Community Newsletter - Northshore School District
Transcription
Community Newsletter - Northshore School District
A N E W S LETTER FOR N O RT H S H O R E S C H O O L DISTRICT FAMILIES & COMMUNITY in this issue S P R I N G 2 0 1 3 DISTRICT NEWS 1 Promises Made, Promises Kept Update on Planning for New High School & Grade Reconfiguration 9 PARTNERSHIPS 10 Northshore Schools Foundation Supports Advanced Programs CALENDAR 11 BOARD RECOGNITION 12 College Bound Scholarship KENMORE JUNIOR HIGH SCHOOL’S 50-YEAR-OLD CLASSROOMS WERE REPLACED WITH A TWOSTORY INSTRUCTIONAL BUILDING USING FUNDS FROM THE 2010 BOND. FIND US ON FACEBOOK D I S T R I C T N E W S Promises Made, Promises Kept An update on the district’s stewardship of funds provided by taxpayers for the 2010 bond measure modernize or replace outdated mechanical, heating and ventilation systems, carpets, flooring, windows and roofing at schools districtwide. The bond has also funded key infrastructure improvements to support classroom and school technology needs, districtwide voice and data network updates, indoor air quality improvements and seismic upgrades. In February 2010, Northshore voters showed their continued support for Northshore schools by approving a $149.2 million bond to protect our community’s investment in public education and provide safe, wellmaintained schools for students and staff members. “A well-supported learning environment is a critical Over the past three years, bond funding has allowed the district to complete substantial renovation projects at two secondary schools— Kenmore Junior High School and Woodinville High School—and condition for student achievement and success.” LARRY FRANCOIS, Superintendent Importantly, all district students have directly benefitted from the facility and technology improvements made using 2010 bond funds. CONTINUED ON PAGE 2 M O R E I N F O R M A T I O N A T W W W . N S D . O R G N O R T H S H O R E S C H O O L D I S T R I C T Promises Made, Promises Kept CONTINUED FROM FRONT PAGE 2010 Bond Key Highlights SUPERINTENDENT LARRY FRANCOIS In February 2010, the Northshore community continued their long tradition of support for their local 3 Major renovation projects at 2 secondary schools 3 23 Building Modernization Program projects at 10 schools 3 21 additional energy efficiency projects at 14 schools 3 Small works and code-related projects districtwide 3 Technology infrastructure updates to support classrooms/schools 3 Pop Keeney visitor bleacher replacement and district field upgrades 3 Planning for north/central enrollment growth and additional portable classrooms for temporary capacity public schools by passing a $149.2 million bond. In this issue of our Community magazine, we are proud to report on the progress we have made to use these resources wisely to protect our community’s investments in their public schools and create a supportive learning environment for tens of thousands of current and future students. Northshore parents entrust us with the education of their most precious possessions. And our community expects us to be good stewards of their tax dollars. We take both of these responsibilities seriously and work hard every day to deliver a world class education with efficiency and accountability. 2 “Projects from the 2010 bond are being completed on time and on budget. That’s a commitment we made to our community and one I’m proud to say we’re successfully honoring,” said Superintendent Larry Francois. The majority of the bond was used to complete Phase 2 of the renovation at Woodinville High School and Phase 3 of the renovation at Kenmore Junior High School. Building Modernization Program The second-largest component of the bond was used to complete projects as part of the district’s long-range Building Modernization Program and small works and code-related projects of $250,000 or less. Northshore has over 2 ½ million square feet of building and classroom space to maintain. More than 22,000 students, staff members, volunteers and parents utilize Northshore classrooms and buildings daily, which causes significant wear and tear over time. “Our facility strategy focuses on providing facilities that support the instructional program and provide a safe and comfortable environment,” said Evan Ujiiye, Capital Projects director. “We use a Building Modernization Program as part of our long-range facilities plan to protect While maintenance and modernization needs far outweigh what is reasonable to include in a bond measure, the district must address 200,000 square feet— equivalent to four elementary schools or one comprehensive high school— per fouryear bond election cycle to maintain status quo. 2 0 1 0 B O N D P R O J E C T S U P D A T E 2010 Bond Projects our community’s investment and extend the life of our facilities.” At sites where the