 Subsidy Variable Fixed Charge Charge (Min Re) (Mn Re) EPRA Determined Tar OOP Notified Tariff Variable Fixed Variable Fixed Charge Charge Charge Charge (Min Rs) (Min RI) (Min IN) (Min Rs) 6,513,119 0.00% For peak load requirement asceadng 5 kW Tone of Use (TOU) - Peak 0.42 0.05% This of Use (TOU) - Off-Peak E- 15) (55) TEMP. 2.46 0.02 0.29% 0.00% 413.61 41.13% 27.72 0.65 Total Raeldenttel Commercial - A2 Commercial For pia load requirement up to 5 kW 1,885 155 37,409 992 9.02% 2.94% 2,722,047 6,661,620 8.66% 329% 310,999 480,605 7.90% 0.08% 65 8,009 11.12% 0.002 0.013 0.016 Commtwelal (<100) Communist (<20 KW) For peak load requitement exceeding 5 kW Regular Time of Use (IOU) - Peak (A-2) Time of Use (TOU) - Off-Peak (Tamp) TEMP. E-1(0) (56) Total Commercial 81 8-1 (09) TOO peak B-2 A (10) 676,224 20.78 2.77 2.47% 21,858 157,479 18.07% 0.33% 2.05% 11,719 0.017 249 42 16.59% 0.104 184 0.75% 1.95% 527 142 781 - 59,129 14.72% 0.021 0.066 7 872 10.98% 0.58% 5 7.15% 238 10 41.39 0.02 201.03 4.92% 0.00% 31.41% Club Supply at 400 Volts - up to 5 kW 0.03 CI (b) Supply a1400 Volts -exceeding 5 kW 0.38 Time of Use (TOU) - Peak Time of Use (TOU) - 011-Peak Tone of Use (TOU) Peak Time of Use (TOU) - Off-Peak Total Single Point Supply D2 Agricultual Tube-viebil Time of Use (TOLO - Peak D-18 Time of Use (TOU) - Off-Peak DIB Total Agricultural Public Lighting 0 Resident's' Colonies H 25 08% 0.187 71 0.012 4 9 654 38 71 4 467 9 87 33 6 38 309 0 68 0 304 2,276 314 0 0 4 3 0 8 1 8 2,670 35 51 .77 251 13.98% 0.000 4,889 10.75% 0.000 1 0.23 1.06 0.00% 0.05% 0.03% 0.13% 6.64 0.79% 20 22.39% 49.15% 0.003 0.001 0.004 0.80 0.10% 16 1 3.311% 3.83 3 119 304 0.24% 1.15% 31 39 142 80 0.902 18,863 64,716 218 740 23.54% 4 13 9 1,1142,3191 0.44% 0.48% 681 149 42.229 4.03 1.98 9.87 26.66 65 880 69 38 18,502 22 58 210 0.099 8,449 117 5 8 27 28.27% 0 1 0 4 3 2 6 10 78 2 8 ea 1 4 10 29 4 0 0 2 5 5 0.016 1 12 27.13% 0.002 8.53% 0.011 0.012 0.003 0.062 4 4 34 48 1 5 29 BB 1 5 41 24 71 5 17 26 302 26 268 43 19,900 66.57% 204 133,570 29.211% 0.45% 2,464 41,794 12.55% 1.13 0.13% 806 5 522 28.08% 11.02 71.29 1.31% 8.47% 33,842 381,817 87.27 10.37% 36,112 428,933 25.59% 27.67% 507% 6 0 0.0% 10,498 5 0.39 0.38 1,415 5,976 8 37% 5 5 0 84101 100% 3,120,226 1,348,106 12.33% Agricultural Tube-wells Tariff D DI Scarp 328,848 0.372 0.024 149 0.00% 19.87% 48 70 247 200 558 3.74 C3 Supply above 11 W 843,781 9,833 8 27 3 8 22 12 37 377 0 Bulk C2 Supply at 11 kV 674 317,316 0.32% C-1C(213) T OFF-PEAK 68 5.53% 2.65 PEAK 0.145 46.66 11.26% 5.23% 11:45% 60.20 C-1C(28) T 139 8 177,531 9,079 92.44 4.70 Total Industrial 48 831 16.45 84 - TOU (Off-peek) TEMP. E-2 (513) 0.119 5,420 1.73% 0.04% 82 - TOU (Off-peek) B4 - TOU (Peak) 49 0.39% B2 - TOU (Peak) B3 - IOU (Peak) 63 - IOU (Off-peak) 9 9 3.25 17.29 6.35 8-1 (09) TOD off peak 2 0.022 14.60 0.35 Industrial 6 43 2 9 0.004 0.0% 103 0.433 4 38 42 0.005 0.090 0.338 1 11 1 8 18 88 87 160 849 18 68 143 570 161 56 760 0.420 3 17 78 0 102 Special Contracts - Tariff K (AJK) Time of Use (TOU) Peak lime of Use (TOU) - Off-Peak Railway TractionTraction - 1 Co-Genrationsi Grand Total 1.547 473 9,350 473 5,888 0.420 2,363 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement September 2012 (Monthly , QuanNly as well as Consolldat Description Sales Sales Mix I Nowa I Morn No. of Con Consumers Connected Load Load Fatter (Wi) iltagal Residential NEPRA Determined To Fixed Variable Charge Charge (RAMA) Mend" 00P NotMed Tariff Fixed Verlaine Charge Charge (RIAWA1) (Rommi Subsidy Fixed Variable Charge Charge (RaikW44) (RsAwin ' U • to 50 Units For MDI Cha ed Charg (WWI load 15.88 1.82% 575,814 GOP 20565 23.83% NEPRA 188.90 0.000 - 3.00 - 2.00 - 1.00 - 511 161 . 9 80 - 5.79 - 3.81 21.14% 1284,630 - 13.00 - 8.11 - 4.89 !foment u to 5 kW 01-100 Units 101-300 Units GOP 182.43 NEPRA 207.30 301-700Un8s GOP Above 700 UMW NEPRA GOP NEPRA 52.45 64.33 6.08% 327 408 - 15.50 - 12.33 - 3.17 15.29 15.29 1.77% 39 037 - 18.50 - 15.07 - 1.43 0.002 - 15.00 - 13.99 9.50 18.50 - 8.22 15.50 - 1.28 1.00 14.77 . 2.23 - 6 555 599 For• sk load • .5 kW . - Tkne of Use (TOU) - Peek 0.48 0.05% Time of Use (TOU) - Off-Pink E-1 p 55 TEMP. 2.47 0.02 0.29% 0.00% 2,094 156 39,893 1,047 8.48% 2.74% 0.016 - 474.44 54.99% 740,300 6,596,539 9.85% 0.0111 - 3.33% 312,040 481,787 8.17% 62 7,261 11.80% 181,898 10,049 12.01% 9.82% 0.085 680,775 10.00% 0.104 152,841 17.38% Toast Residential Commercial • A2 Corn:retie, For • ak load requirement u • to 5 kW 28.75 Commercial v1 - • 17.00 0.004 400 14.50 400.00 9.72 0.015 400 400 - 15.00 400.00 13.20 9.50 17.00 400.00 8.01 15.00 - 12.00 - - 15.00 - 9.50 11 00 15.00 9.30 400 400 400 12.77 8.01 0.00% Commercial (.20 KW) For load . 5 kW exc R • lar Time of Use (TOU) - Peek (A-4 . 0.83 0.07% 3.87 043% 15.94 0.72 1.85% 0.08% 49.70 5.78% 5,832 841 318,575 19.38 224% 21,342 2.65 0.31% B-1 lJ TOO off • sit B-2 A 1. 16.90 5.33 1.96% 82 - TOU 15.81 Tlms of Use (TOU) - Off-Peak TEMP. EA(' (56) Total Commercial 1.01 4.78 1.80 - 1.49 2.00 Industrial 81 13-1 TOD • sit 82 - TOU 83 - TOU ea 94.74 ■ 8.77 83 - TOU Off. 81.38 84 - TOU ■ 3.24 84 - TOU (00-peak) 31.18 E•2 TEMP. 0.02 am 148,734 15.57% 0.82% 12 388 484 54,242 13.45% 1.53% 10.98% 8 010 19.68% 0.78% 7.11% 4 859;342 9,818 0.348 0.034 242 333,598 25.20% 0.201 0.108 0.018 0.080 0.35% 400 400 400 380 10 51 13.99 1.49 8.22 9.14 1.28 1.01 - 2.23 1.29 2.02 1.45 14.70 380 12.88 0.013 380 380 9.20 14 50 380 360 7.75 12.37 360 9.10 12.00 360 - 7.46 11.50 - 0.50 - 2.13 3.51% 0.00% 10 200,556 21.30% 0.093 257.37 29.83% 42,480 1 558 929 22.52% 0.581 C1 ■ w at 400 Volts • to 5 kW 0.02 0.00% 35 -- 251 12.85% 0.000 - 13.00 - 11.55 - 1.45 c1 • Su ,y at 400 Volts 0.40 0.05% 51 4,889 11.14% 0.002 400 11.50 400 10.35 - 1.15 PEAK 0.24 0.03% 0.001 400 15.00 400 13.01 - 1.99 C-lC t,;) T OFF-PEAK 1.18 0.13% 79 7,100 22.30% 0.004 400 9.30 400 8.01 - 1.29 ' '..:., Time of Use 0 Time of Use • 6.29 0.73% 20 18,002 47.83% 0.015 1.15 0.09% - Off-Peek 3.60 0.42% 18 18,883 26.16% 0.002 0.010 10.25 12.80 - 0.75 11.40 14.70 380 - Posit 380 380 380 9.20 7.75 1.45 4.59 0.53% 4 84,718 9.72% 0.013 380 10.10 - 1.20 Time of Use Time of Use - Peak - Off-Peek 1.89 9.24 0.22% 1.07% 19,900 63 61% 360 360 380 360 12.18 7.35 - 1 0.003 0.014 11.30 14.50 9.10 380 380 - - 2.32 1.75 28.18 3.27% 206 133,721 25.86% 0.062 3.78 0.85 0.44% 0.10% 2 445 41,455 12.50% - - 11.00 .. 10.00 810 6 300 18.37% 0.005 200 9.50 120 8.77 80 2.73 6.31 41 0.73% 4.75% 385,872 14.68% 0.083 0.325 200 200 14.50 9.10 200 200 13.00 8.00 - 34,164 52.22 6.05% 433,427 16.50% 0.412 0.51 0.06% 1 419 6.71% - - 15.00 - 0.05% 103 9.69% - - 14.00 - 13.73 0.43 10,520 8,052 12.92 - 100% 3,140,302 9,419,963 12.55% 1.485 Total Industrial Bulk C-1C T • • 0 kW 01 02 I Tube-wells Time of Use • - Peak D-18 Time of Use 0 - Off-Peek13113 Public 0 Residentiel Colonies H LT-7 ......1_,:aina.V...J111111 Timis of Us* • -peak Time of Use • - Off-Peak R TractIonTrection - 1 Co-GenrallorKI Grand Tote! - - - - 862.86 MIMI 380 - '7 O 2.10 1.00 1.50 1.10 1.27 1.08 FORM - 25 (A) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quarterly as well as Consolidated) Connected Load No. of Sides Mix Calumnious Sales Description Load Factor IEPRA D0550510.0 Tart MO) Charged Variable Rod (MkW) Charge Charge (11eu) Oat Rs) ((W nimul MON ) 47 31 16 511,161 1,621 1,191 431 1 284 830 2,695 1,480 1,215 997 647 350 252 230 22 Up to 50 Units For peak load requirement up to 5 kW GOP 01-100 Units 15.88 1.52% 575,814 205.65 0.00% 23.53% NEPRA 168.90 101-300 Units GOP 182.43 207.30 21.14% 301-700Unds GOP 52.45 64.33 6.06% 15.29 15.29 1.77% NEPRA GOP Above 700 Units NEPRA (Min Re) (Min Rs) (MN Rs) (Min Re) Min Re) ReaktanUal NEPRA Subsidy gertaMe Fixed Charge Charge GOP Nagged Tariff Variable Fixed Charge Charge 0.000 39,037 8,555,599 For peek load requirement eimeeding 5 kW 0.05% 0 48 Time of Use (TOU) - Peak Time of Use (TOU) Off-Peak E-1(1) (551TEMP. Total Residential 2.47 0.02 0.29% 0.00% 2,094 156 39,893 1,047 474.44 54.59% 2,740,300 6,696,639 2.74% 9.55% 25.75 3.33% 312,040 .481,787 8.17% 0.002 7 6 0 0.016 23 0 20 0 3 0 0.016 6,643 3,606 2,0311 489 425 64 6 48 3 7 Commercial - A2 Commercial For peak load nwpilrement up to 5 kW 0.00% Commercial (4100) Commercial (u20 KW) For peak load requirement exceeding 5 kW Regular Time of Use (TOU) - Peak (A-2) Time a) Use (TOU) Off-Peak (Temp) TEMP. 6100 (56) Total Commercial 0.00% 0.83 3.67 0.07% 0.43% 62 7,261 1594 0.72 49.70 1.95% 0.06% 5,632 841 limos* 10,049 0.00% 9.82% 5.76% 315,575 650.775 10.00% 19.36 2.24% 21,342 152,641 17.38% 2.65 0.31% Industrial Ell 11.80% 9 55 0.004 6 34 151 12 34 126 11 24 0.104 42 714 42 618 99 232 203 29 40 37 3 161 0.016 0.108 001 is , 0 050 24 9-1 (09) TOO peak TOO off Peek B-1 B-2 A (10) 16.90 1.96% 5.33 112 - TOU (Peak) 15.81 0.62% 1.5.3% B2 • TOU (011-peak) 94.74 10.98% 8,010 659,342 19.68% 0.346 139 63 - TOU (Peek) B3 - TOU (011-peek) 6.77 4 9,818 333,596 000v. 0.034 61.36 0.75% 7.11% 25.20% 0.201 13 76 B4 - TOU (Peek) B4 -TOU (05-peak) 0-2 ism TEMP. 3.24 0.38% - 31.18 0.02 3.61% 0.00% 10 - 200,558 - 257.37 29.53% 42,410 0.02 0.40 0.00% 0.05% 35 51 Total Industrial Bulk C1(4) Supply al 400 Voila - up lo 5 kW 01(b) Buggy at 400 Vole -exceeding 5 kW CAWS) T au 1.16 PEAK C-1C(26)T OFF-PEAK 0.03% 148 734 1557% 13.45% 54,242 - 12.388 484 - 242 .. 237 881 99 . 139 411 24 202 - 35 139 759 86 - 122 14 476 40 -... 89 7 585 47 13 76 5 0.013 21.30% ,... 0.093 33 - 284 0 33 - 2 33 0 - 51 0 22.62% 0.559 297 2,606 297 2.223 - 341 1,655,929 251 12.55% 11.14% 0.00% 0.000 0.002 - 4,889 - - 0 - 0 1 5 1 4 - o 0.001 0 4 0 - 0 11 3 9 64 0 - 0.13% 79 7,100 2230% 0.004 1 0.73% 0.09% 20 18,002 47.83% 0.015 6 72 1 6 - 0.00% 0.002 26.16% 0.010 0.013 1 4 6 11 33 1 4 9 28 52 48 1 5 27 84 23 296 5 1 5 23 C2 Supply a111 kV Time of Use (IOU) - Peak This of Use (TOU) - Off-Peak 629 0.75 3.80 0.42% C3 Supply above 11 IN Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak Tote Single Point Supply 4.59 1.89 9.24 25.16 0.53% 0.22% 1.07% 3.27% 206 18,883 64 718 19,900 133,721 3.76 0.44% 2 445 41 455 12.50% - 8,300 18.37% 0.005 1 8 1 8.31 41.26 0.10% 0.73% 4.75% 610 34,184 385,672 14.66% 0.083 0.325 17 65 91 376 17 55 62.22 6.06% 37,219 433,427 16.60% 0.412 62 617 62 1,419 10,520 6.71% - 18 4 1 Agricultural Tubs-wells - Tariff 0 DI Scarp D2 Auk:Wool Tub►soils Time of Use (TOU) - Peak D-19 Time of Use (TOU) - Off-Peak D1B Total Agricultural 0.85 Public Lighting 0 0.51 Residential Colcsies H Special Contracts - Tang K (AJK) Ilme of Use (TOU). Peak 0.43 Time of Use (TOU) - Off-Peak Railway TrachonTraction - 1 - Co-Genralion-J Grand Total 10 5 - - 6 0.015 0.068 0.06% - 9.72% 0.00% 63.81% 21.56% - 103 6,052 9.89% 100% 3,140,302 9,419,943 12.65% 0.05% 0.003 0.014 0.082 - 42 - - 8 - 6 - 23 68 264 - 1 - 7 2 5 8 - 4 16 - - 43 4 38 6 - 82 330 466 - 7 - 1 8 - 0 0 2 9 45 0 61 - 562.56 1.455 444 9,793 444 7,171 0 2,622 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement 1st Quarter (Monthly, Qua as well as Consolidated) . ''iI.'f":. (141 (141m11) 0, 7( Mega) (1,1N) OWN) (RelklIVIM) (fturawt) (Parkwnr) (rhAwb) (RannWM) Partying Residential Up to 50 Unite 54.71 For peak toad requirement up to 5 kW 01-100 Units GOP 584.99 NEPRA 482.04 101-300 Unite GOP 504.13 NEPRA 586.70 301-7000nite GOP 156.63 NEPRA 197.02 Above 700 UNts 2.07% 575,814 - GOP 52.12 NEPRA 52.12 - 3.00 - 2.00 - 1.00 - 22.12% 511,151 - - 9.60 - 5.79 - 3.81 19.06% 1,284,630 . - 13.00 - 8.11 - 4.89 5.92% 327,408 - 15.50 - 12.33 - 3.17 - 16.50 - 15.07 - 1.43 . . 0.01 - 15.00 - 13.99 - 1.01 9.50 - 8.22 15.50 - 1.28 16.50 1437 - Z23 1.97% 39,037 6.555,599 Far peak load requirement exceeding 5 kW Time of Use (701.11.. Peak 1.44 Tine of Use (TOU) - Off-Peak E-18) (55) TEMP. Total Residential 0.00% - 0.06% - 7.74 0.29% 0.07 0.00% 2,094 156 39,893 1,047 8.86% 3.18% 0.04 - - 1,361.86 51.50% 2,740,300 6,696,639 9.43% 0.048 - 85.33 3.23% 312,040 481,767 8.09% - - 1.00 - Commercial - A2 Commercial • For peak load requirement up to 5 kW Commercial (<100) Commercial (<20 KW) Far peek load noqutrement exceeding S kW R - - - .. - - 2.01 0.08% Time of Use (IOU) - Peak (A-2) 10.83 0.40% 71rne of Um (70t9 - Off-Peak 48.49 7 261 1.76% 5,632 181,898 11.88% 2.01 0.08% • 841 10,049 9.12% - 148.48 11.14% 318,676 680,776 9.82% 0.354 58.41 2.21% 21 342 152 841 17.47% 7.91 0.30% 8.1(09) TOD off peak 50.03 1.89% 8-2 A (10) 18.47 0.70% TEMP. Taal Commercial - - 62 E-18Q (56) 17.00 - 12.85% - - - - - 4.78 0.011 400 14.50 400.00 9.72 0.052 400 15.00 400.00 1320 0.291 400 9.50 17.00 400.00 8.01 15.00 - 1.49 ZOO - 10.51 13.99 8.22 - 1.49 - 1.01 - 2.23 1.29 - 2.02 2.13 1.80 Industrial 81 8-1 (09) TOD peak 82 • TOU (Peak) 132 • TOU (0ff-peak) 83 - TOU (Peak) Ea • 70U (Off-peak) 134 • IOU (Peek) 134 - TOU (01f-peolt) E-2 (51Q TEMP. Tafel Industrial - - 12,388 • 484 50.16 1.90% - 292.28 11.05% 8,010 - . 0.050 - 12.00 15.00 9.50 148,734 15.38% 0.318 - 54242 15.55% 0.059 11.00 15.00 20.24% 0.186 1.062 400 400 400 400 400 0.088 380 9.30 14.70 400 380 8.01 12.68 0.588 380 9.20 380 7.75 0.038 380 14.50 12.37 380 - 9.10 12.00 360 380 - - 7.48 11.50 - 0.50 13.00 - 659,342 17.88 0.68% 4 9,818 184.13 6.06% 242 333,596 9.16 0.35% - 111.09 0.06 4.20% 0.00% 10 - 200,55e - 25.29% 0.282 710.59 30.24% 42,480 1,558,121 23.42% 2.971 251 - 13.60% 4,889 11.43% 0.000 0.004 400 400 25.20% - 128 9.14 12.77 1.45 Bulk C7 (a) Suppe/ at 400 VoNs - up to 5 kW 0.07 0.00% - C1(b) Supply et 400 Vole-exceeding 5 kW 1.22 0.05% 35 51 C-1C(211) T PEAK 0.74 0.03% C-1C(213) T OFF-PEN( 3.39 0.13% 79 7,100 21.79% 0.004 0.008 20.09 0.70% 20 18.002 56.98% 0.034 2.41 0.00% 11.49 0.43% 18 18,883 27.82% 0.020 0.021 14.91 0.5e% 4 64,716 10.52% 5.86 0.22% C2 UN* at 11 kV Tim* of Use (TO(1) - Peak 7kne of Use (70U) - Off-Ptak C.3 Sup* above 11 kV Timor Use • - Peek Time of Usa (704J) - Off-Peak Total Ski& Point Supply - - - - • 11.50 15.00 400 11.55 - 10.35 - 1.45 1.15 400 13.01 - 1.99 8.01 - 129 10.25 12.60 1.15 400 380 380 9.30 11.40 14.70 400 380 380 9.20 11.30 380 380 7.75 0.049 380 380 - 10.10 - 1.20 380 360 14.50 9.10 MO 360 12.18 7.35 - 2.32 1.75 200 200 200 11.00 120 10.00 9.50 14.50 9.10 80 2.73 200 200 - 15.00 14.00 - 29 28.58 1.08% 1 19,900 65.59% 0.018 0.032 88.77 3.36% 208 133,721 30.31% 0.189 12.03 0.45% 13.25% 0.13% 2,445 810 41,455 3.45 6,300 25.01% 0.015 2.10 1.45 Agricultural Tube•tvelle - Tariff 0 D1 Scarp D2 AgrIcullual Tubemmlis lime of Use (TOU) - Peak 0-113 Time of Use (TOU) - Off-Peak 12113 Total Agricultural Public Lighting 0 Residential Colonies H 30.30 1.15% 199.34 7.54% 34,164 385,672 23.60% 1.000 245.12 9.27% 37,219 433,427 25.82% 1.276 1.38 1.24 0.05% 1,419 10,520 5.91% - 0.05% 103 6 052 9.37% - Special Contracts - TartffK (AJK) - Time of Use (TOU) - Ptak - Time of Use (TOU) - Off-Peak - Raltney TractionTniction - 1 - Co-Genrabon...1 Grand Total 2,544.40 - - 0.281 6.77 13.00 1.00 8.00 - 1.50 1.10 - 13.73 - 1.27 - 12.92 - 1.08 - 27 - 2 - - 100% 3,140,302 1,419,963 12.112% 4.539 FORM • 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quartady as well as Consolidated) . . k nd-4: . .. (MkWe) lKaM) RW1 Ran R.) (16.9•) .. ■ :l . ..... :. (mle R.) (Ma Rs) (Min R•) Ikon RI) PAM R4) ROSM949161 U • to 50 Unita NTEMI rfli ATEMI 01.100 UNIT 101-300 Units GOP 504.13 588.70 301-700Unts NEPRA GOP NEPRA 197.02 158.83 52.12 52.12 NEPRA - . - - - 511 181 - - - 4 628 - 3 387 - 1 240 19.06% 1 284 630 - - - 7 387 - 4 088 - 3 279 5.92% 327 408 - - 3 054 - 1 931 - 1 123 860 - 785 - 75 - - - - - 22.12% 584.99 482.04 GOP 109 - 0.00% GOP Above 700 Units - . 2.07% - NEPRA 55 164 - 54.71 - 575 814 - 1.97% - 39 037 6 555 599 1.44 0.00% 0 OS% - - 7.74 0.07 0.29% 0.00% 2,094 158 39 893 1,047 1,361.85 51.50% 2,740,300 8,594,539 85.33 3 23% 312 040 481 787 IMPATERIMM IES Time of Usa • - Paak Tim of Use • - Off-Peak E-1 i (55 TEMP Total Rultlaatlal 0.006 - 22 - 20 2.66% 0.95% 0.044 - - 74 1 - 64 1 9.43% 0.049 - 16 169 • 10,387 8.09% - - 1 451 - 0.00% - - - - - - - 1 10 - - 0 • 5,782 1 280 - 190 - - - Commercial • A2 717 1 M 1 illE Commercial - - 4100 - - - - 20 140 - 160 4 21 442 34 116 - 2,114 142 - - - 7 261 12.65% 0.011 4 29 - 0.00% 11.68% 9.12% 0.052 0.291 - 21 118 - 680 776 9.82% 0.364 142 152 641 17.47% - - 701 • 0.050 - 15.34% 15.56% 0.318 0.050 . 0.188 24 74 119 475 20.24% 1.082 4 859 342 9 818 0.00% 6 lift 0.35% 242 - 333 598 - 25.20% 0.088 0.588 - 0.038 111.09 0.06 420% 0.00% 10 - 200 556 - 25.29% - 0.282 Total Indusalkl 799.59 30.24% 42,480 1,556,929 23.42% 2.671 C1 ■ • 11400 Volts • • to 5 kW .„ at 400 Volta -excaed • S kW Cl 0.07 0.00% 35 251 13.60% 0.000 1.22 0.74 0.05% 51 0.03% 0.13% 11.43% 0.00% 0.004 0.004 7 100 18 002 21.79% 50.96% 0.008 0.75% 79 20 4 889 - - /IMMInnil R '.4w 2.01 0.06% 82 - 10.63 48.49 2.01 0.40% 1.76% 5 832 181 898 0.06% 841 10,049 1411.48 - 5.64% - 318,575 58.41 2.21% 21 342 7.91 030% - ' 50.03 18.47 1.89% 0.70% 12 388 484 &lie -1.90% - 292.28 11.05% 8 010 17.88 0.66% 84-IOU - oak 184.13 9.18 84- TOU Off • ak E-2 69 TEMP. •PCIILLJZI.M.3G.ZA= . 1ii mitenill Iluzizzita... E-1 355 TEMP. Total Commercial 10 19 372 30 - 89 4 1,523 - 292 - 614 - 67 111 411 - 203 752 24 74 189 841 - 8 84 34 112 425 2 718 425 2 341 - 377 33 283 33 227 223 14 1 894 133 223 14 1 427 113 - 102 - 1 011 1 102 - 829 1 895 5,070 595 Industrial 01 TOO • ak 9.1 8-1 09 TOO off • 13-2 A 1, 132 - IOU • oak 02 - TOU Off-• ak B3 - IOU - oak 83- IOU 011- • k 148 734 54 242 T PEAK C-IC C-1 r.. T OFF-PEAK C2 , m 11 kV • Timm of Use • 3.39 20.00 - Off-Peak ...■ Thu of us. • - Psak Time of Ulm OU - Off-Peak 2.41 0.09% 11.49 14.91 0.43% 0.56% 5.88 28.58 0.22% 1.06% 6,843 0 1,157 o2 Public Time of Use TIme al Usa 0 0.020 7 35 7 4 64 718 19,900 0.021 0.049 8 17 108 169 0.00% 85.69% 30.31% 0.018 0.032 0.199 8 11 85 280 8 17 8 11 151 71 210 70 941 70 804 - 132 33 - 120 1 41 455 13.26% • 8 300 0.015 3 30.30 199.34 245.12 115% 7.54% 9.27% 34,154 385,872 21.01% 23.60% 0.261 1.000 37,219 433,427 25.82% 1.276 52 200 256 1.36 0.06% 1 419 10 520 5.91% 1.24 0.05% 6,052 9.37% - Peak - - - OR-Pgalt - . 9,419,963 12.82% 2,644.40 100% 30 89 0.00% 27.42% 10.52% 810 Grand Total 206 - - 2 445 C•GanvMion-.1 13 0.034 0.13% 9 32 229 3 13 0.45% RaaklentialColonlea H 1 11 3.45 Total . rteultural 0 - 2 12.03 Nual Tuba-web Time of Um OU - Peak 13-113 Timed Use OU) - 011-Po15 D111 - 13 10 27 1 14 18 883 133,721 206 3.36% 68.77 11111117.==5!'.■ •dcultural Tube-welis - Tarlff 0 DI ' • 1 1 2 3 1 18 - 103 • 3,140,302 439 1,814 2,415 17 4.539 1361.79 29,762 1 4 - 23 5 17 - 18 14 50 - 134 12 1 9 45 219 1 286 2 23 52 200 264 394 1,595 2.132 - 19 - 2 18 - 1 20 - - Bulk - 38 247 20 182 - 1,361 22,067 1 7,658 FORM - Za FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement October 2012 (Monthly, Quarterly as well as Consolldat Description Sales (MkWO) Soles Mix No. of Consumers Connected Load Load Factor (M) M.90 i%eliel MDI Charged (1416V) NEPRA Determined Tariff Fixed Variable Champ Chugs (isokW/M) (RWMI) GOP Notified Tariff Fixed Variable Charge Charge (RelltWIM) (1sAWk) !tubule's Fixed Charge Variable Chime (R.AWIM) (Rf45441) Residential .4) to 50 Una' 18.86 2A% 888,987 . - 3.00 - 2.00 For peak load requirement up to 3 kW 01.100 Units GOP 194.33 NEPRA 171.77 101400 Units GOP 140.07 NEPRA 157.33 301-7000nits GOP 28.05 NEPRA 33.35 Above 700 Units GOP 7.81 NEPRA 781 24.4% 821,179 17.6% 1,231 881 13.00 8.11 3.5% 207,494 15.50 12.33 1.0% 17,055 - 16.50 15.07 • 15.00 - 9130 - 5.79 - 1.00 , - - - 3.81 4.89 - 3.17 1.43 8,575,595 For peak load requirement exceeding 5 kW 0.0% Time of Use (TOO) - Peak 0.39 0.0% Tlme of Use (TOLI) • O8-Peak 2.15 0.3% 2,197 41.825 7.09% 0.02 0.0% 158 1,051 2.70% 391.48 49.1% 2,748,951 6,618,272 8.10% 3.2% 312,514 482,272 7.20% E-19) (55) TEMP. Total Rcaldenxei 0.002 0.014 - 13.99 - 1.01 9.50 8.22 1.28 18.50 15.50 1.00 17.00 14.77 0.018 Commercial - A2 Comman331For peak bad requirement up to 5 kW 25.34 Comenwciel (<100) - - Regular 0.88 0.1% TM. of Use (TOU) • Peak (A-2) 3.52 0.4% 15.00 1.9% 0.71 0.1%' 4816 Time of Use (TOU) • OR-Peek TEMP. Total Comnatisiel 2.23 - Con (<20 KW) For peek load requirement exceeding 5 kW ..E.J2) (56) - 0.0% 61 7,191 12.88% 5,734 183,141 11.22% 844 10,204 9.58% 11.7% 319,153 692,808 9.08% 15.58 1.96% 21;148 150,853 14.15% 231 0.29% 14.68 1 84% 12,668 151,444 5.79 0.73% • 493 0.003 400 14.50 400 9.72 0.015 400 15.00 400 13.20 0.083 400 9.50 1780 400 8.01 - 4.78 1.80 - 15.00 1.49 2.00 0.101 IndustrW 81 13-1 (09) TOO peak &1(09) TOD off peak B-2 A (10) - 12.00 - 10.51 - 1.49 0.02 - 1580 - 13.99 - 1.01 13.28% 0.11 - 9.50 - 8.22 - 1.25 54,280 14.81% 0.02 100 11.00 400 9.14 0.07 400 15.00 400 12.77 - 2.23 20.20% 0.3 400 9.30 400 8.01 - 1.29 0.04 380 14.70 380 12.58 - 2.02 82 • IOU (Peak) 15.51 1.94% 132 - TOU (Off-peak) 99.06 12.42% 8,103 871,790 790 0.99% 5 '10.713 65.72 1124% 242 337,274 4.30 0.54% 35.30 4.43% 0.02 0.00% 266.17 33.36% Cl(a) Supply at 400 Volts • up to 5 kW 0.02 0.00% Ciao Supply m 400 Volts -exceeding 5 kW 0.38 0.05% PEAK 0.25 0.03% C-1C(213) T 0FF-PEAK 1.33 0.17% 4.81 0.50% Time of Use (TOU) - Peak 0.85 0.1 1% Time of Use (TOU) - OISPeak 3.94 133 - TOU (Peak) 54 - TOU (Off-peek) 84 - TOU (Peak) 134 • TOU (Off-peak) E•2 (55) TEMP. Total Industrial 10 42,667 203,458 213.6996 23.77% • 0.2 380 9.20 380 7.75 - 1.45 0.01 380 14.50 380 12.37 , - 2.13 Goa 360 9.10 12.00 360 - 0.50 7.48 - 11.50 - 1,679,890 23.08% 0.854 33 231 12.47% 0.000 - 13.00 - 11.55 - 1.45 50 4,850 10.77% 0.002 400 11.50 400 10.35 - 1.15 0.001 400 15.00 400 13.01 - 1.99 82 7,159 25.48% 0.004 400 9.30 400 8.01 - 1.29 14 11,594 58.87% 0.012 380 11.40 380 10.25 - 1.15 0.002 380 14.70 380 12.50 22 25,271 21.38% 0 011 380 9.20 380 7.75 - 2.10 0.49% 0.17 0.02% 3 53,800 0.42% 0.000 360 11.30 360 10.10 - 1.20 2.32 MUM C•1C(26) T Coal 11 kV C3 Supply above 11 W Time of Use (TOO) - Peak 2.15 021% 0.004 360 14.50 360 12.18 10.46 1.31% 2 30,818 48.49% 0.021 360 0.10 360 7.35 - 24.38 3.06% 206 133,721 24.98% 0.066 01 Soup 2.03 0.36% 2,376 37,701 10.39% - m oo - 02 Aptness! Tube-nein 0.89 0 i t% 606 8,251 19.41% 0.005 200 9.50 120 6.77 Time of Use (TOU) - OR Total Single Point Supply 1.45 1.75 Agnculturel Tube-welle - Tarr 0 Time ot U.S (Mtn - Peek 1•113 - 11.00 - 80 1.00 2.73 8.73 1.09% 0.079 200 14.50 200 13.00 57.14 7.16% 34,303 388,572 20.25% 0.323 200 9.10 200 8.00 - 1.10 69.62 8.73% 37,268 430,524 22.16% 0.407 Public MOON 0 0.54 0.07% 1,419 10,520 7.00% • 11 73 - 1.27 Rukientlel Colonies H 0.35 0.04% 103 8,052 8.01% 100% 3,149,7U 11,461.487 11.66% Time of Use (TOU) - Off.Peak Dili Total Agricultural • - Peak Ttme of Use (TOU) • Off-Peak Railway TrectionTraction - 1 - Co-Genration-J Grand Total 797.80 15.00 14.00 Special Contracts - UN K (AA9 Time of the - 1.473 - 12.92 1.50 1.00 FORM - 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly , Quarterly as well as Consolidated) Description Ulu hales Mix (MkWh) (Wigs) Load Factor Connected No. of Load Consumers 0109.1 (ION) Subsidy Variable Charge OOP Notified Tariff Variable Fixed Charge Charge NEPRA Determined Twirl MDI Charged Variable Fixed (MIN) Charge Charge (MM Rs) (UM Rs) Fixed Charge Win Rs) (MM Re) (Min Rs) (Min Rs) Residential 888,987 57 38 19 24.36% 621,179 1,849 1,125 524 1886 Up to 50 Units 2.36% 0.00% For peak load requirement up to 5 kW 01-100 Units GOP 194.33 NEPRA 171.77 101-300 Unto GOP 140.07 157.33 17.50% 1,231 881 2.045 1,136 909 GOP 28.05 312% 207,494 517 348 171 NEPRA 33.35 0.95% 17,055 128 115 11 NEPRA 301-700UnIts Above 700 Units GOP 7131 NEPRA 7131 6,575,598 0.00% For peak load mquIremeni exceeding 5 kW Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak E-1(I) (55) TEMP. Total Residential 0.39 0.05% 2.15 002 351.48 0.27% 0.00% 45.07% 25.34 3.1e% ass 0.05% 0.002 6 5 0 41,825 1,051 7.09% 2.70% 0.014 20 0 18 0 3 0 2,740,551 6,618,272 0.10% 0.015 4,420 2,783 1.837 312,514 482,272 7.20% 431 374 57 61 7,191 12.88% 2,197 158 Commercial- Al Commercial For peak bad requirement up to 5 kW Commercial (4100) Commercial (x20 KW) For peak load reexamined exceeding 5 kW Regular Time of Use (TOU) - Peak (A-2) Time of Use (TOU) - Off-Peak (Temp) TEMP. 5.156 (65) Tots* Commercial 3.52 0.44% 0.00% 0015 15.00 0.71 1.88% 0.09% 5,734 844 183,141 10,204 11.22% 9.58% 0.083 6 33 45.28 5.57% 315,163 682,508 9.08% 0.101 40 15.56 1.25% 21,148 150,653 14.15% Industrial 131 2.31 0.29% 8-1 (09) TOD peak (09) TOO off peak 14.68 1.54% 12,888 13-2 A (10) B2 - TOU (Peak) 5.79 15.51 0.73% 493 151,444 64,260 194% 12.42% 0.99% 8,103 B2 TOU (Off-peak) 99.08 53 - TOU (Peak) 83 • TOU (Off-peak) B4 - TOU (Peak) 7.90 65.72 4.30 8.24% 0.54% 242 - I:14 - TOU (Off-peak) TEMP. E-2 (55) 35.30 0.02 4.43% 0.00% 10 - 266.17 33.36% C10) Supply al 400 Volts - up to 5 kW 0.02 0.00% Cl(b) Supply at 400 Volts -exceeding 5 kW PEAK C-1C(26) T 0.38 0.25 Total Industrial 5 871 790 • 20.20% 0.00% 10,713 28.69% 337,274 1.33 C2 Supply at 11 kV Time of Use (TOU) - Peak TITII Of UM (TOU) - Off-Peak C3 Supply above 11 W Tirm or Use (TOU) - Peek Time of Use (TOM) - Ofl-Peak Total Single Point Supply 0.06% 0.03% 0.17% 02 Agricuitual Tutm-welis Time of Use (TOU) - Peak 0-1B Time of Use (TOU) - Off-Peak D1B Total Agricultural 0347 0.037 0.205 33 120 11 22 848 40 IN 90 187 164 23 35 32 139 121 2 19 11 7 64 7 28 233 26 53 198 139 921 116 139 14 794 100 128 605 70 509 95 9 14 78 35 16 a ss& ... -- 0.080 29 321 29 263 258 0 23.08% NB 0 42,687 0.894 33 231 12.47% 0.000 4,850 - 10.77% 0.002 1 4 1 0.001 0 0 82 7,159 14 0.004 0.012 1 11,594 25.48% 58.87% 4 12 5 55 12 21.38% 0.002 0.011 1 25,271 4 '0.42%. 0.000 0 1 8 36 2 21 50 - 2,653 0 - - 1 5 • 58 0 3911 0 - 0 4 3 11 - 0 1 49 - 6 11 - 2 - 6 0 5 18 2,287 4.81 0.60% 0.85 3.94 0.17 0.11% 2.16 10.46 24.38 0.27% 1.31% 2 53 800 30,816 48.49% 0.004 0.021 3.06% 206 133,721 24.58% 0.066 2.86 0.36% 2,378 37,701 10.39% - 1 8 1 8 0.49% 0.02% - 22 3 0 1 8 26 77 263 21 214 - 29 - - 0.11% 608 8,251 19.41% 1.09% 7.18% 34,303 386,572 20.25% 0.079 0.323 15 65 127 520 18 85 114 457 119.82 5.73% 37,206 430,824 22.15% 0.407 81 6811 al 606 0.07% 1,419 10,520 7.00% - Residential Colonies H Special Contracts - Tenff K (AJK) Time of Use (TOU) • Peak Time of Use (TOU) - Off-Peak 0.04% 103 6,052 8.01% - 100% 3,145,754 5,461,487 11.66% 1.473 8 - 2 31 95 0.89 8.73 57.14 0.35 - 31 2 31 - 1 4 0.005 0.54 Grand Total 6 11[114 Pubic Lighting 0 Railway TracdonTrectIon - 1 co-oennsion-.1 48 23.77% Agdcuitural Tube-wells-Tariff D Dl Scarp . 0.017 • 0.110 * 0.017 0.056 3 6 203 456 1,579,550 - Bulk C-1C(26)7 OFF-PEAK 13.28% 14 81% 7 53 143 12 10 0.003 5 - 35 0 3 2 0 13 83 81 - 7 - 1 5 - 0 797.80 441 8,704 440 6.459 0 2,244 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement November 2012 (Monthly, Quarterly as wall as Conseil& -so7.1j 7 , ..411,,ki ',..", PAWN ResidentM1 Up to 50 Units For peak load requirement up to 5 kW 01-100 Units GOP 101-303 Units NEPRA GOP 301-700Unks NEPRA GOP NEPRA GOP NEPRA Above 700 Untie - (16•94) (kW) (RAMA) i (UR) (FNMA) (ItsnWAI) drown (itekWA1) (RenrWit) an 3.17% 806,151 - 3.00 - 2.00 178.40 24.80% 724,656 - 9.60 - 186.51 99.03 108.59 5.79 13.08% 1,105,408 - 13.00 - 8.11 - 4.89 13.54 1.87% 111,853 - 15.50 - 15.86 3.35 3.35 12.33 - 3.17 0.46% 7,984 - 18.50 - 15.07 - 1.43 - - 0.001 0.012 - 15.00 9.50 16.50 - 13.99 6.22 15. 50 - 1.01 1.28 1.00 0.013 - 14.77 . 2.23 • - 1.00 3.81 6 595 028 For peak load requirement exceeding 5 kW Time of Use (TOU) - Peak Thus of Use (TOU) - Off-Peak E-1(1) (55) TFjAP. Total Residential Cornmertial - 42 Commercial For peak load requiremein up to 5 kW 0.34 1.59 0.02 319.25 0.05% 0.22% 0.00% 44.03% 2,708 159 2,718,819 45,411 1,058 5,641,493 Time of Use (TOU) - Peak (A-2) Time of Use (TOU) - Off-Peak 0-1(1b (56) TEMP. Total Commercial 6.66% 21.25 2.93% 313,019 481,694 6.04% . 0.64 177 0.09% 60 7,167 12.20% 6,092 653 320,024 185.948 10,306 485,117 11.67% 5.92% 8.39% 20,487 144,455 Commercial (0100) Commercial (<20 KW) For peak load requirement exceeding 5 kW Regular 4.79% 2.29% 15.85 0.45 41.94 0.52% 2.19% 0.06% 1.79% • - 17.00 0.003 400 14.50 400 0.014 0.079 400 400 . - 15.130 400 400 9.50 17.00 - 9.72 1320 • . 6.01 15.00 - - - - 4.78 1.80 1.49 2.00 - 0.096 Industrial 81 15.92 2.36 15.83 5.11 16.35 8-1 (09) TOD peak 13-1 (09) TOD off peak 8-2 A (10) 132 - TOU (Peek) 132 - TOU (Off.peak) 63 - TOU (Peek) 97.16 6.77 77.55 2.19% 0.33% 2.16% 0.70% 2.26% 13.40% ' 13,484 485 159,112 15.09% . 13.46% 53,296 13.14% 6,157 . 5 677,744 - 10,713 . 19.84% 0.000 0:018 0.113 0.016 0.059 400 400 0.344 0.038 0.204 0.013 0.075 - 400 380 15.00 9.50 11.00 15.00 9.30 .14.70 380 360 360 - 920 14.50 9.10 12.00 400 400 13.00 11.50 15.00 i 5.88 3622 0.01 280.91 1.21% 10.70% 0.81% 4.99% 0.00% 38.75% 0.02 0.33 0.00% 0.05% 0.17 0.79 0.02% 0.11% 86 8,773 12.34% 0.002 •o:000 0.003 C2 Supply at 11 kV 3.17 0.44% 12 10293• 42.19% 0.009 Time of Use (TOU) -Peak Time of Use (IOU) - Off-Peak C3 Supply above 11 kV Time of Use (YOU) -Pak Time of Use lg) - Off-Peek 0.61 2.73 0.10 o.oe% 0.38% 0.01% . 14.10% 0_25% 0.001 0.009 0.000 2.33 11.05 21.30 0.32% 1.52% 2-94% 49.12% 21.54% 0.004 0.019 0.047 2.50 0.89 7.16 50.27 60.65 0.35% 0.10% 0.99% 6.93% 8.34% Public Lighting CI Residential Colonies it Special Connecta . Tariff K (MK) Tine of Use (TOU) - Peek 0.62 0.32 0.09% 0.04% - Time of Use (TOU) - Off-Peak Railway TractionTrection -1 Co-Genration-J 726.09 63 - TOU (Off-peak) 84 - TOU (Peak) 84 - TOU (Off-peek) E-2 (se) TEMP. Total Induutrial 243 338,934 - 31.34% 10 203,456 24.39% 42,551 1,547,712 2414% 30 204 13.19% 50 4,850 12.00 • . 400 400 .. 400 380 360 360 380 - 10.51 1199 8.22 9.14 . 12.77 8.01 . 1188 7.75 12.37 7.46 11.50 - - - 1.49 1.01 1.28 2.23 1.29 2.02 1.45 2.13 - 0.50 0.677 Bulk C100 Supply d 400 Solis - up to 5 kW CND) Supply al 400 Volts -exceeding 5 kW C-1C(215) T PEAK C-1C(28) T OFF-PEAK Total SINN Point Supply Agricultural Tuba-web - Tariff D Di Scarp D2 Agricultual Tube wells Time of Use (TOU) - Peak C1.18 Tine of Use (TOU) - Off-Peak D1B Total Agricultural Grand Total - 24 3 28,572 53,800 9.27%, 0.000 2 207 30,616 135,304 2,185 34,594 991% - 639 6,374 14.83% 389,382 37,324 ' 430,350 17.69% 19.31% 0.005 0.077 0.330 0.412 - 34,520 1,420 103 10,412 6,052 5.20% 7.24% 3,160,548 9,496,444 10.44% 100% 1.441 400 380 360 9.30 11.40 14.70 9.20 380 380 380 380 11.30 14.50 9.10 - 11.00 200 200 200 9.50 14.50 9.10 - 15.00 14.00 - 11.55 - 400 400 400 380 10.35 13.01 . 8.01 - 1.45 1.15 1.99 - 1.29 360 360 360 360 380 12.60 7.75 10.10 12.18 7.35 120 10.00 200 200 - 10.25 - 1.15 2.10 1.45 1.20 2.32 1.75 13.77 13.00 8.00 80 - 2.73 1.50 1.10 13.73 12.92 - 1.27 1.06 - 1.00 FORM-23(A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Mont*, Qua as well as Consolidsted) ,,... Sales Saba Ills ("66%) (lkelle) Fla. of Consumers MDI NEPRA Diatemilmtd Tart "'mid Charged Variable 11551.ff Charge Charge ) (SW) (Mn Re) (MO, Re) (61641•) OOP Notified TarlIT Fixed Variable Charms Charge (Mln Re) (Min Re) (Mln Re) (Min Rs) Realdenthil Up 10 50 Units 22.99 For peak load requirement up to 5 kW 01-100 Units 101-300 Units 17840 NEPRA 166.51 GOP 13.66% OOP 1.67% - I 46 - . - - 23 . 