TRUSS REPAIR, ROOF, GUTTERS
Transcription
TRUSS REPAIR, ROOF, GUTTERS
TRUSS REPAIR, ROOF, GUTTERS, DOWNSPOUTS, SOFFIT & FASCIA REPLACEMENT PROJECT COVENTRY TOWNSHIP ADMINISTRATION & FIRE DEPARTMENT BUILDING 68 Portage Lakes Dr. Akron, OH 44319 PROJECT BID SPECIFICATION & CONTRACT DOCUMENTS SEPTEMBER 2014 -1- INDEX PAGE NO. . 2. INDEX 3. NOTICE TO BIDDERS 4.-10. INSTRUCTIONS TO BIDDERS NOTES DEFINITIONS BID SPECIFICATION DOCUMENTS EXAMINATION OF SITE BID BOND OR CERTIFIED CHECK INTERPRETATION ADDENDA SIGNATURE TO BIDS WITHDRAWAL INSURANCE REQUIREMENTS EQUAL EMPLOYMENT OPPORTUNITY CLAUSE ACCEPTANCE OF PROPOSAL, PERFORMANCE & PAYMENT BOND, AND MAINTENANCE BOND AWARD OR REJECTION OF BID NOTICE OF AWARD PRE-CONSTRUCTION MEETING BUILDING PERMIT 11. PROJECT SCOPE 11.-13. BID SPECIFICATIONS ROOF SPECIFICATIONS REPLACEMENT OF GUTTERS, DOWN-SPOUTS, SOFFITS AND FASCIA INSULATION AND VENTILATION PROTECTION JOB CONDITIONS MATERIAL WARRANTIES 14.-16. BIDDER QUALIFICATIONS 17.-22. PROPOSAL FORMS 23.-24. SALES AND USE TAX - CONSTRUCTION CONTRACT EXEMPTION 25. SUMMIT COUNTY BUILDING PERMIT APPLICATION 26. W-9 FORM 27.-28. PROJECT CONTRACT 29.-37. APPENDICES 1-9 – DRAWINGS 38-40. PHOTOS -2- NOTICE TO BIDDERS Notice is hereby given that sealed bids will be received at the office of the Coventry Township Board of Trustees for the furnishing of labor and material required for the Coventry Administration/Fire Department Truss Repair, Roof, Gutters, Downspouts, Soffit & Fascia Replacement Project according to the specifications for such improvement on file with the Coventry Township Fiscal Officer. Specifications for bids can be picked up for a non-refundable cost of $10.00 per set at the Coventry Township Administration Office, 68 Portage Lakes Drive, Akron, Ohio 44319. Bids will be received until 10:00 a.m., October 2, 2014, at the Administration Office, at which time they will be publicly opened and read. This ad and the bid documents can also be accessed from the Township website at coventrytownship.com by selecting “Township Bids” on the left-side of the home page. Sealed bids are to be mailed or delivered to Fiscal Officer, Joni Murgatroyd, Coventry Township, 68 Portage Lakes Drive, Akron, Ohio 44319, plainly marked "Sealed Bids – Administration/Fire Department Roof." Bids must be accompanied by a bond in the full amount of the bid or a certified check in the amount of ten percent (10%) of the bid. Said check/bond will be returned if a bid is not accepted. The contract will be awarded to the lowest and best bidder. The Board of Township Trustees reserves the right to reject any and all bids. -3- INSTRUCTIONS TO BIDDERS 1. NOTES A. Sealed proposals shall be received by the Coventry Township Board of Trustees for the following project: Coventry Administration/Fire Department Roof, Gutters, Downspouts, Soffit & Fascia Replacement 68 Portage Lakes Drive Akron, Ohio 44319 B. Sealed bids will be received for the above project until Thursday, October 2, 2014 at 10:00 a.m. at which time they will be publicly opened and read by Fiscal Officer Joni Murgatroyd. Submit the sealed bids to the following address: Coventry Township Administration Office 68 Portage Lakes Drive Akron, Ohio 44319 They shall be plainly marked Sealed Bids – Administration/Fire Department Roof. 2. DEFINITIONS A. The word TOWNSHIP, when used in this contract shall be held to mean the Township of Coventry represented by the Board of Trustees, Fiscal Officer, Road Superintendent, Fire Chief, Zoning Inspector or its duly authorized Deputies or Assistants. B. The word FISCAL OFFICER, when used in this contract, shall be held to mean the Fiscal Officer of Coventry Township. C. The word BOARD OF TRUSTEES, when used in this contract shall be held to mean the Board of Township Trustees of Coventry Township. D. The word CONTRACTOR or BIDDER, when used in this contract, shall be held to mean the individual, firm or corporation presenting a proposal or undertaking this contract with the Township of Coventry. E. The word SURETY, when used in this contract, shall be held to mean any firm or corporation, that has executed as surety, the Contractor’s performance bond, securing the performance of the within contract. -4- 3. BID SPECIFICATION DOCUMENTS A. Copies of specifications may be obtained by contractors from the Coventry Township Administration Office during the hours of 8:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m. or by accessing the Township’s website at coventrytownship.com by selecting “Township Bids” on the left side of the home page. These documents may be reviewed without charge during the above noted business hours. 4. EXAMINATION OF SITE A. Each Bidder shall visit the site of the proposed work and acquaint himself with the conditions relating to the construction and labor so that they may fully understand the facilities, difficulties, and restrictions attending the execution of the work. Bidders shall be familiar with the specifications. The failure or omission of any Bidder to receive or examine any form, instrument, or other documents, or to visit the site and acquaint himself with the conditions there existing shall in no way relieve any Bidder from any obligation with respect to his bid or to the Contract. 5. BID BOND OR CERTIFIED CHECK A. Each bid shall be accompanied by a Bid Guaranty and Contract Bond in accordance with Ohio Revised Code section 153.54. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed and authorized to do business in the State of Ohio for the full amount of the bid, or a certified check drawn on a solvent bank, which check shall be in the amount of ten percent (10%) of the amount of the bid. Said bond or check shall be given as security that, if the bid is accepted, a contract will be executed in conformity with the bid. The bid bond or check of the Bidder will be returned upon the proper execution and securing of the contract and acceptance of a valid performance bond. B. Certified checks shall be made payable to Coventry Township to the attention of the Fiscal Officer. Should any proposal be rejected, such check will be returned to the bidder. Should any proposal be accepted, such check would be returned upon proper execution and securing of the contract. If the bidder to whom the contract has been awarded shall refuse or neglect, within ten (10) days after the notice of such award, to execute the same and furnish surety in the amount required, then the certified check shall be forfeited to said Township as liquidated damages for such neglect or refusal. The amount so collected shall be paid into the fund provided for payment of the cost of the proposed improvement. -5- 6. INTERPRETATION A. Any questions pertaining to the interpretation of specifications should be directed to Captain Adam Rockich at 330-644-3228, ext. 608, or Fiscal Officer Joni Murgatroyd at 330-644-0785, ext. 691. 7. ADDENDA A. Addenda will be mailed or delivered to all who are known by the issuing office to have received a complete set of Bidding Documents. B. Each Bidder shall ascertain, prior to submitting a bid that the Bidder has received all addenda issued, and the Bidder shall acknowledge their receipt in the bid. 8. SIGNATURE TO BIDS A. Each bid must give the full business name and address of the Bidder. Bids by partnerships must be signed with the partnership name and by one of the authorized members of the partnership. Bids by corporations followed by the signature and designation of the president, secretary, or other person authorized to act for the president or secretary. 9. WITHDRAWAL A. Prior to the time and date designated for receipt of Bids, any Bid submitted may be modified or withdrawn by notice to the party receiving bids at the place designated for receipt of bids. Such notice shall be in writing. B. Withdrawn bids may be resubmitted up to the time designated for the receipt of bids, provided that they are then fully in conformance with the Notice to Bidders. C. No proposal may be withdrawn or modified after the bid opening. 10. INSURANCE REQUIREMENTS A. The Contractor must provide insurance covering the work period in the amount as follows: 1. Property Damage 2. Public Liability 3. Worker’s Compensation -6- $1,000,000.00 $1,000,000.00 Full Coverage B. In addition, the Contractor must provide insurance, satisfactory to the Township Trustees and Fiscal Officer, up to a maximum of $1,000,000.00, to cover any liability or claim by or through employees, or other persons, which the claim might not be covered by usual forms of Contractor’s liability insurance policies. The Contractor shall hold the Township harmless from any and all loss, cost, damage, expense or liability by reason of property damage or personal injury of whatsoever nature or kind arising out of, as a result of, or in connection with performance of the work under this Contract occasioned in whole or in part by the actions or omissions of the Contractor, its employees, agents or subcontractors. In the event any action is brought against the Township or any of its agents or employees, arising out of the Contractor’s or subcontractor’s performance of the work, the Contractor shall assume full responsibility for the defense thereof; upon Contractor’s failure to do so upon proper notice. Township reserves the right to defend such action and to charge all costs, including reasonable counsel fees, to the Contractor. Contractor agrees to indemnify and hold Township harmless from any payments the Township may be compelled to make based upon wages, to employees of the Contractor, or any subcontractor under any applicable unemployment compensation law or pursuant to any claim by an employee of the Contractor or any subcontractor under any applicable worker’s compensation law. 11. EQUAL EMPLOYMENT OPPORTUNITY CLAUSE A. During the performance of this contract, the Contractor agrees as follows: 1. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, gender identity, sexual orientation or national origin. The Contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment, without regard to their race, religion, color, sex, gender identity, sexual orientation or national origin. As used herein, the word "treated" shall mean and include, without limitation, the following: recruited, whether by advertising or other means; compensation, whether in form of rates of pay or other forms of compensation; selected for training, including apprenticeship; promoted; upgraded; demoted; downgraded; transferred; laid-off; and terminated. The Contractor agrees to and shall post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officers setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall in all solicitations or advertisements for employees placed by or on behalf of the Contractor; state that all qualified applicants will receive consideration for employment without regard to race, religion, color, sex, gender identity, sexual orientation or national origin. -7- 3. The Contractor shall send to each labor union or representative of workers with which they have a collective bargaining agreement or other contract or understanding, a notice advising the labor union or worker's representative of the Contractor's commitments under the Equal Employment Opportunity Policy of the County of Summit and shall post copies of the notice in a conspicuous place available to employees and applicants for employment. 