Capital Improvement Plan 2015-16
Transcription
Capital Improvement Plan 2015-16
FINAL Northbrook Park District Capital Improvement Plan 2015-2016 Through 2019-2020 1 Table of Contents Our Mission, Vision and Guiding Principles ......................................................................................................................3 Introduction ......................................................................................................................................................................4 Project Narrative ...............................................................................................................................................................6 Definitions .................................................................................................................................................................6 Overview ...................................................................................................................................................................6 Priority Codes ............................................................................................................................................................7 Reason Codes ............................................................................................................................................................7 Property and Facilities ......................................................................................................................................................8 Land ...........................................................................................................................................................................8 Capital Improvement Plan Listing by Location............................................................................................................... 12 Project Descriptions ....................................................................................................................................................... 24 Projects Under $10,000 (Manager’s Account) ............................................................................................................... 79 Appendix ........................................................................................................................................................................ 94 Park Fleet Replacement Schedule - Appendix A ........................................................................................................ 95 Playground Replacement Schedule - Appendix B ...................................................................................................... 99 Golf Fleet Replacement Schedule-Appendix C ........................................................................................................ 100 Carry-Over Projects - Appendix D ............................................................................................................................ 104 2 Our Mission, Vision and Guiding Principles 3 Introduction The Capital Improvement Plan (CIP) is the Northbrook Park District's forecast of Park and Facility improvements, along with repair and replacement of existing equipment and vehicles, for the next five years. The CIP provides the Park District Board of Commissioners and Staff with a blueprint of needs that are aligned with other planning documents, including the Comprehensive Master Plan (2004), Community Interest and Opinion Survey (2009), Voice of the Local Golfer, Pellucid Survey (2010), Strategic Plan (2010), Park Master Plans of Meadowhill Park, West Park and Wood Oaks Green Park (2011), Key Citizen Survey (2012) and Northbrook Strategic Sustainability Plan 2013. Several objectives drive the proposed 2015-20 plan: • The Park District will begin to focus on its long-term renovations and maintenance objectives that include pool and theatre upgrades and planning and development of construction drawings for the implementation of sections of the Sportsman’s Country Club, Wood Oaks Green Park, West Park and Meadowhill Park Master Plans. In addition, the District will continue to explore indoor and outdoor recreation space opportunities. • Parks and Properties will continue to focus on repair and replacement of aging infrastructure, including mechanical systems, parking lot repairs and overlays and lighting upgrades, while meeting mandated compliance directives. Such projects include the water service line upgrade into the Meadowhill Aquatic Center and construction drawings for the playground replacement and parking lot resurfacing at Stonegate Park. • 2015 will be another construction-filled year at the Northbrook Sports Center (NSC); the final phase of the floor replacement will take place, along with the next phase of the Low-E ceiling installation for increased energy savings. In addition, the District will begin planning for an extensive renovation of the pool, mechanical system and upgrading the locker rooms and support amenities. • Additional projects consist of asphalt repair and seal coating of parking lots at Meadowhill Park, Wood Oaks Green Park, and Sportsman’s Country Club maintenance yard, Techny Prairie Park and Fields and Anets Drive. 4 • Crack repairs will take place, along with color coating of Indian Ridge basketball court and Meadowhill inline skating rink. • Golf Operations will invest in environmental stewardship projects for the natural areas. • Leisure Services will continue to focus on enhanced programming opportunities for customers as well as facility aesthetics with the repair and improvement funds. These will include theatre house light replacement, retractable seating and floor improvements, and the replacement of the marquee sign at the front of the building. • Other District-wide projects include: Continuation of the technology plan, security efforts and painting of structures and amenities at Village Green Park, Williamsburg Park, Meadowhill Park and Techny Prairie Park and Fields. Funding for projects will come from general tax revenues, surplus from fee-for-service revenues, bond proceeds, development impact fees, state grants and donations. Worksheets describe the projects and operational impacts, if any. The tentative schedules allow the District to make capital expenditures over time with appropriate coordination among the Divisions. The CIP also includes funding for improvements recommended by the Americans with Disabilities Act Transition Plan. The proposed CIP for 2015-16 totals $2.9 million. The 2015-16 CIP reflects an increase in spending from the 2014-15 Plan as the District has elected to draw down balances to address deferred maintenance projects and to maintain current amenities and facilities. The proposed CIP will be available at the Northbrook Public Library and the Joe Doud Administration Building. A summary of the FY 2015-16 CIP is in the Annual Budget, which will be on the District’s website after approval. 5 Project Narrative Definitions A Capital Improvement Plan (CIP), as defined by the National Council on Government Accounting, is a plan for capital expenditures to be incurred each year over a fixed period of years to meet capital needs arising from the long-term work program. A Capital Improvement Project is any major project requiring the expenditure of public funds (over and above operating expenditures of public funds) for the purchase, construction or replacement of the physical assets of the community. The project or asset should have a useful life of more than one year and have significant value. The District has three levels of capital expenditures. Assets over $5,000 with a useful life of more than one year are included for insurance and accounting purposes. • Capital purchases ($200 to $4,999) must comply with general purchasing procedures (verbal quotes if over $2,000, written quotes if over $3,500) and are included in the operating budget. This internal threshold is for tracking purposes and includes items such as tools, smaller equipment, and audio/visual equipment and computer hardware/software. • Capital projects ($5,000 to $9,999) must comply with general purchasing procedures, including written quotes, and are included in the Manager's Account of the Capital Improvement Plan. Capital expenditures over $5,000 are included in the Capital Improvement Plan. • Capital projects (over $10,000) must comply with general purchasing procedures, including due advertisement and sealed bids where appropriate. All capital expenditures over $20,000 require approval by the Board of Commissioners. Overview The 2015-2020 CIP includes an inventory of anticipated capital requirements of the District within the next five years. Fiscal year 2015-2016 is included with the Budget and Appropriations Ordinance and Annual Budget document. Carry-over projects identified and listed in the Annual Budget document as expenditures in the proposed budget year were appropriated in prior budget year(s). The Board discusses and authorizes carry-over projects and amounts during April and May of each year. Many of the cost assumptions in this Plan are preliminary estimates that will require refinement as discussion and implementation of a specific project progresses. As a result, funding needs to be flexible. Certain projects are included in the Plan with the expectation that an opportunity may be available for funding assistance. Should this type of opportunity fail to occur, a project might be dropped or deferred. The CIP represents a continued commitment to the maintenance and improvement of our recreation facilities and the equipment necessary to maintain those facilities. Public comment is solicited before making major investment in facilities, including facility renovations, playgrounds and park development. 6 Continued revision of the CIP will help ensure that the District does not defer major capital requirements to the point where a future Board will have to act with a sense of urgency or under pressure to construct, maintain or replace capital facilities. Priority Codes Staff has assigned the following priority and reason codes to Capital Improvement Projects: A Projects of high priority are those that affect the District's operations, typically are visible to the public, and are necessary to provide the District's current level of service. An example is a playground replacement or repair. A project also may be labeled as a high priority if substantial time and/or funding has been invested in planning or implementation, as in the case of a large project that began in one fiscal year and funded over two or three fiscal years. B Projects of moderate priority are those that relate to established but discretionary norms for maintenance and service necessary to maintain the District's current level of service. These include items based on a "break even" return on investment, such as the replacement of vehicles on a schedule developed to minimize down time and maximize resale value. C Projects of lower priority do not fit the other criteria but are desirable, depending upon funding, and would expand the District's current level or mix of services. An example would be a major repair identified as necessary but with concerns that need to be addressed. Reason Codes CI/ES Community Input/Enhanced Services – Improvements identified from the Community Interest and Opinion Survey, the Golf users survey (Pellucid), or other resident input to enhance or expand recreational services CS/RR Cost Savings/Efficiencies and Repair or Replace – Recommended improvements that would save the District operating funds over the long term through productivity or resource expenditures (i.e., energy) ES Environmental Stewardship – Improvements recommended to enhance the District’s protection of the environment LS Life Safety – Improvements recommended to protect patrons or employees and address local, state or federal compliance requirements 7 Property and Facilities Land The boundaries of the Northbrook Park District extend east from Lake Cook Road on the north, south along the Edens Expressway (I-94) to northern Happ and Sunset Ridge Roads, and then along Waukegan Road to Willow Road, west along Willow Road to the Tri-State Tollway (I-294) and north along the TriState and Sanders Road to Lake Cook Road. Within this area, approximately 13 square miles, the District holds title to 28 parcels, representing more than 500 acres. LOCATION 545 Academy Drive (1/21/1993) Administration and Maintenance Facility 1710 Pfingsten Road (7/28/1977) Brees Park ( 10/17/1956) 1265 Countryside Lane Cedar Lane Lot A (Donated 2/24/1955) 1000 Block of Cedar Lane Coast Guard Park (Granted 7/24/1978) 2490 Dundee Road Countryside Park (Donated 3/28/1955) Walnut and Oakwood Circle Crestwood Park (7/10/1930) 1824 Milton Avenue Englehardt Park Midway Road Floral Park (11/24/2009) 3105 Floral Drive ACREAGE BUILDING SIZE (SF) 2.75 52,486 .55 0 .72 0 .23 0 4.39 0 1.73 0 2.41 0 .35 0 .77 0 8 Greenfield Park/Sky Harbor (Donated 4/9/1965) 2950 Harbor Lane Greenview Park (9/12/2005) 2407 Greenview Road Hampton Lane Basin (Donated 11/28/1978) Highland Road and Vicki Lane 4.9 0 1.88 0 .72 0 7.5 44,735 32.81 19,265 .62 0 2.46 0 1.73 0 1.05 0 151.82 21,585 Indian Ridge Park (6/1/1984) Leisure Center, Senior Center and Northbrook Theatre 3323 Walters Avenue Meadowhill Park (12/10/1958) Meadowhill Aquatic Center, Chalet and Outdoor Education Center 1479 Maple Avenue Meadow Road Tot Lot (Donated 1/30/1956) 1100 Block of Meadow Road Oaklane Park (11/15/1984) 636 Berglund Place Salceda North Park (Donated 6/1/1976) 1010 Fairview Lane Salceda Park-Four Winds (8/5/1990) 1010 Fairview Lane Sportsman’s Country Club (8/11/1978) Clubhouse, Practice Range, Halfway House and Cart Storage 3535 Dundee Road 9 Sportsman’s East Nine (1/13/1988) Maintenance Facility 63.04 14,780 6.15 0 4.46 0 60 2,240 47.82 1,400 6.0 0 10 5,923 4.1 0 23.5 89,096 8.56 0 3401 Dundee Road Stonegate Park (Donated 3/12/1997) 3425 Whirlaway Drive Stonegate Park Lot 133 (12/12/2001) 3425 Whirlaway Drive Techny Prairie Park and Fields (6/1/2000) Techny Prairie Center and Picnic Pavilions 1750 Techny Road Techny Prairie Park and Fields (Donated 1993-1995) Formerly Meadowhill South, Picnic/Warming Shelter and Restrooms 1750 Techny Road Techny Prairie Park and Fields (12/16/2011) 180 Anets Drive Village Green Park (Donated 8/3/1944) Village Green Center and Pavilion 1810 Walters Avenue Wescott Park (5/6/1965) 1820 Western Avenue West Park (5/6/1965) Northbrook Sports Center 1730 Pfingsten Road Williamsburg Square Park (9/6/1974) 200 Lee Road 10 Wood Oaks Green Park (4/11/1975) Tennis Building 55.9 1,750 1160 Sanders Road TOTALS 508.92 ACRES 256,860 SQUARE FEET In addition to the above land, the District leases two parcels: LOCATION Cedar Lane Tot Lot ACREAGE BUILDING SIZE (SF) .95 0 1.5 0 965 Cedar Lane Tower Rink (Lease 8/1954) 1225 Cedar Lane TOTAL 2.42 ACRES The Northbrook Park District serves a population of approximately 33,170 residents. Given the total acres owned or leased (511), the ratio of acres to residents is 15.41 per 1,000. The District operates and maintains 511 acres of property plus an additional 32 acres, due to intergovernmental agreements, for a total of 543 acres. 