1,599 - 1,033 - 588 69 111,853 i - 1,412 .. 803 - 809 - - 248 - 187 - 79 - 55 - 51 - 5 - . _ - - . 0.001 - - 7,984 - - - - 0.46% - - - 3.35 3.35 NEPRA 1,105,408 - 15.88 - - - 108.59 - 724,858 - 13.54 NEPRA Above 700 Units 24.60% 99.03 NEPRA 808,151 - GOP GOP 301-7000nds 3.17% - 8 595 026 0.00% - Time al Use (TOU) - Peak 0.34 0.05% - - Time of Use (TOU) - Off-Peak 1.59 0.22% 2,706 45,411 4.79% For peak load remilremeM exceeding S kW E-1(I) (53)7E1AP. Total Realdentlel 0.012 - 5 - 0 15 13 - 2 0 - 0 - 0 3,401 • 2,111 - 1,283 - 0.02 0.0% 159 1,056 2 29% - 319.25 44.0% 2,768,9111 6,641,493 6.118% 0.013 21.25 2.93% 313,019 481,894 - 5 Commercial - A2 Committal For peak load moulmment up to S kW Commercial (.100) - - Commercial ('20 KW) For peak load requirement exceeding S kW - - - - 80 Regular 0.84 0.09% Tkne of Use (TOU) - Peak (A-2) 3.77 0.52% - 15.85 219% 8,092 Tkne of Use (TOU) - 011-Peak (Temp) E-100 (513) TEMP. Total Commercial 7,187 12.20% 185,948 11.87% 47 - - 361 - 314 - - - . . . - - - - - - - - - - 3 127 - 24 0.003 1 9 1 6 0.014 8 57 s 50 0.079 32 151 32 - 0.06% 853 10,308 5.92% - 139% 320,024 1186,117 8.31% 0.011 15.92 2.19% 20,487 144,455 15.09% 0.000 - 191 2.38 0.33% - - 0.016 - 35 15,83 2.16% 13,484 159,112 13,48% 0.113 - 149 53,298 1114% 0.018 8 56 - 0.059 24 245 38 7 - 1 564 - al - 167 - 24 - 33 - 2 - 129 - 20 8 47 - 10 24 209 - 38 - 8 0.45 41.96 11111 7 38 industrial 81 B•1 COO TOO peak (1-1 (32) TOO off peek - 5.11 0.70% 485 82 - TOU (Peak) 18.35 2.24% - 82 - TOU (Off-peak) 97.18 13.40% 8,157 877,744 19.84% 0.344 138 904 138 778 8.77 1.21% 5 10,713 0.00% awe 14 129 14 111 - 18 77.55 10.70% 243 338,934 31.34% 0.204 77 713 77 601 - 112 5.88 0.61% - 0.013 5 85 5 73 - 13 313.22 4.99% 24.39% 0.075 27 330 27 270 - 59 0 2,418 - 420 0 .. o B-2 A (10) B3 - TOU (Peak) 63 - TOU (Off-peak) 134 - TOU (Peak) 84 - TOU (Off-pask) - 10 13 0 - - 24.24% 0.877 291 30 204 13.19% 0.000 - 50 4,850 9 27% 0.002 1 4 1 3 - - 0.000 0 3 0 2 8,773 12.34% 0.003 1 7 1 6 - 1 10,293 42.19% 0.009 3 36 3 32 - 4 0.00% - 36.75% 42,861 Cl (a) Supply at 400 Volts - up to 5 kW 0 02 0.00% Cl(b) Supply at 400 Volts -exceeding 5 kW 0.33 0.05% PEAK 0.17 0.02% C-1C(26) T OFF-PEAK 0.79 0.11% 88 3.17 0.44% 12 Time of Use (TOU) - Peak 0.81 0.09% Time of Use (TOU) - Off-Peak 2.73 0.33% 0.10 0.01% 2.33 11.05 0.32% 1.52% - 21.30 01 Scarp D2 AgrIcultual Tube-moils Total Indualrial - - 1,1187,712 0.01 280.99 TEMP. E-2 (56) 203,458 - 2,838 2111 Bulk Ce1C(26) T C2 Supply in 11 kV C3 Supply above 11 kV Una of Use (TOU) - Peak Time of Use (TOU) - Off-Peek Total Single Point Supply 125 - 0 - 0 0 - . 0.001 1 9 1 8 - 1 24 26,572 14.10% 0.009 3 25 3 21 - 4 3 53,800 0.25% 0.000 - 0 1 28 - 2 0.004 0.019 1 34 1 49.12% 0 1 0 30,816 7 101 7 81 - 5 19 2.94% 207 138,308 21.18% 0.047 17 220 17 184 - 36 2.50 0.35% 2,185 34,594 9.91% - 25 - 0.89 0.10% 839 8,374 14.83% 0.005 - - Agricultural Tuba-wells - Tariff D Time of Use (TOU) - Peak D-18 Thu of Use (70U) - 011-Peak 019 Total Aoticultund Public Uplitleg 0 Residential Colonies H 1 - 15 104 15 93 34,520 389,382 17.89% 0.077 6.93% 0.330 88 457 88 402 ICU 9.311% 37,324 430,310 19.31% 0.412 82 SW 82 626 0.82 0.09% 1,420 10,412 8.20% • 0.32 0.04% 103 8,052 7.24% - 3,160,8411 9,496,444 10.46% 1.448 - - Time of Use (TOU) - Oft-Peek - - - • 728.09 100% 9 - 429 4 7,983 - 428 3 0 5 0.99% - Grand Total 7 7.18 Tkne of Use (TOU) - Peak Co-Gsnratlon-.1 1 50.27 Special Contracts - TanS K (MK) Railway TrectIonTraction -1 28 - - 2 11 55 0 70 9 - 1 4 - 0 8,781 0 1,1192 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement December 2012 (Monthly,Quarh as DescripSon __..__.-Sales RAliwki Sales Mix No. of Consume rs (%em) Connected Load (kw) Load Factor MDI Charged DAM) (%em) NEPRA Determined Tariff Fixed Variable Charge Chug. (nakwa) (Rs/kWh) GOP NotNied Tariff Fixed Variable Charge Charge (Rs/kW/M) (R•/kWh) Residential Up to 50 Units 35.58 5.63% 140.55 135.48 22.22% 841,994 50.01 7.90% 714,749 1.11% 0.52% 1,180,447 - For peak load requirement up to 5 kW 01.100 Units GOP 101-300 Units NEPRA GOP 301.7000nits GOP 7.03 NEPRA GOP 8.85 Above 700 Units NEPRA - IRIAM//M) iltarkWhi ZOO - 1.00 3.81 9.60 . 179 - - 13.00 - 8.11 - 4.89 42,723 - 15.50 - 12.33 - 3.17 4.506 - 18.50 - 1107 - 1.43 15.00 - 13.99 9.50 16.50 . 122 15.50 53.29 3.29 100 Subsidy Variable Charge Fixed Chug* 3.29 5,612,998 For peak load requirement exceeding S kW 0.00% . Time of Use (TOU)- Peak 0.32 0.05% Time of Um (TOU) - Off-peak E-10) (55) TFJAP. 1.49 0.03 0.24% 0.00% 3,131 160 48,720 1,071 4.20% 3.75% 0.009 238.30 37.87% 2,767,710 6,862,781 4.10% 0.010 16.50 2.81% 313,488 481,992 4.69% Total Remdsntlal Commercial - A2 Commercial For peak load requirement up to 5 kW Commercial (.100) 0.001 - - Time of Use (TOU) - Peak (A-2) 0.49 0.08% 59 6,389 10.50% 0.002 - 1 28 - 1.00 - 2.23 - - - 17.00 14.77 0.00% Commercial (.20 KW) For peak load requirement exceeding 5 kW Regular 1.01 - - 400 14.50 400 972 - 476 400 400 13.20 8.01 1100 - 1.49 2.00 3.32 0.52% 0.013 400 14.12 0.82 2.23% 0.13% 6,228 880 187,383 10,523 10.33% 10.83% 0.070 100 - 15.00 9.50 17.00 38.24 157% 320,615 685,287 7.04% 0.084 15.01 2.37% 19,720 137064 15.00% 0.000 - 3.04 12.00 0.48% - 10.51 - 1.49 B-1(01) TOD off peak B-2 A (10) 0.016 - 17.89 15.00 283% - 11 99 14,310 167,203 14.86% 0.116 - 4.85 9.50 - 0.77% 128 467 50,919 82 - TOU (Peak) 13.08% 0.014 400 1163 298% 0.059 400 10128 - 2.23 16.01% 0.342 400 8.10 0.037 380 380 Time of Use (TOU) - Off-Peak E-1(11) (56) TEMP Total Commercial 1.80 Industrial 61 B-1 (09) TOO peak B2 - TOU (01-pe5k) 133 - TOU (Peak) 03 - IOU (0ff-peak) 1:14 - IOU (Peak) 64 . TOU (Off-peak) E-2 (58) TEMP. Tend industrial 682,742 1.28% 8,212 9 84.04 13.29% 244 341,188 5.07 0.80% 31.78 0.01 102% 0.00% 10 203,458 21.40% 0.073 - 217.e7 4812% 42,972 1,506,511 24.72% 0.876 29 51 194 11.95% 0.900 4,860 7.79% 0.001 400 0.000 400 20 32% 13,059 33.74% 0.207 0.012 ' 1.01 11.00 400 122 9.14 15.00 400 12.77 9.30 14.70 400 380 • 0.01 12.68 380 380 360 7.75 - 12.37 - 2.13 7.46 11.50 - 0.50 9.20 360 14.50 380 9.10 12.00 • 129 2.02 1.45 au& Cl(a) Sudety at 400 Vcds - up to 5 kW 0.02 0.00% C1(b) Supply at 400 Vona -eceeding 5 kW C-1C(28) T PEAK 0.28 0.04% 0.14 0.02% 0.59 0.09% 86 8,773 9.19% aan 12 10,293 38.28% 0.008 0.001 400 380 380 C.1C(26) T OFF-PEAK C2 Supply M 11 kV 13 00 400 11.55 - 1.45 1835 1.15 400 13.01 - 8.01 11.40 400 380 10.25 - 1.15 14.70 380 12.60 - 2.10 7.75 11.50 15.00 9.30 1.99 1.29 288 0.45% Time of Use (TOIL) . Peak 0.58 0.09% Time of Use (TOU) - 01Peak C3 Supply above 11 by 2.39 0.38% 24 26,572 12.30% 0.007 380 0.09 0.01% 3 53,800 0.23% 0.000 9.20 11.30 380 380 1.79 8.32 17.07 10.10 - 120 0.28% 1.32% 2.70% 2 36.99% 0.003 0.017 14.50 9.10 380 360 12.18 7.35 - 2.32 1.75 207 30,816 138,308 380 360 360 17.29% 0.040 2.41 0.47 0.36% 0.07% 2,067 32,956 10.03% 200 11.00 9.50 10.00 10.07% 0.005 - 8,372 175 43.17 5280 120 2.73 839 34.702. - 37,408 392,063 431,391 15.08% 0.074 . 0.327 200 200 14.50 9.10 200 200 8.77 13.00 8.00 80 1.07% 612% - 1.50 1.10 16.77% Public uphtinp G 0.408 0.98 1,420 10,410 Residential Colonies H 15.00 _ 13.73 . 6,052 . - 103 12.87% 5.95% 14.00 - 12.92 - 3,170,436 9,527,840 1.10% 1.416 - Time of Usta0U) . Peak Time of Use (Tot)) - 019Peek Total 'MIN Point Supply 1.45 ftrIcultural Tube-wells - Tariff D DI Scarp 02 Agricultual Tube-welle Tints of Use (T014 - Peak D-18 Time of Use (TOU) - OR-Peak 01B Total Agricultural 8.35% 0.26 0.15% 0.04% Bascial Contracts - Tariff K (/UK) _ • Time of Uss (TOU) - Ptak . - Time of Use (TOU) - Off-Peak Railway TragifnTraetion - 1 co-Gemation4 - - - - Grand Toed 832.593 100% 1.00 1.27 1.08 FORM•21(A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quatterl as will as Consolldat Description Salsa Sales Mix No. of Consumers Connected Load MDI Load Factor . (ukwk) (iwto) NEPRA Det*rmined Tarts Charilod PRIM (Hope) (kw) GOP Nonliad Tariff Subsidy Fixed Charge Variable Charge Fixed Charge Variable Charge Fixed Charge Variable Charge (Wn Rs) GM, h.) (min R.) (min R.) (lan Rai (MS Rs) Residential Up to 60 Units 35.58 5.53% - 0.00% GOP 140.55 22.22% NEPRA 135.48 For peak load requiromeni up to 5 kW 01-100 Units 101.300 Units 301-700UnIts GOP 50.01 NEPRA 53.29 GOP 7.03 NEPRA 885 GOP 3.29 NEPRA 3.29 Atom 700 Units 1,180,447 841,994 71 38 - - - 107 - - - - - - - - . - 1,300 - 814 - 487 - - 693 - 406 - 287 - - 137 - 87 . 50 - - 54 - 50 - 5 7.90% 714,749 - 1.11% 42,723 - 0.52% 4 508 • 8,812,998 For peak lose requirement exceeding 5 kW - - - - - - - Time of Use (TOU) - Peak 0.32 0.05% - . - - ovoi - 5 - 4 - Tkne of Use (TOU) - Off-Peak 1.49 0.24% 3,131 48,720 4.20% 0.009 - 14 - 12 - 2 0.03 0.00% 180 1,071 3.75% - - .0 - 0 - 0 238.30 37.67% 2,787,710 1,162,789 4.90% 0.010 • 2.311 - 1,444 - 887 15.50 2.61% 313,488 481,992 4.89% - : 280 - 244 - - - E-10) (55) TEMP. Total Residential - 0.00% - 0 Conunerciel - A2 Convnercial For peak load requirement up to 5 kW - - Commercial (.100) Commercial (<20 KW) For peak load requirement exceeding 5 kW - - 59 Regular 0.49 0.05% One of use (TOU) - Peak (A-2) 3.32 0.52% - This of Use (TOU) - Off-Peak (Temp) 61(9) (58) Total Commercial - - - 37 - - - • - - - 10.50% 0.002 1 7 1 5 - 2 0.00% 0.013 5 50 5 44 - 8 0.070 28 134 28 113 - 21 12 - 2 418 - Mt 22 - 2.23% 6,228 187,383 10.33% IMO 10,523 10.83% 38.24 11.87% 320,615 1188,2117 7.04% . 15.01 2.37% 19,720 137,064 15.00% 0.000 3.04 0.46% - - 0.018 • 17.89 2.83% 14,310 167,203 14.66% 0.116 467 50,919 13.08% 0.014 - 0.059 . - - 6,389 0.13% - . 14.12 0.82 TEMP. - Industrial 0.084 14 488 34 34 - B1 8.1(09) TOO peak 13-1 (09) TOO off peak 13-2 A (10) 82 - TOU (Peak) 82 • TOU (0ff-poak) 93 • TOU (Peak) 133 - TOU (Off-mak) 84. TOU (Peak) 94 - TOU (Off-peak) - - 23 44 - 9 215 - 38 • 0.342 137 942 137 811 - 131 . 0.037 14 119 14 103 - 33.74% .0.207 79 773 79 851 - 0.012 4 74 4 83 - 11 21.40% 0.073 26 289 26 237 - 52 0.878 289 2,472 - 427 - 16.01% 8,212 682,742 20.32% 1.28% 9 13,059 0.00% 8414 13.29% 244 341,168 5.07 0.50% 31.78 5.02% - 3 147 170 - 8 8.10 - . 0 - 16 122 0 0 . 0.01 0.00% 237.03 45.52% 42,972 1,898,811 24.72% C1(a) Supply al 400 Volta - up to 5 kW 0.02 0.00% 29 194 11.95% 0.000 0 - 0 C1(b) Supply al 400 Voila -exceeding 5 kW 0.28 0.04% 51 4,860 7.79% 0.001 0 3 0 3 - 0 - - 0.000 0 2 0 2 - 0 TEMP. E-2 (51) Total Industrial - - 24 101.28 - - 43 53 - 203,458 158 - 253 2.68% 10 - 48 8 • 0.7-7% - 180 24 4.88 18.83 - - 2,899 281 - Bulk 0 - CAW.) T PEAK 0.14 0.02% C-1C(26) T OFf-PEAK 0.59 0.09% 86 8,773 9.19% 0.002 1 5 1 5 - 1 2.68 0.45% 12 10,293 38.28% 0.008 3 33 3 29 - 3 Time of Use (TOU) - Peak 0.58 0.09% Time of Use (10U) - Off-Flak 2.39 0.35% 12 Sup* al 11 kV - 0.001 0 9 0 7 - 1 24 28,572 12.30% 0.007 3 22 3 18 - 3 3 53,800 0.23% 0.000 0 1 0 1 - 0 - 0.003 1 26 1 22 - 4 78 6 81 - 15 177 18 141 - 28 - 2 - - 0.09 0.01% Time of Use (YOU) - Peak 1.79 0.28% Time of Use (TOU) - Off-Peak 8.32 1.32% 2 30,818 36.99% 0.017 6 17.07 2.70% 207 135,308 17.28% 0.040 18 03 Supply above 11 kV Total Maple Point Supply - - 0 005 0.95 4 1 3 - - 0.074 15 98 15 88 - 15.08% 0.327 65 393 65 345 - 16.77% 0.405 51 522 81 460 10,410 12.87% - 8,052 5.95% - 2,087 0.07% - 675 1.07% 639 43.17 8.82% 34,702 392,063 6110 5.35% 37,406 431,381 Pub6c Ughting 0 0.98 0.15% 1,420 Residential Colonies H 0.26 0.04% 103 Special Contracts - Tariff K (AJK) Tins of Um (TOU)- Off-Peak Railway TractionTraclkin - 1 . - - - - - - - - - Co-Gerwation-J Grind Total 632.50 15 - 4 - 0.38 1 10 47 0 61 13 - 1 3 - 0 - - Time of Use (TOU) - Peak 24 - - 10.07% 0.35% 0.47 Total Agricultural 27 10.03% 8,372 2.41 02 Agficutual Tubemells Time of Use (YOU) - 011-Pack 019 - 32,956 10t Scarp Tins of Use (YOU) - Ptak 6113 - - Agricultural Tubs-wells - Tariff 0 100% 3,170.438 9,527,848 9.10% 1.416 419 8,412 416 4,980 0 1,452 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED 2nd Quarter Revenue & Subsidy Statement momn , ill WW////3 1...0/1317111711/111W VW t:41/{ ' PAWN WWII; ... t .,., .r.FoirAv. Residential to 50 Units 101-300 Una' 301-7001.MM 3.59% 1 160,447 . - 3.00 - 2.00 . 1.00 23111% 841,994 - - 9.60 - 5.79 - 3.81 714 749 - 13.41% • 13.00 - 8.11 - 4.89 GOP 513.272 NEPFtA 473.738 GOP 289101 NEPRA 319.203 - - - 48.622 58.054 2.28% 42,723 - - 15.50 - 12.33 - 3.17 NEPRA GOP 14.251 0.66% 4,508 - - 16.50 - 15.07 • 1.43 NEPFtA 14.251 0.004 - 15.00 - 13.99 - 1.01 9.50 16.50 - 8.22 15.50 - 1.28 1.00 14.77 - 2.23 - - OOP Above 700 Units .:. 77.437 For 01-100 Units 44 (FIMMIM (RMONOM (Perikvil) (Ri/kW/M) (RWW/111 (Ft//kW/M) (UP) (W/1 (.*•••) 7';' i,orio MV, . . • v wo-.....4 - 6,612,998 0.00% - Time of Use (TOU) - Peek 0.05% - - Time of Use (IOU) - Off-Peek 5.238 0.068 024% 0.00% 3,131 160 48,720 1,071 4.91% 2.89% 0.035 - - 949.033 44.03% 2,767,710 1,662,759 6.50% 0.039 - 481,992 5.98% - • • exteedin • 5 kW E-10) (55) TEMP. Total Residential . - Commercial • A2 Commercial Far peak load requirement up to 5 kW Common:MI (.120 KW) Time of Use . 0.06% 1.804 Regular • -- Total Commercial - 1.976 2.09% 0.09% .8,228 060 187,383 10,523 122.462 5.88% 320,615 686,287 19,720 137,084 44.974 Time of Use (TOU) • Off-Puk TEMP. 6.181) (56) 12.89% 6,389 59 0.49% • 10.814 - Peek 10.96% 8.58% 46.487 13-1 (09) TOO peek B-1 (09) TOD off peek B-2 A (10) 82 - TOU (Peak) 83 - TOU (Peak) 83 - IOU Off B4- TOU U 1) 84 - TOU (Off-peek) TEMP. E•2 (58) Total Industrial 2.16% . 0.008 14.50 400.00 9.72 0.042 400 15.00 400.00 13.20 - 1.80 0.232 - 400 - 9.50 17.00 400.00 8.01 15.00 - 1.49 2.00 0.000 - 12.00 - 10.51 - 13.99 8.22 9.14 - 1.49 15.00 - 1 28 12.77 8.01 - 12.68 7.75 - 2.23 1.29 2.02 1.45 12.37 7.46 11.50 - 2.13 • 0.50 1.45 1.15 8.15% 0.281 C-1C(28) T 15.49% 0.36% - 0.050 . 48.204 224% 14,310 167,203 13.16% 0.340 15.758 0.73% 467 50,919 14.13% 0.048 400 48703 2.26% - 0.184 400 297.537 24.765 13.80% 1.15% 6,212 9 682 742 13,059 19.90% 1.033 400 0.110 244 30.42% 380 380 360 14.70 341 188 9.20 14.50 380 360 9.10 12.00 380 400 11.55 - 10.35 227.316 10.55% 15259 0.71% 103.307 0.046 4.79% 0.00% - - 0.039 - • 10 - 0.818 203,458 - • 23.19% 0.229 23.80% 2.647 835.087 35.74% 42,972 1,595,611 0.058 0.00% 29 194 0.986 0.05% 51 4,860 0.5813 0.03% - - . PEAK C-1C(26) T OFF-PEAK C2 Supply at 11 W _...11 Ale is C9g - Peak Time of Use (TOU) - Off-Peak C3 Supply above 11 W Time of Use (TOU) - Peak Time of Use (TOU) - Off•Peek Total Snots Point Supply 400 400 380 360 - 0.002 400 13.01 88 8,773 400 15.00 9.30 400 0.009 400 8.01 _ 10,293 11.40 380 10.25 - 14.70 9.20 380 380 12.60 7.75 9.26% 14.11% 2.711 0.13% 10.1360 0.50% 12 2.039 9.065 0.09% - 0.42% 24 26,572 15.58% 0.026 0.353 0.02% 3 53,800 0.30% 0.001 48.18% - 0.028 0.005 - 0.011 380 380 11.50 1.99 1.29 1.15 2.10 1.45 11.30 360 10.10 - 350 360 14.50 9.10 360 360 12.18 7.35 - 2.32 1.75 , 10.00 80 1.00 380 360 1.20 6.281 29.829 , 0.29% 1.38% 2 30,816 44.20% 0.057 52.741 2.91% 207 135,308 21.15% 0.143 7.774 0.36% 2,087 32,956 10.77% - - 11.00 - 8 372 14.85% 0.015 200 120 6.77 0.230 200 200 9.50 14.50 9.10 200 200 13.00 8.00 - 1.50 1.10 13.73 - 1.27 1.08 2.044 0.09% 22.867 150.588 1.05% 6.99% 639 34,702 8.49% 37,408 2.139 0.10% Residential Orionis, H Special Cornmeal - Tariff K (AJK) 0.938 0.04% 1,420 103 - - Tine of Use (TOU) - Peak - Time of Use (TOU) - 011-Peek - Grand Total 400 13.00 153.073 Railway TractionTlaction - 1 Co-Gelvation-J 11.00 15.00 9.30 400 public War% G Tani Agricultural 9.50 0:004 13.56% - 0.000 Agricultural Tubs-wells - Tariff D 01 Scalp D2 • Mein Tube-seas Time of Use (TOU) - Peak D-113 Time of use (TOU) - Off-Peak 0113 1.01 7.714 - Bulk OR.) Supply et 400 Volts • up to 5 kW 5 kW CUM Susan el 400 Volts 4.78 400 Industrial 61 - - - - - Foeak lose requiremeu Mooed • 5 kW 17.00 - - 0.00% - Communal (<1OO) - • 313;468 2.93% 63.093 - - - 1.046 For • ak load 2,155.490 392,083 17.54% 431,391 19.35% , 9.38% 10,410 0.980 1.224 6,052 7.07% - - 9,527,848 10.33% 4.334 - - 100% 3,170,435 15.00 14.00 - 12.92 2.73 (Min Re) 1 160 447 Units load • *want u to 5 kW GOP 513272 NEPRA 473.738 GOP 289.101 NEPRA 319.203 01-100 Units 101-300 Units 714 749 13.41% 301•700UnIts GOP Above 700 Units GOP 14.251 NEPRA 14.251 NEPRA 8 812 968 5 kW Fm • load • Warns* 7 WM of Use 0 - Peak E-1 0 - Off-Pe* • Tim. of Use (55 TEMP. Total Rasidential 3,787 10,131 0.039 6,662,719 2,767,710 449.033 Cammatetal 4 100 Convitandal (420 KW) Fm • load • *want 19 187 383 10.523 686,287 Off-Puk Tkna of Use TEMP. E-1(1) 56 67 4 10.614 -Peak Time of Use Total Commercla 320,616 KU% 122.462 239 11.15% 69 Industrial a 91 6-1 62 09 TOD • ak 14 310 B-1 09 TOD off • ak 13.16% 29 14.13% 109 B-2 A 10 384 B2 - IOU 682 742 297.537 132 - TOU 50 330 1.15% I53 TOU • B3 • IOU I54 - TOU 227316 10.55% 33 15.259 103.307 0.71% 169 0 4.70% TEMP. E-2 65 Total industrial! 436.097 36.74% 8,420 42,972 1,696,611 7,179 1.242 0.084 1.134 1.130 C1e = te,., at 400 Voks • •to 5 kW C1 • Su at 400 Volts -mica* • 5 kW PEAK T OFF-PEAK C2 Su * 11 kV 2.711 0.13% 10.860 0.50% 497 14.11% 4.282 13.144 0.424 14.573 52.201 102.961 30.816 Time of Usa • - 00-Peak 21.16% Pond Su Total 12.489 6.261 Peak lima of Usa 0.986 0.06% 0.03% 0.568 rIcultural Tube-wells Tariff 0 7.774 0.36% 150.586 6.99% 34,702 :11ft,U1 183.073 6.49% 37,406 431,31 1 2.139 0.936 0.10% 1,420 10,4 0 0.04% 103 D2 • ultual Tube-wait* Peak D-18 Time of Use (TOU) - Off-Peek D18 Total Agricultural Public Lighting 3 Residential Cotonias H Spacial Contracts - Tariff K (AJK) 1,370 1,581 19.38% 18 21 2.71 1.01 6,0 - Tema of Usa (TOU) - Peak Time of Use (TOU) - Off-Peak Raktray TrectionTraction - 1 - - - • - Co-Genrstion-J Grand Total 2,166.490 100% 3,170,436 9,627,1 10.33% 1,266 22,769 17,180 IR FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED January 2013 Revenue & Subsidy Statement Description Sales Sal* Mix iftlftwhi 11*•) No. of Consumers Connected Load Load Factor (kW) (kWil•) NEPRA Detannin* Tariff Variable Fixed Charge Chomp Nra Charged ....,., v"."9 (MOWN (RarcW/IA) GOP Nagler' Tariff Variable Fixed Charge Charge (FIVIEW11) (RilkWIM) Subsidy Variable Fixed Charge Charge (lko/kW11) (Ft•/kW/M) Residential •to 50 Units 40.595 01111 ATE•11 131MMII 01-100 Unto GOP NEPRA 101-300 Units 301.700Ungs - 1 336 326 3.00 - 2.00 - 1.00 3.81 20.12% 799,677 - 9.80 - 5.70 - 6 aos 594 844 - 13 00 - 6 11 - 4.89 119.391 GOP 41.904 NEPRA 44.751 8.328 7.993 1.03% 38,853 - 15.50 - 12.33 - 3.17 NEPRA GOP 3.185 0.52% 4 883 - 16.50 - 15 07 - 1.43 NEPRA 3.185 - 15.00 - 13 99 - 1.01 9.50 16.50 - 8 22 15 50 - 1.28 - 14.77 - 2.23 - GOP Above 700 Units 123.902 6.56% 6,634 813 • Time of Use • - Peak Time or Use (TOU) - Off-Peak E-1 p 55 TEMP. Toed Residential 0.387 0.06% 1 884 0.015 027% 0.00% 218.001 EMI 1 =MIMI! R . War 0.001 50,320 1,074 4.58% 1.96% 0.010 35.3r% KUM] 6,684,207 447% 0.011 3,310 183 0.574 2.69% . 314077 483,045 4.70% 0 425 0.07% 58 6,334 920% Commercial <100 17.00 - - 0.002 400 14.50 400.00 9.72 - 4.78 0.012 400 15.00 400.00 13.20 - 400 00 - 9 50 17 CO 8 01 15 00 - 1.80 1.49 2 00 10 51 - 1.40 13 99 8 22 • - 1.01 1.28 12.77 6.01 - 2.23 12.88 - 2.845 0.43% 1 74% 0 07% 6,311 881 168 815 10,494 7 77% 5 79% 0 068 30.501 660% 321,307 6811,688 6.13% 0.080 81 6-1 w TOO . * 12.747 2.07% 19,352 133,893 13.06% 2.519 0.41% 0.021 8-1 la7 TOO off • a 92 A 1. 15.418 2.50% 4.001 0.55% 82 - TOU - • 14.803 2.40% 92 • TOU Off • 93.861 1521% 8,275 687 314 83 - TOU 12.753 2.07% 6 10,554 81.254 13.19% 252 353,143 8.026 1.30% 46.785 0.022 7.60% 0.00% 10 2111.98111 47.41% 43,112 0.021 0.00% ISSIBiiiiiiiM Taal Commercial 1.00 - - - - 10.714 0.443 •& rrT117.inei:a1.711=1111 - - - Industrial • 133 - TOU O8-• k 134 - TOU 84 - TOU (Olt-peak) TEMP. E-2 Total industrial 14,783 171,423 12.32% 0.123 49,385 11.10% 0.012 0.083 203,456 18.67% 31.50% 12 00 15.00' - 9.50 - 15 00 400 9.30. 400 14.70 0.022 380 380 380 0.119 360 - 9.10 12.00 0.209 914 11.00 400 0.350 0.040 31.52% • 9.20 14.50 380 380 300 7.75 12.37 a 7.46 11.50 ..,., al 400 Volts - u • to 5 kW 5 kW y al 400 Volts -ex 29 194 15.03% 0.000 - 13.00 - 11.55 - 1.45 50 4,800 8.10% 0.001 400 11.50 400 10.35 - 1.15 0.000 400 15 00 400 13.01 87 11 8,833 10,104 10.97% 45.53% 0.003 0.007 400 9.30 8.01 - 380 380 11.40 400 380 10.25 - 1,99 1.29 1.15 380 9.20 380 360 12.60 7.75 - 2.10 1.45 380 360 360 11.30 14.50 9.10 380 10.10 - 1.20 360 360 12.18 7.35 - 2.32 1.75 10 00 60 2.73 1.50 1.10 0.284 0.05% 0.145 0.02% C-I ra.,) T OFF-PEAK 0.708 0.11% 3.358 0.55% 0.724 2.927 0.12% 0.48% 25 27,025 14.83% 0.002 0.009 0.110 3 53 800 0.28% 0.001 2.407 11.473 0.02% 0.39% 1.86% 51.00% 22.158 3.60% 207 30,810 138,572 0.004 0.020 0.047 2 019 32,213 8.84% 6,431 12.47% C-1C c,,) T ,,,, el 11 kV C2 Time of Use • - Peak Time of Use • - Off-Peek Time of Use • - Peak Tens of Use (Lud - Off-Peak 3 2 22.38% 14.70 1 Tubo-wons - TOR D Public - 11.00 - 200 0.087 0.384 200 200 9.50 14.50 9.10 120 200 200 13.00 8.00 - 15.00 • 13 73 - 1.27 14 00 - 12 92 - 1.08 0.25% 0.585 0.10% • • 9.743 40.112 52001 1.58% 6.51% 944% 855' 34,898 37,670 " 394,850 433,494 13.92% 16.43% 0.795 0.13% 1 420 10 410 10.48% - 0.178 0.03% 103 6,052 3.98% - - 3,181,375 9,689,391 6.52% 1.653 - Time of Use Time of Use - Peak 0-18 - Off-Peak 0113 Tatel Agricultural a .• • - Peek - Erne of Use • - Off-Peek - Railway TracUonTraction - 1 Co-Genration-J Grand Total 815.919 100% 6.77 0.485 - Time of Use 1.00 0.005 1.5e0 al Tube•mits Dl D2 0.50 0.960 24.88% PEAK C1 1.45 2.13 1,608,N8 88# C1 a 1.29 2.02 FORM - 2$(A) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement inumuily wenlinlatharil sonwevmawaw.y , muarammy as 'vimla as e. Is No. of Salsa Mix Consumers Sales DsscslpUon Connected Load Load Factor (kW) (1162M (%sgs) WON pm Ru NEPRA GOP 101-300 Units 1,336,328 6.59% 40395 (MN RI) (MN Rs) - - 122 - 81 - 41 - - 1,148 - 717 - 429 123.902 2012% 799,877 119.391 41.904 6.80% 594,844 - - 582 - 340 - 242 1.03% 38,853 - - 124 - 78 - 48 0.52% 4,683 - - 53 - 48 - 5 - - - 0.001 - 44.751 NEPRA Gan Rs) (MN RO (MM Rs) Residential Up to 50 Units For peak load monomial into 8 kW GOP 01-100 Unks Subsidy Variable Flood Charge Chins GOP Nodded Tarlf1 Variable Flood Charge Chums NEPRA Determined TarM MDI Variable Fixed Chu," Chime (MKW) Clump 301-700Units GOP 6.328 NEPRA 7.993 Above 700 Units GOP 3.185 NEPRA 3.185 8,634,813 For peak load rWukanien0 exceeding 5 MN - - 18 0 - 14 0 0.011 2,048 - 1,284 - 744 - - 282 - 245 - - 37 - - - - - - - - - - - - 0.387 0.06% - Thee of Use (TOU) - Off-Peek 1.684 0.015 0.27% 0.00% 3,310 163 50,320 1,074 4.58% 1.98% 0.010 - 218.001 16.31% 2,777,888 6,688,207 4.47% 18.574 2.89% 314,077 483.045 4.70% Tout Residential 0 - - Time of Use (TOU) - Peek E•1 (m) (56) TEMP. - - - - - 5 6 2 0 Commercial-A2 Cornmsrd n For peak load requitement up to 5 kW 0.00% - Commercial ('100) Commerc1el (.213 KW) For peak load requirement exceeding 5 kW 0.425 Regular lima ol Us. (TOU) • Peak (A-2) -Peak Thus of Use (TOU) - 08(Temp) TEMP. E-1(16 (68) Teen Coramernal 0.00% 0.07% 0.00% - 58 - 0.00% - 6,334 9.20% 0.002 1 6 I 4 - 0.012 5 40 35 - 2 5 0.066 0.060 26 32 102 8 5 26 - 88 7 - 16 1 437 32 376 - 81 19 3 - 2.845 0.43% - 10.714 0.443 1.74% 0.07% 8,311 861 188,815 10,494 777% 5.79% 30.801 8.0e% 321,307 1188.8118 6.13% 12.747 133,893 1306% Industrial 131 B-1(09) TOO peak 2.07% , 19,352 2.519 0.41% - 15.418 2.50% 14,763 - 112 - TOU (Peak) 14.803 2.40% - •171,423 49,385 - 82 - TOU (011•peak) 93.661 16.21% 8,275 . 687,314 8 . 10,554 13-1 (M) TOO of peak 4.001 B-2 A (10) 0.85% 83 - IOU (Peek) 12.753 2.07% 83 - TOU (Off-peak) 81.254 13.19% 8.026 1.30% B4 • TOU (Peak) Tout maustrin 252 7.80% 0.00% 47.41% 10 43,112 0.00% 0.145 0.708 0.06% 0.02% 0.11% 3.358 aux 48.785 0.022 94 • TOU (011-paak) TEMP. E-2 OM 454 wises CI(b) Sup* at 400 Volta -exceedMa 5 kW PEAK C-1C(243) T C-1C(26)7 OFF-PEAK C.2 Supply at11 kV 0C21 0.284 Tins el Use (TOU) - Peak 0.724 Tate of Um (TOU) - Off-Peak 2.927 0.110 C3 Supply above 11 kV Time of Use (TOU) - Peak Timed Use (TOU) • Off-Peak Total Single Point Supply 0.12% 0.48% 1887% 11.10% Tined Use (TOU) - Peek 6113 Time of Use (TOU) - Off-Peek 018 Total Agricultural 0.123 0.012 - - 31.52% 0.209 31.50% . 0.022 . 0.119 • 0.980 29 194 15.03% 0.000 50 4,800 8.10% 0.001 8,833 10,104 - - 10.97% 45.53% ovoli 146 44 127 .5 25 222 871 15 79 187 140 15 748 79 140 ' 24.88% 87 11 5 25 - 0.350 • 203,458 - 37 20 7 33 189 750 - 121 182 830 - 118 24 17 8 118 8 99 43 - 426 0 .27 43 - 349 0 - 77 0 314 2,982 315 2,812 • 440 0 - 0.031 3 2 - 0.328 8 34 - 1 0 0.000 0.003 1 3 0.007 I al= 0.009 3 0 0 3 1 2 7 0 1 38 11 3 1 27 3 0 23 1 2 7 17 0.288 0.913 3.862 - 1.519 4.244 20 84 - 0.132 5.584 20.070 192 - 39.977 16 - 9 2 22.158 0.39% 1.86% 3.00% 207 136,572 1.580 0.3% 2,019 32,213 8.64% - 655 8,431 12.47% 0.005 1 6 1 4 0.087 0.384 141 365 029 17 73 91 127 321 457 - 0.488 17 73 91 11 - 1.011 2 - 0.190 2.407 11.473 0.02% 25 3 - 0.28% 51.00% 22.39% 0.001 0.004 0.020 0.047 9.743 40.112 0.1% tax 6.5% 34.896 394,850 . 0.00% 1192% 82.001 S.4% 37,570 433,494 18.43% 10.48% - 0.796 0.1% 1,420 Residential Colonies H 0.178 0.0% 103 6,052 3.98% 3,181,375 9,569,391 8.82% Spacial CMItredil - Tariff K (AJK) - Tine of Use (TOU) - Peek - Co-Genrallon-J Grand Total - 35 353,143 Puliac LIgNIng El Railway TractionTraction - 1 134 • - 0.040 10,410 Time of Use (IOU) - Off-Peak - 38 27,025 53,800 30,818 0 585 D2 Agricullual Tubemells 153 - 0.083 Agricultunl Tubs-wells - Tar"! D DI Scarp - 1,808,968 Bulk Clog Supply al 400 vats - up to 5 kW 12.32% 0.021 616.919 100%, 2 7 1 35 104 17 226 17 - - 12 - 2 488 2 8,209 - 456 4,844 2 0 2 15 44 0 0 82 1,366 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement February 2013 (Monthly, Quarterly as well as Consolidabd) Dascriptlon Sales Sales Mix (141vm ) I %NO No. at Consumers Connected Load Load Factor (kW) illailal MI Chemed ,...., ‘......" NEPRA Determined Tariff p.m, Charge VarMble Chop (FLAW/Ml) (ItsAWh) OOP NotMed Tariff Fixed Vanilla Charge Charge (RsAIWAA) (FirAWII) Subsidy Fixed Varlabie Charge Charge Ma/kW/Mt (RarkWa) ReMdentiall U • N 50 UniM 43.195 7.70% 1,412.775 - 3.00 - 2.00 251 =_MTM1 11=1. 01•100 UNts OOP 117.128 NEPRA 113.315 101-300 Units OOP 37.342 NEPRA 39.806 301-7000nks Above 700 Units GOP 5.263 NEPRA 6.610 GOP 2.459 NEPRA 2.459 - 1.00 - - 19.79% 782 804 . 8.60 - 5.79 - 3.81 6.31% 548,235 - 13.00 - 6.11 - 4.89 0.6es 32,967 - 15.50 - 12.33 - 3.17 0.42% 3 830 - 16.50 - 15 07 - 1.43 0.001 - 15.00 - 13.99 - 1.01 0.010 - 9.50 - 8.22 - 1.28 - 18.50 - 15 50 - 1 00 14.77 - 2.23 - - 8.848 004 Time or Use (TOU) -Peak nrn• of Us• (TOU)- 011•Peek E-1 55 TEMP. Total Residential - - a= 0,08% 1.458 0.25% 3 660 52,918 3.77% 0.017 0.00% 186 1,093 2.10% 207.212 38.00% 6,70 016 4.24% 15.789 2.67% 483,912 4.47% 0.012 - - • Commercial - A2 Commercial For • load • Inirliell • to 5 kW Commercial 41 314,566 - 17.00 0.00% • Tints Si Use (TOU) - Off-Peek EA 58) TEMP. Tool Commercial 0.314 0.05% 2.235 038% 8.444 1.43% 0.433 58 • 6,334 6.80% 6,376 189,850 609% 0,07% 884 10,812 5.59% 27.218 4.60% 321,864 690,706 6,40% 19 146 131,955 12.38% 0.002 400 14.50 400.00 9.72 - 4.78 0.011 400 15.00 400.00 13.20 - 1.80 0.064 400 9.50 400.00 8.01 - 1.49 15.00 - 2.00 - 17.00 - 12.00 - 10.51 - 1.49 15.00 - 13.99 - 1.01 9.50 - 8.22 - 1.26 - 2.23 2.02 0.077 Industrial 111 11.928 2.01% 131 . TOO • sit 2.352 0.40% 84 . TOO off • 14.363 2.43% 15,013 173,513 11.34% 0.122 - 3.995 0.87% 442 47,667 11.48% 0.012 400 11.00 400 9.14 0.061 400 15.00 400 12.77 8,333 893.258 18.74% 0.351 400 930 400 8.01 0.042 380 14.70 380 12.88 - 0.219 380 920 380 7.75 - 0.019 380 14.50 360 12.37 0.111 360 - 9.10 360 12.00 11-2 A 1. 82 - TOU - • 14.189 2.39% 82 • IOU 94.842 16.02% 83 - IOU 19.355 3.27% 4 9.818 158.102 14.88% 257 382,758 10.025 169% 85 - IOU -• 134 - TOU 84 - TOU (08-peak) E-2 ( TEMP. Total industrial 50.013 8.45% 0.018 0.00% 309.163 52.22% 0.022 . 10 203,458 43,208 1:1=1 33.27% 33.67% 28.10% 1.29 1.45 2.13 7.46 - 11.50 - 0.50 0.1168 Sulk 01 1 ,, M 400 VoNs • • to 5 kW 0.022 0.00% 29 194 15.42% 0000 - 13.00 - 11.55 - 1.45 C1 .,., m 400 Volts 0.281 0.05% 49 4,774 8.08% 0.001 400 11.50 400 10.35 - 1.15 0.001 400 15.00 400 13.01 - 1.99 1.29 5 kW C-I •,,,, T PEAK 0.170 0.03% C•1C c,;.1 T OFF-PEAK 0.885 0.12% 89 9,016 10.41% 0.004 400 9.30 400 8.01 - 3.528 0.60% 11 10,104 47.81% 0.006 380 11.40 380 10.25 - 1.15 This ol Use Liu., - Peak 0.700 0.12% 0.002 380 14.70 380 12.80 - 2.10 Th. of Use li•) - O6-Pink 2.933 0.50% 28 27,825 14.44% 0.009 380 9.20 380 7.75 - 1.45 1 387 0.23% 3 53,800 3.53% 0.013 360 11.30 360 10.10 - 1.20 0.003 380 14.50 360 12.18 - 2.32 0.019 360 9.10 360 7.35 - 1.75 80 1.00 C2 , Si 1116/ C3 ... Wove 11 kV Tina of Use (TOU) - OR-Pak Total Single Point Supply 2.397 040% 11.523 1.95% 2 30,816 51.22% 23.1124 LIM% 209 138.129 23.70% 0.929 0.18% 1,978 31 627 4.02% - 0.06% 655 6 421 7.29% 0.005 200 11.00 0.342 9.50 120 6.77 5.154 0.87% 0.072 200 14.50 200 13.00 17.529 2.98% 35,044 396,805 6.05% 0.316 200 9.10 200 23.554 4.05% 37,877 434,563 7.56% 0.323 0.818 0.10% 1 423 10 435 8.11% - - 15.00 - 0.215 0.04% 103 8,052 4.88% - - 14 00 - 3,188,918 9,603,016 8.44% 1.498 - 0.067 Tubs wells • Tuff D Time of Use • - Peak D-113 Time et Use (TOU) - 011-Pook 018 Total Agricultural Public 0 Residential Colonies H L.,..-.---. 71ms ol Use • - Peek - - Time of Use • - Off-Peak - - TrectionTraction • 1 Grand Total 192.001 100.00% - 10.00 8.00 - 2.73 1.50 - 1.10 13.73 - 1.27 12.92 - 1 08 FORM - 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quarterly as wall as Consolidated) Iwo, Description mi. mix (MkWh) No. of Comment Connected Load (S•gs) (IM) Load Factor . . MD chr ,..... NEPRA Determined Tarifl Verlaine Fixed Charge Charge ... . """ _, iiiiiiTTi ' (Min Ra) Gen Ra) (%•94) GOP Notified Tariff Fixed Variable Charge Charge Subsidy Fixed Variable Charge Charge (Min Rs) OM Rs) Win Rs) (Uhl Rs) Resideldial up to 60 uMis 43.195 7.30% - 0.00% 1,412,775 - - - 130 - - 86 - - 43 - 19.79% 782,804 - - 1,088 - 678 - 410 548,235 - - - 517 - 303 - 215 32,987 - - 102 - 65 - 38 - - 41 - 37 - 4 For peak load ntquIremeni up to 5 kW 01-100 Links GOP 117.128 NEPRA 113.315 101-300 Units GOP NEPRA 37.342 39.808 6.31% 301-700Ungs GOP 5.263 0.69% NEPRA 8.610 GOP 2.459 NEPRA 2.459 Above 700 Units - 0.42% 3,830 - - - - Time of Use (TOU) - Peak 0.350 0.06% - - Time of Use (TOU) - Off-Peak E-10) (56) TEMP. 1.458 0.017 0.25% 0.00% 3,880 11313 52,918 1,093 207.212 36.00% 2,784,437 ' 6,702,015 15.789 2.67% - 0.00% - - 8,848,004 For peak load requirement exceeding 5 kW Total Residential Commercial - A2 Commercial For peak load requirement up to 5 kW Commercial (<100) Commercial (<20 KW) . For peek load requirement exceeding 5 kW . 