City Business Plan 2016/2017
Transcription
City Business Plan 2016/2017
City of Rockingham Business Plan November 2015 Contents 1. Introduction 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Page Introduction The Business Plan in Context of the City’s Strategic Framework The Business Plan Components Organisational Context Purpose of a Business Plan and Key Measures of its Success Summary of Key Projects over the next 10 Financial Years Key Assumptions Overall Outlook of the City’s Position Financial Ratios 4 5 6 7 8 9 10 12 12 2. Project/Plan 2.1 2.2 2.3 2.4 Major Sporting and Community Facilities – Construction Timetable Major Projects – Listed By Years Surplus Calculations 2016/2017 – 2025/2026 Surplus Calculations 2016/2017 – 2025/2026 Landfill 14 15 16 17 3. Project Mix 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 Information Communication Technology (ICT) Proposals City Asset Preservation Council Roads – Major Construction Proposals Waste Management – Major Expense Proposals City Dual Use Paths – Major Construction Proposals Infrastructure under $100K City Parks – Major Construction Proposals Climate - Environment Initiatives Marine Infrastructure 19 20 26 27 28 29 30 31 32 4. Reserves and Loans 4.1 4.2 5. Cash Reserves – Movements Loans Summary 34 37 Replacement – Passenger Plant Replacement – Light Commercial Plant Replacement – Landfill Management Plant Replacement – Parks Management Plant Replacement – Engineering Heavy Plant Replacement – Waste Collection Plant 39 41 45 46 50 54 Plant 5.1 5.2 5.3 5.4 5.5 5.6 2 1. Introduction 3 1.1 Introduction The City of Rockingham Business Plan provides a 10-year overview of the City’s operations within the context of a fully integrated strategic and financial planning framework. The plan is guided by the 16 aspirations that have been set out in the City’s Strategic Community Plan, and more specifically is driven by the actions in the Community Plan Strategies that flow from the aspirations. The plan ensures financial sustainability for the future strategic positioning of the City and delivers a 10-year financed model of Principal Activities for the City of Rockingham. Figure 1: The City’s 16 Community Aspirations 4 1.2 The Business Plan in the Context of the City’s Strategic Framework The City’s Strategic Framework allows for community expectations to flow through from the Community Plan Aspirations to the Community Plan Strategies which set out the actions that need to be taken in order to meet these aspirations. The actions within the Community Plan Strategies are budgeted for implementation in either the: - Major Projects Plan - Asset Management Plan or - Service Delivery Plans (also known as Team Plans) Figure 2: The City’s Strategic Planning Framework 5 In considering the above comments, the City of Rockingham Business Plan is the best estimate of future financial forecasting, subject to volatile movements often beyond the control of the local government. It is imperative the City has a method of prioritising projects according to community needs and prioritising the maintenance of existing assets. Further details are provided throughout this document. Past decisions of Council have provided some surety over future revenue predictions and firmed the financial viability of long-planned community infrastructure creation. 1.3 The Business Plan Components Through the City’s Integrated Strategic Planning Framework, various elements contribute towards the “whole” as represented by the Business Plan. This is represented in figure 3. Figure 3: Summary of the components that add up to the figures contained in the City’s Business Plan 10-year Business Plan Service Delivery Plans (Team Plans) ~ Operational Major Projects Plan ~ Capital Asset Management Plan ~ Renewal and Maintenance Key elements include: Key elements include: Key elements include: • • • • • • • Operating Revenue Staff Operating costs Staff overhead costs Proposed staff (~ workforce planning) Facility operating costs Team operating costs Operating projects • • • • • Grant Revenue Income from Development Contributions Major Infrastructure (above $100 K) Minor Infrastructure (below $100 K) Items to be addressed through Climate change Management Fund 6 • • • Building renewal Parks renewal Roads Renewal The City believes there are three primary reasons for preparing a multiple-year Business Plan, which in essence is summarised by the phrase “Proper Planning Prevents Poor Performance”: 1. Good Management: To focus on the City’s current situation, where it is going in the future, and how it intends to structure its operations in order to get there. 2. Informed Decision Making: By planning correctly and presenting information in a usable format, all parties are able to dissect information to make informed, appropriate and rational decisions and the public is able to view the transparent reporting systems of the City. 3. Statutory Requirements: As required by the Local Government Act 1995. 1.4 Organisational Context Team plans are directly related to the teams within the City and can be summarised by figure 4 below. Figure 4: Summary of the City’s Divisional teams 7 1.5 Purpose of a Business Plan and Key Measures of its Success The City of Rockingham’s goal for this plan is to gather all the necessary information required to accurately plan for the future needs of the community by including the following: • • • • • • • • Realistic assessments of current and future operational finances, and to determine the level of “discretionary money” available each year. Identification of all operational/non-operational financial issues. Integration of the Community Plan Aspirations, the Community Plan Strategies, Divisional Team Plans, Infrastructure Plan, Asset Management Plan and Annual Operating Budgets. Finance considerations for future directions, in particular the replacement of existing assets, with the estimated costs and proposed years of implementation to be taken into account. Strategically aligning the course for the continual improvement of services and facilities in line with the Community Plan. Providing a means by which the City can later examine its performance. This will enable it to note reasons for any performance variances to expectations and to analyse the causes of why any projects and their objectives may not be met. Proposal of the most appropriate mix of funding options so as to maximise the services provided and to adequately and more evenly spread the effects across multiple years. Align revenue inflows with expenditure outflows to maximise delivery of both services and construction-based projects. There are generally three basic rules that can be applied to most finance-based projects that give an excellent indication as to the success of the planning process: 1. On time – to develop a timeframe as to the start, completion and cash flow forecast for any given project. 2. On budget – to develop an accurate forecast of costs associated with a number of projects or a single project. On budget means what it states; to come too far over or under budget both restricts projects and future planning processes. It also often leads to an ad-hoc approach to project prioritisation and items “jumping the cue” above predetermined priority levels. 3. Within specification – to develop accurate specifications meeting the needs of the City. Precise specifications reduce the possibility of expensive post construction modifications. It is expected that the following key outcomes will be achieved through the City’s Business Plan: 1. Identification of projects to be completed during the period 2. Structuring of the City’s funding of those projects so they fall within its financial capacity 3. Determination of the composition of those projects so they are achievable/affordable during the next 10 years. It is the City’s intention to continue to strive to achieve the main directions laid down in the Strategic Community Plan and thus the City’s Business Plan. This will entail commitment and discipline to see these projects through to their completion and by maintaining the focus, these will be achieved. 8 1.6 Summary of the Key Projects Covered by the Business Plan over the next 10 Financial Years Note 2.1 of the City Business Plan provides the best overview of the main community infrastructure projects. This is particularly relevant in local governments with rapidly growing populations such as the City of Rockingham. Below is an extract of note 2.1. Project Title Cost Start Year Baldivis South Community Centre Mike Barnett Netball Courts Upgrade Baldivis District Sportsplex Stage 1 (2 x Ovals, 1 x Pavilion) Rockingham Outdoor Youth Space Baldivis South Outdoor Courts Rockingham Central (Library/Youth/Community Centre) Baldivis Outdoor Youth Space 3,502,000 340,000 12,200,000 1,379,000 1,206,000 4,932,000 658,000 2016 2016 2017 2017 2018 2018 2018 East Baldivis Recreation Reserve (Shared Use) Stan Twight Reserve Clubroom Extension Arpenteur Park Extension Aqua Jetty Stage 2 (Expansion) Secret Harbour Community Library 6,432,000 4,470,000 3,020,000 12,728,000 2,621,000 2020 2021 2021 2022 2022 Baldivis District Sportsplex Stage 2 (2 x Ovals, 1 x Pavilion) Baldivis District Sportsplex Stage 3 (Netball Courts and Infrastructure) Anniversary Park Extension Waikiki/Warnbro Outdoor Youth Space 10,441,000 2023 5,915,000 3,576,000 688,000 2025 2025 2025 Baldivis Sports and Fitness Centre 24,014,000 *2026 Rockingham Aquatic Centre Relocation 31,084,000 *2028 *Projects outside scope of current Business Plan – estimate of timeframe only 9 1.7 Key Assumptions • In developing this plan, various parameters have been developed, allowances made, and several assumptions effected in an attempt to take out the “abnormal” and any “one-off” effects so as to arrive at relatively consistent recurrent data calculations relating to recurrent operating costs. • All revenues and expenses from the Millar Road Landfill Facility have been quarantined and clearly indicated where included. This is done in coordination with the Millar Road Landfill Facility Business Plan • The figures included within the plan are based upon present conditions, as well as projections based on current knowledge. • Rate increases for the term of the plan need to be at least 4%. Therefore, the average ratepayer can expect an annual rate increase of approximately 4%. In addition, the City will experience population growth which is anticipated to yield an extra 2% rates each year. • The City of Rockingham is a minimum Financial Assistance Grant (FAGS) local government and receives FAGS in line with population growth. This is anticipated to grow in line with population and can be reasonably anticipated. • The assumption has been made that grants for major capital programs will be available on some occasions. With the exception of road grants, capital grants have been included where known and approved. Capital road grants have been averaged for the duration of the plan. • Recurring grants have been calculated to increase in line with inflation. • Contributions and reimbursements have been calculated to increase in line with inflation. • All of the City’s fees and charges will be put before Council prior to budget adoption, with the majority of these expected to be increased by at least the level of inflation. • Increases in the sanitation charges will be in line with expense requirements. • Interest on investments of the City’s “unrestricted funds” will remain similar to previous years. Over a longer term view this is considered acceptable. There will be variations to the interest earnings on each of the City's cash reserve accounts due to the fluctuations in the amounts transferred into and out of the respective reserve accounts. All interest related to cash reserves is earmarked to be deposited into the related reserve. • Recent changes in State planning policies have allowed for local governments to collect revenue from “new” land parcels created within the City boundaries. The City has now implemented a Developer Contribution Scheme and is collecting revenue for newly created land within the City boundaries. Ongoing adjustments need to be made to this revenue stream and adjusted accordingly. This is a best estimate with current information available. • For all other income, allowances have been made for these to merely increase in line with inflation, where these are expected to continue into future years. • Employee costs are expected to increase moderately in the forthcoming years. This will need to be reviewed annually in line with staff number increases related to population growth. A 2% increase in the employee cost is directly related to population growth. 