11 Capital Improvement Plan Listing by Location 12 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS 210,000 0 0 0 0 0 10,000 20,000 25,000 45,000 50,000 13,000 13,000 10,000 15,000 25,000 45,000 40,000 80,000 13,000 10,000 40,000 25,000 75,000 100,000 180 ANETS DRIVE Anets Site - Well Removal and IEPA Permit Development 180-01 180-02 25 SUBTOTAL 210,000 ADMINISTRATIVE OFFICES Sustainability Plan Implementation Security Plan Implementation Personal Computer Equipment Migration Main Computer Equipment and Network Replacement Computer Software Upgrade Generator Replacement Admin Office Furniture Replacement (2 / Year) Land Acquisition HVAC - Replace Rooftop Unit Roof Replacement Comprehensive Master Plan x x x ADMIN-01 ADMIN-02 ADMIN-03 ADMIN-04 ADMIN-05 ADMIN-06 ADMIN-07 ADMIN-08 ADMIN-09 ADMIN-10 ADMIN-11 SUBTOTAL 25 26 26 27 27 28 28 29 29 30 30 25,000 45,000 40,000 270,000 90,000 325,000 175,000 428,000 253,000 228,000 120,000 0 595,000 CEDAR LANE TOT LOT Playground Renovation CED-01 SUBTOTAL 200,000 0 0 0 0 0 200,000 COAST GUARD PARK Playground Development Phase 2 SUBTOTAL CGP-01 195,000 0 0 0 0 0 195,000 13 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS COUNTRYSIDE PARK Bollard Placement Playground Renovation COU-01 COU-02 31 20,500 205,000 SUBTOTAL 0 20,500 0 0 0 205,000 CRESTWOOD PARK Tennis Court - Maintenance Playground Renovation CRE-01 CRE-02 100,000 245,000 SUBTOTAL 0 0 0 0 0 345,000 0 0 0 0 0 0 ENGLEHARDT PARK Pathway Renovation SUBTOTAL FLORAL DRIVE Playground Renovation FLO-01 200,000 SUBTOTAL 0 0 0 0 0 12,000 115,000 200,000 GREENFIELD PARK Pathway Design/Construction (48 Fund) Backstop Replacement Playground Renovation Parking Lot Development x GNF-01 GNF-02 GNF-03 GNF-04 31 30,000 200,000 50,000 SUBTOTAL 0 0 0 12,000 115,000 280,000 GREENVIEW PARK Playground Replacement Fence Replacement GNV-01 GNV-02 212,000 32 SUBTOTAL 10,000 10,000 0 0 0 0 15,000 110,000 15,000 110,000 212,000 INDIAN RIDGE PARK Playground Renovation Bocce Courts SUBTOTAL IRP-01 IRP-02 325,000 32 0 0 0 325,000 14 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS LEISURE CENTER Theatre House Light Replacement Interior Upgrades and Maintenance Replace Theater Lobby Furniture Replace Exterior Doors and Auto Openers Parking Lot - Resurface Theater Retractable Seating & Flooring Parking Lot and Exterior Lighting Gym Floor Replacement Theatre Border / Side / Downlight replacement Theatre Auto Lighting Fixtures Restroom Remodel Kitchen Remodel Generator Replacement Front Sign Replacement Electrical Upgrades x LC-01 LC-02 LC-03 LC-04 LC-05 LC-06 LC-07 LC-08 LC-09 LC-10 LC-11 LC-12 LC-13 LC-14 LC-15 33 33 34 70,000 15,000 15,500 25,000 34 35 35 36 36 37 37 400,000 240,000 40,000 30,000 72,000 70,000 140,000 65,000 38 12,500 345,000 SUBTOTAL 322,500 100,500 682,000 0 0 435,000 MEADOW ROAD TOT LOT Playground Renovation MEA-01 235,000 SUBTOTAL 0 0 0 0 0 235,000 MEADOWHILL AQUATIC CENTER Concrete Deck Repairs/Replace Pool Apparatus Painting Bathhouse/Pool Painting Pool Slide Improvements Main Pool Cover Deck Furniture Replacement MAC/NSC Pool Bollards Water Slide Maintenance MAC-Pool Repairs Phase 2 MAC Retaining Wall (Carry-Over) Children's Area Water Table Replacement Water Service Line Upgrade to Building Water Slide Shade Cover SUBTOTAL x MAC-01 MAC-02 MAC-03 MAC-04 MAC-05 MAC-06 MAC-07 MAC-08 MAC-09 MAC-10 MAC-11 MAC-12 MAC-13 38 115,000 37,000 39 13,000 800,000 15,000 39 10,000 10,000 10,000 25,000 40 40 15,000 340,000 15,000 100,000 25,000 41 41 42 17,000 60,000 10,000 87,000 368,000 125,000 125,000 10,000 902,000 15 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS MEADOWHILL PARK Velodrome Surface Repair/Seal & Color Coat Master Plan Implementation Chalet - Modifications Inline Skating/Hockey Rink Repairs-Dasher Boards Lighting Upgrades (48 Fund) Playground Renovation 1605 Storage Building x x MHP-01 MHP-02 MHP-03 MHP-04 MHP-05 MHP-06 MHP-07 42 43 43 44 44 45 45 SUBTOTAL 70,000 25,000 50,000 350,000 50,000 250,000 3,500,000 30,000 195,000 200,000 25,000 100,000 50,000 1,045,000 0 3,500,000 OAKLANE PARK Playground Renovation Tennis Court Repair Parking Lot Seal Coat (48 Fund) OAK-01 OAK-02 OAK-03 46 185,500 200,000 46 SUBTOTAL 12,000 0 12,000 0 0 185,500 200,000 0 0 0 0 0 0 25,000 25,000 40,000 25,000 25,000 40,000 0 0 0 47 48 48 30,000 10,000 140,000 30,000 10,000 30,000 10,000 20,000 10,000 49 49 34,000 OUTDOOR EDUCATION CENTER SUBTOTAL PROGRAMS - GENERAL and RECREATION ADA Facility Requirements (47 Fund) Indoor Program Space Planning PG&R-01 PG&R-02 47 SUBTOTAL PARKS MAINTENANCE - 545 Academy Tree Care Prune and Replacement-Ash Tree Park Amenities/Recycling Containers, Picnic Tables Asphalt Repairs (48 Fund) Lighting Upgrades (48 Fund) MHP #2 Light Pole Replacement District Painting Projects Garage Floors Prep and Sealed District Wide Restroom Remodel Baseball Field Netting Replacement-MHP Skinned Infield Renovation Tennis and Basketball Court Repair -Various Parks Skate Park Preventative Maintenance Batting Cage Concrete Maintenance District Tuck-Pointing SUBTOTAL x x x PARKS-01 PARKS-02 PARKS-03 PARKS-04 PARKS-05 PARKS-06 PARKS-07 PARKS-08 PARKS-09 PARKS-10 PARKS-11 PARKS-12 PARKS-13 PARKS-14 80,000 150,000 50 50 51 51 52 52 62,500 25,000 10,000 12,500 25,000 10,000 20,000 25,000 10,000 25,000 10,000 10,000 20,000 16,500 400,000 249,000 107,500 91,500 65,000 92,500 630,000 16 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS PARKS MAINTENANCE Vehicle and Equipment Replacement 2012 Ford Edge-Executive Director's Vehicle (1010) 2008 Subaru Forester-Leisure Services Vehicle (2010) 2007 Chevy 2WD 1500-Leisure Services Truck (2020) 2010 Ford Transit Connect XLT Wagon-Leisure Services Transit (2030) 2010 Ford Transit Connect XLT Wagon-Leisure Services Transit (2040) 2010 Ford Transit Connect Cargo Van-Parks Fleet (3010) 2009 GMC 4WD 2500 (Plow Truck)-Parks Fleet (3020) 2008 GMC 4WD 2500 Utility Body (Plow Truck)-Parks Fleet (3030) 2005 GMC 2WD 2500 w/Lift Gate-Parks Fleet (3040) 2005 Chevy 2WD 2500-Parks Fleet (3050) 2012 Ford F-250 Utility Body 4X4 (Plow Truck)-Parks Fleet (3060) 2013 Ford Transit Connect Cargo Van-Parks Fleet (3070) Bucket Truck-Parks Fleet 2010 GMC 4WD 2500 Utility Body (Plow Truck)-Parks Fleet (3090) 2010 Ford Transit Connect Cargo Van-Parks Fleet (3100) 2006 GMC 6500 Large Dump Truck-Parks Fleet (3110) 2011 Ford F450 Dump (Plow Truck)-Parks Fleet (3120) 2007 Chevy Cube Van-Parks Fleet (3130) 2003 Chevy C4500 Mini Dump-Parks Fleet (3140) 2009 Chevy 2WD 2500-Parks Fleet (3150) 2014 GMC 4WD 3500-Parks Fleet (3180) 2010 Toyota Prius-Parks & Properties Vehicle (3190) 2000 GMC 2WD 1500-Parks Fleet (3200) 2008 GMC 2WD 2500 Crewcab-Parks Fleet (3210) 2009 Chevy 2WD 2500 Liftgate-Parks Fleet (3220) 2001 GMC 2WD 1500-Parks Fleet (3230) 2001 Chevy 2WD 1500-Parks Fleet (3240) 2008 Chevy 2WD 2500 Crewcab-Parks Fleet (3250) 2006 Toro Groundmaster 4500-D (4031) 1995 Club Car Carryall Utility Cart-Parks Fleet (4040) 2000 Bobcat 36" mower (4510) 2000 Bobcat 36" mower (4680) 2002 Kubota 60" Zero-Turn Diesel (4670) 2001 Bush Hog 15' tri-plex (4790) 2009 Smithco Super Star (4920) 1997 Kubota M5400 (5010) 1984 Sullair 185 CFM Compressor-Parks Fleet (5080) 1989 Pace Enclosed Ball Field Trailer-Parks Fleet (5180) 1994 Kalmar AC Forklift 1996 Kubota B2100 Diesel (5220) 2009 Kubota RTV1100 4X4 Diesel (5250) Future Vehicle Replacements/Purchases ABI Force-Infield Groomer Utility vehicle 4x4 SUBTOTAL 1010 2010 2020 2030 2040 3010 3020 3030 3040 3050 3060 3070 3080 3090 3100 3110 3120 3130 3140 3150 3180 3190 3200 3210 3220 3230 3240 3250 4031 4040 4510 4680 4670 4790 4920 5010 5080 5180 5210 5220 5250 ABI 4x4 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 25,000 25,000 23,000 22,000 22,000 22,000 25,000 30,000 25,000 25,000 30,000 22,000 55,000 30,000 22,000 70,000 65,000 30,000 60,000 25,000 25,000 25,000 23,000 30,000 25,000 23,000 23,000 30,000 3,500 3,500 15,000 16,000 15,000 35,000 12,000 20,000 15,000 22,000 325,000 16,000 38,000 97,000 164,000 154,000 113,000 140,000 725,000 17 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS SALCEDA NORTH PARK Playground Renovation SAL-01 245,000 SUBTOTAL 0 0 110,000 15,000 0 0 0 245,000 NORTHBROOK SPORTS CENTER Phase 4- Flooring Replacment Front Office Remodel & Carpet Replacement A-Rink Show System-Sound Lobby Seating and Skater Benches Vestible Door Enclosure B-Rink Show System-Sound Rink Floor Painting - A and B A-Rink Show System-Lighting HVAC-Replacements Low Flow Fixtures-Flusher Upgrade B-Rink Lobby Restrooms Community Room and Multipurpose Room-Projector Install Scoreboard Replacement-Both Rinks Low- E Ceiling Installation Cooling Tower Replacement Generator Replacement Roof Replacement Toliet Replacements Hand Dryer Upgrade Rink Dividers Hot Water Tank and Heater x x SC-01 SC-02 SC-03 SC-04 SC-05 SC-06 SC-07 SC-08 SC-09 SC-10 SC-11 SC-12 SC-13 SC-14 SC-15 SC-16 SC-17 SC-18 SC-19 SC-20 53 54 54 55 55 56 56 57 57 58 58 59 59 60 60 61 61 62 62 63 SUBTOTAL 100,000 40,000 13,000 15,000 18,000 12,000 45,000 40,000 12,000 40,000 30,000 40,000 22,000 20,000 72,500 140,000 150,000 1,000,000 48,000 13,000 15,000 70,000 420,500 298,000 500,000 3,700,000 500,000 3,700,000 30,000 525,000 30,000 525,000 210,000 1,152,000 0 0 0 0 0 0 0 0 0 0 NORTHBROOK SPORTS CENTER POOL Pool Renovation SCPOOL-01 63 SUBTOTAL STONEGATE PARK Park Improvements SUBTOTAL SGP-01 64 18 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS GOLF OPERATIONS Sportsman's Country Club Shoreline Stabilization - Phase 5 Golf Cart Path Maintenance and Potential Expansion Classic 18 Irrigation Pump Shade System for Practice Range Irrigation System Replacement East 9 Glass Door Replacement Naturalized Area Stewardship Generator Replacement Cart Barn Remodel and Roof Replacement Golf Ball Dispenser x x x x GOLF-01 GOLF-02 GOLF-03 GOLF-04 GOLF-05 GOLF-06 GOLF-07 GOLF-08 GOLF-09 GOLF-10 64 65 65 66 40,000 66 67 67 68 68 30,000 20,000 80,000 95,000 54,000 500,000 SUBTOTAL Clubhouse Clubhouse Expansion 95,000 625,000 12,500 20,000 20,000 20,000 525,000 12,500 195,000 1,265,000 169,000 20,000 0 500,000 0 0 0 0 0 5,000,000 GOLF-11 5,000,000 SUBTOTAL Master Plan Implementation Master Plan Development Range Netting/Wood Pole Replacement GOLF-12 GOLF-13 69 SUBTOTAL 49,550 49,550 7,600,000 290,000 0 0 0 0 7,890,000 GOLF OPERATIONS Vehicles and Equipment Replacement 2008 Chevy 2500 HD 4WD (Plow truck) (6030) 2008 Procore 648 Aerator (6090) 2008 Procore 880 Aerator (6100) 2008 Procore 648 Aerator (6110) 2002 Vertidrain Deep Tine Aerator (6120) 2008 Dakota 410 Turf Tender Topdresser (6170) 2006 Turfco CR-10 Topdresser (6180) Turfco Triwave Overseeder (6190) 2009 Groom-It Hydraulic Drag Broom (6200) 2011 Tru-Turf Roller/Spyker (6210) 2011 Tru-Turf Roller/Spyker (6220) 2012 TB-200 Fill & Sweep (6240) 2001 Cushman Truckster (6320) 2007 John Deere TX Turf Gator (6330) 2002 John Deere Pro Gator 2020 (6340) 2005 John Deere Gator TX (6350) 2006 John Deere TX Turf Gator (6360) 2006 John Deere TX Turf Gator (6370) 2011 Clubcar Villager Bus (6410) 2003 Yahama Golf Car (6580) 2003 Yahama Golf Car (6590) 6030 6090 6100 6110 6120 6170 6180 6190 6200 6210 6220 6240 6320 6330 6340 6350 6360 6370 6410 6580 6590 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 32,000.00 20,000.00 20,000.00 20,000.00 25,000.00 15,000.00 17,000 20,000.00 5,000.00 18,000.00 18,000.00 5,000.00 20,000 8,000.00 16,000 8,000.00 8,000.00 8,000.00 10,000.00 8,000.00 8,000.00 19 LOCATION / PROJECT 2003 Yahama Golf Car (6595) 2010 Club Car Range Picker (6600) 2009 Can-Am Outlander ATV (7000) 2006 John Deere 2500 Greensmower (7010) 2006 John Deere 2500 Greensmower (7020) 2014 Toro Groundsmaster 3300 (7040) 2014 Toro Groundsmaster 3300 (7050) 2010 John Deere 2500B E-Cut Triplex (7060) 2003 Toro 3150 Triplex Greenmower (7070) 2007 John Deere 2500B Greensmower (7080) 2011 John Deere 2500E-Cut Triplex (7090) 2008 John Deere 7500 Fairway Mower (7180) 2007 John Deere 3225C Fairway Mower (7190) 2005 Toro Flex 21" W/B Greensmower (7200) 2005 Toro Flex 21" W/B Greensmower (7210) 2005 Toro Flex 21" W/B Greensmower (7220) 2005 Toro Flex 21" W/B Greensmower (7230) 2008 Toro Flex 21" W/B Greensmower (7240) 2008 Toro Flex 21" W/B Greensmower (7250) 2008 Toro Flex 21" W/B Greensmower (7260) 2008 Toro Flex 21" W/B Greensmower (7270) 2010 Toro Flex 21" W/B Greensmower (7280) 2010 Toro Flex 21" W/B Greensmower (7290) 1999 John Deere 1070 Tractor (7380) 2009 Toro 150" Groundsmaster 4700-D (7540) 2013 Toro Groundsmaster 4500 (7560) 1999 36" Bobcat W/B Rotary Mower 2010 Toro 3100-D Reelmaster (7700) 2010 Toro 3100-D Reelmaster (7710) 2014 Toro Groundsmaster 3500 (7720) 2007 Toro 3500-D Sidewinder (7730) 2010 John Deere 4520 Tractor (8010) 2004 Bobcat S-250 Skid Steer (8020) 2003 Toro 3020 Sand Pro Bunker Rake (8110) 2007 Toro Multipro 5700-D 300 Gallon Sprayer (8150) 2009 Toro Multipro 5700-D 300 Gallon Sprayer (8160) 2005 Foley Accupro Grinder (8200) 2003 Neary 277 Bed Knife Grinder (8210) 1987 Ditch Witch Trencher (8500) 2011 No Ramp U19 Trailer (8520) 2008 Provonost P-516/3S Dump Trailer (8580) 2009 Lesco 50 Gal Sprayer Golf Cars (85) Sand Silo (2000-Friesen 12075C) Pond Aerators Drill and Fill Future Vehicle Replacement SUBTOTAL Promotes Sustainability Plan ID 6595 6600 7000 7010 7020 7040 7050 7060 7070 7080 7090 7180 7190 7200 7210 7220 7230 7240 7250 7260 7270 7280 7290 7380 7540 7560 7610 7700 7710 7720 7730 8010 8020 8110 8150 8160 8200 8210 8500 8520 8580 9340 x PAGE 201516 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 201617 201718 201819 201920 FUTURE YEARS 15,000.00 10,000.00 25,000.00 25,000.00 35,000.00 25,000.00 25,000.00 25,000.00 45,000.00 45,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 30,000.00 70,000.00 60,000.00 4,000.00 40,000.00 40,000.00 35,000.00 35,000.00 30,000.00 30,000.00 12,000.00 50,000.00 50,000.00 17,000.00 30,000.00 20,000.00 5,000.00 6,000.00 341,000 20,000.00 9,000.00 673,000.00 0 394,000 217,000 159,000 9,000 1,512,000 20 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS Anetsberger Golf Course Roof Replacement Course Amenities ANETS-01 ANETS-02 9,500 SUBTOTAL SUBTOTAL 0 GOLF OPERATIONS 0 0 244,550 1,659,000 386,000 0 0 9,500 179,000 9,000 14,911,500 TECHNY PRAIRIE PARK AND FIELDS Control Building Playground Renovation Batting Cage Machine Replacements Greenroof Shade Structure Turf Replacement & Fence Ball Field Netting Install & Outfield Fencing Replacement Soccer and Lacrosse Goal Replacement x TPPF-01 TPPF-02 TPPF-03 TPPF-04 TPPF-05 TPPF-06 TPPF-07 400,000 212,000 70 70 71 71 72 SUBTOTAL 12,000 12,000 55,500 880,000 80,000 24,000 12,000 67,500 904,000 0 0 692,000 TOWER RINK Lighting Replacement (48 Fund) TOW-01 100,000 SUBTOTAL 0 0 0 0 0 100,000 VILLAGE GREEN PARK AND CENTER Playground Renovation Memorial Park Renovation Grass Pave Generator Replacement Ball Field Netting Replacement SUBTOTAL x VG-01 VG-02 VG-03 VG-04 VG-05 365,500 72 40,000 35,000 73 60,000 10,000 60,000 40,000 0 0 0 410,500 21 LOCATION / PROJECT Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS WESCOTT PARK Playground Renovation Fencing Replacement WES-01 WES-02 365,500 26,000 SUBTOTAL 0 0 0 0 0 50,000 2,800,000 15,000 45,000 50,000 2,860,000 391,500 WEST PARK Playground Renovation Master Plan Implementation West Park Landscape Improvements 1710 Park Development WEST-01 WEST-02 WEST-03 WEST-04 196,000 73 74 74 SUBTOTAL 0 0 0 196,000 WILLIAMSBURG SQUARE PARK Playground Renovation Tennis and Basketball Court Maintenance Asphalt Path Maintenance and Repair Ball Field Fence Replacement Fence Replacement WIL-01 WIL-02 WIL-03 WIL-04 WIL-05 75 212,000 100,000 15,000 14,000 75 SUBTOTAL 30,000 0 0 30,000 0 212,000 129,000 WOOD OAKS GREEN PARK Entrance Drive Repair Master Plan Implementation Tennis Courts Resurface -Lighting and Tennis Building Landscape Shoreline Stabilization and Sheet Piling Repair/Replacement Playground Renovation Purchase Southwest Corner and Development of Day Camp Invasive Species Removal Light Pole Replacement-Cracking Poles Disc Golf SUBTOTAL x x x WOG-01 WOG-02 WOG-03 WOG-04 WOG-05 WOG-06 WOG-07 WOG-08 WOG-09 76 100,000 3,560,000 76 77 45,000 275,000 874,000 413,500 3,500,000 77 78 78 40,000 33,000 70,000 45,000 308,000 1,084,000 0 0 7,473,500 22 LOCATION / PROJECT PROJECTS UNDER $10,000 Funds 47 and 48 Total Carry-Over Projects Total without Carry-Over projects and 47 and 48 funds GRAND TOTAL (Without Carry-Over) Promotes Sustainability Plan ID PAGE 201516 201617 201718 201819 201920 FUTURE YEARS $149,170 165,000 569,815 2,914,720 7,748,000 3,984,500 2,876,000 3,734,000 33,733,000 23 Project Descriptions 24 Division: Location: Project Title: Priority Code: Administration 180 Anetsberger Drive Anets Site-Well Removal and IEPA Permit A Project ID: 180-01 Reason Code: RR This project is intended to cover the remaining work needed to receive the No Further Remediation letter from the Illinois Environmental Protection Agency (IEPA). After permission is received from IEPA, this project will include the removal and sealing of the remaining monitoring wells and the two deep wells. Project Allocation 15-16 16-17 17-18 18-19 19-20 $210,000 0 0 0 0 Division: Location: Project Title: Priority Code: Administration District-Wide Sustainability Plan Implementation B Project ID: ADMIN-01 Reason Code: ES Implementation of the initiatives in the District-Wide Sustainability Plan. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $10,000 $10,000 $10,000 $10,000 Promotes the Sustainability Plan 25 Division: Location: Project Title: Priority Code: Administration District-Wide Security Plan Implementation B Project ID: Reason Code: ADMIN-02 LS The next phase in the implementation of the security plan will be the continuation of the keyless entry at Village Green Center and Sportsman’s Maintenance Facility in addition to the expansion of the camera system at several Point of Sale (POS) locations throughout the District. Project Allocation 15-16 16-17 17-18 18-19 19-20 $40,000 $20,000 $15,000 0 0 Division: Location: Project Title: Priority Code: Administration District-Wide Personal Computer Equipment Migration A Project ID: ADMIN-03 Reason Code: CS/RR The IT Department maintains more than 200 personal computers, laptops and printers. In an effort to ensure equipment meets current and future needs, along with the desire to normalize cost, the District has adopted an industry standard life cycle of 4-5 years for PCs and printers and 3-4 years for laptops. In 2015, the IT Department anticipates replacing 22 PCs, 3 printers and 8 laptops. Project Allocation 15-16 16-17 17-18 18-19 19-20 $25,000 $25,000 $25,000 $25,000 0 26 Division: Location: Project Title: Priority Code: Administration Project ID: ADMIN-04 District-Wide Main Computer Equipment and Network Replacement A Reason Code: CS/RR In alignment with the District’s effort to utilize technology, a more progressive approach will be used in 2015 to deploy customer facing technologies as well as implement supporting network infrastructure for process improvement practices. This capital budget addresses all hardware to support HR, Technology and Marketing initiatives in 2015 as well as end-of-life infrastructure equipment and overall Network Security. In 2015, the District plans to enhance its backbone, which would address periodic issues in network latency and responsiveness. In addition, we will continue to expand electronic storage capacity to keep pace with the growing storage needs of the District. Enhancements to the District WIFI capabilities along with deployment of mobile hardware to staff will be implemented in 2015. Lastly, IT will continue its core migration plan, which includes the replacement of 4 of the 25 servers and replacement of 2 of the 15 switches. Project Allocation 15-16 16-17 17-18 18-19 19-20 $75,000 $45,000 $45,000 $45,000 0 Division: Location: Project Title: Priority Code: Administration District-Wide Computer Software Upgrade A Project ID: ADMIN-05 Reason Code: CS/RR Network Software Capital budget is the continuation of the District-Wide Technology Plan, including the software requirements of the District. This includes the purchase and implementation of commercial grade WIFI management software for expansion and continued phased deployment across District facilities; standard upgrades to end user software, including Windows, Microsoft, Adobe and GIS products; and standard network software upgrades, including Microsoft SharePoint, IP switch, VM ware, EMC and Microsoft SQL Server. The District will address and update IT’s network security by placing safeguards to protect from issues such as viruses, identity and credit card theft, EMV chip implementation and all other high-risk cyber crimes. The Finance Department also expects to continue replacing its existing fixed asset management software with a more comprehensive and robust application for District-wide assets. As outlined in 2014, the District will continue to comply with and address the changes in the Microsoft landscape in regard to licensing and versions of the major product line, as well as migration off of products that no longer will be supported. In addition, the District will take on several major changes to its core software, which includes changes to Recreation Software. Lastly, the District will continue to focus on upgrade and enhancement to its website, including evaluation of mobile applications and other web modules. Project Allocation 15-16 16-17 17-18 18-19 19-20 $100,000 $50,000 $40,000 $40,000 0 27 Division: Location: Project Title: Priority Code: Administration Administration Generator Replacement B Project ID: ADMIN-06 Reason Code: RR The replacement of the generator at the Administration Building may be necessary in the next 5 years. This generator was installed in 2000, and the projected useful life is 15-20 years. This piece of equipment is having starting issues and will be evaluated annually. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $80,000 0 0 Division: Location: Project Title: Priority Code: Administration Administration Admin. Office Furniture Replacement A Project ID: ADMIN-07 Reason Code: RR This project will replace the existing built-in office furniture at the Administration Facility, focusing on two offices per year. The existing furniture is beginning to delaminate, and drawer hardware is failing. Project Allocation 15-16 16-17 17-18 18-19 19-20 $13,000 $13,000 $13,000 0 0 28 Division: Location: Project Title: Priority Code: Administration District-Wide Land Acquisition B Project ID: ADMIN-08 Reason Code: CI/ES Capital dollars are allocated for future land purchases in underserved areas, as identified in the Comprehensive Master Plan of 2004. Funds may become available from future Development Impact Fees. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 0 Promotes the Sustainability Plan Natural Resource Management -Goal #1 Division: Location: Project Title: Priority Code: Administration Administration HVAC-Replace Rooftop Unit A Project ID: ADMIN-09 Reason Code: RR The District will replace the existing rooftop unit that was installed in 1994 with a higher-efficiency model. The rooftop unit has exceeded its useful life cycle. Replacement coils were installed in 2011, extending the life of the rooftop unit until fiscal year 2016/17. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $90,000 0 0 0 Promotes the Sustainability Plan Energy Goal #1 29 Division: Location: Project Title: Priority Code: Administration Administration Roof Replacement B Project ID: ADMIN-10 Reason Code: CS/RR Replaced in 2007, the roof of the Administration building will be out of its 15-year warranty in 2022. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 0 Division: Location: Project Title: Priority Code: Administration Administration Comprehensive Master Plan B Project ID: ADMIN-11 Reason Code: The Northbrook Board Policy Manual states that; the Board shall maintain a master plan that includes provisions for each of the District’s parks and other key facilities. The Board shall endeavor to keep the master plan current and shall undertake a thorough review of the master plan at least as often as every 10 years. The NPD recognizes that a comprehensive analysis of current programs, services, and facilities is necessary to help the District better prepare for these changes. The Master Plan will be a flexible tool to aid in its planning, thus the District will undergo this process in the upcoming year, as our current Comprehensive Master Plan was completed in March of 2004. Project Allocation 15-16 16-17 17-18 18-19 19-20 $175,000 0 0 0 0 30 Division: Location: Project Title: Priority Code: Parks and Properties Countryside Park Bollard Installation B Project ID: COU-01 Reason Code: CS/RR This project places 120 bollards around the open perimeter of the park to keep out unwanted vehicles. Bollards will be similar to those at Greenfield Park, with regard to spacing and type. The bollards will be made of recycled plastic. