Arawak Cay Port

Transcription

Arawak Cay Port
Arawak Cay Port
New port facility at Arawak Cay
BHM CO. LTD
Client: Arawak Port Development Ltd.
Services Provided
• Risk management
• Value engineering
• Design management of surfacing
materials
• Asphalt and concrete design
• Consideration of local environment
and ensuring no contamination issues
Benefits to Customer
• Safe and secure working on the
Client’s facility
• On-site impact kept to a minimum
• Works carried out to suit other
ongoing improvement works
• Integrated team working with the Port Owners
• Ability to accommodate design changes during construction
• Innovative solutions
Background
The relocation of the port was required to ease heavy Bay Street
container traffic and allows shipping companies to operate from one
location at the mouth of the Nassau Harbour. Arawak Cay marine
works and new apron will allow the port to operate as a recognised
international container port.
The 40-acre development is the home for local shipping companies
and a distribution facility for international freight to the whole of
the Bahamas.
Project Description
BHM was appointed by Arawak Port Development Limited for the
construction of the landside facilities for the new Port on Arawak Cay
to service the island of New Providence and a vital link for goods
transfer to the Family Islands. The works included:• Bulk earthworks and preparation for terminal areas
• Asphalt and concrete surfacing to Container stacking areas
• All associated ancillary works
• Construction of access and service roadways
• Utilities, drainage, lighting, and landscaping for terminal areas
• Demolition of two earthen water reservoirs and ancillary works
• Electrical and telecom works.
BHM branding - February
2014
www.bhm.construction
Baha Mar Resort
BHM CO. LTD
Major Infrastructure works
Client: China State Construction America (CCA)
Services Provided
• Risk management
• Value engineering
• Ashpalt and concrete Design
• Consideration of local environment
Benefits to Customer
• Works carried out to avoid disruption
to existing hotels and residents.
• Integrated team working closely with
the China State Construction America
and the Baha Mar team.
• Working in close collaboration with
third party contractors on site.
•
Ability to react promptly to design changes.
Background
The Baha Mar Resort (also known as The Bahamian Riviera) is
located on the world famous Cable Beach in Nassau. The resort
will feature four elite hotels (SLS Lux, Rosewood, Grand Hyatt
& the Bahamar Casino Hotel) and a state-of-the-art convention
facility, including 2,000-seat performing Arts Centre and Art Gallery.
Amenities will include the 18-hole, 72-par championship Jack Nicklaus
Signature Golf Course.
Project Description
BHM as part of a joint venture were contracted by China State
Construction America for the construction of the major infrastructure
works on one of the largest resort developments in the Caribbean.
Scope of works included:
• Installation of utility services, potable water, storm water,
drainage, sanitary sewer, reclaim water, gas, electrical distribution,
external lighting.
• New car parking areas for the resort, employees, and patrons;
• New roadways into the resort.
• Hard landscaping, decorative sidewalks, waterside place and
Hotel Porte Cochère’s
• Tennis Court construction
• Injection and cooling well construction
• The Design and Build of main entry lake and showcase fountain
water feature and all associated MEP works including lake filtration
and water flow and return systems
• Three pedestrian bridges
BHM branding - February
2014
www.bhm.construction
Baillou Hill Road
BHM CO. LTD
Ground works, Infrastructure and Roadways
Client: Ministry for Public Works and Transport Bahamas
Services Provided
• Risk management
• Value engineering
• Construction management
• Phased traffic management
Benefits to Customer
• Value engineering input
• Minimal disruption to road users,
local business and general public
• High quality of works achieved
• Safe environment for road users
and public maintained
Background
BHM were awarded this scheme following on from the successful
completion of the Harrold Road project. BHM assisted the client in
reaching their budget by offering a number of value engineering
savings, including the use of swales in lieu of a gravity drainage
system. The implementation of a phased traffic management solution
within a highly trafficked, urban area was of significant importance to
the delivery of the project.