10 • Materials and contractors is an area where there can be large cost fluctuations depending upon what is planned. A base figure from prior years has been used and this has been increased or decreased depending on planned operational works. The trend is for this to increase over future years. • Utilities have been calculated to increase in line with inflation and known charge increases. Historically this has been difficult to estimate, particularly related to electricity costs. Unit rates for power have been known to increase in past years by as much as 25%. • Insurances have been calculated to increase by inflation in future years. • Transfers to and from reserves are to occur as per the separate Reserves Summary which is included in section 4 of this document. Cash reserves are a mixture of cash held by statutory requirement and by decision of Council. The ratio of this mixture will adjust year in year out according to prevailing conditions. • The details of loans projected to be repaid each year are shown on the Loans Summary which is included in section 4 of this document. Proposed borrowings are directly related to projects. The City has implemented a modified Gross Debt to Operating Revenue Ratio to measure suitable debt to be held on the balance sheet. This ratio for any given year should not exceed 45%. A Debt Servicing Ratio is also utilised which is not to exceed 8%. • The opening balances remain at zero for the duration of the plan. • The discretionary money for each year is an important figure as to how the City will be able to finance its new projects into the future. A great deal of effort has been put into identifying a figure which is relatively reliable for use into future years, however various assumptions have had to be made so as to arrive at this figure. Historically it tends to be conservative by nature as to restrict unsustainable spending patterns. This plan takes a less conservative approach. • The Team Plans are used to inform major operating outcomes for City operations. Details of specific operational functions will be available in the next version of the Business Plan. 11 1.8 Overall Outlook of the City’s Position This plan proposes a significant shift in thinking from the prevailing six years. It requires significant resources to be delivered to new community infrastructure in the coming decade and keeps rate increases to a minimum. This requires debt levels to be increased, however this is proposed to occur by ensuring the debt does not expand beyond a sustainable level. Much of this infrastructure is to be based in the southern region of the City and related to direct and rapid increases in population. Given the population growth of the City, the construction of new facilities to service the community needs to be matched with the replacement of existing assets and buildings. A balance between these goal areas is always difficult and catering for specific needs can vary between years. The full cost of any new item needs to be fully investigated and taken into account, with those costs projected across the years. This includes not only capital costs but also loan repayments and recurrent net costs. Although the City is faced with some financial challenges, it is in a solid financial position. Alternate revenue streams for the City of Rockingham need to be reviewed on a regular basis. The City is highly reliant on residential rate revenue and lacks diversity of rateable land uses when compared against similar local governments. Noticeably, the City currently lacks a significant rateable industrial precinct. It should be noted that the locality of East Rockingham will assist somewhat in correcting this situation over the next two decades. Millar Road Landfill currently provides significant revenue to the City. A business plan has been completed for this facility which provides guidance to the City on how to manage this revenue. Ultimately the City needs to prepare itself for a time when the revenue from this facility does not exist. Currently the City has cash backed reserves to protect itself from any urgent issues, however rate increases or alternate revenues need to be created over the next 20 years to cover revenue loss from this facility. The City already knows for a fact that this facility will close at some time. Notwithstanding the above, a City Business Plan needs to be flexible enough to allow for changes that may arise. When such situations do arise, Council should be prepared to consider varying its forward plans as much as possible to take advantage of any changes. This said, it should be conditional upon any new projects (which may or may not involve grants) not significantly impinging upon the City’s core goals and long term financial and non-financial objectives. 1.9 Financial Ratios The City reports in the Annual Report a number of financial ratios that provide a snapshot of the City’s financial performance. They are as follows: Current Ratio Asset Sustainability Ratio Debt Service Cover Ratio Operating Surplus Ratio Own Source Revenue Coverage Ratio 2014/2015 2.23 0.77 12.98 (0.09) 0.83 12 2013/2014 1.85 1.13 11.82 (0.10) .82 2012/2013 1.69 0.74 4.26 (0.07) .82 2. Project/Plan 13 2.1 Major Sporting and Community Facilities - Construction Timetable and Other Information Project Title Cost Baldivis South Community Centre Mike Barnett Netball Courts Upgrade Baldivis District Sportsplex Stage 1 (2 x Ovals, 1 x Pavilion) Rockingham Outdoor Youth Space Baldivis South Outdoor Courts Rockingham Central (Library/Youth/Community Centre) Baldivis Outdoor Youth Space East Baldivis Recreation Reserve (Shared Use) Stan Twight Reserve Clubroom Extension Arpenteur Park Extension Aqua Jetty Stage 2 (Expansion) Secret Harbour Community Library Baldivis District Sportsplex Stage 2 (2 x Ovals, 1 x Pavilion) Baldivis District Sportsplex Stage 3 (Netball Courts and Infrastructure Anniversary Park Extension Waikiki/Warnbro Outdoor Youth Space Baldivis Sports and Fitness Centre Estimate Construction Rockingham Aquatic Centre Relocation 3,502,000 340,000 12,200,000 1,379,000 1,206,000 4,932,000 658,000 6,432,000 4,470,000 3,020,000 12,728,000 2,621,000 10,441,000 5,915,000 3,576,000 688,000 24,014,000 31,084,000 Start Year 2016 2016 2017 2017 2018 2018 2018 2020 2021 2021 2022 2022 2023 2025 2025 2025 2026 Date - To Be Confirmed 2028 Date - To Be Confirmed Other Items of Note Waterfront Village - Foreshore Park Redevelopment City Centre - General Infrastructure Other Information 5,000,000 2,500,000 2016 2018 Cost Per Year Op. Revenue Gross Debt 2016 2017 2018 2020 2021 2022 2023 2025 2026 2028 Total 8,842,000 13,579,000 9,296,000 6,432,000 7,490,000 15,349,000 10,441,000 10,179,000 24,014,000 31,084,000 136,706,000 14 115,600,000 121,700,000 126,600,000 138,600,000 144,100,000 151,400,000 157,200,000 171,700,000 31,200,000 41,400,000 42,500,000 44,400,000 47,600,000 57,900,000 65,500,000 59,600,000 Debt Raised 10,175,000 13,580,000 6,200,000 6,450,000 7,500,000 15,400,000 13,500,000 5,900,000 Op. Revenue to Debt Ratio 27.0% 34.0% 33.6% 32.0% 33.0% 38.2% 41.7% 34.7% 2.2 MAJOR PROJECTS - LISTED BY YEARS - Detailed PROJECTS Additional Comments Major Landfill Expenses (excluding Plant) Plant Replacement - Landfill Management Plant 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2,000,000 1,274,000 3,274,000 2023/2024 2,000,000 445,000 2,445,000 2024/2025 2,000,000 2,167,700 4,167,700 2025/26 See Note 3.4 for dissection See Note 5.3 for dissection 4,400,000 0 4,400,000 1,600,000 1,215,400 2,815,400 2,600,000 923,000 3,523,000 2,700,000 2,686,500 5,386,500 1,900,000 320,600 2,220,600 2,000,000 105,500 2,105,500 2,000,000 2,448,000 4,448,000 Landfill Discretional Money Available (Note 2.4) 10,451,000 10,792,000 11,155,000 10,765,260 10,337,083 9,868,169 9,356,093 8,798,304 8,192,114 7,534,692 Net Landfill Contribution to City 6,051,000 7,976,600 7,632,000 5,378,760 8,116,483 6,594,169 6,911,093 4,630,604 6,086,614 3,086,692 Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."M" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" Community Infrastructure Plan Class."S" 3,502,000 340,000 1,109,000 125,000 11,091,000 1,254,000 110,000 448,000 60,000 1,096,000 4,483,000 598,000 585,000 5,847,000 406,000 275,000 11,571,000 2,382,000 949,000 9,492,000 538,000 325,000 63,000 5,377,000 3,251,000 625,000 2,183,000 659,000 295,000 798,750 572,900 996,000 350,000 10,500,000 10,000,000 650,000 450,000 1,000,000 600,000 1,400,000 39,708,452 Community Infrastructure Baldivis South Community Centre Mike Barnett Netball Courts Upgrade Baldivis District Sportsplex Stage 1 (2 x Ovals, 1 x Pavilion) Rockingham Outdoor Youth Space Baldivis South Outdoor Courts Rockingham Central (Library/Youth/Community Centre) Baldivis Outdoor Youth Space East Baldivis Recreation Reserve (Shared Use) Stan Twight Reserve Clubroom Extension Arpenteur Park Extension Aqua Jetty Stage 2 (Expansion) Secret Harbour Community Library Baldivis District Sportsplex Stage 2 (2 x Ovals, 1 x Pavilion) Baldivis District Sportsplex Stage 3 (Netball Courts and Infrastructure) Anniversary Park Extension Waikiki/Warnbro Outdoor Youth Space Baldivis Sports and Fitness Centre Estimate Construction Rockingham Aquatic Centre Relocation 4,063,000 2,746,000 1,157,000 238,000 Civic Infrastructure Waterfront Village - Foreshore Park Redevelopment City Centre Development 5,000,000 2,500,000 Other Capital Expenditure Plant Replacement - Passenger Plant Plant Replacement - Light Commercial Plant Plant Replacement - Parks Management Plant Plant Replacement - Engineering Heavy Plant Plant Replacement - Waste Collection Plant IT Replacement Equipment/Upgrades City Asset Renewal Council Roads - Major Construction Proposals Council Dual Use Footpath - Construction Proposals Infrastructure under 100K City Parks - Construction Plan Climate/Environment Initiatives Marine Infrastructure See Note 5.1 for dissection See Note 5.2 for dissection See Note 5.4 for dissection See Note 5.5 for dissection See Note 5.6 for dissection See Note 3.1 for dissection See Note 3.2 for dissection See Note 3.3 for dissection See Note 3.5 for dissection See Note 3.6 for dissection See Note 3.7 for dissection See Note 3.8 for dissection See Note 3.9 for dissection 332,400 274,000 253,000 545,500 835,000 860,000 9,000,000 11,347,000 1,700,000 350,000 780,000 400,000 2,505,000 39,258,302 312,600 429,300 690,300 981,300 825,000 560,000 9,000,000 9,755,000 445,740 350,000 976,550 400,000 1,150,000 38,838,503 566,500 856,000 586,100 940,500 1,615,000 690,000 9,500,000 9,435,000 367,740 350,000 965,050 400,000 1,100,000 36,048,836 393,000 603,000 742,700 609,500 1,305,000 450,000 9,500,000 9,110,000 370,800 350,000 972,300 400,000 1,185,000 26,576,017 358,000 335,000 903,000 1,454,300 1,367,000 450,000 10,000,000 9,710,000 383,200 350,000 1,045,000 400,000 1,300,000 34,583,552 491,000 481,000 555,800 440,500 885,000 450,000 9,000,000 10,000,000 500,000 450,000 500,000 500,000 1,300,000 33,757,532 See Note 4.1 for Further Information See Note 4.1 for Further Information See Note 4.1 for Further Information (960,000) (569,294) 281,000 508,500 848,000 865,300 1,575,000 450,000 9,000,000 10,000,000 600,000 450,000 1,000,000 500,000 1,300,000 42,280,695 534,000 614,000 740,800 1,329,300 1,885,000 350,000 9,500,000 10,000,000 600,000 450,000 1,000,000 500,000 1,300,000 38,295,340 498,000 1,074,000 608,600 217,000 1,545,000 350,000 9,500,000 9,000,000 600,000 450,000 1,000,000 500,000 1,300,000 27,567,971 90,000 (2,500,000) (2,250,000) (380,000) (840,000) (275,000) (960,000) (479,294) (4,750,000) (380,000) (840,000) (275,000) 0 0 0 38,298,302 38,359,209 31,298,836 26,196,017 900,000 33,743,552 33,482,532 42,280,695 38,295,340 27,567,971 40,608,452 (3,069,618) (2,840,080) (2,753,539) (2,826,328) (2,810,500) (2,697,990) (2,633,999) (2,549,456) (2,468,294) (1,878,304) Reserve Transfers Transfer Baldivis RD Reserve Transfer City Centre Development Reserve Transfer Capital Works Reserve TOTALS EXPENDITURE EXCLUDING LANDFILL Developer Contribution Scheme 900,000 Loan Commitments - What is projected to occur Ln1 Ln2 Ln3 Ln4 Ln5 Ln6 Ln7 Ln8 Ln8 Ln9 Ln10 Ln11 Ln12 Ln13 Ln14 Ln15 In 16/17 In 16/17 in 16/17 In 17/18 in 17/18 In 17/18 In 18/19 In 19/20 In 20/21 In 21/22 in 21/22 In 22/23 In 22/23 In 23/24 In 23/24 In 25/26 Mersey Point Jetty Waterfront Village - Foreshore Park Redevelopment Baldivis South Community Centre Baldivis District Sportsplex Stage 1 (2 x Ovals, 1 x Pavilion) Baldivis South Outdoor Courts Rockingham Outdoor Youth Space Rockingham Central (Library/Youth/Community Centre) Asset Management East Baldivis Recreation Reserve (Shared Use) Stan Twight Reserve Clubroom Extension Arpenteur Park Extension Aqua Jetty Stage 2 (Expansion) Secret Harbour Community Library Baldivis District Sportsplex Stage 2 (2 x Ovals, 1 x Pavilion) Asset Management Baldivis District Sportsplex Stage 3 (Netball Courts and Infrastructure) OTHER INCOME 20 Years 15 Years 15 Years 15 Years 10 Years 10 Years 15 Years 10 Years 15 Years 15 Years 15 Years 15 Years 15 Years 15 Years 10 Years 10 Years See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information See Note 4.2 for Further Information (1,675,000) (5,000,000) (3,500,000) LESS: Raising of Loans for Acquisitions = (10,175,000) (13,580,000) (6,200,000) (3,000,000) (6,450,000) (7,500,000) (15,400,000) (13,500,000) 0 (5,900,000) TOTALS COSTS LESS LOAN REVENUE OF ALL GROUPS 25,053,684 21,939,129 22,345,297 20,369,689 24,483,052 23,284,542 24,246,696 22,245,884 25,099,677 32,830,148 Latest Calculations-Discretionary Money Available (Note 2.3) 11,177,476 9,728,784 10,671,417 11,153,689 12,002,088 12,609,700 13,174,000 13,561,507 14,761,421 25,701,462 DIFFERENCE (7,825,208) (4,233,745) (4,041,880) (3,837,239) (4,364,481) (4,080,673) (4,161,603) (4,053,773) (4,251,642) (4,041,994) Contribution from Grants and Other Sources (7,825,208) (4,233,745) (4,041,880) (3,837,240) (4,364,481) (4,080,674) (4,161,603) (4,053,773) (4,251,643) (4,041,995) (12,200,000) (1,200,000) (1,380,000) (5,000,000) (3,000,000) (6,450,000) (4,500,000) (3,000,000) (12,800,000) (2,600,000) (10,500,000) (3,000,000) (5,900,000) Balance of Uncommitted Funds from Prior Year ALLOCATABLE AMOUNT Debt Servicing Ratio Not Recommended to Exceed 8% Gross Debt to Operating Revenue Ratio 15 Not Recommended to Exceed 45% 0 0 0 0 0 0 0 0 0 0 3.75% 5.10% 4.53% 4.32% 4.44% 4.88% 5.34% 6.00% 6.08% 6.10% 26.99% 34.03% 33.56% 32.01% 32.02% 33.04% 38.22% 41.67% 35.71% 34.69% 2.3 10 YEAR FINANCIAL PROJECTIONS MODEL - PERIOD 2016/2017 TO 2025/2026 - SURPLUS CALCULATIONS OPERATING INCOME Rates including Interims Underground Power Service Charges Total Grants, Subsidies and Contributions - Operating Total Fees & Charges Total Interest Earnings Other Income 2016/2017 $'000's 2017/2018 $'000's 2018/2019 $'000's 76,135 80,703 85,546 902 902 902 2019/2020 $'000's 90,678 2020/2021 $'000's 96,119 2021/2022 $'000's 101,886 2022/2023 $'000's 107,999 2023/2024 $'000's 114,479 2024/2025 $'000's 121,348 8,010 8,090 8,171 8,253 8,335 8,419 8,503 8,588 8,674 40,727 41,948 43,207 44,503 45,838 47,213 48,630 50,089 51,591 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 7,756 7,911 8,069 8,231 8,395 8,563 8,735 8,909 9,087 Less Landfill Income -27,912 -29,029 -30,190 -30,794 -31,410 -32,038 -32,679 -33,332 -33,999 TOTAL OPERATING INCOME 108,018 112,926 118,105 