facility layout meets instructional program needs, failing building system components such as roofing, heating and ventilation systems, mechanical systems, plumbing, lighting and flooring are replaced to extend the overall life of the school facility. It also provides an opportunity for the district to increase energy efficiency and reduce the carbon footprint of buildings. In comparison to 2005, the district has reduced natural gas consumption by 23 percent and electricity by 18 percent. The district works with outside consultants to review and rank all school buildings relative to their educational programs, physical condition and building systems. This information is used by the Capital Bond Planning Task Force to determine which projects will be recommended to the school board in future bond measures. Every four years, the district goes out for a bond to modernize buildings. It is also used by the district to schedule projects over the long term. Using 2010 bond funds to update heating and ventilation controls, systems can now be viewed remotely, reducing costs and increasing responsiveness to issues. Controls were updated for energy efficiency at Bear Creek, Canyon Creek, Crystal Springs, Lockwood and Shelton View elementary schools, and entire Woodinville High School Phase II $72 m Kenmore Junior High School Phase III $25 m Building Improvement Program Bear Creek Elementary School Canyon Creek Elementary School Cottage Lake Elementary School Crystal Springs Elementary School Hollywood Hill Elementary School Leota Junior High School Lockwood Elementary School Moorlands Elementary School Shelton View Elementary School Woodin Elementary School $19.8 m Additional projects through cost savings and state grants (leveraged by bond) $20 m Arrowhead Elementary School Bothell High School Crystal Springs Elementary School East Ridge Elementary School Hollywood Hill Elementary School Kenmore Elementary School Kenmore Junior High School Lockwood Elementary School Maywood Hills Elementary School Skyview Junior High School Sunrise Elementary School Wellington Elementary School Westhill Elementary School Woodmoor Elementary School Technology Infrastructure Districtwide Pop Keeney Stadium Renovation and District Field Projects Bothell High School tennis courts Inglemoor High School track $10 m $7 m Small Works and Code-Related Projects $6.5 m North End Enrollment Growth $4.5 m Administrative Costs $4.4 m Total $149.2 m CONTINUED ON PAGE 6 3 N O R T H S H O R E S C H O O L D I S T R I C T Kenmore Junior High School Phase 3 Quick Facts Architect: NAC General Contractor: Korsmo Cost: $25 million Completion Date: Winter 2012 Project Size: 47,800 sq. ft. Project: Construction of an 18-classroom instructional wing, commons/cafeteria, kitchen and music and CTE classrooms. Energy Efficiency: Uses 25% less energy than state energy code Jobs created: 50 over three years THE CAFETERIA/COMMONS AND KITCHEN WERE REBUILT ON THE SOUTH SIDE OF THE CAMPUS ALONG WITH NEWLY CONSTRUCTED MUSIC AND CTE CLASSROOMS. The Phase 3 construction project at Kenmore Junior High School funded by the 2010 bond renovated a substantial portion of the half-acentury-old campus. The $25 million dollar project was completed ontime and on-budget. Fifty jobs were created over the three years of the project. The single-story classrooms located on the south side of the campus were MUSIC AND SHOP AREAS 4 demolished and a two-story academic wing with 18 classrooms was built on the north side of the campus where the old cafeteria stood. Each classroom is equipped with updated technology including an interactive whiteboard and a sound system to support effective instruction. Wide interior hallways allow for easy passage between classes. A building housing the cafeteria/ commons, kitchen and music, choir and Career Technical Education (CTE) classrooms was constructed on the south side of the campus and serves as a student hub. Remodeled buildings were designed to optimize natural daylight and improve energy efficiency. The newly constructed buildings use 25 percent less energy than the current energy code and building heat loss is projected to be 12.5 percent better than the state code. Each dollar saved through energy efficiencies is a dollar the district can put back into the classroom. Phase 3 also included a new student drop-off/pickup area, improved field access and a revised bus drop-off area. The student courtyard was redone and lined with covered walkways. 