4. The Contractor shall furnish all information and reports required by the commission or its representative, and shall permit access to its books, records and account, by the contracting agency and by the Contract Compliance Officer for purposes of investigation to ascertain compliance with the program. 5. The Contractor shall take such action with respect to any subcontractor as the Township may direct as a means of enforcing the provisions of paragraphs 1 through 8 herein, including penalties and sanctions for noncompliance, provided, however, that in the event the contractor becomes involved in or is threatened with litigation as the result of such direction by the Township, the Township will enter into such litigation as is necessary to protect the interests of the Township and to effectuate the Township's Equal Employment Opportunity Program and in the case of contracts receiving Federal assistance, the Contractor or the Township may request the United States to enter into such litigation to protect the interests of the United States. 6. The Contractor shall and shall cause its Subcontractors, if any, to file compliance reports with the Township in the form of and to the extent prescribed by the commission or its representative. Compliance reports filed at such times as directed shall contain information as to the employment practices, policies, programs and statistics of the Contractor and its Subcontractors. 7. The Contractor shall include the provisions of paragraphs 1 through 8 of this Equal Employment Opportunity Clause in every subcontract or purchase order so that such provisions will be binding upon each Subcontractor or Vendor. 8. Refusal by the Contractor or Subcontractor to comply with any portion of this program as herein stated and described will subject the offending party to any or all of the following penalties: (a) Withholding of all future payments under the involved public contract to the Contractor in violation until it is determined that the Contractor or Subcontractor is in compliance with the provisions of the contract. -8- (b) Refusal of all future bids for any public contract with the Township or any of its departments or divisions until such time as the Contractor or Subcontractor demonstrates that they have established and shall carry out the policies of the program as herein outlined. (c) Cancellation of the public contract and declaration of forfeiture of the Performance Bond. (d) In cases in which there is substantial or material violation or the threat of substantial or material violation of the compliance procedure or as may be provided for the contract, appropriate proceedings may be brought to enforce these provisions, including the enjoining, within applicable laws, of Contractors, Subcontractors or other organizations, individuals or groups who prevent directly, indirectly or seek to prevent directly or indirectly, compliance with the policy, as herein outlined. 12. ACCEPTANCE OF PROPOSAL, PERFORMANCE AND PAYMENT BOND, AND MAINTENANCE BOND A. When a proposal is accepted, and within ten (10) days thereafter, the bidder whose proposal is so accepted, will be required to enter into a contract in the form hereto attached and provide a standard performance and payment bond, in the sum of one hundred percent (100%) of the bid price, executed by an authorized surety, guaranty or trust company, or companies, to the satisfaction of the Board of Township Trustees and Fiscal Officer. B. In addition to the standard performance bond, a one-year maintenance bond, in the amount of ten percent (10%) of the contract amount, shall be required of the successful bidder at their own expense. The one-year term of this guarantee shall begin on the date of the final acceptance of this improvement and shall guarantee that this improvement shall remain in good condition for and during the entire period of the guarantee. If at any time before or during said period of guarantee any defects or omissions become apparent in the work or if it becomes apparent that any of the work is not in accordance with the requirements, or if any work constructed under this contract requires repair due to defects in material or workmanship, or for any other cause which may be attributed to the work which is being done or has been done by the Contractor, as determined by the Township, the Contractor shall rectify such defects or omissions within five (5) days of notification and shall complete such corrections within a reasonable length of time at their own expense. If the Contractor fails to rectify such defects or omissions or to start such repairs within five (5) days, the Township reserves the right to make such corrections at the expense of the Contractor or the Bonding Company. C. If the bid is made by a firm or corporation, the name and place of residence of each member of the firm or partnership must be given. If made by a corporation, the person signing shall state under the laws of what State the -9- corporation was chartered and the name and title of the officers having authority under the by-law to sign contracts. Anyone signing a proposal as an agent must file with it legal evidence of their authority to do so. D. Two (2) proposals from a firm, corporation, or association under different names will not be considered. Reasonable grounds for supposing that any bidder is interested in more than one proposal for this work will be cause for rejection of all proposals in which they are interested. Any or all proposals will be rejected if there are reasonable grounds for supposing that there is collusion among bidders, and all participants in such collusion shall not receive further recognition as bidder for this work. E. Bidders are invited to be present at the opening of proposals, which will occur at the office of the Fiscal Officer of the Township at 68 Portage Lakes Drive, Akron, Ohio 44319 on Thursday, October 2, 2012 at 10:00 a.m. 13. AWARD OR REJECTION OF BIDS A. The Township reserves the right to accept or reject any and all bids, in whole or in part, and may waive minor defects or irregularities in the bidding, which do not affect the bid amount or otherwise give the bidder a competitive advantage. 14. NOTICE OF AWARD A. The successful Bidder, within ten (10) days from the date of the Notice of Award, will be required to execute the Agreement and furnish the necessary Contractor’s Performance Bond, Payment Bond, Certificate of Insurance and Workers’ Compensation. Failure to do so will constitute an abandonment of the Bid and a forfeiture of the Bid Bond. Within ten (10) days of the receipt of the acceptable Bonds and the Agreement signed by the successful Bidder, the Township shall sign the Agreement and return to the Contractor an executed copy of the Agreement. Should the Township not execute the Agreement within such period, the Bidder may, by written notice, withdraw his signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the Township. 15. PRE-CONSTRUCTION MEETING A. Contractor will be required to attend a Pre-Construction Meeting prior to the start of work to review specifications and materials. Date of this meeting will be determined upon award of the contract. 16. BUILDING PERMIT: A. The Contractor shall secure and pay for the building permit. - 10 - PROJECT SCOPE Repair existing roof trusses as per the specifications of Vetter Engineering Inc. Replace existing support structure for Roof top HVAC units (referred to as RTU). Remove and replace existing shingles, repair or replace existing sheathing, gutters, down-spouts, soffits, and fascia for the Coventry Administration / Fire Department building located at 68 Portage Lakes Dr. Akron Ohio 44319. BID SPECIFICATIONS Roof Specifications 1. Repair damaged or altered trusses from original installation per recommendations from Vetter Engineering Inc. drawings are attached. * See Appendix 1-8 2. RTU’s, change existing supporting structural elements, to be constructed as per the original drawing specifications. *See Appendix 9 3. Remove and dispose of all shingles, felt, and miscellaneous material from the building. Dumpster(s) to be provided by roofing contractor, appropriate precautions will be taken to safeguard against debris in the areas of fire apparatus response. Contractor is responsible to notify fire department before blocking any means of egress for any fire department apparatus. Contractor is responsible for daily cleaning of nails etc. in driveway areas. 4. Remove and replace any rotted or damaged roof sheeting. Sheeting that is to remain, that was secured with staples will be nailed to the roof trusses. Cost per sheet should be included in bid document. Contact Township for consultation during tear-off to verify total amount of sheeting to be replaced. 5. Remove old exhaust stack for Boiler. *See attached photo 6. Install Ice-Guard underlayment from the bottom edge of the roof line to a minimum distance of 36” inside any exterior wall, distance is to be measured on a horizontal plane. Ice-guard shall also be installed 72” on each side of every valley and 72” around HVAC and Chimney penetrations extending through the roof line. 7. Install 30 lb. roofing felt over entire roof, except where Ice-guard or rubber roofing material has been installed. 8. Install aluminum drip edge molding along all edges. 9. Re-flash brick chimney with step flashing of approximately twelve (12) to eighteen (18) inches. 10. Re-flash metal vent stack with new metal flashing and pipe collar. *See attached photo - 11 - 11. Install new low profile vent at all ridges and hips. (See Addendum #1) 12. Replace roof vents with matching color vents. 13. Replace all roof pipe penetrations with appropriate flashing boots. 14. Install single piece rubber membrane roofing material, EPDM 60 mil minimum, at the area where the administrative and fire department roof lines meet. Option for EPDM 90 mil to be given. *See attached photo 15. Install Lifetime High Definition Dimensional limited lifetime warranty shingles. Aluminum valleys will be replaced with shingles. Contractor must specify shingle manufacturer and details on type of shingles. Contact Township for color choice prior to installation. 