123,271 129,678 136,443 143,588 151,133 159,102 OPERATING EXPENDITURE Total Employee Costs -47,612 -49,992 -52,492 -55,117 -57,872 -60,766 -63,804 -66,995 -70,344 Total Materials & Contracts -40,203 -42,213 -44,324 -46,540 -48,867 -51,310 -53,876 -56,570 -59,398 Utility Charges -5,107 -5,158 -5,209 -5,261 -5,314 -5,367 -5,421 -5,475 -5,530 Insurance -1,365 -1,392 -1,420 -1,448 -1,477 -1,507 -1,537 -1,568 -1,599 Interest Payable on existing Loans -1,043 -927 -780 -699 -624 -544 -458 -375 -288 Depreciation -43,431 -44,299 -45,185 -46,089 -47,011 -47,951 -48,910 -49,888 -50,886 Other Expenditure -15,684 -16,468 -17,291 -18,156 -19,064 -20,017 -21,018 -22,069 -23,172 Add Back Landfill Expenditure 17,461 18,237 19,035 20,029 21,073 22,170 23,323 24,534 25,807 -136,983 -142,212 -147,667 -153,282 -159,156 -165,292 -171,701 -178,405 -185,410 -28,965 -29,286 -29,562 -30,010 -29,478 -28,849 -28,113 -27,272 -26,309 Add Back Depreciation - non cash 43,431 44,299 45,185 46,089 47,011 47,951 48,910 49,888 50,886 Less Principle Repayment on Existing Loans -2,083 -2,933 -1,556 -1,071 -1,146 -1,217 -1,223 -1,235 -1,317 Less Principle and Interest on Proposed Loans -1,205 -2,351 -3,396 -3,854 -4,384 -5,275 -6,400 -7,820 -8,499 -96,840 -103,197 -107,433 -112,117 -117,676 -123,834 -130,414 -137,571 -144,340 11,177 9,729 10,671 11,154 12,002 12,610 13,174 13,562 14,761 TOTAL OPERATING EXPENDITURE Net Operating Result Subtotal OPERATING SURPLUS 16 2.4 10 YEAR FINANCIAL PROJECTIONS MODEL - PERIOD 2016/2017 TO 2025/2026 - SURPLUS CALCULATIONS - Landfill OPERATING INCOME 2016/2017 2017/2018 $'000's $'000's 2018/2019 $'000's 2019/2020 $'000's 2020/2021 $'000's 2021/2022 $'000's 2022/2023 $'000's 2023/2024 $'000's 2024/2025 $'000's 2025/26 $'000's As Per Millar Road Landfill Business Plan Landfill Operations Transfer Station Recycling Operations Waste Education 24,320 2,873 719 0 25,293 2,988 748 0 26,305 3,107 778 0 26,831 3,169 794 0 27,368 3,233 809 0 27,915 3,297 826 0 28,473 3,363 842 0 29,043 3,430 859 0 29,624 3,499 876 0 30,216 3,569 894 0 TOTAL OPERATING INCOME 27,912 29,029 30,190 30,794 31,410 32,038 32,679 33,332 33,999 34,679 -16,732 -17,479 -18,247 -19,159 -20,117 -21,123 -22,179 -23,288 -24,453 -25,675 -1,603 -1,666 -1,733 -1,820 -1,911 -2,006 -2,106 -2,212 -2,322 -2,439 Recycling Operations -414 -431 -448 -470 -494 -519 -545 -572 -600 -630 Waste Education -138 -144 -149 -152 -155 -158 -161 -165 -168 -171 -18,887 -19,720 -20,577 -21,601 -22,677 -23,806 -24,992 -26,236 -27,543 -28,915 Net Operating Result 9,025 9,309 9,613 9,192 8,733 8,232 7,687 7,096 6,456 5,763 Add Back Non Cash - Depreciation 1,426 1,483 1,542 1,573 1,604 1,636 1,669 1,702 1,737 1,771 10,451 10,792 11,155 10,765 10,337 9,868 9,356 8,798 8,192 7,535 OPERATING EXPENDITURE Landfill Operations Transfer Station TOTAL OPERATING EXPENDITURE OPERATING SURPLUS - Landfill 17 3. Project Mix 18 3.1 INFORMATION COMMUNICATION TECHNOLOGY (ICT) PROPOSALS Major Purchases 2016/2017 Replace DC2 SAN Replace DC2 Physical Servers RFID Library Warnbro (15/16) Rockignham (17/18) City Audio Visual Equipment Infrastructure secuirty Hardward/Software Expansion of Fibre Network to Gary Holland Centre Syren Street CCTV Upgrade LAN switches Replace Records Scanner Replace DC1 SAN Replace DC1 physical Servers Replace 6 Multi Function Devices Implement Facilites Booking Module Replace CCTV dedicated storage Infrastructure from Stage 2 Purchase New Telephony System Replace 3 Multi Function Devices Replace RFID Infrastructure Baldivis Library Major Review intranet/internet sites To be Decided 2017/2018 2018/2019 2021/2022 2022/2023 200,000 50,000 150,000 20,000 50,000 180,000 60,000 250,000 10,000 200,000 50,000 25,000 75,000 100,000 350,000 15,000 150,000 175,000 860,000 19 560,000 690,000 450,000 450,000 450,000 450,000 3.2 City Asset Preservation Work Order 22526 24989 24882 24908 24883 24891 23980 24441 23416 24372 22462 24379 24671 23421 24672 24673 24669 24670 23222 22542 23221 21826 21808 22476 24948 24947 24949 22067 21795 24929 21807 22051 22456 22543 22537 24916 22467 22050 22630 22474 24988 21818 23443 22448 24442 23441 23419 23420 22529 23423 22056 24663 24744 23426 23425 23427 23428 24437 24942 22469 22471 24886 24884 24859 24443 22910 23344 21809 23422 23809 23431 23424 22545 24677 24678 24968 24967 24969 24417 22525 23430 22530 24748 24415 24434 Building Renewal 2016/17 Albenga Place Toilet - Treat rust and internal refurbishment Aqua Jetty - Correct first floor universal access changeroom drainage issues Aqua Jetty - Repaint external items Aqua Jetty - Replace crèche combo playground including softfall Aqua Jetty - Replace whirlpool bridge Aqua Jetty - Resurface leisure pool beach Baldivis Hall (Football) - Replace hall floor Buildings - Urgent Works - BUDGET PURPOSES ONLY - ASSETS TEAM 16/17 Bungaree Gem Club - Refurbish internal and external items Careeba Reserve Changerooms - Replace rusted security screen on western side windows Centaurus Kindergarten - Asbestos - Remove and replace external wall sheeting Churchill Park Toilets - Replace partitioning in male and female toilets Council Administration Building - Bridge Wing (Glazing on Door and Door Handle replacement) - Disability Access Council Administration Building - Refurbish fitout to council chambers Council Administration Building - Square Building (Braile Signage and required fixtures) - Disability Audit Report Council Administration Building - Square Building (Inadequate Latch Circulation Width and Luminance Contrast) Council Administration Building (Council Chambers & Reception Hall) - Hearing Augmentation System Install Council Administration Building (Ground Level 2 Toilets) - Accessibility of Sanitary Compartment Council Depot - Administration Office - Rectify 2 x shower/eyewash units Council Depot - Refurbish male and female changerooms Council Operations Centre - Rectify 1 x shower/eyewash unit Council Operations Centre - Carpark resurface (Hurrell Way) Governor Road Toilets - Refurbish internal and external items including provision of curfew lockout Hefron Street Youth Service Fire Station - Asbestos - Remove and replace electrical boards Lark Hill Hockey / Softball Building - Replace bench seating in changerooms Lark Hill Rugby Building - Replace bench seating in changerooms Lark Hill Soccer/Cricket Building - Replace changeroom seating Larkhill Interpretive Site Display Facility and Toilet - Disposal Lotteries House - Repair, seal and repaint render Mike Barnett Stadium - Building 2 - Install awning or 'bird's beak' on eastern wall vents to prevent rainwater ingress Point Peron Toilet Block - Refurbish internal and external items including provision of curfew lockout Port Kennedy Community Centre - Upgrade HVAC Rockingham Aquatic Centre - Asbestos - Remove all asbestos from Aquatic Centre Buildings Rockingham Bowling Club - Replace carpet in male changeroom Rockingham Bowling Club - Replace water tank roof Rockingham Business Development Facility - Replace roof polycarbonate sheeting Safety Bay Bowling Club - Asbestos - Remove and replace eves, gable ends and internal ceilings Secret Harbour Community Centre - Refurbish internal and external items Sepia Court Childcare - Replace combo playground including softfall Volunteer Task Force - Watts Road - Asbestos - Remove and replace internal and external wall/ceiling panels Warnbro Recreation Centre - Replace crèche combo playground including softfall Anniversary Park - Replace toilets and changerooms Aqua Jetty - Replace external wall panelling Baldivis Hall (Football) - Asbestos - Remove vinyl floor tiles Buildings - Urgent Works - BUDGET PURPOSES ONLY - ASSETS TEAM 17/18 Council Administration Building - Bridge Wing - Renew air-conditioning Council Operations Centre - Replace chemical storage shed Council Operations Centre - Replace storage shelving Don Cuthbertson Reserve - Refurbish internal and external items Golden Bay Foreshore Toilets - Refurbish internal and external fitout Golden Bay (Coastal) Community Centre - Refurbish internal and external items (rust treating and painting) Hourglass Reserve Clubrooms - Refurbish internal and external items including painting and new ceiling to Koorana Changerooms - Treat rust and repaint garrison fencing, gable and changerooms floors Larkhill Cricket/Soccer - Replace all external doors to lower levels Larkhill Hockey/Softball - Replace all external doors to lower levels Larkhill Rugby Union/League- Replace all external doors to lower levels Lifelinks Building - Replace air-conditioning condenser plant frame Mike Barnett (Building 1) - Replace high-risk defective floorboards on court 4 and 7 Port Kennedy Community Centre - Refurbish internal and external items Safety Bay Health Clinic - Asbestos - Remove and replace electrical board Safety Bay Yacht Club - Asbestos - Remove and replace electrical boards Aqua Jetty - Off-site rust treatment and repainting of slide platform and pylons Aqua Jetty - Refurbish leisure pool changerooms and toilets Baldivis Hall - Replace toilet partitioning in male and female toilets Buildings - Urgent Works - BUDGET PURPOSES ONLY - ASSETS TEAM 18/19 Challenger Court - Upgrade air-conditioning in amenities room Challenger Court - Replace garages City Park Toilet Replacement City Administration Building - Refurbish first floor public toilet fitout City Administration Building - Replace all lights from top entry to side/bottom entry Fantasy Park Toilet Replacement Harmony Park Toilet Replacement Hillman Community Hall - Replace flooring Hillman Hall - Install extraction fan in male and female toilets and replace short glazed windows Hillman Hall - Replace selected garrison fencing panels Lark Hill Rugby Building - Replace all rusted mechanical extraction inlet vents Lark Hill Soccer / Cricket - Replace all rusted mechanical extraction inlet vents Lark Hill Softball/Hockey - Replace all rusted mechanical extraction inlet vents Millar Rd Waste Services Bin Shed - Treat rust on wall cladding Millar Road Landfill - Replace transfer station toilet cubicle Paul Garnett Changerooms - Repaint changeroom and washroom floors Rockingham Bowling Club - Petanque Club - Replace patio roof Settlers Hill Kiosk and Changeroom - Paint internal walls of all changerooms and kiosk store Singleton Fire Shed # 1 (Tangadee) - Treat rust, repaint components and refurbish door Singleton Fire Shed (Cavender St) - Refurbish main door, replace electrical components and repaint trusses 20 15,000 20,000 20,425 28,000 20,000 31,845 55,000 100,000 48,000 3,300 18,000 13,412 6,400 350,000 25,000 25,000 5,500 20,000 17,509 100,000 9,196 150,000 220,000 6,000 21,000 21,000 21,000 20,000 150,000 25,000 220,000 40,000 35,000 8,000 18,000 6,500 40,000 45,000 30,000 20,000 2017/18 35,000 500,000 111,050 10,000 100,000 220,000 75,000 50,000 38,000 220,000 55,000 33,000 5,000 30,000 30,000 30,000 45,000 16,500 16,000 6,000 6,000 2018/19 50,265 106,000 7,500 100,000 25,000 80,000 255,000 135,000 100,000 255,000 255,000 50,000 2,500 7,500 5,700 5,700 5,700 4,000 50,000 3,600 10,000 6,000 15,000 14,500 2019/20 2020/21 3.2 City Asset Preservation Work Order 24987 21812 21814 24402 23438 24405 24860 23437 24941 24664 22062 24868 23435 24665 24406 24887 24885 24858 24946 24639 24965 24964 24966 23979 24435 24430 24943 24910 24931 24930 24940 24939 24933 24411 24412 24404 23439 Building Renewal 2016/17 Singleton Foreshore Toilets - Refurbish internal and external fitout Stan Twight Changerooms - Refurbish internal fitout Tuart Park Toilets - Refurbish internal fitout Warnbro Recreation Centre - Refurbish and replace internal and external doors (not including automated or Autumn Centre - Replace timber floor in main hall Baldivis (Tranby) Fire Station - Repaint radio tower and kiosk screen, repaint barge board and carpark line Baldivis Hall - Replace chainmesh fencing to north side of building Council Administration Building - Replace roof tiles and install anticon Hefron St Youth Centre - Refurbish carpark Hourglass Reserve Clubrooms - Repaint colorbond roof Naragebup Environmental Centre (Main) - Treat rust in ceiling Safety Bay Library - Refurbish public toilet and airlock Veterans Memorial Park Toilet Replacement Waikiki Foreshore Toilets (Malibu Rd) - Render and paint all walls Watts Rd Girl Guides (Scout Hall) - Provide universal access and refurbish toilet fitout Aqua Jetty - Refurbish 25m and gym changerooms and toilets Aqua Jetty - Replace aluminium door/window frame on east side of leisure pool Baldivis Hall - Replace aluminium doors and windows in main hall Centaurus Kindergarten - Replace vinyl and carpet in waiting room / store Golden Bay (Coastal) Community Centre - Refurbish male, female, crèche toilets (not including toilet pans and Lark Hill Rugby Building - Replace 1st Floor external CGI steel eaves lining with compressed cement product Lark Hill Soccer / Cricket - Replace 1st Floor external CGI steel eaves lining with compressed cement product Lark Hill Softball / Hockey - Replace 1st Floor external CGI steel eaves lining with compressed cement product Mike Barnett Sports Complex - (Building 2) - Replace winch for court 3 backboard Millar Rd Transfer Shelter - Treat rust and repaint purlins and beams Millar Rd Waste Services Bin Shed - Treat rust on posts, beams and purlins Port Kennedy Community Centre - Replace carpet Rockingham Bowling Club - Replace carpet in clubroom Rockingham Gem Club - Replace kitchenette Rockingham Gem Club - Replace roof Rockingham Golf Club Toilet Near Proshop - Replace roof Rockingham Golf Clubrooms - Refurbish male and female changerooms Rockingham Golf Clubrooms - Replace roof Safety Bay Bowling Clubrooms - Install emergency lighting Safety Bay Bowling Clubrooms - Install fire hose reel Warnbro Recreation Centre - Replace manual winches on backboards with electric winches Warnbro Recreation Centre - Replace roof Yet to be determined Sub Total Buildings 21 2017/18 2018/19 220,000 60,000 80,000 40,000 2,028,087 1,631,550 1,948,965 2019/20 150,000 10,000 5,400 1,500,000 59,000 27,000 20,000 23,000 