17 December 2013 Rokstar Pty Ltd C/- Brazier Motti
Transcription
17 December 2013 Rokstar Pty Ltd C/- Brazier Motti
OUR REF: DA-2013-166 17 December 2013 Rokstar Pty Ltd C/- Brazier Motti Pty Ltd PO Box 420 MACKAY QLD 4740 Dear Sir/Madam DEVELOPMENT APPLICATION Proposal: Application Number: Address: Property Description: Reconfiguration of a Lot & Material Change of Use - 1 Urban Residential Zone into 2 Lots & Dual Occupancy DA-2013-166 Lot 902 Dawson Boulevard, RURAL VIEW QLD 4740 Lot 902 on SP249177 Council acknowledges receipt of the Landscaping Plans for the development for the above proposal received 17 December 2013. The approved plans are attached herein and satisfy Condition 11 of the Decision Notice DA-2013-166 . Would you please update your records accordingly, if you require further information please email Josephine McCann at josephine.mccann@mackay.qld.gov.au . Yours faithfully Shane Kleve Principal Planner This is a Mackay Regional Council digitally signed document. SHEET 1 of 2 LANDSCAPE SPECIFICATION NORTH DA-2013-166 G LIN PA 00 18 1800 PALING FENCE The planting plan is a scale drawing and should not be photo reduced. The symbols used to show new plantings indicate type of plant and location only and do not represent plant size, pot size or future growth. The locations of the primary plantings of trees and/or palms should be scaled off the plan where measurements are not given. The location of shrubs is shown schematically 17/12/2013 to indicate the planting pattern in relation to the primary plants and ground covers are shown as zones of distribution. Both shrub and ground cover locations may be scaled off the plan but are not exact and may require some adjustment when placing plants on site to best achieve the intent shown on the plan within the available space. PREPARATION: Remove all debris, grass and weeds from landscape area. Cut bed areas to subgrade level as necessary to allow for topsoil, apply Gypsum @ 500g/m2 and cultivate existing ground by tyning to 300 depth. In turf areas cut/fill existing ground to 100 below finished level to allow for loam and turf. For isolated trees and palms in the turf areas excavate a 600 x 600 x 600 planting hole and backfill with loam. Prior to tyning or excavating verify the location of services and modify width or depth as necessary to avoid damage. MEL LFL SOIL: Apply 200 minimum depth of conserved site topsoil or use a natural sandy loam or soil mix equivalent to the garden bed. To all turf areas apply 100 of natural sandy loam or soil mix equivalent. All soils to be free of roots, stones and any deleterious matter. Finished level of beds to be kerb height. PLANTINGS: SYZ JAM All plants to be healthy, vigorous container stock, true to the specified botanic species. See Planting Stock Schedule for species and quantities. No species substitution without approval from the landscape designer. CAS SIA TURF FERTILZER: Apply a broadcast dressing of Katec "Super Growth" Fertilizer pellets @100g/m2 to all of the bed area. With each plant place 10g. Agriform planting tablets around the rootball and 50mm below the surface. For 300mm pot use 6 tablets; 200mm pot - 4 tablets' 140mm pot - 3 tablets.For turf apply Katec "Super Growth" Fertilizer pellets @ 100g/m2 to all of the turf area prior TURF to laying and apply Ammonium Sulphate 15/g/m2 one week and four weeks after laying and hose in well. ORGANIC MULCH: Apply 50mm minimum depth of clean hardwood chip mulch to all of the area of the garden bed. Apply mulch as an even layer after all planting, fertilizing and irrigation MEL VDR installation has been completed. Prior to placing mulch, grade soil back from the edge so that the bed edge retains full mulch thickness. Draw mulch back slightly from the plants so that it is not against plant stems. To isolated trees apply mulch to 500 radius from the plant. STONE MULCH: To the stone mulch strips north and south of residence 1 and south of residence 2, cut ground to 50 below finished level, lay weed mat over the area, sucuring it in STONE place with wire or plastic pins as necessary. Cover weed mat with 50 depth of 16mm crushed rock screenings CONCRETE BED EDGE: MULCH Install a continuous concrete bed edge (Kwik Kerb or similar) to the garden bed. Finish - natural cement with no pattern. CONCRETE PAVING SLABS: To the entry of both residences install a path of 600 x 600 concrete paving slabs laid flush with the finished ground level and the adjacent driveway. TURF: STONE To all of turf areas close lay green couch turf. Turf to be tight, weed free and may be composed of mixed couch grass varieties. Turf to be sand grouted, rolled and MULCH RESIDENCE 1 top dressed as necessary to achieve an even mowing surface. APPROVED PLAN E NC FE 160 TURF LEGEND RESIDENCE 2 SIX PAVING SLABS PALMS TURF CONCRETE BED EDGE SIX PAVING SLABS SHRUBS CONCRETE BED EDGE TURF 4 6 8 GROUND COVERS 180 FENCE TURF WOD BIF 10 STONE MULCH 3 x LEP MAD CONCRETE PAVING SLABS 12 HINKLER STREET 14 16 abbreviation botanical name pot size approx.. spacing Phyllanthus multiflorus 140mm 750 Wodyetia bifurcata 300mm minimum heght Qty at planting Ground Cover PHY MUL 150 3 as per plan 1200 2 Palm TURF 3 x PHY MUL 2 TREES WOD BIF 2 x IXO P.M. MULCHED GARDEN BED PLU AUR DUR GEI 0 PLANTING STOCK SCHEDULE REVISION A IRRIGATION SPECIFICATION ADDED. SEE SHEET 2 Client: ARM INDUSTRIAL PTY. LTD WOD BIF Shrubs DUR GEI Duranta repens "Geisha Girl" 200mm as per plan 300 1 IXO P.M. Ixora c.v. "Pink Malay" 200mm as per plan 250 2 PLU AUR Plumbago auriculata 200mm as per plan 250 1 CAS SIA Cassia siamea 300mm as per plan 1000 1 LEP MAD Leptospermum madidum 300mm 5000 400 3 MEL LFL Melaleuca leucadendron fine leaf 300mm as per plan 1000 1 MEL VDR Melaleuca viminalis "Dawson River". 300mm as per plan 900 1 SYZ JAM Syzygium jambos 300mm as per plan 900 1 Trees SIMON M. McCONNELL TROPICAL LANDSCAPE CONSULTANT Project: 140 HINKLER STREET, RURAL VIEW LANDSCAPE PLAN SHEET 1 - PLANTING PLAN 34 Brownhill Street, Mundingburra. 4812 Ph. 07 477 96852 M 0418 776961 e-mail: mcconnellgray@optusnet.com.au This is a Mackay Regional Council digitally signed document. SCALE: 1:200 @ A3 DATE: DECEMBER 2013 REF. No. 560/26A DESIGN: SM DRAWN: LG CHECKED: SM REFERENCE DRAWING: SMARTARCH SITE PLAN SHEET 2 of 2 DA-2013-166 APPROVED PLAN 17/12/2013 IRRIGATION PERFORMANCE SPECIFICATION The landscaped area of both residences to be seperately fully irrigated by permanent inground systems as specified below. To the metered water supply make a 20 ID connection and install an isolating ball valve, a 20 dual check valve backflow device and a 20 Amiad filter with 100 micron screen. This assembly to be on copper or GI risers 300 above ground. From the connection assembly to the solenoids all pipework to be 25 PN12.5 poly. sand bedded with 200 minimum cover Solenoids to be 25 Irritrol 205MT or equivalent in heavy duty path boxes. To all turf areas install pop-up sprinkler systems with Rainbird MPH sprinklers or equivalent with appropriate nozzle sizes to suit to give head to head cover with spray away from the building as far as possible. Pipework 19 or 25 LDPE tube with 150 cover, all fittings tightly clamped. To bed areas install a Toro "Dripeze" (or equivalent non-chemically treated) in line drip tube grid with 2 litre per hour drippers at 300 intervals and lines at 400 spacings. Dripline grids to be laid on the finished ground surface, secured in place as necessary with wire or plastic pins and terminate in a manual drain valve in a small plastic pathbox. Driplines are covered by the mulch layer. Install a Toro Greenkeeper automatic controller (or equivalent) in the dwelling garage or on an external wall to suit convenient access to power. If installed externally house the controller in a lockable weather proof enclosure. Cable from the controller to the solenoid valves to be 1.5mm2 with all joins heat shrink sealed. Supply "as constructed" drawings of the system installed showing all valves, sprinkler locations, distribution lines, drip line grids and the route of control cables. Warranty the system for 12 months and attach this specification with compliance certified by the installer. Any variations are to be approved by the Landscape Architect. Client: ARM INDUSTRIAL PTY. LTD Project: 140 HINKLER STREET, RURAL VIEW LANDSCAPE PLAN. SHEET 2 - IRRIGATION SPECIFICATION SIMON M. McCONNELL TROPICAL LANDSCAPE CONSULTANT 34 Brownhill Street, Mundingburra. 4812 Ph. 07 477 96852 M 0418 776961 e-mail: mcconnellgray@optusnet.com.au This is a Mackay Regional Council digitally signed document. DATE: DECEMBER 2013 REF. No. 560/27A DESIGN: SM DRAWN: LG CHECKED: SM