16. No existing materials are to be re-used. Repair or replacement of Gutters, Down-Spouts, Soffits, and Fascia 1. Repair or replace all gutters and down-spouts with six inch seamless commercial grade. Items that are to be replaced will be done with prior approval before removal. 2. Remove and replace all damaged soffit and fascia to include ledger board cover. Inspect for any rotten wood, replace as needed. 3. Install heat tape in all gutters and downspouts. Existing soffit outlets can be used for a power source providing that they are adequately secured. Install insulation and appropriate ventilation protection inside of the fire department roof 1. Install insulation on top of the existing metal fire department roof deck to a minimum of R40 blown in fiberglass insulation. Coventry Township will be given the cost to have as an option rolled/batt insulation instead of blown in insulation. 2. Install appropriate ventilation baffles at all roof eaves for ventilation protection if blown in insulation is to be installed. Job Conditions The project site is to be kept free from any accumulation of waste materials, debris, rubbish, etc. Items will be placed in dumpsters, or removed from the site, on a daily basis during the construction period. Dumpster location to be determined by Coventry Township. - 12 - 1. Security and Barriers: a. Contractor will follow all applicable OSHA guidelines in regards to all areas of the work that is to be performed. Fall protection, and all necessary safety gear or precautions shall be provided by the contractor to conform to all OSHA guidelines during all phases of the work that is to be performed. This is to include any subcontractors that are on the jobsite. b. Contractor to provide weather barriers to exposed areas of the project to prevent damage to the structure or the contents inside the structure during all phases of the work provided. c. Security and protection provisions shall be the responsibility of the Contractor, including any costs involved to prevent losses and improper actions which could lead to losses. d. Barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from construction operations, to protect non-owned vehicular traffic, stored materials, site and structures from damage shall be provided by the Contractor. 2. Protection of Installed Work: a. Contractor shall protect installed work and provide temporary and removable protection for installed products. Contractor shall control activity in immediate work area to minimize damage. b. Protect finished sidewalks, stairs and other surfaces from traffic, dirt, wear, damage or movement of heavy objects. 3. Final Cleaning: a. Execute final cleaning prior to final inspection. b. Clean debris from roof, gutters, downspouts and drainage systems. c. Clean site and sweep paved areas. d. Remove waste and surplus materials, rubbish, and construction equipment from site. Material Warranties a. Contractor must provide documentation for all material warranties at completion of project. - 13 - BIDDER QUALIFICATIONS SECTION 1. ORGANIZATION . PRINCIPAL OFFICER: _________________________________________________________________________ □ CORPORATION □ PARTNERSHIP □ JOINT VENTURE 1.1 □ INDIVIDUAL □ OTHER How many years has your organization been in business as a Contractor? ______________________________________________________________________________________ 1.2 How many years has your organization been in business under its present business name? ______________________________________________________________________________________ 1.2.1 Under what other or former names has your organization operated? ______________________________________________________________________________________ ______________________________________________________________________________________ 1.3 1.4 1.5 If your organization is a corporation, answer the following: 1.3.1 Date of incorporation: ________________________________________ 1.3.2 State of incorporation:________________________________________ 1.3.3 President’s name:____________________________________________ 1.3.4 Vice-President’s name:_______________________________________ 1.3.5 Secretary’s name:____________________________________________ 1.3.6 Treasurer’s name:___________________________________________ If your organization is a partnership, answer the following: 1.4.1 Date of organization:_________________________________________ 1.4.2 Type of partnership (if applicable):_____________________________ 1.4.3 Name(s) of general partner(s):_________________________________ If your organization is individually owned, answer the following: 1.5.1 Date of organization:_________________________________________ 1.5.2 Name of owner:______________________________________________ - 14 - 1.6 If the form of your organization is other than those listed above, describe it and name the principals: ______________________________________________________________________________________ ______________________________________________________________________________________ SECTION 2. EXPERIENCE 2.3 . List the categories of work that your organization normally performs. ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ 2.2 Do you intend to sublet any portions of the work? □ YES □ NO If “YES” please list below and submit a commitment letter from each subcontractor. NAME OF SUB-CONTRACTOR 2.3 AMOUNT OF SUB-CONTRACT Claims and Suits. (If the answer to any of the following is “yes” please attach details.) 2.2.1 Has your organization ever failed to complete any work awarded to it? □ YES (DETAILS ATTACHED) 2.2.2 □ NO Are there any judgments, claims, arbitration proceedings, liens or suits pending or outstanding against your organization or its officers? □ YES (DETAILS ATTACHED) 2.4 ITEMS OF WORK □ NO Within the last five years has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) □ YES (DETAILS ATTACHED) - 15 - □ NO 2.5 Does your organization have any major construction projects in progress that could delay the project? □ YES (DETAILS ATTACHED) □ NO SECTION 3. REFERENCES 3.1 . Trade References (Name, Address & Phone Number) _1.___________________________________________________________________________________ ______________________________________________________________________________________ _2.___________________________________________________________________________________ ______________________________________________________________________________________ _3.___________________________________________________________________________________ ______________________________________________________________________________________ 3.2 List at least six (6) projects of this size or greater for this type of work that you have completed in Summit County within the last three (3) years. Attach additional sheets if necessary for work qualifications. Owner Name & Address Type of Work Done Phone Number - 16 - Date Job was Completed STATE OF OHIO COUNTY OF SUMMIT ) ) SS ) AFFADAVIT , being first duly sworn, deposes and says that they are (sole owner, a partner, president, etc.) of __________________________________________________________________________________ the party making this bid and that the answers given on Request for Qualifications Forms are complete and true. ________________________________________________ Signature ________________________________________________ Title Date Subscribed and sworn to before me this _______ day of ___________, ________ Notary Public (Notary Seal) - 17 - BID PROPOSAL (SUBMIT IN DUPLICATE) TO: THE COVENTRY TOWNSHIP BOARD OF TRUSTEES FOR: COVENTRY TOWNSHIP ADMINISTRATION/FIRE DEPARTMENT ROOF, GUTTERS, DOWNSPOUTS & SOFFIT REPLACEMENT PROJECT. SUBMITTED BY: _______________________________________________________ (NAME) _______________________________________________________ (ADDRESS) _______________________________________________________ _______________________________________________________ Having read the Instructions to Bidders and the Project Bid Specifications in their entirety, for the Coventry Administration/Fire Department – Truss Repair, Roof, Gutters, Downspouts & Soffit Replacement Project, and having inspected the site of and the conditions affected and governing construction of the said project, the undersigned here proposed to furnish all materials and to perform all labor as specified and as shown for the following sum: RE-ROOFING PROPOSAL Material, for the sum of: $___________________________ Labor for the sum of: $___________________________ Total for the Re-Roof $___________________________ (Cost per Sheet for Plywood: $___________________________) GUTTERS, DOWNSPOUTS, SOFFIT & FASCIA REPLACEMENT PROPOSAL Gutters for the sum of: $___________________________ Downspouts for the sum of: $___________________________ Soffits & Fascia for the sum of: $___________________________ Total for the Gutters, Downspouts & Fascia $___________________________ FIRE DEPARTMENT INSULATION INSTALLATION PROPOSAL Blown in Fiberglass Insulation for the sum of: $___________________________ Option for Roll/Batt Insulation for the sum of: $___________________________ TOTAL FOR THE PROJECT: $___________________________ Cost for Performance Bond: $___________________________ - 18 - The undersigned proposes to furnish any and all material, tools, labor, transportation, machinery, appliances, and appurtenances necessary, and to prosecute to full completion, the work called for under this improvement, all upon the terms and under the conditions and General Provisions and Specifications herein contained. The undersigned agrees that, if this proposal shall be accepted, the undersigned will, within ten (10) days after notification of such acceptance, enter into the contract for the performance of the work proposed, and, as a guaranty of the faithful performance thereof, to furnish at the time of execution of the contract, a bond in the amount equal to one hundred percent (100%) of the total bid price. Each bid shall be accompanied by a Bid Guaranty and Contract Bond in accordance with Ohio Revised Code section 153.54. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed and authorized to do business in the State of Ohio for the full amount of the bid, or a certified check drawn on a solvent bank, which check shall be in the amount of ten percent (10%) of the amount of the bid. Said bond or check shall be given as security that, if the bid is accepted, a contract will be executed in conformity with the bid. The bid bond or check of the Bidder will be returned upon the proper execution and securing of the contract and acceptance of a valid performance bond. ITEM 2: TIME OF COMPLETION The bidder hereby agrees to commence work as soon as possible after the PreConstruction Meeting. It will be necessary for the Administration/Fire Department facility to remain open during all work being completed. Therefore, the Contractor will be required to coordinate with the Township the date work will start to give proper notice. It is the Township’s intent to minimize the disruption of the offices/apparatus response areas to as little a time as possible, unless prohibited by the weather. The Township will require one day advanced notification if any disruption to the egress to emergency traffic in and out of the apparatus bays, or if the administrative offices entrance will be blocked from access for any reason. Work under this contract shall be completed on or before December 15, 2014, unless extended by mutual agreement, in writing, of both parties. Upon failure to have all work completed within the time period specified, the Township shall be entitled to retain or recover from the Contractor, as liquidated damages, and not as a penalty, $100.00 for each and every calendar day thereafter until Contract completion. The Townships’ right to recover liquidated damages shall not substitute any right of recovery for additional cost injured should the Contractor fail to complete the Contract according to the Contract Documents. ITEM 3: ACKNOWLEDGEMENT Bidder hereby acknowledges receipt of addendum Number(s)___________________________________________________ (List all numbers received) - 19 - ITEM 4: BIDDER’S CERTIFICATION The Bidder hereby acknowledges that the following representations in this bid are material and not mere recitals. 1. Bidder has read and understands the Project Bid Specifications and agrees to comply with all requirements of the Project Bid Specifications, regardless of whether the Bidder has actual knowledge of the requirements and regardless of any statement or omission made by the Bidder which might indicate a contrary intention. A. The Bidder represents that the bid is based upon the Standards specified by the Project Bid Specifications & Contract Documents. B. Bidder has visited the Project site, become familiar with local conditions and has correlated personal observations about the requirements of the Project Bid Specifications & Contract Documents. The Bidder has no outstanding questions regarding the interpretation or clarification of the Contract Documents. ITEM 5: SUBCONTRACTOR’S LIST Included in the above proposal are the following Subcontractor’s: NOTE: All Subcontractors to be utilized for Project must be listed at time of bid, which includes their address. 1. __________________________________________________________________ 2. __________________________________________________________________ 3. __________________________________________________________________ 4. __________________________________________________________________ 5. __________________________________________________________________ - 20 - ITEM 6: SIGNATURE TO BIDS Each bid must give the full business name of the Bidder. Bids by partnerships must be signed with the partnership name and by one of the authorized partners. Bids by corporations must be signed with the name by one of the corporation followed by the signature and designation of the president, secretary, or other person authorized to act for the president or secretary. (If a Corporation) ______________________________________________________ Name of Corporation ______________________________________________________ Signature ______________________________________________________ Signature (President) ______________________________________________________ Signature (Secretary) ______________________________________________________ Signature (Title) __________________________________________________________________________________________________________________ (If a Partnership) ______________________________________________________ Name of Partnership ______________________________________________________ Signature ______________________________________________________ Signature __________________________________________________________________________________________________________________ (If an Individual) ______________________________________________________ Signature ______________________________________________________ Doing Business As __________________________________________________________________________________________________________________ ADDRESS: ______________________________________________ Name ______________________________________________ Street ______________________________________________ City State Zip ______________________________________________ Telephone Date:______________________________________ - 21 - THIS AFFIDAVIT IS TO BE FILLED OUT AND EXECUTED BY THE BIDDER, IF THE BID IS MADE BY A CORPORATION, THEN BY THE PROPERLY AUTHORIZED AGENT. AFFIDAVIT STATE OF OHIO ) SS. COUNTY OF ) ________________________________________being first duly sworn, deposes and says that they are____________________________ (sole owner, a partner, president, secretary, etc.) of the