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $20,500 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Greenfield Park Pathway Design/Construction B Project ID: GNF-01 Reason Code: CI/ES Project includes survey and design fees for the development of a pathway connecting the two ball fields with the playground across the street and with Pfingsten Road. The Village is working on an intergovernmental agreement for use of the right-of-way to the Park District. This agreement should be finalized in 2015. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $12,000 $115,000 Promotes the Sustainability Plan Transportation Goal #1 2009 Community Interest and Opinion Survey Walking and Biking Trails 31 Division: Location: Project Title: Priority Code: Parks and Properties Greenview Park Fence Replacement A Project ID: GNV-02 Reason Code: RR This project will include the removal and replacement of the existing painted black chain link fence at Greenview Park with a black vinyl-coated chain link fence fabric. The existing fence posts are beginning to rot at their bases. Project Allocation 15-16 16-17 17-18 18-19 19-20 $10,000 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Indian Ridge Park Bocce Court Installation B Project ID: IRP-02 Reason Code: CI/ES This project will create two bocce courts and one shade shelter at Indian Ridge Park for senior and family activity. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $15,000 $110,000 32 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center/Theatre Theatre House Light Replacement B Project ID: LC-01 Reason Code: RR This project will replace the existing “Show” houselights system and mercury vapor lighting with one LED lighting system. Project Allocation 15-16 16-17 17-18 18-19 19-20 $70,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center Interior Upgrades and Maintenance B Project ID: LC-02 Reason Code: CS/RR Future interior hallway, activity room and office painting projects will be determined by use and wear. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $15,000 0 0 0 33 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center/Theatre Replace Theatre Lobby Furniture B Project ID: LC-03 Reason Code: CS/RR Replace the existing couches and end tables in the Theatre Lobby. The furniture is worn, does not match and has surpassed its life expectancy. Although this is an aesthetic project, the appearance of the facility is important to customers who spend many hours in the building. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $15,500 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center Parking Lot - Resurface B Project ID: LC-05 Reason Code: RR In the 2017/18 fiscal year, the parking lot will be scheduled for a complete reconstruction. The west lot will receive a 2” grind. Asphalt core samples will be obtained in the 2016/17 fiscal year to determine the full extent of the base failure and replacement need. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $400,000 0 0 34 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center/Theatre Theatre Retractable Seating & Flooring A Project ID: LC-06 Reason Code: RR This project will replace the existing retractable seating system. The existing system is uncomfortable, and replacement parts are becoming expensive to purchase. The new system will be retractable. The existing VCT tile flooring will be removed, and the existing concrete floor will be polished and stained. Project Allocation 15-16 16-17 17-18 18-19 19-20 $240,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center Parking Lot & Exterior Lighting B Project ID: LC-07 Reason Code: RR This project will replace the existing lighting fixtures in the Leisure Center parking lot and on the building with energy-efficient lighting. The existing poles are beginning to corrode at the base, and the fixtures are inefficient. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $40,000 0 0 35 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center Gym Floor Replacement B Project ID: LC-08 Reason Code: RR This project will replace the existing gym flooring at the Leisure Center. The current floor is damaged with dent marks, holes and divots. It has surpassed its life expectancy. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $30,000 0 0 Division: Location: Project Title: Priority Code: Leisure Services Project ID: LC-09 Leisure Center/Theatre Theatre Border/Side/Down light Replacement B Reason Code: RR This project will replace the existing aging border lights that use standard light bulbs with LED fixtures and replace stage fixtures, using halogen bulbs with LED fixtures. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $72,000 0 0 36 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center/Theatre Theatre Auto Lighting Fixtures B Project ID: LC-10 Reason Code: RR The existing instruments utilize outdated technology, and the Performing Arts staff uses them to light each show the District produces. The 6-9 new instruments use a technology that is much more efficient, using less energy while producing higher light outputs, allowing for greater visibility and special effects options. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $70,000 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center Restroom Remodel B Project ID: LC-11 Reason Code: RR The District will remodel four existing bathrooms and two "family" bathrooms, removing one floor urinal in main men's bath and converting to wall hung. Each bathroom will be gutted to drywall and concrete. New drywall will be replaced as needed. New standard floor tile and standard wall tile will be provided and installed to half height. New standard fixtures will be provided and installed in same locations. The remodeled restrooms will meet ADA requirements. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $140,000 0 0 37 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center Front Sign Replacement B Project ID: LC-14 Reason Code: RR Replace the 17-year old marquee sign and install a new informational sign along Walters Avenue. Project Allocation 15-16 16-17 17-18 18-19 19-20 $12,500 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Concrete Deck Repairs/Replace A Project ID: MAC-01 Reason Code: CS/RR Fiscal year 2014-15 included testing a new concrete overlay (Elitecrete) on small sections of the front entrance plaza and pool deck at MAC. If the product continues to perform as expected, it would eliminate the removal and replacement of existing pool decking that is budgeted for 2016-17. Decking repair is needed to improve the overall appearance of the deck surface. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $115,000 0 0 38 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Bathhouse/Pool Painting B Project ID: MAC-03 Reason Code: CS/RR The project consists of exterior repair and painting of the Meadowhill Aquatic Center. Scheduled maintenance and painting are required to keep a fresh and attractive appearance for pool patrons. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $13,000 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Project ID: MAC-06 Meadowhill Aquatic Center and Northbrook Sports Center Deck Furniture Replacement MAC/ NSC B Reason Code: CS/RR Replace outdated and worn concession tables and chairs at Sports Center Pool, and purchase more tables for Meadowhill Aquatic Center. Project Allocation 15-16 16-17 17-18 18-19 19-20 $10,000 0 $10,000 0 $10,000 39 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Water Slide Maintenance A Project ID: MAC-08 Reason Code: RR There are three slides at Meadowhill Aquatic Center that require periodic maintenance of waxing, removing mineral deposits, and spot fixing chips in paint and/or fiberglass. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $15,000 0 $15,000 0 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center MAC Pool Repairs Phase 2 of 2 A Project ID: MAC-09 Reason Code: RR The second phase consists of: VFD for Plunge filter $2,200; Protective coating (main filter) $10,000; Plunge pool diamond brite $21,000; Plunge pool cracking at skimmers $65,000; Main Dive Filter $165,000; Pump Motor $7,800; VFD $5,000; Flow sensor $1,200; New Sand $3,600; PVC Piping $10,500; development of a family changing room $48,000. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $340,000 0 $100,000 0 40 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Children’s Area Water Table Replacement B Project ID: MAC-11 Reason Code: CS/RR The current water feature does not work properly, is outdated and in need of repair. Project Allocation 15-16 16-17 17-18 18-19 19-20 $17,000 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Water Service Line Upgrade to Building A Project ID: MAC-12 Reason Code: RR This project will replace the water service line connecting the facility to the new water main, installed in 2009. The existing line is rusting and in poor condition. Project Allocation 15-16 16-17 17-18 18-19 19-20 $60,000 0 0 0 0 41 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Water Slide Shade Cover B Project ID: MAC-13 Reason Code: CS/RR Replace water slide canopy. New canopy will be installed by a professional contractor due to the height of the structure. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $10,000 0 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park Velodrome Surface Repair/Seal & Color Coat A Project ID: MHP-01 Reason Code: CS/RR The project consists of occasional anticipated surface repair to this unique facility. The Velodrome was refurbished in 2005 with spot repairs done in 2007, 2010 & 2015. Repairs should be kept current to sustain the facility. Repairs will include crack filling and seal coating portions of the asphalt. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $70,000 0 0 0 42 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park Master Plan Implementation A Project ID: MHP-02 Reason Code: CS/RR Begin installation of various features in the Meadowhill Park Master Plan. Planning and design will begin in 2017-18, while installation of new playground and possible tennis facility will begin in 2018-19. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $350,000 0 Park Master Plan Component Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park Chalet - Modifications B Project ID: MHP-03 Reason Code: CI/ES The roof is at the end of its life cycle and beginning to leak. Repairs will be made until the roof is replaced as part of the Meadowhill Master Plan implementation. Redesign the layout of the existing restrooms in the Chalet to allow access from inside and outside of the building. This would allow the removal of the porta potty onsite and allow patrons to use the available restroom facilities when the Chalet is not open. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $50,000 0 Park Master Plan Component 43 Division: Location: Project Title: Priority Code: Parks and Properties Project ID: MHP-04 Meadowhill Park Inline Skating/Hockey Rink Repairs –Dasher Boards B Reason Code: CS/RR In 2015-16, the extensive asphalt cracking will be addressed with a temporary repair. The overall project will replace the existing plywood dasher boards with the Gameplex Dasherboard System. This is a freestanding HPDE interlocking panel system that can be removed and stored when the court is redone. 2017-18 work will include the evaluation of placing multi-use courts instead of current inline court. Project Allocation 15-16 16-17 $25,000 17-18 18-19 19-20 0 $50,000 $250,000 Park Master Plan Component Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park Lighting Upgrades (Fund 48) A 0 Project ID: MHP-05 Reason Code: CS/RR Replace the parking lot light fixtures and security lighting with energy-efficient fixtures. The project is expected to be funded partially by grants. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $30,000 0 0 0 Promotes the Sustainability Plan Energy Goal #1 Park Master Plan Component 44 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park Playground Renovation B Project ID: MHP-06 Reason Code: RR Renovate the playground to remove equipment (installed in 1995) to meet current ADA and CPSC guidelines. Playground renovations keep general maintenance costs down through infrequent major repairs and provide users with the newest, safest equipment available. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $195,000 0 Park Master Plan Component Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park 1605 Storage Building Replacement B Project ID: MHP-07 Reason Code: CI/RR Replace the existing storage building at 1605 with a new storage facility. The existing building is in poor condition and had been slated for demolition in 1994 when Park Maintenance moved from the facility. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $200,000 0 45 Division: Location: Project Title: Priority Code: Parks and Properties Oaklane Park Playground Renovation B Project ID: OAK-01 Reason Code: CS/RR Renovate the playground to remove equipment (installed in 1999) to meet current ADA and CPSC guidelines. Playground renovations keep general maintenance costs down through infrequent major repairs and provide users with the newest, safest equipment available. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 $185,500 Division: Location: Project Title: Priority Code: Parks and Properties Oaklane Park Parking Lot Seal Coat B Project ID: OAK-03 Reason Code: CS/RR If an agreement is reached with the Fellowship Church, the District could crack fill and seal coat the church parking lot adjacent to Oaklane Park, if use of the lot is permitted. The lot is approximately 100,000 SF. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $12,000 0 0 0 46 Division: Location: Project Title: Priority Code: Parks and Properties Various Locations ADA Facility Requirements (47 Fund) A Project ID: PG&R-01 Reason Code: LS Funds are provided to develop and implement the ADA Transition Plan to bring facilities to required accessibility standards. For fiscal year 2015-16, projects will include the addition of two new bleacher pads, connection to the existing pathway, and detectable warnings at Wood Oaks Green Park. Project Allocation 15-16 16-17 17-18 18-19 19-20 $25,000 $25,000 $40,000 0 0 Division: Location: Project Title: Priority Code: Parks and Properties District-Wide Tree Prune and Replacement B Project ID: PARKS-01 Reason Code: CI/ES Prune, remove and replace trees in various parks and at Sportsman’s Country Club, as a result of the Emerald Ash Borer infestation. Project Allocation 15-16 16-17 17-18 18-19 19-20 $30,000 $30,000 $30,000 $20,000 0 Promotes the Sustainability Plan Natural Resource Management Goal #1 47 Division: Location: Project Title: Priority Code: Parks and Properties District-Wide Park Amenities & Furnishings B Project ID: PARKS-02 Reason Code: ES The 2015-16 fiscal year includes new concrete picnic tables at the warming shelter, heavy enough to discourage park visitors from moving them; new patio furniture at Techny Prairie Center and; additional waste and recycling containers within parks. Project Allocation 15-16 16-17 17-18 18-19 19-20 $10,000 $10,000 $10,000 $10,000 0 Division: Location: Project Title: Priority Code: Project ID: Parks and Properties Various Locations Asphalt Repairs A PARKS-03 Reason Code: CS/RR This project will include seal coating and patching at Coast Guard Park, Meadowhill Aquatic Center, Sportsman’s Maintenance Drive and Techny Prairie Park and Fields east lot and paths. Project Allocation 15-16 16-17 17-18 18-19 $140,000 0 0 0 19-20 0 48 Division: Location: Project Title: Priority Code: Parks and Properties Various Locations Meadowhill Park #2 Light Pole Replacement A Project ID: PARKS-05 Reason Code: CS/RR Replace the lighting fixtures on Meadowhill #2 field with LED stadium lighting. Poles need to be tested to determine if they need replacement. Project Allocation 15-16 16-17 17-18 18-19 0 0 0 0 Division: Location: Project Title: Priority Code: 19-20 0 Parks and Properties Various Locations District Painting Projects A Project ID: PARKS-06 Reason Code: RR Projects for 2015-16 include Village Green Park gazebo and concession building; Williamsburg Park chain link fence and gate; Techny Prairie Park and Fields warming shelter interior and exterior, Anets Prairie Center exterior and restrooms and the Greenview Park shelter. Project Allocation 15-16 16-17 17-18 18-19 19-20 $34,000 0 0 0 0 49 Division: Location: Project Title: Priority Code: Parks and Properties District-Wide Alternative Energy/Utility Savings B Project ID: PARKS-08 Reason Code: ES, CS/RR Utility savings are expected from efficiency upgrades. Projects include converting to low-flow fixtures for the toilets and urinals at facilities (Joe Doud Administration and Maintenance Center, Village Green Center, Sports Center and MAC Pool). Project Allocation 15-16 16-17 17-18 18-19 19-20 $0 0 0 0 $62,500 Promotes the Sustainability Plan Natural Resource Management Goal #3 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Park Baseball Field Netting Replacement A Project ID: PARKS-09 Reason Code: CS/RR Replace the torn and worn backstop nets installed in 2006 at Meadowhill Park on Fields #4 and #6. The life expectancy is 8-10 years. The nets are in poor condition and need to be replaced to keep stray balls from leaving the playing area. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $12,500 0 0 0 50 Division: Location: Project Title: Priority Code: Parks and Properties Various Locations Skinned Infield Renovation B Project ID: PARKS-10 Reason Code: CS/RR Grade the subsurface to establish a uniform sub-grade with a crown. Finish grade to the proper crown and compaction. The three fields scheduled for 2015-16 are Stonegate #30, Stonegate #31 and Meadowhill #3. Project Allocation 15-16 16-17 17-18 18-19 19-20 $25,000 $25,000 $25,000 $25,000 0 Division: Location: Project Title: Priority Code: Parks and Properties Various Locations Tennis and Basketball Court Repair B Project ID: PARKS-11 Reason Code: CS/RR Perform periodic maintenance of the District’s hard courts, including patching, caulking, color coating and striping. This preventative maintenance ensures that quality courts are available to patrons. Project for 2015-16 includes repairs for Indian Ridge basketball court. Project Allocation 15-16 16-17 17-18 18-19 19-20 $10,000 $10,000 $10,000 $10,000 $10,000 51 Division: Location: Project Title: Priority Code: Parks and Properties Techny Prairie Park and Fields Skate Park Preventative Maintenance B Project ID: PARKS-12 Reason Code: CS/RR Inspect and repair the delaminated concrete, power wash and apply one coat of Enviroseal 40 Penetrating Sealer to the entire Skate Park. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $20,000 0 0 $20,000 Division: Location: Project Title: Priority Code: Parks and Properties Techny Prairie Park and Fields Batting Cage Concrete Maintenance B Project ID: PARKS-13 Reason Code: CS/RR The project involves power washing and applying one coat of Enviroseal 40 Penetrating Sealer to the entire concrete area of the batting cage at TPPF; in addition to an inspection for and repair of any cracks. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $16,500 0 0 52 Division: Location: Project Title: Priority Code: Parks and Properties District-Wide Parks Vehicle and Equipment Replacement B Project ID: V&E Reason Code: CS/RR FY 15-16 includes $97,000 for the replacement of a field groomer, a Parks and Properties pickup truck, utility vehicle and a forklift. FY 16-17 includes $164,000 for the replacement of five Parks & Properties vehicles, three mowers and a Smithco Superstar groomer. FY 17-18 includes $154,000 for the replacement of two plow trucks, a tractor, a utility RTV cart, a zero-turn mower and an air compressor. FY 18-19 includes $113,000 for a Leisure Services vehicle, parks utility body plow truck and two crew cab pickups. FY 19-20 includes $140,000 for a small dump truck, a bucket truck and a pick-up truck with lift gate. Project Allocation 15-16 16-17 17-18 18-19 19-20 $97,000 $164,000 $154,000 $113,000 $140,000 The procedure of the Park District is to review the replacement schedule every year and plan for replacement every seven years for plow trucks and every 50,000 miles or 1,200 hours, depending on overall use and condition, for all other vehicles. Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center SC Phase 4 Flooring A Project ID: SC-01 Reason Code: RR Replace the flooring in the Community Room & Locker Rooms (1-4) and the Multi-Purpose Room in fiscal year 2015-16. Existing flooring is worn in high-traffic areas, and the newly replaced flooring in the Community Room continues to experience fading and discoloration. Project Allocation 15-16 16-17 16-17 17-18 18-19 $110,000 $15,000 0 0 0 Master Plan Implementation 53 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Front Office Remodel & Carpet A Project ID: SC-02 Reason Code: CS/RR After a full operational assessment, a potential project includes the remodeling of the front office to make it more efficient for staff use and more customer-friendly. This will include building an office for the Office Supervisor and providing that position with a more suitable workspace with necessary privacy. The District will replace the carpet in the Main Office as well as in staff offices. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $100,000 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center A Rink Show System-Sound B Project ID: SC-03 Reason Code: CS/RR This project includes replacing the sound system in A Rink to meet new electrical codes and replacing outdated and unreliable equipment. The project will include the replacement of eight speakers, new wiring and installation. Project Allocation 15-16 16-17 17-18 18-19 19-20 $40,000 0 0 0 0 54 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Lobby Seating & Skater Benches A Project ID: SC-04 Reason Code: CI/ES This project includes the addition and replacement of skater benches and lobby/concession area seating to accommodate customer demand. Project Allocation 15-16 16-17 17-18 18-19 19-20 $13,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center SC- Vestibule Door Enclosure A Project ID: SC-05 Reason Code: CI/ES Investigate the option of construction drawings for installing a double door system at the main entrance to reduce heating and cooling costs. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $15,000 0 55 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center B Rink Sound System B Project ID: SC-06 Reason Code: CS/RR This project includes replacing six speakers, mounting materials, new wiring and installation labor. Also included are stereo component replacements. Project Allocation 15-16 16-17 17-18 18-19 19-20 $18,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center A & B Rink Concrete Floor Painting B Project ID: SC-07 Reason Code: CS/RR Repaint the concrete floor in B Rink. The current floor is worn and painted blue. The District would paint the floor white, as recommended by USA Hockey. Extend life of concrete by having proper seal and improve contrast of lines in the ice for hockey and speed skating. A brighter surface would enhance the customer experience. A Rink work is scheduled for 2016-17. Project Allocation 15-16 16-17 17-18 18-19 19-20 $12,000 $12,000 0 0 0 56 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center A Rink Show System-Lighting B Project ID: SC-08 Reason Code: CS/RR This project includes replacing the theatrical lighting system in A Rink to meet new electrical codes and replace outdated and unreliable equipment. The project includes the replacement of wiring, dimmers and can lights and installation cost. Project Allocation 15-16 16-17 17-18 18-19 19-20 $45,000 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Northbrook Sports Center HVAC Replacements A Project ID: SC-09 Reason Code: RR Replace the existing rooftop units with a higher-efficiency model. The 10 rooftop units were installed in 2000 and are approaching the end of their useful life. This project has been split into three phases to address the units that are in disrepair in the first year and to maximize the use of units that are functional. Project Allocation 15-16 16-17 17-18 18-19 19-20 $40,000 $40,000 $40,000 0 0 Promotes Sustainability Plan Energy Goal #1 57 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Low-Flow Fixtures – B Rink Lobby Restrooms A Project ID: SC-10 Reason Code: CI Replace flush push buttons on toilets in the lobby restrooms. Current push buttons are very hard to operate. All other urinals and toilets in locker rooms have automatic flushers installed. The project will increase customer satisfaction. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $30,000 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Community Room Projection Screen B Project ID: SC-11 Reason Code: CS/RR After a full operational assessment, a potential project includes the installation of a ceiling-recessed, electric-operated projection screen and mounted projector in the Community and Multi-Purpose Rooms to enhance the function of the rooms. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $22,000 0 58 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Scoreboard Replacement – Both Rinks A Project ID: SC-12 Reason Code: CS/RR Replace the hockey scoreboards and equipment in both rinks. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $20,000 0 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Low-E Ceiling Installation B Project ID: SC-13 Reason Code: ES The second phase of installing Low-E ceilings in both rinks with A Rink scheduled this year. This project has an estimated energy savings of $21,000 annually. Incentive/Rebate is expected to be $33,000. The simple payback for the installation in both rinks is less than 5 years. Project Allocation 15-16 16-17 17-18 18-19 19-20 $72,500 0 0 0 0 Promotes the Sustainability Plan Energy Goal #1 59 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Cooling Tower Replacement A Project ID: SC-14 Reason Code: RR RMC has recommended replacement of the cooling tower, because the current size of the tower does not have the capacity to handle three compressors at the same time. Currently, only two compressors are used in the summer, and high temperatures delay freezing time, which can cause down time and program interruptions. By upgrading to a larger tower, the District will be able to run three compressors during the summer and keep ice at desired temperatures, providing more reliable programming of the ice surface. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $140,000 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Generator Replacement B Project ID: SC-15 Reason Code: RR The replacement of the generator at the Sports Center may be necessary in the next five years. This generator was installed in 2000, and the projected useful life is 15-20 years. This piece of equipment will be evaluated annually. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $150,000 0 0 60 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Roof Replacement A Project ID: SC-16 Reason Code: RR This project will remove and replace the roof. Sections of the existing roof were installed in 1988, 1996 and 1999 and no longer are covered by warranty. Sections of the roof are experiencing leaking and are in poor condition. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $1,000,000 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Toilet Replacements A Project ID: SC-17 Reason Code: CI Replace toilets in A and B lobbies. The current toilets were installed low, and staff is receiving complaints from customers. Staff will determine the appropriate number of toilets to raise for adult comfort. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $48,000 0 0 0 61 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Hand Dryer Replacement A Project ID: SC-18 Reason Code: RR Replace the existing hand dryers with more efficient and high-output dryers. Current units do not dry hands effectively and produce little heat. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $13,000 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Rink Dividers A Project ID: SC-19 Reason Code: CI/ES Purchase one set of standard Mitey Boards—a system for dividing the ice for programming, primarily during hockey lessons, games and practices. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $15,000 0 62 Division: Location: Project Title: Priority Code: Leisure Services Northbrook Sports Center Hot Water Tank & Heater A Project ID: SC-20 Reason Code: RR This project will replace the undersized hot water tank and heater with two 500 gallon water heaters and two 250 gallon storage tanks. This is a continuation of the hot water delivery project and is designed to address the shower temperature issues experienced throughout the facility. Project Allocation 15-16 16-17 17-18 18-19 19-20 $70,000 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Northbrook Sports Center Pool Pool Renovation A Project ID: SCPOOL-01 Reason Code: CS/RR The project includes the extensive renovation of the aquatic facility and will include, at a minimum, replacement of the main pool shell, adjustments to the diving well to meet current State code requirements, replacement of most mechanical systems, a new shade structure, repairs to the pool deck, zero-depth areas, review of the locker rooms, and architecture and construction management fees. Project Allocation 15-16 16-17 17-18 18-19 19-20 $500,000 $3,700,000 0 0 0 63 Division: Location: Project Title: Priority Code: Project ID: Parks and Properties Stonegate Park Park Improvements A SGP-01 Reason Code: CS/RR Renovate the playground to remove equipment (installed in 1999) to meet current ADA and CPSC guidelines. In addition, the parking lot will be repaved, the pathways will be crack filled and seal coated and pickle ball courts will be added to the tennis court area. The project includes design and permits in Fiscal Year 2015-16 and installation in 2016-17. Project Allocation 15-16 16-17 $30,000 $525,000 Division: Location: Project Title: Priority Code: 17-18 18-19 19-20 0 0 0 Golf Operations Sportsman’s Country Club Shoreline Stabilization Phase 5 B Project ID: GOLF-01 Reason Code: ES The project includes the continuation of the re-establishment and stabilization of pond shoreline with grading and plantings. Phase 5 does not require riprap removal, and the project grading and planting will be preformed in-house. The District will continue to assess the effectiveness of in-house efforts prior to determining the best way to proceed on the remaining ponds. Project Allocation 15-16 16-17 17-18 18-19 19-20 $40,000 $95,000 $95,000 0 0 Promotes the Sustainability Plan Natural Resource Management Goal #1 64 Division: Location: Project Title: Priority Code: Golf Operations Project ID: GOLF-02 Sportsman’s Country Club Golf Cart Path Maintenance and Potential Expansion A Reason Code: CS/RR, CI/ES With further operational assessment needed up to 20,000 linear feet of crushed asphalt path which serves to mitigate lost revenues and compliment our environmental stewardship after significant rain events. Expenditures will also address existing 13,000 linear feet of existing path that have significantly deteriorated and are past expected life cycle. Project Allocation 15-16 16-17 0 $625,000 Division: Location: Project Title: Priority Code: 17-18 18-19 19-20 0 0 Golf Operations Sportsman’s Country Club Classic 18 Irrigation Pump A 0 Project ID: GOLF-03 Reason Code: RR Replace the Classic 18 irrigation pump. Project Allocation 15-16 16-17 17-18 18-19 19-20 $12,500 0 0 0 0 65 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Shade System for Range B Project ID: GOLF-04 Reason Code: CI/ES Purchase and install a 10-bay, covered cantilever shade system to provide customers with relief from the heat and rain. This project is based on customer requests, as it would allow more practice in those conditions. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $54,000 0 0 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Glass Door Replacement A Project ID: GOLF-06 Reason Code: RR This project consists of the replacement of the three sets of glass doors and metal frames at the Clubhouse. Improper locking and securing of the facility is occurring and the metal frames have begun to deteriorate from salt use during the winter. Project Allocation 15-16 $30,000 16-17 17-18 18-19 19-20 0 0 0 0 66 Division: Location: Project Title: Priority Code: Golf Operation Sportsman’s Country Club Naturalized Area Stewardship A Project ID: GOLF-07 Reason Code: ES This project includes the stewardship of the naturalized area and recently restored shorelines at Sportsman’s Country Club adding to the aesthetics and sustainability of the golf course. Project Allocation 15-16 16-17 17-18 18-19 19-20 $20,000 $20,000 $20,000 $20,000 0 Promotes the Sustainability Plan Natural Resource Management Goal #1 Division: Location: Project Title: Priority Code: Golf Operation Sportsman’s Country Club Generator Replacement A Project ID: GOLF-08 Reason Code: RR The generator at Sportsman’s has exceeded its projected useful life and after years of service repairs no longer functions. Project Allocation 15-16 16-17 17-18 18-19 19-20 $80,000 0 0 0 0 67 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Cart Barn Renovation and Roof Replacement B Project ID: GOLF-09 Reason Code: RR Remodel the existing Cart Barn to accommodate Golf’s cart fleet and additional maintenance storage. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $525,000 0 0 0 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Golf Ball Dispenser B Project ID: GOLF-10 Reason Code: RR Touch point system integration will provide a better overall experience for our customers. The credit card functionality is a lot simpler and easier to use; our current system is often confusing. The new system provides the convenience of recharging prepaid cards directly at the machine. Project Allocation 15-16 16-17 17-18 18-19 19-20 $12,500 0 0 0 0 68 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Master Plan Review and Update B Project ID: GOLF-12 Reason Code: RR Project is to provide a thorough and comprehensive document that would strategically guide and prioritize future on course improvements. Course analysis will assess long term concerns and include the drainage system, vegetation and tree plantings, naturalized area recommendations, and designs and permitting for path repairs and potential expansion. Project Allocation 15-16 16-17 17-18 18-19 19-20 $49,550 0 0 0 0 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Vehicle and Equipment Replacements B Project ID: GOLF-V&E Reason Code: CS/RR FY 15-16 No equipment is scheduled for replacement. FY 16-17 Provides $394,000 for the replacement of a top dresser, two work vehicles, and the golf cart fleet. FY 17-18 Provides $217,000 for the replacement of a riding tees/greens mower, two fairway mowers, eight walk-behind greens mowers and a bed knife grinder. FY18-19 Provides $159,000 for the replacement of a plow truck, a range ball cart and picker, a sand bunker rake and two sprayers. FY19-20 Provides $9,000 for the replacement of pond aerators. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $394,000 $217,000 $159,000 $9,000 69 Division: Location: Project Title: Priority Code: Parks and Properties TPPF-Batting Cages Batting Cage Machine Replacements B Project ID: TPPF-03 Reason Code: CS/RR Replace problematic pitching machines. Project Allocation 15-16 16-17 17-18 18-19 19-20 $12,000 $12,000 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties TPPF-Trail Through Time Green Roof Shade Structure B Project ID: TPPF-04 Reason Code: ES Install new green roof shade structure in the northwest area of Trail Through Time. The structure will provide seating and sun relief in the prairie, while offering an educational and picnicking opportunity. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $55,500 0 0 0 Promotes the Sustainability Plan Natural Resource Management #1 70 Division: Location: Project Title: Priority Code: Parks and Properties Techny Prairie Park and Fields Turf Replacement & Fence A Project ID: TPPF-05 Reason Code: CS/RR Remove and replace the artificial turf field installed in 2006. The warranty is for eight years and has expired. The manufacturer recommends replacement every 10 years. The project will include enclosing the fields with an 8’ chain link fence. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $880,000 0 0 Division: Location: Project Title: Priority Code: Leisure Services Project ID: TPPF-06 Techny Prairie Park and Fields Baseball Field Netting Install & Outfield Fencing Replacement B Reason Code: LS After a full operational assessment, a potential project includes raising to 12 feet sections of the outfield fence at Techny 26, 27, and 28 softball diamonds to prevent softballs from landing in the parking lot, paths and other playing fields. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 0 71 Division: Location: Project Title: Priority Code: Leisure Services Techny Prairie Park and Fields Soccer & Lacrosse Goal Replacement B Project ID: TPPF-07 Reason Code: RR Soccer goal replacement for 7x21 foot and 6.5x18.5 foot goals. Current goals will be approaching the end of their three-year life cycle. Replacement goals will be higher quality, so they should last longer and be less likely to break. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $24,000 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Village Green Park and Center Memorial Park Renovation B Project ID: VG-02 Reason Code: CS/RR This project will redesign the north corner of Village Green Park in the memorial garden area to be dedicated in 2017, the District’s 90th anniversary. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $40,000 0 0 0 72 Division: Location: Project Title: Priority Code: Parks and Properties Village Green Center Generator Replacement A Project ID: VG-04 Reason Code: RR The replacement of the generator at the Village Green Center is necessary, as it is no longer operational. This generator has been serviced numerous times over the last few years. Each time it has been called upon to supply emergency power, it has overloaded various components and wiring, causing further extensive repairs. Project Allocation 15-16 16-17 17-18 18-19 19-20 $60,000 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties West Park Master Plan Implementation B Project ID: WEST-02 Reason Code: CS/RR Begin installation of features in the West Park Master plan. Planning and design will begin in 2018-19. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 $50,000 $2,800,000 73 Division: Location: Project Title: Priority Code: Parks and Properties West Park Landscape Improvements A Project ID: WEST-03 Reason Code: RR This project will include the extensive renovation of the planting bed along Pfingsten Road and the property boundary. Existing vegetation is overgrown and blocks the main entrance sign along Pfingsten. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 $15,000 Division: Location: Project Title: Priority Code: Parks and Properties West Park 1710 Park Development A Project ID: WEST-04 Reason Code: RR This project will include the development of the parcel at 1710 Pfingsten Road. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 $45,000 74 Division: Location: Project Title: Priority Code: Parks and Properties Williamsburg Square Park Playground Renovation B Project ID: WIL-01 Reason Code: CS/RR Renovate the playground to remove equipment to meet current ADA and CPSC guidelines. Playground renovations keep general maintenance costs down through infrequent major repairs and provide users with the newest, safest equipment available. This playground was installed in 1999. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 0 0 $212,000 Division: Location: Project Title: Priority Code: Parks and Properties Williamsburg Square Park South Fence Replacement B Project ID: WIL-05 Reason Code: CS/RR Remove and replace 1,250 linear feet of stockade fence. Replace with 6 foot stockade Rustic Cedar, install posts and remove dirt. Price does not include gates. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $30,000 0 0 75 Division: Location: Project Title: Priority Code: Parks and Properties Wood Oaks Green Park Asphalt Maintenance B Project ID: WOG-01 Reason Code: CS/RR This project will make permanent repairs to the entrance drive to Wood Oaks Green Park. The area has experienced severe erosion, and temporary emergency repairs were made to stabilize the roadway in 2014. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $100,000 0 0 Park Master Plan Implementation Division: Location: Project Title: Priority Code: Parks and Properties Project ID: WOG-03 Wood Oaks Green Park Tennis Courts Resurface-Lighting and Tennis Building Landscape A Reason Code: RR This project will resurface the existing tennis courts, install lighting and redesign the area surrounding the tennis hut. Project Allocation 15-16 16-17 17-18 18-19 19-20 $45,000 $275,000 0 0 0 Park Master Plan Implementation 76 Division: Location: Project Title: Priority Code: Parks and Properties Project ID: WOG-04 Wood Oaks Green Park Shoreline Stabilization and Sheet Piling Repair/Replacement B Reason Code: ES/RR Repair or remove and replace the sheet piling along the shoreline at the lake. Initial engineering for sheet piling repairs was conducted after a portion of the wall failed due to a large rain event in 2013. Further investigation showed that a majority of the sheet piling is insufficient in size. Extensive grading is needed if it is determined that the shoreline stabilization will consist of naturalized areas to replace portions of the sheet piling. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $874,000 0 0 Park Master Plan Implementation Division: Location: Project Title: Priority Code: Parks and Properties Project ID: WOG-07 Wood Oaks Green Invasive Species Removals & Replanting B Reason Code: ES Remove invasive species along the back of sled hill and along the tollway and replant slopes with a native plant mix. Estimated area for removals is 3 acres. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $40,000 0 0 Promotes the Sustainability Plan Natural Resource Management Goal #1 77 Division: Location: Project Title: Priority Code: Parks and Properties Wood Oaks Green Park Light Pole Replacement-Cracking Poles A Project ID: WOG-08 Reason Code: RR This project will replace the remaining concrete light poles that are experiencing cracking. There is a partial warranty rebate available. Project Allocation 15-16 16-17 17-18 18-19 19-20 0 $33,000 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Wood Oaks Green Park Disc Golf A Project ID: WOG-09 Reason Code: RR In accordance with the Master Plan for Wood Oaks Green Park, this project will add a 9-hole disc golf course to the park Project Allocation 15-16 16-17 17-18 18-19 19-20 0 0 $70,000 0 0 Park Master Plan Implementation 78 Projects Under $10,000 (Manager’s Account) PROJECT DESCRIPTION WORK SHEETS 79 CAPITAL IMPROVEMENT PLAN 2015-16 PROJECTS UNDER $10,000 (Manager's Account) ID Page Budget (FY 15-16) Leisure Services LC-Refrigerator/Freezer MALS-01 81 $7,000.00 SC-Mylar Curtains SC-Dash Box Replacment MALS-02 MALS-03 81 82 $8,300.00 $4,000.00 MAC-Locker Room Floor Refinish School Basketball Hoop Replacement MALS-04 MALS-05 82 83 $6,000.00 $5,600.00 SC-Mirror Covers-Community Room SC-Instructor Work Area MALS-06 MALS-07 83 84 $4,300.00 $4,200.00 SC Convert First Aid Office to Private Office SC-Ammonia Sensor Upgrade MALS-08 MALS-09 84 85 $4,000.00 $7,000.00 SC-Community Room Can Lights SC-Showcase Lighting SC-Sound System Upgrade MAC/SC Pool Office Furniture Total Leisure Services MALS-10 MALS-11 MALS-12 MALS-13 85 86 86 87 $5,500.00 $2,500.00 $4,000.00 $4,700.00 $67,100.00 MAPP-01 MAPP-02 MAPP-03 MAPP-04 87 88 88 89 $8,500.00 $3,500.00 $5,000.00 $3,100.00 MAPP-05 MAPP-06 MAPP-07 89 90 90 $5,100.00 $6,000.00 $8,500.00 $39,700.00 MAGO-01 MAGO-02 MAGO-03 MAGO-04 MAGO-05 MAGO-06 91 91 92 92 93 93 $4,500.00 $8,120.00 $4,750.00 $9,000.00 $8,000.00 $8,000.00 $42,370.00 Parks and Properties West Park Strike Guard MAC Slide Pool Cover Ventrac Drop Spreader Befco Flail Mower 60" Infield Rascal MVP Parks Utility Cart VG-Gazebo Lighting Upgrade Total Parks and Properties Golf Operations Pump Replacement VFD Replacement Picker Gang SCC Fire Panel Restroom Staining and Painting Restroom Epoxy Flooring Total Golf Operations Grand Total $149,170.00 80 Division: Location: Project Title: Priority Code: Leisure Services Leisure Center/Theatre Refrigerator/Freezer A Project ID: MALS-01 Reason Code: RR The current freezer is not working and the cost of repair is not worth the investment, since the refrigerator/freezer combo is more than 20 Years old. Project Allocation 15-16 16-17 17-18 18-19 19-20 $7,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Mylar Curtain B Project ID: MALS-02 Reason Code: RR Replace existing mylar curtain used for center stage for ice show. Current mylar is 20+ years old and is coming apart, due to years of service. Project Allocation 15-16 16-17 17-18 18-19 19-20 $8,300 0 0 0 0 81 Division: Location: Project Title: Priority Code: Leisure Services Sports Center DashBox Replacement A Project ID: MALS-03 Reason Code: RR This project will include the replacement of current ice show dashbox that is more than 20+ years old. Current dashbox is weak and doesn’t allow for chorography, due to age. Work would be completed inhouse. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Meadowhill Aquatic Center Locker Room Floor refinishing B Project ID: MALS-04 Reason Code: RR This project will include a deep clean and light sanding of the locker room floors, followed by two additional coats of sealer. The abrasive level of the current floor is making it difficult to keep clean. Project Allocation 15-16 16-17 17-18 18-19 19-20 $6,000 0 0 0 0 82 Division: Location: Project Title: Priority Code: Leisure Services Various School Basketball Hoop Replacement A Project ID: MALS-05 Reason Code: RR This project will provide eight adjustable basketball hoops to be used at local schools. The hoops do not lower to the height needed for the respective groups playing. Project Allocation 15-16 16-17 17-18 18-19 19-20 $5,600 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Mirror Covers-Community Room B Project ID: MALS-06 Reason Code: RR This project will include the installation of removable covers for the mirrors in the Community Room. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,300 0 0 0 0 83 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Instructor Work Area B Project ID: MALS-07 Reason Code: RR This project will include the addition of a work space in the pro room to allow instructors who are here all day to work between their lessons. Current staffs use the lobby, which can be quite distracting. We would add shelving units to help with storage of supplies. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,200 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Private Office-Convert First Aid A Project ID: MALS-08 Reason Code: RR This project will include converting the First Aid room to a staff office. Work will require removing cabinets and plumbing and adding office furniture. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,000 0 0 0 0 84 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Ammonia Sensor Upgrade B Project ID: MALS-09 Reason Code: RR This project will include upgrading the existing ammonia sensor. The current system is 15 years old and is reaching the end of its useful life. These systems are in place to monitor any unsafe conditions in the building, protecting staff and the public. Project Allocation 15-16 16-17 17-18 18-19 19-20 $7,000 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Community Room Can Lights A Project ID: MALS-10 Reason Code: RR This project will include replacing the current track lighting and installing more can light fixtures around the perimeter of the Community Room. Project Allocation 15-16 16-17 17-18 18-19 19-20 $5,500 0 0 0 0 85 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Showcase Lighting B Project ID: MALS-11 Reason Code: RR This project will include an upgrade of the current trophy showcase lighting system to increase its efficiency. Current lighting is constantly on; a new system would allow timers to shut lights off when the building is closed. Project Allocation 15-16 16-17 17-18 18-19 19-20 $2,500 0 0 0 0 Division: Location: Project Title: Priority Code: Leisure Services Sports Center Sound System Upgrade A Project ID: MALS-12 Reason Code: RR This project will include replacement of the sound components inside the sound racks in the main office and Sports Center Pool. New components would include new amps, mixer and CD/iPod player . Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,000 0 0 0 0 86 Division: Location: Project Title: Priority Code: Leisure Services Meadowhill and Sports Center Pools Pool Office Furniture B Project ID: MALS-13 Reason Code: RR The current office furniture is old and does not function properly. The request is to replace the guard office table, chairs and managers’ office chairs at MAC and the guard office chairs and managers’ office chairs at Sports Center. All equipment is old, and some pieces are missing. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,700 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties West Park Strike Guard A Project ID: MAPP-01 Reason Code: RR This project will provide additional strobe units at West Park to increase coverage throughout the park. The current combination strobe and horn unit is on the northeast side of the Sports Center and is not visible to the playground, soccer and ball field areas. Project Allocation 15-16 16-17 17-18 18-19 19-20 $8,500 0 0 0 0 87 Division: Location: Project Title: Priority Code: Parks and Properties Meadowhill Aquatic Center Slide Pool Cover A Project ID: MAPP-02 Reason Code: RR This project will replace the existing slide pool cover, which is torn in multiple locations and is becoming difficult to repair. Project Allocation 15-16 16-17 17-18 18-19 19-20 $3,500 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Fleet Ventrac Drop Spreader A Project ID: MAPP-03 Reason Code: RR The Ventrac Sidewalk Drop Spreader would be an attachment to the Kubota RTV. It will assist in the salting or sanding of sidewalks and pathways throughout the District, as it will be attached to provide the ability to salt sidewalks and pathways as they are plowed. Project Allocation 15-16 16-17 17-18 18-19 19-20 $5,000 0 0 0 0 88 Division: Location: Project Title: Priority Code: Parks and Properties Fleet Befco Flail Mower 60” B Project ID: MAPP-04 Reason Code: RR The District will purchase 60-inch wide, 3 point hitch flail mower for use on the rear of our tractors at Parks and Golf. This piece of equipment will be used to mow the prairie and natural areas during years that weather conditions do not allow for prescribed burning. Project Allocation 15-16 16-17 17-18 18-19 19-20 $3,100 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Fleet Infield Rascal MVP A Project ID: MAPP-05 Reason Code: RR This unit hooks up to a 3-point hitch of a tractor and is capable of infield maintenance, compaction relief and renovation, vegetation and lip removal, refresh and decompact warning tracks. Project Allocation 15-16 16-17 17-18 18-19 19-20 $5,100 0 0 0 0 89 Division: Location: Project Title: Priority Code: Parks and Properties Fleet Parks Utility Cart B Project ID: MAPP-06 Reason Code: RR Replace the 1994 Utility Cart that is used for maintenance at Techny Prairie Park and Fields. Project Allocation 15-16 16-17 17-18 18-19 19-20 $6,000 0 0 0 0 Division: Location: Project Title: Priority Code: Parks and Properties Village Green Park Gazebo Lighting Upgrade A Project ID: MAPP-07 Reason Code: RR This project would replace the existing inadequate lighting and electrical wiring at the Gazebo. New lighting would provide security and visibility at night; the new electrical wiring also would reduce the circuit overloads that frequently occur with the existing electrical circuitry. Project Allocation 15-16 16-17 17-18 18-19 19-20 $8,500 0 0 0 0 90 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Pump replacement B Project ID: MAGO-01 Reason Code: RR Pressure maintenance pump (Classic 18) is 15 years old and is no longer working. It needs to be replaced. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,500 0 0 0 0 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club VFD Replacement A Project ID: MAGO-02 Reason Code: RR The variable frequency drive controls the pump station pumps by changing the speed at which they run. As more water is demanded, the VFD ramps up the pump speed only as needed, thereby extending the life of the pump station and irrigation pipes in the ground. Project Allocation 15-16 16-17 17-18 18-19 19-20 $8,120 0 0 0 0 91 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Picker Gang B Project ID: MAGO-03 Reason Code: RR Our picker gang is 5 years old and has run its life cycle. It is becoming increasingly more expensive to repair after each season with parts and labor. Project Allocation 15-16 16-17 17-18 18-19 19-20 $4,750 0 0 0 0 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club SCC Fire Panel A Project ID: MAGO-04 Reason Code: RR The fire panel at Golf Maintenance is a proprietary system that only Simplex technicians can work on when there are programming issues. The unit needed to be reprogrammed several times during the last couple of years, costing the District $2,000-3,000. Project Allocation 15-16 16-17 17-18 18-19 19-20 $9,000 0 0 0 0 92 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Restroom Staining and Painting B Project ID: MAGO-05 Reason Code: RR Paint and stain the posts, trusses and roof deck of the new restrooms and stain the CMU walls of the South Restroom. Project Allocation 15-16 16-17 17-18 18-19 19-20 $8,000 0 0 0 0 Division: Location: Project Title: Priority Code: Golf Operations Sportsman’s Country Club Restroom Epoxy Floor coating B Project ID: MAGO-06 Reason Code: RR Seal the concrete floors of the new restrooms with low-maintenance epoxy coating to improve the appearance and ease of cleaning. Project Allocation 15-16 16-17 17-18 18-19 19-20 $8,000 0 0 0 0 93 Appendix 94 Park Fleet Replacement Schedule - Appendix A APPENDIX A Park Fleet Replacement Schedule No. Year Description 2015-16 2016-17 2017-18 2018-19 2019-20 Fleet Vehicles 1010 1020 2010 2020 2030 2040 3010 3020 3030 3040 3050 3060 3070 3080 3090 3100 3110 3120 3130 3140 3150 3180 3190 3200 3210 3220 3230 3240 3250 2012 2005 2008 2007 2010 2010 2010 2009 2008 2005 2005 2012 2013 2010 2010 2006 2011 2007 2003 2009 2014 2010 2000 2008 2009 2001 2001 2008 Ford Edge Chevy Malibu Subaru Forester Chevy 2WD 1500 Ford Transit Connect XLT Wagon Ford Transit Connect XLT Wagon Ford Transit Connect Cargo Van GMC 4WD 2500 (Plow Truck) GMC 4WD 2500 Utility Body (Plow Truck) GMC 2WD 2500 Lift Gate Chevy 2WD 2500 Ford F-250 Utility Body 4X4 (Plow Truck) Ford Transit Connect Cargo Van Bucket Truck GMC 4WD 2500 Utility Body (Plow Truck) Ford Transit Connect Cargo Van GMC 6500 Large Dump Truck Ford F450 Dump (Plow Truck) Chevy Cube Van Chevy C4500 Mini Dump Chevy 2WD 2500 GMC 3500 HD 4x4 (Plow Truck) Toyota Prius GMC 2WD 1500 GMC 2WD 2500 Crewcab Chevy 2WD 2500 Liftgate GMC 2WD 1500 Chevy 2WD 1500 Chevy 2WD 2500 Crewcab $23,000 $25,000 $30,000 $25,000 $25,000 $30,000 $55,000 $30,000 $60,000 $23,000 $30,000 $25,000 $23,000 $23,000 $30,000 Trailers 5130 5140 5150 5160 5180 5230 5240 1987 Century Concession Trailer 1979 Homemade Float Trailer Special Events Trailer 2010 Towmaster T10 Tilt Trailer 10k 2015 Bravo Enclosed Trailer 2007 Big Tex Utility Trailer 2008 Haulmark Enclosed Ball Field Trailer Aerifying 4230 4660 4700 2006 John Deere Aercore 1500 1996 Bannerman D/M Dresser 2009 Aera-Vator First Products Work Vehicles 4040 5250 1995 Club Car Carryall 2009 Kubota RTV1100 $6,000 4X4 Diesel $22,000 Riding Trim Mower 4670 2002 Kubota 60" Zero -turn Diesel $15,000 95 Walk-Behind Mowers 4510 2000 Bobcat 36" mower $3,500 4680 2000 Bobcat 36" mower $3,500 Wide Area Mowers 4031 4790 2006 Toro Groundmaster 4500-D 2001 Bush Hog 15' tri-plex $16,000 Tractors 5010 5020 5030 5040 5050 5220 1997 2002 2010 2008 2001 1996 $35,000 Kubota M5400 Kubota M5700 Case 580 Super M Backhoe Kubota M7040HDC Bobcat 773 High Flow Skid Steer Kubota B2100 Diesel $15,000 Ball Field Groomer 4890 4920 4921 2013 Gravely Base Runner 2009 Smithco Super Star 2007 Smithco Super Star $15,000 Sprayers 4300 4310 1994 Continental Sprayer-300 gallon 2000 Toro Multipro 5500 300-gallon Blowers & Vacuums 4140 4142 4143 4151 4370 4440 4520 4530 4590 4591 4592 4593 4595 4810 4820 4910 5300 5310 5320 5325 1998 Little Wonder Walkbehind Blower 2001 Little Wonder W/B Blower 2001 Giant Blo blower Little Wonder Walkbehind Blower 2008 Echo PB-620 1990 Giant Vac Trailered Vacuum 1605 1993 ECHO PB-400E Backpack Blower 1993 Giant Vac Walk Behind 8HP 1995 ECHO PB1000 handheld blower 2010 Kawasaki KRB750A Backpack Blower 2010 Kawasaki KRB750A Backpack Blower 2010 Kawasaki KRB750A Backpack Blower 2012 Kawasaki KRB750A-A4 Backpack Blower 2007 Kawasaki KRB750B Backpack Blower 2009 Echo PB-500 Backpack Blower 1998 Stihl Backpack Blower BR400 2008 Stihl Backpack Blower BR550 2008 Stihl Backpack Blower BR550 2009 Stihl Backpack Blower BR550 2009 Stihl Backpack Blower BR550 Chainsaws 4160 4730 4740 4750 4760 4771 4780 4791 1999 2011 2007 2015 2011 2009 1999 1997 Stihl HD FS450K Brushcutter Stihl MS 441 Chainsaw Stihl TS 700 Cutquik Concrete saw Stihl MS 251 chainsaw Stihl 026 chainsaw Husky 14" Topper Chainsaw Stihl HT-131 pole saw Stihl MS250 Chainsaw Line Markers 4850 2014 Graco Field Laser S100 96 4860 4870 2011 Jiffy 8000 Line Striper 2014 Graco Field Laser S100 Generators 4270 4271 4272 4273 Coleman 534008 2008 Honda EU1000i 2009 Briggs & Stratton 2008 Honda EB 5000X Trash Pumps 4350 4360 4380 4480 4710 1987 2008 1982 1991 1996 Teel 3" Centrifugal Pump Honda Trash Pump WH20X (Plate Mounted) Teel 3" Centrifugal Pump Teel 2" Centrifugal Pump Wacker 3" Diaphragm Pump Snowblowers 2091 2092 4080 4090 4101 2008 2012 1990 2004 1998 Toro Powerclear Snowthrower Toro Powerclear Snowthrower Honda HS-80 Snowthrower Toro CCR2450 Toro Snowthrower 4200 4201 4930 4940 4950 2008 2011 2008 2008 2008 Toro Toro Toro Toro Toro Powermax 828LXE 1028 OXE Snowthrower Powerclear Snowthrower Powerclear Snowthrower Powermax 1028LXE Bed Edgers 4460 4461 4462 4471 2014 2010 2014 2010 Little Wonder Bed Edger Bed Edger Little Wonder Bed Edger McLane Edger/Trimmer Hedge Trimmers 4900 4902 2004 Stihl HS80 HedgeTrimmer 2012 ECHO Shaft Hedge Trimmer Sidewalk Edgers 4550 4551 2012 Redmax SGCZ2401S Recipicator 2008 Redmax SGCZ2401S Recipicator String Trimmers 4290 4540 4542 4543 4640 4901 5330 5340 5350 2012 2012 2010 2010 2012 2010 2009 2009 2009 Kawasaki KGT27C-4A Kawasaki KGT27C-4A Kawasaki KGT27C-A1 Kawasaki KGT27C-A1 Kawasaki KGT27C-4A Kawasaki KHT750S Stihl FS 46 Stihl FS 110 Stihl FS 110R Attachment/Implement 97 4220 4450 4690 4705 5051 5052 5053 5054 5055 5056 4180 4470 4581 5070 5080 5200 5210 4560 4800 4880 Total 1972 3-Pt Howard Roto Tiller 1991 Troy-Bilt Work Horse Tiller 2010 Field Turf Groomall Seeder Attachment to Aero Vator (SB20) 2010 Bobcat SG60 Stump Grinder Attachment 2001 Bobcat Skid Steer Blower Attachment 2013 SnowSP-6000 1 CY Salt Spreader 2013 925 Gallon Water Tank 2009 Bobcat Angle Broom Attachment 2001 Bobcat Skid Steer 60" Bucket Attachment 1979 Montgomery Ward Cement Mixer 1991 Brutus Court Roller 2012 Wacker/Neuson Stake Pounder 2010 Morbark M-15 Chipper 1984 Sullair 185 CFM Compressor 1990 Lely Fertilizer Spreader 1994 Kalmar AC Forklift 1976 Layton 607-W 3Ton Vib. Roller 2001 LandPride 48" Overseeder Up-Right Man Lift F-5118 $12,000 $20,000 $49,000 $164,000 $154,000 $113,000 $140,000 98 Playground Replacement Schedule - Appendix B Current installation Original Cost Date for anticipated replacement 20 yr Replacement Budget Cedar Lane Tot Lot 2004 $115,000 2024-25 $200,000 Coast Guard Park 1992 $80,000 2025-26 $98,000 Countryside Park 2001 $80,000 2021-22 $205,000 Crestwood Park 2013 $170,000 2033-34 $245,000 Floral Drive 2010 $160,000 2030-31 $200,000 Greenfield Park 2003 $105,000 2023-24 $200,000 Greenview Park 2007 $118,000 2027-28 $212,000 Indian Ridge Park 2010 $285,000 2030-31 $325,000 Meadow Road Tot Lot 2009 $155,000 2029-30 $235,000 Meadowhill Park 1996 $47,000 2018-19 $195,000 Oaklane Park 1999 $65,000 2019-20 $185,500 Salceda North Park 2008 $170,000 2028-29 $245,000 Stonegate Park 1999 $155,000 2016-17 $295,000 Techny Prairie Park and Fields 2006 $124,000 2026-27 $212,000 Village Green Park 2003 $256,000 2023-24 $365,500 Wescott Park 2005 $210,000 2025-26 $365,500 West Park 2005 $153,000 2025-26 $196,000 Williamsburg Square Park 1999 $124,000 2019-20 $212,000 Woods Oaks Green Park 2008 $275,000 2028-29 $413,500 Site Total $4,605,000 99 Golf Fleet Replacement Schedule-Appendix C APPENDIX C Golf Fleet Replacement Schedule No. Year Description 2015-16 2016-17 2017-18 2018-19 2019-20 Fleet Vehicles 6010 6020 6030 2000 2012 2008 Chevy Venture Ford F-250 4X4 Ext Cab (Plow truck) Chevy 2500 HD 4WD (Plow truck) 2008 2006 2006 2002 2006 2004 1993 2008 2006 2008 2009 2011 2011 2012 2012 Procore 648 Aerator Procore 880 Aerator Procore 648 Aerator Vertidrain Deep Tine Aerator John Deere Core Pulveriser Aerway Greens Express 60" Turfco III Topdresser Dakota 410 Turf Tender Topdresser Turfco CR-10 Topdresser Turfco Triwave Overseeder Groom-It Hydraulic Drag Broom Tru-Turf Roller/Spyker Tru-Turf Roller/Spyker Planetair Trifecta TB-200-(Fill and Sweep) $32,000 Aerifying 6090 6100 6110 6120 6130 6140 6160 6170 6180 6190 6200 6210 6220 6230 6240 $17,000 $5,000 Work Vehicles 6300 6310 6320 6330 6340 6350 6360 6370 6380 6390 6400 6410 6420 6430 6440 6450 6460 6470 6490 6500 6510 6520 6530 6540 6550 6560 6570 6580 6590 6595 2003 2013 2001 2007 2002 2005 2006 2006 2011 2007 2013 2011 2011 2006 2006 2011 2011 2013 2013 2013 2006 2001 2000 2011 2011 2008 2009 2003 2003 1996 Yamaha Golf Car John Deere TX Turf Gator Cushman Truckster John Deere TX Turf Gator John Deere Pro Gator 2020 John Deere Gator TX John Deere TX Turf Gator John Deere TX Turf Gator John Deere E Gator John Deere TX Turf Gator John Deere TX Turf Gator 2011 Clubcar Villager Bus 2011 Clubcar Precedent-Electric Toro Workman 2110 Toro Workman 2110 John Deere E Gator Club Car CarryAll II Electric John Deere TX Turf Gator John Deere TX Turf Gator John Deere TX Turf Gator Toro Workman 3200 ADA Golf Car Turf I Carryall Clubcar Precedent Clubcar Precedent John Deere TX Turf Gator John Deere TX Turf Gator Yamaha Golf Car Yamaha Golf Car Club Car Carryall - Beverage Car $20,000 $16,000 100 6600 6610 2010 2003 Club Car Range Picker Yamaha Golf Car $15,000 Riding Tees/Greens Mower 7010 7020 7040 7050 7060 7070 7080 7090 2006 2006 2014 2014 2010 2003 2007 2011 John Deere 2500A Greensmower John Deere 2500A Greensmower Toro Groundsmaster 3300 Toro Groundsmaster 3300 John Deere 2500 E-Cut Tri-Plex Toro 3150 Triplex Greensmower John Deere 2500B Greensmower John Deere 2500E-Cut Tri-Plex $25,000 Walk-Behind Greens Mowers 7200 7210 7220 7230 7240 7250 7260 7270 7280 7290 2005 2005 2005 2005 2008 2008 2008 2008 2010 2010 Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Rough Mowers 7530 7540 7560 7600 7610 2009 2009 2013 1999 1999 Toro Groundsmaster Toro 150" Groundsmaster 4700-D Toro Groundsmaster 4500 36" Bobcat W/B Rotary Mower 36" Bobcat W/B Rotary Mower Fairway Mowers 7180 7190 7570 7590 2008 2007 2012 2013 John Deere 7500 Fairway Mower John Deere 3225C Fairway Mower Toro Reelmaster 5210 Toro RM5210 $45,000 $45,000 Bank Mowers 7700 7710 7720 7730 2010 2010 2014 2007 Toro Toro Toro Toro 3100-D Reelmaster 3100-D Reelmaster GM3500D 3500-D Sidewinder 1999 2010 2004 John Deere 1070 Tractor John Deere 4520 Tractor Bobcat S-250 Skid Steer Tractor 7380 8010 8020 Bunker Rakes 8100 8110 8140 8180 2012 2003 2010 2011 Toro Toro Toro Toro Sand Pro 2020 3020 Sand Pro Bunker Rake 2020 Sand Pro Bunker Rake 2020 Sand Pro Bunker Rake $12,000 101 Sprayers 8150 8160 9340 2007 2009 2009 Toro Multipro 5700-D 300 gallon Sprayer Toro Multipro 5700-D 300 gallon Sprayer Lesco 50 Gallon Sprayer 2005 2003 Foley Accupro Neary 277 Bed Knife Grinder $50,000 $50,000 Grinders 8200 8210 $17,000 Misc. Large Equipment 5610 8500 8520 8580 7000 8021 1992 1987 2011 2008 2009 2000 2007 Brouwer Turf Roller TR224 Ditch Witch Trencher NO Ramp U19 Trailer Provonost P-516/3S Dump Trailer Can-Am Outlander ATV Sand Silo Bobcat SB200-78" Snowblower Attachment Pond Aerators $9,000 Blowers 9020 9030 9050 9070 9080 2006 2007 2008 2011 2012 Billy Goat Force Blower Billy Goat Force Blower Toro Proforce Blower Toro Proforce Blower Buffalo Cyclone Squared Turbine Blower Backpack Blowers 9700 9710 9720 9730 9740 9750 9760 9770 9780 9790 2006 2007 2010 2010 2010 2010 2006 2007 2013 2014 Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B RedMax Backpack Blower Trimmers 9400 9401 9402 9410 9411 9412 9413 9420 9421 9490 9500 9510 9520 9530 2008 2008 2008 2010 2013 2013 2013 2008 2013 2006 2009 2009 2009 2010 RedMax Recip. Brush Cutter MS290 RedMax Recip. Brush Cutter MS290 RedMax Recip. Brush Cutter MS290 Echo Edger BRD 280 Echo SRM 2501 Echo SRM 2501 Echo SRM 2501 Kawasaki Hedge Trimmer Red Max Hedge Trimmer Tanaka TCB-230 String Trimmer Kawasaki KGT35A-A1 (8.5" Sprinkler Head) Kawasaki KGT35A-A1 (7" Sprinkler Head) Kawasaki KGT27B-A1 String Trimmer Kawasaki KBL27B-A2 String Trimmer 102 9560 9570 9580 9591 2009 2009 2009 2009 Kawasaki KGT27A-A1 String Trimmer Kawasaki KGT27B-A1 String Trimmer Kawasaki KGT27B-A1 String Trimmer Kawasaki KGT27A-A1 String Trimmer Chainsaws 9350 9351 9352 9353 9354 2009 2009 2011 2011 2014 Stihl Stihl Stihl Stihl Stihl MS290 MS290 MS192 TC w/case Pole saw 441-CM Hand Mowers 2110 2130 2190 2200 2008 2007 2009 2009 Ariens 21" Walker Ariens 21" Walker Toro 20" Self Propelled Toro 20" Self Propelled Golf Rental Carts (85) Golf Rental Cart Fleet $341,000 103 Carry-Over Projects - Appendix D CAPITAL IMPROVEMENT PLAN 2015-16 Carry-Over Projects Description Account number Budget Year Budget 2014-15 2010-11 2014-15 $12,365.00 $24,950.00 $50,000.00 Parks Velodrome & Stonegate repairs Meadowhill Aquatic Center Retaining Wall Sports Center and West Park Tennis and Track Repairs Replace retaining wall at MAC Upgrade exterior lighting at Sports Center 6300-5825-VE002 63000-5825-11088 48000-5825-SC015 Total Parks $87,315.00 Leisure Services Sports Center Sports Center Low E-Ceiling Phase 1 Tufflex Flooring Replacement 63000-5820-SC018 63000-5820-SC016 Total Leisure Services 2014-15 2014-15 $72,500.00 $360,000.00 $432,500.00 Golf Operations Sportsman's Continued Shoreline Stabilization Phase 4 63400-5870-GD0008 $50,000.00 Total Golf Operations $50,000.00 Grand Total $569,815.00 104