System Development Map 2014

Transcription

System Development Map 2014
Import & Transmission Capacity
2014 (GWh/d)
FROM
FROM
FRn
FRn
230
270
FRs
255
FRs
395
FRt
FRt
GR
108
38
MT
MT
PL
0
PT
217
1.200
136
PT
164
51
RS
RS
0
140
RU
RU
SE
SI
2.288
120
103
SK
248
696
SI
UA
UA
TK
TK
468
AT BA BE BG CH CY CZ DEg DEn DK EE ES FI FRn FRs FRt GR HR HU IE
IT
LT LU LV MK MT NL PL PT RO RS RU SE
NJORD
FA R O E
ISLANDS
(DK)
UK
UK
494
66
KRISTIN
SI SK UA UK TK
FROM
Key
NATIONAL
PRODUCTION
00
Increase of capacity in the next 5 years
00
Decrease of capacity in the next 5 years
DEg
Den
market area GASPOOL
market area Net Connect Germany
FRn
FRs
FRt
BRENT
Tampen Link
Capacity figures are based on the ENTSOG Transmission Capacity Map 2014 (reference date 1 April 2014).
The increase or decrease of capacity in the next 5 years refers to the evolution towards 2019 capacities
as defined by the High Infrastructure Scenario in TYNDP 2015.
GRTgaz Nord
GRTgaz Sud
TIGF
MAGNUS
STATFJORD
MURCHINSON
SNORRE
TERN
SHETLANDS
ALGERIA
OUTER
HEBRIDES
of
drilling platform
LIBYA
KA
FU
St. Fergus
INNER
HEBRIDES
SLEIPNER
PIPER
FORTIES
BRITTANNIA
FUK
A
Ballylumford
Brighouse Bay
Holford
Kinsale Southwest
Bacton
NBP
BB
L
Humbly Grove
Maasvlakte
Gate Terminal
Rotterdam
Zevenaar
Zeebrugge
Dunkerque
Alveringem
nel
h Chan
Englis
Loenhout
BRUSSELS
Lille
Haanrade Düsseldorf
Bocholtz Broichweiden
Stolberg
‘s-Gravenvoeren
Bras
Lannion
Gournay-sur-Aronde
Caen
Brest
Petange
Saint-Clair-sur-Epte
PEG NORD
Saint-Illiers
Obergailbach
Medelsheim
Au
am Rhein
Cerville
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Montoir de Bretagne
2015
MO
NA
CO
Nantes
Soings-en-Sologne
Fallentor
Wallbach
Wolfersberg
Thayngen
Basel
Rodersdorf
La Rochelle
GWh/d
Bay of Biscay
El Ferrol
A Coruña
Pamplona
Sagunto
Ciudad Real
Sines
E
NE
y
rr
Valencia
Palma de Mallorca
Albacete
h
e
n
SARDINIA
ia
S
NOR
D ST
REA
M
a
TAP
Cagliari
Porto Botte
Granada
Motril
TOTAL SEASONAL INJECTION : 530.596 GWh
2.000
Tarifa
Strait of Gibraltar
26,07% FULL on 31/03/2015
94,36% FULL on 23/10/2014
4.707 GWh/d INJECTION on 25/05/2014
Almeria
Ceuta
0
GAZ
MED
Tangier
-2.000
ALGIERS
TOTAL SEASONAL WITHDRAWAL : 699.911 GWh
Skikda
-4.000
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
2014
Mar
Messina
Bursa
Karacabey
TURKEY
Tuz Gölu
Volos
Aegean
Sea
M
ED
Aksaray
Aksaray
Kahramanmaras
Nigde
Konya
Aliaga
GREECE
Ceyhan
Tarsus
Isparta
Izmir
Aliveri
Tarsus
Karaman
Burdur
Aydin
Sanandaj
Iskenderun
Icel
Denizli
Kirkuk
Antalya
Mugla
Agrigento
Megalopolis
Koudiet Eddraouch
TUNIS
Homs
EAST MED
M A LTA
LA VALETTA
NICOSIA
Malta LNG
GK
1-G
K4
GRE
EN S
TRE
AM
CYPRUS
Hadithah
BEYROUTH
Vassilikos
Cyprus Onshore LNG storage
C R E TA
DAMASCUS
EAST MED
TRANS-MEDITERRANEAN GAS PIPELINE
Levantine
Basin
Mediterranean Sea
TUNISIA
GA
ZO
DU
CE
NR
ICO
Hadera offshore
Tel Aviv
TAMAR
TRIPOLI
SCARAB
SAFFRON
ABU QIR N
ABU SIR
AKEN
BALTIM S
Damietta
KERSH
KAROUS
DARFEEL
Tobruk
10%
Benghazi
Alexandria
TAO
KAMOSE
THEKAH
G
EM
ne
eli
Pip
El Arish
Idku
i Gasline(AGP)
e
Trans-Sina
s Pipelin
Egypt Ga
Hassi Messaoud
P
AG
0%
CAIRO
LNG
AMMAN
ISRAEL
Port Said
5%
A’youn Moussa
Al Nasiriyah
Al Basrah
JORDAN
Abadan
KUWAIT
Eilat
Taba
Al ‘Aqabah
KUWAIT CITY
Marsa El Brega
CANARY ISLANDS
Mina al Ahmadi
Mina Abdulla
Santa Cruz de Tenerife
EU Supply Sources
Shares on the lowest & the highest demand days
40%
JERUSALEM
P)
(AG
line
ipe
as P
bG
Ara
Agadir
BALTIM E
ROSETTA
Misurata
Askhkelon
MARINE 1 and 2
BALTIM N
Marrakesh
45%
Ahwaz
MARI-B
Hassi R' Mel
ROSETTA
Libya
IRAQ
Haifa
TAMAR
15%
Algeria
BAGHDAD
LEBANON
APHRODITE
Yearly Supply
Norway
Esfahan
AGP
Tripoli
JUGURTA / MISKAR
MA
TT
EI
GG1-GG2
5
-GZ
GZ0
AZ
DG
ME
MOROCCO
Russia
Borujerd
AGP
25%
20%
Baiji
Baniyas
MA
GR
EB
-EU
RO
PE
GA
S(
ME
G)
Winter Supply
(01.10.2014 - 31.03.2015)
Kermanshah
SYRIA
Gela
Casablanca
Key
Qom
Kilis
Adana
Hatay
Revithoussa
Porto Empedocle LNG
Sanliurfa
Gaziantep
Manisa
Turgutlu
ATHENS
Mazara del Vallo
Beni Saf
ME
G
35%
NP
Adiyaman
Usak
Lamia
Halkida
Kayseri
Nevsehir
Afyonkarahisar
Thiva
ED
SM
AN
TR
TEHRAN
Kutahya
Larissa
Trikala
IRAN
Malatya
Kirsehir
Eskisehir
Canakkale
Elazig
Melilla
RABAT
EU Supply Sources
Seasonal & Yearly Supply Shares
Summer Supply
(01.04.2014 - 30.09.2014)
s
Van
Kirikkale
Oran
2015
30%
Ionian
Sea
Gioia Tauro
MEDG
AZ
40%
ro
Erzincan
Yozgat
ANKARA
Balikesir
Catanzaro
Medgas LNG
Arzew
-6.000
Sa
I
ST
Palermo
of
IG
EA
- SARDIN
4.000
Mediterranean Sea
Cartagena
Málaga
IA - ITALY
Cádiz
ALGERIA
6.000
Withdrawal max = 9.998 GWh/d
Injection max = 4.707 GWh/d
f
ul
ne
li
Pipe
EP
ITG
Highest withdrawal
Lowest stock level
Highest injection
Highest stock level
(GALSI)
Key
8.000
G
Katerini
Thesprotia
lian
Sivas
Kuzey Marmara
Gulf of Saros
Alexandroupolis LNG
Rasht
ato
s-An
Tran
Istanbul
Kipi
South Kavala
Thessaloniki
ALBANIA
Otranto
Alexandroupolis
Kavala
Agri
Tabriz
Cankiri
Marmara
Tekirdag Ereglisi
AZ.