2 0 1 0 B O N D P R O J E C T S U P D A T E Woodinville High School Phase 2 Quick Facts Architect: studio Meng Strazzara General Contractor: Cornerstone Cost: $72 million Completion Date: Winter 2012 Project Size: 148,200 sq. ft. Project: Construction of a three-story instructional wing. Replacement of theater, gym annex and performing arts classrooms. Energy Efficiency: Uses 42% less energy than state energy code Jobs created: 156 over three years THE THREE-STORY INSTRUCTIONAL WING HOUSES 37 GENERAL EDUCATION, NINE SCIENCE, THREE BUSINESS/COMPUTER AND ONE HEALTH OCCUPATIONS CLASSROOMS. The Phase 2 remodel at Woodinville High School included the replacement of aging classrooms spread across the campus in a “California style” design with a three-story instructional building housing 37 general, nine science, one health occupations and three business/computer classrooms and administration, counseling and student career services areas. Classrooms are larger and equipped with an interactive white board and a voice amplification system that improves instruction. and expand the scope of the project to replace the gym annex. The Phase 2 remodel project generated 156 construction jobs over the three years of the project. Ninety-eight percent of recycled building materials were used to complete the project and solar power panels were installed for increased energy efficiency. Energy use is 42 percent less than allowed by the state energy code and the projected heat loss of the buildings is 21 percent below the state code. The project also completed the soccer field restoration, traffic circulation improvements, frontage improvements and the installation of 602 additional school parking spaces. The old theater and music and performing arts classrooms were replaced with a performing arts building that holds a new 450seat theater and music and drama classrooms. The $72 million dollar project was completed on-time and under-budget, allowing the district to leverage the economic environment VIEW OF THE FRONT OF WOODINVILLE HIGH SCHOOL FROM THE UPPER PARKING LOT PHOTOS COURTESY OF DALE LONG, NW ARCHITECTURAL PHOTOGRAPHY 5 N O R T H S H O R E S C H O O L D I S T R I C T CONTINUED FROM PAGE 3 PROMISES MADE, PROMISES KEPT heating and ventilation systems were replaced at Canyon Creek, Crystal Springs and Shelton View elementary schools. Central gas boiler units are more energy efficient and contribute to quieter classrooms. Boilers were replaced at Cottage Lake and Moorlands elementary schools, and seismic upgrades were made to the front office at Crystal Springs Elementary School. Roofing was replaced at Canyon Creek and Crystal Springs elementary schools; windows were replaced at Bear Creek, Crystal Springs and Lockwood elementary schools; and flooring was replaced at Crystal Springs, Hollywood Hill and Shelton View elementary schools. Repairs were made to the covered walkways at Canyon Creek Elementary School, and improvements were also made to site and traffic circulation at Woodin Elementary School. Two projects, replacement of flooring at Bear Creek Elementary School and updates to the heating and ventilation system controls at Leota Junior High School, are tentatively scheduled for completion in 2014. State Grants Thanks to the passage of the 2010 bond, the district was able to leverage these bond dollars to apply for state job grants and secure an additional $11 million to invest back into Northshore schools. Northshore was awarded these grants based on increases in energy efficiency, local funding support through the bond and whether projects were shovel ready. These state grants are being supplemented by $9 million from a combination of funding from property Building Modernization Program Projects School Heating & Ventilation System Controls Updates Heating & Ventilation System Replacement Building Modernization Projects funded with 2010 bond Bear Creek 3 Canyon Creek 3 Windows (Glazing) Lockwood 3 3 3 3 3 3 3 3 3 3 3 2014* 3 3 Moorlands Shelton View Roofing 2014* 3 Hollywood Hill Leota JH Flooring/ Casework $19.8 million Cottage Lake Crystal Springs Boiler Replacement Other: Seismic Upgrades, Walkways, Site Circulation 3 3 3 3 Woodin 3 Energy Efficiency Projects completed or to be completed with bond-leveraged state job grants and overall cost savings Arrowhead 3 Bothell HS 100 Bldg. Summer ‘13 or ‘14 Crystal Springs Gym Summer ‘13 or ‘14 East Ridge 3 3 Hollywood Hill Summer ‘13 Kenmore 3 Kenmore JH Gym/Admin Lockwood Pods/Gym Maywood Hills Gym 3/Summer ‘13 or ‘14 3 2013 or 2014 3 2013* 2013* Skyview JH 3 Wellington 3 Westhill 6 2013* 2014* Sunrise Woodmoor * tentaively scheduled $20 million 3 3 Summer ‘13 or ‘14 2 0 1 0 B O N D P R O J E C T S sales, rental income revenue and cost savings on overall bond projects to support additional school projects. Eleven additional projects have been completed to date using these funds from grants and cost savings. The heating and ventilation system controls were updated at Lockwood Elementary School; heating and ventilation systems were replaced at Arrowhead and Kenmore elementary schools; windows were replaced at East Ridge, Lockwood and Wellington elementary