Installation and Operation of the Knutsen Ballast Water Treatment
Transcription
Installation and Operation of the Knutsen Ballast Water Treatment
Installation and Operation of the Knutsen Ballast Water Treatment System – KBAL Per Lothe Hong Kong 18 February 2014 pel@knutsenoas.com Long-term partner, recognised for providing safe, efficient and innovative solutions for our clients Knutsen Group Knutsen OAS Shipping AS (KOAS) Knutsen NYK Offshore Tankers (KNOT) • Fully integrated shipping company • LNG tankers • Product and Chemical Carries • Maritime Technology – R&D • Shuttle tankers • FSO • Future Long Range Offshore Support vessels • Special offshore units Management companies Knutsen OAS Espana SA Knutsen OAS (UK) Ltd Canship Ugland Inc. Canada 49% KNOT – World leading within Offshore Loading Knutsen OAS Shipping KOAS – Major LNG service provider LNG carrier leaving Bilbao for 20 years T/C LNG Side by Side transfer operations Knutsen OAS Shipping World smallest LNG ship in operation West Coast of Norway M/T Sevilla Knutsen leaving Yard for its first cargo May 2010 Knutsen Technology Knutsen Technology Knutsen Ballast water - KBAL Knutsen VOC KVOC Knutsen EOR KEOR Knutsen Pressurised Natural Gas PNG Different Zooplankton in the oceans Zooplankton (Artemia) Invasive Species Economic loss of about $137 billion a year or "more than double the annual economic damage caused by all natural disasters in the United States." Phytoplankton in the oceans Algae bloom Barents Sea Cholera bacteria Filter operations will be challenging and more than 95% of all BWT technologies require filters Very coarse sand Coarse sand Medium sand Fine sand Very fine sand Silt (mud) Clay (mud) Colloid (mud) 1000 – 1200 µm 500 – 1000 µm 250 – 500 µm 125 – 250 µm 62,5 – 125 µm 3,9 – 62,5 µm < 3,9 µm <1 µm 40 µm filter Human hair Mud will not be handled by filters Knutsen objectives BWT • • • • • • • • No filter Environmental friendly Easy to operate and maintain Easy to retrofit Simple outline and minimal footprint Robust and flexible Cost efficient Safe Innovation To introduce new technology can sometimes be like mountain climbing Basic elements in the KBAL Technology P1/P2 = 250 P1 = 2,0 barg P2 = -0,988 to -0,975 barg UV system Diameter D Height >13 meter Volume V Water can boil at ambient temperature Results KBAL land test Organism >50µm Test cycle Water Test water (Req.: >100.000/m3) 1 Brackish 234129 2 Brackish 199571 3 Brackish 223192 4 Brackish 196839 5 Brackish 185088 6 Seawater 203746 7 Seawater 206792 8 Seawater 202250 9 Seawater 439054 10 Seawater 182104 11 Brackish 193338 Avg. Brackish 205360 Avg. Seawater 246789 Total Average 224191 1 Treatment day 5 before discharge 855 414 83 42 11 30 14 13 0 159 259 14 147 99,9993 % Organism ≥ 10-50µm 2 treatment 1 Treatment 2 treatment day 5 day 5 after Test water day 5 before discharge after discharge discharge (Req.: <10/m3) (Req.: >1000/ml) (Req.: < 10/ml) 6 2 2 0 5 1,7 0 0 0,3 0,7 0 2,5 0,5 1,6 3000 1600 2400 1100 (700) 1600 1600 2400 1700 900 1700 1700 1900 1660 1691 20 50 20 20 70 na 20 13 3 na 159 57 12 34 99,98 % 0,8 0,8 0,4 0,2 <0,2 <0,2 <0,2 <0,2 <0,2 <0,2 0,4 0,5 <0,2 <0,3 Shipboard Installation KBAL 600 • Location – Above deck • Existing Systems – Minimum relocation – Few additional valves • Operation – Easy to operate from cargo control FOOTPRINT TODAY KBAL 600 Reactor and UV unit Regulator and flow meter UV unit and camera