Welcome to Tom Willoughby. An award
winning contractor based in the heart of
Yorkshire.
Tom Willoughby has built a reputation for excellence in the construction and
refurbishment of auto dealerships. Having worked on some of the region’s most
prestigious projects we have received high praise from clients for quality and
value for money.
Our strength within this particular sector is down to our highly experienced
and competent management team who have established a reputation for their
professionalism and ability to meet and surpass client expectations.
Our expertise as an auto dealership contractor includes complete site and
building construction and all our staff are skilled in pre-construction and
estimating services, scheduling, quality control, and construction management.
It is this combined experience which ensures our projects are completed on
time and within budget.
Excellence in project delivery is what we strive for, but our commitment does
not stop there. We also offer a professional after sales service to ensure that
you achieve optimum performance throughout.
As well as being Constructionline registered, the company is an award winning
member of the Considerate Constructor Scheme, placing our performance in
the top 7.5% in the UK.
So if you’re building a new auto dealership or planning the renovation of an
existing facility then Tom Willoughby Ltd can ensure you get the right results, on
time and on budget.
4
5
case studies
Lookers Volkswagen Northallerton
This project undertaken for the renowned Lookers Group involved the
refurbishment and redesign of an extension to the existing showroom; achieving
a brighter more comfortable environment for customers.
The scope included the internal refurbishment of a new sales area and customer
lounge with new corporate lighting and feature signage. New external cladding
and associated mechanical and electrical improvements were also required.
The car parking and associated works were also included in scheme.
The project was carried out in a live environment and completed in 2012.
Value
£380,000
Duration
16 Weeks
Just a quick line to thank your team for completing Northallerton Volkswagen on time and to an excellent
standard of workmanship. It is a breath of fresh air to work with a contractor who has been so positive
and professional in all aspects of the project. Hope we work together again soon on another scheme.
Bill Ashcroft – Fletcher Smith Architects
Completed
2012
6
7
case studies
Lookers Volkswagen darlington
The brief in Darlington included the overhaul of the showroom with a full
refurbishment aimed at providing a contemporary, welcoming environment for
customers.
The project included the internal refurbishment of the new sales area and
customer lounge with new corporate lighting and feature signage. New
external cladding and associated mechanical and electrical improvements
were also required. Car parking and associated works also formed part of the
redevelopment.
The work was carried out in a live environment and completed in 2012.
Value
£370,000
Duration
12 Weeks
It is rare (in my experience) to be able to congratulate a contractor for their quality and performance in all
aspects of a contract, but the exception is this project. Well done and thanks to Tom Willoughby.
Andrew Murray – Volkswagen Project Manager
Completed
2012
8
9
case studies
Lookers Volkswagen blackburn
This prestigious new 17 car showroom comprised the erection of a new steel
frame extension on reinforced concrete foundations. Insulated profile steel
cladding was utilised for the external envelope incorporating powder coated
aluminium curtain walling, windows and doors.
Internally the existing showroom was fully refurbished to a very high standard in
line with the latest corporate identity. Alterations to the parts, consultation and
valet bays were also made.
The design and build scheme included full mechanical and electrical
improvement works which were carried out whilst maintaining services to the
adjacent workshop area which remained trading throughout the works.
Drawing on our experience of previous dealership refurbishment projects
ensured we achieved a high quality finish whilst delivering on time and on
budget.
Value
£700,000
Duration
18 Weeks
Completed
2013
10
Tom Willoughby proved to be an excellent partner with which to carry out our project. During a very
large refurbishment in cramped conditions they remained focused on our need to keep functioning as
a business at all times. Even through the most difficult of weather conditions they kept the site safe,
presentable and in full working order. The final product is beyond my expectations and the attention to
detail in the final phases of the project resulted in an excellent finish.
Jon Williams – Regional Brand Director (Lookers Volkswagen)
11
case studies
synter group volkswagen harrogate
An impressive redevelopment, this project included the construction of a first
floor mezzanine office extension and toilet facilities with the front of house area
redesigned in line with Synter Group’s new retail concept. In parallel the provision
of temporary accommodation for office and front of house staff was delivered.
The scheme was carried out over the winter months for completion and
trading early February. Working collaboratively with the client, Tom Willoughby
successfully delivered a design and build service creating a high quality car
showroom that reflected the latest corporate identity.
Value
£380,000
Duration
13 Weeks
I just wanted to thank you and your team for delivering our fantastic new showroom on time as
promised. The quality of work is second to none and we were more than impressed. I find your
attention to detail and professionalism outstanding. I have spoken to John Buchan regarding your
company’s standard of work and recommended you be considered for future developments. I also
have no problem recommending your company to other dealer groups that will no doubt be visiting
us to inspect the showroom and new retail concept.
Completed
2013
John Steele – Brand Manager (Sytner Volkswagen)
12
13
our group
Building Contracts up to £15 million
and Partnerships and Developments
throughout the North East.
Structural Steelwork, Architectural
Metalwork, Specialist Products.
As part of the FT Construction Group we
have the support and resources to deliver
outstanding results.
With our head office in Northallerton we undertake projects across the entire
region extending north towards the Scottish borders. These include project and
refurbishment works for the private and public sector together with measured
term contracts from our network of regional offices.
Our success has resulted in significant expansion and the company now has
offices in Catterick, York, Waddington, Weeton, Scarborough and Harrogate.
We directly employ 200 members of staff from the local communities in which
we work.
Materials are sourced locally wherever possible which not only helps us to
maintain a high standard but allows us to maintain our ethos of supporting our
local communities through employment opportunities and direct investment.
Private Developers and Property
Investment
Lookers Volkswagen Northallerton
14
15
TOM WILLOUGHBY LIMITED
STANDARD WAY, NORTHALLERTON, NORTH YORKSHIRE, DL6 2XE
TEL : 01609 772 062 – FAX: 01609 775 443 – EMAIL : contact@tomwilloughby.co.uk