party making the foregoing bid; that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation; that such bid is genuine and not collusive or sham; that said bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any bidder, or anyone else, to put in a sham bid, or that anyone shall refrain from bidding; that said bidder has not in any manner, directly or indirectly, sought by agreement, communication or conference with anyone to fix the price of said bidder or any other bidder, or to fix any overhead, profit or cost element of such bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract or anyone interested in the proposed contract; that all statements contained in such bid are true, and further, that said bidder has not directly or indirectly, submitted their bid price or any breakdown thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection therewith, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any other individual except to such person or persons as have a partnership or other financial interest with the said bidder in their general business. ________________________________________________ Signature ________________________________________________ Title Date Subscribed and sworn to before me this _______ day of ___________, ________ Notary Public (Notary Seal) - 22 - DECLARATION OF PERSONAL TAX DELINQUENCY OHIO REVISED CODE 5719.042 I, _________________________________________________ hereby affirm that ___________________________________________, bidder herein IS/IS NOT (as applicable) charged at the time of submitting this bid with any delinquent personal property taxes on the general tax list of personal property of the County of Summit. The amount of such due and unpaid delinquent tax and any due and unpaid penalties and interest is $_______________________. Signature Title STATE OF OHIO )( COUNTY OF SUMMIT, SS. )( Before me, a Notary Public, in and for said County, personally __________________________ Appeared authorized signatory for _____________________________, and acknowledges that they have signed the foregoing instrument and that the same is their free act and deed. IN TESTIMONY WHEREOF, I have affixed my hand and seal of my office at _____________________, Ohio, This _________day of _________________, ______. (Notary Seal) ____________________________________________ NOTARY PUBLIC - 23 - - 24 - - 25 - - 26 - (The bidder is not to fill in the following blanks) PROJECT CONTRACT (Executed in Duplicate) This Contract made and entered into this _____ day of ___________________________ 20 ______ , by and between the Board of Township Trustees of Coventry Township, Summit County, Ohio, designated as “first party”, and herein of ________________________________________hereinafter designated as "second party". WITNESSETH: That said second party, for and in consideration of the sum of__________________ Dollars, to be paid as hereinafter specified, hereby agrees to furnish unto said first party, all the labor and materials required for the Coventry Township Administration/Fire Department – Roof, Gutters, Downspouts and Soffit Replacement Project in accordance with requirements and specifications for the same, hereto attached, which requirements and specifications are hereby declared to be a part of this contract. Said second party further agrees to furnish said materials and to do the same work promptly, in a workmanlike manner, without hindrance or delay, the whole to be completed to the satisfaction of the said first party, on or before December 15, 2014, (unless extended by mutual agreement, in writing, of both parties). And said first party, for, and in consideration of the true and faithful performance of said work and finishing of said materials as aforesaid, hereby agrees to pay unto said second party, the full sum of the contract within thirty days when the aforesaid materials have been furnished and said labor shall have been completed and accepted, and upon receipt of the Maintenance Bond. - 27 - It is mutually agreed that no extra work or materials shall be charged for unless ordered in writing by said first party. ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Witness or hands, this _________ day of _______________________________,_________. COVENTRY TOWNSHIP __________________________________________ David Calderone, Trustee __________________________________________ Tom Seese, Trustee __________________________________________ Edward Diebold, Trustee __________________________________________ Joni Murgatroyd, Fiscal Officer CONTRACTOR Signed in Duplicate in Presence of: ________________________________ __________________________________________ Signature ________________________________________ Signature ________________________________ __________________________________________ Printed Name - 28 - Appendix 1of 9 - 29 - Appendix 2 of 9 - 30 - Appendix 3 of 8 - 31 - Appendix 4 of 8 - 32 - Appendix 5 of 9 - 33 - Appendix 6 of 9 - 34 - Appendix 7 of 9 - 35 - Appendix 8 of 9 - 36 - Appendix 9 of 9 - 37 - REPLACE FLASHING REPLACE ROOF VENTS Matching Color REMOVE NEW COLLAR & FLASHING NEW BOOT Photos 1 of 3 - 38 - ADD RIDGE VENTING TO FRONT & REAR OF F.D. EDPM NEW BOOTS Photos 2 of 3 - 39 - RE-USE EXISTING PEDESTAL FOR RTU REPLACE SUPPORT STRUCTURE RE-USE EXISTING PEDESTAL FOR RTU REPLACE SUPPORT STRUCTURE Photos 3 of 3 - 40 -