DESIGN DOCUMENTS PRESENTATION

Transcription

DESIGN DOCUMENTS PRESENTATION
September 15, 2014
DESIGN DOCUMENTS PRESENTATION
N E W G L A D E WAT E R M I D D L E S C H O O L
Gladewater Independent School District
Acknowledgments
2
Narrative3
Gladewater Independent School District
Site Analysis
4
Site Plan
5
Floor Plans
6-9
New Middle School
Perspectives10-16
Schedule17
TABLE OF CONTENTS
Huckabee | New Middle School, Gladewater Independent School District
1
Gladewater ISD Board Members
J.P. Richardson, Ed. D. Superintendent
Jon Keller
President
Rickie Blackmon
Vice-President
Jon Rowe
Secretary
Garth Cockerell
Board Member
David Floyd
Board Member
Matt Byrd
Board Member
George Glenn
Board Member
Gladewater Middle School Principals
Gladewater Independent School District
New Middle School
Mr. Chris Langford
Principal
Geoffrey Gregory
Assistant Principal
Project Design Team
Craig Drone
Principal, Huckabee
Terry Salinas
Associate Principal, Huckabee
Konrad Judd, AIA
Lead Designer, Huckabee
Jim Wallace, AIA
Project Designer, Huckabee
Civil Engineering
Johnson Pace
Longview, TX
MEP Engineering
Estes McClure & Associates
Tyler, TX
Food Service
JMK
Rowlette, TX
Structural Engineering
Huckabee
Fort Worth, TX
Technology/Security
Huckabee
Fort Worth, TX
Garland, TX
ACKNOWLEDGMENTS
Huckabee | New Middle School, Gladewater Independent School District
2
Project Introduction:
A new Middle School for Gladewater is planned as part of the May 10, 2014 bond
package. This facility will accommodate the current student population at the middle
school as well as provide for future growth. The following spaces are included in the
program:
- Classrooms for 6th, 7th, 8th grades
- Science labs
- Library with computer lab
- Band Hall with Ensemble Room and Instrument Storage areas
- Choir/Theater Arts Room with dressing rooms
- Two gyms with locker rooms and a Weight Room
Gladewater Independent School District
New Middle School
Site Circulation:
The new Middle School will share a site with the existing Weldon Intermediate
School. Both campuses will have separate access points for vehicular traffic, but will
share a bus loop. Parent pick up and drop off will be accessed from Coach Cooksey
Street, at the west of the site, leading to a visitor parking lot at the main entrance.
Faculty and staff parking is accessed from Saunders Street, and will contain over 120
spaces. In order to avoid school traffic from exiting and entering directly from Loop
485, all traffic is accessed from the side roads. This strategy lessens the volume and
stacked vehicles that would be along Loop 485 on school mornings and afternoons.
The main entry to the school will be at the south side of the site, facing Loop 485.
Athletic fields, located at the west side of the school, will have direct access from the
student locker rooms and the cafeteria. The cafeteria will also have access for the
bus pick up and drop off lanes.
Building Design:
In concept, the middle school will have a central spine, or main corridor, that runs
the length of the building. This layout separates the larger common areas from
the classrooms, and also serves as a buffer to separate the loud rooms from the
classrooms. This main corridor will have light wells and clerestory glazing to allow
natural light into the first floor. Stairways will be open to the corridor and designed
as communicating spaces. At the east side of the spine will be the classroom wing.
Classrooms and science labs for 6th, 7th, and 8th grades will be a two-story portion
of the building.
Larger spaces, such as the band hall and gyms, will be on the opposite side of this
central spine, and provide easy access to these common areas for students. The
stage sits in between the cafeteria and the competition gym and is shared by both
to give flexibility for a variety of uses.
Athletic and PE locker rooms are located along the north and west sides, adjacent
to the gyms. A PE gym and a competition gym are located next to each other. A
weight room will be across the corridor from the gym. During athletic events, the
west entry will serve as a public entrance and will have restrooms and a concessions
area. Staff parking at the west side will be utilized for events and special activities.
The Fine Arts wing will be located at the south part of the building, and will include
a Band Hall with an ensemble room, a Choir Hall which will also be used as a Theater
Arts room, instrument storage, and an art classroom with an attached kiln room.
Access from the exterior will be provided to the Band Hall, for ease of loading and
unloading instruments and equipment. Dressing rooms, restrooms, and storage
rooms will be located near the center of the Fine Arts area for shared use.
The interior concept for the new Middle School for Gladewater is to provide a sense
of pride within the students, teachers, and faculty using timeless colors and durable
materials. The interior spaces will complement Weldon Intermediate.
NARRATIVE
Huckabee | New Middle School, Gladewater Independent School District
3
Abandoned
Public Pool
Existing Gas Line
Slope of High Side
Site
Low Side
Proposed
Site
Low Side
View to Site
SITE ANALYSIS
Huckabee | New Middle School, Gladewater Independent School District
4
Faculty/Staff &
Event Parking
Saunders St.
Existing
Parking
Existing Weldon
Building
Bus Loo
p
Faculty and Staff
Parking
Existing Gym
Coach Cooksey St.
I.S. Bus Loop
Faculty and Staff
Parking
New Middle
School
Service
New Weldon
Addition
Playground
Visitor Parking
Roden Lane
Existing
Service
M.S. Bus Loop
Visitor Parking
M.S. Parent Drive Loop
S. Loop 485
SITE PLAN
Huckabee | New Middle School, Gladewater Independent School District
5
FOR SECURITY PURPOSES, THE FLOOR PLANS HAVE BEEN REMOVED.
PLEASE CONTACT THE DISTRICT FOR COPIES.
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
10
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
11
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
12
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
13
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
14
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
15
PERSPECTIVE
Huckabee | New Middle School, Gladewater Independent School District
16
MASTER SCHEDULE
2014
April
May
2015
July
June
Aug.
Sept.
Oct.
Nov.
Dec.
Jan.
Feb.
Mar.
April
May
June
July
Aug.
COMPLETE
06.23.14
Pre-Design
START
05.13.14
COMPLETE
06.11.14
Conceptual Design
START
05.27.14
COMPLETE
07.21.14
Schematic Design
START
06.11.14
COMPLETE
08.18.14
Design Development
START
07.21.14
COMPLETE
09.26.14
Construction Documents
START
08.19.14
COMPLETE
12.05.14
Jurisdictional Review
START
09.26.14
COMPLETE
11.17.14
Bid and Award
START
09.29.14
COMPLETE
08.20.15
START
11.20.14
Construction
SCHOOL STARTS
08.24.15
TODAY
SCHEDULE
Huckabee | New Middle School, Gladewater Independent School District
17