Nakhchivan
Bazargan
Tokat
Sakarya
Komotini
Bayburt
Astara
Kapan
Amasya
Eregli
Xanthi
Aegean LNG
TAP
n
Murcia
Marismas
Drama
Nakchivan
Gümüshane
Goris
YEREVAN
Horasan
Kord Kui
Lachin
ARMENIA
Kars
Trabzon
Karabük
Edirne
o
eid
Huelva
9.998 GWh/d WITHDRAWAL on 05/02/2015
Alicante
Sidirokastron
Nea Messimvria
s
Po
Jaén
Petrich
Karperi
Fier
TAP
Taranto
e
Gyumri
KALIAKRA
Malkoclar
Kilkis
Fiere
offshore
San Foca
TIRRENICA PIPELINE
10.000
El Ruedo
Ihtiman
Kulata
Brindisi
Potenza
n
Stepanakert
Sinop
Srtandszha
Okarem
Sabirabad
A Z E R B A IAgdam
JAN
Vale
Artvin
Bartin
Stara Zagora
Galmaz
Sangachal SHAH
DENIZ
CP)
ne (S
ipeli
sus P
a
c
u
a
th C
Sou
Aghstafa
Rize
KAVARNA
Kirklareli
FYROM
Cordoba
Sevilla
BULGARIA
Kyustendil
TIRANA
Napoli
IBIZA
GWh/d
Zidilovo
Grottole-Ferrandian
MALLORCA
Las Barreras
Dupnitsa
Fiume Treste
Bari
MENORCA
Black Sea
Burgas
SKOPJE
T
AGRI
Hazar
Mingachevir
Akhaltsikhe
Kobuleti
Samsun
Campobasso
Olbia
DOMINO
ITB
Balearic
Sea
Castellón
de la Plana
Varna
GALATA
SOFIA
U N M I Pristina
KOSOVO
PODGORICA
IAP
Badajoz
Ruse
Chiren
Dimitrovgrad
P
S PA I N
Castor
LUCEAFARUL
Pleven
Niš
MONTENEGRO
P
IA
Cuenca
WHITE STREAM
(option 1)
TBILISI
Ordu Giresun
IA
a
Teruel
Toledo
Supsa
AGRI
Turkmenbashi
Garadag
Ismailly
Sheki
Kutaisi
Kulevi (Poti)
DOINA
ANA
Negru Voda W
HI
Kardam
(opTE ST
tio REA
n1 M
)
Dobrich
Kozloduy Oryahovo
SERBIA
WHITE STREAM
(option 2)
EAM
STR
ITE ion 2)
H
W opt
(
Constanța
Silistra
Zaječar
COBALCESCU
LEBADA
Ploče
L’Aquila
ROME
Balaceanca
Zugdidi
e
elin
Pip
Tra
BAKU
GEORGIA
Sukhumi
BUCHAREST
Giurgiu
e
MS-ATR
Campo Maior
Ajaccio
Tarragona
Urziceni
Ghercesti
S
Barcelona
Guadalajara
MADRID
Cellino
Sochi
an
spi
Ca
ns-
Siazan
Yalta
Sevastopol
Podisor
Horezu
Mehedinti
Zenica
Mostar
c
CORSICA
Yela
BELGRADE
Zvornik
Posušje
Imotski
ti
Lleida
VIP IBERICO
Split
Dzhubga
Banatski Dvor
Kiseljac
a
Setubal
EU Storage / Injection / Withdrawal
Seasonal Profile / GWh/d
Bastia
Piombino
Palazzo Moroni
Perugia
PSV
Simferopol
Isaccea
ROMANIA
Hateg
SARAJEVO
E
2015
Rio Marina
Ávila
Cáceres
Rosignano
offshore
Sibiu
Balkanabat
Derbent
Novorossiysk
Orlovka
G.Vakuf
ri
Segovia
Gulf of
Lion
Cetatea de Balta
ASHGABAT
Caspian Sea
Hlibovske
Mediaș
Knin
Benkovac
Ancona
Porto Recanati
offshore
Livorno
Horia
Arad
Makhachkala
Severo-Stavropolskoye 2
Chernomorsk
ODESSA SHTORMOV KRYM
Nades-Prod-Seleus
Bilciuresti
Loznica
Severo-Stavropolskoye 1
GOLITSYNO
Novi Sad
Brod
Derventa Modrica
Krasnodarskoye
STREIKOV
Onesti
Coroi
EE
2014
Cumulative curve
Pinasses
Zaragoza
Ligurian
Sea
Toulon
Banja Luka
d
Salamanca
Guarda
LISBON
Mar
Figueras
Falconara Marittima LNG
OLT Offshore LNG Toscana
Bos. Krupa
Travnik
Zadar
LIN
PE
Feb
Le Perthus
Huesca
San Marino
I
A P
Jan
AND.