314,588 - - - 5 - 5 - 0 3.77% 2.10% 0.010 - - 14 0 - 12 0 - 2 0 4.24% 0.012 - 1,897 - 1,187 - 711 4.47% - - 288 - 233 - 35.210 - - - - - - - - - - - - - - - - 8.80% - 0.002 0.011 1 5 5 34 8,378 1384 189,850 10,812 8.09% 5.59% 0.064 - 28 - 80 7 4.60% 321,864 11100,708 5.40% 0.077 31 - 11.928 2.01% 19,148 131,955 12.38% - 2.352 0.40% - - 0.022 14.383 2.43% 15,013 173,513 11.34% 0122 2235 0.35% - TIM' of Use (TOU) - Off•Peak (Temp) E-101) (56) TEMP. 8.444 0.433 1.43% 0.07% 27.2111 58 - - - 8,334 - 0.314 0.00% 0.06% - Regular • Time of Use (TOU) '. Peek (A-2) 'foul Commercial 483,912 - - 0.001 - 2 1 3 5 30 : 26 88 8 340 - 364 - • 31 4 13 1 - 54 - 143 - 125 - 17.773 - 35 - 33 - 138 44 - 118 - 2.378 18 181 - 32 780 - 122 245 683 - 128 industrial 81 B-1(09) TOO peak - 8-1 (011) TOD off peak - 213 5 25 140 882 140 16 265 811 18 83 3.995 0.81% 14.189 2.39% 442 - 47,887 - 11.48% - 0.012 B2 - TOU (Peak) awl 5 25 82 • TOU (Off-peak) 94.842 16.02% 8,333 893,258 18.74% 0.351 83 - TOU (Peak) B3. TOU (Off-peak) 19.355 4 9,818 0.00% 0.042 88.102 3.27% 1465% 257 33.27% 0.219 84 • TOU (Peak) 10.025 169% - 3132,758 - - 0.019 83 7 B4 • TOU (Off-peak) TEMP. 8.2 (58) 50.013 0.018 8.45% 000% 203,458 - 33.87% 0.111 309.1113 69.22% 10 43,208 1,622,423.. . 26.10% 0.969 40 316 0.022 0.281 0.170 0.885 0.00% 29 onoo - 0.05% 003% 0.12% 49 B•2 A (10) Total Industrial Bulk C1(a) Supply at 400 Volts - up to 5 kW CI()) Supply st 400 Volts -exceeding 5 kW C-1C(26) T PEAK C-1C(26) T OFF-PEAT( C2 Supply* 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak 3.526 0.00% 0.700 0.12% 2.933 0.50% 0.23% 89 11 28 18 35 105 21 246 0.342 0.08% 855 8,421 5.154 17.529 35.044 396,805 37,677 1,423 103 0.04% Time of Use (TOU) - Peak Time of Use (TO(1) - Off-Peak .RaWmy TraetionTractlon -1 CoGenration-J Grand Total 492.001 - 5 0 0 3 8 40 1 2 1 10 27 10 - - 4 5 1 7 14 29 - 85 - 1.885 5.582 20.185 21 206 - 39 9 - - 0.005 1 3 1 2 8.05% 0.072 0.318 14 83 75 180 67 140 434,863 7.66% 0.393 79 248 14 83 78 10,435 8.11% - 8,052 4.88% • 0.07 9 - 3 - 1 8 19 0 219 8 3 1 0 215 - 0.784 - 0.232 - - . 100% 1.470 4.253 1 7 D2 Agricultual Tuba-wells - - 0.003 0.019 0.067 4.02% 0.215 9 23 3.53% 51.22% • 31,827 Special Contracts - Tariff K (A)K) 38 0.338 0.884 4.055 4 1,978 Residential Colonies H 0.323 - 0.009 0.013 0.16% 0.10% 0 032 - 14.44% 0.929 0.818 - 3 2 5 27,825 01 Scarp 23.064 0 -... 316 3 1 23.70% Public Lighting 0 470 0.002 134,529 . - - 2 0.67% 2.96% 4.06% 2,679 3,149 - 209 Time of Use (TOU) - Peak WEI Time of Use (TOU) - Off-Peak D18 Total Agricultural 62 0 10,104 2.91% Agricultural Tube-wells - Tariff D 21 - 1 2 23.624 Total Single Point Supply - 0.004 0.008 53,800 30,818 1.387 2.397 11.523 124 373 0 1041% 47.81% - Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak 7 40 awl 9,018 39 145 0 0 001 . 7 455 0.22 0 0 0.40% 1.96% C3 Supply above 11 kV 3 15.42% 8.08% - 194 4,774 - 37 , 3,188,918 , 9,603,016 6.44% 1 446 5,646 446 4,642 0 1,304 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement March 2013 FORM - (Monthly, Quarterty as wall as Consolidated) Description Residential • to 50 Units . MIIII AIIII 01-100 Units GOP NEPRA 101400 Units GOP NEPRA 301-7000nits 00P NEPRA Above 700 Units GOP NEPRA Sales Sakes FAIR (W)Wh) (Wheal 44.894 44.894 107.181 104.509 29.891 31.553 3.708 4.718 2.128 2.128 No. of Connected Load COMIUMIM Load Factor (kW) (11.9.) 7.51% MDI Charged ,__ MIMI NEPRA Determined Tariff Variable Flied Charge Charge (Rs/kWh) (Fts/kWRA) 3.00 - 1520,525 00P Notified Tarts Variable Fixed Charge Charge (Rs/kW/M) - (Rs/kWh) Subsidy Variable Fixed Charge Charge (Fts&WRA) (RNA)Wh) 2.00 - 1.00 • 3.81 78.74% 758,524 - 9.80 - 5 79 - 523% 481 430 - 13.00 - 8.11 - 4.89 0.85% 22,253 - 15.50 - 12.33 - 3.17 0.37% 2,537 - 18 50 - 15.07 - 1.43 0.001 0.009 - 15.00 9.50 18.50 - 13.09 - - 8.22 15.50 - 1 01 1.20 1.00 0.010 - 14.77 - 2.23 - - 8,853,529 Far post load requirement mcceeding 5 kW Time of Use • . Peak Thlillat Use (TOU) - Off-Peak E-1(1) (55) TEMP. Total Residential Communist • A2 Commercial For • ak load • meat • to 511W Commercial <1 R• 0.280 1.324 0.005 189.210 14.471 0.05% 0.23% 0.00% 33.06% 3,771 187 2,757,207 54,045 1,098 6,705,672 3.38% 0.87% 3.86% 2.53% 314,781 484,241 4 09% 0.05% 0.41% 1 MI% 0.05% 4.73% 11.841 2.221 14.331 3.531 13.358 86.441 16.779 92.714 8.344 44.599 0.018 294,179 2.07% 0.39% 2.51% 0.82% 234% 15 11% 2.93% 16.21% 1.46% 7.110% 0.00% 51.44% 0.016 0.222 0.120 0.480 2.882 0.571 2.400 •.•...■ 0.740 2.132 Time of Use • - Peek 10.278 Time of Use (TOU) - Off-Peak 19.818 Total Single Point Supply 0.00% 0.04% 0.02% 0.08% 0.50% 0.10% 0.42% 0.13% 0.37% 180% 3.47% Industrial 81 11-1 w TOD . ak 8-1 kw TO0 off • ak 111-2 A 1' 82 - TOU • 82 - TOU 133 - TOU B3 - TOU 08- • k B4 - TOU B4 - TOU (Off-pesk) TEMP. E-2 (51) Total Industrial Bulk ..,, at 400 Volts - u • to 5 kW Ci a CI • Su ;y at 400 Volts -exceed • 5 kW C-1C w T PEN C-1Ct;,) T OFF-PEAK , at II kV C2 Time of Um • . Peak Tam of Um • - Off-Peak Tubs-walls - Tarlf? D DI : - • D2 al Tube-wells Time of Use • - Peak 13-113 Time of Use (TOU) - Off-Peak D113 Total Agricultural Public 0 Residential Colonies H - : -, -•MrijaLIEM Time of Use • • Peak Trim of Us* • - Off-Peak Rai TractionTraction - 1 Co-Genrallon-J Grand Total - 17.00 0 00% 0.270 2.358 9.817 0.384 27.077 1 MtailaTWZJMIll Time al Use (TOU) -.Off-Peak E-1(i1) (56) TEMP. •Total Commercial - - 0.910 0.496 7.200 32.272 40.879 0.580 0.188 0.18% 0.09% 1.26% 5.84% 7.15% 0.10% 0.03% • 571.908 100.00% 57 8,287 5.87% 8,428 870 322,134 190,821 10,884 1192,013 6.90% 4.68% 5.36% 19,112 131,471 12.34% 0.001 0.012 0.067 14.50 15.00 9.50 17.00 - 12.00 400.00 400.00 400.00 - 4.78 1.80 1.49 2.00 10.51 13.99 0.22 9.14 12 77 8.01 12.88 7.75 12.37 7.48 11.50 - 1.49 9.72 13.20 8.01 15.00 0.0110 15 147 428 174,805 45,793 11.23% 10.58% 8,392 4 259 699,588 9.818 389,851 18.93% 10 203,456 30.03% 0.021 0.123 0.010 0.082 0.349 0.043 0.225 0.021 0.107 43,362 1,634,792 24.65% 0.091 29 48 194 4,784 11.25% 8.39% 90 11 9,020 10 104 7.28% 38.81% 28 3 27,825 53,800 11 81% 1.88% 0.000 0.001 0.000 0.003 0.008 0.001 0.008 0.016 0.004 0.018 0.057 34.34% 400 400 400 - 2 209 30,818 136,529 45.68% 19.88% 1,953 859 31,205 6 444 3.99% 10.55% 35,147 37,759 1 429 103 398,221 435,870 10,454 8,052 11.10% 12.85% 7.60% 3.78% 0.005 0.073 0.324 0.401 - 3,192,193 9,624,372 8.14% 1.509 15.00 - 9.50 400 400 400 380 380 380 300 11.00 15.00 9.30 14.70 9.20 14.50 9.10 12.00 400 400 400 380 380 380 380 - 1.01 1.28 2.23 1.29 - 2.02 1.45 2.13 - 0.50 13.00 11.50 15.00 9.30 11.40 14.70 9.20 11.30 14.50 9.10 400 400 400 380 380 380 380 360 380 11.55 10.35 13.01 8.01 10.25 12.80 7.75 10.10 12.18 7.35 - 1.45 400 400 400 380 380 380 360 360 360 - 1.15 1.99 1.29 1.15 2.10 1.45 200 200 200 11 00 9.50 14.50 910 120 200 200 10.00 8.77 13.00 8.00 80 - 1.00 2.73 1.50 1.10 - 15 00 14 00 - 13.73 12.92 - 1.08 - - 1.20 2.32 1.75 1.27 FORM -281 A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly , Quartlrty as wall as Consolidated) Description Salm Sales Mix (155W)' (%see) No. of Consumers Connected Load Load Factor (kW) (5.1s) Mill NEPRA Determined Tariff Chaf9" Fixed Variable PAM Charge Charge Phan Rs) (Mn Rs) (MM Rs) Subsidy Fixed Variable Charge Charge (ken Rs) (Min Rs) GOP Notified Tariff Fixed Variable Charge Charge ((Mn Rs) Residential Up to 50 Units 44.69 7.81% For peek bad requirement up W 5 kW 01-100 Units GOP 44.89 7.81% 107.18 18.74% NEPRA 10451 101-300 Units 756,524 i - - - - 134 - - 1,003 . 89 - - 821 - 383 45 - • 5.23% 481,430 - - - 410 - 242 - 188 GOP 3.71 0.85% 22,253 - - 73 - 48 - 27 NEPRA 4.72 GOP 2.13 - - 35 - 32 - 3 NEPRA 2.13 - - - - NEPRA Above 700 Units - 2989 31.55 GOP 301-700Unds 1,520,525 • 0.37% 2,537 - - - - - 0.28 0.05% - 0.001 - 1.32 0.01 ,159.21 0.23% 0.00% 8,653,529 - For peak load requirement exceeding 5 kW Time of Use (TOU)• Peak Time of Use (TOU) - Off-Peak E-1 (O(65 ) TEMP. Total Residential Commercial • A2 Commercial For peak load requirement up to 5 kW Commercial (0100) Commercial (020 KW) For peak load requirement exceeding 5 kW - 1,673 - - - 248 - - - . - 54,045 1,098 336% 0.87% 0.009 - 40.10% 3,771 167 2,7117,207 6,708,672 3.55% 0.010 14.47 2.53% 314,781 484,241 - - 4.09% - - - • - • Regular 127 0.05% Time of Use (TOU) • Peak (A-2) 2.36 9.82 0.36 0.41% Time of Use (TOU)- Off-Peak (Temp) E-1(11) (58) TEMP. Total Commercial - 13 0 4 11 0 1.58% 0.08% . 57 - 4, 0 - 2 0 1,045 - 825 214 - - 32 - - - - - - - 8,287 - .5.87% 0.001 1 4 1 3 - - 0.012 5 • 14 1 32 31 77 5 330 4 . 27 5 27 32 - 0.087 0.080 35 91 6 383 124 31 - 18 8,426 870 322,134 190,821 10,684 8.90% 4.68% 592,013 5.311% 131,471 12.34% - - 142 - - 0.021 - - 1123% m00% ' 0.123 0.010 - 33 138 - 0.062 27.08 4.73% • 11.84 2.07% 19,112 2.22 0.39% 2.51% B-2 A (10) 14.33 153 15,147 ' 0.82% 428 B2 - TOU (Peak) 13.38 234% - 82 - TOU (Off-peak) 86.44 15.11% 8,392 899,588 16.93% 0.349 83 - TOU (Peak) 16.78 2.93% 4 9,816 0.00% 0.043 83 - TOU (Off-peak) 92.71 1621% 259 . 389,1351 - 34.34% . . 0.225 30.03% 1,834,7112 ' ' 24.85% 1 as industrial 131 - 13-1 (09) TOO peak 8.1 (09)700 off peak 134 - TOU perm 84 - TOO (Off-perm E-2 (58) TEMP. Total Industrial Bulk C1(a) Supply al 400 Volts - up to 5 kW C1(b) Supply at 400 Volts -exceeding 5 kW C-1 C(28) T PEAK C-1C(211) T OFF-PEAK C2 Supply al 11 kV Time of Use (TOU) - Peek . 174,805 45.793 - 39 4 200 25 139 804 139 18 247 853 0.021 88 7 16 88 121 7 103 0.107 - 39 . 406 0.22 333 0 0.961 316 2,981 39 3111 8.34 1.48% 44.60 0.02 7.00% 0.00% 10 • 294.18 51.44% 43,352 0.02 0.22 0.00% 29 194 11.25% 0.000 48 0.12 0.48 0.04% 0.02% 0.08% 6.39% - 0.001 0.000 0 0 2.88 0.50% 90 11 4,784 9,026 10,104 7.26% 38.81% 0.003 aoos 1 2 26 27,825 11.81% 0.001 0.008 3 53,800 1.88% 45.88% 0.016 0.004 0.018 19.55% 0.057 203,456 - - 0.57 0.10% 2.40 0.74 0.42% 0.13% 2.13 10.28 0.37% 1.50% 2 30,816 19.52 3.47% 209 136,629 0.91 0.16% 1,953 31,205 3.99% - 0.50 0.09% 659 7.20 32.27 40.118 116% 5.64% 1.15% 35,147 37,769 6,444 398,221 435,570 10.55% 11.10% 1286% 0.005 0.073 0.324 0.401 Public UgMing G au 0.10% 1,429 10,454 7.60% - Residential Colonies H 0.17 0.03% 103 8,052 3.76% - Time of Um D014 - Off-Peak C3 Supply above 11 kV Time of Use (TOL) - Peak Time of Use (TOU) - 011-Peak Total Single Point Supply Time of Use (TOU) - Peak 0-18 Time ot Use Dots - 06-Peak 018 Total Agricultural - Time of Use (TOU) - Peak - Time of Use (Pi) - Off-Peak - - 571.91 - Grand Total - 112 - 34 134 213 719 2,636 18 73 • 0 445 0 0 0 33 0 1 2 - 29 - 3 0 3 8 22 0 3 7 19 - 8 1 7 8 31 94 6 1 7 7 - 28 78 206 21 172 - 9 - 21 , 0 - 3 0 2 4 10 - 1 3 15 65 15 65 - 10 413 so 94 258 364 8 - 9 - 2 - 2 1 3 5 104 294 1 1 1 5 18 33 0 1 1 0 11 35 49 1 0 - Specisi Contracts - Tuff( K (AJK) Reihvay TractIonTractoe -1 Co•Genration-J - 2 2 4 0 - Agricultural Tubeivells - TartIT D Di Scarp 02 Agricultual Tubmwelis 32 171 092 4 25 - 2 18 7 30 118 - 105% • 3,192,193 9,624,372 5.14% 2 449 5,586 449 4,487 0 1,205 FORM - 2.6 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement 3rd Quarter (Monthly, Quarterly as well as Consolidatod) 1'7, (kR/WR) Reskiengal Up to 50 UPI (Wagel 128.483 For peak load requirement up to 5 kW OOP 348.211 NEPRA 337215 101-300 Units GOP 109.137 NEPRA 118.112 GOP 15.300 NEPRA 19.321 Above 700 Units 722% 44.894 01-100 UM, 301-7001.Pls (kW) (Rs/kW/W) (WWI (RONA) (RVIONIPA) (Rs/W41) 3.00 - 2.00 - 1.00 - 9.60 - 5.79 - 3.81 - 13.00 - 8.11 - 4.89 - 15.50 - 12.33 - 3.17 - 18.50 - 15.07 - 1.43 - - 0.004 - 15.00 - - 1.01 9.50 16.50 - 13.99 8.22 15.50 - 1.28 1.00 14.77 - 2.23 - - 756,524 6.13% 481,430 (Rs/kWh) - 1,520,525 19.56% (RsAWRA) - 0.111111 22,253 - GOP 7.770 0.44% NEPRA 7.770 2,537 8653,529 For peak load requirement exceeding 5 kW - - - Tlme of Use (TOU) - Peak 1.017 0.06% - Time of Um (TOU) - Off-Peak E-10) (55) TEMP. 4.486 0.038 0.25% 0.90% 3,771 187 54,045 ' 1,098 3.77% 1.58% ooze - 814.422 3462% 2,787,207 8,708,572 4.18% 0.032 - Total Residential Commercial - A2 Commie For peak load requirement up to 5 kW Commercial (u100) 48.833 Regular 2.63% - 314,781 - - . 484,241 . - 4.42% . - - - - 400 14.50 400.00 9.72 - 4.78 0.037 400 15 00 400.00 13.20 - 1.80 0.199 ,- 400 - 9.50 17.00 400.00 8.01 15.00 - 1.49 2.00 - 1.49 - 1.28 - 2.23 1.29 - 0.05% Time of Use (TOU) - Peak (A-2) 7.238 0.41% - Timm of Use (TOU) - Off-Peak EAR) (fa) TEMP. 28.775 1.240 1.52% 0.07% 8,428 870 190,821 10,864 8.89% 5.31% 85.084 4.78% 322,134 892,013 5.81% 0140 Tote! CommemIal 91 2.05% &1(09) TOO peak 8-1 (09) TOD off peak 9-2 A (10) 82 - TOU (08-peak) 83 - TOU (Peak) 133 - TOU (017-peek) 84 - IOU (Peak) 114 - TOU (OR-peak) E-2 (M) TEMP. Total indwells! 10.51 - 11.52% 0.369 - 9.50 13.99 8.22 11.50% 0.033 400 11.00 0.187 400 • 400 15.00 9.30 400 1.047 400 12.77 8.01 174,805 11.528 0.65% 428 45,793 42.330 2.38% - - 274.945 15.45% 8,392 599,588. 17.95% 380. 14.70 380 12.88 380 360 9.20 14 50 380 7.75 360 12.37 - 2.13 380 - 9.10 12.00 360 - 7.48 11.50 - 0.50 400 13.00 400 400 11.55 - 1.45 400 380 380 4 9,818 259 389,851 28.395 1.40% 141.397 0.059 7.94% 0.00% 10 - 203,458 - 31.73% 0.333 895.331 KM 43,352 1,534,782 25.01% 2.882 13.90% 7.54% Goat 0.063 Cl(b) Supply el 400 Volts -exceeding 5 kW 0.787 0.04% 48 4,784 PEAK 0.434 0.02% C-1C(26) T OFF-PEAK 1.872 0.11% 9.747 1.994 0.55% Tens of Use (TOU) - Peak Time of Use (TOU) - Off-Peak 8.259 0.46% 2.238 0.13% 6.936 33.271 85.598 0.39% 1.87% - 3.68% 0.11% - - 0.001 400 11.50 15.00 0.003 44.05% 0.019 0.004 380 380 11.40 14.70 - 2.10 26 27,825 13.55% 0.024 380 380 7.75 - 1.45 3 1.90% 0.032 360 360 10.10 - 2 53,800 30,818 9.20 11.30 49.30% 0.012 0.056 360 360 14.50 9.10 360 360 12.18 7.35 - 1.20 2.32 1.75 209 138,529 21.94% 0.180 4.97% - • 200 80 200 200 398,221 10.31% 0.233 1.011 116.833 5141% 37,759 435,670 12.24% 1.257 1.993 0.557 0.11% 1,429 8.71% - 0.03% 103 4.20% - Special Contracts - Tariff K (MK) - - 10,454 8,052 _ Tlme of Use (TOU) - Peak - - - - Time of Use (TOU) - Off•Peak - - - - - - Residentiel Colonies H Raliway TractionTraction - 1 Co-Genrellon4 Grand Total 1,779.825 100% - 12.60 10,104 - 35,147 Total Agricultural 10.25 1.29 1.15 , 11 - 10.08% Public Ughting G - 9.30 31,205 6,444 22.097 89.914 1.99 8.01 400 0.19% 1.15 - 0.008 3.399 1.423 10.35 13.01 9.47% 1,953 859 02 Agficultuel Tube-welts TVs@ of Use (TOU) - Peak 0.19 Time of Use (TOU) - Off-Peak 1318 -- 9,026 0.08% 1.24% 5.05% 01 Scarp 1.45 90 0.014 Agricultural Tube-wells - Tariff D 2.02 - - - 9.14 0.660 2.75% 14.72% - 1.01 0.126 48.886 32,36% 400 - 262.071 194 Total Moyle Point Supply - 15.00 15,147 29 Time of Use (TOU) - Peak Time of UP (TOU) - Off-Peak 12.00 - 2.40% 0.00% C3 Supply above 11 kV - 44.110 0.059 C.2 Supply at 11 kV 0.063 131,471 - 12.68% 0.40% 19 112 - Bulk Cl (a) Supply et 400 Volts - up to 5 kW 41C(25) T 7.33% - 36.516 7.092 132 - TOU (Peak) 5,287 - - 17.00 0.005 1.009 industrial 57 - - - - Commerclal (420 KW) For peak load requirement exceeding 5 kW - 3,192,193 9,524,372 , - 120 10.00 9.50 14.50 9.10 200 200 13.00 8.00 15.00 - 14.00 - 11.00 1.00 - 2.73 1.50 1.10 13.73 - 1.27 12.92 - 1.08 - 2 6.77 - 8.44% • 4.571 - FORM - 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement /Monthly, Qwtl.dvas well as Consolidated) ..', i:ii " . , - getWX) r Residential up to 50 UN% For peak load requirement up to 5 kW OOP 01-100 Units 12848 44.69 7.22% 211% 1,520,525 - .- 34821 10.56% 758'524 - NEPRA 337.21 101-300 Units GOP NEPRA 109.14 301-7001We OOP 15.30 NEPRA 19.32 6.13% 481 430 - - - 056% 22,253 - . NEPRA .. 2,537 - 0.44% - 3237 - - 7.77 7.77 - 385 . . 257 - - 128 2,018 - 1,221 . - 1,509 - - 624 299 - 885 - - - 116.11 OOP Above 700 Units . (ean Rs) (ken Rs) (Mn R.) (min Rs) gun Rs) (Min Rs) Meat (kW) . • lima) 1 ..,,'• - - 128 - . - 189 - 111 . - 117 - 11 - - 6,653,529 For peak load requirement exceeding 5 kW 71ms of Use (toll) • Peak Time of Ude (TOU) - Off-Peak E-10) (55) TEMP. Total Residential Commends! - A2 Commercial For peak load requirement up to 6 kW Commercial (n100) Common:1i (120 KVV) For peak load requirement exceeding 5 SW - 0.00% 0.06% 1.02 Time of Use (TOU) - Peak (A-2) Tyne of Use (TOU) - Off-Peak (Temp) TEMP. &Kg (56) Teen Commercial 0.004 . - 15 - 14 - 1 - 42 1 - 37 1 - 6 - 6,618 - 3,515 - 2,103 - - - - - . 796 - 892 - 104 . - - - - - - - - 4.47 0.04 0.25% 0.00% 3,771 187 54,045 1,098 3.77% 1.58% 0.028 - 614.42 37.03% 2,787,207 6,708,872 4.18% 0.032 314,781 263% 48 83 - - 0.00% - - 0.00% - 0.06% 484,241 57 4.42% - - - - 6,287 7.33% 0.005 - - 0.037 7.24 0.41% - 28.78 1.24 1.62% 0.07% 6,426 870 190,821 10,664 6.89% 5.31% 0.109 - 85.09 4.71% 322,134 1192,013 5.81% 0.240 36.52 2.05% 19,112 131,471 12.88% 2 14 15 109 79 95 273 21 1,214 2 10 - 5 14 98 - 13 79 . 96 230 19 - 1,046 - 43 2 168 - 54 383 105 - 56 21 - - 4313 - 384 106 419 - 99 - Industrial 131 8-1(09) TOD peak B-1(09) TOD off peak 7.09 0.40% - - 0.063 - 44.11 2.41% 15,147 174,805 11.52% 0.369 - 8-2 A (10) 11.53 0.65% 428 - 11.50% - 0.033 0 187 74 835 14 74 62 - MU (Peak) 2.35% 45,793 - 14 42.33 16.46% 8,392 420 2,557 48.80 262.07 2.75% 1472% 4 17.95% 000% 1.047 83 - TOU (Peak) 83 - IOU (Off-peak) 899,588 9,1318 420 82 - TOU (Off-peak) 274.95 0.126 0.860 48 248 719 2,411 26.40 1.48% - 369,851 - 32.38% - 0.063 714% 000% 50.30% 10 43,352 203,456 31.73% - 15.01% 0.333 22 122 383 2.882 948 84 • IOU (Peak) 84 - TOU (0ff-peak) TEMP. E-2 (511) 1o6e) Industrial Bulk CI (a) Supply et 400 Volts • up to 5 kW C1(b) Supply st 400 Volts -exceeding 5 kW 141.40 o.pe 696.33 0.06 0.79 C2 Supply et 1116/ Time of Use (TOO - Peak Tkne of Use (TOU) - 011-Peak C.3 Supply hove 11 IN Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peek Total Single Point Supply 0.00% 0.04% - 259 29 48 . 1,834,782 194 4,764 0.02% 0.11% 9.75 0.55% 90 11 1.99 0.11% - 02 Aescutual Tub►welle Tkne of Use (TOU) - Peak 0-18 Time alUse (TOU) - 011-Peak13113 Total Agricultural 94 - 48 820 - 355 99 248 - 380 22 2,031 327 1,287 I 122 - 1,055 1 9,082 948 7,727 8 7 17 1 4 6 7 .9.47% (loos 44.05% • 0019 7 111 2 10 10 4 29 78 25 101 20 59 303 679 - 0.004 0.024 1 1 10,104 0.001 - 232 0 - 1,366 - 0 - 1 9 56 - 2 10 10 4 20 15 100 25 84 1 1 2 11 - 4 - 12 046% 0.13% 0.39% 1.57% 68.60 369% 2 209 138,529 13.55% 1.90% 49.30% 21.94% 3.40 0.19% 1,953 31,205 4.97% - 37 - 34 1.42 22.10 89.91 0.05% 0.014 3 14 10 10.31% 0.233 1.011 46 201 320 ' 818 2 48 201 287 719 118.83 6.56% 37,759 • 8,444 396,221 436,870 0.10 1.24% 5.05% 859 35,147 1224% 1.257 250 1,190 249 1,050 10,454 8.71% - - 30 - 27 - 3 011% 1,429 4.20% . - 8 - 7 - 1 28 3 27,825 53,800 - 30,816 0.032 0.012 0 056 0.160 59 - 1.99 Residential Colonies H 0.58 Ftallway TractionTraction -1 Co•Genration-J - 1 - 0.000 0.003 541 2,202 - - 7 8.25 2.24 8.94 33.27 Public Wiling 0 Special Contracts - Tang K (AJK) Tine of Use (701J) - Peak 71me of Use (TOU) - 011-Peak 7.54% - 127 9,028 Agricultural Tube-wells-Tariff 0 DI Scarp 13.90% - 1 4 - - 1.87 0.43 PEAK C-1C(26) T CAW.% 7 OFF-PEA( 0 ' 1.01 Regular . - 0.03% 103 8,052 - - - - - - - - - - • - - - 1,362 17,820 - - ■ 3,192,193 103% 1,779.53 Grand Total 9,624,372 8.44% 6 - 23 84 245 570 3 16 58 109 - 3 1 - 4 33 99 1 139 - 1,351 13,943 1 3,877 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement April 2013 (Monthly , Quarterly as well as Consolidat ed) DI(SeflptIon Sales PAWN Sales Mix No. of Consumeni (repel Connected Load (kW) Load Factor MW Charged MON) , 114.9.1 NEPRA Determined Tariff GOP Notified Tariff Subsidy Fixed Charge VoriabN Charge Fixed Change Variable Charge Fixed Charge Variable Charge (Ra/kW/M) (112/kWh) (RarkW/M) (Raol(Wh) (WkW/k1) (Rs/11VVIO Residential ! to 50 Units 37.96 517% 1,295,246 - 3.00 - 2.00 - 1.00 GOP 132.03 20.77% 7213,938 - 9.60 - 5.79 - 181 NEPRA 126.18 8.57% 714,763 - 13.00 - 1 11 - 4.99 1.06% 53,188 • 1150 - 12.33 - 117 0.39% 3,788 - 18.50 - 15.07 - 1.43 For peek load requirement up to 5 kW 01.100 UNts 101-300 Units 301-7000n8s Above 700 Units - GOP 55.12 NEPRA 59.67 GOP 8.73 NEPRA 8.02 GOP 2.50 NEPRA 2.50 6,864,788 For peak load requirement wicesdng 5 kW - - Tine of Use (TOU). Peak 0.29 0.05% Time of Use (TOU) • Off-Peak 1.35 0.21% 3,818 54,340 3.40% 0.02 0.00% 165 1,079 2.06% 23538 37.13% 2,711,684 4,720,205 4.81% 16.61 2.111% 315,154 485,085 4.89% E-1(9 (55) TEMP. Total Residential 0.001 15.00 0.009 9.50 - 1 22 - 1.28 1150 - 15.50 - 1.00 14.77 - 123 0.010 13.99 1.01 - Commercial - A2 Commercial For peak Wed requirement up to 5 kW Common:lel (<100) - 17.00 - - - - Commercial (<20 KW) For peak load requirement exceeding 5 kW - Regular Minot Use (TOU) - Peak (A-2) Tine of Use (TOU) - OR-Peak 8-109 (58) TEMP Total Commercial 0,31 0.05% 59 6,244 6.82% 0.002 400 14.50 clout 400 0.075 400 - 400.00 9.72 15.00 unclo 13.20 9.50 400.00 8.01 - 1.49 15.00 - 2.00 2.40 0.38% 10.12 1.59% 6,473 191,648 7.23% 0.36 0.08% 574 10,955 4.55% 29.81 4.85% 322,560 693,932 5.88% 12.39 1.95% 19,053 131,024 12.96% 2.32 0.37% 15.40 2.42% 15,277 175,918 11.99% 0.124 - 3.52 0.55% 422 44,924 10.73% 0.011 400 11.00 0.082 400 17.50% 0.355 400 0.043 380 0.228 380 9.20 0.020 360 14.50 36.11% 0.109 360 9.10 380 17.00 4.78 - 1.80 0.010 Industrial 81 13-1 (Om 700 peak 13-1 (09) TOO ort peak 132 A (10) B2 - TOU (Peak) 14.89 2.34% 62 - TOU (Off-peek) 90.17 14.19% 8,448 705,934 153 - TOU (Peak) 16.33 2.57% 4 9,818 B3 - TOU (01pealq 88.34 13.90% 259 372,289 B4 - TOU (Peak) 10 17 1.80% 134 - IOU (011-peak) 53.83 8.44% 0.01 0.00% 307.16 41.33% 8-2 381 TEMP Total Industrial - - 0.020 10 203,458 32.51% 43,473 1,641363 26.60% 12.00 - 10.51 - 1.49 15.00 - 13.99 - 1.01 9.50 - 8.22 - 1.28 400 9.14 15.00 400 12.77 9.30 400 8.01 14.70 380 12.68 - 380 7.75 - 360 12.37 12.00 2.23 - 1.29 2.02 1.45 2.13 7.46 11.50 - 0.50 1.45 0.972 Bulk C l(a) sassy at 400 volt, - up to 5 kW 0.02 0.00% 29 194 1125% 0.000 13.00 - 11.55 C10)6pief u el 400 Volts -*needing 5 kW - 0.23 0.04% 47 4,578 6.79% 0.001 400 11.50 400 10.35 - 0.02% 0.000 400 15.00 400 13.01 1.15 C.-1C(213) T PEAK 0.12 C•1C(213) T OFF-PEAK 0.52 0.08% 91 9,212 7.72% 0.002 400 9.30 400 8.01 - 1.29 3.28 0.52% 11 10,104 44.44% 0.007 380 11.40 380 10.25 - 1.15 Time of Use (TOU) - Peak 0.59 0.09% 0.001 380 14.70 380 12.60 Time of Use (T0t) - Off-Peak 2.58 0.40% 26 27,825 12.60% 0.008 380 9.20 380 7.75 - 1.45 0.13 0.02% 3 53,800 0.33% 0.003 360 11.30 360 10.10 - 1.20 Time of Use (701.9 - Peak 1.89 0.30% 0.003 360 14.50 360 12.18 - 2.32 Time of Use (TOU) • 01Peek 8.91 1.40% 2 30,818 39.59% 0.017 360 9.10 380 7.35 - 1.75 18.24 2.117% 209 136,829 18.30% 10.00 - C2 Supply at 11 kV C3 Supply above 1 1 kV Total Single Point Mandy 1.99 2.10 0.043 Nirlcultural Tube-wells - Tariff D Ell Scup 1.24 020% 1,912 30,511 5.58% D2 Agricultual Tube-wells 0.58 0.09% ' 880 - 5,591 13.82% Time of Use (Iou), Peak D-18 - - 11.00 - 0.004 200 9.50 120 6.77 80 8.38 1.32% 0.076 200 14.50 200 13.00 33.49 5.27% 35.262 399,967 11.47% 0.337 200 9.10 200 8.00 - 43.141 5.117% 37,834 438,019 13.71% 0.411 Public Lighting 0 0.48 0.07% 1,430 10,457 8.06% - Residential ColoNes H 0.24 0.04% 103 8,052 6.37% 3,197,493 9,648,607 9.03% Timed Use (TOU) - Off-Peak 13113 Total Agricultural Special Contracts - Tariff K (MK) K) Time of Use (TOU) - Peak Time of Use (TOU) - OfFPtik - Co-flkenration-J Onind Total 636.64 15.00 - 13.73 - 1.27 14.00 - 12.92 - 1.08 - - 100% 1.832 1.10 - - Railway TractIonTraction - 1 1.50 - - 1.00 2.73 - FORM - 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement ....r Descriplion Seise Sales UM (1/10141) Msg.) No. Consumers Connected ted Load Load Factor (kW) Oise.) MDI Chorus Win Rs) (Len Rs) (1.41s1 Rs) OM Rs) (1Als RI) (kiln Rs) Subsidy Variable Charge OOP NotMed Tariff Variable Fixed Chary. Charge NEPRA Determined Torii( axed Variable Charge Charge Charged (Mull) ininm Rssidendal 37.98 5.97% - 0.00% GOP 132.03 20.77% NEPRA 126.18 Up to 50 Units Forsook load requirement up to 5 kW 01.100 Units 101-300 Unite GOP 55.12 NEPRA 59.67 1,295,248 720,936 114 - - 1211 - - . - 714,763 . .. - 776 - 447 - 329 1.05% 53.188 - - 124 - 83 - 41 - - 41 - 38 - 4 - - - - 6.73 8.02 GOP 2.50 2.50 0.39% 0.29 0.00% 0.05% - _ - - 0.001 - 4 1.35 002 0.21% 0.00% 3,818 165 54,340 1,079 3.40% 2.06% 0.009 - - 13 0 235.58 37.13% 2,711,664 6,720,205 4.81% 0.010 - - 2,254 1661 2.81% 315,154 485.085 4119% - - Commercial (<100) - 0.00% - - - - Commercial (<20 KW) For peak load requirement exceeding 5 kW - - - 0.31 0.00% (los% 2.40 0.35% - 10.12 0.38 1.59% 0.05% 8,473 874 191,848 10,955 21.51 4.59% 322,680 12.39 1.95% 19,053 2.32 0.37% - 15.40 2.42% 15,277 3.52 0.55% 422 NEPRA 784 447 5.137% NEPRA Above 700 Units 38 - - GOP 301-7000nils - 76 - 3,788 6,664,786 For peak load requirement exceeding 5 kW Time of Use (TOU) - Peak Tkne of Use (TOU) - Off-Peak E-1(1) (55) TEMP. Total RasIdential Commercial - A2 Commarcial For peak load requirement up to 5 kW - Regular - Time of Use (TOU) - Pm* (A-2) Tiros of Use (TOU) - Off-Peak (Temp) E-1(10 (56) TEMP. Totel Commercial - 11 0 2 - 0 1,423 - 0 861 282 - 245 - - - - - - - - • 59 - - 4 - - - - - - - 6,244 6.82% 0.00% 0o02 0.014 1 5 5 36 1 5 7.23% 4.55% 0.075 - 30 .._ - 96 6 693,932 6.811% 0.090 36 131,024 12.95% - . 0.020 175,918 11 99% - •44,924 - 10.73% - 0.124 0.011 3 37 32 - 1 4 30 - 81 5 - 15 425 31 367 - 1 69 - 149 130 32 127 18 35 148 - - - - 2 20 - 7 - 33 118 - 33 128 - Industrial -B1 B-1 (09) TOO peak B4(09)100 off peak • 9-2 A (10) - - - 4 39 4 32 0.062 25 223 25 190 87 722 207 885 82 . TOU (Peak) 14.89 2.34% - B2 . TOU (Mnsk) 90.17 14.19% 8,448 705.934 17.50% 0.355 142 839 142 B3 - TOU (Peak) 133- TOU (Off-peak) 16.33 2.57% 13.90% 4 259 • 9,818 372,289 0.00% 16 - 0.020 ' 87 7 240 813 18 32.51% 0.043 0.228 147 7 126 0.109 - 39 - 488 0.18 • 0.972 321 3,119 39 321 400 0 2,661 - 0 2 2 - 0 0 - 1 4 1 4 0 88.34 10.17 - 1.50% - 53.83 0.01 307.16 8.44% 0.00% 48.33% 10 43,473 203,458 - 38.11% 26.60% 1,543,313 Bulk C1(s) Supply M 400 Volts - up to 5 kW 0.02 C1(b) Supply at 400 Volts -mumeding 5 kW PEAK C-1C(26)7 0.23 0.12 0.00% 0.04% 29 47 0.02% 91 194 • 13.25% 8.79% 4,578 - B4 - TOU (Plait) I34 - TOU (01-peak) TEMP. 6-2 (55) Total Industrial C-1C(26) T OFF-PEAK C2 Supply 411116/ Time of Us* (TOU) - Peak Tkne at Use (TOU) - 011-Psak C3 Supply above 11 kV 0.52 0.05% 3.28 0.59 0.52% 0.09% 1.89 8.91 0.40% 0.02% 0.30% 1.40% 18.24 01 Scarp D2 Agpicultual Tube-walls Time ot Use (rou) - Peek1:1-1E1 Tlme of Usa (TOU) -Off-Peek D1B Taal Agricultural Tim* of Use (TOU) - Peak Time of Use (TOW O642ssk Total Single Point Supply 2.56 0.13 11 26 3 Time of Use (TOU) - Peak Time of Use (70U) - Off-Peak Ralteray TractionTractIon - 1 CoGenration-J Grand Total 0 7.72% 0.002 0 1 10,104 - 44.44% - 0.007 27,625 53,800 - 12.80% 0.33% 0 3 2 0 0 88 0 467 5 1 3 37 3 4 34 0.001 0,008 1 3 9 24 1 3 7 - 20 - 39.59% 0.003 0.003 0.017 1 1 a 1 27 81 1 1 1 23 65 - 18.30% 0.043 16 159 169 - 12 - 0 4 16 2.57% 2 209 30,816 138,621 1.24 0,20% 1,912 30,511 5.58% - 0.56 0.09% 660 5,591 13.82% 0.004 1 5 1 4 8.36 33.49 43.58 1.32% 5.27% 35,282 37,834 399,987 11.47% 0.076 0.337 15 67 121 305 13.71% 0.418 54 441 109 288 393 - 436,069 15 87 83 1,430 10,457 6.06% - 8 - 1 103 6,052 5.37% - 3 - 0 11.57% 0.24 0.07% 0.04% - - - - - 636.66 100% 9.03% 0.48 Residential Colonise H Spacial Contracts - Tanff K (/UK) - 0.001 0.000 9,212 Agricultural Tub-wells - Tariff D Public UgMingl3 0.000 22 14 - 6 11 - 7 - 3 - 30 1 0 2 13 37 0 62 - 3,157,493 . 9,646,607 1.632 465 6,472 466 5,003 0 1,470 FORM - 26 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement May 2013 (Monthly , Quarterly as well as Co nsolidated) -) 11.18"..4 Mb' HlInffhl No. of Gansu mers (%en) Connected tow Load Fewer (NW) Mewl MCI (MIN) NEPRA Ostemiined Tariff 00P Notified TarN Subsidy need Clow Venable Chwge Reed Charge Vsrieble Charge Reed Charge Verloble Cage (Rl.WJIM) wentwit (Renwim) fftenbilt MUMMA (Rai WS) Residential 9e to 50 Units 33.31 524% 1,301.366 0.000 - For peek bed requitement se la 5 kW 01-100 Utile GOP NEPRA 101-300 Utile 150.51 3.00 - 2.00 - 1.00 - - - 3.81 23.70% 724,342 - 9.60 12.05% 718,140 - 13.00 8.11 4.89 1.79% 53,439 - 15.50 12.33 3.17 0.46% 3 786 16.50 15.07 1.43 15.00 13.99 - 5.79 140.96 GOP 75.50 NEPRA 83.88 301-7000M1. GOP 11.35 NEPRA 13.50 Abow 700 Units GOP 2.89 NEPRA 2.89 6,676 210 For peek loud requIrement mewing 5 kW - Ilene of Use (TOU) - Peek lime of Use (TOU) • Off-Peak E-10) (55) TEMP. Total Residential 0.36 0.05% ' 1.63 029% 3,538 54,449 4.60% 0.01 0.00% 186 1 ,081 1.27% 274.76 43U% 2,508,075 8,733 740 5.63% 15.27 2.56% 316,643 486,062 5.15% • 0.001 0.011 9.50 922 16.50 15.50 1700 14.77 1.01 - 1.28 1.00 0.013 Commercial - AZ Commented For peek load requirement up to 5 kW - Commerciel (.100) - 2.23 - Commercial (.20 KW) For peek load requirement el:weans S kW - ft5119, 0.41 0.06% Timed Use (TOU) - Peek (A-2) '2 63 0.41% Time of Use (70U). Off-Peak 11.30 1.78% 0.39 0.06% 33.00 6-29% 10.55 1.66% 19,143 2.55 0.40% 13.60 2.14% 15,349 176,272 424 45,014 E-1(1) (51) TEMP. UN Commendel 59 6257 8.96% 0.002 192,034 8.06% 97a 10,977 167% 324,084 698,330 9.50% 131.286 11.01% 6,504 400 14.50 0.014 400 0.061 100 400.00 9.72 - 15.00 Qom 13.20 - 9.50 400.00 8.01 - 17.00 4.78 1.60 1.49 15.00 - 2.00 1.49 0.048 Industrial Ill 8-1 (09) TOO peak 151 (09) TOO off peak B.2 A (10) B2 - TOU (peek) B2 - TOO (011.pesk) N - TOU (Peek) 53 - TOU (01Speek) 114 - TOU (Peak) 84 - TOU (01Spee4) 2.58 0.45% 14.7a 2.33% as 05 12.62% 6,488 707,356 5.44 0.68% 4 tau 74.92 11.50% 260 373,039 5.50 0.97% • - 12.00 - 10.51 - 0.020 - 15.00 - 13.99 - 1.01 10.57% 0.123 - 9.50 - 8.22 - 1.25 8.77% 0.011 400 11.00 400 9.14 0.063 400 15.00 400 12.77 - 2.23 0.362 400 9.30 100 6.01 - 1.29 0.037 380 14.70 360 12.68 - 2.02 0.231 380 9.20 380 7.75 0.018 360 14.50 sea 12.37 - 2.13 0.097 360 9.10 360 15.80% 27.51% 33.93 5.34% 0.02 0.00% 249.21 36.77% CI (a) &witty at 400 WM - up to 5 kVi 0.01 0.00% 29 194 9.81% 0.000 - CI (b) Supply st 400 Vdb -aloseding 5 kW 0.27 0.04% 47 4,587 0.13% 0.001 400 0.001 6-2 (511) TEMP. Toed Induaerbi 10 203,866 22.80% 12.00 43,976 1,941,973 20.48% 1.43 7.46 - 11.50 13.00 - 11.55 - 1.45 11.50 400 10.35 - 1.15 400 15.00 400 13.01 - 1.99 0.50 0.491 Bunt C.1C(26) T PEAK 0.18 0.03% C-1C(211) T OFF-PEAK 0.72 0.11% 91 9,231 10.67% 0.003 400 9.30 400 8.01 3.67 0.61% 11 10, 124 52.37% 0.006 360 11.40 380 10.25 - 1.15 0.69 0.11% 0.002 380 14.70 380 12.60 - 2.10 .111 IN Time of Use (TOU)- Peak Time of Use (IOU)- Off-Ptsk 1.29 3.16 0.50% 26 27,861 15.61% 0.009 380 9.20 NO 7.75 0.02% 3 53,906 0.26% 0.000 360 11.30 360 10.10 - 1.45 0.10 Time of Us. (TOU) - Peek 1.56 629% 0.004 360 14.50 360 12.18 - 2.32 Germ of Use (TOU) - Off-Peek 5.93 141% 2 30,876 39.63% 0.021 360 9.10 360 7.35 19.62 3.12% 210 139,803 19.84% 0.049 1.26 020% 1,921 30,572 5.75% - 0.56 11.23 45.55 58.63 0.39 0.29 - 0.09% 1.77% 7.17% 913% 0.06% 0.05% 663 5,802 13.69% 35,429 38,013 1,437 103 400,773 436,947 10,478 6,064 15.57% 111.38% 5.14% 6.52% 0.004 0.077 0.341 0.423 3,212,800 9,666,036 9.00% C3 Reply abow 11 W Toler Singie Point Supply 1.20 1.75 Nwitteltural Tube-wells - Thrill() pi Scarp 02 Agrkullud Tube-web Tkne of Use (TOU)- Peak 0-18 Tim. of Use (TOU)- Off-Pesti:11B Toted Agriculturel Pubic UghtIng 0 Reeidsnlid Colones H Specie Commas -1.61 K (A.11() llme of Uwe (TOU) - Peak Tkne of Use (TOU) • Off-Peek - Ralaw, TradlonTnedon -1 Co•0enrallon4 Omni Total 1115.10 100% 1.543 - 11.00 - 10.00 - 1.00 200 200 200 9.50 14.50 9.10 120 200 200 6.77 13.00 8.00 60 - 2.73 1.50 1.10 15.00 14.00 - 13.73 12.92 - 1.27 1.08 FORM -28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quartsdv as wall as Consolidated) Daerlpllrl fits Sake Mkt pawn) (Skie) No. et Consume Cannecied Load Load Peeler (O W) (now) MDI GOP Notified Tariff Variable Fkad Charge Charge NEPRA Detannined Tariff . %disks rawa. Charged paw) Fkod Charge wan Re) (kin Rai (tom Re) (kan Re) (kiln Re) Subsidy Vodkas Flood Charge Charge Ban Re) Residential' 33.31 524% - 0.00% GOP 150.51 23.70% NEPRA 140.98 • lo 50 Urfa 01.100 Uri 76.50 101-300 Urals GOP NEPRA 83.88 301-700Uak GOP 11.35 NEPRA 13.50 Anew 700 Unite GOP NEPRA 2.89 1 301 366 724 342 - 33 - 182 620 - 470 69 87 0.000 - 100 - - - - . - - 1,353 . 