Project Description
BHM were employed by the Ministry for Public Works and Transport
to carry out the following scope of works:
• Site clearance and bulk earthworks
• Stabilisation of base material
• New utility ducts
• New road drainage system
• Road lighting and electrical work
• Kerbing & sidewalks
• Realignment of roadway and roundabouts
• Rehabilitation of Harrold Road Roundabout to allow for new filter
lanes and increased traffic capacity
• Hard and soft landscaping
• White lining
BHM branding - February
2014
www.bhm.construction
Balmoral Residence
BHM CO. LTD
Subdivision including Ground works, Infrastructure and Roadways
Client: Balmoral Development Ltd
Services Provided
• Risk management
• Value engineering
• Construction management
• Coordination with other
contractors on site
• Engineering including drainage
and asphalt design
Benefits to Customer
• Collaborative approach to negotiate
additional works
• Delivery on time and budget
• Single point of contact for client team
• Extensive value engineering input
• Close working relationship with other contractors on site
Background
The Balmoral Development is a gated community comprising a
total of 70 single family lots, located on the south side of Stanford
Drive. As part of sub-division works, BHM were initially employed
by Balmoral Development Ltd to carry out site clearance and
bulk earthworks on the project. Having successfully delivered this
element of the works, the client had the confidence to negotiate
significant additional works including the installation of a gravity
and forced sewer system, water main, road sub base and hot mix
asphalt paving. The works took place on a congested site as the
lots were built while BHM carried out the subdivision element. BHM
liaised closely with other contractors to ensure the works progressed
smoothly and safely.
Project Description
BHM were employed by Balmoral Developments to carry out the
following scope of works:
• Site clearance
• Bulk earthworks
• Storm and sewerage drainage
• Associated manholes and laterals
• Water main
• Roadway sub base
• Hot Mix Asphalt paving
BHM branding - February
2014
www.bhm.construction
Freeport Container Port
BHM CO. LTD
Container stacking port
Client: Hutchinson Whampoa
Services Provided
• Risk management
• Value engineering
• Construction management
•
Laboratory testing
Benefits to Customer
• Collaborative approach to give client
best value
• Single point of contact for client team
• Coordination with existing infrastructure
• In house plant, materials and testing
Background
Since 2005 BHM has executed multiple projects at the Freeport
Container Port creating over 30 acres of container stacking areas
inclusive of GS6, Delta 2,3,4, ASC, Shoreline protection Works, and
Roadway Rehabilitation of Alpha and Bravo Blocks.
Project Description
The project scope included:
• Site clearance
• Removal of contaminated soils
• Bulk earthworks
• Drainage and well drilling
• Density testing
• Sub base and base layers
• 4 inch type S-II hot mix asphalt pavement
• Areas of chip and seal
• Security fencing
BHM branding - February
2014
www.bhm.construction
New Providence Road
New Providence Island road corridor improvements
BHM CO. LTD
Client: Jose Cartellone
Services Provided
• Risk management
• Value engineering
• Design management of surfacing
materials
• Asphalt and concrete design
• Liaison with existing local
businesses, home owners and motorists
• Consideration of local environment
and traffic congestion
Benefits to Customer
• Ensuring minimum disruption to
road users
• Out of hours working hours
• Advance notification of areas of work to the local communities and press
• Impact of the works on neighbours kept to a minimum.
• Integrated team working collaboratively with main Contractor
• Ability to react promptly to unforeseen circumstances or traffic congestion
• Innovative solutions to keep road fully operational at busy times
Background
The New Providence Road Improvement Project has decreased traffic
congestion and relieved motorists frustration, with a major upgrade
and improvement of the road network.
The project includes construction of 11.6 miles of roads, and
comprises of nine new roads, major improvement of ten existing
roads and numerous new or improved intersections
Project Description
BHM was appointed as a major specialist subcontractor to
support and collaborate with the main contractor, Jose Cartellone
Construcciones Civiles. The project included the major reconstruction
and improvement of numerous roads within the urban environment of
Nassau. Much of the works were undertaken out of busy commuter
hours to minimise disruption to the general public and road users.
The works for BHM being predominately:• All base course works
• Full depth reconstruction of the existing roads
• Earthworks and full depth construction of new roads
• All asphalt surfacing works
• Associated sidewalk and concrete pavements.
BHM branding - February
2014
www.bhm.construction
Sports Complex Development Project
BHM CO. LTD
National Sporting Complex Development
Client: Ministry of Works and Transport
Services Provided
• Risk management
• Value engineering
• Special design of surfacing materials
for Sporting Association compliance
• Asphalt and concrete design
• Liaison with stakeholders, users and
approved associations
• Consideration of local environment
and relocation of existing facilities
Benefits to Customer
• Single point of contact for
stakeholders and Client
• Impact of the works on existing users addressed
• Integrated team working collaboratively with the Client and Stakeholders
• Ability to react promptly to the requirements of the specialist associations
• Innovative solutions proposed and agreed with specialists
Background
The new National Stadium is in the heart of New Providence on a
450 acre plot which includes access roads, 15,000 capacity parking,
a recreational park, velodrome cycling track, athletes’ village complete with facilities for American football, baseball and softball
stadiums. The whole complex includes commercial and
press facilities.