220,000 17,000 135,000 2,166,400 2020/21 106,000 22,600 30,000 4,370 43,000 85,000 85,000 85,000 1,756 35,000 13,000 12,000 17,500 25,000 31,000 3,500 69,000 182,000 10,000 15,000 13,000 240,000 1,128,726 3.2 City Asset Preservation Work Order Building Renewal Parks Renewal 2016/17 22580 Anniversary Park - replace aged edging with limestone block Anniversary Park - Replacement Non Compliant Play Equipment 21893 Bayeux Gardens Replace Rubber Softfall Bayview Reserve combination unit replace aged equipment Bungaree Reserve double bay cricket batting nets/bowling replace complete structure Cannes Place Reserve Replace CCA Treated Gazebo 2017/18 5,000 30,000 4,000 35,000 40,000 22,000 Carreba Reserve double bay cricket batting nets/bowling replace complete structure 40,000 Centenary Park replace 2 aged shelters (54468) & (54469) with hard stand 50,000 Centenary Park replace aged furniture under shelters with 2 x picnic tables ( Boardwalk -exteria design) 21863 Chesapeake Park Non Compliant & Aged Equipment 22635 City Park Large combination unit replace aged equipment City Park small combination unit replace aged equipment 22572 Delphinius Reserve - Replacement Aged Playground Equipment Don Cuthbertson replace aged BBQ,s 56425 - 44692 Fantasy Park replace aged BBQ 58902 - 58903 21904 Georgetown Drive Reserve Replace Non Compliant & Aged Play Equipment Golden Bay Foreshore Reserve replace 5 x picnic tables (Boardwalk design -exteria blue) Greeson Parkway Reserve replace aged swing Grice Reserve replace aged rubber softfall 21868 Hoskin Park 47619 Replace Ageing Play Equipment 21885 Hourglass Reserve Replace CCA Treated Pine Shelters 21917 Inverness Reserve Replace Ageing Softfall 21916 Inverness Reserve Replace Non Compliant Play Equipment Koorana Reserve double bay cricket batting nets/bowling replace complete structure Lewington Reserve - Replacement Non Compliant Play Equipment 22581 Lewington Reserve replace aged edging with limestone block Living Waters Reserve double bay cricket batting nets/bowling replace complete structure 21872 Madeira Reserve Non Compliant Equipment 21866 Madeira Reserve Replace Aged Softfall 21867 Mayfield Reserve Replace Ageing Softfall Oasis Reserve replace aged rubber softfall 23575 Parks Infrastructure - Urgent replacements - BUDGET PURPOSES ONLY Round Hill Reserve replace aged combo unit & swing Salamanca reserve replace aged concrete seat with Floreat green aluminium seat exteria Salamanca Reserve replace aged furniture under shelter with picnic table (Boardwalk-exteria design) Salamanca Reserve replace aged shelter with (Tranby Gazebo -exteria design) with hardstand Santa Monica Reserve combination unit replace aged equipment Santa Monica Reserve replace aged pit edging with limestone blocks Santa Monica Reserve replace aged play equipment Santa Moninca Reserve replace aged edging with limestone block Seabrooke Reserve replace aged pit edging with limestone blocks Seabrooke Reserve replace aged play equipment Singleton Foreshore replace aged BBQ 58391 with brick double plate 21899 Spiral Reserve (Toledo) Replace Aged Equipment & Softfall Torbay Mews Reserve replace aged bench seats around play area x 3 22575 Trusty Park - Replacement Non Compliant Playground Equipment Tuart Park replace aged park bench seats x 3 ID 61185 - 61184 - 105262 22584 Warnbro Parklands (Warnbro Rec.) - Replacement Non Compliant Play Equipment Warramunga Reserve replace small combination unit 21942 Birdsville Reserve 48139 Replace Non Compliant Play Equipment & Ageing Softfall 22624 Blair Court Replacement Play Equipment 22633 Brixham Way Reserve Replacement Play Equipment 7,500 40,000 180,000 40,000 5,000 13,000 13,000 19,000 18,500 4,200 57,000 7,000 55,000 3,000 25,000 40,000 35,000 5,000 40,000 25,000 5,000 8,000 30,000 100,000 24,000 2,700 3,500 25,000 35,000 5,000 35,000 5,000 5,000 35,000 9,000 14,000 6,300 23,000 6,300 36,000 23,000 14,000 29,000 13,000 22625 Buckle Court Reserve Replacement Play Equipment 29,000 22621 City Park Replacement Geodesic Climber 24,500 21913 Don Cuthbertson Reserve A Replace Ageing Softfall 8,000 22617 Dress Circle Reserve Replacement Play Equipment 24,300 22628 Eva Lynch Reserve Softfall Replacement 12,600 22637 Fantasy Park Replacement Playground Equipment 230,000 22620 George Foster Reserve Replacement Play Equipment 38,000 22571 Gidgi Way Reserve - Replacement Aged Playground Equipment (except for equipment replaced June/July 2013 t fi Parkway d ) 22618 dGreeson Reserve Replacement Play Equipment 23,500 22626 Harrington Gardens Replacement play Equipment 44,000 22611 Hayeswater Reserve Replacement Play Equipment 40,000 21884 Hourglass Reserve Replace Non Compliant Play Equipment & Ageing Softfall 25,500 4,500 21937 Larkhill Sporting Reserve (North) Replace Ageing Play Equipment 97,800 21938 Larkhill Sporting Reserve (South) Replace Non Compliant Play Equipment & Ageing Softfall 35,000 22593 Lawrie Stanford Replacement Aged Play Equipment 28,000 22607 Len Pike Reserve Replacement Play Equipment 28,000 22582 Lynx Way Reserve - Replacement Aged Play Equipment 33,000 22619 Nottley Crescent Reserve Replacement Rubber 78,163 23575 Parks Infrastructure - Urgent replacements - BUDGET PURPOSES ONLY 100,000 45,000 25,000 21,500 22622 Phoebe Hymus replace aged play accessible play equipment Phoebe Hymus Reserve aged rubber softfall 21897 Pimento Circle Reserve Replace Aged Equipment 22 2018/19 2019/20 2020/21 3.2 City Asset Preservation Work Order Building Renewal 2016/17 2017/18 22589 Rhonda Scarrott Reserve Replacement Non Compliant Play Equipment 38,000 22606 Safety Bay Foreshore (Bent Street) Replacement Play Equipment 78,000 22612 Santa Monica Reserve Replacement Non Compliant Play Equipment 28,000 22627 Seahaven Reserve Replacement play Equipment 37,000 22594 Townsend Reserve Non Compliant Play Equipment 33,000 21909 Waterfront Parkway Reserve Replace Non Compliant & Ageing Play Equipment 40,000 2018/19 21931 Tranby Reserve 48061 (& Brennan) Replace Non Compliant & Ageing Play Equipment 96,000 22614 Three Bears Loop Reserve Replacement Play Equipment 21,000 22616 Welch Way Reserve Replacement Play Equipment 23,000 22623 Whitehead Reserve Replacement Play Equipment 31,000 23059 Willow Tree Reserve - replace No Compliant and Ageing Play Equipment 25,000 21939 Wise Meander Reserve 48400 Replace Non Compliant Play Equipment & Ageing Softfall 14,000 22629 Warnbro Beach Foreshore Replacement Softfall 2019/20 2020/21 5,000 22631 Malabar Reserve Replacement Softfall 6,000 22632 Axminister Reserve Replacement Play Equipment Yet to be determined Sub Total Parks 1,235,000 1,364,363 31,000 1,111,200 1,396,200 1,396,200 1,363,200 1,396,200 1,396,200 Lighting Renewals 23798 23802 23814 23803 23807 23813 23810 23807 23808 23801 23812 23796 23811 Lighting - Cud Swamp_ Replacement of Luminaires only (Bourke Hill LEDS) Lighting - Tuart Park - replacement of luminaires and poles Lighting - Harmony Park - Pole and Lighting replacement with Bell Park 6.5m poles fittings TBD Lighting - Palermo Cove - replacement of Poles and Luminaires Lighting - Cobblestone Circuit - replacement of Poles and Lumnaires Lighting - Koorana Reserve - Power Upgrade for the future supply of two extra columns Lighting - City Park poles and luminaires renewal Lighting - Hourglass Reserve Carparks - Renewal Lighting - Cobblestone Circuit - Replacement of Poles and Lumnaires Lighting - Patterson Road - Replacement of Fittings Lighting - Fantasy Park - Luminaire upgrade to LED Lighting - Emerald Park - Replacement and Retro fit lights on path way lights Lighting - Lynx Parkway public access way-replacement of bollards to antivandals Lighting - Eva Lynch Reserve-Replacement of poles and luminaires Lighting - Nottley Crescent- replacement of poles and luminaires(solar) Lighting - Palisades Blvd-Replacement of poles and Luminaires Lighting - Redesign&Replacement of surrounding streets of golf island Secret Harbour Lighting - Pheobe Hymus Foreshore - Replacement and retro fit lights on path way Lighting - Stan twight Reserve - Upgrade to the Pole Lighting (Collapsable Poles) Lighting-Bluestone Parkway- Pole and Luminaire replacement Lighting-Anstey Road- Redesign and replacement of streetlighting Lighting-Secret Harbour Blvd- Redesign and replacement of streetlighting Lighting-Civic Blvd, Central Pmde,Charlgrove Ave and Admin luminaire replacement and pole painting Lighting-Southern suburb of Secret Harbour-redesign and replacement Poles & Luminaires Lighting renewals - Yet to be determined Sub Total - Lighting 24,000 34,608 84,480 31,724 34,608 180,000 180,000 70,000 34,608 249,251 81,900 52,800 42,900 34,500 75,000 95,000 163,930 60,000 220,000 120,000 241,000 400,000 1,000,000 524,157 674,028 Road Renewals Woodbridge Drive - renewal Bonnydoon Court - renewal Sunningdale Circle - renewal Killarney Place - renewal Glencoe Place - renewal Brae Court - renewal Brigadoon Place - renewal Duncraig Court - renewal Matilda Court - renewal Meadow Court - renewal Madison Place - renewal Aspen Court - renewal Belair Place - renewal Glenway Loop - renewal Blesmere Court - renewal Wedge Court - renewal Beermullah Way - renewal Kopai Crescent - renewal Catambro Way - renewal Pinjar Court - renewal Jaugle Place - renewal Lakemba Way - renewal Minigwal Loop - renewal Burnside Way - renewal Auld Court - renewal Jubilee Drive - renewal Burnside Way - renewal Blair Court - renewal Darlot Court - renewal Dundas Court - renewal Noumea Place - renewal Nandi Court - renewal 288,095 36,702 89,682 28,066 28,066 15,832 30,945 15,832 17,272 33,104 43,556 29,365 13,739 86,508 11,122 10,468 34,055 74,069 45,123 20,433 63,001 125,151 111,529 73,218 45,123 65,555 106,349 38,889 29,440 38,889 27,778 17,664 23 1,075,281 761,000 1,000,000 524,157 3.2 City Asset Preservation Work Order Building Renewal 2016/17 Nurrari Close - renewal Lambasa Place - renewal Tana Court - renewal Kenton Way - renewal Glen Street - renewal Sycamore Close - renewal Goddard Street - renewal Stainer Avenue - renewal Campbell Way - renewal Whiley Court - renewal Casserley Road - renewal Keppell Mews - renewal Swift Court - renewal Ricketts Court - renewal Discovery Crescent - renewal Galley Close - renewal Ceri Close - renewal Aquitania Close - renewal Batavia Court - renewal Europa Court - renewal Nautilus Close - renewal Majestic Close - renewal Columbus Court - renewal Karrawa Gardens - renewal Lusitania Court - renewal Britannia Place - renewal Canberra Close - renewal Armada Close - renewal Murdoch Drive - renewal Bentley Street - renewal Fitch Street - renewal Cavender Street - renewal Currie Street - renewal Hokin Street - renewal Reveley Street - renewal Kingsbridge Road - renewal Monkton Way - renewal Fairmile Street - renewal Hartland Way - renewal Dolton Place - renewal Basslet Place - renewal Manta Court - renewal Endeavour Drive - renewal Clermont Place - renewal Cook Court - renewal Mayflower Close - renewal Corsair Close - renewal Moorburg Loop - renewal Bathurst Road - renewal Melbourne Close - renewal Timaru Close - renewal Sirlus Place - renewal Oceanic Ct - renewal Hood Ct - renewal Chesapeake Parade - renewal Cygnus Street - renewal Hurrell Way & Morgan Intersection 1 - renewal Hurrell Way & Islip Intersection - renewal Morgan Street & Islip Intersection - renewal Hurrell Way & Morgan Intersection 2 - renewal Hillman Hall Car Park - renewal Don Cuthbertson Car Park at Elanora Drive - renewal Car Park with Access Road at Warnbro Beach Road and opposite of House# 80 - renewal Car Park beside of Warnbro Beach Road at opposite of House # 168 - renewal SES Car Park in Crocker Street - renewal Nib treatment/Brick Paving Works in City Centre and Various Location - renewal Chelmesford Avenue - Renewal Castlereagh Circle - Renewal Glenroy Gardens - Renewal Doncaster Garden - Renewal Mitford Garden - Renewal Whitechurch Mews - Renewal Delwood Court - Renewal Glenway Loop - Renewal Ellesmere Court - Renewal Wedge Court - Renewal Aspen Court - Renewal Belair Place - Renewal Madison Place - Renewal Bonnydoon Court - Renewal Portsea Place - Renewal 2017/18 44,444 38,889 24,603 129,206 17,460 58,492 77,215 89,921 65,476 11,066 84,682 34,779 23,748 79,574 40,476 27,928 31,746 9,524 15,090 9,524 21,278 61,111 11,776 38,084 10,060 27,306 36,375 11,776 61,111 69,841 21,825 52,770 44,618 51,095 8,376 126,190 42,063 64,350 75,450 14,286 45,270 16,356 180,714 12,234 45,055 64,768 15,832 65,488 14,393 16,552 41,020 16,552 23,748 16,552 88,698 116,667 11,798 11,798 11,798 13,943 21,236 10,193 21,802 13,131 55,000 300,000 129,603 313,968 38,013 41,318 34,707 67,762 38,013 191,666 24,791 23,138 62,063 29,749 89,444 79,331 36,360 24 2018/19 2019/20 2020/21 3.2 City Asset Preservation Work Order Building Renewal 2016/17 Kingsbridge Road - Renewal Monkton Way - Renewal Fairmile Street - Renewal Hartland Way - Renewal Dolton Place - Renewal Basslet Place - Renewal Manta Court - Renewal Success Drive - Renewal Marjorie Parade - Renewal Derwent Place - Renewal Kybra Mews - Renewal Stuart Place - Renewal Walleroo Place - Renewal Westralia Gardens - Renewal Mildura Place (West) - Renewal Anzac Place - Renewal Bradbury Street - Renewal Leeuwin Parade - Renewal Cascade Close - Renewal Peninsula Place - Renewal Reflection Mews - Renewal Fountain Court - Renewal Ward Road - Renewal The Avenue - Renewal Penang Loop - Renewal Ryde Close - Renewal Sark Place - Renewal Requa Crescent - Renewal Cadiz Place - Renewal Torbay Mews - Renewal Princep Place - Renewal Silver Grove - Renewal Paluma Court - Renewal Elata Mews - Renewal Konda Close - Renewal Rattan Cove - Renewal Coronata Drive - Renewal Warnbro Sound Ave/Read St - Nib Renewal 2017/18 2018/19 2019/20 2020/21 290,238 96,746 148,005 173,536 32,857 104,122 37,618 253,730 91,270 40,159 122,301 76,667 56,587 74,841 83,968 120,476 147,857 106,421 141,053 29,870 54,762 76,335 181,158 96,203 215,397 47,929 54,540 182,540 54,540 47,460 60,189 63,198 30,094 37,618 30,094 18,501 310,317 250,927 Drainage Renewals Drainage renewals at various locations 250,000 250,000 200,000 