871 1,090 - 12.05% 716 140 1.79% 53 430 . 209 - 140 . 0.46% 3,788 - 46 - 44 - • - - 2.89 6,678,210 For peak load rewirernert exeseang 5 kW Tinte of Use (TOU) - Peak Tkne of Use (TOU) - Off-Peak E-1(I) (55 ) TEMP. Total Itseldentisl 0.36 0.06% - - 0.00% - - - - - 5 0.001 5 2 1.83 029% 3,535 54,449 4.60% 0.011 15 - 0.01 0.00% 106 1,081 1.27% - - 0 - 0 - 0 276.76 43.85% 2,805,075 5,733,740 5.63% 0.013 - 2,524 - 1,782 - 1,061 18.27 21111% 316,643 488,062 5.15% - 311 - 270 • - 0.00% 17 Commercial - AZ For peek Iced lerpiremeni up to 5 kW Cowmen:lel I00 5.98% 0.002 1 a 1 4 - 0.00% 0.014 6 39 6 35 - 5 192,034 ' 908% am 33 107 33 91 - 17 871 10,977 4,87% - 324,084 695.330 En% 0.096 131,255 . 11.01% 0.00% Ragas, 008% Time of Use (TOU) - Peak (4-2) 2.63 0.41% - 11.30 1.70% 6,504 0.39 0.05% 33.00 130% 10.55 1.66% 19,143 2.55 0.40% - Thu of UN (TOU) - Mena (Twee) E-1(1) (58) TEMP. Tata Comma/old - - - . - 8,257 0.41 Fr peak load rakiremeird mowing 5 kW 41 - 59 7 39 470 39 8 - 1 405 - 85 18 Industrial IN 5-1 (OM TOD peak 0.020 - 127 - 111 - 38 - 36 - 3 - 112 • 17 129 13.60 2.14% 15,349 178,272 10.57% 0.123 2.88 0.45% 424 45,014 3.77% 0.011 4 32 4 26 2.33% - 0.063 25 222 25 189 -.. 82 - TOU (Peek) 14.75 33 52.05 12.92% 8,450 707,358 15.59% 0.382 145 763 145 657 - 105 92 - TOU (Offbeat) 5.44 0.116% 4 9,838 0.00% 0 037 14 so 14 89 74.92 11.80% 260 373,039 27.51% 0:231 86 689 88 581 - 109 8-1 (09) TOO off peek B-2 A (10) B3 - TOU (Peak) 53 - TOU (Off-peak) - - - 0.018 e 80 6 88 22.80% 0.097 33 309 35 253 - - 1,646,673 20.48% 0.961 29 194 9.81% 0.000 47 4,587 8.13% 91 11 9,231 10,124 10.67% 52.37% 26 3 27,881 53,905 15.61% 0.26% 2 210 30,878 135,803 39.03% 19.84% - - 5.50 0.87% 33.93 5.34% 0.02 0.00% - 246.21 51.7714 43,678 Chid %kph at 4114 Vob - w le 5 WV 0.01 0.00% C1 (b) gook a 400 Veen we:wane 5 kW 0.27 0.04% 0.18 0.72 3.57 0.89 3.15 0.10 1.88 5.93 19.112 0.03% 0.11% 0.81% 0.11% 0.50% 0.02% 029% 1.41% 3.12% 54 - TOU (Peek) 94 - TOU (011-p.k) E-2 (54) TEMP Total Woad.' 10 203,868 • 12 - 56 317 2,102 - 357 0 317 2,4611 0 - 0.001 1 3 1 3 - 0 0.001 0.003 0.008 0.002 0.009 0.000 0.004 0.021 0.049 0 1 3 1 4 0 1 7 15 3 7 44 10 29 1 27 81 206 0 1 3 1 4 0 1 7 18 2 6 40 9 25 1 23 86 173 - 0 1 4 1 5 0 4 16 32 13 4 148 364 627 5 4 - - Bulk PEAK C.-IC.(281 T C-1C(28) T OFF-PEAK C2 Supple at 11 W Time of Use (TOU)- Peak Tkne of Lleit (TOU) - Off-Peak C3 Supply above 11 W Time of Use (TOU) • Peak Tkne of Ulla (TO(/) - Off-Peek Total ',bleb Paint Supply Amicultural Tube-welle - Tariff 13 DI Sake 02 Aperailkol Tube-wok Time el We (TOU) - Peak I)-18 Time of Use (TOU) - Off-Peek D15 Tata Agrieullural Pubic Winn G Retidsralal Caorwe II Spasiel Condole - Tariff K (MK) lime of Use (TOU) - Peak Tkne of Use (TOU) - Off-Peak Raiway TrationTradien -1 Ce-Genretion-J Grand Told 11 0 0.21 - 5 1.28 0.58 11.23 45.55 U.83 0.39 0.29 835.10 0.20% 0.09% 1.77% 7.17% 9.211% 0.08% 0.05% ' 1,921 683 30,572 5,602 5.75% 13.89% 35,429 35,013 1,437 103 400,773 436,947 10,478 6,064 15.57% 18.38% 5.14% 6.52% 0.004 0.077 0.341 0.423 - 1 15 88 85 - 14 5 163 415 597 6 4 0 15 68 54 • - 0 • 0 1 2 17 50 70 0 0 - • 100% 3,212,600 9,6116,035 9.00% 1.543 459 6,574 458 4,978 0 1,888 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement June 2013 (Monthly, Qwrtarly as well as Consolldat Description galas Sales Mix Dawn) No. of Consumers 114.94, Connected Load Loud Factor (kW) (%alls) M D1 Charged irmun NEPRA Determined Tariff GOP Notified Thrift Subsidy Fixed Charge Variable Charge Fixed Charge Variable Charge Fixed Charge Variable Charge (FtWkW/M) (Rs/kWh) (IW/kW/IA) (Rs/kWh) (RsAW/11) (Rs/kWh) Residential Up to 50 Una. 25.12 For peak load requirement up to 5 kW 01-100 Units 101-300 Units 301-700UnNs 3.71% - GOP 181.99 NEPRA 161.99 23.90% 1,308,009 728,040 3.00 - 2.00 . 1.00 - - 9.80 - 5.79 - 3.81 - 13.00 - 8.11 - 4.89 - 15.50 - 12.33 - 3.17 - 16.50 - 15.07 - 1.43 - - - - 15.00 - 13.99 - 1.01 - - 9.50 - 8.22 - 1.28 - 18.50 - 15.50 - 1.00 • 17.00 - 14 77 - 2.23 - GOP 95.01 14.02% NEPRA 95.01 14.02% - GOP 15.87 2.31% 53,712 NEPRA 15.87 2.31% - GOP 4.03 0.59% 3 805 NEPRA 4.03 0.59% - - - - 0.24 0.04% 3,858 Above 700 Units - - 721,805 _ 8,695,495 For peak load requirement exceeding 5 kW Tine of Use (TOU) - Peak Tine of Use (TOU) - Off•Peak E-1(I) (55) TEMP Total Residential 1.33 0.20% 0.01 0.00% 303.40 61.11% 2,519,394 6,751,169 6.16% • 20.81 3.04% 318,258 487320 5.79% - 0.00% - - - 0.00% - 187 , 54,590 1,084,, 3.32% 1.52% Commercial - 42 Commercial For peak load ntquiramenl up to 5 kW Commerou (.1co) Commercial ("20 KW) For peak load requirement exceeding 5 kW Regular Time of Use (TOU) - Peak (A-2) " 0.84 0.09% - 80 8,273 14.04% 2.83 0.39% - 11.18 1.55% 6,537 192,531 7.95% 0.21 0.03% 883 11,005 2.59% 35.27 6.20% 325,736 697,129 5.93% 15.51 2.29% 19,241 131,828 16.15% 2.05 0.30% - 11.43 1.89% 15,428 176,729 7.07 1.04% 426 45,131 112 - TOU (Peak) 15.40 2.27% - 132 • TOU (011•pear) 88.48 13.05% 8,531 709,187 9.84 1.45% 4 9,883 81.07 9.01% 252 374,004 5.48 0.81% - Tine of Use (TOU) - Off-Peak E-101) (56) TEMP. Tote Commercial - - . - - 0.002 400 14.50 400 9.72 - 4.78 0.013 400 15.00 400 13.20 - 1.80 0.074 400 9.50 400 8.01 - 1.49 - 17.00 - 15.00 - 2.00 - 10.51 - 1.49 13.99 _ 1.01 - 8.22 - 1.28 0.069 industrial 81 E1-1 (Om TOD pink 8.1 (09) TOO off peak 8-2 A (10) 133 - TOU (Peak) 83. TOU (011-perdr) 04 - TOU (Peak) B4 • TOU (OR-peak) E-2 (58) 37.18 TEMP. 5.48% 0.00% Toter indsmIriel - - 12.00 0:020. , 15.00 8.86% 0.122 - 9.50 21.48% 0.011 400 11.00 400 9.14 - 1.88 0.061 400 15.00 400 12.77 - 2.23 0.360 400 9.30 400 8.01 - 1.29 0.042 380 14.70 380 12.68 - 2.02 0.225 . 380 920 380 7.75 - 1.45 0.019 380 14.50 380 12.37 - _ 2.13 0.106 360 9.10 360 7.48 - 0.50 - 17.09% 2237% - 10 204,393 ,.. 43,902 1,660,935 253.41 37.39% Ct(a) Supply al 400 Valhi - up to 5 kW 0.02 0.00% 29 Cl(b) Supply al 400 Voile -exceeding 5 kW 0.32 0.05% 47 PEAK 0.16 0.03% C.1C(211) T OFF-PEAK 0.76 0.11% 92 9,254 4.85 0.89% 11 10,151 0.55 0.08% , 2.56 0.38% 28 27,953 0.13 0.02% 3 54,048 1.e6 0.27% 24.91% 12.00 . - 11.50 1.84 21.03% 0.1155 195 16.18% 0.000 - 11.55 - 1.45 4,599 9.44% 0.001 400 11.50 400 10.35 - 1.15 0.000 400 15.00 400 13.01 - 1.99 11.29% 0.002 400 9.30 400 8.01 - 1.29 82.72% 0.007 380 11.40 380 10.25 - 0.001 380 14.70 380 12.60 - 12.53% 0.007 380 9.20 380 7,75 - 0.32% 0.003 380 11.30 360 10.10 - 1.20 0.003 360 14.50 360 12.18 - 2.32 360 9.10 7.35 - 1.75 10.00 - .. Bulk C-1CO8) T C2 Supply at 11 kV Time of Use (IOU) - Peak Time of Use (TOU) - OR-Peak C3 Supply above 11 kV Time of Use (TOU) - Peak Tirm of Use (TOU) • Off-Peak - - - - - - - 13.00 935 1.38% 2 30,958 41.38% 0.017 20.37 3.01% 211 137,155 20.34% 0.042 DI Scarp 3.47 061% 1,931 30,652 15 51% - - D2 Agricultuel Tutie-vmNs 0.93 0.14% 887 ' 5,617' 22.61% - 200 9.50 Total Single Point Supply 350 , 1.15 _ 2.10 1.45 AgricuPural Tube-wells • Tariff D Time of Use (TOU) - Peak 13-113 11.00 120 6.77 80 1.00 2.73 8.75 1.29% 0.062 200 14.50 200 13.00 - 1.50 51.44 7.59% 35,809 401,810 17.54% 0291 200 9.10 200 8.00 - 1.10 64.59 9.53% 38,207 438,079 20.20% 0.363 nubile Ughting 01 0.44 0.08% . 1,444 10,505 5.70% - - 15.00 - 13.73 - 1.27 Residenbat Colonies ti 0.34 0.05% 104 8,080 7.59% - - 14.00 - 12.92 - 1.08 Special Cordracts - Tariff K (AJK) -. - Tines Us* (TOU) - Peak - - Tim of Use (TOU) - Off-Peek - - 9.55% 1.141 Tim of Use (TOU) - Off-Peak 0113 Total Agricultural Ftaihray TrecdonTrection - 1 - - ' - Co-Genndion-J Grand Tote! 677.56 117% 3,229,000 9,691,055 FORM - 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement (Monthly, Quarterly as well as Consolldat DescrIpdon Sales gales Mix No. ot Connected Load . Consumer. (%age) (MSWS) (SW) MDI Charged ogign Load Factor NEPRA Determined Tarlff Variable charge Subsidy Variable Flied charge Charge GOP Notified Tarlff Variable Fixed chew charge Fixed Charge ... (1‘.9.1 (Min Re) (Min R.) (min R.) (kin R.1 (min Ru) (Min Ru) Rellidential Up to 50 ants 25.12 3.71% For peak load requirement up to 5 kW 01-100 Unita GOP 181.99 0.00% NEPRA 161.99 75 - - 50 - - 25 . 1,585 - 938 - 627 - - 1,235 - 771 - 485 243 - - 193 - 50 68 - 61 - 6 721,805 - 2.31% 53,712 - - - 3,805 - - 95.01 301.700Units NEPRA 15.87 , • 4.03 0.59% NEPRA - - 14.02% 96.01 NEPRA GOP GOP - 728,040 - GOP Above 700 Units - 23.90% 101-300 Unita 15.87 1,308,009 4.03 1 - 6,895,495 For peak load requirement exceeding 5 kW . - - 0.00% - . - Time of Use (TOU) - Peek 0.24 0.04% - - Time of Use (TOU) - 011-Peak E-10) (55) TEMP. 1.33 0.01 0.20% 0.00% 3,858 187 4 13 0 - 3 11 0 303.40 44.76% 20.61 3.04% - 0.00% • - Taal Residential Commercial - At Ccanmercial For peak load requirement up to 5 kW Commercial (<100) Canvnercial (<20 KW) For peak load requirement exceeding 5 kW - 0.00% Regular 0.64 0.09% Time of Use (TOU) - Peak (A-2) 2.63 0.39% Time of Use (TOU) - Oft-Peak (Temp) E-1(19 (56) TEMP. Total Commercial 11.18 1.66% 0.03% 0.21 36.27 5.20% - - - 0 - 3.32% 1.52% - 2,119,394 54,590 1,084 6,751,169 - 1.16% - - 3,201 - 2,027 - 318,258 487,320 5.79% - 60 - - 350 - 304 - - - • - - - - - - - - - - 14.04% 0.002 1 - 000% 0.013 5 725% - 2.59% 16.15% - 6.93% 48 - - 192,531 11,005 325,738 - 697,129 1,174 -- 8,273 6,537 883 , 2 0 0.074 ' 0.089 - 3 9 39 1 8 5 29 106 4 - 35 609 29 35 35 90 3 438 - 5 - - ' 17 0 . 71 Industrial 15.51 229% 19,241 131,628 2.05 0.30% 1.69% B-2 A (10) 11.43 7.07 15,428 124% 426 82 - TOU (Peak) 15.40 2.27% - 178,729 46,131 - 132 - TOU (Off-peak) 88.48 13.05% 8,531 709,187 B3 - TOU (Peak) 9.84 61.07 1.45% 9.01% 4 282 B1 B-1 (09) TOD peak B-1(09) TOD off peak B3 - TOU (Oft-peak) - - 186 - 163 0.020. - 0.122 0.011 - - 29 - 94 23 2 15 21.48% - 4 31 109 78 • 0.061 24 231 24 65 197 1709% 0.350 140 823 140 709 - 9,883 000x 0.042 16 0.225 85 16 85 - 22.37% 145 582 125 374,004 473 - 20 89 8.86% 4 F - 13 34 114 12 5.48 0.81% - 0.00% 0.019 7 79 7 68 37.18 263.41 5.45% 0.00% 204,393 - 24.91% 0.00% 0.108 39 - 277 - 61 1,560,935 21.03% ' 0.95$ 316 338 2,691 39 37.39% 10 43,902 316 2,196 - 362 0.02 0.00% 29 195 ' 47 4,599 - 0 - PEAK 0.05% 0.03% 0 3 0 0.32 0.18 0 2 - C-1C(26)7 OFF-PEAK 0.78 0.11% 92 C2 Supply at 11 W 4.85 0.55 0.69% 11 0.05% 0.35% 26 12.53% B4 - TOU (Peak) 134 - TOU (O6-peak) E-2 (55) TEMP. Total Industrial - - Bulk Cl (a) Supply el 4C0 Volts - up to 5 kW C1(b) Supply M 400 Volts -exceeding 5 kW C-IC(26) T Tined Use (TOU) - Peak Ike* of Use (TOU) - Off-Peak C3 Supply above II kV Time of Use (TOU) - Peak Time or Use (TOU) - Off-Peak Total Single Point Supply , - 0.00% 0.001 0.000 9,254 11.29% 0.002 1 7 1 8 - 1 10,151 - 62.72% 0.007 3 53 3 0.001 0.007 1 3 8 1 24 0.32% 0.00% 41.38% .._ 0.003 1 0.003 0.017 1 8 15 1 23 69 - 85 3 1 1 8 - 5 0.00% 48 7 - 0 4 16 212 16 179 - 33 3 1.86 9.35 20.37 0.02% 0.27% 1.35% 2 3.01% 211 137,168 20.34% 0.042 3.47 0.51% 1,931 30,852 15.51% - 0.93 8.75 51.44 0.14% 867 5,617 401,810 0.082 0.291 3 - 0.000 9.44% 27,953 54,048 30,958 2.58 0.13 0 - 16.18% ' 0 0 4 3 1 27 20 0 0 1 4 Agricultural Tube-wells - 'Tariff D 01 Scarp 35 - 12 se 9 127 488 12 58 6 114 411 - 71 642 71 666 - 13 57 76 4 - 0 6,419 - 1,737 - 435,079 22.81% 0.00% 17.54% .20.20% Public lighting 0 0.44 0.06% 1,444 10,505 570% - - Residential Colonies hi 014 0.06% 104 6,080 7.59% - - D2 Agricullual Tube-wells Time of Use (TOU) - Peak 10-1B Time of Use (TOU)- Off-Peak D1B Total Agricultural 54.59 129% 7.59% 35,609 38,207 5.53% - - Time of Use (TOU) - Ott-Peak - - 677.85 100% Grand Total - 1 8 7 5 3 - Special Contracts - Tad( I K (AJK) Time of Use (TOU) - Peak Railway TractionTrachon - 1 Co-Genration-J 0.353 38 3,229,000 9,691,055 9.58% 1.441 437 7,156 - -,4 437 FORM - 28 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement 4th Quarter Monthly, Quarterly as well as Consollda ,. 70 . (04kWe) (lag.) (kW) 114941 (RsaW/M) (R. I,) (ReaWIM) (Reawe) (I140eW/11) (RIMMI) Residential Up to 50 Units 96.387 For peak load requirement up to 5 kW 4.1% 1,308,009 - 01-100 Unks GOP NEPRA 429.155 101-300 Units OOP 226.633 NEPRA 238.582 444.530 301-700UnIts OOP 33.748 37.194 Above 700 Units NEPRA 00P NEPRA 9 418 9.417 221% 728,040 11.8% 721,805 1.7% 53,712 - 0.5% 3,805 Tine of Use (TOU) - Peak 0.887 0.0% - Time of Use (TOU) - Off-Peak E-1(1) (55) TEMP 4.502 0.038 0.2% 0.0% 816.142 Commercial (.20 KW) For peak load requimnent exceeding 5 kW Reguiw Time of Use (TOU) - Peak (A-2) Time of Use (TOU) - Off-Peek E- 1(I1) (58) TEMP. Total Comnetelai - 1.00 • 3.81 - 9.80 - 5.79 - - 13.00 - 8.11 - 4.89 - 15.50 - 12.33 - 3.17 - 16.50 - 15.07 - 1.43 0.002 - - 13.99 - 15.00 9.50 16.50 - 8.22 15.50 17.00 - 14.77 . 6,895,495 - Commercial (000) 2.00 - 0.0% Total Residential - - - Commarelal - A2 Commercial For peek load requirement up to 5 kW 3.00 - • For peak load requirement exceeding 5 kW - - _ 3,856 167 . 54,590 1',0114 3.77% 1.61% 0.020 - 41.1% 2,811,304 8,781,169 '6.62% 0.022 55.493 2.8% 318,258 487,320 5.20% - • 0.0% - ' ' - • 0.1% 7.865 32.594 0.982 911.077 0.4% - 1.7% 0.0% 8,537 883 50% 325,738 60 - - - 1.384 - - - 1.01 - 1.28 1.00 - 2.23 - - - 0.006 400 14.50 400 9.72 - • 4.78 0.041 400 15.00 400 13.20 - 1.80 0.230 - 400 9.50 17.00 400 - 8.01 15.00 - 1.49 '2.00 8,273 9.93% 192,531 11,005 897,129 7.73% 3.99% 8.42% 0.277 . Industrial 61 &1(09) TOD peak B-1 (09) TOD off peak 38.450 2.0% 19,241 6.923 0.4% - 40.422 2.1% 15,428 178,729 45.131 131,828 13.34% - - 12.00 - 10.51 - 1.49 0.061 - 15.00 13.99 10.44% 0.389 - 9.50 . - . 128 13.83% 0.033 400 11.00 400 9.14 0.186 400 15.00 400 12.77 - 2.23 - 13-2 A (t0) 13.471 0.7% 428 82 • TOU (Peak) 45.072 2.3% - 260,678 31.807 13.4% 8,531 1.6% 224.327 11.5% 21.127 1.1% - 124.718 0.031 8.4% 0.0% 10 - 806.528 41.4% 43,902 C 1(a) Supply et 400 Volts - up to 5 kW 0.058 0.0% 29 195 13.03% 0.000 - 13.00 C1(b) Sup* et 400 Volta -exceeding 5 kW 0.818 0.0% 47 4,599 8.10% 0.003 400 11.50 C-1C(26) T PEAK 0.478 50% 0.001 400 15.00 C-10(28) T OFF-PEAK 2.001 0.1% 92 9,254 9.87% 0.008 400 9.30 11 10,151 53.06% 0.022 380 380 132 - TOU (Off-peak) 133 - TOU (Peak) 83 - TOU (Off-p1*) 84 - TOU (Peak) 134 - TOU (Off-peak) E-2 (58) TEMP. Total industrial. - 8.22 1.01 16.78% 1.067 400 9.30 400 8.01 - 1.29 4 709,187 9,883 380 14.70 380 12.68 - 2.02 282 374,004 27.39% 0.121 0.883 380 9.20 360 14.50 380 380 7.75 0.057 12.37 - 2.13 0.314 - 360 9.10 12.00 3e0 - 7.46 11.50 • 0.50 - 11.55 - 1.45 400 10.35 - 1.15 400 13.01 - 1.99 8.01 - 1.29 11.40 400 380 10.25 - 14.70 380 12.80 204,393 27.88% 1,850,935 22.32% 1.45 2.311 Bulk C2 Supply M 11 kV • - 11.797 0.8% Time of Use (TOU) - Peek 1.838 0.1% Time of Use (TOU) - Off-Peek C3 Supply above 11 kV 8.292 0.4% 28 27,953 13.55% 0.024 380 920 380 7.75 0.357 0.0% 3 54,048 0.30% 0.006 360 11.30 10.10 - 1.20 Tkna of Use (TOU) - Peak Time of Use (IOU) - Off-Peak 5.803 27.191 0.3% - 1.4% 30,958 40.11% 14.50 9.10 12.18 7.35 - 2.32 1.75 0.0 137,153 19.45% 0.011 0.055 0.134 360 360 68.423 2 211 360 360 360 - 11.00 80 2.73 ... Total Single Point Supply • - 0.004 Agricultural Tubs-wells - Tariff D DI Scarp 5.998 0.3% 1,931 • 2.051 0.1% 867 30,852 5,817 8.93% D2 Agricultual Tube-mid 18.87% 0.008 28.349 130.478 1.5% 6.7% 35,609 401,810 14.83% 0.216 0.969 Thne of Use (TOU) - Peak D-113 Time of Use (TOU) - 011-Peak 1316 Total Agricultural 186.875 5% 38,207 438,079 17.39% 1.193 Public UgMlnp 0 1.293 0.1% 1,444 10,505 5.82% - Residential Colonies H 0.883 0.0% 104 6,080 6.48% - Special Contracts - Tee K (MK) - 0.0% Time of Use (TOU) - Peak Time of Use (TOU) • OR-Peek - 0.0% 3,221,000 9,611,086 9.18% 4.817 Rehm TrectlanTreetion - 1 co-GenratiorKi - 0.0% - 0.0% 0.0% Grand Total 1,948.604 100% 200 200 200 - i/zfr / 1.15 2.10 1.45 - 10.00 14.50 9.10 120 200 200 6.77 13.00 - 8.00 - 1.50 1.10 15.00 14.00 .. 13.73 - 1.27 12.92 - 1.08 9.50 96 1.00 FORM - 28 ( A ) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement , • ,.. '• •V. . 7`•:" • ' • -,. Moon (lAkWh) (W4) ..%''f:17! " 1_.... 101-300 Units 98.387 4.9% 1,308,009 444.530 0.0% 22.0% 728,040 NEPRA 429.155 GOP 226.833 NEPRA 238.562 33.748 301•700Unita GOP Above 700 Units GOP 9.417 NEPRA 9.418 - 721,805 - • 1.7% 53,712 - 0.3% 3,805 - 11.8% - 289 - 4,130 . - 3,101 - (MN Rs) (Mire Rs) 193 - 96 2,574 - - 1,556 1,838 - 1,283 - - - 577 - 416 - 160 • - 155 - - 142 - 13 - - - - - - - 37.194 NEPRA -- _. _. . • (Min Rs) (Mire Rs) NM Rs) (Inn Rs) Residential Up to 50 Units For peek load requirement up to 5 kW GOP 01-100 UMW env.7"P' ' .151i:'.. ; •&. • (% em) . '' 6,695,495 For peak load nicrukerneM exceeding 5 kW Time of Use (TOU) - Peak Tlme al Use (TOU) - Off-Peak 61(0 (55) TEMP. Total Residential - - 0.0% 0.887 0.0% - 4.502 0.038 0.2% 0.0% 3,858 187 818.142 42% 2,619,394 55.493 2.6% Commercial (c100) - 0.0% 318.258 - Convnertial (.20 KW) For peek laid requirement exceeding S kW • 0.0% Commercial - A2 ComMennll For peak load requIremerd up to 5 kW Polluter Time of Use (TOU) - Peak (A-2) Time of Use (TOU) - Off-Peak (Temp) TEMP. . E-1(11) (56) Total Commercial 0.1% 1.364 60 - 1 3.77% 1 61% 0.020 - - - 6 0 6.62% 0.022 - 5,309 - 6,213 - 3,096 487,320 5 20% - 943 - - - 124 - - 820 - - - - . - 0.002 - - - - - - - 6,273 913% 0.008 2 20 2 13 17 115 17 101 92 111 310 18 92 - 261 14 - 49 2 1,404 111 1,210 - 198 57 7 - 14 7.665 04% - - 0/41 32.594 0.962 1.7% cox 8,537 883 192,531 11,005 773% 3.99% 0 230 - 98.077 6.0% 326,738 697,129 6.42% 0277 38.450 2.0% 19,241 131,626 13.34% - - 481 - 404 - - - 0.061 - 104 - 97 - 7 8.923 0.4% 10.44% 0.369 0/33 384 148 876 13 74 332 - 52 25 0.188 13 74 101 427 2,088 401 - 338 - 64 325 - - Industrial • B1 B•1(06) TOO peak 178,729 45 131 13•1 (Oa) TOO off peak 40.422 2.1% 15,428 -13-2 A.(10) 13.471 0.7% 426 45.072 2.3% - 260.878 13.4% 8,531 709,187 16 78% 1.087 427 2,424 31.607 1.6% 4 9,863 0.00% 0.121 48 224.327 11.5% 1.1% 262 • 465 2,064 82 - TOU (Peak) 82 • TOU (Off-peak) B3 - TOU (Peak) 83 - TOU (Off-peak) 21.127 84 - TOU (Peak) - 374,004 - 13.63% - 27.39% - 0.683 0.057 280 20 306 0.314 113 - 1,135 0 8,168 124.718 0.031 64% 0.0% 10 - 204,393 - 27_86% - 806.826 41.4% 43,902 1,660,935 22.32% 2891 964 0.0% o 0% 0.0% 29 195 4,599 - 13.03% 8.10% 0.000 0.003 - PEAK 0.058 Delis 0.478 C-IC(26) T OFF-PEAK 2.001 0.1% 11.797 0.6% 134 - TOU (Off-peak) TEMP. 84(513) Total Industrial Bulk Cl (a) Supply al 400 Voks - up to 5 kW Cl 00 SWOT at 400 Volts -exceeding 5 kW C-icori) T 12 37 1 54,590 1,084 6,761,169 - - . - 13 43 1 C2 Sword 11 w Timed Use (TOU) - Peak Time of Use (TOU) - Off-Peak C3 Supply above 1110/ lime of Use (TOU) - Peak Time of Use (TOU) - Off-Peak Total flIngb Point Supply 47 - 9,254 11 1.838 8.292 0.357 0.1% 0.4% 0.0% • 5.603 27.191 68.428 0.3% 1.4% 3.0% • 5.998 0.3% 10,151 - D2 Abricullual Tube-wells Time of Use (701J). Peak D-113 U (TOU) - cel-Peak D113 Time ofse Total Agricultural Public Lighting 0 Residential Colonies H Special Controcts - Tariff K (MK) Time of Use (TOU) - Peak Time of Use (TOU) • Off-Peek Bathyal/ TractionTraction - 1 Co-GenratIon-J Grand Total 2.051 28.349 130.478 166.576 1.293 0.883 260 20 1.739 261 - 45 113 930 0 - 205 0 6,961 - 1,217 1 964 - 0 8 - 1 19 8 16 - 8 121 2 23 84 - 1 3 14 - 9 7 0.00% 9.87% 0.001 0.008 53.06% 0.022 8 0/04 0.024 2 134 27 0.008 0.011 0.055 9 2 4 20 76 4 81 247 606 9 2 4 20 60 12 0 - 13 48 2 13.55% 0.30% 40.11% 119 137,168 19.45% 0.134 50 1,931 30,652 8.93% es 0.1% 1.5% 6.7% 867 35,809 16.67% 14.83% 0.008 - 5,617 401,810 19 1 14 411 1,187 43 194 35,207 438,079 17.39% 1.193 1,684 2311 369 1,044 1,488 - 11.11% 2 43 194 239 10,505 5.82% - - 19 - 18 - - - 12 - 11 4.517 1,363 27,953 0.1% 0.0% 1 444 104 8,080 8.46% 0.218 0.969 4 88 200 46 611 60 - 4 - 54,048 30,958 26 3 Agricultural Tube-vrega - Tariff 0 DI Scarp 576 1 1 3 1 1 1 3 46 123 6 1 6 1 43 144 198 2 1 1,945.604 0.0% - 0.0% • - 0.0% 0.0% 100% 3,226,906 9,591,066 9.16% 20,203 /A 1,362 16,400 1 91 4.110: FORM - 29 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement 2012-13 (Monthly, Quartwly as well as ConaolldatMJ ,L=7.ir . - r-r..4 r..r. 1.1;.. .. LW ''' .4 ''''''"'', •*''', ■ EIPT.11 ' 4.1...140, a ., ,,, I (MM) 1. .1.. (11.1.00 - MICE ( M) ' 1' ' ":',` ''..:;. aw .4 ',.1111g, f -,0. . M.:,...., ... (RV/AO .9 1, (Rs/kW11) (Ih/kW/M) (RailMt) :......,... , (RAIN/M) os I", . ..S.TIP"11, 'LL'....,. ..4'.. ' (Ra/kWh) Residential Up to 50 Uses 357.02 For peak load requirement up to 5 kW 01-100 Uses 4.10% 44.89 OOP 1 891 01 GOP 1,129 00 NEPRA 301-700UMts GOP 22.17% 728,040 13.24% 721,805 Above 700 Units OOP NEPRA 83.55 - 2.00 - 1.00 - - - 9.60 - 179 - 3.81 - 13.00 - 8.11 - 4.89 - 15.50 - 12.33 - 3.17 2.00% 311.59 NEPRA 3.00 - 1 240 57 254.30 - - 1.722 15 101-300 Unils 1,308,009 53,712 - 0.96% 83.55 3,805 16.50 15.07 1.43 6,695,495 For peak load requirement exceeding S kW Time or Use (TOIL) - Peak Time of UN (TOU) - Off-Peak E-10) (55) TEMP. 011111111KCial -, Total Residential 0.00% 4.39 0.05% - 21.95 0.20% 3,856 54,590 4.59% 0.127 9.50 8.22 1.28 0.22 0.00% 187 1,004 2.28% - 18.50 15.50 1.00 3,741.46 43.07% 2,219,394 8,751,189 8.33% 0.142 250.75 2.14% 318,258 487,320 5.87% 17.00 14.77 - 0.00% 0.016 15.00 - 13.99 - 1.01 • - A2 Commercial For peak load requirement up to 5 kW Commercial ((100) R•auter Time of Use (TOU) - Peak (A-2) Time of Use (TOU) - Off-Peek 5-1(10 (56) TEMP. - Total Common . Commercial (.20 KW) . For peak load requirement exceeding 5 kW , - - - 2.23 . - - - 6. 19 0.07% 38.15 0.42% _ 152.84 1.70% 6,537 192,531 9.08% 8.19 0.07% 883 11,005 8.42% - 482.11 8.30% 328,738 1197,129 7.40% 1.182 179.88 2.11% 19,241 131,628 15.60% 0.000 29.84 0.35% - 182.77 2.14% 15,428 176,729 11.81% 1.396 - 45,131 14.98% 0.172 100 11.00 100 9.14 0.743 400 15.00 400 4.209 400 9.30 400 0.446 380 14.70 356 10.99 24 3.71 2.547 380 9.20 358 6.25 24 2.95 17 3.81 60 6.273 11.26% - 0.029 400 14.50 400 9.72 - 4.78 0.172 400 15.00 400 11 20 - 1.80 0.951 100 9.50 400 8.01 1.49 15.00 2.00 - 17.00 - 12.00 - 10.51 15.00 - 13.99 industdal • 131 &1(00) TOO pue 8-1 (09) TOO off peak 8-2 A (10) 82 - IOU (Peek) - 59.23 0.69% 428 188.27 2.18% - 0.223 - 9.50 12.77 - 2.23 8.01 - 1.29 13.20% 8,531 709,187 123.14 1.44% 4 9,863 811- TOU (Off-peak) 897.85 10.53% 262 374,004 27.40% 71.94 0.84% 0.198 360 14.50 343 10.69 480.51 5.63% 10 204,393 26.84% 1.158 360 9.10 343 5.97 43,902 1,880,931 23.07% 11.090 114 - TOU (Peek) 84 - IOU (08-paak) E-2 (58) TEMP. 1.01 I 28 1 ,125.44 18.12% 1.49 - 822 83 TOU (Peak) 82 - TOO (06-peak) - 0.19 0.00% 3 3311 84 30.13% CI(e) 3upply at 403 Volts - up lo 5 kW 0.25 0.00% 29 195 14.46% 0.001 - 13.00 - CI(D) Supply at 400 Volts -exceeding 5 kW 3.81 0.04% 47 4,599 9.48% 0.015 100 1-1.50 387 8.75 33 15.008 367 11.31 33 3.69 367 6.50 33 2.80 2.75 Total Industrial - - 12.00 11.50 0.50 Bulk 11.55 - 1.45 2.75 C-1C¢8) T PEAK 2.22 0.03% 0.008 400 C-1C(26) T OFF-PEAK 9.97 0.12% 92 9,254 12.30% 0.033 400 52.49 0.62% 11 10,151 59.03% 0.103 380 11.40 356 8.65 24 8.28 0.10% 0.033 380 14.70 356 1091 24 3.79 37.11 0.44% 26 27,953 15.16% 0.095 380 9.20 358 6.25 24 2.95 3 54,048 3.77% 0.087 380 11.30 343 8.51 17 2.79 0.051 360 14.50 343 10.51 17 3.99 360 9.10 343 5.87 17 3.23 C2 Supply et 11 kV Time of Use (IOU) - Peak Time of Use (TOU) - Off-Peak ,c3 Supply above 11 kV Time of Use (TOU) - Peak Time of t/se (TOU) - Off-Peak Total Shigle Point Supply - 030 17.86 0.21% 24.68 0.29% 118.88 1.30% 2 30,958 43.83% 0.200 276.64 3.23% 211 137,168 22.93% 0.8211 29.20 0.34% 1,931 30,652 10.87% - 8.97 0.11% 667 5,817 18.23% 0.052 200 9.50 120 6.77 NrIcultutal Tubs-wells - Tarlff 0 DI Scarp D2 Sideullual Tube-web - 11.00 - 10.00 Time of Use (Mu) - Peak DAR 103.41 1.21% 0.939 200 14.50 200 13.00 Time of Use (IOU) - Off-Peek 018 570.32 ON% 35,609 401,810 16.20% 3.980 200 9.10 200 8.00 711.90 1.36% 38,207 438,079 •18.88% 4.9111 Public Ughting 0 6.79 0.06% 1,444 10,505 7.37% - - 15 00 Residential Colonies H 3.60 0.04% 104 6,060 6.76% - - 14.00 100% 3,228,000 9,891,066 10.06% Toni Agricultural • 13.73 80 - - 12.92 - Co-deintion-J Grand Total 8,628.23 1.27 1.08 Time of Use (TOU) - Peak Tkne of Use (TOU) - Off-Peak 1.50 1.10 Special Comma - Tariff K (AJIg Railway TrectionTraction - 1 1.00 2.73 17.001 (18 FORM• 28( A) FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Revenue & Subsidy Statement .reax''' )MkWO) . %V.Niume-ii, -,,, :4 -., E:. ..yr,v, Ar,- ,t` ti..,..',0 A.P)§.:,V,0 '.-.F.loi irLe,...‘ ..6X.11,........ Residential • Up to 50 Unks For peak load requirement up to 5 kW OOP 01-100 Units 101-300 Units 301-700Units Above 700 Units NEPRA GOP NEPRA GOP NEPRA GOP NEPRA 357 - - 10,949 - - 5,594 - 9,156 - - 6,971 4,830 - - 3,138 - - 1,694 1,379 - - 1,259 - - 119 - - . - - 66 209 4 18,543 721,805 - - - 2.96% 53,712 - - - 83.55 83.55 098% 3,805 - - i 4.39 21.95 022 3,741.46 0.00% 0.05% 0.28% 0.00% 44.40% 3,858 167 2,519,394 54,590 1,084 6,751,161 250.75 2.94% 318,258 487,320 1,722.15 1,129.00 1,240.57 254.30 311.59 - - 13.24% 44.69 1,691.01 714 - 1,071 - . - - - 4.19% . 1,308,009 0.52% 726,040 22.17% - 357.02 (Min Re) (Mk, Rs) (Min Rs) Mtn Rs) (Mn Rs) (Mn Rs) (lksg.) lkW) Mae.) r, 7 ,7 • 18,127 8,895,495 For peak load requirement exceeding 5 kW Time of Ufa (TOU) - Peak Tkne of Um (TOU) - Off-Peak E-1(1) (55) TEMP. Total Residential Commercial - A2 Commercial • For peak load requirement up to 5 kW Commercial (<100) Consmucial (<20 KW) For peek bad requirement exceeding S kW Regular Time of Use (TOU) - Peak (A-2) Time of Use (10U) - Off-Peak (Temp) TEMP. E•100 (58) Total Commercial 11-2 A (10) 82 - TOU (Peak) 62 - TOU (00-peak) B3 - TOU (Peak) 83 . TOU (Off-peak) 114 - TOU (Peak) 84 - TOU (Off-peak) TEMP. E-2 (50) Total Industrial Bulk C1(a) Supply at 400 Volts - up to 5 kW Cl(b) Supply M 400 Volts -exceeding 5 kW PEAK c., cm T C-1C(211) T OFF-PEAK C2 Supply at 11 kV 11me of Use (TOU) - Peak Time or Use (TOU) - Off-Peak C.1 supply above 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak Total Illngb Point Supply Public Lighting GI Residential Colonies H Special Contracts - Tailff K (AA Time of Use (TOU) - Folk Tkm of Use (TOU) - Off-Peak Rudely TractIonTraction - 1 Co-Genration-J Brand Total 40,227 5.87% - - 4,263 - - - - - - 11.26% 0.029 0.172 clam - . 90 0.00% - 8.19 38.15 0.00% 0.07% 0.42% 60 - 152.84 8.19 1.79% 0.07% 6,537 883 8,273 192,531 . 11,005 462.11 130% 326,735 697,129 9.06% 6.42% .7.40% 17986 2.11% 19,241 . 15 428 426 - 131,628 15.60% 1.162 180 3 - 4 28 0 25,461 - 14,798 - 3,704 - 559 - - - - - 60 477 1,224 93 - - - 228 12 61 .29.84 182.77 5923 0.35% 2.14% 089% 2.16% 186.27 1125.44 123.14 897.85 71.54 480.51 0.19 13.20% 1.44% 10.53% 884% 5.83% 0.00% 3,334.14 31.13% 10 43,902 0.25 3.61 0.00% 0.04% 29 47 2.22 9.97 52.49 828 37.11 17.86 24.68 118.88 275.64 0.03% 0.12% 0.62% 510% 0.44% 0.21% 0.29% 1.39% 323% 92 11 28 3 2 211 29.20 8.97 103.41 570.32 711.90 0.34% 0.11% 1.21% 8.99% 9.38% 8,531 4 282 - 6.79 3.60 5.625.23 0.08% 0.04% -176,729 45,131 709,187 11.61% 14.98% 18.12% 9,883 374,004 204,393 . , 0.00% 27.40% 2984% 23.07% • 1,650,935 195 4,599 . 9,254 10,151 - 14.48% 9.48% 12.30% 59.03% 137,165 15.16% ' 3.77% ' 43.83% 22.93% 1,931 687 35.609 35,207 30,652 5,817 401,810 438,071 10.87% 18.23% 18.20% 15.66% 1 444 104 10,505 6,080 7.37% 6.76% - 101%_ 3,229,000 27,953 54,048 30,958 0.000 0.223 1.398 0.172 0.743 4.209 emus 2.547 0.196 1 158 11.090 _.._ 0.001 0.015 0.008 ' 5033 0.103 0.033 0.095 0.087 0.051 0.200 0124 30 es 12 88 379 - 542 1,452 105 12 68 379 . 440 4,452 460 5,666 - 1194 2,158 445 - 1,890 415 - 1,502 541 2,379 9 015 _ 1,561 6,958 - 288 30 234 110 415 1,452 2 49 - Agricultural Tube-wells - Tariff D 01 Scarp 02 kgricultual Tube-wells Time of Use (TOU) - Peak D-18 Moe of Use (TOU) - Off-Peak 12 113 Total Agelcultuntl - - - industrial 81 11-1 (09) TOD peak 8.1 (M) TOO off peak 4.59% 2 28% 6.33% 0.016 0.127 0.142 69 297 1,685 189 965 70 418 3,674 6 3 13 40 13 37 30 . 18 72 232 0.052 0.939 3.960 4.951 - 10 188 791 989 17.661 6,364 - 1 736 652 2,794 10,487 1,810 8,260 1,043 4,373 2 33,740 3 44 33 93 598 122 341 202 358 1,082 2,876 321 85 1,499 5,190 7,064 102 50 69 297 1,685 189 985 70 418 3,674 13 25,739 - 1,302 153 788 0 5,001 3 39 29 - 0 4 . 4 13 - 130 890 3.58 5 2 - 3 13 40 13 37 30 538 104 288 180 18 72 232 301 674 2,431 - 292 81 1,344 4,583 11,260 - 93 48 - 6 188 791 984 - 60 17 54 21 57 208 440 - 4 4 20 24 155 627 GM 9 4 - 9,661,066 10.05% 60,543 5,360 611,591 4 21,952 FORM - 29 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED Proposed Revenue & Subsidy Statement (Monthly, Quartorly as we./ as 2013-14 . ... •'• it . 17..1 7 jk7 h V ._ TW^4.1 , .'",T,Fr .... MOAN eta 1. , :, '1' t• ;try,',•Lti, t r <=3 Consonda P1111 M.P) (UP) (4441444) .... MAW% , ... .... ' (5440099 01144.10a MAW/Mt 0114a440 Residential Up le 50 Ur 350.58 4.07% Fe/ peek bed requktment up u 5 kW 1,019,395 - - - 3.00 - 2.00 - - - 1.00 - 01-100 Ude 1,940.93 22.20% 054,254 - 1422 - 5.79 - 843 101-300 Uri 1,175.07 1240% 1,053,534 - 19.25 - 8.11 - 11.14 301-700Unite 264.37 302% 168,959 - 22.95 - 12.33 - 10.02 96.57 000% 22,253 - 24.43 - 15.07 - - - 9.38 - - 2221 - 13.99 - 822 1407 - 922 - 5.05 - 24.43 - 15.58 - 9.93 - 25 17 - 14.77 - 10.40 - - - - 11.75 Above 700 Uri% Fat peek toed requirement aoudad SOW Tkne tilde (TC4J) • Peek Tkro of Use (TOU) - 011-Peek E-1 01('35) TEMP Told Reddened 6,995,405 - 4.37 005% - 21.92 025% .1 ,074 022 000% 3,999.94 43.41% . - • 0.015 54,590 4.55% 0.115 164 1,084 2.35% 2,929,434 9,791169 . . 482% 0.130 • Conwnsicil - A2 Cammercili Fa putt bed requnment up k• 5 IM 259.72 Common:MI (.100) - Commercie11,20 KW) F. PINK Mad tatiumment aceednip S kW - Repast 'Unmet Use (TOU) - Peek (4,2) Bete of Use (TOU) - Ce-Peek E-10) (58) TEMP Toad Commessiel 2.95% 0.00% 334,256' - .487,320 ' 6.06% - - .- 0,273 0.56 0.07% 30.e9 oArs - 150.11 1.79% 5,671 192,531 926% 0.14 007% 878 11,005 6.37% 464.45 &JO% 340,879 897,129 7.61% 1.144 198.94 215% 23,820 131,628 10.39% 0.000 29.70 0,223 73 11.94% - . 0.029 400 21.47 400 9.72 - 0.171 400 2221 400 1320 - 9.01 0.944 400 14.07 400 9.01 - 0.00 25.17 - 15.00 - 10.17 - 17.77 - 10.51 - 726 - 22.21 - 13.99 - 8.22 5.85 . Industrial 81 6-1 (041) TOO posit 15-1 (OP) TOO all peek 034% - 184.00 - 211% 12.234 176,729 11.92% 1.396 - 14 07 - 9.22 - 134.53 0.74% 594 45.131 18.40% 0.172 400 16.29 400 9.14 - 7.15 191.05 219% - 0.742 400 2221 400 12.77 - 9.44 92 -700 (011-post) 1,154.96 1317% 8,411 709,187 18.50% 4201 400 13.77 400 8.01 • 5.76 83 - TOU (P40k) 130.38 149% 5 . 9.563 150.90% 0.452 380 21.77 390 12.68 - 9.09 63 - TOU (O6•peak) 905.89 1033% 255 374,004 - 27.04% 9-24(101 92 - TOU (Peek) 114 - IOU (Peak) 73.49 • 84 - WU (08-imak) E-2(59) 496.53 TEMP 094% 590% - - 11 0.18 000% 3,420.45 9901% 46,331 Cl(e) Sup* et 400 Vole - up b 3 kW 028 000% CI (b) Sup* 3.94 004% ' PEAK 2.20 0.03% C-1C(28) T OFF-PEAK 1024 Toad ladamtrIN - 204,393 2773% . . 