Cotignola & San Potito
S.M.
Sotin Bačko Novo Selo
Bekdash
Sea of Azov
Yuzhnyi
Odesa
Kaushany
Tirgu-Mures
Osijek
BOSNIA
HERZEGOVINA
Gospič
Firenze
Marseille
Bihač
Bologna
I TA LY
Panigaglia
Cazin
Tržac
Pula
Ravenna
C YR E N
Dec
Fos Faster
Fos Tonkin Fos
Cavaou
Nice
Minerbio
Vel. Kladusa
Grebenyky
KERCH
Csanadpalota
Zsana-Nord
Slobodnica
T U R K M E N I S TA N
CHISINAU
Sarmasel
Subotica Kiskundorozsma
Sombor
Donji Miholac
Benicanci
C R O AT I A
Krk
Ungheni
Satu Mare
Varosföld
Dravaszerdahely
Grubisno Polje
A
Cantanhede
Manosque
Cruzy (Hérault)
Logroño
Burgos
Soria
Bucelas
Nov
PEG TIGF
VIP PIRINEOS Larrau
Celorico
Mangualde
Carriço
Genova
Toulouse
Pau
Valladolid
Zamora
-30.000
Oct
Palencia
Lussagnet
Vodnjan
MOLDOVA
Szöreg-1
MGP
Kuschevskoye
Moldova North
Iaşi
HUNGARY
Lučko
Omisalj
Tekovo
Vecsés
Siófok
Karlovac
Rijeka
Krk
Beregovo
Beregdaróc
Kardoskút-Pusztaszolos
RE
Fuentes de Onõro
Lacq
Irun
Umag
Cavarzere
Porto Levante
Cortemaggiore
Serrablo
PORTUGAL
Sep
S.Sebastián
Vitoria
Carriço
Aug
Biriatou
Leon
Vale de Frades
L’ADOUR
ARTERE DE
Porto
Viro
Rostov-na-donu
Anan’iv
Hajdúszoboszló
Adony
Okoli
TIC
RIA
-20.000
Izaute
Sabbioncello
Uzhgorod
BUDAPEST
Százhalombatta
Ercsi
ZAGREB
Platovo
Oleksiivka
Budince
Vel’ké
Kapušany
Vel’ké Kapušany
Csepel
Prokhorovka
Donetsk
Mediesu Aurit
LJUBLJANA
Trieste
Dashavske
Bohorodchanske
Ivánka Pri Nitre
Vel'ké Zlievce
Pusztaederics
v
Astrakhan
UKRAINE
Košice
BRATISLAVA
Rogatec
SLOVENIA
Zaule LNG
Venezia
Bordolano
CY
FROM
TO
-10.000
Bilbao
Gorizia
Ripalta
Torino
Bilbao
Ourense
Valença do Minho
Sergnano
Gaviota
Pontevedra
Sempeter
AD
S U P P LY
0
Santander
Vel’ké
Zlievce
Győr
Cersak
Uherske (XIV-XV)
Lviv
Bilche-Volytsko-Uherske
Balassagyarmat
Collalto
Trento
Milano
Grenoble
PIR-MIDI
GAVIOTA
Lugo
Tuy
Brugherio
Láb*
Mosonmagyarovar
Murfeld
Tarvisio
Cornegliano
Tersanne
Musel / Gijon
10.000
Jul
Passo Gries
Hauterives
Nitra
Láb
Kittsee
Weitendorf
II
TAG
TAG
I
BizzaroneSettala
Bordeaux
Oviedo
Jun
Jura
Klagenfurt
Arnoldstein
Drozdwicze
Gazli
Verhunske
Proletarske
Ivano-Frankivsk
Jablonov
Nad Turňou
Zvolen
Graz
Griespass
Castillon
(Dordogne)
Mugardos
Nussdorf/Zagling
Oparske
Jaroslaw
Drozdovychi
Rzeszow
Poprad
Žilina
CEGH
AUSTRIA
Haidach*
Breitbrunn
Innsbruck
Husow
Strachocina
Aigelsbrunn
Lyon
MIDCAT
20.000
RUSSIA
NATIONAL PRODUCTION
DEMAND
UGS INJECTION
EXPORTS
Geneva
PEG SUD
7 Fields
Kufstein
SWITZERLAND
Etrez
MI
DC
AT
UGS WITHDRAWAL
LNG
LIBYA
ALGERIA
NORWAY
Le Verdon-sur-Mer
Kiefersfelden
Puchkirchen
Lanžhot
Baumgarten
VIENNA
Thann
Salzburg
Pogórska Wola
Skoczów
L
SO
30.000
FRANCE
Pfronten
LIECHT.
BERN
Linz Schönkirchen / Reyersdorf
t
es
W
Inzenham
Leiblach
Zürich
Volgograd
Kehychivske
Cherkasy
SLOVAKIA
Tvrdonice
Reinthal
Tallesbrunn
Haidach USP
Inzenham-West
Lindau
Dolni Dunajovice
WAG
G
Oltingue
Kharkiv
Solokhivske
HOOD
BROTHER
Hermanowice
Uhřice
HA
LIAISON NORD-SUD
Oberkappel
Swarzow
Tworzeń
Oświęcim
STORK
Dolni Bojanovice
České Budějovice
Haiming 2-F
Haiming 2-RAGES
Überackern
Überackern 2
MONACO
I
München
Wolfersberg
Fronhofen-Trigonodus
Alsace Sud
Céré-la-Ronde
EUROPEAN SUPPLY
Bierwang
Schmidthausen
Chémery
Cieszyn
Brzeznica
Lobodice
Brno
AL
II
STORK II
Třanovice
BACI
2014
Mar
Katowice
M
GALSI
Jul
Hradec Králové
Stuttgart
EG
Sokhranovka
Volgogradskoye
Štramberk
TE
Orleans
KIEV
U Z B E K I S TA N
Serebryanka
Pisarevka
Krasnopopivske
VOB
Leonberg
NP
Dierrey-Saint-Julien
Valuyki
Wronów
VTP-GAZ-SYSTEM
C Z E C H R E P.