200,000 200,000 Footpath Renewals Saga Court - renewal Waterton Way - renewal Penguin Road - renewal Kingston Way - renewal Haiti Place - renewal Simpson Avenue - renewal Cascade Close - renewal Trade Winds Drive - renewal 11,880 14,040 18,000 14,040 6,300 19,800 9,900 10,122 Road/Kerbing/Drainage renewals - yet to be determined 4,665,591 4,737,400 6,750,917 Sub Total Roads 5,062,885 4,928,806 5,426,835 4,937,400 6,950,917 Total 9,000,000 9,000,000 9,500,000 9,500,000 10,000,000 25 3.3 COUNCIL ROADS - MAJOR CONSTRUCTION PROPOSALS MAJOR CONSTRUCTION DESCRIPTION OF WORKS Baldivis Rd (Safety Bay to Highbury) (Stage 2) Baldivis Rd (Highbury to Sixty Eight) (Stage 1) Gnangara Dve (Read to Willmott) (Stage1) Safety Bay Rd (Sabot - Hokin) Safety Bay Rd (Rand-Viking) Baldivis Rd (Sixty Eight - Karnup) Patterson Rd Westbound (Wanliss - Dixon) Patterson Rd Eastbound (Wanliss - Dixon) Arcadia Dve (Watts Rd - Penguin Rd) Warnbro Sound Ave/Axminster (SBS) Warnbro Sound Ave/Kingsbridge (SBS) Central/Civic/Syren (SBS) Mandurah/Fifty Dixon/Mandurah/Gilmore Nairn Dve (Clyde - Blaxland) Charthouse / Investigator Willmott Dr / Gnangara Dr Fairview Dve (various locations) Road Safety Projects Road Resurfacing Create Boulevard style road Create Boulevard style road Create Boulevard style road Resurface Resurface Resurface Resurface Resurface Resurface Intersection Upgrade Intersection Upgrade Roundabout Intersection Upgrade Intersection Upgrade Upgrade to Dual Carriageway roundabout roundabout LATM Devices Various LATM Devices Baldivis Rd (Highbury to Sixty Eight) (Stage 2) Gnangara Dve (Read to Willmott) (Stage 2) Port Kennedy Drive (Stage 1) Patterson Road MRRG Resurfacing Projects Nairn Dve (Blaxland - Cottonwood) State Blackspot projects National Blackspot projects Jean Pierre Drive Charthouse Ave / Seahaven Gnangara / Santa Monica Road Safety Projects Road Resurfacing Create Boulevard style road Create Boulevard style road Upgrade to Dual Carriageway reconstruct Various Upgrade to Dual Carriageway Various Various LATM Devices Roundabout Roundabout Various LATM Devices Port Kennedy Drive (Stage 2) Karnup Rd (Baldivis to Eighty) (Stage 1) Patterson Road 2nd stage MRRG Resurfacing Projects Parkin St (Safety Bay to Patterson) Currie St / Farrington Street State Blackspot projects National Blackspot projects Safety Bay LATM Charthouse Street midblock LATM Road Safety Projects Road Resurfacing Upgrade to Dual Carriageway Create new road reconstruct Various Channelisation & Turn Pockets Roundabout Various Various Traffic calming Median treatment Various Swinstone St (Read to Townsend) Read Street / Warnbro Sound Ave Nairn Dve (Safety Bay north 650m) State Blackspot projects National Blackspot projects Parkin/Safety Bay/Pt. Peron/Hymus Arkwell Street Road Safety Projects Road Resurfacing Create new road Profile & Reseal Upgrade to Dual Carriageway Various Various Roundabout median islands (Street scape) Various Various Karnup Rd (Baldivis to Eighty) (Stage 2) MRRG Rehabilitation Projects Nairn/Safety Bay State Blackspot projects National Blackspot projects Gascoyne Way LATM Seabrooke Avenue Road Safety Projects Road Resurfacing Create new road Various Upgrade Intersection Various Various Various median islands (Street scape) Various Various 2016/17 2017/18 2018/19 2019/20 2020/21 480,000 2,400,000 600,000 126,000 240,000 288,000 51,000 63,000 330,000 39,000 30,000 300,000 225,000 1,000,000 800,000 340,000 375,000 130,000 150,000 2,000,000 600,000 1,800,000 600,000 900,000 225,000 1,000,000 240,000 150,000 120,000 300,000 350,000 150,000 2,000,000 2,400,000 300,000 900,000 225,000 660,000 340,000 240,000 150,000 200,000 350,000 150,000 2,200,000 2,400,000 1,125,000 1,000,000 240,000 150,000 325,000 200,000 150,000 2,200,000 3,000,000 1,125,000 1,000,000 240,000 150,000 325,000 200,000 150,000 2,200,000 Total Road Expenditure OTHER CONSTRUCTION Arterial Lighting Roadways Council Public area lighting Plan Drainage upgrades Various Locations Guarded School Crossings Parking Upgrade various Bus Shelters Total Other Construction TOTAL EXPENDITURE 26 9,967,000 8,435,000 8,115,000 7,790,000 8,390,000 450,000 250,000 500,000 50,000 100,000 30,000 1,380,000 11,347,000 400,000 250,000 500,000 40,000 100,000 30,000 1,320,000 9,755,000 400,000 250,000 500,000 40,000 100,000 30,000 1,320,000 9,435,000 400,000 250,000 500,000 40,000 100,000 30,000 1,320,000 9,110,000 400,000 250,000 500,000 40,000 100,000 30,000 1,320,000 9,710,000 3.4 WASTE MANAGEMENT - MAJOR EXPENSE PROPOSALS (Excluding Plant) 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 Landfill Cell Construction - Cell 17 Cell Construction - Cell 18 Cell Construction - Cell 19 Cell Capping - Cells 12 & 13 Cell Capping - Cells 14 & 15 Cell Capping - Cells 16 & 17 Waste Strategy Initiatives 2,400,000 0 0 0 0 0 0 2,700,000 0 0 2,600,000 0 1,500,000 0 0 0 0 1,600,000 0 0 500,000 0 0 0 0 0 0 0 1,900,000 0 0 SUB TOTAL 4,400,000 1,600,000 2,600,000 2,700,000 1,900,000 27 3.5 CITY DUAL USE PATHS Major Works Safety Bay Road Casserley Road Hennessy Way Safety Bay Road Eighty Road Torrens Drive Hawker Reserve Dodd Place McCormick Street Powis Way - Bralich St Burnside Way Eighty Road Wombarra Street Leghorn St Exhibition Way Taggert Ave Benbecula Loop Fountain Park Lewington Street Hillman Street Delaney Parkway Dennis Rtt Acute Street Nome Place Burnside Way Chinchilla Parkway Warnbro Sound Ave Baldivis Road Baldivis missing path links Eighty Road Various Strategic Missing Paths 2016/17 Identifier Afron - Bus stop Seabrooke Ave - Hennessy Way Casserley Rd - Swifts Crt Warnbro Stn - Baldivis Town Safety Bay Rd - Kingaroy Dr Lakemba Way - End June Rd - Hawker Reserve Currie St - McCormick St PAW - Studzor St Fendam - McCormick Burnside - Shopping Centre 512 Eighty Rd - Ridge Blvd Johanna Way - Bancourra Pkwy Chalgrove Ave - Leach Cres Park Ave - Rae Rd Eighty Rd to Huxtable Tce Strasbourg Rmbl - Nunton Pl Cordoba Ave - Laguardia Lp Victoria St - Weld St Rockingham Beach Rd - Lewington St Kerb Parking Area - Park Lot 8007 (POS) to Wise Meander Read St - Robinson St Cul-de-sec - The Avenue Shopping Centre - Burnside Way Savilla Tce - La Estrada Way San Sebastian Blvd-across Warnbro Sound Ave End of path to Nth of Tamworth Blvd Various Tuart Dr (South) - Sixty Eight Rd 2017/18 2018/19 2019/20 2020/21 1,700,000 156,000 24,000 12,000 9,600 54,000 54,000 7,200 22,800 12,000 39,300 36,840 18,000 78,000 76,800 149,100 46,200 17,640 43,200 50,400 37,200 7,800 42,000 7,800 62,400 120,000 1,700,000 28 445,740 367,740 370,800 133,200 250,000 383,200 3.6 Infrastructure under $100K Major Works Public Art Reserves Public art Buildings Emergency Incident Business Operations Centre Yet to be Determined 2016/2017 40,000 40,000 30,000 240,000 350,000 29 2017/2018 350,000 350,000 2018/2019 2019/2020 2020/2021 2021/2022 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 3.7 CITY PARKS -MAJOR CONSTRUCTION PROPOSALS MAJOR CONSTRUCTION DESCRIPTION OF WORKS 2016/17 Parks Capital Renewal General Parks and Bores Passive Reserve Development Irrigation Replacement New Parks Development Upgrades/renewal Central Irrigation Management Controls Controller Replacement Arterial Road Entry Statements Streetscapes Parks Infrastructure upgrades Park Furniture Replacement Foreshore Strategy Beach Access Paths and Fencing 30,000 21,000 Playgrounds - New New Playgrounds 90,000 Greening Plan Landscape Renewal Environmental Reserves Natural Area infrastructure Cud Swamp Fence Bush Land Conservation areas 36,000 Sawley Close Fence Bush Land Conservation 13,000 Karnup Townsite Upgrade limestone tracks/parking Upgrade limestone tracks/parking 19,000 Karnup Townsite Fence boundary conservation area 10,000 Woodleigh Grove Limestone Emergency access/Firebreak track 42,000 Townsend Reserve Gazebo/Bus Shelter 23,500 Sports Reserve Floodlighting Club Infrastructure Upgrades 225,000 2017/18 2018/19 2019/20 2020/21 230,000 240,000 250,000 250,000 80,000 200,000 280,000 280,000 85,000 70,000 80,000 50,000 50,000 50,000 50,000 50,000 200,000 40,000 25,000 25,550 26,550 27,300 25,000 225,000 25,000 25,000 80,000 300,000 300,000 85,000 50,000 25,000 250,000 TOTAL EXPENDITURE 30 780,000 200,000 976,550 965,050 972,300 1,045,000 3.8 CLIMATE - ENVIRONMENTAL INITIATIVES Location Description Administration Building Gary Holland Community Centre Governor park Harmony Park Kent St Arts Centre Lark Hill Maintenance Shed Millar Rd Administration Village Green Anniversary Park Men's Shed Aquatic Centre Coastal Community Centre Hillman Hall Hourglass Changerooms McLarty Hall Mike Barnett Rockingham Bowling Club Rockingham Tennis Club Safety Bay Bowls Safety Bay Tennis Club Secret Harbour Community Hall Settlers Hills Pavilion Shoalwater Foreshore Stan Twight Warnbro Recreation Centre Air-conditioning chilled water storage tank Energy Management System Install LED park lighting Install LED park lighting Install PV array Install PV array Install PV array Install LED park lighting Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install PV array Install LED park/path lighting Install PV array Install PV array Unidentified 2016/17 2017/18 2018/19 2019/20 2020/21 35,000 15,000 125,000 75,000 50,000 25,000 15,000 60,000 400,000 31 10,000 20,000 20,000 5,000 5,000 5,000 20,000 10,000 5,000 20,000 5,000 10,000 5,000 140,000 5,000 50,000 65,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 3.9 MARINE INFRASTRUCTURE MAJOR CONSTRUCTION DESCRIPTION OF WORKS Donald Drive, Boat Ramp Lanes 5 and 6 Development of new concrete boat launching facility and infrastructure Beach Access and Coastal Erosion Rockingham buried sea wall (Flinders-Wanliss) Point Peron Boat Ramp dredging Asset protection and coastal management Navigation Channel and Tern Island Sand bar Excavation and dredging protection of asset/public safety 2016/17 Palm Beach Boat Ramp Reconstruction Peron Beach GSC Groynes Stage 2 Point Peron Boat Ramp Upgrade Carpark expansion at Point Peron, Palm Beach & Bent Street 2018/19 2019/20 2020/21 1,100,000 650,000 330,000 500,000 Protection of Point Peron Boat launching facility and coastal management Establishment of lanes 5 and 6 to assist the ramp in meeting increasing demand Based on Boat user survey additional carpark provision at boat ramps is required Mersey Point Jetty Construction Feasibility Study Waikiki Beach Jetty 2017/18 As per the Mersey point to Port Kennedy Study 2012, there is a recognised need for additional jetty facilities in Warnbro Sound 600,000 500,000 585,000 1,675,000 250,000 As per the Boat User Survey there is a need for the City to Investigation and concept design - Cockburn Sound investigate future opportunity for additional boat ramp facilities. Boat Ramp Coastal Protection Adaption Design - Warnbro Sound 150,000 Coastal Protection adaption Design - Palm Beach 150,000 Palm Beach Ramp Rock Armour Upgrade 250,000 150,000 Bent Street Navigation Channel Upgrade 350,000 TOTAL EXPENDITURE 2,505,000 32 1,150,000 1,100,000 1,185,000 1,300,000 4. Reserves and Loans 33 4.1 CASH RESERVES - Movements Reserve # 6167 2016/17 Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 5,552,100 5,774,184 0 222,084 5,774,184 0 230,967 6,005,152 2016/17 6165 3,148,204 0 0 125,928 3,274,132 2016/17 415,002 0 0 16,600 431,602 2016/17 14,783,373 0 0 591,335 15,374,708 2016/17 496,250 0 0 19,850 516,100 2016/17 1,733,106 0 0 69,324 1,802,430 2016/17 2023/24 2024/25 2017/18 6,005,152 0 0 240,206 6,245,358 2018/19 6,245,358 0 0 249,814 6,495,172 2019/20 6,495,172 0 0 259,807 6,754,979 2020/21 6,754,979 0 0 270,199 7,025,178 2021/22 7,025,178 0 0 281,007 7,306,185 2022/23 7,306,185 0 0 292,247 7,598,433 2023/24 7,598,433 0 0 303,937 7,902,370 2024/25 3,274,132 90,000 0 132,765 3,496,897 2017/18 3,496,897 0 (2,250,000) 139,876 1,386,773 2018/19 1,386,773 0 (380,000) 55,471 1,062,244 2019/20 1,062,244 0 (840,000) 42,490 264,734 2020/21 264,734 (275,000) 10,589 323 2021/22 323 0 0 13 336 2022/23 336 0 0 13 349 2023/24 349 0 0 14 363 2024/25 431,602 0 0 17,264 448,866 448,866 0 0 17,955 466,820 466,820 0 0 18,673 485,493 485,493 0 0 19,420 504,913 504,913 0 0 20,197 525,109 525,109 0 0 21,004 546,114 546,114 0 0 21,845 567,958 567,958 0 0 22,718 590,677 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 15,374,708 0 0 614,988 15,989,697 15,989,697 0 0 639,588 16,629,284 16,629,284 0 0 665,171 17,294,456 17,294,456 0 0 691,778 17,986,234 17,986,234 0 0 719,449 18,705,683 18,705,683 0 0 748,227 19,453,911 19,453,911 0 0 778,156 20,232,067 20,232,067 0 0 809,283 21,041,350 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 516,100 0 0 20,644 536,743 2017/18 536,743 0 0 21,470 558,213 2018/19 558,213 0 0 22,329 580,542 2019/20 580,542 0 0 23,222 603,763 2020/21 603,763 0 0 24,151 627,914 2021/22 627,914 0 0 25,117 653,031 2022/23 653,031 0 0 26,121 679,152 2023/24 679,152 0 0 27,166 706,318 2024/25 1,802,430 0 0 72,097 1,874,527 2017/18 1,874,527 0 0 74,981 1,949,508 2018/19 1,949,508 0 0 77,980 2,027,489 2019/20 2,027,489 0 0 81,100 2,108,588 2020/21 2,108,588 0 0 84,344 2,192,932 2021/22 2,192,932 0 0 87,717 2,280,649 2022/23 2,280,649 0 0 91,226 2,371,875 2023/24 2,371,875 0 0 94,875 2,466,750 2024/25 City Centre Carpark - Cash in Lieu Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 567,679 0 0 22,707 590,386 2016/17 6108 2022/23 Public Carpark Reserve - Cash in Lieu Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6107 2021/22 Administration Building Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6101 2020/21 Waste & Landfill Preservation Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6105 2019/20 Town Planning Scheme Reviews Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6104 2018/19 Capital Works & Purchases Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6100 2017/18 Employee Leave 590,386 0 0 23,615 614,001 2017/18 614,001 0 0 24,560 638,561 2018/19 638,561 0 0 25,542 664,104 2019/20 664,104 0 0 26,564 690,668 2020/21 690,668 0 0 27,627 718,295 2021/22 718,295 0 0 28,732 747,027 2022/23 747,027 0 0 29,881 776,908 2023/24 776,908 0 0 31,076 807,984 2024/25 