2.541 380 13.62 390 7.75 - 5.97 0.198 300 21.47 380 12.37 - 9.10 1.170 360 13.48 MIO 7.48 - 0.02 11.50 - 027 - 11.55 - 7.70 400 10.35 - 688 400 13.01 - 920 400 8.01 - 5.78 16.30 380 1025 - 0.83 9.17 17.77 . 1,650,935 23.66% 11.097 36 195 " 15.33% 0.001 - 1925 58 4,509 . 1.79% 0.014 400 17.03 0.008 400 n 21 012% 82 9,254 12.63% 0.032 400 13.77 54.46 002% 22 10,151 61.24% 0.102 390 Bulk at 400 Yoke oliceedng 51411 C.IC(2111) T C2 Waded 11 W . Time at Use (TOU) • Peek Time at Use (IOU). 011.Pe6t C3 Supoly. above 11 kV Tims at Uwe (TOU) • Poi* Time d Use (TOU). Off.Peek Tat. Sine% Point Supply 8.31 000% 0.033 MO 21.77 350 12.60 - 37.30 0 43% 17 27,953 15.23% 0 094 380 13.62 380 7.75 - 5.87 19.28 021% 4 54,048 3.86% 0.089 3430 10.73 300 10.10 - 6.63 - 2523 029% 0.050 300 2147 360 12.18 - 929 121.95 1.39% 1 30,955 44.97% 0.197 300 13.48 300 7.35 - 0.13 26223 322% 220 137,169 23.49% 0.619 3205 0.37% 3,297 30,052 11.95% - 1629 - 10.00 - 8.29 9.34 011% 70 5,817 0.048 200 14.07 120 0.77 80.00 7.30 103.18 118% - 0.924 200 21.47 200 13.00 - 9.47 200 13.49 200 8.00 - - + ArImernd Tubs-ivolls - Tarti 0 01 Strap 02 Adicultual Tube-utak Tine at Uwe (TOU)• Peelt13.113 Tote al Use (TOU). 01141mit DI II - - 589.02 5.72% 36,142 401.810 16.73% 3.913 733.82 837% 39.509 431,871 19.12% 4.810 Pubic Upkeep 0 8.98 0.08% 1.510 10.505 7.59% - Reetdardel Colas= H 3.73 004% 111 0,080 7.00% 3,343,000 9,691,066 10.33% Toed A6rbttlbmal Spend Calm% - Tod K (AJK) - Time at Use (TOU) - Peek - llme al Use (TOU) -00.Pasit - ReAvey Trecletarscion - 1 - Co-Gentelbon-J Grand Tall 9,747.83 5.45 - 2221 - 13.73 - 8.45 - 20.73 - 1292 • 7.51 - 100% 17176 • /00 rrnt ! 14; M rr emal 1001-21if ef ell ar.casasscs:,z .. Trcq il i I g g1-111_ a': ii. lA tVE li i _ I i i 5 . es upp 0 a a a r.) a o itt p r. c. Ft ti...:9t ' 0-00 0. . 11511 i/i105/ Is 0 i : o cl .. a F- ; . , p. 5, : . -..NPPPP.0P -. M tril . x , i iii . t !..MO. - 55.5 0P 'iR , '' t ♦ " . F. C 1 S i 5 ' 1 ' igia ' ;,—, S-ignmatsr..' P p NP,.. ssEilg5 titgri i c al pa s ...., ,, p —. M 0 COY 4.Mili lliV,:ii istit' ' c zseisiseut.. w, .. OS-454E3st. ta. • ; -. P .i1115555:t1 '"'"' " P -• P Setlig"S .:.0. :. . " !Olt NPt“1 7. -71 i131', r Fin'i i .P 1.g!!' e t.ie .:::, ,. _. -.up-. 113'g .. +w o + ttE3il . '""' " '"" ""' P ;.p.:-..,i,55;115s.es. .4-511it.51113 inE,51"I N us;ivvN x esus;;s4... • i P P 115E1 ifigit'' '.F..,. 1.1:s' .53511' .7.13P;Pf•P ,g.- .. iiiii.1,i3 11111:41:se. ii:Ii. '1 it - ii iS iiI5filisu. lAiiiiiiAli '3gi.' .,sstiltse "". '1er, i':21iF.s" r e Lis' . t iii557a5ses. t-E11i511113 isI51"1 ss /MI5 -5E3 P 0 00 = "1E3E' tll Ei2t? 51;4E58311 1.1.51' PPP° I ilsis sg=as 5/ 55§151515/5' 51g1515'15551 55115" 1 555g if 1.t., , sw5i I P011eP, s . ln'u 't .'i'VS = . 10t. :43'166.5 1_'.4'usss . =i i v t..g ai -4 ,;EP. ,s is c, g, . 1'1 fig'3": tt5';.It'S 11-3-155 t111'15. 1i 7 4 74;01 .P21 p.... .. 1151iii li;;;;;;;;; i§s5.;;;;;5; ; 2t --4? .101is ill ril MI IV )SO -IIVOA 222222'ii! -4 firliq 88 MIA - I- 4 g 1 .1 _s ,1 i if112 ^-•••••— 1 lEitiz§'Peg.P. ttitt.ine.s,g2W ;Jut:Br:re tr5CEEEr.T21 _ 114.of Uw(TOU)- Peek(4421 ..--41ii.n =AM 1 •400 Voll4-mewing S z 0 r OFF-PEAK i : ... . T i e 7 ii .6 01(0100N* ••••••••••--••-••••••• R-'es2 !Ifilil ••••••••4••• • C-1E4203T Mit, "1 ..2 .. illi'! Q ni 1 it-g? 1??i ling" ‘,II i2 E 1 gg -._. iii'5 -- Lis' 2111'5 1 OFFICE OF THE COMPANY SECRETARY FESCO Head Quarter Canal Road Faisalabad. Phone # 041-9220211 Fax # 041-9220233 /4,4,,y. , 25 ,N,45-te FESCO Subject: EXTRACT OF RESOLUTION PASSED BY THE BOARD OF DIRECTORS IN ITS 111111/37Th MEETING HELD ON MAY 14, 2013. The Board resolved as follows:a. To file annual Tariff Petition for determination of consumer end tariff of the Company for FY 2013-14 for various categories of consumers with National Electric Power Regulatory Authority (NEPRA). b. The Chief Executive Officer .FESCO along with following officers is hereby authorized:- i. Ghazanfar Ali Baloch G.M (Operation) Muhammad Iqbal Ghori Finance Director Muhammad Naeem Ullah Director (HR &Admin) Khurshid Alam Chief Commercial Officer Sheikh Akhtar Hussain Chief Technical Officer Aziz Ahmed Additional Dir (Gen) IS Ch. Ghulam Rasul Chief Engineer (T&G) Abdul Razzaq Additional Director General (L&L) To sign individually or jointly the necessary documents for filing of annual tariff petition for FY 2013-14. ii. Subsequent review petition after determination on the tariff petition of FY 2013-14, if any. iii. To pay the necessary tariff petition filing fee as per NEPRA rules. iv. To appear before the Authority as needed and do all acts necessary for completion and processing of the applications. Certified True Copy in) cretary FESCO B818501 1111111111110111111111111111111111111111111111 ?LI •1 71 . ;2:-."; • ' \p. 9AT f:t4.kir rw, - *•.. ',111tOrxelh.FiLtriim • .1.10.1,44 47.170 a B804200 111111111111111111111111111111111111111111111111 AFFIDAVIT I Dr. Rana Abdul Jabbar Khan 5/0 Rana Abdul Ghaffar Khan, Chief Executive Officer Faisalabad Electric Supply Company Limited (FESCO), holding CNIC No. 34101-4940598-9, being duly authorized Representative / Attorney of Faisalabad Electric Supply Company Limited (FESCO), Canal Road Abdullahpur Faisalabad, hereby solemnly affirm and declare that the contents of Tariff petition for FY 2013-14, including all supporting documents, are true and correct to the best of my knowledge and belief and that nothing has been concealed. Verified or Loa day of 2013 DEPONENT (Dr. Rana Abdul Jabbar Khan) Chief Executive Officer FESCO Limited Faisalabad ED 41,0 Oreit-74' frsv., 2- .1t. 04.0 VI Art. • ••1' ' li*ffC It A.1.117‘.1to ALA , CBE4S'":`' - • : •: ••;, • • 1"1,0147—,ci : itiii.4_f-t-f,114,,-,..7.t-000ti3-9,25 . !" ;-:0:0,4,4! - 7 _Dae. = 1.: ORDER • .41 I (Original 3m1n-diction) ECelPIVS: Mr. Jusocc litikhar lv:uhammad Chaudhry, CJ Mr. Justice rjaz Ahmed Chaudhry Mr. Justice Guizar Al%med iikumairy ttiightNislas14.12925aufw [Action taken on unprecedented Load Shedding in the Country] tirtura.1-11..ttiglbti; Cqletta,7ef 2009 [News clippiuy published in the daily ]innah, wainabad, dated 1'l.04.20091 Applicant Mr. 14 1zi-ud-Din,in person (in CMA:2602/13) flacQkirt's Notice For N I DC & PEPCO For WAPDA Mr. Oddar-ul-Munir Murtaze, CE (Hydei Power) For 'RSA .11 Mr. Z irgham Eshaq, MD. Mr. M. Waqar. Rana, ASC For ALDEI Noma For SSGC & SNGPL Mr. k•irn Iqbal, ASC Mr. Aril Hameed, MD, SNGPL Date of Hearing 31.05 2013 01120, IIF . • mumfuvAiLtAl) CH4t,c./DHR; C3.— In response to notice, Mr. Zargharil Eshaq, Managing Director, PEPCO & NTDC appeared and stated that efforts are being made to implement TEST the order of this Court dated 21.05.2013 i.e. to supply avai!abre C rAjri01 ailliti1311 iglarn:"1:34- eiectric;ty equitably in betwec!ri the domestic and industrial COZISt1.7.ers. he further stated 1: tat due to lack of communicatio between the NIDC arid DISCOs, ::e Zd Wti9S:E0 s.:00z is facing some problems. -2- 2. In view or such statement, we direct all the Managing Directors of DISCOs throughout the country to convene a meeting with the Managing' Director NTDC through Video Conference on 15 ' June, 2013 and after conclusion of meeting, all the stakeholders i.e. M.Ds of DISCOS and the Chairman IRSA as well as Secretary, Ministry of Water & Power etc shall prepare a joint statement to ensure the implementation of order dated . 21.05.2013 in letter and spirit, and the same shall be filed in the office of Registrar of this Court by tomorrow positively, for our perusal in chambers. However, it is made clear to all the M.D"'s of DISCOS that they are bound by this order which shall be Implemented without any excuse. 3. . The case is adjourned, however, if need be, the date already fixed i.e. 10.06.2013 shall be accelerated. This order communicated thmua .11x. to the all concerned during course of the day h M.D, PEPCO and NTDC, for strict compliance. ,•.,r . ‘4,0,•1 hkvcoatieckck e_WV, 4fteLA, Q -ri 4 ertifleyretratfoopy 1.4 1!!::;rident Islamabad 3 1.05.2013 7;7','a 46:76, be tolony: COM GI PakIstau , , ' --Sv. , 0 - ' ,k'vi,.7.4 ii",...., = , 4.' . 4 4 ' ' ,' ,'■ Ae ,..4.k ' .L.: Audited Actual/Proj 41, 61 Si' Projected Basic Pay 2,214 2,469 2,348 Allowances 1,904 2,476 2,719 349 419 2,372 2,922 Employee Benefits Retirement Benefits New Recruitment Impact Total Pay & Allowances Repair & Maintenance 6,839 8,286 9,207 514 699 753 568 • Total Repair & Maintenance 1,321 Travelling expenses 178 Transportation 286 1169 Bank Charges Total TOTAL 0 & M 3,431 201 Repair of Damaged /Sick Tranformers Other O&M Exp. 508 1,633 8,986 251 281 251 301 690 718 16 17 1,239 1,287 10,207 11,815 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED O&M BUDGET ALLOCATION FOR FY 2012-13 Rs: In Thousands AM NC HEAD Budget FY 2011-12 Expenditure FY 2011-12 Total Exp. Act/Prol 2012-13 Projected 2013-14 520100 PAY AND ALLOWANCES BASIC PAY ADHOC RELIEF ALLOWANCE 2011 © 1 CASH MEDICAL ALLOWANCE CONVEYANCE ALLOWANCE DEPUTATION PAY DUAL CHARGE ALLOWANCE ENTERTAINMENT ALLOWANCE GROUP LIFE INSURANCE HOUSE RENT ALLOWANCE JOB ALLOWANCE LIVERY ALLLOWANCE LOCAL COMPENSATORY ALLOWANCE OFFICIATING PERSONAL S/PAY OTHER ALLOWANCE OVER TIME ALLOWANCE PERSONAL ALLOWANCE QUALIFICATION/TECH: PAY SENIOR POST ALLOWANCE SHIFT ALLOWANCE SPECIAL PAY STAFF ALLOWANCE WASHING ALLOWANCE ADHOC RELIEF ALLOWANCE 20% 201 PROJECT ALLOWANCE (ARMY) SPECIAL ALLOWANCE 20/25 % SPECIAL ALLOWANCE 15/20 % ADHOC RELIEF ALLOWANCE 50% ADHOC ALLOWANCE @10% BY GOP SUB TOTAL: 520300 DAILY WAGES LABOUR 520400 EMPLOYEE BENIFIT 520401 FREE SUPPLY 520402 HOUSE RENT ALLOWANCE 520403 FUNERAL EXPENSES 520404 SPORTS & RECREATION 520405 AWARDS & GRATUITY 520406 MEDICAL EXPENSES 520407 EDUCATION & TRAINING 520408 SOCIAL SECURITY CONTRIBUTION 520409 EMPLOYEE OLD AGE BENEFITS 520410 EDUCATION CESS 520411 RES: TELEPHONE 520412 INCENTIVE TO EMPLOYEES 520413 PRORATA MEDICAL EXPENSES 520414 LEAVE ENCASHMENT 520415 MEDICAL EXPENSES (RTD.) 520416 FREE SUPPLY (RTD.) 520417 STANDARD RENT 520418 REFRESHMENT CHARGES SUB TOTAL: 520500 SHARE IN FUND CONTRIBUTION 520502 PENSION FUND SUB TOTAL 520101 520102 520103 520104 520105 520106 520107 520108 520109 520110 520111 520112 520113 520114 520115 520116 520117 520118 520119 520120 520121 520122 520123 520124 520125 520126 520127 2,126,090 206,068 164,017 174,423 85 480 130 7,030 240,808 164,036 22,598 22,535 685 23,989 69,162 20,306 1,075 72 5,089 2,865 18,840 654,064 2,214,091 210,911 160,731 220,062 144 493 214 8,195 236,797 215,094 22,547 22,795 354 26,545 76,824 19,233 2,575 22 5,070 3,649 224 20,124 457 651,249 2,468,817 244,894 162,257 369,232 151 529 357 7,692 238,265 222,894 25,093 22,629 434 26,276 70,619 20,328 3,094 30 4,924 4,172 18,874 393,420 639,551 3,924,447 251,032 1,123 1,380 133 24,929 23,464 8 1,502 8,306 99,375 8,467 20,710 30,800 3,621 27 474,879 _ _ _ ._ 4,118,399 291,885 155 1,066 87 30 23,094 23,913 2 1,703 4,056 69,283 23,246 32,365 56,746 2,429 530,058 - 4,944,535 330,567 321 4,756 1,000 69 24,469 51,678 3 1,406 2,481 120,981 606,000 168,000 215,000 2,399 1,529,130 340,245 703,135 1,933,000 2,348,000 245,000 162,257 369,232 151 530 360 8,077 238,265 222,894 27,038 22,629 435 26,276 76,824 20,328 3,094 30 4,924 4,172 18,874 393,420 639,551 234,631 5,066,994 416,515 4,800 2,000 69 26,365 51,678 3 1,406 2,481 120,981 606,000 204,960 262,300 2,585 1,702,143 2,357,294 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED O&M BUDGET ALLOCATION FOR FY 2012-13 Rs: In Thousands NC HEAD PARTICULARS 630200 530201 530202 530203 R&M OF BUILDING CIVIL WORKS OFFICES STORE HOUSES OTHER BUILDINGS (OPER) SUB TOTAL R&M OF DISTRIBUTION PLANT R&M of 132 KV Grid Statiom Equip: R&M OF 66 KV GRID STATION EQUIP: R&M OF 33 KV GRID STATION EQUIP: R&M OF 11 KV GRID STATION EQUIP: R&M OF 132KV DIST: LINES R&M OF 66KV DIST: LINES R&M OV 33KV DIST: LINES 11 KV DIST: LINES 400 V LOW TENSION LINES 220 v LOW TENSION LINES 530600 530601 530602 530603 530604 530605 530606 530607 530608 530609 530610 530611 530612 530613 530614 530615 530616 530617 530618 DIST: TRANSFORMERS SERVICE DROPS METERS STREET LIGHT CAPACITORS LINE T&P SUB TOTAL R & M OF GENERAL PLANT COMPUTER & OFFICE EQUIPMENT FURNITURE COMMUNICATION EQUIP: FIRE SAFETY EQUIPMENT 530700 530701 530702 530708 530709 530710 530711 ARM AND AMMUNATION 530713 MISC: EQUIPMENT SUB TOTAL 530800 R&M OTHER PHY: PROPERTY . 530801 SCHOOL 530802 HOSPITAL 530803 RES: BUILDING 530804 REST HOUSES 530805 COMMUNITY CENTRES 530806 MOSQUES SUB TOTAL 560100 RENT RATES & TAXES 560101 RENT OF BUILDING 560102 TAXES AND LICENCES SUB TOTAL 570000 POWER, LIGHT & WATER 580100 COMMUNICATION 580101 TELEPHONE 580102 POSTAGE/TELEGRAPH 580103 PAGER EXPENSES SUB TOTAL Budget Pf 2011-12 7,413 575 7,835 15,823 16,813 3,392 1,833 1,310 51,011 7,488 4,637 186,612 9,949 4,662 3,984 6,132 297,824 9,928 501 663 25 190 4,526 15,833 515 .13,844 564 970 15,892 15,951 812 16,763 23,259 16,970 1,683 18,653 Expenditure Fy 20142 7,306 40 7,702 15,049 16,220 3,610 1,363 716 71,313 8,285 5,198 332,594 12,236 3,978 568 3,991 12,410 472,483 7,999 241 587 22 171 1,816 10,835 526 13,882 566 757 15,731 14,666 548 15,215 29,655 17,743 1,864 19,607 Total Exp . . 20043I Projected 2013-14. 6,025 417 6,594 13,036 27,761 4,521 5,592 387 6,119 12,098 25,764 4,196 2,478 1,194 64,517 13,356 5,534 488,313 12,767 4,444 1,912 32,851 657,326 526,157 13,756 4,788 2,061 35,397 708,269 10,060 615 591 34 10,840 663 637 36 173 1,897 13,370 599 14,000 680 186 2,044 14,406 800 16,079 862 17,325 15,640 636 16,276 42,823 19,509 2,339 21,848 16,852 685 17,538 53,705 21,021 2,520 23,542 2,670 1,287 69,517 14,391 5,963 646 15,085 733 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED ESTIMATED O&M FOR FY 2013-14 Rs: In Thousands A/C HEAD PARTICULARS BUdget FY 2011-12 Expenditure FY 20'1142 . 690000 590101 590102 590103 600000 601000 610000 620000 630000 640000 650000 650100 650200 650300 650400 660000 670000 710000 720000 730100 730101 730102 730103 730104 750000 760000 760100 760200 760300 770000 780200 910700 OFFICE SUPPLIES & OTHER EXP. STATIONERY OTHER EXPENSES COSUMEABLE ITEMS SUB TOTAL STORE HENDLING EXP: SLOW MOVING ITES ADVERTISING & PUBLICITY SUBSCRIPTION & PERIODICAL DONATIONS & CONTRIBUTION REPRESENTATION & ENTERTA: TRAVELLING EXPENSES TA/DA ALLOWANCE RETIREMENT/TRANSFER TA/DA SPORTS T.A/ D,A SUB TOTAL INJURIES/DAMAGES INSURANCE COLLECTION EXPENSES DIRECTORS FEE PROFESSIONAL FEE LEGAL CHARGES AUDITORS FEE CONSULTANCY FEE SOFTWARE LICENCE FEE SUB TOTAL MANAGEMENT FEE VEHICLE EXPENSES REPAIR OF VEHICLE FUEL & OIL LICENCES & INSURANCE SUB TOTAL 1% OVER HEAD/S-CHARGES Payment to Nepra (Distribution Licence Fee) BANK CHARGES Reserve Flnanical Impact of new recruitment Total Repair of Sick/Damage Transformers Total Total Exp. Act/Proj 201243 Projected 2013-14 - 9,710 11,339 80,252 101,300 17 9,388 821 808 169,740 5,791 6,385 181,916 8,800 6,558 192,953 3,400 9,020 1,050 4,971 11,200 26,241 2,450 34,663 209,750 3,430 247,843 21,601 14,642 11,442 85,840 91,924 18 63,853 828 844 170,461 3,683 4,610 178,754 7,101 232,304 2,555 7,392 1,725 717 17,980 27,814 1,658 32,189 251,229 2,644 286,062 21,601 11,441 11,822 76,263 99,525 20 7,500 860 1,006 238,636 8,064 4,467 251,167 9,000 12,000 252,086 3,600 13,075 1,755 9,344 18,656 42,830 2,653 25,126 253,171 2,648 280,946 22,104 12,327 12,738 88,500 113,566 22 21,082 926 1,084 238,636 8,064 4,467 251,167 9,000 12,000 257,118 3,600 13,075 1,755 5,068 18,656 38,554 2,700 25,126 272,792 2,648 300,567 23,817 16,650 17,042 40,996 16,586 14,738 19,228 16,158 19,228 16,500 201,197 6,638,338 6,876,806 10,206,970 11,248,379 568,000 I 11,814,379 TENTATIVE R&M EXPENSES FOR THE F.Y. 2013-14 (IN MILLION) R&M EXPENSES Repair cost of Damaged T/F . 500 • 233.8 Repair cost of In House Sick T/F 205.3 Repair cost of Out Source Sick T/F 129.1 Total • 1068.2 Sr. Engineer (Operation) OM Chief Engineer (Operation) FESCO Headquarter Faisalabad DAMAGED TRANSFORMERS. TO BE REPAIRED DURING F.Y 2013-14 . TENTATIVE COST OF . • Capacity of T/F In KVA Total Quantity 50 45400. . 213 25 • 60350 776 . 100 . 705 200. 608 Total -. • • 2302 • Repair Cost I Unit - Total Cost 9670200 46831600 • 92650 • 65318250'. 184200 • •111993600.. 382600 . 233813650 Rs.233.8 Million •i,4n F•ii;!•-• f•r" 01(i. fr!Tenallotl • :;..neer (Ope:r TENTATIVE COSTOF OUT SOURCE REPAIR OF SICK TRANSFORMERS DURING F.Y 2013-14 Name of Circle Capacity of T/F in KVA 1st F(Abad • 2nd. F/Abad :1 • 1 15• 37' •60 114 Jhang. •• Total Quantity Sargodha Out Source Repair - (35%) • . Total Cost o • • 7 14. • 0 •• 1 33 261* .376 • 707 •247 639 723 . 1658 •• 5801• • •••.-182 Repair Cost / ' Unit • • 14696500 59500 . „46690000.".• ".0 75' .100 128 • 200 • • . 104 • 234 235 '353. . 211:.' • oso 333 120000 ,39960000•1 174 16O000 • 27840000 • ' 498, . 97 • 400 tot.IFESCO 0 2 • 387 ' 662 ' 1235 • -, •1559.. 3 3843 • • 0 • .1334 • . •• 420000 •.429186500• R6..19.1 Million • ( Sr. Enidgeg-(Opticiiiii) •• .! . 0/0 Chief Engpieer (Operation) . FFSCOIL;mdquarter FaisOabad . TENTATIVE COST OF IN HOUSE REPAIR OF SICK TRANSFORMERS DURING FN 2013-14'.': Name of Circle • Capacity of TlF '2nd • in Kwk• • 1st F/Abad • • FIAbad Jhang - • Sargodha 25.' 1' 261.. 37 •162 .• • • 376 235- 128.:.::. 104 518.816.. .211 • 353 9.7 '662 1235. 1559 . ' 92650.:: Note:;: 10, 15, 75 & 400 KVA T/Fs will be repaired in hoime 1863.00' . .92650 • 57165050 184200 .69680800 3• 500000 1500000 •!, 2509.. • 1037906 ' 205263336• • sto ..498 324 3843. 208840001 ' 45400 • • 60350: 617 , •400 Total FESCO •• 387 . • •• 32426 •••• 2. • 200 , . 272070 .. 460• '•• 1658.' • 639. 1 • . Total COst:. 30230:: • 9 1' :15 In House • Repair Cost / Repair Unit (65%)* • • Total .• Quantity • •• Rs.205.35 Million fir;-2.ngitteet (0 ng hiezt (Qpemcicr,-). . 00 SUB: ERP IMPLEMENTATION PLAN IN FESCO. It is the dire need of the time that with the help of latest technology, efficiency of the Company in various activities will• be on highest level. Through implementation of complete ERP solution to integrate all data, and processes' of FESCO into a unified system and run the business more efficiently. We are planning to start Implementation of ERP in current financial year i.e. 2013-14. ERP — enter rise Resource Hamlin is an integrated automation of various business activities being performed in the Company. Following are the key benefits of ERP , 1. Integration 2. Efficiency 3. Cost Reduction 4. Accuracy 5. Control Although, there are so many activities for fully automation of the utility distribution business, but to start with, we select following three modules for immediate implementation in this year. First Phase of ERP 1. Accounting & Financial Information Sy -stctu • ,i. ii. General Leger Accounts Payable iii. Accounts Receivable iv. Fixed Assets v. Cash Management • vi. vii. Budget & Payroll. Financial Statements viii. • Fixed Assets Accounting ix. Planning & Budgeting x. Loan Management xi. Fund Management , xii. Pension Management 2. Customer Billing and Information System The system will re-engineer the existing billing system using the latest technology in order to meet •with the special reporting requirement using readily available historical data and to improve efficiency. It will re-engineer customer information system, power sale & billing system, bill' collection system, defaulter management system, IT department and Line Losses System. 3. Material Management System a. Inventory Management b. Purchasing Management • c. Disposal Management d. M.M. Reports i. Transaction History ii. Stock Level Listing iii. Stock Valuation Report iv. Stock Activity Report v. Summary of Stock Activity. vi. Reorder Lists 4. Project Management System i. ii. Work Order System • Project Monitoring and Costing. Project Scheduling iv. Project Budgeting • v. Project Costing . • vi. Project Structitie and Creation vii. Project Assignment/Resource Allocation viii. Project Time Tracking ix. Project Security x. .Project Collaboration 5. Human Resource Management System The system will involve. designing & implementing a set of internally consistent policies & practices that ensure that the company's human capital contributes to the enhancement of its business objectives. It will include recruitment processing, career profiling, HR Analysis and Payroll... Therefore, budget allocation for this complete project for this Fiscal year 2013-2014. Module All Modulei consists of followings things Total Cost 1- Accounting & Financial 1. License Cost Total Coit will be worked out alter Information System 2. Implementation Cost finalization of actual reqiiirements. 3. Computer Hardware Cost 4. Manpower Outsourcing & 2-Customer Billing and Information System 3-Material Management System 4-Project Management System 5-Human Resource Management System 5. Consultancy Services Cost The time required for these activities "Go Live" is approximately 382 Working Days. . • . Phases - Kick-Off Project - - . .382 Working Days - 15 Days Evaluation of the ERP Documentation and Gap 22 Days . Analysis of CPM & FPM (if required) .. - Key User Training. . . 30 Days - Build/Setup/Customization 45 Days - User Acceptance Testing . - . 45 Days . End User Training , 45 Days • - Transition and Go Live — Selected Offices • (Chief Office, Finance Directorate, Regional Stores, Field Stores, Project Management Unit, • . .90 Days ' . • • PD construction, Civil Works, 5 Division Office and 5 RO) - . - . Transition and Go Live — Remaining Offices 90 Days . ( Remaining Offices) • . • _ Objectives/Phases: • • . . Mobilize Team and Kick-Off Project • Evaluation of the ERP. Documentation and Gap Analysis of CPM & FPM (if required) • • Key User Tmining • • Setup/Build/Customization and Integration • User Acceptance Testing • End User Training • Transition & Go-Live Scope of the Project: • Hardware and Infrastructure • Software Media and licenses • Original Equipment Manufacture (OEM) based trainings • Implementation, Data Conversion and Integration services • Support and Maintenance Therefore, it is requested, to accord approvals for the following:1. Administrative Approval .for ERP implementation. 2. Provision of budget for the year 2013-14 & 2014-15 as mentioned above i.e. Rs: 300 Million. • For the year 2013-14 Rs.200 Million For the year 2014-15 Rs.100 Million 3. Establishment of ERP Directorate headed by a Project Director. - 4. A team headed by Functional / Process Managers for each module. 5. Activation of ERP Setup (already approved by BOD) in IT for support. h@ i FESCO OFFICE OF TIIE PROJECT DIRECTOR GSC FESCO FA1SAIABAD • Phone No.041-2642751 Fax No.' 041-2642752 Memo. No. 10,Dq, Dated o g Ic-d/ /2013 Finance Director, FESCO, Faisalabad. Attention : Dy. Manager Accounts (CP &C) SUBJECT: FESCO TARIFF PETITION FOR FY 2013-14 Ref. Your office letter No.1945 dated 01.04.2013 Enclosed please find herewith the requisite inform as desired vide letter No. referred to above for further necessary action please. og CM 11 1 PROJECT ERE OR GSC FESCO (W 'DA) Faisalabad. :;4 , ,..t • ' • -1 D•timan(flarm: DinslorTin aieg Lw face poidu 4,0 NJ,IL WinL/0lLMc Works to be completed during 2013-14 under 6th STG (Revised) Program through FESCO's . own sources . Sr.N o Type of work. . .01 • 132 KV New Grid Stations • - 02 03 • 04 05 132KV G/S Lundian wala 132KV G/S Mamu ICanjan 132KV G/S G.F Shah 132KV G/S Kot Shalddr No. Cost in Millions (Rs* 04 680.00 01 6.50 04 280.00 04 120.00 . Augmentation / Replacement of Power Transformers with 10/13, 20/26 & 31.5/40 MVA Extension of Grid Stations (Transformer Bays) . • Extension of Grid Stations (Line . Name of work Bays) 132 KV Transmission Line . 4 Chiniot Rd. Fsd. 66KV G/S Chashma. 66KV G/S Nowshera " 66KV G/S Trug. .' 66KV G/S Bhabra. 132KV G/S Bandala 132KV G/S Bhakkar 132KV G/S Bhamb 132KV G/S Muridwala 132KV SDT T/L Piplan-Bhakar 132KV SDT T/L F/F Kot Shakkar. 132KV D/C T.T. Singh-Muridwal 132KV D/CT/L F/F Mamu Kajan 132KV DIC T/L F/F Lundianwala "KV D/C T/L 220KV Bandala — 132KV Bandala 132KV SDT T/L N/abad Shahkot (in & out at 220KV Bandala.) 132KV S/C T/L N/abad Shahkot (in & out at 220KV Bandala.) Deputy Is eager .Iusp) Gsc TTSCO Faisalabad. 0 - - 08 ._ TOTAL 981.46 2067.96 FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED FAISALABAD' FESCO PROFORMA PC (DITRIBUTION OF POWER) "DOP" [2010-2011 2011 TO 2014 - 20151 Chief Executive Officer FESCO CANAL ROAD FAISALABAD APRIL 2010 6.3 YEAR-WISE NUMBER OF ADDITIONAL CUSTOMERS TO BE CONNECTED OVER THE PERIOD 2010-2015 . Year 2010-11 2011-12 2012-13 • 2013-14 2014-15 TOTAL Customer 163747 174194 185308 197131 209708 930088 added 6.4 DISTRIBUTION TRANSFORMERS AND LENGTH (KM) OF HT/LT LINE YEAR-WISE OVER THE PERIOD 2010-2015. DESCRIPTION 2010-2011 2011-12. 2012-13 2013-14 2014-15 TOTAL 11 KV LINE 325.00 346.00 368.00 391.00 420.00 1850.00 LT LINE 389.00 412.00 439.00 467.00 501.00 2208.00 DIST.T/Fs(Nos). 3626 3857 '4103 4366. 4644 20596 •: Cost estimates have been prepared by using price level December 2009 .The inflation rate of 6.5% for projected price level for 2010-15. 6.5 CURRENCY CONVERSION RATES. Following currency conversion rates have been adopted in the cost estimates. 1 US $ = PKR 84.00 6.6 EXISTING FACILITIES AT PROPOSED SITES GENERAL DESCRIPTION OF THE EXISTING DISTRIBUTION SYSTEM AND IMPORTANT STATISTICS 6.6.1 Number of customers and sales during previous 5 years to different categories of customers (Domestic, Commercial, Industrial, Agricultural etc.) in the zone affected by the project. 10 6.9.1'. TOTAL NO.OF CUSTOMERS (RURAL. & URBAN) CATEGORY, WISE TO BE INSTALLED OVER A PERIOD 2010-2015 1 Category-wise Customers to be added. Year Domestic 2010-11 142345 • 17194 - 2243 2011-12 151427 18290 2012-13 161088 2013-14 2014-15 Commercial Industrial Agricultural , Other Total 1867 98 163747 2386 1986 105 174194 19458 2539 2112 111 ' 185308 171366 - 20699 2701 2247 118 '197131 182299 22019 2873 2391 126 • 209708 808525 97660 12742 - 10603 558 930088 For the purpose of calculating number of customers to be added Circle-wise the percentage sharing has been calculated from the total number of customers as on 30-062009 is given in the progress report for the year 2008-2009 which has been supplied by each Circle under FESCO. Percentage sharing is given in the table below: CIRCLE-WISE %AGE SHARING. CIRCLE %AGE SHARING 1st Faisalabad • 23.46% 2nd Faisalabad 15.63% Jhang 33.20% Sargodha . 27.71% ,rmacw.....Ilif 11 From the above ratios connection to be added circle-wise & year-wise over a period 2010-2015 is given as under: 6.9.2 TOTAL NO.OF CONNECTIONS TO BE ADDED CIRCLE-WISE . 1st Faisalabad = 218199 2"d Faisalabad = 145373 Jhang Sargodha TOTAL: 308789 = 257727 930088 In the light of above chart the circle-wise and category be . added in the 10th five : table: -wise No. of customers to year plan have been calculated and giveu as in the following 7.4 YEAR WISE COMPONENT WISE FINANCIAL PHASING. The financial requirement of funds is as follows: Funds Requirement (Rs. In. Million) • S.No. Year LCC FCC I , - • • TOTAL . 1. 2010-11 632.43 632.43 2. 2011-12 . 716.82 716.82 . 3. 2012-13 811.42 - 811.42 4. 2013-14 919.34 919.34 5. 2014-15 1040.64 1040.64 TOTAL 4120.65 4120.65 8. ANNUAL OPERATING COST OR ANNUAL RECURRING EXPENDITURES. SR.. NO DESCRIPTION LCC a. 0 & M Charges 206.03 206.03 b. Depreciation 144.00 144.00 C. Amortization Local Cost of Rs. Rs. 4120.65 Millions @13%. over a period of 20. years with grace period of 3 years 612.00 612.00 . •Total FCC TOTAL Rs in Million. . 963.03 • 963.03 2?-4 9. 9.• DEMAND AND SUPPLY ANALYSIS EXISTING CAPACITY OF SERVICES AS ON JULY 2009. Total installed capacity of WAPDA 17948 MW Total installed capacity of FESCO Grid System 2897.75 MVA or 9.2 PROJECTED DEMAND The future Loads of all types of categories are calculated on the basis of present pattern of Power Consumption, taking into consideration Industrial and Agricultural Development Programs, Future GDP Growth and other Economic - factors. A Regression based Statistical Model has been framed to work out the Load Forecast. Based on GOP Medium Term Development Framework, the demand Forecast up to 2014-15 is as follows; SYSTEM DEMAND FORECAST Year Demand (MW) Computed % Growth Rate 2008-09 2276 8.50 2009-10 2470 8.50 2010-11 2680 8.50 2011-12 2908 8.50 2012-13 3155 8.50 2013-14 3423 • 8.50 2014-15 3714. 8.50 BREALDOWN OF CAPITAL COST YEAR WISE COVERING THE WHOLE OF THE INVESTMENT PERIOD AS BELOW (IN MIllionPAK RUPEES) ...•• DESCRIPTION Sr. No. - 2012-2013 ; 2010-2011 2011-2012 LOCAL FEC TOTAL LOCAL FEC TOTAL LOCAL FEC TOTAL 2013-2014 2014-2015 TOTAL LOCAL FEC TOTAL LOCAL FEC TOTAL LOCAL FEC TOTAL 1 COST OF MATERIAL 202.31 229.22 229.22 259.17 259.17 296.05 1165.03 178.29 296.05 178.29 202.31 1165.03 A)11 KV LINE 1850 KM 189.26 189.26 214.39 214.39 245.63 053.80 147.85 166.67 245.63 147.85 166.67 963.80 KM . B)LT LINE =1:18 . _ 744.75 843.81 843.81 955.73 955.73 1080.93 4282.72 744.75 1080.93 657.50 657.50 4282.72 C)SUB-STATION 132.19 149.72 149.72 169.53 169.53 191.95 759.99 132.19 759.99 116.60 191.95 • 116.60 COST OF ELECTRICAL MATERIAL (12% STORE 8 TRANSPORTATION CHARGES ALREADY INCLUDED) 1100.24 3 8% INSTALLATION CHARGES ON ACTUAL AMATERIAL 78.59 COST 4 COST OF SERVICE CONNECTIONS (8% INSTALLATION 99627 CHARGES ALREADY INCLUDED) 5 TOTAL MATERIAL COST (INCLUSIVE OF 8% 2175.10 INSTALLATION CHARGES 2+3+4) _ • • ' 1245.92 1412.01 1412.01 1598.82 1598.82 1814.56 1814.56 7171.54 1245.92 7388.96 .1100.24 100.86 100.86 . 114.20" 114.20 129.61 51226 E12.26 89.00 129.61 • 78.59 1128.68 1278.76 1278.76 1448.80 1448.80 1641.50 1641.50 6494.01 6494.01 99627 1128.68 2463.60 2791.63 2791.63 3161.82 3161.82 3585.67 3585.67 14177.82 14177.82 2175.10 2463.60 168.34 168.34 .190.03 190.03 215.50 215.50 853.57 853.57 0) SERVICE CONNECTIONS 6 EXPENDITURE FOR OTHER OVER HEADS (LAND. 131.16 131.16 148.55 89.00 148.55 CIVIL WORKS T&P AND CONSULTENCY CHARGES etc) 7 TOTAL PROJECT COST (5+8) CAPITAL COST CONTRIBUTION FROM CONSUMERS NET PROJECT CAPITAL COST SR NO (74) 2612.15 2959.97 2959.97 3351.85 3351.85 3801.17 15031.40 15031.40 2306.26 2612.15 3801.17 2306_26 1895.33 2148.55 2148.55 2432.51 2432.51 2760.53 10910.75 10910.75 1673.83 1895.33 2760.53 1673.83 811.42 811.42 919.34 919.34 1040.64 1040.64 4120.65 4120.65 632.43 632.43 716.82 716.82 sid idddddeidddiddeiddidididdid40.144144d (cc) - , - SUB: ERP IMPLEMENTATION PLAN IN FESCO.