Háje
Plzeň
MEGAL
VHP NCG
Karlsruhe
Chervonopartyzanske
Wroclaw
PRAGUE
Waidhaus
Sandhausen
D
AL
ZW
RD AR
NO HW NG
SC EITU
L
Beynes Supérieur
Le Mans
NP
L
Trois Fontaines
Saint-Arnoult
des Bois
Lampertheim
TE
Olyshivske
Hora Svaté Kateriny
Brandov
Deutschneudorf
Eschenfelden
MEGAL
Frankenthal
Germigny-sous-Coulombs
GA
PARIS
GERMANY
Stepnovskoye 2
Belgorod
Wierzchowice
Olbernhau
Hähnlein
Gernsheim
Remich
LUX.
Beynes Profond
Jun
Bad Lauchstädt
Reckrod
Stockstadt
Mozyr
Pribugskoye
Odolanów
Aral
Sea
Stepnovskoye 1
Sudzha
Mozyrskoye
Kobryn
WARSAW
Jeleniów
LUX.
Wysokoje
Rembelszczyzna
Gubin
Lasów
Bozoi
K A Z A K H S TA N
Kondratki
EuRoPoL
Poznan
Pogar
Lodz
Reckrod
Le Havre
Saratov
Osipovskoye
L
Po
Ro
Eu
Rüdersdorf
BRETELLA
Blaregnies
Talovskoie
BELARUS
EuRoPoL
Leipzig
Kirchheiligen
Akshabulak
AL
YAM
Peschano-Umetskoye
Wloclawek
Lwòwek
Guben
Bernburg
Kassel
Eynatten
B E L G I U MRaeren/Lichtenbusch
Quévy
Taisnières
Cherbourg
Obbicht
Dilsen
Kotlovka
Tietierowka
Mogilno
Mallnow
Kienbaum
Buchholz
Katharina
VILNIUS
PL
GI
POLAND
Berlin
Essen Dortmund
Poppel
ZTP-H
Hannover
Stassfurt
Tegelen
Zandvliet
Yelshano-Kurdyumskoye 2
Orel
VHP-GASPOOL
Empelde
Yelshano-Kurdyumskoye 1
Šakiai Kaunas
Szczecin
BERLIN
Münster
Penza
Uvyazovskoye
Orsha
MINSK
Ahlten
Rehden
Drohne
Epe*
ME
Atlantic Ocean
Zelzate
Emsbüren
Xanten
Hilvarenbeek
Peckensen
Steinitz
Rehden
Uelsen
Winterswijk
Bremen-Lesum
L
NE
Nordlohne
Enschede
TTF
G
RH
Kasimovskoye
Kaluzhskoye
Visaginas
Płoty
Kraak
Wardenburg
Oldenburg
Kalle
AMSTERDAM
ISLES OF
S C I L LY
6.217 GWh/d on 03/08/2014
5.000
Vlieghuis
T H E N E T H E R Alkmaar
LANDS
ZBG
Isle of Portland
Bunde
Bunder-Tief
Norg
NP
10.000
Zuidwending I
Julianadorp
Bergermeer
TE
15.000
Oude Statenzijl
Panevėžys
Möckow Kamminke
OPAL
20.000
Balgzand
Aqtobe
RUSSIA
Gdansk
Niechorze
Świnoujście
NEL
Michailovskoye
Jauniunai
Kaliningrad
Sovkhoznoye
Kiryushkinskoye
Samara
MOSCOW
Rezekne
LITHUANIA
Kaliningradskoye
Musinskoye
Daugavpils
Syderiai
Kosakowo
Harsefeld
Amanakskoye
Dmitrievskoye
Jurbarkas
L
21.912 GWh/d on 05/02/2015
Isle of Grain
Huntorf-L
Grijpskerk
KKP
PIPE
Quarnstedt
Hamburg
Etzel*
MIDA
25.000
LONDON
W
GT
Klaipéda LNG
Greifswald
Dornum
Krummhörn
Groningen Emden
NGT
Schelkovskoye
L AT V I A
Siauliai
Baltic Sea
Kiel-Rönne
Nüttermoor
LEMAN
Cardiff
nnel
Cha
tol
Bris
Trelleborg
Ellund
Kantchurinskoye
v
L
2.827.146 GWh
21.912 GWh/d
DEMAND
30.000
GALLION
KINSALE HEAD
SEVEN HEADS
EU Daily gas demand profile
Seasonal Profile / GWh/d
GWh/d
LOG
GS
Bednodemyanovskoye
Kieménai
v
OPA
EU Oct 2014 - Mar 2015 (Winter)
EU Max. Day
(05/02/2015)
Milford Haven
South Hook LNG
Dragon LNG
Inch
Avedore
Izborsk
Iecava
Kuršėnai
EAM
D STR
NOR
Dragør
BAL
TIC
A6
1.552.208 GWh
6.217 GWh/d
Cork
U N I T E D Birmingham
K I N G D O M Warwick
Malmö
Stenlille
AUDREY
HEWETT
TOR
INTERCONNEC
EU Apr 2014 - Sep 2014 (Summer)
EU Min. Day
(03/08/2014)
4.253.173 GWh
Theddlethorpe
Saltfleetby
COPENHAGEN
Fredericia
Nikolskiy
Inčukalns
Riga
Liepaja
Egtved
Misso
RIGA
Rough
METHYS
Hill Top Farm
Shannon LNG
Waterford
ROUGH
Easington
Hole House Farm
King Street
MARKHAM
Skallen
ELLE
IBP
W. SOLE
Halmstad
AN
DEUD
EUROPEAN DEMAND
Point of Ayr
Limerick
Aldbrough
Manchester
Gulf of
Riga
Korneti
GAZ
DUBLIN
Nizhny Novgorod
Pskov
Värska
Karksi
Varberg
DENMARK
Nybro
F3
Gnosjö
Gislaved
Pe
nt
a
Galway
Hornsea
Hatfield Moor
Leeds
MURDOCH
JönKöping
Göteborg
Kazan
Cheboksary
Pärnu
GTF
DA
L
Loughshinny
Preesall
Irish
Sea
TYRA
WE
Gormanston
Barrow
NPTF
PE
OPI
EUR
E
RPIP
NO
IN
TE
RC
ON
NE
CT
OR
1
ISLE OF MAN
SYD
ARNE
II
EUROPIPE
C
NE
ON
RC
E
T
IN
IRELAND
Outlook for the next 5 years
R2
TO
Teesside
SEAL
LNG STORAGE
Belfast
Bellanaboy
Lille Torup
HOD
Nevskoye
Yaroslavl
TAG
Twynholm
NOGAT
TS
CA
Cluden
IP
Aalborg
VALHALL
Gatchinskoye
ESTONIA
Vallby Kile
Göteborg LNG
Karashurskoye 2 (Udmurd Complex)
Narva
Stenungsund
Hirtshals
LULITA
HARALD
FRAN
PIPE
ZEEP
