Installing the Device on a Worktable(The S6700 cannot be placed on a worktable)
S2700/3700/5700/6700
Series Ethernet Switches
Adhibit the rubber pads.
Install the device on a worktable.
Quick Installation Guide
Part number: 31504991
Rev: 07
The device model is on the product nameplate.
Service and Support
Tool List
Crosshead
screwdriver
Claw hammer
Flathead
screwdriver
Adjustable
spanner
Marker pen
ESD-preventive
M6 Plug bolt
Cable tie
Percussion drill
(φ8 Drill bit)
Optical fiber
bundling tape
Huawei Technologies Co., Ltd.
Address: Administration Building,
Huawei Technologies Co.,
Ltd.,Bantian, Longgang
District,Shenzhen,People’s
Republic of China
Email: support@huawei.com
Website: http://www.huawei.com
Postcode: 518129
Diagonal pliers
Rubber pads
Installing the Device on a Wall
●
●
●
●
●
The S6700 and S5710-EI cannot be wall-mounted.
To prevent injuries, check that there is no electrical wire at the locations to be drilled before drilling holes in the wall.
When the 220 mm depth chassis of an S2700 or S3700 is mounted on the wall, use two screws to install the rack-mounting ear onto the chassis.
When a device is mounted to the wall, the front panel must face down to prevent water.
Ensure that there are no flammable or explosive materials near the switch and no sundries within 100 mm around the switch.
Fix the rack-mounting ears.
Accessories
Install the plug bolt.
M4
φ8 Drill bit
M6 plug bolt
Rubber pads
Captive nut
M4 screw
Long
Short
AC terminal
M6 screw
loose-proof pinch rack-mounting ear rack-mounting ear
Rear
rack-mounting
ear(S5710 -EI)
Front
rack-mounting
ear(S5710 -EI)
90。
Precautions
● Before installation, take ESD-preventive measures, for example, wear ESD-preventive gloves or a wrist strap.
● When the devices without fans are piled, ensure that the distance between each two devices is no less than 1U.
● Leave at at least 50 mm space beside and behind the chassis to allow for cooling air circulation.
● The AC terminal loose-proof pinch is used only when the switch is placed on a desk or wall-mounted.
Install the device on the wall.
Mark the hole locations on the wall according to
the device installed with rack-mounting ears.
Installing the Device in a Cabinet
● When the ground screw is located on one side of the switch, the ground cable cannot be connected when the switch is in a cabinet. Connect the
ground cable before installing the switch in the cabinet.
● The S6700 chassis is 420 mm in depth. To fix the S6300 chassis securely in a rack, install guide rails in the rack.
● When the 220 mm depth chassis of an S2700 or S3700 is installed in a cabinet, use two screws to install the rack-mounting ear onto the chassis.
● The dimensions of RPS1800 chassis are 442 mm x 310 mm x 43.6 mm (W x D x H) and can be installed only in a 19-inch IEC cabinet.
● The RPS1800 can use only short rack-mounting ears, which are installed at two ends and middle of each side.
2 Fix the captive nuts.
1 Fix the rack-mounting ears.
A
B
1U=44.45mm
C
1U
M4
M4
IEC cabinet (19 inch)
D
S2700-9TP-SI/EI
ETSI cabinet (21 inch)
E S5710-EI
● The power supplies and fan modules are hot swappable, but service cards are not. (The service cards of S5700-28C-HI, S5700-28C-HI-24S,
S5710-28C-EI, and S5710-52C-EI are hot swappable.)
M4
IEC cabinet (19 inch)
Installing and Removing the Modules
3 Install the device in a cabinet.
Installation of the power
supply module.
Removal of the power
supply module.
Installation of the front-access
service module.
Installtion of the rear-access
service module.
M4
>=1U
IEC cabinet (19 inch)
M6
IEC cabinet (19 inch)
● A 4-port GE optical interface card or 4-port 10GE optical interface card must be installed together with an external channel card (except on
an S5700-28C-HI or S5700-28C-HI-24S). Otherwise, the interface card cannot work.
● Remove blank panels before installing service modules.
Copyright © Huawei Technologies Co., Ltd. 2012. All rights reserved.
Remove the filler panel from the power
module slot on the RPS1800.
√
Install the RPS module.
×
Optical fibers
Ethernet cables
● Hold the upper edge of the filler panel and pull
the filler panel downward (1). Do not pull the
filler panel horizontally (2).
Cable tie
Power cables
● Move the white button leftward to loosen the handle, and pull out the handle (1).
● Install the power supply into the slot and push the handle inside (2)
● Move the white button rightward to lock the handle (3). To remove the RPS
module, reverse the steps (3-2-1).
Fiber bundling tape
PGND cable
Connecting PGND Cables and Power Cables
Connect the PGND cable.
Connect the DC power cable.
Installation of stack cables
● For how to install stack cards of the S5700, see the installation of the rear-access service module.
● The S5700 uses PCI-E cables, or SFP+ stack cables to connect stack interfaces on the ETPC card or the specified interfaces.
● The S5700-LI supports 1-meter passive SFP+ stack cables and 10-meter active SFP+ stack cables that are used to connect to the last two
SFP uplink optical interfaces. The bandwidth is 2.5 Gbit/s when 1-meter SFP+ stack cables or stack optical modules are used; the bandwidth
is 5 Gbit/s when 10-meter SFP+ stack cables are used.The S5700-LI also supports SFP+ stack optical modules.
● The S5710-EI supports 1-meter and 3-meter passive SFP+ stack cables and 10-meter active SFP+ stack cables that are used to connect to
10GE interfaces. The bandwidth is 10 Gbit/s when SFP+ cables are used.
● The S5700S-28P-LI-AC and S5700S-52P-LI-AC do not support stacking.
● The S6700 supports stack using service interfaces. It supports a maximum of eight stack interfaces,and 1-meter, 3 meter and 10-meter
SFP+ stack cables.
Connect the AC power cable.
Installation of stack cables.
S5700
I
1:1
S3700
S6700
I
Connect the RPS power cable.
A
B
+12V
RTN
C
RPS1800
● Do not connect power cables when the device is
powered on, so as to avoid injuries.
● Do not power on the device before device installation
and cabling are completed.
● Make sure that the protection grounding cable of the
device is grounded.
● The S6700 can use only AC power supply.
● A switch can use two types of RPS cables, as shown in
Figure A and Figure B.
● Figure B and Figure C show the RPS cable connection.
Figure B shows how an RPS cable is connected to a
switch.
Figure C shows how an RPS cable is connected to an
RPS1800.
Laying out Cables
Removal of stack cables.
S5700
S3700
Port number used in installing stack
cables of the S3700.
Model
Port Number
S3700-28TP
S3700-52P
25/26
49/50
● Do not stare at optical interfaces. The optical fiber contains laser light sources that hurt human eyes.
● Lay out and bundle power cables, optical fibers, and Ethernet cables separately, with the distances in between longer than 10 cm.
During the cabling, if the quantity of cables is rather great, you can route the cables in the cabinet first, and then install connectors