• It is the dire need of the time that with the help of latest technology, efficiency of the in various activities will be on highest level. Through implementation of complete ERP Company solution to integrate all data and processes of FESCO into a unified system and run the business more efficiently. We are planning to start implementation of ERP in current financial year i.e. 2013-14. ERP — enterprise Resource Plannin is an integrated automation of various business activities being performed in the Company. Following are the key benefits of ERP 1. Integration 2. Efficiency 3. Cost Reduction 4. Accuracy 5. Control Although, there are so many activities for fully automation of the utility distribution business, to start with, we select following three modules for immediate implementation in this year. but First Phase of ERP 1. Accounting & Financial Information System i. General Leger ii. Accounts Payable iii. Accounts Receivable iv. Fixed Assets v. Cash Management vi. vii. viii. Budget & Payroll Financial Statements Fixed Assets Accounting ix. Planning & Budgeting x. Loan Management • xi. xii. Fund Management Pension Management • 2. Customer Billing and Information System The system will re-engineer the existing billing system using the latest technology in order to meet with the special reporting requirement using readily available historical data and to improve efficiency. It will re-engineer customer information system, power sale & billing system, bill' collection system, defaulter management system, IT department and Line Losses System. 3. Material Management System a. Inventory Management b. Purchasing Management c. Disposal Management d. M.M. Reports i. Transaction History ii. Stock Level Listing iii. Stock Valuation Report iv. Stock Activity Report v. Summary of Stock Activity vi. Reorder Lists 4. Project Management System i. Work Order System ii. Project Monitoring and Costing. iii. Project Scheduling iv. Project Budgeting v. Project Costing vi. Project Structure and Creation vii. Project Assigmnent/Resource Allocation viii. Project Time Tracking Project Security x. Project Collaboration, 5. Human Resource Management System The system will involve designing & implementing a set of internally consistent policies & practices that ensure that the company's human capital contributes to the enhancement of its business objectives. it will include recruitment processing, career profiling, HR Analysis and Payroll. , Therefore, budget allocation for this complete project for this Fiscal year 2013-2014. Module All Modules consists of followings things Total Cost 1- Accounting & Financial 1. License Cost Total Colt will be worked out after Information System 2. Implementation Cost finalization of actual requirements. 3. Computer Hardware Cost 4. Manpower Outsourcing & 2-Customer Billing and Information System 3-Material Management System 4-Project Management System 5-Human Resource Management System 5. Consultancy Services Cost The time required for these activities "Go Live" is approximately 382 WorkingDa s. - ' • Phases . • 382 Working Days • - Kick-Off Project - Evaluation of the ERP Documentation and Gap 15 Days 22 Days Analysis of CPM & FPM (if required) - Key User Training, 30 Days - Build/Setup/Customization 45 Days - User Acceptance Testing - End User Training - Transition and Go Live — Selected Offices • (Chief Office, Finance Directorate, Regional . 45 Days 45 Days 90 Days Stores, Field Stores, Project Management Unit, PD construction, Civil Works, 5 Division Office and 5 RO) - - Transition and Go Live — Remaining Offices ( Remaining Offices) . . 90 Days . Objectives/Phases: t- • Mobilize Team and Kick-Off Project • Evaluation of the ERP. Documentation and Gap Analysis of CPM & FPM (if required) • Key User Training • Setup/Build/Customization and Integration • User Acceptance Testing • End User Training • Transition & Go-Live Scope of the Project: • Hardware and Infrastructure • Software Media and licenses • Original Equipment Manufacture (OEM) based trainings • Implementation, Data Conversion and Integration services • Support and Maintenance Therefore, it is requested, to accord approvals for the following:- 1. Administrative Approval for ERP implementation. 2. Provision of budget for the year 2013-14 & 2014-15 as mentioned above i.e. Rs: 300 Million. For the year 2013-14 Rs.200 Million For the year 2014-15 Rs.100 Million 3. Establishment of ERP Directorate headed by a Project Director. • 4. A team headed by Functional / Process Managers for each module. 5. Activation of Setup (already approved by BOD) in IT for support. BUDGET REQUIRED FOR HT/LT PROPOSALS FOR FY 2013-14 AVERAGE AMOUNT AMOUNT ATUS OF HT ROPOSALS proved work order ider process Total DOP ELR TOTAL Rs. Million PER WORK DOP ELR Rs. Million 8 12 20 158 237 19.75 9 14 23 162 250 17.91 17 26 3 L__-4- -) 320 ___ 487 . 18.76 807 AVERAGE AMOUNT PER WORK AMOUNT "ATUS OF LT 'ROPOSALS: DOP proved work ELR TOTAL Rs. Million DOP ELR Rs. Million 330 525 128 217 0.657 325 459 784 267 375 0.82 Total 520 789 1309 395 592 irand Total 537 815 1352 715 1079 order ider process 195 • 0.754 1.32 1794 Hence in view of above the amount for, one HT work is taken as 18.76 Millions ntative) and average of Rs.1.32 Million for each LT work for the FY 2013-14. BUDGET REQUIRED FOR HT PROPOSALS F.Y 2013-14 SR. NO. NAME OF FEEDER %VD %AEL Estimated Cost (Rs.) M REMARKS 1 ABBA KHEL & MUSA KHEL 52.4, 38.9 18, 16 71.81 UNDER PROCESS/PROGRESS 2 AREA PLANNING OF RAVI & JAKHAR 29.7, 44 10, 19 48.65 UNDER PROCESS/PROGRESS 3 AREA PLANNING OF CHIDRU & SHER 72.8, 20 WALA (NEW PROPOSED SORROW WALA) 32,6 52.29 UNDERPROCESS/PROGRESS 4 NOOR PUR 17 . 33.7 UNDER PROCESS/PROGRESS 5 MANGUANA 42.1 17 29.78 UNDER PROCESS/PROGRESS 6 MELA 41.5 . 17 13.16 UNDER PROCESS/PROGRESS 7 HARNOLI 37.8 14 29.19 UNDER PROCESS/PROGRESS 8 RIAZABAD 37.4 15 19.64 UNDER PROCESS/PROGRESS 9 MOHAR 9.6- 3 24.08 UNDER PROCESS/PROGRESS 10 BANGLA 34.6 16 25.93 UNDER PROCESS/PROGRESS 11 KHANSAR 22.4 11 10.65 UNDER PROCESS/PROGRESS 12 AHMAD WALA 31.5 9 24.6 UNDER PROCESS/PROGRESS 13 KOT AHMAD YAR 25.8 10 15.98 UNDER PROCESS/PROGRESS 14 JANAJ WALA 24.3 9 17.83 UNDER PROCESS/PROGRESS 15 ' ASSIAN . 22.7 9 14.85. UNDER PROCESS/PROGRESS 16 SANGRA 24.3 9 , 29.78 UNDER PROCESS/PROGRESS 17 SANDRAL 22.9 9 ' 18.83 UNDER PROCESS/PROGRESS 18 SAT GARAH 11.8 7 1.79 UNDER PROCESS/PROGRESS 19 MUNARA 22.4 8 11.58 UNDER PROCESS/PROGRESS 20 AREA PLANNING OF 49-Tail & Astana Fazal 3.4, 20.2 2, 6 6.69 UNDER PROCESS/PROGRESS 21 BAGH 25 6 22,27 UNDER PROCESS/PROGRESS 22 HADDA 7 8.68 UNDER PROCESS/PROGRESS 47.4 ' • . 18.3 .,/ BUDGET REQUIRED FOR HT PROPOSALS (F.Y 2013-14 SR. NO. NAME OF FEEDER %VD %AEL Estimated REMARKS Cost (Rs.) 23 WAGHI 19.6 6 14.11 UNDER PROCESS/PROGRESS 24 REWAZ 25.4 5 17.22 UNDER PROCESS/PROGRESS 25 AHMAD NAGAR 19.1 6 8.78 UNDER PROCESS/PROGRESS 26 JOHAL & F-5 11.8, 9.7 5, 2 10.65 UNDER PROCESS/PROGRESS 27 BUKHARIAN 18.3 4 10.23 UNDER PROCESS/PROGRESS 28 AREA PLANNING OF MADINABAD, GM ABAD, SEEDABAD & SADDAR 1.29 UNDER PROCESS/PROGRESS 29 JHUMRA ROAD 11.3 4 5.92 UNDER PROCESS/PROGRESS 30 KHIZARABAD 9.6 3 0.85 UNDER PROCESS/PROGRESS 31 RAIL BAZAR 5.9 2 5.97 UNDER PROCESS/PROGRESS 32 SHEIKHUPURA ROAD 2.8 1 - 3.82 UNDER PROCESS/PROGRESS 33 LANGAR MAKDOOM 27.9 11 - 20.8 UNDER PROCESS/PROGRESS 34 BAHADRI WALA ' 18.4 8 9.8 UNDER PROCESS/PROGRESS 35 REHMAY SHAH 31.6 8 18.5 UNDER PROCESS/PROGRESS 38 SHERAZA 33.4 13 18.9 UNDER PROCESS/PROGRESS 37 KANJAWANI 12 5 14.9 UNDER PROCESS/PROGRESS 38 PINDI SHEIKH MUSA 17.4 8 18.7 UNDER PROCESS/PROGRESS 39 COLLEGE ROAD 8.1 4 5.8 UNDER PROCESS/PROGRESS . 68.2 16 51.8 UNDER PROCESS/PROGRESS 30.3 12 19.8 UNDER PROCESS/PROGRESS • 40 • DARYA KHAN 6.8,4.8,0.8, 2, 2, 0, 1 2.3 • 41 SADNAHI 42 YARU KHEL 9.1 4 5.3 UNDER PROCESS/PROGRESS 43 RURAL (QUAIDABAD) 28.2 ' 12 14.8 UNDER PROCESS/PROGRESS • ' 807.1 . TOTAL E:\directorylsalee Zi A 1st Circle -1?__LI-) Sr. NO. LT code Location 1 3122 All HILAL E AHMAR CHOWK SRG ROAD FAISALABAD 2 3123 Al2 Bole De Jhugi 3 3123 A21 Chak No. 7 Nb Jilal Chowk Base Line 4 3123 A22 St No. 2 Tanga Chowk Islam Nagar 5 3123 B10 Chak No. 8 JB Mehboob Town 6 3124 B01 Street No. 9 Tariqabad 7 3124 B11 St No. 14 Tahir Road Fsd. 8 3125 B91 Chak No. 53 JB Sidhuan 9 3125 B93 Azafi Abadi Chak No. 7 JB 10 3125 B94 Chak No. 7 JB Changar Bhasti 11 3125 F20 Chak No. 119 JB Samana 12 3125 B36 CHAK NO. 6 JB 13 3125 E28 ALI TOWN NEAR SHAFIQ PATHAN 3125 E27 ALI TOWN NEAR AKBAR NAZIM 3125 B96 Borraywal transformer No. 1 chak no. 50 JB 16 .3125. .. G47 Chak No. 49 JB Bhattha 17 '3126_ G25 NISHAT ABAD 30 FEET BAZAR 18 3126 G26 KACHI ABADI REHMAN ABAD . 19 3126 G24 GHAZI ABAD NO 2 20 3126 M32 Moh. Rasool Nagar St. no 4 21 3126 R06 Moh. Haiderabad St 12 22 3127 L05 Muslim Town No. 1 Near Park Dr. Naeem 23 3127 RO1 Bhutto Plot Chak No. 117 JB 24 3127 R02 Chak No. 117 JB Dhanola Fsd 25 3127 R06 Chak No. 117 JB Dhanola Fsd 26 3127 R07 Chak No. 117 JB Dhanola Fsd 27 3127 R08 Chak No. 117 JB Dhanola Fsd 28 3127 R09 Chak No. 117 JB Dhanola Fsd 29 3127 S03 Muslim Town No. 1 30 3127 MR01 MUTOO PURA FAISALABAD 31 3127 NO2 CHAK NO 122 JB NOOR PUR 32 3127 N04 CHAK NO 122 JB NOOR PUR 33 3127 L03 Canal Bank Muslim Town 14 15 • - . 34 3127 MO1 Chak No. 196 Rb Ghona West 35 3127 M02 Chak No. 196 Rb Zabeda Town 36 3127 M03 Chak No. 196 Rb West Ghona 37 3127 NO3 Chak No. 122 JB Barkat Chowk 38 3127 L07 Umar block muslim town 39 3131 M91 RAFHAN ROAD 40 3131 M97 AHMED RAZA ROAD 41 3131 M101 SUSAN ROAD 42 3132 F28 GoII Amin Town 43 3133 B09 Chak No 198 Rb 44 3133 R04 Zia Town 45 3134 S25 CHAK NO 203 RB AKBAR TOWN 46 3134 W05 Chak No. 203 Rb Malik Pur Zeshan Park 47 3138 . NO3 48 3138 N08 Dhodiwala 214 Rb 49 3138 N13. Usman Town Near Canal 50 3138 N21 Dar UI Islam Colony 51 3138 N24 - Hamyun Town 52 3138 N26 Chak No. 215 Rb Kakkuana 53 3138 N27 Latif Park 54 3138 N29 Chak No. 209 Rb Jawai Colony 55 3141 C36 Chak No 128 Gb Near Railway Line 56 3141 F91 Madina Cold Store Jhumra Rd 57 3141 F18 MOH: CAMP ' 58 3141 F34 MOH. MAHMOOD COLONY JARANWALA 59 3141 K90 Alvi Park 60 3141 K89 Ghulam Rasool Colony 61 3141 F37 Gallani Mohallam 62 3141 03 Lorry Adda 63 3141 F41 Near P.0 Mochi Bazar 64 3141 04 Moh. Anwar Abad 65 3141 08 Bashir Colony Chak No. 128 Gb 66 3141 C42 Ahmad Park Jrw 67 3141 C43 Rasheed Park Jrw 68 3141 C44 Farooq Park Near Railway Phatak . Chak No. 209 Rb Tall Wala (\/ 69 3141 F47 Moh. Camp Jrw 70 3141 K95 Mohallah Alvi Park 71 3141 MO1 Moh. Muhammad Pura 240 More 72 3141 M03 Mustafa Abad 240 More Jrw 73 3141 F38 Moh. Nawaz Colony 74- 3142 B25 Chak No 658 Jrw 75 3142 B26 Chak No 236 Gb Jrw 76 3142 L02 Chak No. 569 Gb 77 3142 B24 CHAK NO 459 GB JRW 78 3142 B42 CHAK NO. 53 JB 79 3142 106 CHAK NO 651/2 GB 80 3142 B39 Chak No. 587/GB 81 3142 TO1 CHAK NO. 629/GB 82 3142 T02 CHAK NO. 630/GB 83 3142 L02 CHAK.NO. 570/GB 84 3142 RO1 MOH. SALAM TOWN JARANWALA 85 3142 L07 CHAK NO 644 /GB JARNAWALA 86 3142 B45 Chak NQ. 628 Gb Jrw 87 3143 All Chak No 108 Gb 88 3143 C66 Chak No. 21 Gb 89 3143 G53 Chak No 126 Gb 90 3143 N82 Chak No 121 Gb 91 3143 N83 Chak No 64 Gb 92 3143 P77 Chak No 106 Gb 93 3143 P79 Chak No 105 Gb 94 3143 C63 CHAK NO 22 GB 95 3143 N78 CHAK NO 110 GB 96 3143 N73 CHAK NO 109 GB 97 3143 P61 ADDA ALI PUR BUNGALOW 98 3143 P68 Chak No. 104 GB 99 3143 C09 CHAK NO 119 GB 100 3143 G57 Chak No. 126 Gb Jrw 101 3143 N82 Faisalabad Road Jhall 102 3144 SO2 Chak No. 168 GB 103 3144 A06 Chak No 130 Gb _ 104 3144 A07 Chak No 131 Gb 105 3145 S38 Chak No 39 Gb 106 3145 S46 Chak No 91 Gb 107 3145 S52 Chak No 240 Gb 108 3145 L06 CHAK NO. 216/GB 109 3145 L20 CHAK NO. 229/RB 110 3145 S48 Chak No. 89 Gb 111 3146 A10 Chak No. 283 JB Rodala Mandi 112 3146 D04 Chak No 580 Gb 113 3146 R09 Chak No. 147 Gb Jrw 114 3146 R10 Chak No 354 Gb 115 3146 T13 Chak No 653/4 Gb 116 3146 T11 Chak No. 630 Gb 117 3146 . A07 Chak No 280 Gb 118 3151 A10 Chak No. 136/Rb Bakhray Wall 119 3151 A35 MOH. MUBARAK COLONY 120 3151 A18 Chamra Mandi Chak Jhumra 121 3151 A04 Chak No. 18 JB Hamonkay -122 3152 D07 Chak No. 132 Rb 123 3152 R27 CHAK NO 189 RB NEAR GHULAM MUSTAFA 124 3152 1126 CHAK NO 189 RB NEAR SHAMSI MASJID 125 3152 S07 Chak No 141 RB 126 3152 Z02 Chak No 164 RB 127 3152 DO1 Chak No 158 RB 128 3152 D14 Chak No. 135 Rb Kanan Sayan 129 3153 130 3153 CO2 CHAK NO. 124RB PROPIAN 131 3154 K04 MOH: JANOBI MOUZA MANGOWAL KHUSHAB 132 3161 F-16 Jamal Jatti F/Abad Road 133 3161 G29 Bahar Colony 134 3161 G34 Chakiwala chowk satelite town 135 3163 C04 Moh. Shadi Malang Near Patwari 136 3163 C14 Abadi Thali wala bau wala near tibba kamangran 137 3163 CO3 Chara Jall Near Rajoka Chak 138 3163 C13 Mohsin Abad Chak No. 468 3153A47 CHAK NO 73 RB 139 3163 C16 Rajoya chowk Jhang road 140 3163 C64 Near Imam Bargah Thathi Bharbi Chiniot 141 3163 CO2 Moh. Rasta Chowk 142 3164 B50 Chak No 195 JB 143 3164 B55 Agee! town 144 3164 B65 Chak No. 242 JB 145 3164 B80 Abadi Rojokian Wala Risaloo 146 3164 B81 Amin Pur Road Near Town Committee Bhow 147 3164 G18 Mouza Adlana 148 3164 B77 • Mouza Noshera 149 3165 P09 Moh. Darul Aloom Fc School 150 3165 P10 Kot Wasawa 151 3165 P02 Moh. Darul Fatoh 152 3165 PO4 Moh. Darul Sadar Near Mirza Majeed 153 3165 P05 Moh. Nusrat Abad 154 3165 P07 Purana Dairy Form 155 3165 P11 Moh. Darul Aloom Goal Chowk 156 3165 P12 Moh. Darul Rehmat Sharqi 157 3165 P13 Moh. Darul Yaman Gharbo 158 3165 P25 Muslim Colony Chenab Nagar 159 3165 P33 farooq Abad Chiniot 160 3165 P35 Moh. Darul Rehmat Mandi Bazar 161 3165 P21 Mouza Channi Qureshian 162 3166 E14 Sabu Wala • . - 2nd Circle Sr. NO. DOP HEAD LT code Location 1 3111 A13 MOH. HAMYUN NAGAR 2 3111 C15 C BLOCK NEAR 115/C P-COLONY 3 3111 A03 HURIANWALA CHOWK P/COLONY 4 3111 A10 NOOR PUR ST NO 11 5 3112 B20 Mohammad All Town 6 3113 K50 CHAK NO. 176/GB 7 3113 C16 CHAK NO 224 RB CHAUDARY PARK 8 3113 C04 SHALIMAR PARK NR SHAH P/DEAL 9 3113 CO2 MOH. AMMO ABAD 10 3115 F04 BASTI ALLAH HOO WALT 11 3115 F13 BABAR CHOWK P/COLONY 2 12 3115 F08 CHAK NO 225/RB AHMAD ABAD ST NO 4 FSD 13 3115 F15 RACHNA TOWN NO 2 NEAR MOTI MAUD 14 3115 F17 MOH. ALAHIABAD ST NO 5 15 3116 H8 CHAK NO. 248 RB DALOWAL 16 3116 H11 CHAK NO. 253 RB ISLAM NAGAR FSD 17 3116 H09 CHAK NO. 248 RB DALOWAL 18 3116 H10 CHAK NO. 248 RB DALOWAL 19 - 3116 H2O CHAK NO 253 RB JAHANGIR KALAN 20 3211 M05 Abadi Shiekhan Wala 21 3211 M10 Sultan Chowk Masoodabad 22 3211 M14 Mehmood Town Sq. No. 28 Samanabad 23 3212 G09 RAHMANIA TOWN 24 3212 A23 Data Astana Road Partab Nagar 25 3212 A25 St. No. 3 Main Bazar Ayub Colony No. 2 26 3212 A26 St No. 6 Ayub Colony Diwar Wali Side 27 3212 A28 St No. 5 Ayub Colony Near Girls School 28 3212 K21 St No. 2 Makhdoom Road Khalidabads 29 3212 K22 St No. 10 Rehmania Road Partab Nagar 30 3212 K23 Makhdoom Road Near Makhdoom 31 3213 CO1 Chak 298 Rb Aroori 32 3213 CO2 Chak No. 232 Rb Risala Wala 33 3213 C06 Chak No. 233 Rb Tikkey Wala - 34 3213 C18 Chak No. 221 Rb Dera Sultan 35 3213 C23 Chak No 232 Rb Abadi Waliabad 36 3213 C24 Chak No. 296 Rb 37 3213 C27 Chak No 221 Rb Kakuana 38 3213 C28 Chak No 221 Rb Rasala No 15 39 3213 C29 Chak No 232 Rb Azafi Abadi 40 3213 SO1 NEAR SHABAAZ LAL MILL 41 3214 J08 Gali No. 8 Main Road Gurunankpura 42 3214 S13 Moh. Kausar Abad Near Dhoobi Ghat 43 3214 A02 All Housing Colony Near All Masjid 44 3214 A03 Tali Chowk All Housing Colony 45 3214 J10 Near Chand Bakary Affghanabad 46 3214 J11 Moh. Naseerabad Opposite Govt. School 47 3214 312 Gall No. 11 Moh. Gurunankpura 48 3214 L07 Bandok Shah Wali Galli Lakar Mandi Fsd 49 3214 S19 Liaqat No. 2 St 19 50 3215 G09 Chak No 197 Gb 51 3215 T83 CHAK NO 66 JB 52 3215 53 3216 A09 Chak No.134 JB 54 3216 A20 Chak No. 84 JB Khoo Wala Chowk 55 3216 A21 Chak No. 84 JB Abadi Nahar Wali 56 3216 SO4 Chak No 275 JB 57 3216 3216A18 CHAK NO 76 JB 58 3216 3216S24 CHAK NO 241 RB NEAR RIAZ 59 3216 K10 Chak No. 273 JB 60 3216 P06 Chak No. 276 JB 61 3216 P07 Chak No. 276 JB 62 3216 P08 Chak No. 276 JB Near Masjid 63 3216 SO2 Chak No. 275 JB Near Khan Shabeer 64 3222 F02 Moh. Gm Abad No. 2 65 3222 F04 Rasheed Abad 66 3222 F06 Gali No. 10 Usman E Ghani 67 3222 F08 Gali No. 4 Rashid Abad 68 3223 109 Gali No. 04 & 05 Tariq Colony 3215G09 CHAK NO 63 JB GARDANA ROAD . 69 3224 R47 Gulzar Colony 70 3224 R48 Adda Chakera 71 3224 - R49 Awami Colony 72 3224 R50 Young Wala 73 3224 R51 Arshad Town 74 3224 R52 Azam Town 75 3224 R53 Madina Abad 76 3224 R55 Sana Park 77 3224 R56 Rasool Pura 78 3224 R57 Amin Park 79 3224 R59 Bilal Park 80 3225 R37 Chak No 31 JB 81 3225 . R41 82 3225 R36 CHAK NO 31 JB 83 3225 J70 CHAK NO. 40 JB 84 3231 C53 Moh. Shoukat Abad 85 3231 D58 Chak No 471 Gb 86 3231 062 Chak No 441 Gb Bujoki 87 3232 J01 Chak No 216 Gb 88 3232 J112 Chak No 217 Gb 89 3232 G107 CHAK NO 540 GB 90 3232 91 3232 CO1 LALU KHILAN WALA 92 3233 P56 NEAR PULL SALAM FAQEERIAN 93 3234 B06 Pathan Colony 94 3234 95 3236 KO1 195 Gb 96 3236 L29 Chak No 197 Gb 97 3236 M13 Chak No 196 Gb 98 3236 M18 Chak No 196 Gb 99 3241 A07 P/Colony No. 1 Near Silver Spoon 100 3241 A10 Yasrab Colony Near Primary School 101 3241 A13 Imam Bargah Botane Zohra 102 3241 A09 Khalsa College 659 Apc 103 3241 All Saad Bela . MOH. GULZAR E MADINA AMIN PUR - 3236M12 CHAK NO 192 GB 3234R03 CHAK NO 458/3 GB 104 3241 Al2 Near P-18 Al Najaf Colony 105 3241 A14 Imam Bargah Botane Zohra 106 3242 B04 Zulfiqar Colony St No. 2 107 3243 C17 Moh. Barkat pura near FIA 108 3244 DO1 Chalk No239 Rb Fsd 109 3244 D03 Chak No 78 JB Big Fsd 110 3244 D05 Chak No 256 Rb Dengha 111 3244 D17 Chak No 236 Rb Kajlay 112 3244 D25 Moh. Farooqabad Bansanwali Gali 113 3245 F02 Chak 25/Rb Moh. Fateh Pur 114 3245 F03 Chak No 215 Rb Moh. Fateh Pur 115 3245 F10 Cha No 215 Neithery Near Mubark Shah 116 3245 F11 Chak No 238 Rb Awan Wala 117 3245 F15 St No. 3 Garden Colony 118 3245 F17 St No. 6 Garden Colony 119 3245 F18 St No. 7 Garden Colony 120 3245 F23 Nawab Town No. 2 Near Mazhar Saqlain Shah Fsd 121 3245 F24 Moh. Fatheabad Fsd 122 3246 H13 Chak No. 263 Gb Dijkot - Jhang Circle Sr. NO. DOP Head LT code Location 1 3311 R20 RAFIQUE CHWK 2 3311 R18 SABZI MANDI JHAN 3 3311 M15 MOHALLAH YOUSAF ABAD . 4 3311 R17 MOHALLAH JALAL ABAD 5 3311 M14 MOHALLAH JALAL ABAD 6 3313 A38 Abadi Amir Ahmad Chah Keekar Wala 7 3313 C08 Basti Abbas Pura haveli bahadur shah 8 3313 M51 LAILA MAJNOO GATE MOH PINDI 9 3313 M44 CHAH KARLI WALA 10 3313 M48 JHANG BAZAR 11 3314 S17 MOUZA KUL NAWAN THATFIA 12 3318 G02 Abadi Chak No 642 Jb 13 3318 G11 CHAK NO. 386 14 3318 G03 CHAK NO 446 3B ABADI ARSHAD SIPRA 15 3318 F39 Riaz Chowk S/Town 16 3318 M02 Ck No 268 Khokhra 17 3318 • -F12 Z-Block S/Town 18 3319 K24 MOH: NAI ABADI KUNDIAN 19 3319 F23 Abadi Chah Azeem Wala Link Chiniot 20 3321 C09 Moh. Mehmood Abad Madina Town 21 3321 A06 ISLAM PURA 22 3321 A14 NEAR SECONDARY SCHOOL T.T. SINGH 23 3327 R37 Chak No. 291 Gb Rajana 24 3328 J04 Chak No. 318 Gb Tt Singh 25 3331 R10 Ashraf Colony St No 3 Gojra 26 3331 R03 AHMED ABAD TOWN GOJRA 27 3331 R04 GARRAH MOHALLAH 28 3331 C06 Gulshan Mehmood Colony Abdullah pur near bakery 29 3331 305 Chak No. 308 JB 30 3332 MA11 CK NO 241 GB GARRA 31 3332 T04 CHAK NO 373 JB 32 3333 KO1 Chak No. 309 JB 33 3334 P01 Chak No 342 JB . • • 34 3334 N62 CHAK NO. 336/JB 35 3335 D02 Chak No. 97 JB 36 3341 A07 Moh, Rehman abad Jhumra Road 37 3343 B30 MOZA THATHA SARNANGA 38 3343 B16 MOUZA IDLANA 39 3343 509 THATA JHANB 40 3343 B32 MOHALLAH TANKI BAZAR 41 3344 P17 AZAFI ABADI NUSRAT ABAD 42 3344 P14 MOHALLAH DAR UL SHAKAR CHANAB NAGAR 43 3345 E05 MOH. HWRA ROAD NEAR BAILY CHOWK 44 3345 E 48 Chak no 55 Janubl 45 3345 E53 Thatha Waryo Lalian 46 3345 E55 Moh, Railway station Lalian 47 3346 C11 VILLAGE RASHEEDA 48 3346 C33 MACHIAN WALA 49 3346 C21 KOT AHMED YAR . 50 3346 R44 MOH SIRAJIA CHOWK RODO SULTAN 3346 C06 Fazal Colony 52 :3346 C10 Moh, Aali Eid Gah road 53 3346 C17 54 3346 C09 Phool Ground Chiniot 55 3347 R29 Mouza Wijhalkay 56 3347 R26 Nadeem Abad near Thana Barrana 57 3351 58 3351 J46 MOH. DADIAN WALA 59 3351 001 CHAH NAGRI MOZA KHAN PUR 60 3351 J41 CK NO 67 ML HABIRMARKEET 61 3351 J01 NEAR POLICE STATION HAYDERABAD 62 3351 J44 CK NO 49 /TDA 63 3352 DOP1 CK NO 54 /MA 64 3354 K57 ADDA ALI KHEL 65 3354 . K50 MOH RAILWAY STATION 66 3354 K52 MOH. FAR000IYA MASJID 67 3354 K49 MOH. KUNDYARAN WALA 68 3354 K51 MOH MULA ABDUL KAREEM 51 . J43 Hayat Pur Kanjuan ADDA SIRAY MUHAJAR . 69 3355 C63 St. Zafar Ullah Khan Dhandhla 70 3355 C64 Near Model High School Chimni 71 3355 C56 BASTI KHOKHAR NASHEEB 72 3356 R29 KOTLA JAM 73 3356 R27 MOH. QAZIAN WALA 74 3361 W29 Chak No 402 JB Virkan 75 3361 W43 BASTI FATEH PUR 76 3363 J01 Abadi Jaboana 77 3363 UO2 SULTAN LASHARI 78 3364 S70 Basti Mehram Wala Dagree 79 3364 S20 Basti Noor Shah Garh Mor 80 3364 S24 Mouza Fateh pur perry 81 3364 S20 Moh. Abbas Pur Gm Raja 82 3365 22 83 3365 C27 RASHK ABAD JHANG ROAD 84 3365 A04 Moh. Dubkalan 85 3366 A70 Moh. Farooq Abad Shumali 86 3366 A75 Moh. Faroog Abad Janubi 87 3366 S25 Basti Sammondana AP sial 88 3366 S65 Moh.Mehrnoob Colony Ap Sial - 89 3371 R50 Moh. Madinabad 90 3372 F05 CHAK NO. 717/GB 91 3372 H05 CHAK NO. 54/1 TOKRA 92 3372 J08 CHAK NO. 736/GB 93 3373 K09 CHAK NO. 9 NB 94 3373 H14 CHAK NO 341 GB 95 3373 H15 GHOUSIA CHOWK 96 3374 N08 CHAK NO 686 /27 GB 97 3374 A02 MOUZA QAZI GHALIB ' , MOH.MADIN WALA - DOP Head Jhang Circle LT code Sr. NO. Location 1 3411 C19 CHOWK BLOCK NO. 3 SARGODHA 2 3412 R81 CHAK NO. 78/NB 3 3413 A73 Al Farooq Colony 4 3413 A31 CHAK NO 56 NB 5 3413 Al2 TAQI PARK NEAR HAIDARABAD TOWN 6 3413 A15 HA.1I COLONY NEAR 31-1AL CHAKIAN 3414 T90 Lak Colony Tariq Abad Main Road 8 3414 178 Chak No. 125 Sb 9 3421 101 Near Masjid Siddique E Akbar Rehman Pur Srg 10 3421 B10 NEAR GRAVE YARD BLOCK D S/TOWN 11 3421 B11 Moh, Ansar_ Pura 12 3423 S15 Mela Mandi Road Fedral Public School 13 3425 B18 Langer Makhdoom 14 3425 009 Sial Abadi 15 3425 D10 Village Their 16 3425 17 3431 C04 Abadi Ghulam Bhikh Deowal 18 3431 C52 Chak No 6 Sb 19 3431 C53 Chak No 05 Sb Ansar Colony 20 3432 B01 Vijhi Colony Miani 21 3432 B10 Ghughiat Village Bhera 22 3432 B17 Abdul Market Bhera 23 3432 B19 Mughal Abad 24 3432 B21 Village Rakh Miani 25 3432 B23 Jinnah Abadi Wadhan Bhera 26 3432 B40 Kalyan Pur Lokri Bhera 27 3432 B98 Kalyan Pur Lokri Near Kothi 28 3432 B08 MILINGAN WALA SUMBLLAN WALA 29 3432 B99 ZAIN PUR ROAD BHERA 30 3432 31 3432 32 3432 3432-B- HAM SHARIF BEHRA 33 3432 3432-B- KALAS SHARIF BEHRA . 7 3425D08 DHERA MUNDERAIN BHAGTAN•WEALA 3432-B- MEHAR COLONY BEHRA 3434-P- VILLAGE SALAM MOCHY WALA nr . 34 3432 35 3432 B52 VILLAGE SHEIKH PUR BHERA 36 3432 B26 Village Chant 37 3433 K59 Dera Bashir Goraya Mela 38 3433 K62 Chak No 49 39 3433 K63 Chak No 50 40 3433 K28 VILLAGE RAWAN DERA KHIZAR HAYAT 41 3433 K12 MOHRI WALL 42 3433 K31 MOHALLAH LAKAN WALA KOT MOMAN 43 3433 K29 MOHALLAH AHMED KHAN KOT MOMAN 44 3433 K32 MOHALLAH MAIN BAZAR KOT MOMAN 45 3434 P01 Dera Nasar Hayat Awan 46 3434 P03 Gakhra (Phularvran0 47 3434 P197 Jhalar Warraichan 48 3434 P22 Lillah Colony Dhori 49 3434 P28 Dera Lakkan Ktomoman 50 3434 P30 Havali Rajkot Pind Macoo 51 3434 P36 Khizar Abad Dera Mohammad Yar 52 3434 P47 Tasawar Hayat Qureshi Melowal 53 3434 P51 Village Ratto KaIan Chowk Near Civil Hospital 54 3434 P99 Pul Salm Dhakli Garh Qaim 55 3434 3434"P" MUHAMMAD HAYAT VEROWAL DERA THABAL 56 3434 3434-P- DERA ABDALANA MELOVAL 57 3434 3434-P" FEROZE COLONY 58 3434 3434P19 KAKO KA ARA HUJJAN 59 3434 3434P90 UMAR KOT 60 3434 3434612 NEAR POST OFFICE BHERA 61 3434 3434P20 PULL NEHAR HUJJAN 62 3434 3434P49 OXFORD HIGH SCHOOL PHULARWAN 63 3434 P06 MOH, MANGTAN WALA CHAKIAN PHULARWAN 64 3434 P08 Dera Liaqat Samoor Near Pul Salam 65 3435 P06 Abadi Haji Aslam Bhalwana 66 3435 P14 Sargodha Road 67 3435 P16 Abadi Kamray Wala 68 3435 P45 Chak No 10 MI 3432B97 VILLAGE KHIZAR NEAR DERA .... 69 3435 PB53 Chak No 15 Nb 70 3435 P12 Abadi Kumharan Purana Bhalwal 71 3435 P07 Village Jahan Pur Village purana balwal 72 3435 P13 Manzoor Hayat Colony 73 3435 P36 Chak No. 17 Nb 74 3436 S05 Nabi Shah Khurd • 75 3436 S06 Din Pur Sharif 76 3436 S09 Jhumat Sharif 77 3436 S10 Thathi Valana West Side 78 3436 S11 Ghanghwal Barth Road 79 3436 S46 Kot Mumtana 80 3436 S55 Jhugian Bhakhyana 81 3441 B12 Block-12 Jouhar Abad 82 3441 J49 ASIF COLONY JOUHARABAD 83 3441 A13 Azmat Colony J/Abad 84 3442 M05 Moh. Sanghial Nali 85 3442 A50 MOUZA JASWALA 86 3443 - 027 Moh. Haji Ghulam Muhammad Village Okhli Mohla 87 3443 C05 NEAR NOORANI MASJID QAID ABAD 88 3444 N05 Moh. Ardal Kufri 89 3444 N08 Village Tarriry 90 3444 P01 Dhoke Moman Changi 91 3444 P03 Moh. Dhiba Chingi 92 3444 PO4 JANOBI LARRI 93 3444 P05 AHMED ABAD 94 3451 S09 MOH, SAIDAN WALA WANDHI GHAND WALL 95 3451 S08 WANDHI GHAND WALL NEAR NIAZI COLLEGE 96 3451 S12 MOHALLAH SYEDIAN WALA WANDHI GHAND WALL 97 3451 S15 YAROO KHEL 98 3452 A13 KALRI CITY 99 3452 A06 SHABAZ COLONY TALA GANG ROAD 100 3452 K04 MAWA WALA WANDHI P.M SHAH 101 3452 A15 MOH, INAYAT KHEL KALRI 102 3452 A09 DHOK CHAKDHA 103 3452 M04 ADDA MOSA KHEL • _... 104 3452 SO1 WANDHA KHIALIAN WALA 105 3452 M03 MOH GHURNIAN WALA MOSA KHEL 106 3452 M07 PAR WANDHI NEAR ARA MACHINE MOSA KHEL 107 3452 M08 MOH SHERKHET MOSA KHEL 108 3452 M06 MOH, PAR WANDHIU MOSA KHEL 109 3452 A10 Ban Hafiz Jee 110 3452 Al2 Thamey Wali Village 111 3452 MO1 Madi Khelan Wala 112 3452 R11 Village Machi Wala 113 3452 S06 Village Mast Wala 114 3453 K17 MOH, BABA MO] ALI SHAIB DAWOOD KHEL MIANWALI 115 3453 K05 KOT CHANDAN VILLAGE 116 3454 H51 CHAK NO 19 A/M.L 117 3454 H88 MOH BHROKHAN WALA BALA CITY 118 3454 L08 MOH GHARIB ABAD NEAR SUGAR MILL 119 3454 L22 MOH MUSTAFA ABAD PIPLAN 120 3454 , H65 NEAR GHALLA MANDI HARNOU 121 3454 D41 MOH AAGAR KHAN RODI 122 3454 013. CHAK NO 18 M.L 123 3454 133 Moh, Sabtain Khan Piplan 124 3455 S11 WANDHI GHAND WALL NEAR MANDI MASJID 125 3456 A35 NEAR RAILWAY STATION DOUBA 126 3456 A34 DOUBA CHOWK DOUBA 127 3456 A29 JAIL SHUMALI 128 3456 A02 Moh. Yasin wala Doaba 129 3456 Z03 Dera Kanialan Wala Jall 130 3461 C20 Block 25,26 Near Girls High School 131 3461 C21 Chowk Block No. 26 132 3462 S10 CK NO 127 NB NEAR MASJID 133 3463 S64 VILLAGE DHOOL KADHI 134 3463 135 3465 S09 Near Town committee shah pur city 136 3465 S10 Jahan Abad 137 3466 F104 CHAK NO. 212 GB 138 3466 322 . 3463S78 VILLAGE LALWALA NEAR DERA RAB NAWAZ 139 I I 3466 I 328 lialpana FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED FAISALABAD FESCO PROFORMA PC - I (DISTRIBUTION REHABILITATION) 12010 - 2011 TO 2014 - 2015] Chief Executive Officer FESCO CANAL ROAD FAISALABAD MAY - 2010 "- 17 CAPITAL INVESTMENT MRs Unescalated . 2010-2011 . 2011-2012 2012-2013 . 2013-2014 . 2014-2015 Total: Escalated 723.75 780.08 833.46 887.99 939.44 770.79 884.79 1006.78 1142.38 1287.11 4164.72 5091.85 Further break-down of unescalated capital investment into different areas is given below: UNESCALATED CAPITAL INV. MRs 1• 2• Distribution Rehabilitation Miscellaneous Total: 4123.49 41.23 99 1 4164.72 100 7.1 INDICATE DATE OF ESTIMATION OF PROJECT COST December, 2009. 7.2. BASIS OF COST ESTIMATES Cost estimates have been prepared by unit prices of December, 2009 and projected by using the inflation rate of 6.5 % for 2010-2011 to 2014-2015, and construction units in accordance with WAPDA's standard construction drawings. Details are given in Annex-2. 7.2.1. ANNUAL INCREASE IN REVENUE The saving in purchase of energy is calculated in Table-3. (Actual avg. purchase price for Financial year 2008-09 Rs. 5.84 /kWh. 7.2.2. ESTABLISHMENT COST No establishment cost has been charged as the increase in energy sale is a transfer from energy losses to sales. The cost of establishment remains unchanged. 19- 7.2.11. CASH FLOW STATEMENT Cash flow statement for the period (2010-11 to 2019-20) is given in final tables. 7.3. YEAR WISE ESTIMATION OF PHYSICAL ACTIVITIES. Description Unit 2010-11 2011-12 2012-13 Rehabilitation of HT Feeders Rehabilitation of LT Feeders Replacement of 1phase meters Replacement of 3phase meters Nos. 30 35 38 Nos. 650 675 700 1 Nos. 50,000 52,000 Nos. 7000 7200 2013-14 2014-15 Total 42 185 725 750 3500 55,000 57,000 60,000 274,000 7500 7700 7900 37300 j 40 • 7.4 YEARWISE COMPONENT WISE FINANCIAL PHASING. Year wise breakup of the cost is given below. Refer to Final Tables 1 & 2 for detail's. Description Material Vehicle T&P Store Charges(Already included in the cost of material) Installation Charges(8%) Less value of Dismantled Material Total cost of Construction Misc. Charges (1 %) LCC(unesclated) LCC(escalated) 8. 2010-11 659.46 25.93 0.95 0.0 2011-12 722.18 16.51 1.00 0.0 49.03 18.78 52.84 20.17 56.43 21.20 60.09 22.17 63.55 23.04 281.93 105.36 716.59 772.36 825.21 879.20 930.14 4123.49 7.17 723.75 770.79 7.72 780.08 884.79 8.25 833.46 1006.78 8.79 887.99 1142.38 9.30 939.44 1287.11 41.23 4164.72 5091.85 2012-13 2013-14 780.59 831.84 8.29 8.29 1.10 1.15 0.0 . 0.0 2014-15 883.38 5.07 . 1.18 0.0 Total 3877.45 . 60.09 - 5.38 0.0 ANNUAL OPERATING COST/ RECURRING EXPENDITURE AFTER COMPLETION OF PROJECT. (Total Rs. in Millions) a) O&M Charges 204.00 b) Depreciation. 178.00 20 c) Amortization Charges (Local Cost of Rs. 5092 Million @ 13% over a period of 20 757.00 years with a grace period of 3 years. Total 1139.00 Detail is given in final tables. 9. DEMAND AND SUPPLY ANALYSIS. 9.1. EXISTING CAPACITY OF SERVICES AS ON JULY 2009. Total installed capacity of WAPDA • Total installed capacity of FESCO Grid System 17948 MW 2897.75 MVA or 2463.08 MW 9.2. PROJECTED DEMAND The future Loads of all types of categories are calculated on the basis of present pattern of Power Consumption, taking into consideration Industrial and Agricultural Development Programs, Future GDP Growth and other Economic factors. A Regression based Statistical Model has been framed to work out the Load Forecast. Based on GOP Medium Term Development Framework, the demand Forecast up to 2014-15 is as follows; - t.i. i7 1ZL --ferzazzai -(7) N DISTRIBUTION REHABILITATION BREAKDOWN OF UNESCALATED AND ESCALATED CAPITAL INVESTMENT COST. :to • (DEC, 2009 PRICE LEVEL Million Rs.) 2010-11 2011-12 2012-13 2013-14 2014-15 TOTAL Cost of Electrical Material 659.18 721.91 780.32 831.60 883.14 3876.15 8.29 8.29 5.07 64.09 1.00 1.10 1.15 1.18 5.38 0.27 0.27 0.24 0.24 1.30 Cost of Vehicles 25.93 16.51 Cost of Tools & Plants 0.95 4 Cost of recording meters & personal computers 0.28 Total cost of materials for the projects (1+2+3+4) 686.34 739.69 789.98 841.28 889.63 3946.92 21.20 22.17 23.04 105.36 768.78 819.11 866.59 3841.56 52.84 56.43 60.09 63.55 281.93 772.36 825.21 879.20 930.14 4123.49 8.25 8.79 9.30 41.23 0 0 0 0 0 780.0796 833.4604 887.9947 939.4376 4164.7234 1006.78 1142.38 1287.11 5091.85 1006.78 1142.38 1287.11 5091.85 Less value of dismantled material 18.78 7 20.17 Net cost of material (5-6) 667.56 719.52 Installation charges 08% on original cost 49.03 Total cost of construction (7+8) 716.59 Misc. charges @1% 7.17 7.72 Foreign Exchange Component 0 12 Local currency component (Un-Escalated) (9+10+11) 723.7511 Local currency component (Escalated) 770.79 14 Total escalated cost of Project (FEC+LCC) 770.79 884.79 884.79 INCREASE IN REVENUE AS A RESULT OF ENERGY LOSS REDUCTION PROGRAMME NOS OF 11 KV NOS OF LT AVG SAVINGS Sr. FEEDERS TO BE PROPOSALS TO BE PER PROPOSAL No. REHABILITATED YEAR Current Cumulative Fromula 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. • a 2010-11 30 2011-12 35 2012-13 2013-14 2014-15 38 40 42 2015-16 2016-17 2017-18 2018-19 2019-20 REHABILITATED 30 65 103 143 185 185 185 185 185 185 SAVINGS IN ENERGY Mkwh Current Cumulative b=a+b POTENTIAL • Mkwh LT HT Purchase Saving in ATTRIBUTABLE Rate purchase of BENIFITS TO per Energy REHABILITATION kWH (MRs.) TOTAL (Rs.) fMRs.) d=c+d a f g= bx a h= d x f 1= g + h 650 1.069 0.031 1 k=lxj 32.058 20.150 L 675 • 1325 52.208 0.962 5.840 0.028 304.895 62.511 304.895 36.968 99.478 5.840 580.952 580.952 650 700 725 750 2025 2750 3500 3500 3500 0.866 0.779 0.701 0.701 0.701 0.025 89.147 50.848 139.994 5.840 0.023 817.566 111.397 62.147 817.566 173.544 0.020 5.840 129.685 1013.498 71.187 1013.498 200.872 5.840 0.020 129.685 1173.092 71.187 1173.092 200.872 5.840 0.020 1173.092 129.685 71.187 1173.092 200.872 5.840 1173.092 1173.092 1173.092 3500 0.701 0.020 129.685 71.187 3500 200.872 0.701 5.840 0.020 1173.092- 129.685 71.187 200.872 5.840 129.685 1173.092 71.187 1173.092 200.872 5.840 1173.092 1173.092 3500 0.701 0.020 Methodology: Saving per proposal has been calculated on the basis of historical data ofprevious proposals already analyses and executed. LT saving = (Total Saving of 95proposals/95) =2930871 /95 = 30851 KWH = 0.0309 MKWH HT saving = (Total Saving of 16 proposals/16) =17098000 /16 = 1068625 KWH = 1.0687 MKV Value of column 100% & 'f' are reducing 0 of .10 % per year during project period Detail is at Annexure - 4 „emmIressmaliti , tIMI /..6 :-•1/ ..,..,.....