IPE
SN
FULMAR
LA
NG
EL
ED
SO
UT
H
SEA
L
Moffat
Stublach
EU Total 2014
ULA
EKOFISK
Islandmagee
CORRIB
Small scale LNG liquefaction plant
Under construction or Planned
multiple storage facilities
operated by different SSOs
Edinburgh
Kustanay
Karashurskoye 1 (Udmurd Complex)
TALLINN
Paldiski
Brunnsviksholmen
(Nynäshamn)
Udmurt - Novotroitskoie
RUSSIA
CIS
St. Petersburg
and
Finl
f of
Gul
Muuga
BALTIC CONNECTOR
STOCKHOLM
/ LNG
Ora
(Fredrikstad)
ak
rr
e
ag
Sk
GYDA
Londonderry
/ Derry
LNG Export Terminal
Under construction or Planned
Gas storage projects
Glasgow
Ch
an
ne
l
LNG
LNG Import Terminal
Under construction or Planned
Unknown
May
Rafnes
at
eg
tt
Ka
Cross-Border third country import/export
Under construction or Planned
Other type
Apr
Joddbole
EUROPIPE II
No
rt
h
ELGIN
FRANKLIN
Kotka
Primorsk
Hanko
Lysekil
STATPIPE
Depleted (Gas) field
on shore / offshore
May
Haugesund
Karmøy
Kårstø
Skangass
Risavika
EI
EUROPIP
Cross-Border Europe
Under construction or Planned
Salt cavity - cavern
North
Sea
UGS
Mäntsälä
HELSINKI Tolkkinen
Stavanger
DRAUPNER
Vyborg
Espoo
Lohja
NELSON
Third country cross-border interconnection point
Acquifer
Apr
OSLO
Kirov
Kouvola
Turku
Pansio LNG
Imatra
Lappeenranta
Lahti
Hameenlinna
EVEREST
Gas storage facilities
Nokia
Kollsnes
C
NER
SLEIP
ASTANA
Tampere
Bergen
E IIA
PIP
E
E
Z
IIB
Bygnes
IPE
P
E
IPE
P
E
T
A
Z ST
ATE
ENS
OND
MILLER
FINLAND
Kyroskoski
Pori
HEIMDAL
JOTUN
BERYL
D
RLE
STE
E
V
SAGE
Se
a
Small scale LNG liquefaction plant
P
NLG
GS
FLA
th
e
LNG Export Terminal
gas field
SWEDEN
Yekaterinburg
Petrozavodsk
AGP
Gas Reserve areas
Bereznikovskoye
OGT
NORWAY
LNG Terminals’ entry point
intro transmission system
project
Nyhamna
AGP
36” and over
H
RT
O
N
N O R WAY
PIPE
STAT
Cross-border interconnection point
with third country (import/export)
24” to 36”
Trondheim
Pori LNG
STATPIPE
under 24”
OSEBERG
He
br
id
es
Transport by pipeline
Tjeldbergodden
HULDRA
VESLEFRIKK
BRAGE
TROLL
TOGI
TUNE
RUSSIA
Cross-border interconnection point
within Europe
Pavlodar
Arab G
as Pipe
line (A
GP)
Intra-country or intra balancing zone points
Other Countries
Omsk
HEATHER
ALWYN
ENTSOG Observers
DRAUGEN T
ORMEN LANGE
ED
EL
G
N
LA
VISUND
KVITEBJØRN
GULLFAKS
HALTENPIPE
TK
TK
0
0
HELDRUN
ASGARD
SK
SK
White Sea
Tornio Manga LNG
SI
0
808
NORNE
SE
SE
28
UK
1.727 1.441
RU
RU
UA
UK
RS
73
SI
Khanty
RO
RS
109
Punginskoye
Port Vitino
PT
RO
178
0
PL
PL
119
RO
1.125
Shatrovskoye
NL
NL
PT
Novosibirsk
MT
175 163
28
ICELAND
MK
MT
PL
Pomorskiy
Strait
Murmansk
LV
MK
339
MURMAN
LU
REYKJAVIK
LV
Salekhard
Barents
Sea
KILDIN N
LT
62
20
NL
959
Hammerfest
IT
LU
62
ALBATROSS
IE
0
39
LV
MK
408
IT
627
Pechora Sea
MELKØYA
HU
0
342
LT
MK
NL
3
IE
1.140
ASKELADD
HR
53
HU
129
Data keys
Trading Points / Market Areas
76
SHTOKMAN
SNØHVIT
GR
61
HR
HU
GAMMA
TANA
P
200
UA
ENTSOG Member Countries
Etzel*
567
170
DZ LNG NO LY BY RU UA
ENTSOG Associated Partner
0
870
LU
SK
Map points
FI
LT
323
ES
60
FI
IT
350
0
KEYS
Countries
165
IE
1.093 591
EE
70
AGP
0
IE
SE
* If a storage facility is connected to a transmission system in a different country from where it is located, the respective storage capacity is included under the country
to which the storage is connected.
DK
NO
RT
HE
RN
LIG
HT
S
TO
599
RO
All data provided in the map are for information purposes and shall be treated as indicative only.
Under no circumstances shall they be regarded as data for commercial use.
DK
HR
LU
The Country Profiles present transmission capacities between countries (after application of the Lesser-of-rule), storage & LNG capacities according to the
interconnection to the country's transmission system* and installed gas-fired power generation capacity, and the capacity outlook for the next 5 years. The gas
production reflects the maximum deliverability achieved. The demand data represent actual country demand for the respective days/periods.