schools; boilers were replaced at Westhill Elementary School and the Kenmore Junior High School gym; and roofing was replaced at Arrowhead, Sunrise (partial) and Wellington elementary schools. Ten additional energy efficiency projects are tentatively scheduled for completion in the next year: heating and ventilation system replacements at Bothell High School 100 bldg., Crystal Springs Elementary School gym, Lockwood Elementary School pods/gym, Maywood Hills Elementary School gym, and Hollywood Hill and Woodmoor elementary schools; boiler replacements at the Kenmore Junior High School administration building and Skyview Junior High School; and flooring and roofing replacements at the Maywood Hills Elementary School gym. The bond measure also funded small works projects under $250,000 and code-related projects. Over a dozen projects were completed for fencing, ADA (Americans with Disabilities Act) improvements, bathroom modifications, portable relocations to schools in the northern U P D A T E DISTRICT ENERGY SAVINGS ANNUAL UTILITY SAVINGS $117,699 /year ANNUAL ELECTRICAL CONSUMPTION SAVINGS 909,991 kWh/year Removing 120 GREENHOUSE GASES (CO2) CARBON MONOXIDE (CO) = 1,793,587 lbs /year 61 lbs /year NITROGEN OXIDES (NOX) SULFUR DIOXIDE (SO2) 2,064 lbs /year 646 lbs /year off our local roads + planting 245 acres of corridor, classroom modifications for instructional program changes (e.g. Bothell HS composites program and Inglemoor HS green design program), additional science rooms, audio/ visual systems improvements at Inglemoor High School, modifications for special needs students and portable upgrades. A portion of the bond was used to replace the field and visitor bleachers at Pop Keeney Stadium, which had reached the end of their useful life, and complete other district field projects. The tennis courts at Bothell High School and the track at Inglemoor High School were resurfaced. Baseball outfields at each of the high schools were also refurbished, redressed and reseeded. Energy Efficiency As the district renovates its buildings, energy efficiencies are made which will continue to provide a cost savings over the long term. Efficiency efforts include replacing outdated mechanical, heating, ventilation and air conditioning systems with newer more efficient models, replacing old windows and updating manual heating and ventilation system controls for remote management. Annual utility savings for the district is currently $117,699, which is equivalent to removing 120 vehicles from local roads and planting 245 acres of trees. These savings allow Northshore to put more operational dollars back into classrooms to support student learning. Technology Infrastructure Technology is an essential component of the modern-day classroom and instruction. Ten million dollars was used to support technology infrastructure to allow schools to better handle increased technology use and reduce school operational costs. All instructional spaces were outfitted with voice amplification and a portion of the bond was used to install instructional presentation tools such as interactive whiteboards and projectors. Northshore expanded the wireless network to cover all district buildings and classroom spaces, added higher speed connections to schools to handle increased network use, and updated firewalls, the Web filter and other network servers to handle faster network connections and more usage. The district also CONTINUED ON PAGE 8 7 N O R T H S H O R E S C H O O L D I S T R I C T CONTINUED FROM PAGE 7 PROMISES MADE, PROMISES KEPT built fiber optic connections to Timbercrest Junior High School and East Ridge Elementary School, which are currently leased, and made adjustments to improve performance at other schools—all for $1 million less that projected. District servers were modernized to a virtual server system and the 16-yearold telephone system was replaced with a network-based system that is more expandable and less expensive to maintain. It reduces costs for long-distance and fax services. Administrative software systems— fiscal, human resources, student, timekeeping—were also updated to improve reliability and save money. Enrollment Growth Enrollment in the north and central corridor of the district has grown substantially over the last several years and will continue as more houses are built. The district has implemented a variety of shortto mid-term solutions to manage this growth through boundary adjustments, program moves, in- and out-of-district waiver restrictions, but these schools are now at or nearing capacity. The bond also provided funding for necessary architectural and consulting services to design facilities to support projected growth. If the 2014 bond measure is approved by voters, the district will be ready to immediately begin construction of a fourth