City Centre Development Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 2,380,594 0 0 95,224 2,475,818 2,475,818 0 0 99,033 2,574,851 2,574,851 0 (2,500,000) 102,994 177,845 34 177,845 0 0 7,114 184,959 184,959 0 0 7,398 192,357 192,357 0 0 7,694 200,051 200,051 0 0 8,002 208,053 208,053 0 0 8,322 216,375 216,375 0 0 8,655 225,030 4.1 CASH RESERVES - Movements 2016/17 6125 Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 1,029,722 0 0 41,189 1,070,911 2016/17 6115 194,790 0 0 7,792 202,582 2016/17 335,034 0 0 13,401 348,435 2016/17 2,667,401 0 0 106,696 2,774,097 2016/17 903,568 0 0 36,143 939,710 2016/17 14,742 0 0 590 15,332 2016/17 2023/24 2024/25 1,070,911 0 0 42,836 1,113,747 2017/18 1,113,747 0 0 44,550 1,158,297 2018/19 1,158,297 0 0 46,332 1,204,629 2019/20 1,204,629 0 0 48,185 1,252,814 2020/21 1,252,814 0 0 50,113 1,302,926 2021/22 1,302,926 0 0 52,117 1,355,043 2022/23 1,355,043 0 0 54,202 1,409,245 2023/24 1,409,245 0 0 56,370 1,465,615 2024/25 202,582 0 0 8,103 210,685 2016/17 210,685 0 0 8,427 219,112 2018/19 219,112 0 0 8,764 227,877 2019/20 227,877 0 0 9,115 236,992 2020/21 236,992 0 0 9,480 246,471 2021/22 246,471 0 0 9,859 256,330 2022/23 256,330 0 0 10,253 266,583 2023/24 266,583 0 0 10,663 277,247 2024/25 348,435 0 13,937 362,373 2017/18 362,373 0 0 14,495 376,868 2018/19 376,868 0 0 15,075 391,942 2019/20 391,942 0 0 15,678 407,620 2020/21 407,620 0 0 16,305 423,925 2021/22 423,925 0 0 16,957 440,882 2022/23 440,882 0 0 17,635 458,517 2023/24 458,517 0 0 18,341 476,858 2024/25 2,774,097 0 0 110,964 2,885,061 2017/18 2,885,061 0 0 115,402 3,000,464 2018/19 3,000,464 0 0 120,019 3,120,482 2019/20 3,120,482 0 0 124,819 3,245,302 2020/21 3,245,302 0 0 129,812 3,375,114 2021/22 3,375,114 0 0 135,005 3,510,118 2022/23 3,510,118 0 0 140,405 3,650,523 2023/24 3,650,523 0 0 146,021 3,796,544 2024/25 939,710 0 0 37,588 977,299 2017/18 977,299 0 0 39,092 1,016,391 2018/19 1,016,391 0 0 40,656 1,057,046 2019/20 1,057,046 0 0 42,282 1,099,328 2020/21 1,099,328 0 0 43,973 1,143,301 2021/22 1,143,301 0 0 45,732 1,189,033 2022/23 1,189,033 0 0 47,561 1,236,595 2023/24 1,236,595 0 0 49,464 1,286,058 2024/25 15,332 0 0 613 15,945 2017/18 15,945 0 0 638 16,583 2018/19 16,583 0 0 663 17,246 2019/20 17,246 0 0 690 17,936 2020/21 17,936 0 0 717 18,653 2021/22 18,653 0 0 746 19,399 2022/23 19,399 0 0 776 20,175 2023/24 20,175 0 0 807 20,982 2024/25 Strategic Master planning Reserve Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 607,492 0 0 24,300 631,792 2016/17 6147 2022/23 Climate Change Management Reserve Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6146 2021/22 Legal Fees Reserve Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6141 2020/21 Ansty Park Shared Costs Reserve Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6139 2019/20 Storm Damage Reserve Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6144 2018/19 Property Valuation Fees Reserve Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6118 2017/18 Workers Compensation 629,554 0 0 25,182 654,736 2017/18 631,792 0 0 25,272 657,063 2018/19 654,736 0 0 26,189 680,925 2019/20 657,063 0 0 26,283 683,346 2020/21 680,925 0 0 27,237 708,162 2021/22 683,346 0 0 27,334 710,680 2022/23 708,162 0 0 28,326 736,489 2023/24 710,680 0 0 28,427 739,107 2024/25 Baldivis Road Upgrade Reserve - DC Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 1,449,421 0 (960,000) 57,977 547,398 547,398 0 (569,294) 21,896 (0) (0) 0 0 (0) 0 35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.1 CASH RESERVES - Movements 2016/17 6155 2017/18 Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 185,849 0 0 7,434 193,283 2016/17 6169 193,283 0 0 7,731 201,014 2017/18 0 0 0 0 0 2016/17 2020/21 2021/22 2022/23 2023/24 2024/25 201,014 0 0 8,041 209,055 2018/19 209,055 0 0 8,362 217,417 2019/20 217,417 0 0 8,697 226,114 2020/21 226,114 0 0 9,045 235,158 2021/22 235,158 0 0 9,406 244,565 2022/23 244,565 0 0 9,783 254,347 2023/24 254,347 0 0 10,174 264,521 2024/25 0 0 0 0 0 0 0 0 0 2017/18 2018/19 0 0 0 0 0 2019/20 0 0 0 0 0 2020/21 0 0 0 0 0 2021/22 0 0 0 0 0 2022/23 0 0 0 0 0 2023/24 0 0 0 0 0 2024/25 Carbon Tax Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 3,187,120 3,314,605 3,447,189 3,585,076 3,728,479 3,877,618 4,032,723 4,194,032 4,361,793 0 127,485 3,314,605 0 132,584 3,447,189 0 137,888 3,585,076 0 143,403 3,728,479 0 149,139 3,877,618 0 155,105 4,032,723 0 161,309 4,194,032 0 167,761 4,361,793 0 174,472 4,536,265 2016/17 6130 2019/20 Developer Contributions Scheme Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 6306 2018/19 Harrington Waters Sp. Area Rates 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 CLAG -Peel Mosquito Control Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 22,378 0 0 895 23,273 2016/17 23,273 0 0 931 24,204 2017/18 24,204 0 0 968 25,172 2018/19 25,172 0 0 1,007 26,179 2019/20 26,179 0 0 1,047 27,226 2020/21 27,226 0 0 1,089 28,315 2021/22 28,315 0 0 1,133 29,448 2022/23 29,448 0 0 1,178 30,625 2023/24 30,625 0 0 1,225 31,850 2024/25 Learning City Strategy Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-transfer TO Reserve Closing Balance 200,988 0 0 8,040 209,028 2016/17 209,028 0 0 8,361 217,389 217,389 0 0 8,696 226,085 226,085 0 0 9,043 235,128 235,128 0 0 9,405 244,533 244,533 0 0 9,781 254,314 254,314 0 0 10,173 264,487 264,487 0 0 10,579 275,066 275,066 0 0 11,003 286,069 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 40,507,566 90,000 (569,294) 1,622,103 41,650,375 41,627,431 0 (4,750,000) 1,665,097 38,542,528 38,540,201 0 (380,000) 1,541,608 39,701,809 39,677,947 0 (840,000) 1,587,118 40,425,065 40,422,644 0 (275,000) 1,616,906 41,764,550 41,739,734 0 0 1,669,589 43,409,323 43,406,805 0 0 1,736,272 45,143,077 45,117,269 0 0 1,804,691 46,921,959 TOTAL -ALL RESERVES Opening Balance Transfers TO Reserve Transfers FROM Reserve Interest-Transfer TO Reserve Closing Balance 39,874,812 0 (960,000) 1,594,992 40,509,804 36 4.2 LOANS SUMMARY NEW LOAN BORROWINGS Year PROPOSED NEW BORROWINGS PROGRAM 2016 2016 2016 2017 2017 2018 2018 2019 2020 2021 2021 2022 2022 2023 2023 2025 2016/2017 Mersey Point Jetty (20 Year Loan) Foreshore Redevelopment (15 Year Loan) Baldivis South Community Centre (15 Year Loan) Baldivis District Sportsplex Stage 1 (2 x Ovals, 1 x Pavilion) (15 Year Loan) Rockingham Youth Outdoor Space (10 Year Loan) Baldivis South Outdoor Courts (10 Year Loan) Rockingham Central (Library/Youth/Community Centre) (15 Year Loan) Asset Management (10 Year Loan) East Baldivis Recreation Reserve (15 Year Loan) Stan Twight Reserve Clubroom Extension (15 Year Loan) Arpenteur Park Extension (15 Year Loan) Aqua Jetty Stage 2 (Expansion) (15 Year Loan) Secret Harbour Community Library (15 Year Loan) Baldivis District Sportsplex Stage 2 (2 x Ovals, 1 x Pavilion) (20 Year Loan) Asset Management (10 Year Loan) Baldivis District Sportsplex Stage 3 (Netball Courts and Infrastructure) (10 Year Loan) New Loans - BORROWED AMOUNTS Year PROPOSED NEW LOAN REPAYMENTS PROGRAM 2015 2015 2016 2016 2016 2017 2017 2018 2018 2019 2020 2021 2021 2022 2022 2023 2023 2025 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/26 1,675,000 5,000,000 3,500,000 12,200,000 1,380,000 1,200,000 5,000,000 3,000,000 6,450,000 4,500,000 3,000,000 12,800,000 2,600,000 10,500,000 3,000,000 10,175,000 2016/2017 Secret Harbour SLSC (P & I Loan) Eighty Road Reserve Clubroom and Lights (P & I Loan) Mersey Point Jetty (P & I Loan) Foreshore Redevelopment (P & I Loan) Baldivis South Community Centre (P & I Loan) Baldivis District Sportsplex Stage 1 (2 x Ovals, 1 x Pavilion) (P & I Loan) Rockingham Youth Outdoor Space (P & I Loan) Baldivis South Outdoor Courts (P & I Loan) Rockingham Central (Library/Youth/Community Centre) (P & I Loan) Asset Management (P & I Loan) East Baldivis Recreation Reserve (P & I Loan) Stan Twight Reserve Clubroom Extension (P & I Loan) Arpenteur Park Extension (P & I Loan) Aqua Jetty Stage 2 (Expansion) (P & I Loan) Secret Harbour Community Library (P & I Loan) Baldivis District Sportsplex Stage 2 (2 x Ovals, 1 x Pavilion) (P & I Loan) Asset Management (P & I Loan) Baldivis District Sportsplex Stage 3 (Netball Courts and Infrastructure) (P & I Loan) New Loans - REPAYMENTS 2017/2018 13,580,000 2017/2018 6,200,000 2018/2019 3,000,000 2019/2020 6,450,000 2020/2021 7,500,000 2021/2022 15,400,000 2022/2023 13,500,000 2023/2024 0 2024/2025 244,000 430,000 133,000 239,000 167,000 244,000 430,000 133,000 478,000 334,000 600,000 185,000 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 255,000 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 201,500 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 403,000 329,000 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 403,000 658,000 237,000 316,000 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 403,000 658,000 474,000 316,000 675,000 274,000 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 403,000 658,000 474,000 316,000 1,350,000 274,000 472,500 201,500 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 403,000 658,000 474,000 316,000 1,350,000 274,000 945,000 403,000 1,213,000 2,404,000 3,425,000 3,881,500 4,412,000 5,294,000 6,480,000 7,829,000 8,503,000 5,900,000 5,900,000 2025/26 244,000 430,000 133,000 478,000 334,000 1,205,000 185,000 161,000 510,000 403,000 658,000 474,000 316,000 1,350,000 274,000 945,000 403,000 793,000 9,296,000 Total New Borrowings 1,675,000 5,000,000 3,500,000 12,200,000 1,380,000 1,200,000 5,000,000 3,000,000 6,450,000 4,500,000 3,000,000 12,800,000 2,600,000 10,500,000 3,000,000 5,900,000 81,705,000 Expiry Year 2025/26 2025/26 2036/37 2031/32 2031/32 2032/33 2027/28 2028/29 2033/34 2029/30 2035/36 2036/37 2036/37 2037/38 2037/38 2043/44 2033/34 2035/36 EXISTING LOANS Expiry Loan No EXISTING LOANS - REPAYMENTS 263 2121 242 244H 244I 244J 245(1) 245(2) 245(3) 245(4) 252(1) 252(2) 252(3) 264(1) 270B 274 275 276 277 280 2016/2017 ADMINISTRATION & GOVERNANCE Nil LAW, ORDER & PUBLIC SAFETY Dog Pound EDUCATION Nil HEALTH Nil WELFARE SERVICES Nil COMMUNITY AMENITIES Nil RECREATION & CULTURE Rockingham Entertainers Rockingham Bowling Club Warnbro Recreation Centre Warnbro Recreation Centre Warnbro Recreation Centre Waterfront Village Waterfront Village Waterfront Village Waterfront Village Lark Hill Development Lark Hill Development Lark Hill Development Lark Hill Regional Sporting Complex Lark Hill Development Lark Hill Development Lark Hill Development Lark Hill Development Jetties TRANSPORT Nil ECONOMIC SERVICES Underground Power - Shoalwater OTHER PROPERTY & SERVICES Nil TOTAL EXISTING ANNUAL LOAN REPAYMENTS TOTAL ANNUAL SELF SUPPORTING (SS) LOANS TOTAL ANNUAL LOAN REPAYMENTS LESS SS LOANS ANNUAL BUDGET COSTS OF LOAN REPAYMENTS (Note: This includes Existing Loan Repayments as well as new Loan Repayments) 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 78,005 78,005 78,005 78,005 78,005 78,005 78,005 78,005 78,005 10,056 18,137 94,251 94,492 141,683 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 57,830 10,056 18,137 438,241 439,034 141,683 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 57,830 10,056 18,137 10,056 18,137 10,056 18,137 10,056 18,137 10,056 18,137 10,056 10,056 141,683 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 141,683 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 141,683 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 141,683 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 43,217 43,848 44,624 43,392 43,217 65,771 44,624 86,783 44,908 233,336 243,765 585,035 1,129,694 1,129,694 2025/26 78,005 44,908 233,336 243,765 585,035 564,848 Principle on Debt Outstanding Net Loan Repayments Finish 2027 Finish 2024 Finish 2021 Finish 2017 Finish 2017 Finish 2021 Finish 2024 Finish 2024 Finish2024 Finish 2024 Finish 2024 Finish 2024 Finish 2024 Finish 2024 Finish 2026 Finish 2027 Finish 2028 Finish 2028 Finish 2018 Finish 2018 Finish 2015 3,146,666 28,193 3,118,474 4,331,474 3,835,200 28,193 3,807,007 6,211,007 2,335,248 28,193 2,307,055 5,732,055 1,770,400 28,193 1,742,207 5,623,707 2016/2017 2017/2018 2018/2019 2019/2020 1,770,400 28,193 1,742,207 6,154,207 1,770,400 28,193 1,742,207 7,036,207 1,628,717 28,193 1,600,525 8,080,525 1,610,580 10,056 1,600,525 9,429,525 1,610,580 10,056 1,600,525 10,103,525 1,185,048 1,185,048 10,481,048 DEBT SERVICING Level of MAXIMUM LOAN REPAYMENTS of Available Revenue (8% is the Maximum) Period 9,250,063 31,201,999 9,739,887 41,425,045 10,126,590 42,483,397 10,410,517 41,661,438 2020/21 11,086,079 44,375,086 2021/22 11,526,967 47,607,638 2022/23 12,112,405 57,860,168 2023/24 12,572,411 65,484,356 2024/25 13,290,786 59,322,721 2025/26 13,736,961 59,560,626 4,331,474 6,211,007 5,732,055 5,623,707 6,154,207 7,036,207 8,080,525 9,429,525 10,103,525 Net Loan payments as a percent of Available revenue 3.75% 5.10% 4.53% 4.32% 4.44% 4.88% 5.34% 6.00% 6.08% 6.10% Debt Outstanding as percent of Available Revenue 26.99% 34.03% 33.56% 32.01% 32.02% 33.04% 38.22% 41.67% 35.71% 34.69% Available Operating Revenue 115,625,788 121,748,584 126,582,371 130,131,468 138,575,988 144,087,094 151,405,058 157,155,143 166,134,821 171,712,017 37 10,481,048 5. Plant 38 5.1 REPLACEMENT - PASSENGER PLANT Rego No Plant No Plant Description Original Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 1EQD495 656444 Mazda CX5 GT 42,000 7/11/2014 1EVE 970 651355 Kia Carnival Platinum Wagon 46,500 30/07/2015 1EHQ686 65293 Mitsubishi Outlander Aspire 4WD 42,000 9/09/2013 2002 RO 65043 Mitsubishi Outlander 4WD 34,000 27/08/2013 2004 RO 65825 Mitsubishi Outlander 34,000 19/05/2015 19300 21000 23,000 2026 RO 65025 Mazda 6 Touring Sedan 34,000 15/01/2015 19,300 21,000 23,000 2029 RO 65635 Mazda 6 Sport 34,000 7/05/2015 19,300 21,000 23,000 25,000 2031 RO 650544 Mitsubihi Outlander LS 34,000 13/08/2014 19,300 21,000 23,000 25,000 27000 2033 RO 651144 Mazda 6 Touring Wagon 34,000 20/08/2014 19,300 21,000 23,000 25,000 27000 2036 RO 65273 Mitsubishi Outlander 4WD 34,000 1/03/2013 21,000 23,000 25,000 2037 RO 65735 Golf 110 Tdi 34,000 28/07/2015 2042 RO 652655 Mazda 6 Sport 34,000 