0
ES
GR
150
HU
gie@gie.eu
www.gie.eu
11
DEn
1.214
FRs
HR
info@entsog.eu
www.entsog.eu
4
FRt
GR
LV
DEn
EE
FRn
570
FRt
T +32 2 209 05 00
F +32 2 209 05 01
322
FI
249
410
T +32 2 894 51 00
F +32 2 894 51 01
904
DEg
366 935
ES
710 1.915
FRs
LT
29
EE
46
370
Avenue de Cortenbergh 100
1000 Brussels - BELGIUM
36
AM
0
FRn
Avenue de Cortenbergh 100
1000 Brussels - BELGIUM
0
DEg
DK
FI
IT
163
219
CZ
530
STRE
ES
444
1.350
BLUE
DEn
CZ
TRAN
S-B
PIPELALKAN
INE
755
CY
IBR
DEn
130
Kara Sea
CH
13
CY
DEg
1.776
223
BG
0
IGB
552
605
0
ia
CZ
CH
781
n
CZ
0
LUDLOV
th
CY
BG
BE
630
1.146
o
CY
158 342
B
CH
BA
18
f
CH
AT
o
BG
EE
The respective data are based on the TYNDP 2015, GSE 2014 Storage Map, GLE 2014 LNG Map and ENTSO-E SO&AF 2014-2030 (unless respective ENTSOG members
provided their own data). The 2014 historical data on demand & supply, incl. the winter 2014-2015, are based on data from the TSOs and GSE AGSI and AGSI+ Platforms.
BE
BG
DEg
0
BE
464
DK
The System Development Map 2014 presents existing infrastructure & capacity and planned infrastructure and capacity outlook from the perspective of the year 2014.
BA
1.612
lf
461
192
u
BA
SI SK UA UK TK
G
BA
366
AT
LT LU LV MK MT NL PL PT RO RS RU SE
TR
AN
SP
OR
T
AT
IT
ASG
ARD
AT
BE
SYSTEM DEVELOPMENT MAP
2014
AT BA BE BG CH CY CZ DEg DEn DK EE ES FI FRn FRs FRt GR HR HU IE
TO
DZ LNG NO LY BY RU UA
Persian
Gulf
Las Palmas
Arico-Granadilla LNG
(Tenerife)
Arinaga LNG
(Gran Canaria)
Kangan
Sharm el-Sheikh
35%
Key
Min. Day
Max. Day
Laayoune
30%
Ras Tannurah
SOUTH PARS / NORTH DOME
25%
Dhahran
ALGERIA
20%
L I B YA
EGYPT
Abqaiq
SAUDI ARABIA
MANAMAH
Dukhan
15%
Ras Laffan
Q ATA R
DOHA
Umm Bab
Red
Sea
10%
WESTERN
SAHARA
5%
0%
BAHRAIN
NP
Russia
Norway
Algeria
Libya
LNG
ABQAIQ - YANBU
Jebel D hanna
MALI
Yanbu
UAE
UGS
on the minimum demand date UGS is not a part of
the supply but of the demand due to the filling of storages
EU Supply Sources
Minimum and Maximum use of import capacity (GWh/d)
22.000
M AU R I TA N I A
Umm Sa’id
RIYADH
AUSTRIA
Total 2014
1 Jan 2014 to 31 Dec 2014
BELGIUM
BOSNIA-HERZ.
BULGARIA
CROATIA
CZECH REPUBLIC
DENMARK
ESTONIA
FINLAND
FRANCE
FYROM
GERMANY
GREECE
HUNGARY
IRELAND
ITALY
LATVIA
LITHUANIA
LUXEMBURG
NETHERLANDS
POLAND
PORTUGAL
ROMANIA
SERBIA
SLOVAKIA
SLOVENIA
SPAIN
SWEDEN
SWITZERLAND
UNITED KINGDOM
Summer
1 Apr 2014 to 30 Sep 2014
Winter
1 Oct 2014 to 31 Mar 2015
17.000
Key
Min. Flow
Max. Flow
STORAGE
12.000
Capacity
LNG
Deliverability
Injection
WGV
579 GWh/d
484 GWh/d
48.752 GWh
Deliverability
Injection
WGV
Send-out
- GWh/d
Send-out
Storage
- GWh
Storage
170 GWh/d
88 GWh/d
7.755 GWh
461 GWh/d
2.516 GWh
Deliverability
Injection
WGV
- GWh/d
- GWh/d
- GWh
Deliverability
Injection
WGV
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
Storage
- GWh
Storage
- GWh
Storage
- GWh
Storage
- GWh
Storage
Maximum
Production
- GWh/d
Maximum
Production
7 GWh/d
Maximum
Production
Maximum
Production
6 GWh/d
Maximum
Production
Installed
gas-fired
capacity
- MWe
Installed
gas-fired
capacity
38 GWh/d
36 GWh/d
6.154 GWh
Deliverability
Injection
WGV
63 GWh/d
42 GWh/d
6.083 GWh
Deliverability
Injection
WGV
532 GWh/d
369 GWh/d
32.131 GWh
Deliverability
Injection
WGV
Deliverability
Injection
WGV
0 GWh/d
0 GWh/d
0 GWh
Deliverability
Injection
WGV
0 GWh/d
0 GWh/d
0 GWh
3.817 GWh/d
Deliverability
1.770 GWh/d
Injection
142.615 GWh
WGV
Deliverability
Injection
WGV
- GWh/d
- GWh/d
- GWh
6.624 GWh/d
Deliverability
3.982 GWh/d
Injection
288.437 GWh
WGV
Deliverability
Injection
WGV
- GWh/d
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
1.032 GWh/d
Send-out
- GWh/d
Send-out
Send-out
164 GWh/d
Send-out
- GWh/d
Send-out
- GWh
Storage
- GWh
Storage
- GWh
Storage
6.421 GWh
Storage
- GWh
Storage
Storage
889 GWh
Storage
- GWh
Storage
Maximum
Production
- GWh/d
Maximum
Production
0 GWh/d
Maximum
Production
Maximum
Production
0 GWh/d
Maximum
Production
178 GWh/d
92 GWh/d
10.978 GWh
7.000
PRODUCTION
2.000
Maximum
Production
41 GWh/d
Maximum
Production
0 GWh/d
197 GWh/d
3.575 GWh
0 GWh/d
Maximum
Production
- GWh/d
Maximum
Production
Maximum
Production