To achieve the National Stadium in this key location, the existing
hot rod drag racing strip and other facilities had to first be
successfully relocated.
Project Description
BHM was the lead partner of the Joint Venture contracted by
the Government of the Commonwealth of the Bahamas for the
construction of infrastructure works for the National Stadium
together with major works for the overall National Sporting Complex
Development. Works being undertaken included:
• 4 Major roadways to supplement the New Providence Road
Network and provide stadium access;
• 4 Major junction improvements along Yellow Elder Way,
Thompson Boulevard and Baillou Hill Road;
• Stadium parking areas with ancillary works;
• Utility, drainage and landscaping for Stadium surrounds;
• Upgrade of the existing waste water treatment plant for the
Greater Oakes Field and Yellow Elder Area;
• Relocation and upgrade of drag racing track to International
Hot Rod Association compliance.
BHM branding - February
2014
www.bhm.construction
West Bay Street Realignment
Infrastructure works for Cable Beach resort
BHM CO. LTD
Client: Baha Mar Ltd.
Services Provided
• Risk management
• Value engineering
• Design management of surfacing
materials
• Asphalt and concrete design
• Liaison with existing local businesses
and hotels
• Consideration of local environment and
ensuring no contamination issues
Benefits to Customer
• Ensuring minimum disruption to
road users
• Impact of the works on neighbours kept to a minimum.
• Works carried out to avoid disruption to existing hotels
• Integrated team working closely with Baha Mar team
• Ability to react promptly to design changes or unforeseen circumstances
• Working closely with Power Company to completely avoid power outages
• Innovative solutions
Background
Baha Mar, hotel development and major infrastructure is set on 3,000 feet
of white-sand beach just 12 minutes from Nassau’s newly expanded Lynden
Pindling International Airport. The resort features an elite collection of hotel
brands with gaming, entertainment, private residences, shopping and natural
attractions that reflect an authentic Bahamian experience.
Amenities include the 18-hole, 72-par championship Jack Nicklaus Signature
Golf Course, a state of the art convention facility, which includes a 2,000-seat
performing arts centre and art gallery.
The whole project has required major new and upgraded infrastructure
including new highways, reinforced power and other utility supplies support by
a full upgrade of Nassau International Airport.
Project Description
BHM as lead partner of a joint venture and overall contract administrator
were contracted by Baha Mar Ltd for the construction of the major
infrastructure works on one of the largest resort developments in the
Caribbean. The project included:
• The realignment of West Bay Street, a major arterial roadway for
New Providence;
• Construction of 7 roundabouts to supplement access to the new hotel
resort development;
• Ancillary works for utility service upgrades, drainage, street lighting, and landscaping;
• New parking areas for relocated Straw Market, employees, and patrons;
• Relocation of the famous Cable Beach Median Walk.
• The construction of a new dual carriageway between realigned West Bay
Street, the development and John F. Kennedy Drive, part of the main
spine road for the island of New Providence;
• Construction of a further 3 roundabouts on existing major roads;
• Ancillary works for utility service upgrades, drainage, street lighting,
and landscaping;
• Relocation of 132kVA high voltage power lines.
BHM branding - February
2014
www.bhm.construction
UTILITIES DATASHEETS IN PROGRESS
BHM CO. LTD
The following
1
DATA SHEET
IS UNDER CONSTRUCTION
www.bhm.construction
BAHAMAR COOLING WELLS
BHM CO. LTD
Title
Client: Name
Services Provided
• Value Engineering
• Risk Management
• onstruction management
• Traffic management
• Ashpalt Design
Benefits to Customer
• Single point of contact for client
• Works planned to minimize impact
on road users
DATA SHEET
UNDER
CONSTRUCTION
• High standards of quality and
safety management
• In house plant and materials
• Employment of skilled local workforce
Background
As part of wider infrastructure upgrades on Abaco Island, BHM
completed the contract for the rehabilitation of North Abaco
Settlement Roads over a distance of 33 miles.
Project Description
Our scope of works included:
• Bulk Earthworks
• Shaping and grading
• Traffic management to ensure works carried out safely
• Edge treatment and making good of existing surface
• New chip and sand seal roads construction
• Thermoplastic road markings
BHM branding - February
2014
www.bhm.construction