7/05/2015 19,300 2047 RO 65594 Golf GTI 34,000 14/07/2014 19,300 2066 RO 65074 Mitsubishi Outlander 34,000 26/11/2014 19,300 2081 RO 65935 Mitsubishi Outlander 34,000 24/07/2015 2003 RO 659244 Ford Focus 24,000 18/12/2014 18,500 21,000 26000 26,000 25,000 29000 27,000 24,000 26,000 20,000 22,000 20,000 31,000 33,000 29000 31,000 33,000 25,000 27,000 25,000 24,000 27,000 27,000 25,000 25,000 22,000 20,000 27,000 25,000 23,000 21,000 32000 29000 24,000 22,000 21,000 30,000 27,000 27000 25,000 23,000 22,000 27,000 25,000 24000 26,000 2005 RO 65234 Toyota Corolla Ascent Hatch 24,000 22/07/2014 18,500 21,000 2007 RO 652555 Holden Cruze CD Wagon 24,000 8/04/2015 18,500 21,000 2008 RO 65284 Nissan Pulsar ST 24,000 8/10/2014 2009 RO 65213 Toyota Corolla 24,000 16/07/2013 2010 RO 65813 Hyundai i30 Wagon 24,000 28/11/2013 2012RO 65152 Toyota Corolla Ascent 24,000 10/07/2012 2014RO 65904 Nissan Pulsar ST 24,000 10/06/2014 18,500 16,000 21,000 17,500 17,500 21,000 19,000 16,000 23,000 17,500 21,000 18,000 22,000 2016 RO 65803 Toyota Corolla Ascent 24,000 19/04/2013 2024 RO 654344 Toyota Corolla Ascent 24,000 24/04/2014 2025 RO 65312 Toyota Corolla 24,000 12/10/2012 2027 RO 65703 Hyuundai i30 Active Hatch 24,000 24/04/2013 2028 RO 65222 Toyota Corolla Ascent Hatch 24,000 5/12/2012 2034 RO 65782 Volkswagen Polo 24,000 5/06/2012 2038 RO 65444 Hyundai i30 Wagon 24,000 1/05/2014 2039 RO 65793 Hyundai i30 Wagon 24,000 11/10/2013 2040 RO 69545 Holden Cruze CD Wagon 24,000 24/02/2015 18,500 21,000 2043 RO 65845 Holden Cruze CD Wagon 24,000 12/03/2015 16,000 21,000 2044 RO 65393 Ford Focus 24,000 12/12/2013 65583 Ford Focus 24,000 18/10/2013 2045 RO 17,500 19,000 18000 22,000 16,000 17,500 17,500 21,000 19,000 16,000 23,000 18,500 21,000 18,500 22,000 17,500 21,000 19,000 18,000 16,000 2025/26 39 23,000 20,000 17,000 20,000 18,500 23,000 5.1 Rego No REPLACEMENT - PASSENGER PLANT Plant No Plant Description Original Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2046 RO 65572 Hyundai i30 Active 24,000 14/12/2012 2048 RO 658344 Hyundai i30 Active Wagon 24,000 14/03/2014 2054 RO 61544 Hyundai i30 24,000 4/04/2014 17,000 2055 RO 65723 Hyundai i35 Elite 28,000 28/02/2013 17,000 2056 RO 62144 Nissan Pulsar ST 24,000 28/05/2014 17,000 2057 RO 65854 Nissan Pulsar ST 24,000 20/11/2014 2059 RO 65863 Hyundai i35 AWD 28,000 4/09/2013 17,000 2060 RO 65874 Nissan Pulsar ST 24,000 15/10/2014 17,000 2061 RO 65343 Ford Focus 24,000 12/12/2013 17,000 20,000 2062 RO 65353 Ford Focus 24,000 12/12/2013 17,000 20,000 2063 RO 65164 Hyundai i30 Active 24,000 29/01/2014 17,000 20,000 2064 RO 65203 Hyundai i30 Active 24,000 29/08/2013 17,000 18000 2067 RO 65403 Hyundai i30 Active 24,000 25/09/2013 17,500 18,000 2071 RO 65893 Hyundai i30 24,000 18/06/2013 2080 RO 65884 Toyota Corolla 24,000 11/12/2014 2083RO 62832 Toyota Corolla 24,000 10/07/2012 17,000 2087RO 656255 Nissan Pulsar ST 24,000 18/02/2015 17,000 18,000 21,000 2088 RO 65362 Hyundai i30 Active 24,000 14/12/2012 17,000 18,000 21,000 2089RO 65384 Hyundai i30 Active 24,000 5/12/2014 2021RO 65745 Nissan Pulsar ST 24,000 14/01/2015 2103 RO 65455 Hyundai i30 24,000 24/08/2015 18,000 19,000 20,000 21,000 22,000 2104 RO 65465 Hyundai i30 24,000 24/08/2015 18,000 19,000 20,000 21,000 22,000 2105 RO 65475 Hyundai i30 24,000 24/08/2015 18,000 19,000 20,000 21,000 22,000 2106 RO 65485 Hyundai i30 24,000 28/08/2015 18,000 19,000 20,000 21,000 22,000 2107 RO 65495 Hyundai i30 24,000 28/08/2015 18,000 19,000 20,000 21,000 22,000 2108 RO 65505 Hyundai i30 24,000 28/08/2015 18,000 19,000 20,000 21,000 NEW TBA 24,000 18,500 NEW TBA 24,000 18,500 NEW TBA 25,000 Total Annual Cost = 16,000 18,500 14600 23,000 18000 23,000 20,000 18000 23,000 20,000 17,500 18000 23,000 18000 23,000 19000 16,000 23,000 21000 18,500 17,500 23,000 18,500 20,000 19,000 17,000 16,000 23,000 20,000 18,500 19000 23,000 21000 20000 21000 18500 332,400 312,600 40 566,500 393,000 22,000 20000 23000 358,000 491,000 281,000 534,000 498,000 659,000 5.2 Rego No. REPLACEMENT - LIGHT COMMERCIAL PLANT Plant No. Plant Description Orginal Purchase price Date Purchased 2016/17 2017/18 2018/19 2019/20 1DUV 967 63701 Suzuki LT-A400FL1 Kingquad 13,000 24/10/2011 1EJI514 63663 Suzuki 400ASI 4WD Bike (Rangers) 9,400 25/11/2013 11,000 2006 RO 62062 Holden Colorado 4x4 38,000 16/10/2012 27,000 2011 RO 62644 Holden Colorado 4x2 Dual Cab 29,500 9/04/2014 22,500 2013 RO 62984 Holden Colorado 4x2 40,000 18/07/2014 17,000 2015 RO 62345 Mitsubishi Triton 4x4 Dual Cab 31,000 14/08/2015 20,000 2017 RO 62714 Ford Ranger 4x2 Dual Cab 30,000 27/11/2014 23000 2019 RO 62324 Holden Colorado 4x2 28,000 4/09/2014 22,500 2023 RO 62584 Isuzu Dmax Dual Cab 4x4 35,000 1/08/2014 25,000 2049 RO 62095 Holden Colorado 4x2 Dual Cab 28,100 12/02/2015 2051 RO 62923 Isuzu Dmax Dual Cab 4x2 28,000 27/02/2013 2052 RO 65692 Mitsubishi Triton 4x4 Dual Cab 32,000 7/09/2012 2058 RO 62501 Isuzu Dmax 4x4 31,000 2065RO 62911 Ford Ranger 4x2 28,000 2068 RO 62303 Nissan Navara RX 4x4 38,000 11000 2021/22 2022/23 2023/24 2025/26 13,500 31,500 30000 26000 44,000 23,000 26,000 26,000 28,000 26,000 23,000 21,000 26,000 24,000 18,000 19,000 21,000 31,000 29,000 26,000 26,000 14/10/2013 2024/25 14000 30/01/2012 16/08/2011 2020/21 27,500 26,000 30,000 2069 RO 62155 Isuzu Dmax Dual Cab 4x2 29,000 23/03/2015 20,000 2070 RO 62292 Renault Kangoo Van 24,000 18/10/2012 17,500 2072RO 62184 Nissan Navara 4x4 39,000 26/08/2014 26,000 2073RO 62281 Holden Colorado 4x4 39,000 30/08/2011 2074 RO 62202 Nissan Navara 4x4 39,000 25/10/2012 2075 RO 622555 Nissan Navara 4x4 42,000 18/03/2015 2076 RO 62232 Nissan Navara 4x4 39,000 1/02/2012 25,000 29,000 2077 RO 622222 Nissan Navara 4x4 39,000 29/08/2012 25,000 29,000 2078 RO 622144 Nissan Navara 4x4 39,000 4/07/2014 2079 RO 62262 Nissan Navara 4x4 39,000 25/10/2012 24,000 20,000 29,000 33,000 28000 33,000 30,000 26,500 34,000 34,000 34,000 28000 41 34,000 34,000 28000 26000 34,000 26,000 30000 34,000 5.2 Rego No. REPLACEMENT - LIGHT COMMERCIAL PLANT Plant No. Plant Description Orginal Purchase price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 62124 Ford Ranger Dual Cab 28,600 31/10/2014 2084 RO 62172 Isuzu Dmax 4x2 28,000 21/09/2012 2085 RO 62193 Nissan Navara Dual Cab 4x4 39,000 20/03/2013 2086 RO 62084 Mitsubishi Triton 4x4 Dual Cab 33,000 20/03/2014 24,000 29000 2091 RO 62823 Holden Colorado 4x2 28,000 15/08/2013 21,500 24,000 2092 RO 62044 Holden Colorado 4x2 28,000 29/01/2014 2093 RO 62904 Holden Colorado 4x2 Dual Cab 28,000 5/09/2014 2094RO 62314 Nissan Navara Dual Cab 4x4 39,000 26/08/2014 2095RO 62872 Mitsubishi Triton 4x4 Dual Cab 38,000 29/03/2012 2096RO 62022 Ford Ranger Dual Cab 38,000 13/07/2012 2097 RO 62892 New Dual Cab Utility 28,000 1/11/2012 2098 RO 62943 New Asset Utility 28,000 22/03/2013 21,500 2099RO 62953 Nissan Navara 4x4 39,000 5/04/2013 24000 RO 10 65655 Isuzu Dmax Single Cab 4x2 28,000 29/05/2015 22500 26000 2020RO 62135 Holden Colorado Dual Cab 4x2 30,000 15/05/2015 22500 26000 RO 4704 63595 Suzuki 250 Quad bike 8,000 14/05/2015 RO 14692 69523 Toyota 12 seater bus 50,500 28/11/2013 35,000 RO 14726 69533 Toyota 10 seater bus ( Wheel Chair) 62,700 12/12/2013 35,000 RO 26 62624 Isuzu Dmax Dual cab 4x4 34,000 11/04/2014 23000 RO 28 62974 Ford Ranger Dual Cab 4x2 30,000 24/01/2014 23,000 RO 3 62765 Mitsubishi Triton Dual Cab 4x4 34,000 16/04/2015 RO 32 62863 Ford Transit SWB 30,500 4/09/2013 22,500 RO 33 62003 Ford Ranger 4x2 38,000 3/04/2013 27,000 RO 37 62493 Holden Colorado 4x2 28,000 27/08/2013 22,500 RO 38 625644 Holden Colorado 4x2 30,000 22/04/2014 22,500 23,000 29,000 25500 22,500 34,000 29,000 33,000 28,000 26000 22,500 20000 25,500 24000 32,000 27,000 25,000 34000 29,000 32,000 30,000 21,000 24000 26,000 25,000 28000 32,000 18,500 13,500 40,000 40,000 26,000 26,000 33,000 28,000 42 2025/26 26,000 2082 RO 25,000 2024/25 26,000 32,000 47,000 26,000 26,000 5.2 Rego No. REPLACEMENT - LIGHT COMMERCIAL PLANT Plant No. Plant Description Orginal Purchase price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 26,000 RO 39 62704 Ford Ranger 4X2 30,000 28/08/2014 RO 4 62164 Holden Colorao 4x4 47,000 24/03/2014 30000 RO 41 62513 Ford Ranger 4x2 30,000 3/04/2013 21,800 RO 43 62811 Mitsubishi Triton Dual Cab CDI 30,223 30/08/2011 RO 44 62615 Mitsubishi Triton Dual Cab 4x4 38,000 22/05/2015 RO 45 627733 Isuzu Dmax Dual Cab 4x4 38,000 27/02/2013 26,500 RO 46 620344 Ford Transit Van 33,000 28/08/2014 26,000 RO 48 62882 Ford Ranger Utility 37,900 29/06/2012 RO 49 62544 Ford Ranger Dual Cab 4x2 30,000 28/08/2014 RO 53 69013 Holden Colorado 4x4 45,000 8/07/2013 RO 59 62784 Mitsubishi Triton Dual Cab 4x4 38,000 2/09/2014 RO 6 62274 Mitsubishi Triton Dual Cab 4x4 38,000 2/09/2014 28,000 RO 62 62594 Holden Colorado Hi- Rider 4x2 Single Cab 38,000 1/10/2014 23,000 RO 64 620555 Holden Colorado Single Cab 4x4 30,000 15/05/2015 RO 67 62633 Ford Transit Ute LWB 38,500 29/05/2013 RO 69 62744 Holden Colorado Hi-Rider 4x2 Single Cab 38,000 26/09/2014 RO 7 62074 Ford Transit SWB Van 31,000 24/01/2014 RO 70 628455 Mitsubishi Triton 4x2 33,600 18/09/2015 RO 71 62242 Holden Colorado 4x4 38,700 16/08/2012 RO 72 62573 Ford Ranger 4x2 35,000 5/09/2013 21,000 RO 73 62603 Mitsubishi Triton 4x2 38,000 23/04/2013 21000 39000 RO 75 62963 Isuzu D-Max SX 30,000 20/06/2013 25000 27,500 RO 77 627944 Toyoya Hiace Van 50,000 9/04/2014 RO 78 69554 Mercedes Sprinter Van 54,500 25/02/2014 35,000 RO 79 62803 Ford Ranger Dual Cab 4x2 28,500 29/11/2013 81,000 23,000 38,000 44000 26000 23,000 25500 30,500 27,000 30000 29,000 24,000 30000 26,000 23,000 25,000 34,000 29,000 30000 26000 34,000 43,000 28000 24000 30000 26000 43,000 23,000 25,000 22,500 37,000 25,000 25,000 31,000 27,000 27,000 23,000 30,500 27,500 43 37,500 25,000 5.2 Rego No. REPLACEMENT - LIGHT COMMERCIAL PLANT Plant No. Plant Description Orginal Purchase price Date Purchased 2016/17 2017/18 2018/19 2019/20 RO 81 62674 Ford Ranger Dual Cab 4x2 30,000 29/08/2014 RO 84 62403 Holden Rodeo 4x4 38,000 27/09/2013 27,000 RO 85 627522 Mitsubishi Triton Single Cab 36,000 30/01/2012 38000 RO 86 62852 Mitsubishi Triton Dual Cab 4x2 30,000 17/02/2012 RO 87 62695 Holden Colorado Dual Cab 4x2 30,000 22/01/2015 RO 88 62684 Holden Colorado Dual Cab 4x2 30,000 25/02/2014 RO 97 62533 Mitsubish Triton 22,000 1/03/2013 RO 98 62734 Holden Colorado Dual Cab 4x2 30,000 25/03/2014 RO 20 62934 Misubishi Triton 4x2 Single Cab 38,000 26/10/2014 2090 RO 62335 Holden Colorado 4x4 Single Cab Trademate 44,000 30/03/2015 29,000 2053 RO 62995 Mitsubishi Triton Dual Cab 4x2 29,000 27/02/2015 25,000 RO 74 62355 4x4 Dual Cab Tray Back Ute 35,000 18/09/2015 Total Annual Cost = 2020/21 2021/22 2022/23 2023/24 2024/25 26,000 23,000 29,500 27,000 25000 22,000 25500 26,000 23,000 25,000 22,000 26000 37,000 25,000 22000 21000 40000 33,000 28,000 38000 274,000 2025/26 429,300 44 856,000 603,000 335,000 42000 481,000 508,500 614,000 1,074,000 295,000 5.3 REPLACEMENT - LANDFILL MGT PLANT Plant No Rego No Plant Description Model Date Purchased 2016/17 60032 RO12955 Caterpillar Grader (Replace with Eng Ops) 120H 21/01/2002 60302 1EBP 872 Yanmar Loader V4-6 15/11/2012 60332 Sumitomo 20 Tonne Excavator SH210LC-5 15/11/2012 60349 Sumitomo 12 Tonne Excavator 2017/18 2018/19 60353 Liebher Track Loader LR634 22/10/2013 Bomag BC772RB-2 (Landfill) BC772RB-2 10/06/2011 60383 Bomag BC772RB-2 24/04/2013 60392 CAT Track Loader 963DC 3/04/2012 604144 Liebher Track Loader LR632B 17/12/2014 60420 1DGL 588 Loader Doosan DL250 12/01/2010 60435 1ESW278 Kawasaki Loader 90ZV 21/01/2015 2020/21 2021/22 2022/23 700,000 600,000 1,100,000 970,000 1120000 990,000 940,000 700,000 330,000 295,000 570,000 525,000 Yanmar Diesel Pump L48 22/10/2007 5,800 6,500 Yanmar Diesel Pump L48 22/10/2007 5,800 6,500 60487 Tank / Pump Truck Mounted 5/09/2007 60509 Cardboard Compactor S15100 5/09/2008 60511 Waste Compactor 5555950 25/05/2011 60520 Moxy Water Cart 30,000 Litre 25/03/2010 60532 Cummins Generator GMS100CS-AU 22/08/2012 60543 Moxy Water Cart 35,000 Litre 27/09/2013 60564 Genelite Generator 20KVA GMS20KS-AU 30/05/2014 60574 Polystyrene Compactor Z-C200 5/02/2014 60584 Lighting Tower 88,000 355,000 65,000 30,000 360,000 70,000 Isuzu FVZ 1400 Hooklift 3/05/2010 RO 51 Isuzu FVZ 1400 6 wheel tipper 9/05/2008 61110 RO 6881 Isuzu 6 Wheeler Bin hook trcuk 2/11/2000 61828 RO 31 Isuzu Crew Cab FRR500 11/12/2008 61843 RO 66 Isuzu Tipper FRR500 10/09/2013 63805 Husqvarna Ride on Mower GTH3052TDF 27/05/2015 64445 Odour Unit Skid Mounted Skid Mount 5/05/2015 66235 High pressure Cleaner Jetwave CW200-21 1/05/2015 66288 Honda Pressure Cleaner 8/02/2008 66527 Genelite Generator 4.5KVA 18/01/2007 68019 Pressure Cleaner Pressure Cleaner 11/02/2009 68217 Ingersol Rand Compressor 1/12/1997 604722 Kohler Skid Mounted Pump 4" Trash Pump 8/10/2012 23,500 21,500 52000 2/04/2014 RO 13448 2025/26 180,000 60457 61018 2024/25 140,000 60467 61010 2023/24 85,000 8/01/2009 60371 2019/20 18,500 245,000 165,000 250,000 178,000 150,000 100,000 6,800 7,700 7,100 30000 5,000 4,000 4,000 42,000 38,000 45 Total Annual Cost = 0 1,215,400 923,000 2,686,500 320,600 1,274,000 445,000 2,167,700 105,500 2,448,000 5.4 REPLACEMENT - PARKS MGT PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 60045 1ETU 971 Case skid steer loader 60,000 19/05/2015 60700 RO 8494 Vermeer Wood Chipper 63,500 15/01/2010 Wicket Roller 29,000 5/09/2012 60752 60757 Wicket Roller 30,000 26/10/2007 61069 RO 61 Isuzu Water Truck 220,000 1/07/2009 61410 RO 95 Isuzu Tipper 61,000 27/05/2010 61427 RO 42 Mercedes Tipper 130,000 12/06/2007 61430 RO 47 Mitsubishi Fighter 6.0 82,000 29/03/2010 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 62,000 125,000 138,000 39,000 35,000 190,000 65,000 85,000 132,000 105,000 128,000 61453 RO 96 Isuzu Tipper 60,000 1/03/2013 RO 30 Hino 300 Two Way Tipper 77,000 7/06/2015 61495 RO 5737 Hino 300 Two Way Tipper 77,000 20/07/2015 61501 RO 22 Isuzu NPR300 60,000 14/10/2011 65,000 75,000 61511 RO 76 Isuzu NPR300 60,000 8/11/2011 65,000 75,000 61523 RO 17 3 Tonne Tipper (3Way) 70,000 5/08/2013 61555 RO 15 Hino 300 Two Way Tipper (Crane) 85,800 8/03/2015 