2.684 GWh/d
28.460 MWe
Installed
gas-fired
capacity
4.830 MWe
Installed
gas-fired
capacity
4.330 MWe
Installed
gas-fired
capacity
3.750 MWe
Installed
gas-fired
capacity
44.910 MWe
Installed
gas-fired
capacity
1.030 MWe
Installed
gas-fired
capacity
1.843 MWe
Installed
gas-fired
capacity
Total 2014
Summer
Winter
1.252 GWh
215 GWh
1.110 GWh
Total 2014
Summer
Winter
822.995 GWh
300.674 GWh
554.682 GWh
Total 2014
Summer
Winter
31.603 GWh
13.357 GWh
17.600 GWh
Total 2014
Summer
Winter
86.772 GWh
25.546 GWh
65.773 GWh
Total 2014
Summer
Winter
47.018 GWh
21.562 GWh
25.807 GWh
Total 2014
Summer
Winter
679.205 GWh
237.850 GWh
441.355 GWh
Total 2014
Summer
Winter
15.058 GWh
4.379 GWh
9.276 GWh
Total 2014
Summer
Winter
26.677 GWh
9.734 GWh
16.149 GWh
Total 2014
Summer
Winter
Installed
gas-fired
capacity
Total 2014
Summer
Winter
345.619 GWh
132.742 GWh
228.016 GWh
Total 2014
Summer
Winter
84 GWh/d
Maximum
Production
213 GWh/d
2.666 GWh
- GWh/d
55 GWh/d
39 GWh/d
4.950 GWh
Deliverability
Injection
WGV
572 GWh/d
484 GWh/d
40.660 GWh
Deliverability
Injection
WGV
0 GWh/d
0 GWh/d
0 GWh
Deliverability
Injection
WGV
- GWh/d
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
- GWh
Storage
- GWh
Storage
- GWh
Storage
- GWh
Storage
Maximum
Production
- GWh/d
Maximum
Production
3 GWh/d
Maximum
Production
- GWh/d
Maximum
Production
Maximum
Production
156 GWh/d
Max. Day
(06/02/2015)
2.901 GWh/d
Max. Day
(09/01/2015)
12 GWh/d
Max. Day
(06/02/2015)
4.299 GWh/d
Max. Day
(08/01/2015)
194 GWh/d
Max. Day
(07/01/2015)
592 GWh/d
Max. Day
(02/02/2015)
204 GWh/d
Max. Day
(03/02/2015)
3.582 GWh/d
Max. Day
(23/01/2015)
105 GWh/d
Max. Day
(06/01/2015)
130 GWh/d
Max. Day
(06/02/2015)
63 GWh/d
Max. Day
(12/01/2015)
1.938 GWh/d
Max. Day
(01/12/2014)
696 GWh/d
Max. Day
(08/01/2015)
198 GWh/d
Max. Day
(08/01/2015)
Min. Day
(03/08/2014)
94 GWh/d
Min. Day
(09/08/2014)
236 GWh/d
Min. Day
(15/06/2014)
1 GWh/d
Min. Day
(05/07/2014)
41 GWh/d
Min. Day
(20/07/2014)
36 GWh/d
Min. Day
(09/08/2014)
75 GWh/d
Min. Day
(26/07/2014)
19 GWh/d
Min. Day
(06/05/2014)
2 GWh/d
Min. Day
(10/08/2014)
40 GWh/d
Min. Day
(03/08/2014)
410 GWh/d
Min. Day
(04/10/2014)
0 GWh/d
Min. Day
(25/05/2014)
1.188 GWh/d
Min. Day
(04/05/2014)
39 GWh/d
Min. Day
(28/05/2014)
36 GWh/d
Min. Day
(27/10/2014)
79 GWh/d
Min. Day
(15/08/2014)
700 GWh/d
Min. Day
(24/06/2014)
11 GWh/d
Min. Day
(12/08/2014)
35 GWh/d
Min. Day
(09/06/2014)
10 GWh/d
Min. Day
(27/07/2014)
504 GWh/d
Min. Day
(03/08/2014)
280 GWh/d
Min. Day
(20/04/2014)
69 GWh/d
385 GWh/d
EU Max. Day
NOUAKCHOTT
94 GWh/d
EU Min.
Day
EU Max. Day
EU Min. Day
916 GWh/d
240 GWh/d
EU Max. Day
EU Min. Day
7 GWh/d
2 GWh/d
EU Max. Day
EU Min. Day
106 GWh/d
46 GWh/d
EU Max. Day
EU Min. Day
112 GWh/d
37 GWh/d
EU Max. Day
EU Min. Day
452 GWh/d
79 GWh/d
EU Max. Day
EU Min. Day
185 GWh/d
22 GWh/d
EU Max. Day
EU Min. Day
25 GWh/d
10 GWh/d
EU Max. Day
EU Min. Day
122 GWh/d
51 GWh/d
EU Max. Day
EU Min. Day
2.854 GWh/d
410 GWh/d
EU Max. Day
EU Min. Day
9 GWh/d
1 GWh/d
EU Max. Day
EU Min. Day
4.290 GWh/d
1.365 GWh/d
EU Max. Day
EU Min. Day
70 GWh/d
69 GWh/d
EU Max. Day
EU Min. Day
495 GWh/d
97 GWh/d
EU Max. Day
EU Min. Day
190 GWh/d
88 GWh/d
EU Max. Day
EU Min. Day
3.515 GWh/d
861 GWh/d
EU Max. Day
EU Min. Day
80 GWh/d
20 GWh/d
EU Max. Day
EU Min. Day
98 GWh/d
41 GWh/d
EU Max. Day
EU Min. Day
61 GWh/d
11 GWh/d
EU Max. Day
EU Min. Day
1.902 GWh/d
515 GWh/d
EU Max. Day
EU Min. Day
642 GWh/d
280 GWh/d
EU Max. Day
EU Min. Day
151 GWh/d
84 GWh/d
157.367 GWh
63.211 GWh
96.665 GWh
Deliverability
Injection
WGV
Storage
Max. Day
(29/12/2014)
920 MWe
333 GWh/d
267 GWh/d
34.100 GWh
Send-out
78 GWh/d
10.895 GWh
3.686 GWh
7.881 GWh
20.060 MWe
Storage
Max. Day
(07/01/2015)
500 MWe
Installed
gas-fired
capacity
Send-out
- GWh
187 GWh/d
DEMAND
Installed
gas-fired
capacity
Maximum
Production
- GWh/d
Max. Day
(04/02/2015)
418.363 GWh
125.236 GWh
319.521 GWh
230 MWe
Send-out
S U D A Storage
N
452 GWh/d
5.800 MWe
Installed
gas-fired
capacity
18 GWh/d
436 GWh/d
Max. Day
(05/02/2015)
-13.000
Total 2014
Summer
Winter
Storage
123 GWh/d