„. .„ Me-OTC% % SN _,ti ...1,_ Nr • II A / PSOtROPTififi5 M artED ____ .4,.L, (DIS 7_,., ' --.4 L_:-Li ...,7,,777, 7,..__;:___.„ 5 kt :r. ali. .,..,:d . ___L ,..,,-,L 4 _,..i.'i-rt ;-'.1,, ' . --:i, .______., , ' j ,,.r.. _. ..-4' ' ,, .........„.. Th ... ' 2, -,_.r e,,.. ...„ ,y ,,, ,,, ,, ,,.4,., -:!'"' 6'''.1. ‘. - -. -_,,..,_.1i,_,.__._ ,7 .i,p:-,,- - - t ,ut-F.. , i- - 7f----4 ......._..e.........t r-LrL.,.,...ka,-..: -------- --,1E;;,. .,--...:174Pr 11 • --'': - ,- -._:,; .7,--,, -,_ ---r 'T.,- --,....i tr-77-,-T" '''' -77-„-; 12 at'. .'1":*4;!!4'41t-t"-, , .,- - -r Z. ' r ' Tiro11.,......,.44,, . . , ,' .... IT T? 4-....kaj, E 4 ---- ---.41-- - --x-i---,-4----1 , ,t. 770.79 •. ' 901.62 52.21 6.ta 6369.22 113 3O4.89 . 0,00 951.01 304.99 1•z . , - i 1894 'l _at] 00079 78 99 5.84 580.95 -496.73 716.00 703.00 691 f= - -i.i 0.00 106.49 1113.27 199 erio,95 272 39..49 1142.38 269.00 -444 817.58 152.19 -436 1294.57 -428 0.00 . 817.58 173.54 6.84 9.71 432.00 792.00 751.00 1 10713..09 -295 1287.11 203.67 1490.78 200.87 "7 -285 50 0.00 1013.50 -295 71937 -275 582 652 6.84 -281.07 823.00 524.00 -210 203.67 -199 768.00 715 463 447 209.67 -189 200.87 600 -3197..4629 560.00 18:1 6.10 -179 203.67 1173.09 0%0 -166 710 644 -155 203.67 " 1172. 666 09 200.87 609 :."1:. , 559.00 -180 1173.09 203.67 -165 203.87 84 -151 11117733;09 594 200.67 09 534 9699..4422 6.84 481.00 491 1173.09 203.67 441 0.00 397 203.67 72 /81-00 531 200.87 469 5.84 415.00 439 1173.09 82.00 . 71.00 388 0.00 343 62 474 1173.09 411 969.42 358.00 203.67 392 1173.09 340 2203 9%67 0.00 296 7 54 5• 423 200% 1173.09 97 7 361 969.42 5.84 308.00 350 203.67 1173.09 298 0.00 203.67 254 378 200.87 1173.09 318 266.00 52. 5793.:00 °0 44663. 312 1173.09 286..00 00 °° 46 261 209.87 40 220 0.00 337 200.87 1173.09 278 969.42 La: 229.00 209.67 278 1173.09 290 203.67 189 301 200.87 243 5.84 1173.09 0.00 1173.09 969.42 47.00 37.03 34 198.00 • 249 203.67 201 203.67 30 164 269 200.87 214 5.84 170.00 203.67 222 1173.09 42.00 33.00 177 203.67 140 240 200.87 1173.09 09.19 1111773319 99 96 187 5.84 9699.4422 37.00 29.00 25 147.00 203.67 198 154 203.67 22 122 214 200.87 164 5.84 127.00 1173.09 0.00 969.42 33.00 25.00 177 203.67 135 203.87 0.00 1173.09 105 1173.09 200.87 9° 19 191 144 969.42 109.00 1 158 203.67 173.09 119 203.67 14 90 200.87 126 :.11 644 1173.09 0.00 1173.09 969.42 2 94.00 360.00 203.67 90 122 141 203.67 9.00 104 0.00 14 78 1173.09 153 200.87 111 969.42 5.84 81.00 203.67 1173.09 127 92 0.00 203.67 67 1173.09 200.87 5.84 969.42 70.00 21.00 203.67 112 1173.09 15.00 80 203.67 0.00 58 200.87 1173.09 85 9.42 6.84 60.00 2 19.00 13.00 12 136 97 203.67 101 70 203.67 1173.09 0.00 1173.09 96 9 50 109 200.87 75 5.84 52.00 17.00 11.00 810 122 203.67 1173.09 62 203.67 0.00 43 1173.09 97 68 5.84 969.42 45.00 15.00 10.00 1173.09 80 66 203.67 203.67 2201967 0.00 7 37 1173.09 87 7 58 969.42 5.94 39.00 203.67 13.00 1173.09 9-00 203.67 48 0.00 6 200.87 1173.09 77 51 5.84 969.42 39.00 12.00 203.67 1173.09 8.00 203.67 0.00 42 5 27 1173.09 5.84 29.00 1 173.09 11.00 203.67 57 7.00 36 203.67 0.00 4 24 2200 1173.09 99.467 7 J9 969.42 5.84 25.00 10.00 1173.09 51 203.67 6.00 32 203.67 0.00 4 21 6b 24 200.87 1173.09 969.42 5.84 21.00 9.00 203.67 1173.09 5.00 28 203.67 0.00 3 17 200.87 1173.09 5.84 969.42 18.00 203.67 a.00 1173.09 40 5.00 203.67 25 0.00 3 15 1173.09 200.87 44 26 969.42 5.84 16.00 7.00 203.67 1173.09 38 4.00 21 203.67 0.00 2 19 200.87 39 1173.09 23 5.84 14.00 203.67 1173.09 6.00 32 4.00 19 0.00 203.67 2 12 200.87 , 1173.09 95 5,84 96 20 9699.4422 12.00 5.00 203.67 29 1173.09 3.00 16 203.67 0.00 2 10' 1173.09 200.87 21 18 5.94 969.42 10.00 1 203.67 5.00 26 173.09 3.00 15 203.67 0.00 .2 8 200.87 28 1173.09 16 5.84 969.42 9.00 11 73.09 4.00 23 2.00 13 509.19 1 7 1682.28 25 14 1478.60 8.00 6670 4.00 21 2.00 12 1 7 17 9.00 28 16 8 27830 . .., F ) 'EP IL'r.. 2011 2 2012 3 2013 4 2014 5 2015 6 2016 7 2017 8 2018 9 2019 10 2020 11 2021 12 2022 13 2023 14 2024 15 2025 16 2026 17 2027 18 2028 19 2029 20 2030 21 2031 22 2032 23 2033 24 2034 25 2035 26 2038 27 2037 28 2038 29 2039 30 2040 91 2041 32 2042 33 2043 34 2044 35 2045 i? •-•,.: 1.- -I ,,..,...„,,, •4 4- . "f .-• • 1 ' . 4.. 4 - - __,..,...- n__,z-1i'" - ---. - - n 934.00 .00 Net Present Value Benefit Cost Ratio internal Financial Rata of Ratum(IFRR): 29% ,1 BUDGET RE • UIRED FOR HT LT PROPOSALS FOR FY 2013-14 Cinder process STATUS OF LT PROPOSALS AVERAGE AMOUNT " PER. WORK 'Rs. Million Approved wdrk order • .0.657 1- Grand Total Hence • in view of above the amount for one HT work is taken' as 18.76 Millions (tentative) and average of Rs.1.32 Million for each LT work for the FY 2013-14. •: . BUDGET REQUIRED FOR HT PROPOSALS. F y 2013-14 UNDER PRODESSIPF1DGRiSS AREA PLANNING OF CHIDRU 8 SHER WALA (NEW PROPOSED SORROW WALA) UNDER PROCESS/PROGRESS • EAdirectorylsaleem • • BUDGET REQUIRED FOR HT PROPOSALS. • (F.Y 2013-14) - SR. NO. • 23 24 • 25 28 NAME OF FEEDER WAGHI REVYAZ • • AHMAD NAGAR JOHAL & F-5 Estimated Cost (Raj XYD %AEL 19.6. 6 14.11 UNDER PROCESS/PROGRESS 25.4 5 17.22 • UNDER PROCESS/PROGRESS 19.1 • 6 8.78 UNDER PROCESS/PROGRESS 5, 2 10.65 UNDER PROCESS/PROGRESS 11,8, 9.7 ItimARKS . ' • 27 25 29 30 BUKHARIAN • 18.3 AREA PLANNING OF MADINABAD, GM ABAD,SEEDABAD & SADDAR JHUMRA ROAD KHIZARABAD 6.8,4.8.0.8, 2, 2, 0, 1 2.3 10.23 UNDER PROCESS/PROGRESS .29 UNDER PROCESS/PROGRESS 11.3 4 5.92 UNDER PROCESS/PROGRESS 9.8 3 0.85 UNDER PROCESS/pROGRESS .5.97 . . . . UNDER PROCESS/PROGRESS 3.82 UNDER PROCESS/PROGRESS 31 RAIL BAZAR 5.9 32 SHEIKHUPURA ROAD 2.8 .33 LANGAR AAAKDOOM 27.9 • 11 • 20.8 . , UNDER PROCESS/PROGRESS 34 BAHADRI WALA • 18.4 8 9.8 UNDER PROCESS/PROGRESS • 31.6 a 18.6 UNDER PROCESS/PROGRESS' -■ 33.4 13 18.9 UNDER PROCESS/PROGRESS 12 5 14.9 UNDER PROCESS/PROGRESS PINDI SHEIKH MUSA 17.4 6 16.7 UNDER PROCESS/PROGRESS COLLEGE ROAD 8.1 4 5.6 UNDER PROCESS/PROGRESS 35 REHMAY SHAH . 36 • SHERAZA 37 38. 39 KANJAWANI • 1 40 DARYA KHAN 68:2 16 51.6 UNDER PROCESS/PROGRESS 41 SADNAHI • 30.3 12 19.5 UNDER PRQCESS/PSOGRESS ' YARD KHEL • 9.1 4 5.3 UNDER PROCESS/PROGRESS 26.2 12 • 42 , • 4 43 RURAL (QUAIDA BAD) • TOTAL • 14.6 UNDER PROCESS/PROGRESS 807.1 E:WIrectory\saleem 1st Circle Sr. No. ELR head LT Code Location 1 3122 A13 Press Market Amin Pur Bazar Fsd 2 3122 A09 BILAL ROAD SITARA ROAD 3 3122 A10 MALL ROAD 4 3123 A23 Dhillo Chowk Chak No. 7 JB Fsd\ 5 3123 A25 All Town Sarwar Block 6 3123 A26 Bhutto Plot Chak No. 7 JB 7 3123 A87 CHAK NO.7 JB MADNI CHOWK 8 3123 9 3123 A72 NAWAZ TOWN CHAK NO. 7 JB 10 3124 B02 Street No.10 Islamia Park Near Surriay Ch. 11 3124 B03 Street No. 17 Mehmoodabad 12 3124 804 Street No. 3 Khalidabad 13 3124 B05 Tower Road Near Mehmoodabad 14 3124 B06 Shadman Road Near Maqbool Masjid 15 3124 B07 Near 384 B Gulistan Colony Fsd 16 3124 B08 S.S Road Ahmed Abad Fsd - 17 3124 B12 K-Block Gulistan Colony 18 3124 B95 S NO. 7 TARIQ ABAD 19 3125 B51 • Chak No. 48 JB Bhamipur 20 3125 B92 Chak No. 7 JB Kareem Town 21 3125 C11 Shadman Town Near Dairy Home 22 3125 C12 New Lasani Town T/F No 2 23 3125 C13 Shadman Town Near Seed Thekedar 24 3125 G20 CHAK NO 135 JB KITCHIAN 25 3125 G15 CHAK NO 46 JB 26 3125 B47 CHAK NO 8 JB 27 3125 S06 CHAK NO. 65 RB 28 3125 A19 CHAK NO.7 JB NALKA KOHALA 29 3126 3126M34 MOH. NASIR ABAD 30 3126 3126M35 MOH. NASIR ABAD ST NO 6 31 3126 A27 MUGHAL PURA NO 2 NEAR PIPE FACTORY 32 3127 MO1 Muslim Town No. 1 Fsd 33 3127 R05 Chak No. 117 JB Dhanola Fsd 3123B01 MUSLIM TOWN SARGODHA ROAD . 34 3127 501 Usman Town St. No. 11 35 3127 R03 CHAK NO. 119/JB RASOOL PUR 36 3127 MO1 CHAK NO. 196 RB 37 3127 M02 D BLOCK MILLAT TOWN 38 3127 NO1 MOH. SHAH ABAD NOOR PUR 39 3127 MR02 NEW GREEN TOWN ST 2 FSD 40 3127 MR03 NEW GREEN TOWN ST 6 FSD 41 3131 M129 IMRAN ROAD UMER STREET 42 3131 M126 IMRN ROAD KHAYABAN NO. 2 43 3131 M128 KHAYABAN COLONY KASHMIR ROAD 44 3131 M110 KHAYABAN COLONY NO. 2 45 3131 M131 OFFICER COLONY NO 2 46 3131 M116 ST # 12 W-BLOCK 47 3131 M105 WARRIACH CHOWK 48 3131 M127 VV-BLOCK ST # 14 MADINA TOWN 49 3131 M111 X-BLOCK ASHRAF SHAHEED ROAD 50 3131 M125 • X-BLOCK ST # 3 51 3132 A19. ST #2 DASTGIR COLONY 52 3133 B12 Chak No. 201 Rb Chandian Talawan 53 3133 B13 Chak No. 197 Rb Bagewala 54 3133 B14 Chak No. 201 Rb Chandian Talawan 55 3133 F08 Chak No 205 Rb Malouana 56 3133 F10 Chak No. 200 Rb Lathianwala 57 3133 F14 Arshad Town 58 3133 F15 Zahid Nazir Colony 59 3133 L20 3 Marla Scheme Fakhar Colony 60 3133 L21 Fakhar Abad Old Abadi 61 3133 L22 Thakar Wala Town Fsd 62 3133 R05 Tayyab Town Fsd 63 3133 R06 Chak No. 204 Rb Wali Town Fsd 64 3133 R07 3 Marla Scheme Jinnah Abadi 65 3133 3133B10 CHAK NO 198 RB 66 3133 3133L02 CHAK NO 199 RB GAT WALA 67 3133 LO1 CHAK NO 199 RB GATTWALA 68 3134 B21 CHAK NO. 201/RB . 69 3134 BH14 70 3134 S21 CHAK NO. 203/RB MALIK PUR 71 3134 B13 CHANDIAN TALANWAN 72 3138 NO2 Kehkashan Colony 73 3138 N07 Khekashan Colony 74 3138 N09 Jalvi Market 75 3138 N10 Hassan Pura Street No. 4 76 3138 N11 Naimat Colony No 1 St No 6 77 3138 N12 Yousaf Abad St No 5 Near Sabzi Wala 78 3138 N15 Additinoal Abadi Yousaf Abad 79 3138 N16 Himmat Pura Chak No 214 Ghousia Road 80 3138 N17 Mohallah Aslam Ganj _81 3138 N18 Daud Colony Near Hospital 82 3138 N19 Hassan Pura St No 14 83 3138 N20 Hassan Pura St No 9 84 3138 N22 Dawood Colony 85 3138 N28 Suleman Colony 86 3138 87 3138 Z69 CHAK NO. 210 RB 88 3141 A01 Near Fesco Divn Jrw 89 3141 C35 Near Siraj Medical Store 90 3141 C39 Ghulam Bheek Colony Chak No. 128 Gb 91 3141 F42 Near Statelife Office Jrw 92 3141 F44 Moh. Nawaz Colony 93 3141 F45 Moh. Usmania Park 94 3141 F48 Chowk Pully Kumharanwali Jrw 95 3142 B42 Chak No. 629/Gb 96 3142 B43 Chak No. 629 Gb Jrw 97 3142 105 Chak No. 643 Gb kw 98 3142 B21 CHAK NO 568 GB AHMAD KHAN WALA 99 3142 B19 CHAK NO 624 GB HARI PUR 100 3143 A13 Chak No. 108 Gb 101 3143 A14 Chak No. 108 Gb 102 3143 C65 Chak No. 53 Gb kw 103 3143 C66 Chak No. 55/Gb CHAK NO. 202 RB PHATAK -3138Z76 CHAK NO 229 RB ADDA MAKUANA - 104 3143 C67 Chak No 21 Gb 105 3143 C68 Chak No. 122 Gb 106 3143 G52 Chak No. 58 Gb 107 3143 G58 Chak No. 58/Gb 108 3143 N81 Chak No. 123 109 3143 N84 Chak No. 67 Gb 110 3143 P64 Chak No. 106/Gb 111 3143 P80 Chak No. 97/Gb 112 3143 P81 Chak No 93 Gb Jara iwala 113 3143 P82 Chak No 106 Jaranwala 114 3143 P62 ADDA ALIPUR BUN ALLOW 115 3143 R59 CHAK NO 105 GB 116 3143 3143C64 CHAK NO 119 GB 117 3143. G51 CHAK NO 93 GB 118 3143 P65 CHAK NO. 101/GB 119 3143 C13 CHAK NO. 212/GB 120 3144 R08 Chak No 433 Gb 121 3144 122 3144 RO1 CHAK NO 433 GB 123 3144 R03 CHAK NO. 37/GB 124 3145 S17 Chak No. 72 Gb 125 3145 S32 Satiana Adda 126 3145 S43 Chak No 83 Gb 127 3145 S39 CHAK NO. 113/JB 128 3146 A05 Chak No 356Gb 129 3146 R04 Chak No 583 Gb 130 3151 A02 Chak No. 107 JB Pahi ng 131 3151 A06 Main Bazar Near T&T Dffice 132 3151 A09 Mohallah Mughal Pure1 133 3151 A14. Chak No. 111 JB Dholan Wal 134 3151 A56 Chak No. 118 JB 135 3151 A63 103 JB Bandala /Barna la 136 3151 137 3151 138 3151 Jryv - J04 CHAK NO 34 GB SA rIANA 3151A48 CHAK NO 107 JB PHAI ANG A52 CHAK NO 19/JB KADU :11 A37 CHAK NO 25 JB SA JAY WALA 139 3152 D06 Chak No 142 Rb 140 3152 R29 Chak No. 189 Rb 141 3152 R32 Chak No. 192 Rb Rasool Nagar 142 3152 R33 Chak No. 192 Rb Moh. Qasayan Wala 143 3152 R34 Chak No. 193 Rb Shren Wala 144 3152 S08 Chak No. 57 Rb Rajay Wala 145 3152 Sll Chak No 54 Rb Saryali 146 3152 Z06 Chak No. 165 Rb Jandwali 147 3152 Z07 Chak No. 165 Rb 148 3152 D02 CHAK 185 RB 149 3152 A02 CHAK NO 133 RB 150 3152 S03 CHAK NO 146 RB KHEWA 151 3153 A61 Chak No 266 Rb Rana M/Amin 152 3153 A76 Chak No 73 Rb 153 3153 A49 CHAK NO 266 RB RAHMAN COLONY 154 3153 C17 RASOOL PURA KHURRIANWALA 155 3161 G32 Satellite Town Near Khoti Maqsood lqbal 156 3161 G33 Moh. Hussain Abad . 157 - 3161 Q01 Chak No. 15 Monia 158 3162 P59 Mohallah Ahmed Pura 159 3163 C20 Abadi Tarkan Qaisar Abad 160 3163 C29 Rajoya Road Muslim Colony 161 3163 C55 Chah Pakka Chiniot 162 3163 C57 Phool Ground Chiniot 163 3163 C60 Chak No. 138 Nol 164 3164 B03 Abadi Bohar Wala 165 3164 B31 Moh. Tufail Pura Bhowana 166 3164 B52 Moh. Rehman Abad Bhowana 167 3164 B57 Near Police Station Bhowana 168 3164 B60 Saddiqia Colony 169 3164 B63 Mouza Nitherka 170 3164 B64 Mohallah Islampura 171 3164 B71 Azafi Abadi Ada Jamia Abad 172 3164 B72 Mouza Adlana 173 3164 B79 Moh. Hussain Abad 174 3165 P01 Moh. Darul Saddar 175 3165 P24 Muslim Colony Near Mosque Chenab Nagar 176 3166 E01 Moh. Mustafa Abad Lalian 177 3167 R25 Thatha Mahnikay 178 3167 R35 ADDA MOHAMMAD WALA 179 3167 R32 BASTI NANAK PURA CHAK NO 45 JANUBI 180 3167 R27 QADIR ABAD ELR Head 2nd Circle Sr. No. Location LT Code 1 3111 A05 DOGAR BASTI NEAR WATER TANK WASA 2 3111 Al 6 NEAR R.0 WASA TANKI RD P/COLONY 3 3111 A02 QADAFI ABADI UPPER NOOR PURA QADI CHOWK 4 3112 B22 Mama Iqbal Colony I Block 5 3112 B07 MOH. ASAIR SINGH 6 3112 B06 MOH. QASIM ABAD FSD 7 3112 B05 RA]A GHULAM RASOOL NAGHAR 8 3112 B04 Sarfraz Colony Main Bazar Near Madina General Store 9 3113 C26 DAWOOD NAGAR ST # 5 10 3113 C23 DAWOOD NAGAR ST # 8 11 3113 C22 PC # 2 SIDDIQUE GRAVEYARD 12 3115 F06 BATALA COLONY 13 3115 F24 CHAK NO.226 RB NEAR CHAKKI WALA 14 3115 15 3115 F03 MAIN SOHAILABAD NEAR GRAVE YARD 16 3115 F23 MOH: NEW GARDEN TOWN NEAR MUNIR ZIA 17 3115 F08 NEW GARDEN TOWN 18 3115 3115F09 RAILWAY COLONY 19 3115 3115F27 ST NO.6 HASEEB SHAHEED ROAD MUHAMMAD ABAD 20 3116 21 3116 22 3211 B07 Raja Park Samanabad 23 3211 M22 St 4 Masoodabad 24 3211 M02 MANAN TOWN SAMANABAD 25 3211 NO1 ST 6 MASOODABAD SAMANABAD 26 3212 G24 St No 4 Sher All Road Khalid Abad 27 3212 K16 FAISAL MARKET DIJKOT ROAD 28 3213 C17 Chak No. 231 Rb Bhuria Pind 29 3213 C26 Chak No 231 Rb Rasala No 7 30 3213 M30 , Near Milk Frosh B Block Sirsyed Town 31 3213 S19 AHATA GYAN MILLS FACTORY AREA 32 3213 123 ALMADINA COMMERCIAL MARKET 33 3213 - 3115F16 HASEEB SHAHEED COLONY H11 CHAK NO 275 RB KARTAR PUR 3116H02 CHAK NO. 258 RB LAMA PIND DIJKOT FSD 3213T09 AQB SHEIKH YASIR E BLOCK • • 34 3213 3213M05 CHOWK CENTRAL JAIL 35 3213 3213A38 JAWALLA NAGAR NEAR SHAKEEL P/SHOP 36 3213 37 3213 3213A07 SAMAN ABAD NEAR HANIF ANSARI 38 3213 3213A08 SAMAN ABAD NEAR QAYYUM TEA STAL 39 3214 A04 Ruldu Chowk Ali Housing Colony 40 3214 A05 All Housing Colony Near Shah Kyriana Store 41 3214 J16 Moh. Naseerabad Opplosiet St. No. 11 Gurnankpura 42 3214 J17 Moh. Punj Peer Near Girls High School 43 3214 J18 Moh. Punj Peer Kabar Market 44 3214 L14 Main Bazaar Moh. Naseerabad But Chowk 45 3214 L15 Moh. Naseerabd Tubail Dippu Wala 46 3214 L27 Moh. Saif Abad No. 1St No. 17 Jhang Road 47 3214 L28 Moh. Saif Abad No. 1 St No. 13 Jhang Road 48 3214 L30 Near Takoni Ground Liaqat Town 49 3214 L31 Near Takoni Ground Cable Wala 50 3214 L32 B Block Liaqat Town Near Malik Hotel 51 3214 S11 Near Liaqat Press Sheikh Colony 52 3214 'S33 Liaqatabad No 1St 6 53 3214 S34 Sheikh Colony A Block Near Shahzad Pump 54 3214 535 Sheikh Colony A Block Near Umar Foundation School- 55 3214 S36 Liaqat Town D Block Near Ayesha Sardar Masjid 56 57 3214 G16 AKB POLICE CHOKI GULFASHAN COLONY 3214 A18 GHAUSIA CHOWK GULFASHAN COLONY 58 3214 3214124 LIAQAT TOWN AQAB ABU BAKAR PLAZA 59 3214 3214122 LIAQAT TOWN NEAR UTILITY STORE 60 3214 3214121 MOH. LIAQAT ABAD NO. 2 ST # 13 61 3215 T59 TAJ COLONY JHANG ROAD 62 3216 A25 Chak No 76 JB Jodhan 63 3216 K14 Chak No 273 JB 64 3216 K15 Chak No 273 JB 65 3216 K16 Chak No 273 JB 66 3216 P34 Chak No 82 JB Narangabad 67 3216 501 Chak No 241 Rb 68 3216 S03 Mohallah Rashid Park M18 MIAN HOUSE SIR SYED TOWN 69 3216 S12 Chak No. 275 JB Adda Pensra 70 3216 S22 Chak No 241 Rb Chanchal Wala 71 3216 3126A02 CHAK NO. 84 JB NEAR SCHOOL 72 3216 3216A01 CHAK NO. 84 JB NEAR TOWER 73 3221 RO1 Haji Fateh Muhammad Ansari 74 3222 F03 Abadi Bagh Wali 75 3222 F44 Chatri Wall Ground 76 3222 F45 Near Post Office Sadar Bazar 77 3222 F46 Jameel Town Near Dr. Saleem 78 3222 F47 Shabrati Near New Model School 79 3222 F53 Civil Quarter 80 3222 F54 St 3 G.M. Abad No 2 81 3222 F55_ Moh. Usman-E- Ghani Fsd 82 3222 3222F36 FLAT FDA WALA 83 3222 3224R22 ST. # 4 MADINA ABAD 84 3223 GO1 Khushi Abad 85 3223 110 Haisan Wali Basti 86 - 3223 202 ALPHA HOEISRY PATHAN WALA . 87 3223 3223018 MOH. ZAFAR ABAD 88 3223 3223010 NEAR POST OFFICE JINNAH. COLONY 89 3224 R25 . Moh. Gulzar Colony St No. 07 90 3224 R35 Kaleem Shaheed Colony No. 1 Near Masjid 91 3224 R38 Moh. Azam Abad Street No. 6 92 3224 93 3225 A01 Chak No. 31 JB • 94 3225 K02 Chak No 29 113 95 3225 545 Chak No. 34 JB 96 3225 S46 Chak No. 218 Rb 97 3225 S47 Chak No. 218 Rb 98 3225 S49 Chak No. 58 Gb 99 3225 Z03 Chak No. 321B Fsd 100 3225 101 3225 A21 CHAK NO 613B 102 3225 A20 CHAK NO. 3 JB 103 3231 F80 ' _ 3224R21 SALEEMI CHOWK REHMAT GUJJAR WALA 3225R45 CHAK NO 153 JB Near Wapda Office F/Abad Road)mundri 104 3231 F88 Near Madina Furniture Rajana Road 105 3231 S89 Chowk Chak No 136 Gb Bari 106 3231 3231G61 CHAK # 137 GB 107 3231 3231G64 CHAK # 220 GB 108 3231 3231S54 CHAK NO 390 GB SHARQI 109 3231 3231D51 CHAK NO 442 GB 110 3231 3231055 CHAK NO 467 GB 111 3231 S148 CHAK NO 527/GB 112 3231 D121 CHAK NO. 444 JB POLLA 113 3231 3231D56 MOH. MEHNDI TOWN 114 3231 3231066 MOH. SHAOUKAT ABAD SAMUNDRI 115 3231 3231065 MOH. SLATER HOUSE SAMUNDRI 116 3231 117 3231 118 3232 J13 Chak No 217 Gb 119 3232 K48 CHAK 483 GB 120 3232 F02 CHAK NO 469 GB 121 3233 - K54 Chak No 171 Gb 122 3233 K34 NIAMATABAD ST # 5 123 3234 B01 BASTI LAL SHAH 124 3234 B03 BAUGLA CHOWK 125 3234 B01 CHAK NO. 504 GB 126 3234 127 3235 P06 Chak No. 407 Gb 128 3235 S03 CHAK NO.401/GB GANDAS WALA 129 3235 M03 CHAK NO.542/GB BALUANA 130 3235 S07 GHAR FATEH SHAH MAIN ROAD 131 3236 M14 Gujjar Basti Adda Murid Wala 132 3236 M15 Adda Murid Wala 133 3236 S11 CHAK NO 181 GB NEAR MASJID 134 3236 M07 CHAK NO 192 GB OJALA 135 3236 L22 CHAK NO 247 GB 136 3236 K09 MAMU KANJAN ROAD MURID WALA 137 3241 A01 Hamayon Nagar Madni Town kw 138 3241 A04 Moh. Fatehabad St No. 1 F132 NEAR POST OFFICE SAMUNDRI 3231C75 NEAR TUFAIL TROLLY WALA TANDLA ROAD 3234K04 LIAQAT CHOWK _ 139 3241 A05 P/Colony No. 1 Near Liaqat 140 3241 A08 Near Maqsooda Zia Hospital 141 142 143 144 145 146 3242 B03 Salma Town Faisalabad 3243 . CO1 Nisar Nagar Barkat Corporation 3243 C05 Moh. Bilal Town St 3 3243 C07 Moh. Ghausiabad St 8 3243 C08 Dastgir Pura Near Super Market 3243 C09 Jhanda Singh 147 148 3243 C10 Peopoles Colony No 2 C Block Near Achoo Karyana Store 3244 Dll Lala Zar Colony 149 150 151 152 153 154 155 156 157 158 159 3244 D12 Farooq Abad St 4 3244 D13 Pull Abdullah S/Road 3244 D14 Chak No. 242 Rb Dasuha 3244 D15 Chak No 247 Rb Eid Gah Road 3244. D20 Moh. Farooqabad St 5 3244 D21 3244 D23 Muhammadi Chowk D-Type 3245 F01 Chak No 215 Rb Near Fayyas Lona 3245 F04 - Rachna Town 2 Faisalabad 3245 F05 Moh. Rachna Town No 1 3245 F09 Younis Town Satiana Road 160 161 162 163 164 165 166 167 168 3245 F16 Chak No 238 Rb Awan Wala 3245 F20 Moh. Kareem Town Near Rasool Park 3245 F21 Chak No. 225 Rb Malikanwala 3245 F21 Moh. Ashraf Abad Near Roohani Qadri Masjid 3245 F22 Chak No. 215 Rb Near Faiz Loona 3245 F22 Moh. Feroz Shah Near Factory Noddle 3245 F23 Gali No 6 Moh. Alla Abad 3245 F24 Moh. New Garden Town 3245 F26 Moh. Batala Colony Chak No. 242 Rb Dasuha Bagh Wali Colony . . Jhang Circle Sr. No. ELR Head LT Code I Location 169 3311 R21 Abadi Harmal Pur 170 3311 U05 Kashif Colony Pakka Railway Road 171 3311 C18 CHAUDHARY COLONY 172 3311 C19 MOH. GULAB WALA 173 3311 C20 MOH. HUSSAINABAD 174 3312 Sil Adda Khewa 175 3312 S05 ABADI CK NO 163 DUBA 176 3313 177 3313 178 3313 3313M55 BASTI KAL WALL 179 3313 3313J01 CHAK NO 309 JB 180 3313 181 3313 33131325 KHETIAN WALA 182 3313 3313M56 MOH. AKBAR PURA 183 3313 3313M25 MOH. BLOCK SHAH 184 3313 3313B38 MOH. BUDHAY WALA 185 3313 3313B19 MOH. SHUP SURI 186 3313 187 188 3314 3314 B12 ADDA SHEIKHEN 189 3316 K14 Moh. Saddique Abadi Mahar Wall Mandl Shah Jewana 190 3316 N71 Moh. Qadir Pura Shah Nikdar 191 3318 101 Pir Zada Chowk 192 3318 102 Saleem Chowk S/Town 193 3318 103 Awais Chowk S/Town 194 3318 104 Near Dars Usmania S/Town 195 3318 3318S27 F-BLOCK S/TOWN 196 3318 3318S28 MOH,MOHAMMADI 197 3318 3318S25 MOH. ISLAM ABAD S/TOWN 198 3318 3318S29 PIR PATHAN S/TOWN 199 3318 3318B02 RUSTAM WALA 200 3318 3318M10 Z BLOCK S/TWON 201 3319 3313M53 ABADI BASHIR WALL M55 M52 A33 ABADI NAQAD PURA JHANG BAZAR NEAR OLD SABZI MANDI MOH: MUSTAFA ABAD 3314B14 ABADI KALERA F13 Moosa Chowk 202 3319 F20 Chak No. Ghumnana 203 3319 F22 Abadi Sharif Abad Link Chiniot 204 3319 R28 ABADI LAKHI WALA 205 3319 3319C01 AL HAD COLONY 206 3319 3319804 CHAK NO 262 .113 207 3319 3319B03 CHAK NO 265 JB 208 3322 J25 Chak No 315 JB T.T. Singh 209 3322 B25 CHAK NO. 379 JB 210 3331 R08 Mongi Road (Mollay Wala) 211 3331 S03 CHAK NO. 298 212 3331 R06 NEW PLOT ST. NO 3 213 3331 S03 NISHTABAD NEAR MASJID 214 3332 M09 Chak No. 245 Gb Talwandi 215 3332 M03 CHAK NO. 207/GB 216 3332 T03 CHAK NO. 372/JB BHUJIAN WALA 217 3332 218 3333 219 3333 220 3333 MO1 CK NO 351 3B 221 3333 J09 MOH: DASTGEER COLONY GOJRA ST NO. 3 . 222 . 3334 NO1 CHAK NO 338 JB 223 3334 N04 CHAK NO. 276 JB 224 3334 P54 CHAK NO. 91/JB PACCA ANNA 225 3335 S20 CHAK NO. 222/GB 226 3341 D14 CK NO 125 JAPPAY 227 3341 D15 DERA HAFIZ GHANI 228 3342 P15 MOH JHAKRIAN CHINIOT 229 3342 P07 MOH. MOAZAM SHAH CHINIOT 230 3342 P05 MOH. RASHID ABAD CHINIOT 231 3342 PO4 MOUZA SIPRA CHINIOT 232 3343 N04 MOH BAIGAIN WALA 233 3343 B42 MOH. REHMAN ABAD HOSPITAL ROAD BHOWANA 234 3343 B45 MOUZA ADLANA 235 3343 B49 Risaloo Colony 236 3344 P11 DAR-UL-NASAR CHENAB NAGAR 3332T06 MUGHAL PURA GOJRA MOl Chak No 415 JB Chandarka . 3333356 CHAK NO.430/GB 237 3344 P12 MOH DAR-UL-SADAR 238 3344 P15 MUSLIM COLONY NEAR T.D.C.P 239 3345 E06 Abadi Hajia Abad 240 3345 E03 Moh. Hujra Road near Dr. Siddique 241 3346 C05 CHAH RARRI WALA 242 3346 C26 DERA SYED AHMED YAR SHAH 243 3346 C35 HUSSAIN PURA RAMA 244 3346 C30 MOH. ANSARIAN NEAR UNCHI 245 3346 C37 MOH. NOOR WALA 246 3347 R31 CHAK NO 46 BAKALA WALA 247 3351 J34 Chak No. 60.61/TDA 248 3351 J37 Lorry Adda Makera City 249 3351 J38 Mohallah Kaisan Wala Mankera 250 3352 B31 BAST! HABIB BEHAL ROAD BHAKKAR 251 3352 252 3353 D27 Near Masjid Maraqba Hall Darya Khan 253 3353 D24 MOH: FAROOQ ABAD DARYA KHAN 254 3353 D24 MOH: PIR BUDHAYA 255 3353 D25 MOH: PIRAN WALL 256 3354 K39 CHAK NO. 61/DB ALI KHAIL 257 .3354 K34 MASJID KHULF-RASH 258 3354 K43 MOH ISLAM DIN 259 3354 K42 MOH: GATTA FACTORY 260 3354 K04 MOHALLAH ASHFAQ NOON PANDI KHEL 261 3354 K45 Mohallah Khawaja Khel Kalur Kot 262 3354 K02 MOHALLAH RODI KHEL KALOOR KOT 263 3354 K41 WANDHI NOON 264 3355 COl Moh. Nazir Town Bhakkar 265 3355 C62 Moh. Alamabad Behal Road Bhakkar 266 3355 C07 GAL' BUTT WALT NEAR CHISTHI CHOWK 267 3355 C49 Imam Bargah Mai Khando Wala 268 3355 C47 MOH BHATTIANWALA KHANSAR CHOWK 269 3355 270 3355 271 3355 3352B38 BASTI NOWANI BHAKKAR 3355C60 MOH. TIBAH MOHABBAT SHAH CO1 Mohallah Habib Abad Darya Khan Road 3355C59 NAZIR TOWN . 272 3355 C05 NAZIR TOWN BHAKKAR 273 3355 CO2 Near Barney House Umar Farooq Road 274 3355 C04 NEAR OLS SESSION COURT 275 3355 C53 NEAR SHAFIQ KHAN BEHAL RD 276 3355 C45 NEAR TEVTA CENTER MADINA TOWN 277 3355 C52 NEAR UMAR CHAHAN BEHAL RD 278 3355 C54 NEAR YASIN KACHI HOUSE 279 3355 C08 PYALA CHOWK MANDI TOWN 280 3356 R30 Dera More Kotia Jam 281 3361 A22 Chak No. 4781B 282 3361 H22 Gall High School Wali H.B Shah 283 3361 H15 ADDA HAWELI BHADAR SHAH 284 3361 M25 CHANN PIR COLONY 285 3361 286 3361 287 3362 288 3362 F47 BAZAR KHMAN WALA 289 3362 F38 BERON DISTRICT JAIL JHANG 290 3362 291 3362 F39 MOH. YOUSAF ABAD 292 3363 J02 Basti Abbas Nagar 293 3363 M56 Mari Shah Sakhira 294 3363 R12 Abadi Rehmat Abad 295 3363 3363R14 ABADI MUVIA NAGAR 296 3363 3363R16 ABADI NUSRAT WALA 297 3364 R10 Abadi Farooq Azam 298 3364 R60 Moh. Hospital Chowk 299 3364 R90 Adda Sharif Abad 300 3364 S41 Moh. Shafqat Colony 301 3364 S60 Basti Gorthani Mouza Meer 302 3364 S84 Moh. Gulshan Town 303 3364 R51 ADDA HASOO BALAIL 304 3364 P43 Adda Sharif Abad Layya Road 305 3364 R51 DHOOTI WALA MOUZA DAGREE 306 3364 A01 Mohallah Raza Abad Garh Mor 3361H16 KOT DEWAN M32 Near Ashraf House Ck. No 3 Ghagh 3362F42 BAST! AHA WALT 3362F44 KETCHA KOT RAOD MASJID MPLA WALT .. . 307 3364 308 3365 309 3365 C23 ABADI FATEH WALA 310 3365 C26 MAIN BAZAR MERIK SIAL 311 3366 Y35 Chak No. 4-4 R A.P. Sial 312 3366 K90 ABADI KUNDAL KHOKHRA 313 3371 A02 Tota Bazar Kamalia 314 3371 C22 Moh. Fazal Dewan Chowk Kamalia 315 3371 C23 Moh.Hussain Shah Kamalia 316 3371 C24 Chechawatni Road Kamalia 317 3371 C26 lqbal Bazar Kamalia 318 3371 C27 Moh. Islam Nagar Kamalia 319 3371 C36 Moh. Kharian Wala 320 3371 R44 Kachi Basti Hassan Khan Chowk 321 3371 R45 Moh. Razaabad 322 3371 R47 Pakistan Chowk Kamalia 323 3371 R49 Moh. Islam Pura Near Ramzan 324 - 3371 Q39 Kothi Bahadar Chann 325 3371 A01 MOH. RAVI KAMALIA 326 3372 F07 Chak No 713 Gb 327 3372 F08 Chak No 707 Gb 328 3372 Fll Chak No. 716 Gb 329 3372 F13 Chak No, 707 Gb 330 3372 J13 Chak No 739 Gb 331 3372 J12 CHAK NO 739 GB JAKHAR 332 3372 H03 CHAK NO. 515/GB 333 3372 H08 MOH. NADRA ABAD KAMALIA 334 3373 G19 Lower Colony Pirmahal 335 3373 G21 Moh. Katchi Kothi Pirmahal 336 3373 G25 Moh. Ghareeb Abad 337 3373 G26 Mohallah Ghousiabad 338 3373 H29 Ranjana Road Pir Mahal 339 3373 109 Harisabad Pirmahal 340 3373 H22 AZAFI ABADI CHAK NO. 342 GB 341 3373 H18 AZAFI ABAI CHAK NO. 346GB R13 Mohallah Uch gull Imam Rodu Sultan 3365C34 132 KV GRID STATION COLONY S/KOT 342 3373 J05 BASTI KAMAY SHAH P/MEHAL 343 3373 H23 CHAK NO. 347 GB 344 3374 M22 Chak No 719 Gb 345 3374 N21 Chak No 672/13 Gb 346 3374 S20 Mouza Shah Pur 347 3374 D11 CHAK NO 720 GB KAMALIA 348 3374 S21 CHAK NO 762 GB " Sargodha Circle Sr. No. ELR Head LT Code I Location 1 3411 C51 Block 15-16 Sargodha 2 3411 C54 Jharran Wall Jhaal 3 3411 C61 Kamboh Colony 4 3411 C42 MOHAMMADI COLONY ST # 13 SRG 5 3411 05 NEAR AMIN COLONY RISALA RD 6 3411 03 NEAR HAM MANZAL TOHEED RD 7 3411 C47 Near Masjid Farooq E Azam Muqam E Hayat 8 3411 C49 Near Sherpao Chowk M/Hayat 9 3411 C48 New Madina Colony 10 3411 C59 Shoukat Hayat Colony Srg 11 3411 C62 St No. 18 Muhammadi Colony 12 3411 C52 Street No 4 Kamboh Colony Srg 13 3412 R17 Adda Chak No. 84 Nb 14 3412 R03 Bajwa Colony Sargodha 15 3412 RO1 BAJWA COLONY SARGODHA 16 3412 R15 Chak No 48 Nb 17 3412 - R04 Chak No 85 Nb 18 3412 R10 Chak No 91 Nb 19 3412 R88 CHAK NO. 101 NB 20 3412 R27 Chak No. 79 Nb Near Imam Kot 21 3412 R93 Chak No. 92 Nb 22 3412 R91 CHEEMA COLONY SARGODHA 23 3412 R13 Fatima Jinnah Colony St No. 2 24 3412 R06 Fatima Jinnah Colony St No. 9 25 3412 R95 Rana Town Khushab Road Srg 26 3412 R96 Sabharwal Colony Sargodha 27 3413 A46 Chak No 5 Rakh Dharema Jinnah Colony 28 3413 A20 CHAK NO 58 NB 29 3413 A35 Chak No. 57 Nb 30 3413 A39 Jinnh Colony Dharema 31 3413 A30 Khalid Sultan Colony Near Chakkian 32 3413 A53 Marri Ajnala Road 33 3413 A45 New Hayderabad Town Srg 34 3413 A37 SULTAN MEHMOOD WALA 35 3413 A14 SYEDA COLONY DHAREMA 36 3413 A49 Vegowal Adda Sargodha 37 3414 T93 Aasi Colony Istacilabad 38 3414 T64 ANWAR COLONY SMAIR ROAD 39 3414 T60 CHAK NO 112 SB 40 3414 179 CHAK NO 126 SB 41 3414 T29 CHAK NO. 126/NB 42 3414 T04 Chandni Chowk Istaglalabad 43 3414 T96 Hameed Town Sillanwali Road Srg 44 3414 T92 Islampura St. No. 3 45 3414 T62 ISTAQLALABAD 46 3414 T61 PATHANA WAOAL CHOWK 47 3414 T38 PUL III 48 3414 G13 SHADAB COLONY NEAR SARWAR CHAKI WALA 49 3414 T59 Sharif Colony 48 Morre Paf Road 3414 T89 Zahoor Colony Near !shag Kabab Wala 51:. 3421 I11 BASHIR COLONY SARGODHA. 52 3421 107 JAMIL PARK NEAR WATER SUPPLY SRG 53 3421 PO4 Near Darbar Ghalab Shah Rehmanpura 54 3421 P02 Near Divsiion Office Blook D S/Town 55 3421 P06 Near Fine Kulcha House Block A S/Town 56 3421 P05 Near Islampura Railway Phatak 57 3421 P03 Near Noorani Masjid Islampura 58 3421 B06 SARWAR COLONY SRG 59 3422 A01 Block F Zafar Colony 60 3422 A10 Din & Mubarak Colony 61 3422 A06 Iqbal Colony Near Noorani Masjid Sargodha 62 3423 SO1 JAFRIA COLONY NEAR DR. TAHIR 63 3423 S01 MUMTAZ PARK & QASIM PARK 64 3424 M06 CHAK NO 26 SB 65 3424 M07 CHAK NO 27 SB 66 3424 M05 CHAK NO 34 SB 67 3424 M10 CHAK NO 86 SB 68 3424 006 CHAK NO. 42 SB 50 • 69 70 3424 C11 Farooq Colony St 6 Near Makki Masjid 3424 M03 LOLAY SHARIF 71 3425 A07 Azafi Abadi Naseer Pur Kalan 72 3425 B05 CHAK NO 66 SB 73 74 3425 E13 MAKDOOM ABAD 3425 A08 Mouza Naseer Pur Kalan 75 76 77 3428 N05 CHAK # 91 BHATTIAN WALA 3428 DO1 CHAK # 91 SARFRAZ WALA 3428 N51 Chak No 27 Nb 3428 N54 Main Bazar Chokera 3428 F08 MANZOOR COLONY SRG 3428 N11 NEAR SHADAB SCHOOL BLOCK-Y SRG 3428 N08 VILLAGE AJNALA SRG 3431 Cal Chak No. 2 Nb Jinnah Abadi 3431 C43 LALA ZAR COLONY BHALWAL 3431 A36 SHAH MIHAMMAD COLONY 85 3432 B54 ALI PUR SAIDAN CHOWK 86 87 88 3432 B09 . ALI PUR SAIDAN NEAR U/COUNCIL 3432 P10 Bughadadi Street Phularwan 3432 B02 Gate Peeran Wala 3432 B37 ISLAM PURA LOKRI 3432 K03 MANZOOR TOWN SARGODHA 3432 B25 Model High School Bhera 3432 B04 Moh. Sheikhan Wala Mianwali 3432 B18 Moh. Talian Wala 3432 B05 Moh.Bawa Shah Latif Bhera 3432 K05 MUJAHID COLONY 3432 B95 NEAR POLICE STATION MIANI 3432 P14 Sardar Shah Colony 98 99 3432 B27 VLIHY VILLAGE 3432 B11 Village Ghughiat 100 3432 B03 ZAIN PUR WESTBHERA 101 3433 K05 BALDIA (THANA) CHOKW KOT MOMAN 102 3433 K30 BULDIA TOWN 103 3433 K07 CAPTAIN UMAR HAYAT CHOWK K/MOMAN 78 79 80 81 82 83 84 89 90 91 92 93 94 95 96 97 104 3433 K58 Chak No 9 Nb Lokari 105 3433 K16 CHENAB BAZAR KOT MOMAN 106 107 3433 K10 Hilal Pur Village 3433 K38 LILIANI CHAPPAR WALA CHOWK 3433 K17 Maghrbi Bazar Bhabra 3433 K41 Mid Mor Kot Moman 3433 K94 MOH. GUJJRAN WALA 3433 K06 MOH: SINDHU GOODS KOT MOMAN 3433 K07 Pull Miani Bhabra 3433 K06 Raheem Pur Village 3433 K36 RAWANA 3433 K39 RAWANA NEAR DERA KHIZAR HAYAT 3433 K14 VILLAGE KOT UMRANA 117 118 3434 P26 Chakian Phularwan 3434 P31 Choni Khawaja Saleh 119 120 121 122 123 3434 P82 DERA FEROZA ABAD 3434 P21 DERA MIANA NABI BAKHSH GARH QAIM 3434 P30 FAROOQ ABAD 3434 P58 FAROOQ ABAD (RATOO KALA) 3434 194 Haweli Karam Dakli Garh Claim 124 125 126 127 128 129 130 131 132 3434 P24 Hujjan Street 200 Kva T/F 3434 195 Jinnah Abadi Head Faqirian 3434 P25 Moh. Lahan Dhori 3434 P17 Muslim Sheikh Colony Pind Macco 3434 P69 NEAR POST OFFICE PHULARWAN 3434 P96 PURANA CHABBAH 3434 P34 RIZVI HOSPITAL PHULARWAN 3434 P03 Saddiq Bhatti Phularwan 3434 P09 Sikka House Phularwan 133 134 135 136 3434 P46 TOHEED ABAD 3434 P35 VEROWAL ZAREEN PHUL1ARWAN 3434 P57 Village Abdal 3434 P32 Village Abdal Near Qabarstan 137 138 3434 198 Village Dhory Bati Chowk 3434 P71 VILLAGE GARH QAIM 108 109 110 111 112 113 114 115 116 i 139 140 141 142 143 144 145 146 147 148 149 150 151 152 3435 P10 Al Wagar Town Bhalwal 3435 P12 Chak No. 13 Nb 3435 P01 Chak No. 18 Nb 3435 P09 Chak No. 18 Nb 3435 P44 ISLAM PURA LOKRI 3435 P42 MUKHTAR COLONY BHALWAL 3435 P02 Purana Bhalwal Lak Abadi 3435 P28 ST 5 ASHRAF COLONY 3435 P11 Sulman Pura St No 18 3436 S20 BONGA SURHKRU 3436 S40 BUDHA COLONY SP NOON 3436 S42 HAFIZ ABAD 3436 S44 KHAWAJA ABAD 3436 S65 Nawab Shah Colony Nized Kot Hakim 153 3436 S36 Ranjhian Wala East Side 154 3436 S11 Village Kurshid Sardar pur Noon 155 3436 S24 Village Pachani West Side 156 157 158 159 160 161 162 3441 - A21 3441 P08 Block No. 06 Charagh Colony J/Abad 3441 J05 MOH. MOCHIAN WALA BOLA 3441 J10 MOH. REHMANIA MITHA TIWANA 3441 J04 MOH. SUMBLIAN WALA VILLAGE HADALI 3441 J06 MOH.LOHARAN WALA VILLAGE BOLA 3442 K18 AZIM ABAD NEAR MUHAMMADO RICE MILL 163 3442 K13 MOH, RONAQ PURA KHUSHAB 164 165 166 167 168 169 170 171 172 3442 ROl Moh. Sardar Bahadur Khushab 3442 MOl Moh. Ustad Tahir Nari 3442 K03 Mohallah rushwal mangwal 3442 K02 MOUZA SANDRAL 3443 801 CHAK NO 23 NB 3443 CO1 MOH. BINDIAL QUAIDABAD 3443 CO3 Moh. Hakeem Khel Village Ameer Wala 3443 MO1 MOH. KHANAY KHAIL VILLAGE UTTRA 3443 P01 Moh. Muhammad Afzal Kalu/Yaroo Khali 3443 CO2 Near Jinnah Park Q/Abda 173 ,. Al Awan Town J/Abad . 