high school as a longer-term capacity solution for north end enrollment growth and to support grade reconfiguration. To help address this growth, the board used $2 million from the 2010 bond towards the total purchase price of 61 acres adjacent to Fernwood Elementary School as a potential future high school site. Due to the economic environment, the board was able to capitalize on lower property values and purchased the property in 2012 for much less than the asking price of a few years prior. Bond measures provide the critical funding needed to maintain Northshore schools over the long term. The 2010 bond measure allowed the district to complete two substantial secondary school renovation projects, Building Modernization Program projects at 21 district schools, numerous small capital projects, field renovations, technology infrastructure improvements and planning for north end enrollment growth. 8 “We are maintining our community’s investment in their public schools and assuring that students now and into the future will benefit from a well-supported learning environment that supports student achievement and success,” LARRY FRANCOIS, Superintendent ADDITIONAL INFORMATION www.nsd.org N E W H I G H S C H O O L & G R A D E R E C O N F I G U R A T I O N Update on District Planning for a New High School and Grade Reconfiguration District will announce community membership opportunities on task forces to plan for new high school and grade reconfiguration this spring. Proposed location for a north end high In October 2012 the school board voted to pursue funding school to address enrollment growth issues for the construction of a high school in the north end of the district to provide a longer-term solution to current N and projected enrollment growth and to reconfigure grade levels to a K-5 elementary, 6-8 middle school and 9-12 high 180th St. SE Wto provide greater E school model educational opportunities 184th SE for students. S The new high school will be the primary component of the 6 district’s 2014 bond measure, and if the bond measure passes, construction of the new high school would begin 193rd SE 23 196th SE 196th SE in the spring of 2014. The district would ideally open the Fernwood Elementary Schoool KENNARDS CORNER new high school and implement grade reconfiguration and associated boundary adjustments in fall 2017. 59th SE 51st SE 43rd SE d. Dam 208th SE Bea r 9 Wood in d. Jew ell R d. R ert Filb Lit t l e ville- 67th Ave. SE Snoh is R Gra Edmonds District Snohomis District nn 22nd SE 35th SE 19th Dr. SE Everett District 57th Ave SE 75th 35th SE 39th SE 132nd NE s l ee Wo od inv ill e-S noh o mis 120th Ave NE hR d. 75th SE 35th SE 31 st 23rd SE Samma 88th Ave. NE 14 148th Ave. NE 6th 124th Ave. NE 100 Woo Juan dinv itaille Way 84th Ave. NE NE r ive ve. hR th A mis 140 ma nd Sam -Redmo ville . NE th Ave 80th Ave. NE 83rd 73rd Ave . NE 68th Ave. NE 61st Ave. NE 19th Ave SE . NE 23rd Ave SE 101st Ave 104th NE Bothell Way NE 9th SE Meridian s d. R nds din Woo Juanita Dr. 1 31 o Sim Shoreline District 55th Ave. 62nd 5th W Locust Wa y 28th N 3rd SE 12th W 4th W d. Rd. ek R son C re Ma Communication ltb THRASHER’S yR CORNER d. Over the past three months, Superintendent Francois has 527 212th St. given nearly 70 presentations at PTA, staff and community 4 212th St. 212th SE meetings to educate families, staff and community on theCANYON Canyon Creek Elementary Schoool PARK 220th St. 20 planning for a new high school and grade reconfiguration 19 44 Skyview Junior High School 99 224th and to gather feedback. A video of Superintendent 405 SW 228th at 228th Francois’ presentation is228th alsoSt.available online www.nsd.org/edtf. 232nd 11 15 237th 43 Public Participation Opportunities School Consolidation 240th SE The district has begun school The school board has not madeLoackdecision on whether 240th 96 planning for a new high522 wood R d . so that crews can begin construction work immediately school consolidation will be a part 9 of the district’s overall 31 if the 2014 bond measure passes. The 73 district will also plan for a new high school and grade reconfiguration. 