20.896 GWh
7.852 GWh
14.624 GWh
32.543 GWh
12.371 GWh
19.159 GWh
Send-out
- GWh
Deliverability
Injection
WGV
Max. Day
(09/02/2015)
Total 2014
Summer
Winter
Total 2014
Summer
Winter
- GWh/d
Storage
86 GWh/d
24 GWh/d
2.839 GWh
143 GWh/d
28.121 GWh
10.422 GWh
18.432 GWh
5.625 GWh
1.608 GWh
3.807 GWh
Send-out
0 GWh
Deliverability
Injection
WGV
Max. Day
(08/01/2015)
Total 2014
Summer
Winter
Total 2014
Summer
Winter
0 GWh/d
Storage
478 GWh/d
281 GWh/d
27.765 GWh
13 GWh/d
1.506 GWh
432 GWh
1.168 GWh
29.060 GWh
9.301 GWh
19.763 GWh
Send-out
- GWh
Deliverability
Injection
WGV
Max. Day
(31/12/2014)
Total 2014
Summer
Winter
Total 2014
Summer
Winter
- GWh/d
2.424 GWh/d
729 GWh/d
59.158 GWh
932 GWh/d
160.371 GWh
60.966 GWh
110.964 GWh
76.972 GWh
23.729 GWh
55.722 GWh
212 GWh/d
Deliverability
Injection
WGV
Max. Day
(22/01/2015)
UGS
Total 2014
Summer
Winter
Maximum
Production
Maximum
Production
- GWh/d
- GWh/d
- GWh
427 GWh/d
LNG
Installed
gas-fired
capacity
Storage
560 GWh/d
3.211 GWh
Deliverability
Injection
WGV
Max. Day
(30/01/2015)
Libya
1.940 MWe
5 GWh/d
Send-out
Storage
0 GWh/d
0 GWh/d
0 GWh
-8.000
Algeria
Installed
gas-fired
capacity
Maximum
Production
Send-out
Deliverability
Injection
WGV
264 GWh/d
132 GWh/d
25.520 GWh
Total 2014
Summer
Winter
Norway
430 MWe
81 GWh/d
Deliverability
Injection
WGV
78.735 GWh
26.949 GWh
51.785 GWh
Russia
Installed
gas-fired
capacity
Maximum
Production
- GWh/d
C -HGWhA D
3.196 GWh/d
Deliverability
1.499 GWh/d
Injection
182.765 GWh
WGV
Total 2014
Summer
Winter
NP
700 MWe
2.190 MWe
0 GWh/d
29 GWh/d
19 GWh/d
2.530 GWh
-3.000
990 MWe
Installed
gas-fired
capacity
Maximum
Production
Deliverability
Injection
WGV
Installed
gas-fired
capacity
6.880 MWe
1.390 MWe
304 GWh/d
881 GWh/d
511 GWh/d
69.630 GWh
5.056 MWe
POWER
GENERATION
Installed
gas-fired
capacity
0 GWh/d
Deliverability
Injection
WGV
Installed
gas-fired
capacity
-
Installed
gas-fired
capacity
59 GWh/d
- GWh/d
- GWh
N
IGER
0 GWh/d
0 GWh/d
0 GWh
Installed
gas-fired
capacity
3.830 MWe
Installed
gas-fired
capacity
Total 2014
Summer
Winter
44.068 GWh
21.434 GWh
23.411 GWh
Total 2014
Summer
Winter
315 GWh/d
1.870 MWe
113.341 GWh
34.611 GWh
78.426 GWh
Installed
gas-fired
capacity
240 MWe
Installed
gas-fired
capacity
920 MWe
46.433 GWh
14.459 GWh
33.778 GWh
Installed
gas-fired
capacity
375 MWe
1.916 GWh/d
22.718 GWh
4 GWh/d
Deliverability
Injection
WGV
11 GWh/d
4 GWh/d
94 GWh
Deliverability
Injection
WGV
- GWh/d
- GWh/d
- GWh
Deliverability
Injection
WGV
Send-out
- GWh/d
Send-out
- GWh/d
Send-out
Storage
- GWh
Storage
- GWh
Storage
Maximum
Production
1 GWh/d
Maximum
Production
- GWh/d
Maximum
Production
Installed
gas-fired
capacity
26.251 MWe
Installed
gas-fired
capacity
Total 2014
Summer
Winter
301.607 GWh
132.300 GWh
174.752 GWh
Total 2014
Summer
Winter
920 MWe
11.912 GWh
3.515 GWh
8.316 GWh
Installed
gas-fired
capacity
100 MWe
32.761 GWh
9.752 GWh
23.096 GWh
1.822 GWh/d
14.782 GWh
1.136 GWh/d
31.390 MWe
Total 2014
Summer
Winter
651.718 GWh
246.392 GWh
405.534 GWh
- GWh
- GWh
- GWh
Total 2014
Summer
Winter
642 GWh/d
Max. Day
-
- GWh/d
Max. Day
(07/01/2015)
293 GWh/d
Max. Day
(09/02/2015)
43 GWh/d
Max. Day
(06/02/2015)
1.352 GWh/d
Max. Day
(28/12/2014)
146 GWh/d
Max. Day
(01/01/2015)
153 GWh/d
Max. Day
(21/01/2015)
Min. Day
(03/08/2014)
113 GWh/d
Min. Day
-
- GWh/d
Min. Day
(10/08/2014)
54 GWh/d
Min. Day
(09/08/2014)
12 GWh/d
Min. Day
(20/04/2014)
557 GWh/d
Min. Day
(06/09/2014)
13 GWh/d
Min. Day
(14/07/2014)
40 GWh/d
Min. Day
(20/09/2014)
EU Max. Day
EU Min. Day
489 GWh/d
113 GWh/d
EU Max. Day
EU Min. Day
- GWh/d
- GWh/d
EU Max. Day
EU Min. Day
248 GWh/d
57 GWh/d
EU Max. Day
EU Min. Day
41 GWh/d
12 GWh/d
EU Max. Day
EU Min. Day
1.295 GWh/d
565 GWh/d
EU Max. Day
EU Min. Day
70 GWh/d
14 GWh/d
EU Max. Day
EU Min. Day
151 GWh/d
41 GWh/d
EU Max. Day
EU Min. Day
Total 2014
Summer
Winter
1.191 GWh/d
919 GWh/d
53.262 GWh
Installed
gas-fired
capacity
Total 2014
Summer
Winter
Total 2014
Summer
Winter
8.179 GWh
3.072 GWh
5.475 GWh
175 GWh/d
130 GWh/d
28.579 GWh
3.754 GWh/d
O683M
AN
GWh/d
2.950 GWh/d
991 GWh/d