174 3443 W03 VILLAGE BINDIAL 175 3443 N07 VILLAGE ZIA WAGHRA 176 3444 N22 MOH. MUNDIAL NOUSHERA 177 3451 S16 MOH. NOOR PURA 178 3451 K26 Moh. Sydan Wala Jahan Abad 179 3451 KOl VILLAGE BITTIAN 180 181 182 183 184 3452 B17 Bharion Wala Gharbi 3452 B16 Bharion Wala Sharqi 3452 K02 CHAH ABBAS WALA 3452 DO1 Dera Soney Khel 3452 B06 Dhoke Mastal 185 186 187 188 189 3452 A01 Dhoke Muhammaday Khel 3452 B05 KHAWAJABAD SHARIF- 3452 A08 Moh. Barey KhelRikhi 3452 KO1 MOH. BULAND KHEL MOCH 3452 K11 MOHALLAH SAND PANSARI MOCH 190 191 192 193 194 195 196 197 3452 K03 Rokhri City 3452 A02 Sohrab Wala 3452 SB1 TURA BAAZ TOWN NEAR HOTEL DORAN 3454 A01 Moh. Madris Near Puly Hernoli 3454 Dli CHAK NO 16/ML 3454 L37 Moh. Balochan Wala Piplan 3454 A03 Near Railway Line Piplan 3454 L30 Rail Bazar Piplan 198 3454 H43 Village Hafiz Wala 199 200 201 202 203 204 205 3456 K24 Chak No 3 Db Kundian 3456 A36 Dhup Sari Doaba 3456 A04 Moh. Haji lqbal BacherJall 3456 ZOS Moh. Han main Bazar Alo wall 3456 Z04 Moh. Molvi khelan Wala 3456 Z02 Moh. Rana Yousaf Alo wall 3456 A32 Moh. Seloan Wala Doaba 206 3456 K10 MOH: ISLAMABAD NEAR MASJID GHOUSIA 207 208 3457 B14 Chak Qudrat Abad 3457 B09 Moh. Dhakuan Wala 209 3457 B02 Moh. Ibrahim Abad W/Bhachran 210 3461 C13 Bakar Mandl Road Sargodha 211 3461 C16 Block 27 Sargodha 212 3461 C12 Factory Area Chowk Japan Park Srg 213 3461 C07 GULBERG PARK NEAR AL SAUDIA BANK 214 3461 C10 NEAR SARGODHA COTTON FACTORY AREA 215 3461 C15 Near Shukat General Store Block 25 216 3461 C08 SAIN JAMAL ROAD NEAR BABU GHAR 217 3461 C11 SULEMAN PURA SARGODHA 218 3462 S11 46 ADDA ROAD S/WALI 219 3462 S15 ASLAM ABAD COLONY 220 3462 S06 BHUTTO COLONY CHAK NO. 130 NB 221 3462 S39 Chak No. 126 Sb Moh. Niaz All - 222 3462 S34 LORRY ADDA CHAK MUBBARAK 223 3462 SO1 NISHATABAD SILLANWALI 224 3463 S99 AI Qamar Colony Sial Sharif 225 3463 S66 MAIN. BAZAR SAHIWAL 226 3463 S03 NEAR JHAMTEE GATE SAHIWAL 227 3463 S72 ST 7 ' NAWAN LOAK SAHIWAL 228 3463 S33 VILLAGE MOCHIWAL 229 3463 S71 Village Punj Peer 230 3463 SO4 VILLAGE SANGO RAKAH 231 3464 S10 KHICHIYAN DAY JHUGGAY 232 3464 SO1 MEHAR ABAD COLONY 233 3464 S32 Mian Bazar Farooqa 234 3464 S05 NOOR PUR KHOKHRAN 235 3464 S06 VILLAGE DILAWAR SAHIWAL 236 3464 S08 VILLAGE PIND MAKEN 237 3464 504 VILLAHGE KOT GUL 238 3465 533 Aqil Shah Kalan Dera Amjad 239 3465 S34 Aziz Colony Shahpur Sadar 240 3465 S17 3HUGIAN HAMOKA 241 3465 S16 KUDYANA 242 3465 S19 KUNDAN KALAN 243 3465 S14 MANGOWAL KHURD . - . 244 3465 S06 Mangraill 245 3465 S49 Near Chaki Abdul Hameed Shahpur City 246 3465 S03 Near Dar Javed Hussain Shah Shah pur city 247 3465 S23 NEAR FRIENDS BOOK DEPO SHAH PUR 248 3465 S48 Near General Bus Stand Shahpur City 249 3465 SO1 NEAR TEHSIL KATCHERY 250 3465 SO2 NEAR UNION COUNCIL 251 3465 S12 NEAR WATER SUPPLY SHAH PUR SADAR 252 3465 S22 PLAZA CHOW 253 3466 J44 Faisal Colony 254 3466 J33 HAFIZ COLONY JHAWERIAN 255 3466 J66 Main Bazar Bakhar Bar 256 3466 J29 MAIN BAZAR KALRA 257 3466 J24 MOHALLAH AWAN WALA JHAWARIAN 258 3466 J10 NEAR AKBAR MUGHAL HOUSE 259 3466 J12 RIAZ-UL-KHATEEB COLONY 260 3466 J97 Sadel Bangla 261 3466 168 Village Manaky Wala . PSDP 2013-14 (PROPOSED) DETAIL OF WORKS TO BE EXECUTED IN PSDP 2013-14 (PROPOSED) (Rs. In Million) DETAIL OF WORKS PDEIP TRANCHE-11 Description LOCAL Purchase of 6 Nos. 20/26 MVA Power 1 Transformer S.# 2 3 Purchase of 14 Nos. 31/40 MVA Power Transformer Duties/Taxes etc F/LOAN TOTAL 193.012 193.012 521.556 521.556 585.827 585.827 TOTAL WORKS TR-11 585.827 714.568 PDEIP TRANCHE-111 S.# Description LOCAL F/LOAN Mobilization advance for TR-111 Projects 1 222.773 (Estimated) TOTAL WORKS TR-111 TOTAL WORKS 2013-14 585.827 222.773 937341 1,300.395 TOTAL 222.773 222.773 1,523.168 4.64.1.*SCGA■ 11.1, rffi. ••■ • STATUS OF SUB PROJECTS PROPOSED INTRANCHE-II FESCO . • 1 • . • Name of Grid Station . • ---------- • Power T/Fs to be Scope installed • . (MVA) 1 1 132KV Daud Khel District Mianwali i 1 i 32KV Ludewala District Sargodha • •• Status • . Addition of new 20/26 MVA Power T/F approved by FESCO E 1 x 26 - • ' , 01 No. 10/13 MVA 66/11 KV Power T/F . will be removed and a 20/26 MVA on 1 x 26 132/11 KV will be added. The proposal • is approved by FESCO. E 1 . 1 i 132KV Jouharabad District Khushab Addition of new 20/26 MVA Power T/F approved by FESCO 1 x 26 1 Addition of new 20/26 MVA Power T/F approved by FESCO • Addition of new 20/26 MVA Power T/F approved by FESCO 132KV Nishatabad New Faisalabad E 1 x 26 132KV Kamalia District T.T Singh - E 1 x 26 1 32KV Mianwali E 1 x 26 Addition of new 20/26 MVA Power T/F approved by FESCO ' 3 x 40 3 No. 20/26 MVA Power T/Fs will be augmented approved by FESCO 132KV Jhang City 132KV Gojra District T.T Singh 1 A 132KV Jaranwala District Faisalabad 132KV Jhang Road Faisalabad \ 132KV Samundri Road Faisalabad . 2 Na. 20/26 MVA Power TIFs will be augmented approved by FESCO •• • 2 x 40 3 x 40 ' 3 No. 20/26 MVA Power T/Fs will be augmented approved by FESCO A ..2 x 40 2 'No. 20/26 MVA Power T/Fs will be augmented approved by FESCO• .•A 2 x 40 2 No. 20/26 MVA Power T/Fs will be augmented approved by FESCO 2 x 40 - - 2 No. .20/26 MVA Power T/Fs will be augmented approved by FESCO ' - 132KV Factory Area Faisalabad . Total MVA Added X A 716 • Table 3: FESCO Sub -Projects FESCO Tranche 3 Projects Project Name Type of Project Quantity of Projects Line works by FESCO Resources Faisalabad GIS) New Substation 1 . 2 X 40 MVA Line works by FESCO Resources Shahbaz Khel Mianwali New Substation •1 2 X13 MVA Total New Substation 2 1 Project Associated Number 12221e5 F2 F4 F10 18 Hazari Conversion from 66kV to 132kV F5 F12 GM Raja Conversion from 66kV to 132kV F6 • F9 66 KV Rakh Dagran • Conversion from 66kV to 132kV F7 F11 Kala Bagh Conversion from 66kV to 132kV F8 • 1 1 3 1 30 F10 F4 HB Shah -18 Hazed (F/F 18 Hazari) Double Circuit Transmission Line r Double Circuit Transmission Line gu.11.1.,... • Transmission IJZKV Hydropower 220kV Daud Khel ir4 • F5 2 x 13 MVA Double Circuit Transmission Line Double Circuit Transmission Line F12 1 X 13 MVA, 1 X 26 MVA 1 220kV Grid TT Singh to HB Shah Piplan Bhakkar in and out (F/F Rakh Dagran) F7 1 x 13 MVA 1 X 26 MVA .4 F6 132 KV D/C 18 Hazari-GM Raja 60 5 4 98 1 45 Total SDT Transmission Line 1 45 Total Projects 11 143 SDT. . Transformers 2 X 26 MVA Conveision from 66kV to F9 F11 Circuit Length km DETAIL OF PRIOR YEAR ADJUSTMENTS FOR F.Y 2012-13 Description Ref PPP (Adjusted) (Rs./kWh). • DM (Rs./kWh) PYA (Iti.AWh) ASR (Rs./kWh) Ref . Unit sold Actual Unit sold 1. Un-Recovered Power Purchase Price Cost of Power Rs. In Millions Notified Assessed referemce PPP for year 2011-12 90,624 Add MTN Adjustments 1st qrt 's Adjustment Other than fuel 3,026 2nd qrt 's Adjustment Other than fuel 3rd qrt 's Adjustment Other than fuel 4th qrt 's Adjustment with fuel Total Add Monthly Fuel Adjustment 1st qrt's Fuel Adjustment 528 2. Un-Recovered Prior Year Adjustment 141 Prior Year Adjustment 376 Annual Prior Period Adjusment allowed 3,789 Less: Recovered through notified ratesfor the Year Total 462 979 1,429 2nd qrt 's Fuel Adjustment 3rd qrt 's Fuel Adjustment 4th qrt 's Fuel Adjustment Not Determined Total Total Adjustments Total PPP with Adjustments Power Purchase Cost as per CPPA Disallowed Power Purchase Cost Recovery of P P Cost/Adjustment Given Recovery Through 1st qtrs monthly Adjustment Recovery Through 2nd qtrs monthly Adjustment Recovery Through 3rd qtrs monthly Adjustment Recovery Through 4th qtrs monthly Adjustment Total Adjustment given Recovered through notified rate 1st qrt Recovered through notified rate 2nd qrt Recovered through notified rate 3rd qrt Recovered through notified rate 4th qrt Total 2,870 26,863 21,897 18,080 19,796 86,636 Total Recovered PPP Total assessed PPP with adjustments Unrecovered PPP 89,506 97,283 7,777 2,870 6,659 97,283 97,358 75 462 979 1,429 10.16 0.96 0.23 11.34 8,921 8,528 3. Consumer Mix Variance Rs. In Millions Consumer Mix for the 1st Qrt Notified rate during the qrt (Rs./kWh) Actual unit sold during the qrt on actual Losses(MkWh) Recovery on notified rate Actual revenue for the qrt 11,787 Consumer mix Variance (Excess Recovery ) 1,920 9,867 Consumer Mix for the 2nd qrt 11.34 2,644 29,988 33,066 (3,079) Notified rate during the qrt (Rs./kWh) Actual unit sold during the qrt on actual Losses(MkWh) Recovery on notified rate Actual revenue for the qrt Consumer Mix Vsrlance/Less Recovery 11.34 2,155 24,443 21,585 2,859 Consumer Mix for the 3rd art Notified rate during the qrt (Rs./kWh) Actual unit sold during the qrt on actual Losses(MkWh) Recovery on notified rate Actual revenue for the qrt Consumer mix Variance (Excess Recovery ) 11.34 1,780 20,183 20,476 (293) Consumer Mix for the 4th art Notified rate during the qrt (Rs./kWh) Actual unit sold during the qrt on actual Losses(MkWh) Recovery on notified rate Actual revenue for the qrt Consumer Mix Variance /Less Recovery Total Consumer Mix V811.11141 for the Year Financial Impact 51-350 Units for FY 2011-12 Total Unrecovered Cost for the Year 11.34 1,949 22,099 21,692 407 (106) 3,888 21,426 No. PF-:4(06y2012-FHPL . . MARY NO.2! Government of Pakistan (-?....1.....z:-.: Ministry of Water and Power . DATED 1) i7....... ..),. T• •.-----7 • VA/ •---e-? Power Coordination, Policy •and Finance Wing HE-MW-4.:TERS FE9C0 ............... :-' . . FaisaLbod Sa.j•:cl: NON - ACCOUNTAL OF TFC LOANS AND MARIc UP SY DISCOS. • Isla : „food ille, 13u. May, 2013 I am directed to refer to 1 ESCO's letteT No. 1030&/FD/IESCO, dated 10-01-2013 on the above subject ana to state that CPPA is supplying electricity and DISCO's are requIre, Power Purchase Price (PP A). is sup ;- to pay on account of are not paying full colt of supply to CITY-,, Doh( InPPowor Sector has been Increaelng time and agian causing stuck-up of • kw:1;11,11,11y, circular System. FY 2011-12, s towards Power Generators could not be fulfilid. In order to overcome theInvicious cycle involving Power Generators, Oil and Gas Companies and Refineries, GOP arronjed TFC loans of PKR 239 up billion through PHPL on comparatively low rates to pay of Power Generator, involving -ligherwould mark be nocost. needIftoDISCO's arrange paid loans.CPPA against PPP for pnward payments to P.-)wer Generators there ; behalf DISCO 2. .. ....ofMark — 's up.forcost nonto- be p recorded in DISCO's book:.; of accounts as the Icons were arranged on a DISCOs ma takec issuesyment wi h / non - accountal of :nark - up on bank loans arranged by PHPL. 4 their Tariff , • 0 '.--- 7, 1!ow them to transfer 3•. mark-up cost through It ma y be pointed out that liabilities of D!SCOS would not be. affected •..;...their be books of accounts as the loans would be replac3d wit': CPPA'spayables. by CPPA's payablesloans would incorporo;ingin reduced to the extent of loans. Equity of the Compank,:o w ould GOP .is the owner of distribution companies being share;:older not be negntivo. and reniain same. arranged by it through PHPL. . ' as well as g;:orantor of TFC loans . 4• In view of above it is advised to all DISCO's (-:::::::e • ' - Incorporated' loans and the mark -.4) costs on these pt :CISCO and- S,EPCO .as they have lenniq thl. . subject loans and mark -.up on these bans. in their bco' eir books of accounts)- to incorporate . - -r,ccounts and to cc: issued by CPPA in respect of t'. • s -.. debit ; credit notes Jere in loans and . rnark --Up: Q SCO's pa ant of mark - u • to PI- 'D r are i'ilfm advised to make A.847...olfi ____,0.21.0. 191,4/2rd a iment to banks under the- new rnec'lanism isslo tyj 5. ohis Compliance report is r q ' .o be submitted to ibis • , shall be part of performance evaluaon criterion of CEO. :inistry at the earliaFt by 25-05-20)37-Tta ----- . 7. namma :Q rh an '375-7A7// DadtIon Officer F) Chief Executive Officer MEPCO, Multan. r-1:11:9•213 .777xecutive Officer FaIsai?b ad. Chicf I.-; :ecuti7e Officer LE CO, La cr; • .-_:iecutive Officer PE Pesti ;war. • Chief Executive Officer HEC- CO, Hyderabac. Chief Executive Officer IESCO, Islamabad. Chief Executive Officer GEPCO, Gujranwala. For information: 1:St (HRSA) Orr ) 7- a) b) The Chief Financial Officer, PEPCO WAPDi• House Lahore The Chief Financial Officer, Power Holding Pdvate Limited Islamabad CC: 1. Ps to Additional Secretary• Ministry of Water and Power. 2• PA to Joint Secretary (Power), Ministry of Wate: snd Power. 3. PA to Deputy Secrelc, 'Ff'avy.4.44.4Pte14%,... & Power • (crc) 011:;:vr n wa.a......••■ •■■■ 10011 Central Poiopor Purchasing Agency MANAGER FINANCE (TREASURY) CPPA • Napier Road, Gardee Trust Building, Lahore. PHONE 99213791-94 EXT 120 *FAX NO. 99213701 OFFICE OF THE . MANAGER FINANCE (TREASURY) CPPA 1410.1111F/(T)/CPPA/10T/ t DATED: 1 6 JAN 2013 FINANCE DIRECTOR FESCO, FAISALABAD. SUBJECT: DEBIT MEMO FOR Jul-12 Please find enclosed herewith Debit Memo details as below pertains to your company for necessary .. ,i.,,,•;;,7 40 7..nd ear! ad ustment at our end. SR.NO 1 DEBIT MEMO NO. 1 PPA-26/FESCO-2 MONTH -- Jul-12 AMOUNT ENCLOSURES 238,818,100.00 • 4si (CPC). n,n . 1v ASS_Trri ANAGER ACCOUNTS RECEIVEABLE PAYABLES/10T . 3( 3 Dr ! '.... ,1,, d, ( I / .• #/..I,.•• t . e. I 1 .,..,,.., .......',k.. /. 1 rower Purchasing Agency__ Central Power Purchasing Agency )IRE MANAGER FINANCE (TREASURY) CPPA Gardee Trust Building Napier Road Lahore. DEBIT MEMO REFERNECE. JVI (20) DATED 3-7-2012 PP4 July-12 ISSUING OFFICE PPA-26/FESCO-2 MANAGER FINANCE (TREASURY) CPPA RECEIVING OFFICE: FINANCE DIRECTOR, FESCO, FAISALABAD. Dated: July-12 We have Debited your account for the amount of Rs. 238,818,100 Two Hunched Thirty Eight Million Eight Hundred El Itoon Thousand Ono Hundred Rupoos and Zero Paisa Being the do rooted on account of 1st Mark up payment against 136.454 Billion Syndicatod Term FinancoTacility on your behalf as approved by Ministry of Water & Power vide No.P-1-6(&4)/2012 (copy onciosod) ACCOUNT CODE 150107 1112SCR21"-'7101: OTHER RECEIVABLES FIEBIT 238,818,100 TOTAL ,rI. ,4! PREPARED BY 238,818,100 11.1111 11111111111111111 .. • 4C " dNECKED BY APPR I VED ■ a,..„„. ■ ••.•mft=1.1•■ •■ ••.... ••■■ •■ J 1st Mark-up Payment against 136.54 Billion (STFF.) TOTAL DEBITABLE AMOUNT 4,670,098,264.00 LESCO 319,219,209.00 PPA-25/LESCO-2 FESCO 233,818,100.00 PPA-26/FESCO-2 c("MEPCO 632,063,524.00 PPA-27/MEPC0-2 QESCO 737,253,206.00 PRA-28/QESCO-2 GEPCO 1 23,920,509.00. PPA-29/GEPC0-2 ESCO 146,201,094.00 PPA-30/IESCO-2 PESCO 1 ,350,921,897.00 PPA-31/PESCO-2 HESCO 583,282,172.00 PPA-32/HESCO-2 SEPCO 538,418,553.00 PPA-33/SEPC0-2 TOTAL 4,670,093,264.00 5 p 1 !.• • FILE MOST Ilvf/v113DIATE 13Y AX No.PI-6(84)/2012 • Government of Pakistan Ministry.of Water and **#****** Power Subject: Islamabad June 13, 2012 PTV? 116.;154 BILLI EQB_EszEraz YNCIDATr:D TRR EA) trNAN T HOLDINGP VATS :A Lim TED.i R 4 0 098 264/mArt 1( up • 7: The undersigned isdirceted to say that Syndicated:Term Finance Facility of PKR 136,454,200,00/ executed between Power Holding (Private) Limited and Syndicate Banks : Or the purposesThe of onward lending to the ;DISCOs for funding repayment liabilitie ; of the'DISCOs. di sbursement. of facility Was made on February 21,2012. 2. period FebruaryThoL Mark-up payment amounting to PKR 4,.670,098,264/- for the ary 21 2012 to.ay 20, .2012 (90 days) in respect of the subject thcility was due on May 2-1,• 20 2 as per the Syndicated Term Finance Agreem l order toof service the mark-up payrrn int on due date, PHPL, requested all DISCOS;ent. forInpayment their respective share in the 'subject facility on April 23, 2012, May I.5, 2012. and May 21, 2012. Directions liven by this Ministry in* the meeting held oniMay 14, 2012 to the DISCOS for paym.:nt of their share in the mark-up payment, D.ISCOs are have not yet ' remitted their share to PHPL. On the whet hand the Syndicate Banks had for payfilcnt a: id Habib Bank Limited vide its requested to make 0 JC 3. . • follows:- Invastai-'3 J. pressing very c June 05, 2012 has mark-up from 21-02-2012 to 20-05-2012. The Tetail of the mark-up payment due from each,: of thc DISCO Name 4 s. reminder d. • is as- nrouut o rticipalion t.1.) GEPCO JESCO FESCO LEsco SEPC.0 1-11:2SCO 141:PCO 11211 PESCO Cruel Total: Dn Start Date -s Calculation Redemption Date 3 620,796,158 4 271,803,912 6 977 954,429 9 327,170,294 11.731 890 151 1 r,042,7.16 771 1 1,468_074 459 2 541,580,224 /,472,131 602 1 16 454 200 000 21-02-2012 21-02-2012 21-02-2012 21 -02-2012 21-0 2:2012 21-02-2012 21-024012 21 -02-201 2 2 1 -02.-2012 t (6 /7 L isdike>. cg---1)) • 20-05-2012 20-05-2012 20-05-2012 20-05-2012 2005-2012 20-05-2012 20-05-2012 20-05-2012 20-0 5-2012 No. of iln 90 90 90 90 971 90 90 90 90 Rental i-ate 13.88% 13.88% 13.35% 13.88% 1 3.88% 13.83% Alork-up Payment 123,920,509 146 201094 238 siseint 31.9,219 209 5:isa:413,553 5N3,2 X2,172 632,063,524-737,253,206- /CO 150 911 ---c••••:•_----:• g7)7.-_ 4 6711,1 ,16,1 • 19/ ■ 12:11 HP LASERJET FAX p . .. 2 :- 4. .• • • - •• -•- • ••The ::ecretary, Water and Power has desired that Chief Financial Officer • (PEPCO) may pa this payment of PIER 4,670,098,264/- in PLIPL's NIDA. Account No.000006-3, Natic nal Bank of Pakistan, "B" Block, Pak. Secretariat, Islamabad on t. `account of DISCOs. share in the mark-up in respect of PKR 136.454 billion Syndicated ,• Term Finance Faci :ity obtained on behalf of the DISCOS for onward rep aytilcut to I Syndicate Banks by Pl-iPL under intimation to this Ministry urgently. ( M. Zargikuni lisliaq Witan ) Joint Seorctiry (Power) • Mr. Abdul Majid vi, Chief Financial Off ccr (PEPCOINTDC), WAPDA House, Lahorn .• FAISALABAD ELECTRIC SUPPLY COMPANY t:4 FESCO 4!' • PHONE # 041-9220232 FAX # 041-9220233 www.fesco.com.pk OFFICE OF THE CHIEF EXECUTIVE OFFICER FESCO FAISALABAD Fs' .• Dated /,g /March/2013 /C70- NO HR & Admn Director -; Faisalabad a'? :4, Subject: MINUTES/RECOMMENDATIONS OF SCRUTINY COMMITTEE MEETING REGARDING BIFURCATION OF OPERATION S/DIVISIONS. DIVISION AND CIRCLES. With reference to Chief Executive Officer, FESCO Office m Order No 5823/M-26. dated 14/10/2011, please find enclosed herewith Minutes of Scrutiny Committee Meeting regarding bifurcation of Operation Sub-Division, Divisions and Circle for further necessary action. . • - .1. DA/As above • -4 • : ENGR SHEIKH AKUTAR HUSS CHIEF TECHNICAL OFFI R FESCO H/Q FAISA BAD • ' • MINUTES OF SCRUTINY COMMITTEE T MEETING REGARDING BIFURCATION OF OPERATION SUB-DIVISIONS; DIVISIONS & CIRCLES Ref:- Chief Executive Officers Office Order No. 5823/M-26 dated 14/10/2011. „. FESCO ..;.• 1. Scrutiny Committee fix, r ■ ., ,,.1 „AG'. ..g The Scrutiny committee'of FESCO consisting of the following officers held its 17th .4. meeting on 06/03/2013 in FESCO committee Room to examine in detail various aspect •., of Bifurcation of Operation S/Diyns, Divns & Circles cases: a. b. c. d. e. 2. Chief Technical Officer FESCO Convener HR & Admn Director FESCO Finance Director FESCO Member Member Chief Engineer (Operation) FESCO Manager (HRM) FESCO Member ■ F Secretary/ Member Back Ground A. Authorization PEPCO vide Chief Engineer (Operation) letter No 1625-33 dated 06.09.2010 has authorized DISCO's to bifurcate / create of new Sub Divisions on need basis. B. Criteria:Criteria for bifurcation / creation of Sub Divisions has been fixed vide WAPDA letter No 2353-2406 dated 27.11.2001 which is as under: a). Number of Customers Urban and Rural Sub-Divisions a. b. Minimum Limit Urban: • ii. '' Rural: Maximum Limit Urban ii. 1- Rural : 16000 Customers 12000 Customers 24000 Customers 18000 Customers 41-4 I/ 4 T CRITERIA FOR CALCULATION OF SUB-DIVISION STAFF General Section SDO Standard .., Authorization i CompUter Sr. Jr. Operator 'Clerk Clerk 1 .? ' •• 2 TCC Driver N.Q :. • 1 : , 2 3 , C D Sweeper 1 1 1 Technical Staff a). No. of Customers: Urban / Mixed Sub-Division Rural Sub-Division 16000 12000 24000 - 18000 Addl: S/Divn to be created when Number Excess of the Normal by 50% b). Authorization of Staff: MS-1/ MS-11/ •LS-I LS-11 LA/1-1 Line Staff Standard Authorization LM-II 8 Additional for every . 2500 customers for Urban • &, '41500 Customers for Rural Sub-Division above Normal Additional Staff for length of, line _ Upto 80 Kms (Urban) Upto 120 Kms (Rural) Upto 120 Kms (Urban) Upto 180 Kms (Rural) Upto 180 Kms (Urban) Upto 270 Kms (Rural) Upto 270 Kms (Urban) Upto 405 Kms: (Rural}_-' Upto 405 Kms (Urban) Upto 600 Kms (Rural) MS-I/ LS4 - MS-II t LS-11 - LM-I LM-H - - 2 2 2 2 3 3 4 4 -' 2 2 4 4 6 6 ALM LFM-I LFM-H 24 - 3 - ALM LFM-I - LFM-II 4 4 8 8 12 12 12 12 1 Commercial Staff Meter Reader Bill Distributor Note:- MRs / BDs (Per Consumers) Urban Rural 15001000 3000 2000 Tube Well 300 Line & Reading Staff to be Authorized as per Proposed yardstick for Urban & Rural Sub-Division on the basis of number of consumer and length of line • i C. S 41 6 11 * 41- if SII-741 I 'I - S71- S' Load Management & Customer Services Committee of BOD FESCO in its meeting held on March 22, 2012 noted that mostiof the Sub Divisions in . , FESCO have large number of consumers in the Sub Divisions, even some 1 Pk ', Sub Divisions th more than 40000 are not 1 1 manageable as.the maximum 24000 number of consumers are feasible consumers ';; which ,for a Sub Division., ••• I/ Committee directed HR&Admn Director to prepare the proposals of bifurcation/creation of Sub Divisions, Divisions and Circles, keeping in view the number of consumers, geographical position and work load in consultation with field formations 9 : •4 E. 4 , - , ' 1 4 Case was placed before Load Management and Customer Services i,; Committee of t BOD FESCO on 02/03/2013 and the same was k . . recommended with few suggestions. F. . Line Losses Line Losses percentage of the Sub Division is 05% more than that of the overall line losses of the Company. G. Procedure for Bifurcation of Sub-Division: . Proposal! of bifurcation/creation of Sub Division is initiated b concerned Circle. Operational. Department vets the operational viability and improvement in the Customer Services sphere. iii. Finance . Director FESCO vets the Financial Implication. Case is then referred to Scrutiny Committee which after analysis recommends the creation/bifurcation of Sub-Division. iv. The cases recommended by Scrutiny Committee are presented in Load Management & Customer Services Committee and its recommendations are placed before BOD for approval. The case will be presented to NEPRA before implementation. H. Oroanoram: : i. ..!4 *. - Organogram of -,existing and new Sub Divisions;,is essentially the part of the each proposal of bifurcation/creation of Sub Division/Division. '• ,C .1-: ,. "i' ! ,̀114 3. .:1 ,;I: " ' t ■ ': 7: ''' i j i .';' ; Justification / Benefits of Bifurcation / Creation of Sub-Divisions/ Divisions i. . , Better Services to the Consumers. iii. System Will Improve. : -5 • Complaints will decrease. iv. Supply Continuity will improve. v. Efficient Utility Functions. vi. Efficient Utility Practices. _., . Administrative Losses will Reduce. ii. vii. viii. ix. x. A, x • ::,:. • ■ ' . . ., Reduction in work burden upon Employees. -; .. FESCO Recovery will improve. FESCO image/namewill brightened. ., .. 1 1 . i' 4. . Conclusions: a). 4 In continuation ofmore than seventeen series of meeting / deliberations on the subject, the ...4 Scrutiny committee final meeting held on 06/03/2013 in FESCO committee Room, scrutinized the bifurcation cases of Operation Sub-Divisions, 'Divisions and Circles and recommended the following cases unanimously to put up in Load management and customer Services - Committee meeting dated 02/03/2013. 1,, Name Circle No. of Existing Division .5 2nd JHG L 4 6 SRG 6 Total 21 No. of No. of Existing. Proposed S/Division Division 29 . 3 No. of Proposed S/Division 5 No. of Financial Addl Staff Implication Required (Million) 802 263.34 • .3 11 . ,1201 446.48 32 3 15 1707 574.58 34 — 2 1288 379.60 4998 1664.00 118 11 42 jrUUjJ L I 'A a 3 II 1 TT TIVVT1I''' . .), . .-Phss.ses of Implementation: b). 1 ; A 1 Subject matterafter approval, will be implemente in ,' i..' , 1,:,..I..,, -....,,,,,... 1,1,•.! (:),..1k '1" . . , h :"' -_,.- ' • .1 1 . , ,, , - ,F nancial Implication - - - • ... '-'. t Bukharian S/Divn. Muslim Tonw S/Divn. Sargodha , 41 ,. . , bub -,-a. ' ' .' .. Y,"''VrOPQS,ed ' , '' -7:" ' ••''',"%41-. ,.''' -"utvn.(Divn, '.' '' /4'1 ," ..-, " . '.' ',T,4,,, 4 *Mang following 37Phases. i Phase-1 -..:, ...' , 3 4 1 2 3 4 1 2 3 4 Chenab Nagar Divn. & AM(CS) Tandlianwala-II S/Divn. Killianwala S/Divn. Tandlianwala-Il Divn. & AM(CS) Gorja Road S/Divn. Maghiana S/Divn. Ashraf Shaheed S/Divn. ISargodha Road S/Divn. Jhang-1I Divn. & AM(CS) Noor Pur Thal S/Divn. Bhabra S/Divn. Joharabad Rural S/Divn. Nishtar Abad S/Divn. 35.14 26.42 93.54 62.63 22.42 66.79 29.91 30.89 37.32 28.01 31.96 25.66 18.54 18.17 :1- 570.32 4' •' F.' / 4 104.49 245.38 126.12 94.33 570.32 Phase-II • , 1st 2nd Jhang Sargodha ' 0,11. 1 2 3 2 3 4 1 2 3 4 5 7 1 2 3 4 5 ProPoteit , Nemat Colony S/Divn. Awagat S/Divn. Sheikhpura Road Divn. & AM(CS) Rehamat Town S/Divn. Madina Abad S/Divn. Sadar Bazar S/Divn. Gulberg Divn. & AM(CS) Bhakkar Rural S/Divn. Mankera S/Divn. Kamalia 3rd S/Divn. Civil Line T.T Singh S/Divn. Toba Road Gojra S/Divn. Jhang Road Gojra S/Divn. Nia Lahore-2 S/Divn. Khushab Rural S/Divn. Sial More S/Divn. Sahiwal # 3 S/Divn. Urban Mianwali-2 S/Divn. 2nd Divn. Mianwali & AM(CS) . , Total:. Implication ' Total, 27.01 39.14 95.17 29.02 21.16 21.84 21.49 19.72 36.80 35.70 34.44 36.79 23.55 27.08 29.37 25.32 18.00 31.67 51.38 26.09 555.57. 7.-;k,' iiiiit-of--;?;" :;-,k7". CP `` `:-.T .T'.̀!),:nr :>'':*'' '''-';'' 1'3P,."-:!' ' rt''' "7.1-- ::' Piriantial- ,''''','Y 't.• ,-i. p'VY,'-,..7 "IA -ta•i- 1 , A- ' , rk, s. •. P osed , Sub-ilvp/Divn. -.• , '- .: Totair•T'el-: 2nd Jhang Sargodha • Total , 2 1 2 3 4 5 6 1 2 3 4 5 6 7 1 2 3 4 Chak Jhumra No. 3 S/Divn. Khanuana Divn. & AM(CS) Dalowal S/Divn. Karim Town S/Divn. ,, i mplication -,- .i,,, ..• ,..--A.‘-, 38.91 63.68 24.77 22.04 28.92 22.56 116.89 18.83 11.27 13.27 30.29 28.95 37.14 27.63 224.73 •• Samanaabad Divn. & AM(CS) Mujahidabad S/Divn Lakar Mandl S/Divn. Sir Shmir S/Divn. H.B Shah S/Divn. Kot Shakir S/Divn. Sandelianwali S/Divn. Darya Khan Divn. & AM(CS)• Jhandanwala S/Divn. _ Dulleywaia S/Divn. 18 Hazari Divn. & AM(CS) Ludewala S/Divn. Silanwali #2 S/Divn. ' Qamar Mashani S/Divn. • • _Bhaghtanwala Divn. & AM(CS) . - , ,r -;;,...:, -, .. -.,:t ,,4, ., - •s.;-..: 4,„t,,N i-,, ,.. 36.20' 39.33 25.19 30.07 29.47 132.81 47.18 26.09 ., r 5 3 8 .11 , • ...s. , 538.11 DA/Complete Detail/Cases:of Sub-Divisions, Divisions & New circle submitted by all S. (Muha ad qba hori) (Muh a Nae Ullah F ance Director Director (HR&A) Member Member (Khalid Rashid) Chief Engineer (Op) Member Zt-I' •, 17:e (Sheikh Akhtar Hussain) Chief Technical Officer FESCO Faisalabad (Convener) Op) (Muhamm Manage HIRN MemberaSec rat-Jy - • ABSTRACT OF ALL THREE PHASES FOR CREATIONaT DIVISION/SUB-DIVISION UNDER FESCO (Rs. In Million) Name of Circle I ist Phase 2nd Phase 3rd Phase BENEFITS OF. BIFURCATION [CREATION OF SUB-DIVISIONS/ DIVISIONS Better Services to the Consumers. ys em Will Improve. Complaints will decrease. • iv. Süpiy Continuity 'Will . v. Efficient. Utility Functions. vi. Efficient Utiiiti Practices. ::> &41.111, VII. . Reduction in Work burden upon Employees. FESCO Recovery will improve. X. 36 ' : FINANCIAL BENEFITS - .41t-:.Jarv Reduction in Administrative Losses With the creation of 42 No. New S/Divns 11 No. New Divns: . Administrative Losses will reduce by.1.25%..._ . " • Existing. Administrative Loss Efidiii06/2012 36 Administrative Losses consists of: 0). Non detection of discrepancies of tariff and_others > Non detection of slowness on eeplatethent Of meters Delay in installation of connections • eiali in replacement o meters etc. vOra:ujing 76 No. S/Divns cital .SiDitcni., and providing staff as per criteria Administrative Losses will be reduced by = 1.25% = 107 (M) -Units = 1070 (N) Rs. 7 FINANCIAL BENEFITS 2. Reduction in Technical Losses Technical Losses will be reduCed by I % y Reduction in Technical Losses will be achievers by: a). Initiation of. new HT Proposals b). Initiation of new LT Proposals' ). InitiatiorCiiikda:Planning Replacementof Defective e). Proper maintenance of tystem (HT/LT/17FP • Proper Load Balancing of T/Fs ••• otal erief6 =1.010+850=1920 .7144t*I-)P Total Expenditure WV< =1664 (M) Rs. 38 Note:In case of non bifurcation of existing S/Divns. having consumers 25000 to 49028 future effect will be a). Increase in Administrative Loss due to insufficien_t vigilance/over burden by , b). Increase ihiTechnical Loss (Due to insufficient maintenance/ improvernerd in vet loaded system) 0.5% - 425. (w) Rs. i •• '• 50 (M) Rs. • ••• " '.1. 7•"*.!••• - • • • • c). d) ;.;. . Further deterioration in company efficiency deterioration in Customer Se4vices 39