6 195th 203rd 42 527 21 begin assembling various task forces (high school, middle There are a few elementary schools on the192nd east side 7of the NE 195th 5 13 202nd district with overall school enrollment in the 300s. Moving41 school, elementary, etc.) to start planning for grade Hollyhills NE 185th and theDrive transition process. Each task sixth-grade classes to middle school as part of grade d 186th r a 86 reconfiguration e B . force will include reconfiguration will further shrink enrollment at these 71 Blvd community/parent representatives. WOODINVILLE KENMORE Information about these task forces along with applications schools. The board is expected to make a decision on this 522 180th 175th St h Rive m isposted will be issue at the end of the school year or over the r on the district Web site, www.nsd.org, in Hwy 5summer. BOTHELL 22 LAKE mid-spring, included newsletters and 405 in district and school 173rd St W t 171st St. shared with local media. If the board votes to close A a small elementary school, 22 S any school consolidation 160th 72 H would be in conjunction NE 1 I Additional information47 is available on the district Web with the desired opening of a new high school, grade N NE 155th G site, www.nsd.org/edtf, or by calling the Communications reconfiguration and associated boundary adjustments in rd T 3 5 26 Department at 425.408.7670. the fall of 2017. 1 O 10 1 N NE 14 143 NE 145th St. Administration High Schools 9 P A R T N E R S H I P S Northshore Schools Foundation Provides Support for District Advanced Programs Schools foundation funding initiatives are helping students prepare for postsecondary success. To be competitive in today’s job market, students need to complete some type of postsecondary education which may mean attending college. Students who select to attend college are better prepared for the rigors of college-level work through their participation in advanced courses in high school. Northshore School District strives to increase the percentage of students completing Advanced Placement (AP), International Baccalaureate (IB) and College in the High School (CHS) courses to help increase students’ probability of success in college. The Northshore Schools Foundation provides funding to the district to help students meet the need to take higher level courses and be better prepared for college. The foundation, which supports programs and partnerships that enhance learning opportunities for all Northshore students, presented a $29,600 check to the district at the Jan. 22 school board meeting. A portion of the funds will be used to support advanced programs in Northshore schools. Woodinville and Inglemoor high schools have received $1,000 from the schools foundation to purchase textbooks that meet the needs of IB, AP and CHS precalculus and calculus classes at those schools. The funds will help increase the number of students able to complete and earn credits in advanced math in IB, AP and CHS as well as be prepared to place in advanced level math and/or engineering courses at a college or university. “We are honored to support Northshore’s commitment to expand advanced course work offerings for our students to challenge themselves,” stated Northshore Schools Foundation Executive Director Carmin Dalziel. “It is a priority for the Foundation to ensure that all students are supported in their personal educational path and our investment in advanced courses helps achieve that goal.” College in the High School (CHS) provides college-level academic courses in high school for qualified high school students and gives them an opportunity to get a jumpstart on their postsecondary education by offering college credit. These credits are offered without a cost to the student’s family. Northshore is piloting a new University of Washington (UW) CHS Neurobiology and Addiction science course at Bothell High School and the $5,000 funding from the schools foundation will cover a portion of the costs of student books and workbooks as well as equipment and supplies. Students will fulfill a third lab science and earn 5 UW credits upon successful completion of the course. Science is a college entrance requirement for all four-year universities. The capacity to offer advanced math classes to more students has helped contribute to the district being named to the AP District Honor Roll for the third consecutive year. Northshore is one of only two school districts in Washington state and one of 42 in the nation to receive this honor three years in a row. Information on the Northshore Schools Foundation funding initiatives can be found online at www.NorthshoreSchoolsFoundation.org. 10 3 calendar C A L E N D A R 2 0 1 2 College Bound Scholarship Helps Students Attend College for FREE Eligible families are encouraged to sign their seventh- and/or eighthgraders up for the opportunity to receive free tuition and books at a state college or university. APRIL College Bound Scholarship is a unique opportunity for eligible seventhand eighth-graders to pursue higher education. The state College Bound Scholarship will cover the cost of tuition and books (at public college rates) and can be used to attend two- or four-year public colleges or universities, most independent four-year colleges or one of many private career or vocational schools in Washington. MAY Students are eligible if they meet one of the four income standards listed below: • Student is eligible for the federal free and reduced-price lunch program. • Student is currently in