Shipboard testing results • 5 tests performed • Water inlet 2 first tests less than IMO requirements • 3 last tests excellent inlet condition and excellent treatment results 99,9991 % Approval process • Second part of 2010 – IMO land based test • Second part of 2011 – Shipboard testing • Summer 2012 – Environmental testing • Autumn 2012 – Documentation work • Type approval received – November 2012 • AMS Approval – February 2014 Tanker installation 3000 m3/hr KBAL Shelter 80 To Air R 100 13 m UV 650 600 F To sea 600 600 B.B.P. 600 600 B.L.P. 600 600 To ballast tanks or to sea Pressure/Vacuum Reactor and UV (3000 m3/hr) KBAL 3000 Compartment KBAL 3000 pressure/vacuum reactor KBAL 3000 M/T Ingrid Knutsen delivered Des. 2014 Sales (January 2013) New buildings: (received orders) • HHI 2531, KBAL 3000, charterer: ENI, owner KNOT, delivery: July 2013. • HHI 2532, KBAL 3000, charterer: ENI, owner KNOT, delivery: Start up on board mid Aug 2013. • HHI 2575, KBAL 3000, charterer: Exxon, owner KNOT, delivery: Start up on board mid Sep 2013. • Cosco Zhoushan Shipyard Co, KBAL 3000, charterer: Repsol, owner KNOT, delivery: September 2014. • HHI 2733 and HHI2734, 2 x LNGCs, KBAL 3000, charterer: Gas Natural, owner: KnutsenOAS Shipping, delivery: 2016 Retrofit: • KBAL 600, M/T Gijon Knutsen, DNV class, Successful FAT performed 30.04.12 Hilda Knutsen delivered 05.08.13 KNOT New Shuttle Tankers will be equipped with KBAL BWT and circulation 350 From aft ballast tanks 50 600 650 300 300 300 300 300 400 500 W.P. Strip Ed. 600 700 650 650 500 200 500 200 500 200 500 200 500 600 200 600 600 500 B.L.P. 600 200 600 400 450 UV 400 300 500 700 350 350 600 400 B.P. 2 650 650 600 500 200 500 200 500 200 500 200 500 550 200 200 600 500 700 B.P. 1 650 400 S.C. 300 300 300 300 30 300 To Cargo System B.P. Ballast pump B.B.P. Ballast booster pump B.L.P. Ballast lift pump 300 900 900 R 300 B.B.P. F 13 m From I.G. main line To air 100 200 Example: LNGC; Treatment by circulation, arr. in E/R Pressure vacuum reactor located on 3rd Flat To Air Main deck 25.400 A/B P/V Alternative routing above deck ø450 2nd Flat appr. 12.000 A/B ø450 F ø550 UV 3rd Flat appr. 20.000 A/B During voyage: Sea water from a given ballast tank B.P. no.2 B.P. no.1 B.P. no.1: Ballast pump no.1 B.P. no.2: Ballast pump no.2 P/V: Pressure vaccuum valve UV: UV reactor F: Flowmeter During voyage: Sea water to the same given tank LNGC, Treatment by circulation KBAL installed in E/R LNGC, Treatment by circulation KBAL installed in Engine Room LNGC, Treatment by circulation KBAL installed in E/R Treatment sequence; green: treated water LNGC, Treatment by circulation KBAL installed in E/R Treatment sequence; green: treated water No more free rides across the oceans??? This ship has KBAL inside. Keep distance!!!
Similar documents
File - Safety Culture Symposium
ExxonMobil, Marathon Oil, Hibernia Management and Development Company, Suncor Energy (Petro Canada), Encana, Husky Energy, Northern Transportation Company, Atlantic Towing, A. Harvey & Company, Off...
More informationCo., Ltd. Shanghai Jiangnan Changxing Shipbuilding Co.,Ltd
CSSC Guangzhou Longxue Shipbuilding Co.,Ltd Guangzhou Shipyard International Co. Ltd. Guangzhou Wenchong Shipyard Co., Ltd. Guangzhou Huangpu Shipyard Co.,Ltd.
More informationlight. - prisha illumination
Sand Black 3000K / 4000K (warm white / neutral white) cut out dimension : 166 x 84 h100
More information