62668 RO 19 Isuzu NPR300 Crew 62,300 18/12/2008 77,000 61535 RO 13 Hino 300 Two Way Tipper 77,000 17/07/2015 77,000 61565 RO50 1DTY 909 Hino Tipper Arrow Board 76,000 8/03/2015 Toro Workman MDX 17,000 17/10/2011 63013 RO 55 Massey Ferguson Tractor 70,000 28/02/2013 63028 RO 83 Kubota 64,000 23/12/2008 63044 RO14892 Massey Ferguson 5430 83,000 21/08/2014 63050 1DNF 582 Gianni Ferrari 45,000 30/11/2010 63068 RO 92 Kubota 64,000 23/12/2008 63073 RO 27 Massey Ferguson Tractor 70,000 28/02/2013 63087 1CRS 569 Massey Ferguson Tractor ( Larkhill) 70,000 29/11/2007 63092 1DWG 316 Kubota L4240 Tractor 29,000 17/04/2012 63494 1EKX 324 Toro Workman MDX 16,500 16/04/2014 63505 1ETW 906 Toro 4700 Rotary Gang Mower 81,000 29/05/2015 63513 1EFY209 Toro Groundmaster 3280D 27,000 23/07/2013 63527 1COX 345 Toro Reel Master 4000D 1COX345 75,000 7/09/2007 63532 1EBC579 Toro Workman MDX 18,000 5/11/2012 63549 RO 13062 Schaffer Loader 50,000 3/04/2009 2025/26 70000 61465 63001 2024/25 65,000 75000 72,000 77,000 60,000 70,000 80,000 73,000 19,000 22,000 65,000 80,000 85,000 90,000 102,000 63,000 71,000 75,000 70,000 85,000 64,500 79,000 22,000 18,000 21,500 90,000 30,000 38,000 83,000 46 16,500 93,000 22,000 57,000 5.4 REPLACEMENT - PARKS MGT PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 63563 1EFZ782 Toro Mower 30,000 23/03/2013 63583 1EFI 021 Toro Mower 27,000 2/07/2013 635855 1EUS 220 Toro Mower 24,000 24/06/2015 636022 1DWN104 Toro Mower 28,000 30/03/2012 63615 1EUR 605 Toro Mower 24,000 24/06/2015 63623 1EFH 550 Toro Mower 27,000 3/07/2013 63653 1EDA 470 Toro Mower 28,500 1/02/2013 63679 1DFX 161 Gianni Ferrari 50,000 18/12/2009 63685 1ESA 407 Toro Mower 100,000 29/01/2015 63690 RO 8431 63711 1DTO 035 63723 2017/18 2018/19 2019/20 2020/21 2021/22 33,000 2022/23 2023/24 33,500 33,000 37000 32,000 33,500 37000 33,000 37000 33,000 42,000 33,000 42,000 58,000 65,000 115,000 130000 Tandem Trailer 6,000 14/04/2010 29,000 27/10/2011 1EIZ710 Kubota Mower 25,000 21/11/2013 33,000 42,000 63733 1EJO218 Kubota Mower 25,000 21/11/2013 33,000 42,000 63743 1EJO 219 Kubota F3680 Side Discharge 30,000 64058 RO 8726 Bob Cat Trailer 17,000 31/03/2008 64109 RO 8422 Bike Trailer (Rangers) 3,600 30/01/2009 64118 RO 8389 Platform Tandem Trailer 9,800 31/07/2008 64125 RO 8927 Tandem Ptatform Trailer 100,000 5/05/2015 64256 RO 8230 Plant Trailer 13,000 23/05/2006 64274 RO 8751 Plant Trailer 9,500 1/04/2014 64281 RO 8562 Plant Trailer 13,000 23/03/2011 64293 RO8448 Plant Trailer 9,000 20/05/2013 9,000 28,000 22/11/2013 31,000 30,000 34,000 25,000 6,000 7,000 13,000 28,000 8,500 13,000 14,000 15,000 64305 RO 8939 Plant Trailer 13,000 29/06/2015 64318 RO 8399 Plant Trailer 13,000 13/05/2008 9,500 64325 RO 3991 Tandem Trailer 4,500 20/12/2005 4,500 64335 RO 3997 Tandem Trailer 4,500 9/12/2005 4,500 64369 1TKN 564 Singe Axle Trailer 2,500 23/12/2009 3,000 64379 RO 8432 Luggage Trailer 3,500 23/12/2009 4,500 64384 RO 8866 Singe Axle Trailer 2,500 8/05/2014 643955 1ERL 479 Hydralada 70,000 30/01/2015 64450 RO 8451 Singe Axle Trailer 2,500 16/02/2010 Dog Trailer (Rangers) 7,000 10/07/2014 1TJD 554 Tandem Van Trailer 6,300 24/06/2008 64474 2025/26 42,000 30,000 Toro Mower 64508 2024/25 14,000 13,000 2600 43,000 3,500 9000 47 8,000 5.4 REPLACEMENT - PARKS MGT PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 64511 1TNK 663 Mower Trailer 8,500 64524 RO8864 Tandem Trailer 8x5 4,500 64533 RO8704 Tandem Trailer 4,000 14/02/2013 8,000 64543 RO8706 Tandem Trailer 4,000 14/02/2013 8,000 64553 RO8705 Tandem Trailer 4,000 14/02/2013 8,000 64563 RO8707 Tandem Trailer 4,000 14/02/2013 8,000 64573 RO 8708 Tandem Trailer 4,000 14/02/2013 13,000 Spray Unit 14,500 12/08/2011 Peruzzo Triflex Gang Mower 38,000 2/09/2014 64591 64614 1TPR 513 10/10/2011 16,000 20,000 75,000 Howard Slasher 7,500 16/12/2009 Aggrizzi Slasher 7,000 22/12/2005 64678 Howard Flail Shredder 12,500 28/07/2008 64699 Redexim Level Spike 12,000 16/07/2009 Pegasus Tri Deck 58,500 28/11/2014 Tycrop Material Handler 47,500 30/06/2010 55,000 Wiedenmann Sweeper 41,000 28/01/2010 47,000 64788 Aggrizzi Slasher 7,200 6/06/2008 64795 Trimax Stealth 22,000 17/03/2015 64800 Smudge Board 5,000 17/12/1993 64819 Fertilizer Spreader 9,300 12/03/2009 64828 Gyral Easy Edger 10,000 30/08/2008 1TPY 353 64780 RO 8495 64838 1TJG 719 Custom Made Beach Cleaner 69,000 1/08/2008 64842 1TMS400 Peruzo Tiger 45,000 17/02/2012 64859 Redmix Verti Drainer 55,000 24/06/2009 66181 Wave Pool Cleaner 12,000 9/11/2011 66190 Squat Pack Sprayer 4,700 15/01/2010 66215 Generator 2,200 16/01/2015 8,000 13,500 15,000 66,000 11,000 55,000 10,000 12,500 10,000 95,000 50,000 45,000 15,500 18,000 5,500 Lawn Vacuum 2,200 21/09/2012 2,500 2,200 15/04/2014 2,700 66329 Wacker (Larkhill) 2,200 17/11/2009 66333 Wacker 2,200 17/01/2013 Dolphin Pro 2 Cleaner 4,200 23/06/2012 5,500 22/09/2005 6,500 2,200 Genelite Generator Ings Turf Cutter 14000 8,000 66242 66752 90,000 9,000 66294 67025 2025/26 5900 64659 64770 2024/25 15,000 14/04/2014 64665 64704 2023/24 2500 3,000 3100 2,500 48 2800 2,800 4,000 8,000 10,000 9,600 5.4 REPLACEMENT - PARKS MGT PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 67032 Mow Master Mower 5,700 5/09/2012 67036 Ings Turf Cutter 5,000 14/09/2006 67046 Dwyer Felton Mower 30" 4,800 31/10/2006 7,500 8,500 67056 Dwyer Felton Mower 22" 4,200 31/10/2006 6,500 7,500 67064 Mow Master Verti Cutter 30" 6,300 19/02/2014 67349 Horizon Punt 2,000 8/01/2009 67408 Self Propelled Broom 4,500 30/01/2008 67418 MEY Reel Mower 4,500 30/01/2008 67461 Deutscher H660 Self Propelled Mower 5,000 28/11/2011 67603 Bluebird De-Thacher 2,400 8/03/2013 67816 Stihl Chainsaw 1,500 17/11/2006 68277 Silvan Spray Unit 14,500 8/05/2007 68906 Comet Potting Machine 27,000 5/05/2006 Isuzu FH FSR850 Water Truck 192,000 3/06/2011 69191 7FB 562 69333 Van Trailer 2,500 17/05/2013 71204 Stihl Chainsaw 2,200 2/05/2013 Mitsubishi Fighter 6.0 86,000 16/04/2010 614400 RO 82 641333 RO 8730 Plant Trailer 13,000 28/08/2013 642400 RO 8446 Tandem Trailer 3,800 28/05/2010 642611 RO 8563 Mower Trailer 13,000 14/03/2011 Mow Master Mower 4,800 5/09/2012 Tool Box 7,000 Scarifier 23,000 670422 64644 NEW TBA Tandem Trailer 5,000 NEW TBA 400Ltr Quickspray Unit 5,000 Total Annual Cost = 7,800 10,250 8000 2,600 6,000 10,000 5,500 7,000 2,800 3300 1,500 14,000 16,000 46,000 245,000 2,700 2,100 2,200 2300 105,000 128,000 14,000 6,000 15,500 6,800 10,000 2/10/2014 26,000 10000 7500 253,000 690,300 49 586,100 742,700 903,000 10000 555,800 848,000 740,800 608,600 798,750 5.5 REPLACEMENT - ENGINEERING HEAVY PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 600099 RO 5 60028 N/A 60039 RO 99 60063 2017/18 2018/19 Doosan Front End Loader 340,000 7/12/2009 CAT Forklift 40,000 23/12/2008 CAT Motor Grader 330,000 20/01/2009 RO 14725 Volvo Backhoe 132,000 5/12/2013 60079 1CZN 157 Bomag Twin Drum 58,000 15/01/2009 60085 1ETU 972 Case Skid Steer Loader 58,000 19/05/2015 60098 RO 14 Volvo Front End Loader 160,000 14/04/2008 60119 RO 23 Dynapac Roller 160,000 20/03/2009 60134 RO 11 Hako Sweeper/Scrubber (Litter Busters) 141,000 9/10/2014 165,000 64044 1TPS 108 Plant Trailer (Sweeper) 20,000 9/10/2014 20,000 61154 RO 12 Hino 921 (Litter Busters) 90,000 16/10/2014 60124 1EQZ 186 Hako Sweeper/Scrubber (Litter Busters) 141,000 12/12/2014 165,000 63924 1TPW 273 Plant Trailer (Sweeper) 20,000 16/12/2014 20,000 61164 2101 RO Hino 921 (Litter Busters) 90,000 29/10/2014 61174 2102 RO Hino 921 (Litter Team 1) 86,000 29/10/2014 63904 RO8880 Tandem Trailer (Litter Team 1) 5,500 24/11/2014 66794 NEW Pressure Cleaner 2,200 2019/20 2020/21 2021/22 2022/23 280,000 2023/24 2024/25 175,000 48,000 290,000 140,000 42,000 85,000 142,000 140,000 185,000 110,000 185,000 110,000 110,000 12000 21/10/2014 7,000 6,000 8,000 110,000 61185 2100 RO Fuso Canter 815AMT (Litter Team 2) 76,000 13/05/2015 63914 RO8881 Tandem Trailer (Litter Team 2) 5,500 25/11/2014 TBA NEW Pressure Cleaner 5,000 60154 Generator PR Power ( Depot Admin) 27,000 30/04/2014 34,500 60164 Generator PR Power (Depot Workshop) 27,000 30/04/2014 34,500 12000 7,000 6,000 61025 RO 94 Hino FG 345,000 9/02/2015 61043 RO 8 Mercedes Jetting Vac Truck 360,000 24/05/2013 60128 1CTP 128 MacDonald Sweeper CN200 180,000 10/03/2008 61054 RO 100 Isuzu FSR700 200,000 15/04/2014 61070 RO 13432 Isuzu 6 wheel tipper truck 220,000 26/03/2010 61087 RO 36 Mercedes Tipper 130,000 12/06/2007 61090 RO 60 Izuzu FSR850 155,000 9/02/2010 2025/26 285,000 8,000 300,000 325,000 360,000 420,000 155,000 190,000 170,000 180,000 138,000 50 145,000 5.5 REPLACEMENT - ENGINEERING HEAVY PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 61108 RO 29 Isuzu 6 wheel tipper truck 190,000 8/05/2008 61124 RO 58 Hino Truck 80,000 1/07/2014 61137 RO 25 Mercedes tipper truck 130,000 12/06/2007 145,000 61147 RO 9 Hino 6 wheel tipper truck 148,000 21/06/2007 145,000 61473 RO 57 Isuzu (Graffiti Removal) 87,000 26/06/2013 61482 RO 68 Isuzu (Graffiti Removal) 87,000 5/01/2012 62100 RO 63 Isuzu Twin Cab Service Truck 100,000 13/01/2010 62119 RO 54 Isuzu NPR300 70,000 29/01/2009 64004 1TFB 139 Trailer Single Axle 2,500 17/05/2004 64017 RO 8281 Tandem Trailer ( Skidsteer) 16,800 14/02/2007 640233 1TON562 Trailer Single Axle Mobile Toilet 4,500 29/08/2013 64030 1TCJ 395 Trailer Single Axle ( Emergency) 2,500 16/11/2000 64070 1TKZ 732 Tandem Kerbing Trailer 18,200 17/05/2010 641444 RO 8865 Singe Axle Trailer 2,200 9/05/2014 64159 1TCK 184 Trailer VMS 21,000 17/06/2009 64165 RO 8937 Tandem Trailer 5,000 19/06/2015 6500 641755 1TQC 553 Trailer VMS 35,000 27/02/2015 48,000 641855 1TQC 554 Trailer VMS 35,000 27/02/2015 48,000 64197 1THS 241 Trailer VMS 19,500 8/03/2007 38,000 64207 1THZ 154 Tandem Trailer 4,000 1/06/2007 8,000 64218 1TJH 615 Trailer VMS 19,500 29/07/2008 28,000 64228 1TJH 616 Trailer VMS 19,500 29/07/2008 28,000 64239 1TKC 185 Trailer VMS 21,000 7/07/2009 64345 RO 8938 Tandem Trailer (Litter Crew) 6,800 18/06/2015 643500 RO 8519 Tandem Tailer 12,900 25/06/2010 Digger Cleana Pickup Broom 8,000 27/09/2006 64406 64412 1TND116 Tipping Trailer Litter Crew 8,000 11/05/2012 644388 RO 8358 Tandem Trailer 5,000 7/02/2008 Hardy Skid Mount Spray Unit 9,000 31/01/2014 64604 135,000 100,000 80,000 99,000 75,000 90,000 85,000 150,000 90,000 2500 22,000 6,000 3,500 25,000 3,500 32,000 30,000 9,000 15,000 13500 12,000 12,000 51 13,000 14,700 5.5 REPLACEMENT - ENGINEERING HEAVY PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 64903 Seive Bucket 5,500 3/05/2013 66008 Concrete Kerbing Machine 40,000 21/07/2008 55,000 66013 Unimec Roller 17,000 17/06/2013 20,000 66027 Midget Concrete machine 8,000 19/07/2007 66042 Honda Bricksaw 14" 2,600 25/09/2012 66050 Concrete Floor Saw 3,500 13/09/2010 66074 Concrete Saw 2,200 30/10/2014 66106 Wacker Pump 2,800 9/11/2006 66170 Pressure Cleaner 4,500 18/05/2010 66220 Generator 1,900 3/09/2010 66255 Pressure Cleaner 4,500 23/02/2015 5,000 66279 Lincon Weder Generator 12,300 9/11/2009 14,000 66311 Asphalt Plate Compactor 2,000 16/08/2011 66345 Generator 2,200 7/06/2005 66354 Generator 2,200 27/02/2014 66368 Compressor 2,200 18/06/2008 66372 Wacker Foot Compactor 3,250 22/08/2012 66381 Graco airless spray pump 7,600 2/12/2011 12,000 66394 Wacker Foot Compactor 2,900 13/02/2014 3,500 66436 Cement Mixer 2,200 7/11/2006 66424 Graco airless spray pump 8,000 26/11/2014 66509 Generator 2,000 19/11/2009 New Pressure Cleaner Rangers 3,200 24-Jan-13 3,500 3,800 66923 Jetwave Pressure Cleaner (Graffitti RO57) 3,600 4/02/2013 3,700 5,000 66946 Compressor 2,500 20/12/2006 66958 Pressure Cleaner 7,500 11/06/2008 67143 Pressure Cleaner 2,200 24/05/2013 66783 64063 1TOR796 VMS Trailer 30,000 8/11/2013 64093 1TOR798 VMS Trailer 30,000 8/11/2013 2023/24 2024/25 2025/26 9,000 12,000 3,500 4,100 5,000 3,000 5600 4,000 4,500 5,000 5,500 2,800 3200 5,100 2,800 3,500 2,500 3,000 2,000 2,700 3,000 2,100 13500 3,000 9,000 12,000 4,000 3,000 2,500 2,700 52 2,900 3100 40,600 40,600 5.5 REPLACEMENT - ENGINEERING HEAVY PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 2017/18 2018/19 2019/20 2020/21 68110 Compressor AMT55 5,500 24/03/2010 7,000 67103 Jetwave / Yanmar HW200-15 12,500 23/01/2013 18,000 676933 Generator (Assets) 2,200 14/02/2013 68309 Allspray Drain Cleaner 15,000 1/04/2009 68482 Quickview Haloptic System Camera 20,600 1/03/2012 30,000 68499 Unicom Teleview CCTV Camera 21,500 22/12/2009 80,000 Tandem Trailer 4,500 3/12/2009 Pressure Cleaner Hot/Cold 5,000 15/01/2013 8/11/2013 69219 RO 8428 66303 64083 1TOR797 New VMS Trailer 30,000 NEW TBA New Green Blast Machine 65,000 NEW TBA New Gas Detector 20,000 NEW TBA 4.5T Truck 100,000 Total Annual Cost = 2021/22 2022/23 2023/24 2024/25 2025/26 5,000 15,000 34,000 95,000 6,000 9,000 11,000 40,600 75,000 21,000 22,000 24,000 NEW PLANT 25,000 25000 120000 545,500 53 981,300 940,500 609,500 1,454,300 440,500 865,300 1,329,300 217,000 572,900 5.6 REPLACEMENT - WASTE COLLECTION PLANT Plant No Rego No Plant Description Original Purchase Price Date Purchased 2016/17 2017/18 2018/19 61702 RO 80 Volvo FE 300HP 392,000 13/07/2012 61713 RO 1987 Isuzu FVD1000 317,000 14/06/2013 61725 RO 40 Volvo FE 300HP Superior Pak 382,400 28/07/2015 61732 RO 56 Volvo FE 300HP 392,000 13/07/2012 61745 RO 24 Volvo FE 300HP Superior Pak 382,400 25/06/2015 435,000 61754 RO-18 Isuzu FSR700 288,500 26/02/2014 305,000 61764 RO 93 Volvo FE 300HP 388,000 25/08/2014 61772 RO 91 Volvo FE 300HP 392,000 24/06/2008 61783 RO 65 Iveco F23250/260 Superior Pak 329,000 27/06/2013 61793 RO 52 Iveco F23250/260 Superior Pak 329,000 27/06/2013 61803 RO 90 Isuzu FVD1000 320,000 25/11/2013 61830 RO 21 Isuzu NPR400 68,000 9/02/2010 NEW 66235 TBA Side loader Rubbish truck 6,600 2020/21 2021/22 2022/23 435,000 2023/24 2024/25 2025/26 505,000 400,000 435,000 435,000 468,000 505,000 435,000 505,000 505,000 370,000 425,000 450,000 528,000 450,000 515,000 385,000 450,000 515,000 385,000 450,000 515,000 440,000 480,000 85,000 65,000 440,000 High pressure Cleaner 2019/20 435,000 1/05/2015 505,000 17,000 Total Annual Cost = 835,000 54 825,000 1,615,000 1,305,000 1,367,000 885,000 1,575,000 1,885,000 1,545,000 996,000