foster care or a dependent of the state (automatically eligible to apply). • Student’s family receives basic food/TANF benefits. • Student’s family meets income requirements. Students enroll by: • Completing an application. • Taking a pledge to graduate from high school with at least a 2.0 cumulative GPA and to demonstrate good citizenship. Students will receive the scholarship for free tuition at one of Washington’s community, technical or four-year colleges, including many private institutions, if they fulfill the pledge, are admitted to college, complete a Free Application for Federal Student Aid (FAFSA) and meet the income requirement. Parents, all you have to do is complete the application form with your child and return it to your child’s counselor by Friday, May 24. Forms are available from your child’s counselor or online at www.wsac.wa.gov/ PreparingForCollege/CollegeBound. Please contact your child’s counselor if you have any questions or the Communications Department at 425.408.7670. 12 15-19 2 0 1 3 TEACHER WORK DAY No School SPRING BREAK No School 27 28 MEMORIAL DAY No School TEACHER WORK DAY No School JUNE 19 - *LAST DAY OF SCHOOL Early Dismissal *Make-up days to be added to the end of the school year 2013 GRADUATIONS JUNE 10 NORTHSHORE NETWORKS 3 p.m. Northshore Performing Arts Center 18125 92nd Ave. N.E. Bothell, WA 98011 JUNE 12 BOTHELL HIGH SCHOOL 12 p.m. INGLEMOOR HIGH SCHOOL 3:30 p.m. Comcast Arena 2000 Hewitt Ave. Everett, WA 98021 SECONDARY ACADEMY FOR SUCCESS 7 p.m. WOODINVILLE HIGH SCHOOL 7 p.m. NON-DISCRIMINATION STATEMENT Northshore School District prohibits discrimination on the basis of age, sex, marital status, genetic information, sexual orientation including gender expression or identity, race, creed, religion, color, national origin, honorably discharged veteran or military status, or the presence of any sensory, mental, or physical disability or the use of a trained dog guide or service animal by a person with a disability, unless based upon a bona fide occupational qualification, in all its employment procedures, training, programs and activities and provides equal access to the Boy Scouts and other designated youth groups. The following employee has been designated to handle questions and complaints of alleged unlawful discrimination: Jeff Sherwood, Human Resources Director, 3330 Monte Villa Parkway, Bothell, WA 98021, (425) 408-7601. 11 NEXT EDITION: JUNE 2013 NON PROFIT U.S. POSTAGE PAID Permit #231 Seattle, WA UPCOMING BOARD MEETINGS: APR 9, 23 / MAY 14, 28 / JUN 11, 25 NORTHSHORE SCHOOL DISTRICT BOARD OF DIRECTORS Julia Lacey, District 1 Janet Quinn, District 2 Dawn McCravey, District 3 Sandy Hayes, District 4 Todd Banks, District 5 Larry Francois, Superintendent Administrative Center 3330 Monte Villa Pkwy. Bothell, WA 98021-8972 ECRWSS Residential Customer Email at: schoolboard@nsd.org superintendent@nsd.org WANT TO KNOW MORE ABOUT THE NORTHSHORE SCHOOL DISTRICT? Contact Communications 425.408.7670 / www.nsd.org This publication is produced by Northshore School District. Why are you receiving this newsletter? An estimated 70 percent of the residents within the school district do not have school-age children in Northshore schools. The purpose of Community, therefore, is to let those members of the community know about the programs and activities taking place in their Northshore School District. This publication is not mailed using an address list. Instead, to greatly reduce the cost of postage, we use a bulk mailing process that has it delivered to every residential customer on each letter carrier’s route. School Board Recognizes Efforts of Elementary Principals The Board of Directors recognized elementary principals for their efforts in implementing new elementary curriculum, developing SMART goals to accomplish board performance measures, and working in Network teams to support each other as instructional leaders. One of the hallmarks of a great school is a great principal. The Northshore School District is fortunate to have building leaders who exemplify the current professional standards as they work to serve their students, staff and communities with distinction. Strengthening Our L TO R, BACK ROW: TODD BANKS, SANDY HAYES, JANET QUINN, GARY KEELER, DOUG HALE, DIANE HUTCHISON, LEW DICKERT, BETHEL SANTOS, DAVID WELLINGTON, JEN BENSON, PAUL BODNAR, LARRY FRANCOIS. L TO R, FRONT ROW: JILL CRIVELLO, CATHI HACKETT, ANN MADSEN, JULIA LACEY. Those honored include Bill Bagnall, Scott Beebe, Jen Benson, Paul Bodnar, Jill Crivello, Anne Cullum, Lew Dickert, Shelley Habenicht, Cathi Hackett, Doug Hale, Jesse Harrison, Steve Hopkins, Diane Hutchison, Gary Keeler, Angela Kerr, Ann Madsen, Pete Misner, Brenda Naish, Annette McNabb, Bethel Santos, Donna Tyo and David Wellington. Community Through Excellence in Education